Loading...
HomeMy WebLinkAbout6277-1DUKE - CITRUS AND SLOVER AVE INSPECTION NOTES: 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6632 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE -CONSTRUCTION INSPECTION INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDE INITIAL AND FINAL TESTS. FINISH GRADE PRIOR TO PLANTING PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS AND PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. 4. A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE DESIGNER OF THE LANDSCAPE PLANS, IRRIGATION PLANS OR THE LICENSED LANDSCAPE CONTRACTOR OF THE PROJECT. 5. COMPLY WITH SECTION 28-1 17 VERIFICATION OF LANDSCAPE INSTALLATION WITH THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734. 6. NO CERTIFICATE OF OCCUPANCY SHALL BE ISSUED UNTIL A CITY LANDSCAPE INSPECTOR HAS VERIFIED THAT ALL IRRIGATION, GRADING AND PLANTING HAVE BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS OF SECTION 28-117 WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE # 1734. 7. AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED PER SECTION 28-1 17 WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734. SOILS MANAGEMENT PLAN REQUIREMENTS: CONTRACTOR SHALL OBTAIN SOILS TESTS COVERING ALL PLANTING AREAS AFTER COMPLETION OF FINISH GRADING AND PRIOR TO START OF SOIL PREPARATION WORK. TESTS SHALL BE PERFORMED BY AN APPROVED CALIFORNIA AGRONOMIC SOILS TESTING LABORATORY AND SHALL INCLUDE A FERTILITY AND SUITABILITY ANALYSIS WITH WRITTEN RECOMMENDATIONS FOR SOIL PREPARATION AND PLANTING BACKFILL MIX. THE AMENDMENTS IN THESE SPECIFICATIONS ARE THE MINIMUM REQUIREMENT AND ARE FOR BID PURPOSES. ALL SOILS CONDITIONING AND AMENDMENTS SHALL BE PER THE FINAL SOIL REPORT RECOMMENDATIONS. THE MINIMUM AMENDMENT AND FERTILIZER APPLICATION RATES SPECIFIED HEREIN ONLY WHEN THEY EXCEED THE SPECIFIED MINIMUMS. THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING: THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE OF COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY. THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE INSTALLATION OF ANY PLANT MATERIAL. THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL MANAGEMENT REPORT RECOMMENDATIONS. AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE PROPERTY WITH A CERTIFICATE OF COMPLETION , CERTIFICATION OF INSTALLATION, IRRIGATION SCHEDULE OF LANDSCAPE AND MAINTENANCE. CITY REQUIRED STATEMENT: I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND HAVE SUBMITTED A COMPLETE LANDSCAPE DOCUMENT PACKAGE. 11/15/2022 THOMAS HAYES Sheet Index 1 Cover Sheet 2 Irrigation Plan 3 Irrigation Schedules 4 Irrigation Details 5 Irrigation Details 6 Irrigation Details 7 Planting Plan 8 Planting Details 9 Specifications 10 Specifications Contact Info Owner/Applicant: Duke Realty Name: Kyle Ficke Address: Spectrum Center Drive, Suite 1600 Irvine, Ca 92618 Phone: 949-797-7042 Civil Engineer: Albert A. Webb Associates Name: Byanka Velasco Address: 3788 McCrary Street Riverside, Ca 92506 Phone:951-320-6001 Landscape Architect: Hunter Landscape Name: Tom Hayes Address: 711S. Fee Ana Street Placentia, Ca 92870 Phone: 714-986-2400 Water District: Fontana Water Company Name: Joshua Swift Address: 15966 Arrow Route Fontana, Ca 92335 Phone:909-822-2201 Electrical: Southern California Edison Phone:1-800-655-4555 ABBREVIATIONS I General Notes I Vicinity Map AC CJ ASPHALT CONCRETE COLD JOINT PIP POURED IN PLACE PROPERTY LINE �ONC CENTERLINE CONCRETE or RAD R RADIUS RISER CONT DIA CONTINUOUS DIAMETER RWD RS REDWOOD ROUGH SAWN D.F. EA DOUGLAS FIR EACH SL SHT SCORELINE SHEET EJ EQ EXPANSION JOINT EQUAL SPECS SQ SPECIFICATIONS SQUARE EXIST. FRH EXISTING FIRE HYDRANT STD STRUCT STANDARD STRUCTURAL FS FT FINISH SURFACE FEET S4S T SURFACE FOUR SIDES TREAD FTG FOOTING THK THICK GA GALV GAUGE GALVANIZE(D) TOC TYP TOP OF CONCRETE or CURB TYPICAL GB HP GRADE HIGH POINT TOW TOF TOP OF WALL TOP OF FOOTING MAX MIN MAXIMUM MINIMUM UNO VEH UNLESS NOTED OTHERWISE VEHICULAR NIC NTS NOT IN CONTRACT NOT TO SCALE VERT WWM VERTICAL WOVEN WIRE MESH OC PA ON CENTER PLANTING AREA WI d WROUGHT IRON NAIL PENNY SIZE IRRIGATION 1. FINAL LOCATION OF CONTROLLER TO BE DETERMINED IN THE FIELD WITH APPROVAL OF OWNER AND LANDSCAPE ARCHITECT 2. REFER TO GENERAL IRRIGATION NOTES ON IRRIGATION PLAN. PLANTING 1. ALL BOX TREES ARE TO BE SELECTED BY THE LANDSCAPE ARCHITECT. 2. CONTRACTOR IS TO SPOT ALL PLANT MATERIAL AND HAVE LANDSCAPE ARCHITECT APPROVE THE SPOTTING PRIOR TO THE EXCAVATION OF ANY PLANT PIT. ALLOW 48 HOURS LEAD TIME. ANY TREE, SHRUB, OR VINE THAT IS PLANTED WITHOUT APPROVAL OF THE LANDSCAPE ARCHITECT MAY BE MOVED AT THE CONTRACTOR'S EXPENSE. 3. REMOVE STAKES FROM ALL ESPALIERS AND VINES AND ATTACH TO WALLS, POST, ETC. 4. PRIOR TO PLANTING INSTALLATION, CONTRACTOR SHALL HAVE SOIL TESTED AND SEND RESULTS TO PUBLIC WORKS INSPECTOR. REFER TO SPECIFICATIONS FOR SOIL PREPARATION INFORMATION. 5. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR FOR FINAL INSPECTION WHEN INSTALLATION IS COMPLETE, AND FOR A FINAL MAINTENANCE INSPECTION AT THE END OF THE MAINTENANCE PERIOD. HUNTER LANDSCAPE BENCH MARK: 711 S. Fee Ana Street SAN BERNARDINO COUNTY TBM PER FIELD BOOK 4015/848 Placentia, California 92870 ELEVATION = 1019.83% DATUM = 1929 Ph: 714.986.2400 RAILROAD SPIKE IN POWER POLE /71833, N.E. CORNER Fax: 714.986.2408 POPLAR AVE. & SANTA AM AVE. EST. FROM BM B-38. DIAL �IIIITWO WORKING L YOU DI YOU i �� :0 00 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT POTABLE WATER TOTAL LANDSCAPE AREA: 15,662 SQ. FT. CITY REQUIRED NOTES: A MINIMUM 3" LAYER OF MULCH SHALL BE APPLIED ON ALL EXPOSED SOIL SURFACES OF PLANTING AREAS EXCEPT TURF AREAS, CREEPING OR ROOTED GROUNDCOVERS, OR DIRECT SEEDING APPLICATIONS WHERE MULCH IS IS CONTRAINDICATED. FOR SOILS LESS THAN 6% ORGANIC MATTER IN THE TOP 6" OF SOIL, COMPOST AT A RATE OF A MINIMUM OF FOUR CUBIC YARDS PER 1,000 SQUARE FEET OF PERMEABLE AREA SHALL BE INCORPORATED TO A DEPTH OF SIX INCHES INTO THE SOIL. RECIRCULATING WATER SYSTEMS SHALL BE USED FOR WATER FEATURES (DOES NOT APPLY) PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES. CHECK VALVES OR ANTI -DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR. A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES. A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE DESIGNER OF THE LANDSCAPE PLANS, IRRIGATION PLANS, OR THE LICENSED LANDSCAPE CONTRACTOR FOR THE PROJECT. COMPLY WITH SECTION 28-117 VERIFICATION OF LANDSCAPE INSTALLATION WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734. WITH REGARDS TO LANDSCAPE MAINTENANCE DISTRICTS OR PUBLIC LANDSCAPE, IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO COMPLY WITH FCC SECTION 28-118, SPECIAL LANDSCAPE DISTRICT REQUIREMENTS. SHOULD CONSTRUCTION OF THE REQUIRED Q PNos�p IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON `? DRAWN BY: AND CARRIED FORTH IN A DILIGENT MANNER, THE PREPARED UNDER THE SUPERVISION OR CITY ENGINEER MAY REQUIRE REVISIONS TO THE 1/31/2023 DESIGNED Br: PLANS TO BRING THEM INTO CONFORMANCE WITH sT'F of°caue�R�,e STANDARDS IN EFFECT. Th- Hq.a DATE: 11.15.22 10 Freeway SITE slaver Ave a a Q 2 � a U � U CITY OF FONTANA, CALIFORNIA Citrus and Slover Ave Street Improvements Cover Sheet DATE: APPROVED Nw ffdw Ift. 2022 iPPROVED BY. 01 `16t2023 rgaray FOR DRAWING NO.: GIA LAM KIM CRY ENGINEER RCE 62296 DATE 6277 F , 0