HomeMy WebLinkAbout6282-2------- - -- --------
I--- - - -_ - ---_ -(t_ -------------------------------
__--- _ p-----------� -----------_
- - - - -
------------------- - - - - - - -
- - - - - - - - - - - - - - -
99-4-'2'-0"7 611
'-
31+On 32+00 33+00 _ _ 34+00 35+00 36+00
W I- e
- - - h - - _
j lJ RupA AV
Q
HARDSCAPE LEGEND
1. CONCRETE PAVING WITH NATURAL COLORAND HAND
SEEDED AGGREGATE,'
'GOLDEN EYE"PEBBLES PEBBLES WITH MEDIUM REVEAL FROM
SOUTHWEST BOULDER. (619) 751.3333
2. COBBLE STONE SET IN MORTAR
)N(5XAT79D
HUNTER LANDSCAPE
BENCH MARK: 711 S. Fee Ana Street
SAN BERNARDINO COUNTY TBM PER FIELD BOOK 4015/848 Placentia, California 92870 TWO
DAYS
ELEVATION - 1019.83'. DATUM - 1929 Ph: 714.986.2400 YW pG YO p�IG
RAILROAD SPIKE IN POWER POLE #71833, N.E. CORNER Fax: 714.986.2408 TOLL �-�->
POPLAR AVE. & SANTA ANA AVE. ESr. FROM BM B-38. A PUI�>� ALM
w
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
STANDARDS IN EFFECT.
DESCRIPTION DATE ENGR. CfTY DATE
�� `PNDSCApF
(7 � DRAWN BY:
PREPARED UNDER THE SUPERVISION OR
4L 1/31/2023 DESIGNED BY:
U�l9TF o
OFCA0FDCHECI�D BY:
Thomas Hays DATE 11.7.22
N
0 10' 20' 40'
CITY OF FONTANA, CALIFORNIA
JURUPA AVENUE STREET IMPOVEMENTS
SCALE:
Hardscape Plan DAM AS NOTED
APPROVED JAN. M. 2023
APPROVED BY: 01.116.12023 rgaray FOR DRAWING No.: 2
GIA LAM KIM CITY ENGINEER R.C.E. 62296 DATE 6282