This technical memorandum presents a comparative analysis of the air quality, energy, and greenhouse gas
(GHG) impacts of the proposed Santa Ana & Live Oak Project (proposed project), located on the northwest
corner of Live Oak Avenue and Santa Ana Avenue in the City of Fontana. The 13.8-acre proposed project
site is within the Southwest Industrial Park Specific Plan (SWIP), which designated the site as industrial with
a maximum FAR of 0.8, or 484,387 square feet (SF). This buildout was evaluated in the SWIP Final EIR (Final
EIR). The proposed project would develop a 319,956 square foot unrefrigerated high-cube warehouse. The
proposed project would demolish the existing structures on the site, which consist of various wooden structures.
To support the CEQA document for the proposed project, this report analyzes the proposed project’s
construction and net operational impacts to air quality (emission of criterial pollutants) emissions using the
California Emissions Estimator Model (CalEEMod) land use emission model. Table 1 shows the estimated
construction schedule, which is expected to last about 19 months.
Table 1. Construction Schedule
Activity Start Date End Date Total Days
Demolition 10/1/2022 10/14/2022 10
Site Preparation 10/15/2022 10/28/2022 10
Grading 10/29/2022 12/9/2022 30
Trenching 12/10/2022 12/23/2022 10
Building Construction 12/24/2022 2/16/2024 300
Paving 2/17/2024 3/15/2024 20
Architectural Coating 3/16/2024 4/19/2024 25
Source: CalEEMod Sheets
Summary of Air Quality, Energy and GHG Impacts
Air Quality:
The proposed project’s maximum daily emissions (regional and local) for construction and operation of the
project would not exceed the South Coast Air Quality Management District’s (SCAQMD) regional or local
thresholds of significance. The proposed project would generate less or equal regional and local emissions
of ROG, SO2, PM10, and PM2.5, when compared to the approved previous SWIP, while generating less than
significant but higher emissions of NOx and CO.
In addition, all construction activities would be required to comply with applicable SCAQMD rules and
regulations, including Rule 403 to minimize fugitive PM dust emissions and Rule 1113 which allows only Low-
Volatile Organic Compounds (VOC) paints. Projects that do not exceed the regional thresholds are assumed
to not have a significant impact on a project level and cumulative level. Therefore, the proposed project
would have less than significant air quality impacts, and no new impacts would result.
To: City of Fontana, Planning Division
From: Alex J. Garber
Date: 6/17/2022
Re: Air Quality, Energy, and Greenhouse Gas Impact Analysis for the Santa Ana & Live
Oak Development
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
2
Energy:
The proposed project’s energy consumption for construction activities related to redevelopment of the site
for new industrial warehousing uses would be permitted to require compliance with existing fuel standards,
machinery efficiency standards, and CARB requirements that limit idling of trucks. Through compliance with
existing standards the proposed project would not result in demand for fuel greater on a per-development
basis than other development projects in Southern California. There are no unusual project characteristics
that would cause the use of construction equipment that would be less energy efficient compared with other
similar construction sites in other parts of the State. The operation of the proposed project would consume
less electricity, natural gas, gasoline, and diesel then assumed by the Final EIR due to the reduction in building
size and associated vehicular/truck trips. In addition, the proposed project is similar to other industrial
projects and would comply with incumbent Title 24 standards as well as all applicable City business and
energy codes and ordinances. Therefore, the proposed project would not result in a new impact related to
energy consumption.
GHG:
The proposed project would generate 4,636 MTCO2e per year, 1,557 MTCO2e less than the previous SWIP
analysis. Therefore, the proposed project would not result in a new impact related to GHG emissions as
compared to the approved SWIP.
In addition, the proposed projects net GHG emissions when taking account for the existing emissions would
be 1,747 MTCO2e, below the 3,000 MTCO2e per year screening threshold set by the City of Fontana.
Therefore, net new GHG emissions would not be significant.
Air Quality Impact Tables
Methodology and Model Inputs
To calculate the net operational impacts, the previous SWIP industrial warehouse air quality analysis
emissions was run using CalEEMod (v2022.1), as the previous analysis was done using an older model not in
use anymore. For the previous SWIP and proposed project, ITE Trip Generation Manual 11th Edition rates for
warehouse (Land Use Code 150) was used to be consistent with the proposed project’s Trip Generation and
VMT analysis1. In addition to comparing the proposed project to the previously SWIP, a net operational
analysis was completed, which compared the existing trailer storage operation (existing) to the proposed
project, for informational purposes. Counts were taken at the existing driveways to calculate an accurate
trip generation for the existing operations on the project site.
The area, energy, and mobile emissions were calculated for the maximum buildout of the site pursuant to the
SWIP, proposed project, and existing site. CalEEMod defaults for area, energy, and mobile analysis (other
than the trip generation) was used for the existing operation. For the maximum buildout of the site pursuant
to the SWIP and proposed project analysis, CalEEMod Defaults were used other than for three and four+
axle trucks, medium heavy duty and heavy heavy duty respectively, trip lengths. A trip length of 40 miles2
was used, and the following mitigation measures from the SWIP Final EIR that are applicable to the project
were incorporated:
4.2‐1a All construction equipment shall be maintained in good operating condition to reduce emissions.
The construction contractor shall ensure that all construction equipment is being properly
serviced and maintained as per the manufacturer’s specification. Maintenance records shall be
available at the construction site for City verification. [GPEIR MM AQ‐1]
4.2‐1b Prior to the issuance of any grading permits, all applicants shall submit construction plans to
the City of Fontana denoting the proposed schedule and projected equipment use. Construction
1 Trip Generation and Vehicle Miles Traveled (VMT) Screening Analysis, EPD Solutions, 2022
2 SCAQMD High-Cube Warehouse Vehicle Trip Generation Analysis (October 2016)
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
3
contractors shall provide evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for the project. Contractors
shall also conform to any construction measures imposed by the SCAQMD as well as City
Planning Staff. [GPEIR MM AQ‐2]
4.2‐1c All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule
1113. [GPEIR MM AQ‐3]
4.2‐1d Projects that result in the construction of more than 19 single‐family residential units, 40
multifamily residential units, or 45,000 square feet of retail/commercial/industrial space shall
be required to apply paints either by hand or high volume, low pressure (HVLP) spray. These
measures may reduce volatile organic compounds (VOC) associated with the application of
paints and coatings by an estimated 60 to 75 percent. Alternatively, the contractor may specify
the use of low volatility paints and coatings. Several of currently available primers have VOC
contents of less than 0.85 pounds per gallon (e.g., dulux professional exterior primer 100
percent acrylic). Top coats can be less than 0.07 pounds per gallon (8 grams per liter) (e.g.,
lifemaster 2000‐series). This latter measure would reduce these VOC emissions by more than
70 percent. Larger projects should incorporate both the use of HVLP or hand application and
the requirement for low volatility coatings. [GPEIR MM AQ‐4]
4.2‐1e All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108.
4.2‐1f Prior to the issuance of grading permits or approval of grading plans for future development
projects within the project area, future developments shall include a dust control plan as part
of the construction contract standard specifications. The dust control plan shall include measures
to meet the requirements of SCAQMD Rules 402 and 403. Such measures may include, but are
not limited to, the following:
• Phase and schedule activities to avoid high‐ozone days and first‐stage smog alerts.
• Discontinue operation during second‐stage smog alerts.
• All haul trucks shall be covered prior to leaving the site to prevent dust from impacting the
surrounding areas.
• Comply with AQMD Rule 403, particularly to minimize fugitive dust and noise to
surrounding areas.
• Moisten soil each day prior to commencing grading to depth of soil cut.
• Water exposed surfaces at least twice a day under calm conditions, and as often as
needed on windy days or during very dry weather in order to maintain a surface crust and
minimize the release of visible emissions from the construction site.
• Treat any area that will be exposed for extended periods with a soil conditioner to
stabilize soil or temporarily plant with vegetation.
• Wash mud‐covered tires and under carriages of trucks leaving construction sites.
• Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by
construction vehicles or mud, which would otherwise be carried off by trucks departing
project sites.
• Securely cover all loads of fill coming to the site with a tight‐fitting tarp.
• Cease grading during periods when winds exceed 25 miles per hour.
• Provide for permanent sealing of all graded areas, as applicable, at the earliest
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
4
practicable time after soil disturbance.
• Use low‐sulfur diesel fuel in all equipment.
• Use electric equipment whenever practicable.
• Shut off engines when not in use.
4.2‐2c All industrial and commercial facilities shall post signs requiring that trucks shall not be left
idling for prolonged periods pursuant to Title 13 of the California Code of Regulations, Section
2485, which limits idle times to not more than five minutes [GPEIR MM AQ‐9].
4.2‐2d The City shall require that both industrial and commercial uses designate preferential parking
for vanpools. [GPEIR MM AQ‐10]
4.2‐2f All industrial and commercial site tenants with 50 or more employees shall be required to post
both bus and MetroLink schedules in conspicuous areas. [GPEIR MM AQ‐12]
4.2‐2g All industrial and commercial site tenants with 50 or more employees shall be requested to
configure their operating schedules around the MetroLink schedule to the extent reasonably
feasible. [GPEIR MM AQ‐13]
4.2‐2j All residential, commercial, and industrial structures shall be required to incorporate light
colored roofing materials. [GPEIR MM AQ‐16]
4.2‐2k Prior to approval of future development projects within the project area, the City of Fontana
shall conduct project‐level environmental review to determine potential vehicle emission impacts
associated with the project(s). Mitigation measures shall be developed for each project as it is
considered to mitigate potentially significant impacts to the extent feasible. Potential mitigation
measures may require that facilities with over 250 employees (full or part‐time employees at
a worksite for a consecutive six‐month period calculated as a monthly average), as required
by the Air Quality Management Plan, implement Transportation Demand Management (TDM)
programs.
4.2‐2l New warehouse facilities or distribution centers that generate a minimum of 100 truck trips per
day, or 40 truck trips with transport refrigeration units (TRUs) per day, or TRU operations
exceeding 300 hours per week shall not be located closer than 1,000 feet from any existing
or proposed sensitive land use such as residential, a hospital, medical offices, day care facilities,
and/or fire stations (pursuant to the recommendations set forth in the CARB Air Quality and
Land Use Handbook).
This MM is satisfied by the results shown in the Santa Ana & Live Oak Heath Risk Assessment. In
addition, the net truck trips generated by the proposed project is less than the existing use.
4.2-5a Prior to the issuance of building permits, future development projects shall demonstrate the
incorporation of project design features that achieve a minimum of 28.5 percent reduction in
GHG emissions from business as usual conditions. Future projects shall include:
Energy Efficiency
• Design buildings to be energy efficient and exceed Title 24 requirements by at least 5
percent.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
5
• Install efficient lighting and lighting control systems. Site and design building to take
advantage of daylight.
• Use trees, landscaping and sun screens on west and south exterior building walls to reduce
energy use.
• Install light-colored “cool” roofs and cool pavements.
• Provide information on energy management services for large energy users.
• Install energy-efficient heating and cooling systems, appliances and equipment, and control
systems (e.g., minimum of Energy Star rated equipment).
• Implement design features to increase the efficiency of the building envelope (i.e., the
barrier between conditioned and unconditioned spaces).
• Install light-emitting diodes (LEDs) for traffic, street, and other outdoor lighting.
• Limit the hours of operation of outdoor lighting.
Renewable Energy
• Install solar panels on carports and over parking areas. Ensure buildings are designed to
have “solar ready” roofs.
• Use combined heat and power in appropriate applications.
Water Conservation and Efficiency
• Create water-efficient landscapes with a preference for a xeriscape landscape palette.
• Install water-efficient irrigation systems and devices, such as soil moisture-based irrigation
controls.
• Design buildings to be water efficient. Install water-efficient fixtures and appliances (e.g.,
EPA WaterSense labeled products).
• Restrict watering methods (e.g., prohibit systems that apply water to non-vegetated
surfaces) and control runoff.
• Restrict the use of water for cleaning outdoor surfaces and vehicles.
• Implement low-impact development practices that maintain the existing hydrologic character
of the site to manage storm water and protect the environment. (Retaining storm water runoff
onsite can drastically reduce the need for energy-intensive imported water at the site).
• Devise a comprehensive water conservation strategy appropriate for the project and
location. The strategy may include many of the specific items listed above, plus other
innovative measures that are appropriate to the specific project.
• Provide education about water conservation and available programs and incentives.
Solid Waste Measures
• Reuse and recycle construction and demolition waste (including, but not limited to, soil,
vegetation, concrete, lumber, metal, and cardboard).
• Provide interior and exterior storage areas for recyclables and green waste and adequate
recycling containers located in public areas.
• Provide education and publicity about reducing waste and available recycling services.
Transportation and Motor Vehicles
• Limit idling time for commercial vehicles, including delivery and construction vehicles.
• Promote ride sharing programs (e.g., by designating a certain percentage of parking
spaces for ride sharing vehicles, designating adequate passenger loading and unloading and
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
6
waiting areas for ride sharing vehicles, and providing a website or message board for
coordinating rides).
• Create local “light vehicle” networks, such as neighborhood electric vehicle (NEV) systems.
• Provide the necessary facilities and infrastructure to encourage the use of low or zero-
emission vehicles (e.g., electric vehicle charging facilities and conveniently located alternative
fueling stations).
• Promote “least polluting” ways to connect people and goods to their destinations.
• Incorporate bicycle lanes and routes into street systems, new subdivisions, and large
developments.
• Incorporate bicycle-friendly intersections into street design.
• For commercial projects, provide adequate bicycle parking near building entrances to
promote cyclist safety, security, and convenience. For large employers, provide facilities that
encourage bicycle commuting (e.g., locked bicycle storage or covered or indoor bicycle
parking).
• Create bicycle lanes and walking paths directed to the location of schools, parks and other
destination points.
Table 2 provides the details used for the analysis for each facility.
Table 2. Existing, SWIP Final EIR Buildout, and Proposed Project Data Inputs
Metric Existing SWIP Final EIR Buildout Proposed Project
Building Size 13.8 Acres 484.387 TSF 319.956 TSF
Base Year 2024 2024 2024
CalEEMod Land Use Parking Lot Unrefrigerated
Warehouse No Rail
Unrefrigerated
Warehouse No Rail
Daily Trip rate From counts at project
driveways. 1.71 1.71
Fleet Mix
746 Total trips: 307
Passenger trips, 140 2-
Axle truck trips, 116 3-
Axle truck trips, and 183
4+-Axle truck trips
822 Total trips, 596
Passenger trips, 38 2-Axle
truck trips, 47 3-Axle truck
trips, and 141 4+-Axle
truck trips
547 Total trips, 397
Passenger trips, 25 2-Axle
truck trips, 31 3-Axle truck
trips, and 94 4+-Axle
truck trips
Trip Distances CalEEMod Defaults
Passenger Vehicles and 2-
Axle trucks: (CalEEMod
Defaults)
3-Axle and 4+-Axle
Trucks (40 miles, 100
percent primary trips)
Passenger Vehicles and 2-
Axle trucks: (CalEEMod
Defaults)
3-Axle and 4+-Axle
Trucks (40 miles, 100
percent primary trips)
TSF: Thousand Square Feet
DU: Dwelling Unit
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
7
Regional Emissions
The SCAQMD has adopted maximum daily emission thresholds3 (pounds/day) for the criteria pollutants
during construction and operation of a project. The SCAQMD regional thresholds that apply to criteria
pollutants are listed in Table 3: Regional Construction Emissions Estimates, Table 4: Regional Comparative
Operational Emissions Estimates, and Table 5: Regional Net Operational Emissions Estimates. The estimated
CalEEMod emissions include the project emissions generated both from onsite sources (such as off-road
construction equipment and fugitive dust) and offsite sources (vehicle travel leaving and arriving to the site).
As shown in Table 3, Table 4, and Table 5, the proposed project would result in less than significant regional
air quality impacts. In addition, the proposed project is estimated to generate less ROG, SO2, PM10, and
PM2.5 emissions than the SWIP development assumptions.
Table 3. Regional Construction Emission Estimates
Construction Activity
Maximum Daily Regional Emissions
(pounds/day)
ROG NOx CO SO2 PM10 PM2.5
2022
Demolition 3.1 31.8 26.4 0.0 2.9 1.5
Site Prep 5.3 51.2 40.6 0.1 8.4 5.2
Grading 4.6 44.6 35.2 0.1 4.8 3.0
Trenching 0.9 7.2 10.3 0.0 0.3 0.3
Building Construction 2.3 17.7 26.1 0.0 0.9 0.7
Maximum Daily Emissions 5.3 51.2 40.6 0.1 8.4 5.2
2023
Building Construction 2.2 15.7 27.8 0.0 0.8 0.6
Maximum Daily Emissions 2.2 15.7 27.8 0.0 0.8 0.6
2024
Building Construction 2.0 14.9 23.8 0.0 0.8 0.6
Paving 1.6 7.9 11.0 0.0 0.4 0.4
Architectural Coating 63.5 1.4 3.8 0.0 0.1 0.0
Maximum Daily Emissions 63.5 14.9 23.8 0.0 0.8 0.6
Maximum Daily
Emission 2022-2024 63.5 51.2 40.6 0.1 8.4 5.2
SCAQMD Significance
Thresholds 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
Source: CalEEMod Sheets
3 SCAQMD April 2019. Found on 9/3/2020 at http://www.aqmd.gov/docs/default-
source/ceqa/handbook/scaqmd-air-quality-significance-thresholds.pdf
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
8
Table 4. Regional Comparative Operational Emission Estimates
Operational Activity
Maximum Daily Regional Emissions
(pounds/day)
ROG NOx CO SO2 PM10 PM2.5
Area 9.6 0.1 13.9 0.0 0.0 0.0
Energy 0.1 1.6 1.4 0.0 0.1 0.1
Mobile 3.5 18.6 23.8 0.2 3.9 1.0
Off Road 0.0 14.1 141.0 0.0 0.0 0.0
Stationary 0.4 1.1 1.0 0.0 0.1 0.1
Total Proposed Project
Operational Emissions 13.5 35.6 181.1 0.2 4.1 1.2
Total SWIP Site Buildout
Operational Emissions 19.9 30.8 59.2 0.3 6.1 1.8
Total Net Operational
Emissions -6.4 4.8 121.9 -0.1 -2.0 -0.6
SCAQMD Significance
Thresholds 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Source: CalEEMod Sheets
Table 5. Regional Net Operational Emission Estimates
Operational Activity
Maximum Daily Regional Emissions
(pounds/day)
ROG NOx CO SO2 PM10 PM2.5
Area 9.6 0.1 13.9 0.0 0.0 0.0
Energy 0.1 1.6 1.4 0.0 0.1 0.1
Mobile 3.5 18.6 23.8 0.2 3.9 1.0
Off Road 0.0 14.1 141.0 0.0 0.0 0.0
Stationary 0.4 1.1 1.0 0.0 0.1 0.1
Total Project Operational
Emissions 13.5 35.6 181.1 0.2 4.1 1.2
Existing Operational
Emissions 3.5 18.5 21.8 0.2 3.7 1.0
Total Net Operational
Emissions 10.0 17.1 159.3 0.0 0.4 0.2
SCAQMD Significance
Thresholds 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Source: CalEEMod Sheets
Local Emissions
Localized significance thresholds (LSTs) were also adopted by the SCAQMD due to project-related
construction or operational air emissions having the potential to exceed the state and national air quality
standards in the project vicinity, while not exceeding the regional emission significance thresholds adopted
by the SCAQMD. These thresholds set the maximum rates of daily construction or operational emissions from
a project site that would not exceed a national or State ambient air quality standard4. The differences
between regional thresholds and LSTs are as follows:
1. Regional thresholds include all sources of project construction and operational emissions generated
from onsite and offsite emission sources whereas the LSTs only consider the emissions generated from
onsite emission sources.
2. LSTs only apply to CO, NOx, PM10, and PM2.5, while regional thresholds include both ROG and SOx.
4 SCAQMD 2008: Final Localized Significance Threshold Methodology. Referenced on 9/3/2020 at
http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/localized-significance-thresholds/final-lst-
methodology-document.pdf
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
9
3. Regional Thresholds apply to emission sources located anywhere within the SCAQMD whereas the
LSTs are location dependent and also depend on the size of the project, and emission location
relative to the nearest sensitive receptor.
A sensitive receptor is defined as an individual who is most susceptible to negative health affects when
exposed to air pollutants including children, the elderly, and adults with chronic health issues. Such receptors
include residences, schools, elderly care centers, and hospitals. SCAQMD provides screening look up tables
(Appendix C of the SCAQMD 2008 Final Localized Significance Threshold Methodology)5 for projects that
disturb less than or equal to 5 acres in size in a day. These tables were created to easily determine if the
daily emissions of NOx, CO, PM10, and PM2.5 from a project could result in a significant impact to the local
air quality. The thresholds are determined by:
• Source receptor area (SRA), the geographic area within the SCAQMD that can act as both a source
of emissions and a receptor of emission impacts (project is located within SRA 34, Central San
Bernardino County),
• Size of grading disturbance (construction)/size of the project (operation),
• Distance to the nearest sensitive receptor.
The project construction phase with the most ground disturbance would be the site preparation phase, which
would grade 3.5 acres per day, so 3.5 acres was used for the look up tables. The thresholds for 3.5 acres
were interpolated from Appendix C using the thresholds for 2 acres and 5 acres. Distance to the nearest
sensitive receptor also determines the emission thresholds. The sensitive receptors closest to the project include
a residence west of the project site boundary, about 32 meters (104 feet). The distance of 25 meters
provided in the lookup tables was used for a conservative analysis. Table 6: Localized Construction Emission
Estimates shows the thresholds and estimated maximum daily construction emissions for the proposed project.
As seen in Table 5, the proposed project has a less then significant localized construction air quality impact.
The LSTs for operation are determined by the size of the project site and the distance to the nearest sensitive
receptor. The proposed project is 13.8 acres; therefore, the LST 5-acre thresholds were used for a
conservative analysis. No credit was taken from the existing use for the LST analysis; however, the previously
approved total is included for comparison. As shown in Table 7, the proposed project is estimated to
generate higher emissions of NOx and CO, equivalent emissions of PM10, and less emissions of PM2.5.
However, the proposed project’s emissions are below the localized significance thresholds; therefore, the
proposed project has a less than significant localized operational air quality impact, and no new impacts
would result.
5 SCAQMD 2008: Final Localized Significance Threshold Methodology Appendix C. Referenced on 9/16/2020 at
http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/appendix-c-mass-
rate-lst-look-up-tables.pdf?sfvrsn=2
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
10
Table 6. Localized Construction Emission Estimates
Construction Activity
Maximum Daily Regional Emissions
(pounds/day)
NOx CO PM10 PM2.5
2022
Demolition 29.6 24.3 2.8 1.4
Site Prep 51.1 39.3 8.4 5.2
Grading 44.3 33.6 4.8 3.0
Building Construction 7.0 8.4 0.3 0.3
Maximum Daily Emissions 14.2 14.7 0.7 0.7
2023
Building Construction 12.8 14.3 0.6 0.6
Maximum Daily Emissions 12.8 14.3 0.6 0.6
2024
Building Construction 12.2 14.2 0.5 0.5
Paving 7.8 10.0 0.4 0.4
Architectural Coating 1.2 1.5 0.0 0.0
Maximum Daily Emissions 12.2 14.2 0.5 0.5
Maximum Daily Emission 2022-2024 51.1 39.3 8.4 5.2
SCAQMD Significance Thresholds 220 1,359 11 6
Threshold Exceeded? No No No No
Source: CalEEMod Sheets
Table 7. Localized Comparative Operational Emission Estimates
Operational Activity
Maximum Daily Regional Emissions
(pounds/day)
NOx CO PM10 PM2.5
Area 0.1 13.9 0.0 0.0
Energy 1.6 1.4 0.1 0.1
Total Mobile 1.9 4.3 0.1 0.0
Off Road 14.1 141.0 0.0 0.0
Stationary 1.1 1.0 0.1 0.1
Total Project LST Operational
Emissions 18.8 161.6 0.3 0.2
SCAQMD Significance Thresholds 270 1,746 4 2
Threshold Exceeded? No No No No
Total Previous LST Operational Emissions 5.5 29.7 0.3 0.3
Comparative LST Operational
Emissions 13.3 131.9 0.0 -0.1
Source: CalEEMod Sheets
Conclusion
The proposed project’s maximum daily emissions (regional and local) for construction and operation of the
project would not exceed the South Coast Air Quality Management District’s (SCAQMD) regional or local
thresholds of significance. The proposed project would generate less or equal regional and local emissions
of ROG, SO2, PM10, and PM2.5, when compared to the SWIP development assumptions, while generating
less than significant but higher emissions of NOx and CO.
In addition, all construction activities would comply with applicable SCAQMD rules and regulations, including
Rule 403 to minimize fugitive PM dust emissions and Rule 1113 which allows only Low-Volatile Organic
Compounds (VOC) paints. Projects that do not exceed the regional thresholds are assumed to not have a
significant impact on a project level and cumulative level. Therefore, the proposed project would result in
less than significant air quality impacts, and no new impacts would result.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
11
Energy
The State CEQA Guidelines do not have specific thresholds for Energy consumption. Rather, the question in
Appendix G: VI Energy (a) asks, “[Does the proposed project] Result in potentially significant environmental
impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project
construction or operation?”. Therefore, for the purpose of this analysis, a significant impact would occur if:
• The Project design and/or location encourages wasteful, inefficient, and unnecessary consumption
of energy, especially fossil fuels such as coal, natural gas, and petroleum, as well as the use of fuel
by vehicles anticipated to travel to and from the project.
The following assumptions were used to calculate the energy consumption of the proposed project:
• The proposed project’s construction and operational energy consumption would be provided by
Southern California Edison Company.
• Construction equipment fuel consumption derived from Air Resources Board (ARB) Offroad2021
emission model
• Fuel Consumption from vehicle travel derived from ARB EMFAC2021 emission model
• Electrical and natural gas usage derived from the CalEEMod model
Construction
Electricity and Natural Gas Usage:
Due to the proposed project’s size and the fact that construction is temporary, the electricity used would be
substantially less than that required for project operation and would have a negligible contribution to the
project’s overall energy consumption. The electric power used would be for as-necessary lighting, powering
electric construction equipment, and electronic equipment such as computers used inside temporary
construction trailers. Natural gas is not anticipated to be needed for construction activities. Any consumption
of natural gas would be minor and negligible in comparison to the operation of the proposed project.
Petroleum Fuel Usage:
The construction equipment associated with construction activities (off-road/heavy duty vehicles) would rely
on diesel fuel as would vendor and haul trucks involved in delivering building materials and removing the
demolition debris from the project site. Construction workers would travel to and from the project site
throughout the duration of construction, and for a conservative analysis it is assumed that construction workers
would travel in gasoline-powered passenger vehicles.
Table 8 used the total fuel consumption and horsepower-hour data contained within the ARB OffRoad2021
emission model for specific types of diesel construction equipment. It should be noted that the total fuel
consumption is a conservative analysis and would likely overstate the amount of fuel usage, as specific
construction equipment is not expected to operate during the duration of the construction activity (i.e., crane).
Table 9 summarizes the project’s construction vehicle fuel usage based on vehicle miles traveled and fuel
usage factors contained in the ARB EMFAC2021. The trips included are worker vehicles, vendor vehicles, and
haul vehicles. Table 10 shows the overall fuel consumption for construction of the proposed project.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
12
Table 8. Construction Equipment Fuel Usage
Activity Equipment Number
Hours
per
day
Horse-
power
Load
Factor
Days of
Construction
Total
Horsepower-
hours
Fuel Rate
(gal/hp-hr)
Fuel Use
(gallons)
Demolition
Concrete/Industrial Saws 1 8 33 0.73 10 1,927 0.041881728 81
Rubber Tired Dozers 3 8 36 0.38 10 3,283 0.01985595 65
Tractors/Loaders/Backhoes 2 8 367 0.4 10 23,488 0.020601315 484
Site Preparation Rubber Tired Dozers 3 8 367 0.4 10 35,232 0.020601315 726
Crawler Tractors 4 8 87 0.43 10 11,971 0.022175849 265
Grading
Excavator 2 8 36 0.38 30 6,566 0.01985595 130
Graders 1 8 148 0.41 30 14,563 0.021161331 308
Rubber Tired Dozers 1 8 367 0.4 30 35,232 0.020601315 726
Scraper 2 8 423 0.48 30 97,459 0.024988526 2,435
Crawler Tractors 2 8 87 0.43 30 17,957 0.022175849 398
Utilities
Excavator 4 8 36 0.38 10 4,378 0.045116197 198
Plate Compactors 4 8 8 0.43 10 1,101 0.024592837 27
Skid Steer Loaders 1 8 71 0.37 10 2,102 0.019369887 41
Tractors/Loaders/Backhoes 1 8 84 0.37 10 2,486 0.010444403 26
Building Construction
Cranes 1 8 367 0.29 300 255,432 0.014895293 3,805
Forklifts 3 8 82 0.2 300 118,080 0.010444403 1,233
Generator Sets 1 8 14 0.74 300 24,864 0.045116197 1,122
Tractors/Loaders/Backhoes 3 8 84 0.37 300 223,776 0.022175849 4,962
Welder 1 8 46 0.45 300 49,680 0.026298689 1,307
Paving
Pavers 2 8 81 0.42 20 10,886 0.021532281 234
Paving Equipment 2 8 89 0.36 20 10,253 0.018464524 189
Rollers 2 8 36 0.38 20 4,378 0.019836075 87
Architectural Coating Air Compressors 1 8 37 0.48 25 3,552 0.027796281 99
Total 18,948
Source: Fuel Calculation Sheets
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
13
Table 9. Estimated Project Vehicle Fuel Usage
Construction
Source Number VMT Fuel Rate Gallons of Diesel
Fuel
Gallons of
Gasoline Fuel
Haul Trucks 18 360 5.85 62 0
Vendor Trucks 52 159,120 8.94 17,789 0
Worker Vehicles 254 783,568 24.02 0 32,139
Total 17,851 32,139
Source: CalEEMod Sheets
Table 10. Total Construction Fuel Usage
Construction Source Gallons of Diesel Fuel Gallons of Gasoline Fuel
Construction Vehicles 17,851 32,139
Off-road Construction
Equipment 18,948 0
Total 36,799 32,139
Operation
The operation of the proposed project would consume electricity, natural gas, and petroleum. The
comparative energy consumption can be found in Table 11, which includes the estimates with project design
features and mitigation from the SWIP. Electricity and natural gas consumption were found in the CalEEMod
Output Sheets attached. The gasoline consumption rates utilize the same assumptions that were used for the
worker vehicles. As shown in Table 11, the proposed project is estimated to require less electricity, natural
gas, gasoline, and diesel fuel then the SWIP development assumptions.
Table 12 shows the net energy consumption of the proposed project when accounting for the existing gasoline
and diesel consumption. As can be seen in Table 12, the project would consume more electricity, natural gas,
and diesel; however, would consume less gasoline. While the total VMT of gasoline consuming vehicles would
increase with the proposed project, the estimated vehicle splits would favor more fuel-efficient vehicles (like
automobile or passenger trucks) when compared to the existing project site uses that consist of more light
heavy duty vehicles.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
14
Table 11. Project Comparative Annual Operational Energy Requirements
Operational Source Energy Usage
Electricity (Kilowatt-Hours)
Proposed Project 1,446,403
Previous SWIP 2,189,735
Difference -743,332
Natural Gas (Thousands British Thermal Units)*
Proposed Project 6,133,999
Previous SWIP 9,247,203
Difference -3,113,204
Petroleum (gasoline) Consumption
Annual VMT Gallons of Gasoline Fuel
Proposed Project 1,902,970 79,136
Previous SWIP 2,880,939 119,805
Difference -977,969 -40,669
Petroleum (diesel) Consumption*
Annual VMT Gallons of diesel Fuel
Proposed Project 1,882,003 288,904
Previous SWIP 2,849,197 436,788
Difference -967,194 -147,884
*Operational Equipment (i.e. forklifts/fire pumps) included
Source: CalEEMod Sheets
Table 12. Project Net Annual Operational Energy Requirements
Operational Source Energy Usage
Electricity (Kilowatt-Hours)
Proposed Project 1,446,403
Existing 0
Difference 1,446,403
Natural Gas (Thousands British Thermal Units)*
Proposed Project 6,133,999
Existing 0
Difference 6,133,999
Petroleum (gasoline) Consumption
Annual VMT Gallons of Gasoline Fuel
Proposed Project 1,902,970 79,136
Existing 1,755,522 84,305
Difference 147,448 -5,169
Petroleum (diesel) Consumption*
Annual VMT Gallons of diesel Fuel
Proposed Project 1,882,003 288,904
Existing 1,657,489 217,527
Difference 224,514 71,377
*Operational Equipment (i.e. forklifts/fire pumps) included
Source: CalEEMod Sheets
Conclusion
The proposed project’s energy consumption for construction activities related to redevelopment of the site
for new industrial warehousing uses would be permitted to require compliance with existing fuel standards,
machinery efficiency standards, and CARB requirements that limit idling of trucks. Through compliance with
existing standards the proposed project would not result in demand for fuel greater on a per-development
basis than other development projects in Southern California. There are no unusual project characteristics
that would cause the use of construction equipment that would be less energy efficient compared with other
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
15
similar construction sites in other parts of the State. The operation of the proposed project would consume
less electricity, natural gas, gasoline, and diesel then the SWIP development assumptions. In addition, the
proposed project is similar to other industrial projects and would comply with current Title 24 requirements
as well as all applicable City business and energy codes and ordinances. Therefore, the proposed project
would result in a less than significant impact on energy consumption.
Greenhouse Gas
SCAQMD has convened a Greenhouse Gas Emissions (GHG) CEQA Significance Threshold Working Group
recommends a tiered approach, Tier 1 to Tier 5, to evaluate potential GHG impacts from various uses. This
assessment will apply the Tier 3: Numerical Screening Thresholds approach. Tier three consists of screening
values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. Also,
pursuant to SCAQMD methodology, project construction emissions are averaged over 30 years and are
added to the project’s operational emissions. If a project’s emissions are below one of the following screening
thresholds, then the project impact would be is less than significant:
• Option 1: All land use types: 3,000 MT CO2e per year
• Option 2: Based on land use type: residential: 3,500 MT CO2e per year; commercial: 1,400 MT
CO2e per year; or mixed use: 3,000 MT CO2e per year
Executive Order S-3-05’s year 2050 goal is the basis of SCAQMD’ draft Tier 3 screening level thresholds.
The objective of the Executive Order is to contribute to capping worldwide CO2 concentrations at 450 ppm,
stabilizing global climate change. The City of Fontana utilizes Option 1, and therefore the threshold is 3,000
MT CO2e per year.
The project’s construction GHG emissions are shown in Table 13. Table 14 shows the overall amortized
construction emissions added to the proposed projects operational emissions (with project design features
and SWIP mitigation included) compared to the estimated operational emissions from the SWIP development
assumptions. These emissions were calculated using the CalEEMod Model. As shown in Table 14, the proposed
project generates less GHG emissions then the previous SWIP.
Table 15 shows the proposed projects net GHG emissions when accounting for the existing emissions. As
shown in Table 15, the proposed project would generate a net 1,747 MTCO2e, and therefore would not
exceed the 3,000 MT CO2e per year threshold and generate less GHG emissions than would be produced
by the SWIP development assumptions. Therefore, impacts would be less than significant, and no new impacts
would occur.
Table 13. Project Construction GHG Emissions
Activity
Annual GHG Emissions
(MTCO2e)
2022 169
2023 738
2024 116
Total Emissions 1,023
Total Emissions Amortized
Over 30 Years 34
Source: CalEEMod Sheets
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
16
Table 14. Project Comparative Total GHG Emissions
Activity
Annual GHG Emissions
(MTCO2e)
Project Operational Emissions
Area 7
Energy 560
Mobile 3,346
Offroad 517
Stationary 5
Waste 70
Water 136
Total Proposed Project Gross
Operation Emissions 4,636
Project Construction Emissions 34
Total Proposed Project Emissions 4,670
Previous SWIP Gross Operation
Emissions 6,227
Comparative Emissions -1,557
Source: CalEEMod Sheets
Table 15. Project Net GHG Emissions
Activity
Annual GHG Emissions
(MTCO2e)
Project Operational Emissions
Area 7
Energy 560
Mobile 3,346
Offroad 517
Stationary 5
Waste 70
Water 136
Total Proposed Project Gross
Operation Emissions 4,636
Project Construction Emissions 34
Total Proposed Project Emissions 4,670
Existing Gross Operation
Emissions 2,923
Net Emissions 1,747
Significance Threshold 3,000
Threshold Exceeded? No
Source: CalEEMod Sheets
Conclusion
The proposed project would generate 4,636 MTCO2e per year, 1,557 MTCO2e less than implementation
of the SWIP Final EIR development assumptions. Therefore, the proposed project would not generate a new
or greater impact on GHG emissions compared to the approved SWIP.
In addition, the proposed projects net increase in GHG emissions when taking account for the existing
emissions would be 1,747 MTCO2e, below the 3,000 MTCO2e per year screening threshold set by the City
of Fontana.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
17
Figure 1: Project Site Plan
Source: HPA Architects
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
18
CalEEMod Sheets
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
1 / 42
Santa Ana & Live Oak Construction Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.3. Construction Emissions by Year, Mitigated
3. Construction Emissions Details
3.1. Demolition (2022) - Unmitigated
3.2. Demolition (2022) - Mitigated
3.3. Site Preparation (2022) - Unmitigated
3.4. Site Preparation (2022) - Mitigated
3.5. Grading (2022) - Unmitigated
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
2 / 42
3.6. Grading (2022) - Mitigated
3.7. Building Construction (2022) - Unmitigated
3.8. Building Construction (2022) - Mitigated
3.9. Building Construction (2023) - Unmitigated
3.10. Building Construction (2023) - Mitigated
3.11. Building Construction (2024) - Unmitigated
3.12. Building Construction (2024) - Mitigated
3.13. Paving (2024) - Unmitigated
3.14. Paving (2024) - Mitigated
3.15. Architectural Coating (2024) - Unmitigated
3.16. Architectural Coating (2024) - Mitigated
3.17. Trenching (2022) - Unmitigated
3.18. Trenching (2022) - Mitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
3 / 42
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.2.2. Mitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
4 / 42
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
5 / 42
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Construction
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.0573832174187, -117.48128719045326
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
320 1000sqft 8.55 319,956 52,330 0.00 ——
Parking Lot 103 Space 0.93 0.00 0.00 0.00 ——
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
6 / 42
——0.000.000.004.32Acre4.32Other Asphalt
Surfaces
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Sector #Measure Title
Construction C-13 Use Low-VOC Paints for Construction
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.124 15.5 27.8 0.04 2.83 1.11 6,387
Mit.63.5 15.5 27.8 0.04 2.83 1.11 6,387
% Reduced 49%——————
Daily, Winter (Max)———————
Unmit.124 51.2 40.6 0.06 8.65 5.28 7,093
Mit.63.5 51.2 40.6 0.06 8.65 5.28 7,093
% Reduced 49%——————
Average Daily (Max)———————
Unmit.8.77 11.2 18.0 0.03 2.01 0.79 4,457
Mit.4.62 11.2 18.0 0.03 2.01 0.79 4,457
% Reduced 47%——————
Annual (Max)———————
Unmit.1.60 2.05 3.29 < 0.005 0.37 0.14 738
Mit.0.84 2.05 3.29 < 0.005 0.37 0.14 738
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
7 / 42
% Reduced 47%——————
Exceeds (Daily Max)———————
Threshold 75.0 100 550 148 150 54.0 —
Unmit.Yes No No No No No —
Mit.No No No No No No —
Exceeds (Average
Daily)
———————
Threshold 75.0 100 550 148 150 54.0 —
Unmit.No No No No No No —
Mit.No No No No No No —
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Year ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily - Summer (Max)———————
2023 2.14 15.5 27.8 0.04 2.83 1.11 6,387
2024 124 1.34 3.80 < 0.005 0.39 0.12 571
Daily - Winter (Max)———————
2022 5.31 51.2 40.6 0.06 8.65 5.28 7,093
2023 2.09 15.7 24.7 0.04 2.83 1.11 6,210
2024 124 14.9 23.8 0.04 2.77 1.05 6,156
Average Daily ———————
2022 0.67 6.41 5.44 0.01 0.81 0.46 1,020
2023 1.49 11.2 18.0 0.03 2.01 0.79 4,457
2024 8.77 1.90 3.07 < 0.005 0.31 0.13 700
Annual ———————
2022 0.12 1.17 0.99 < 0.005 0.15 0.08 169
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
8 / 42
2023 0.27 2.05 3.29 < 0.005 0.37 0.14 738
2024 1.60 0.35 0.56 < 0.005 0.06 0.02 116
2.3. Construction Emissions by Year, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Year ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily - Summer (Max)———————
2023 2.14 15.5 27.8 0.04 2.83 1.11 6,387
2024 63.5 1.34 3.80 < 0.005 0.39 0.12 571
Daily - Winter (Max)———————
2022 5.31 51.2 40.6 0.06 8.65 5.28 7,093
2023 2.09 15.7 24.7 0.04 2.83 1.11 6,210
2024 63.5 14.9 23.8 0.04 2.77 1.05 6,156
Average Daily ———————
2022 0.67 6.41 5.44 0.01 0.81 0.46 1,020
2023 1.49 11.2 18.0 0.03 2.01 0.79 4,457
2024 4.62 1.90 3.07 < 0.005 0.31 0.13 700
Annual ———————
2022 0.12 1.17 0.99 < 0.005 0.15 0.08 169
2023 0.27 2.05 3.29 < 0.005 0.37 0.14 738
2024 0.84 0.35 0.56 < 0.005 0.06 0.02 116
3. Construction Emissions Details
3.1. Demolition (2022) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
9 / 42
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 3.02 29.6 24.3 0.03 1.31 1.21 3,434
Demolition ————1.47 0.22 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.08 0.81 0.67 < 0.005 0.04 0.03 94.1
Demolition ————0.04 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.02 0.15 0.12 < 0.005 0.01 0.01 15.6
Demolition ————0.01 < 0.005 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.08 0.11 1.14 0.00 0.01 0.00 208
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.03 2.04 0.91 0.01 0.12 0.05 1,286
Average Daily ———————
Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 5.80
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.06 0.02 < 0.005 < 0.005 < 0.005 35.3
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 0.96
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
10 / 42
Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 5.84
3.2. Demolition (2022) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 3.02 29.6 24.3 0.03 1.31 1.21 3,434
Demolition ————1.47 0.22 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.08 0.81 0.67 < 0.005 0.04 0.03 94.1
Demolition ————0.04 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.02 0.15 0.12 < 0.005 0.01 0.01 15.6
Demolition ————0.01 < 0.005 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.08 0.11 1.14 0.00 0.01 0.00 208
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.03 2.04 0.91 0.01 0.12 0.05 1,286
Average Daily ———————
Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 5.80
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
11 / 42
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.06 0.02 < 0.005 < 0.005 < 0.005 35.3
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 0.96
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 5.84
3.3. Site Preparation (2022) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 5.22 51.1 39.3 0.05 2.76 2.54 5,545
Dust From Material
Movement
————5.66 2.69 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.14 1.40 1.08 < 0.005 0.08 0.07 152
Dust From Material
Movement
————0.16 0.07 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.03 0.26 0.20 < 0.005 0.01 0.01 25.2
Dust From Material
Movement
————0.03 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
12 / 42
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.09 0.12 1.33 0.00 0.01 0.00 243
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 7.61
Average Daily ———————
Worker < 0.005 < 0.005 0.04 0.00 < 0.005 0.00 6.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.21
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.12
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.03
3.4. Site Preparation (2022) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 5.22 51.1 39.3 0.05 2.76 2.54 5,545
Dust From Material
Movement
————5.66 2.69 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.14 1.40 1.08 < 0.005 0.08 0.07 152
Dust From Material
Movement
————0.16 0.07 —
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
13 / 42
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.03 0.26 0.20 < 0.005 0.01 0.01 25.2
Dust From Material
Movement
————0.03 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.09 0.12 1.33 0.00 0.01 0.00 243
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 7.61
Average Daily ———————
Worker < 0.005 < 0.005 0.04 0.00 < 0.005 0.00 6.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.21
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.12
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.03
3.5. Grading (2022) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
14 / 42
Off-Road Equipment 4.44 44.3 33.6 0.06 2.14 1.97 6,734
Dust From Material
Movement
————2.67 0.98 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.37 3.64 2.76 0.01 0.18 0.16 553
Dust From Material
Movement
————0.22 0.08 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.07 0.67 0.50 < 0.005 0.03 0.03 91.6
Dust From Material
Movement
————0.04 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.11 0.14 1.52 0.00 0.02 0.00 278
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.13 0.06 < 0.005 0.01 < 0.005 81.2
Average Daily ———————
Worker 0.01 0.01 0.13 0.00 < 0.005 0.00 23.2
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 6.68
Annual ———————
Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 3.84
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.11
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
15 / 42
3.6. Grading (2022) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 4.44 44.3 33.6 0.06 2.14 1.97 6,734
Dust From Material
Movement
————2.67 0.98 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.37 3.64 2.76 0.01 0.18 0.16 553
Dust From Material
Movement
————0.22 0.08 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.07 0.67 0.50 < 0.005 0.03 0.03 91.6
Dust From Material
Movement
————0.04 0.01 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.11 0.14 1.52 0.00 0.02 0.00 278
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.13 0.06 < 0.005 0.01 < 0.005 81.2
Average Daily ———————
Worker 0.01 0.01 0.13 0.00 < 0.005 0.00 23.2
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
16 / 42
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 6.68
Annual ———————
Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 3.84
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.11
3.7. Building Construction (2022) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 1.48 14.2 14.7 0.03 0.70 0.65 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.02 0.22 0.23 < 0.005 0.01 0.01 41.3
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.04 0.04 < 0.005 < 0.005 < 0.005 6.84
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.72 0.95 10.2 0.00 0.11 0.00 1,868
Vendor 0.06 2.59 1.17 0.01 0.12 0.06 1,759
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
17 / 42
Average Daily ———————
Worker 0.01 0.01 0.17 0.00 < 0.005 0.00 29.7
Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 < 0.005 27.6
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 4.92
Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 4.56
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.8. Building Construction (2022) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 1.48 14.2 14.7 0.03 0.70 0.65 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.02 0.22 0.23 < 0.005 0.01 0.01 41.3
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.04 0.04 < 0.005 < 0.005 < 0.005 6.84
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.72 0.95 10.2 0.00 0.11 0.00 1,868
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
18 / 42
Vendor 0.06 2.59 1.17 0.01 0.12 0.06 1,759
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.01 0.01 0.17 0.00 < 0.005 0.00 29.7
Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 < 0.005 27.6
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 4.92
Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 4.56
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Building Construction (2023) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.97 9.15 10.2 0.02 0.43 0.39 1,885
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.18 1.67 1.86 < 0.005 0.08 0.07 312
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
19 / 42
Offsite ———————
Daily, Summer (Max)———————
Worker 0.74 0.71 12.4 0.00 0.11 0.00 2,004
Vendor 0.05 1.97 1.06 0.01 0.12 0.06 1,743
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Worker 0.69 0.83 9.35 0.00 0.11 0.00 1,831
Vendor 0.04 2.05 1.08 0.01 0.12 0.06 1,740
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.49 0.59 7.07 0.00 0.08 0.00 1,329
Vendor 0.03 1.47 0.77 0.01 0.08 0.04 1,243
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker 0.09 0.11 1.29 0.00 0.01 0.00 220
Vendor 0.01 0.27 0.14 < 0.005 0.02 0.01 206
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.10. Building Construction (2023) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
20 / 42
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.97 9.15 10.2 0.02 0.43 0.39 1,885
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.18 1.67 1.86 < 0.005 0.08 0.07 312
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Worker 0.74 0.71 12.4 0.00 0.11 0.00 2,004
Vendor 0.05 1.97 1.06 0.01 0.12 0.06 1,743
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Worker 0.69 0.83 9.35 0.00 0.11 0.00 1,831
Vendor 0.04 2.05 1.08 0.01 0.12 0.06 1,740
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.49 0.59 7.07 0.00 0.08 0.00 1,329
Vendor 0.03 1.47 0.77 0.01 0.08 0.04 1,243
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker 0.09 0.11 1.29 0.00 0.01 0.00 220
Vendor 0.01 0.27 0.14 < 0.005 0.02 0.01 206
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
21 / 42
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 1.30 12.2 14.2 0.03 0.54 0.49 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.12 1.12 1.31 < 0.005 0.05 0.05 243
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.02 0.20 0.24 < 0.005 0.01 0.01 40.2
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.66 0.77 8.59 0.00 0.11 0.00 1,795
Vendor 0.04 1.96 1.03 0.01 0.12 0.06 1,721
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.06 0.07 0.83 0.00 0.01 0.00 168
Vendor < 0.005 0.18 0.09 < 0.005 0.01 0.01 158
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker 0.01 0.01 0.15 0.00 < 0.005 0.00 27.8
Vendor < 0.005 0.03 0.02 < 0.005 < 0.005 < 0.005 26.2
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
22 / 42
3.12. Building Construction (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 1.30 12.2 14.2 0.03 0.54 0.49 2,639
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.12 1.12 1.31 < 0.005 0.05 0.05 243
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.02 0.20 0.24 < 0.005 0.01 0.01 40.2
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.66 0.77 8.59 0.00 0.11 0.00 1,795
Vendor 0.04 1.96 1.03 0.01 0.12 0.06 1,721
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.06 0.07 0.83 0.00 0.01 0.00 168
Vendor < 0.005 0.18 0.09 < 0.005 0.01 0.01 158
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker 0.01 0.01 0.15 0.00 < 0.005 0.00 27.8
Vendor < 0.005 0.03 0.02 < 0.005 < 0.005 < 0.005 26.2
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
23 / 42
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Paving (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 0.85 7.81 10.0 0.01 0.39 0.36 1,517
Paving 0.69 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.05 0.43 0.55 < 0.005 0.02 0.02 83.1
Paving 0.04 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 13.8
Paving 0.01 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.07 0.09 0.96 0.00 0.01 0.00 200
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker < 0.005 < 0.005 0.06 0.00 < 0.005 0.00 11.2
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
24 / 42
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.85
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.14. Paving (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 0.85 7.81 10.0 0.01 0.39 0.36 1,517
Paving 0.69 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.05 0.43 0.55 < 0.005 0.02 0.02 83.1
Paving 0.04 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 13.8
Paving 0.01 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
25 / 42
Worker 0.07 0.09 0.96 0.00 0.01 0.00 200
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker < 0.005 < 0.005 0.06 0.00 < 0.005 0.00 11.2
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.85
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.15. Architectural Coating (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179
Architectural Coatings 124 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179
Architectural Coatings 124 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 12.2
Architectural Coatings 8.48 ——————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
26 / 42
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 2.03
Architectural Coatings 1.55 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Worker 0.14 0.13 2.27 0.00 0.02 0.00 393
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Worker 0.13 0.15 1.72 0.00 0.02 0.00 359
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.01 0.01 0.12 0.00 < 0.005 0.00 25.0
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 4.14
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.16. Architectural Coating (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
27 / 42
Daily, Summer (Max)———————
Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179
Architectural Coatings 63.2 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179
Architectural Coatings 63.2 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 12.2
Architectural Coatings 4.33 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 2.03
Architectural Coatings 0.79 ——————
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Worker 0.14 0.13 2.27 0.00 0.02 0.00 393
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Worker 0.13 0.15 1.72 0.00 0.02 0.00 359
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker 0.01 0.01 0.12 0.00 < 0.005 0.00 25.0
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
28 / 42
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 4.14
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.17. Trenching (2022) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 0.80 6.97 8.39 0.01 0.30 0.28 1,243
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.02 0.19 0.23 < 0.005 0.01 0.01 34.1
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.03 0.04 < 0.005 < 0.005 < 0.005 5.64
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.13 0.18 1.90 0.00 0.02 0.00 347
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
29 / 42
Average Daily ———————
Worker < 0.005 < 0.005 0.05 0.00 < 0.005 0.00 9.67
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.60
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.18. Trenching (2022) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location ROG NOx CO SO2 PM10T PM2.5T CO2e
Onsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Off-Road Equipment 0.80 6.97 8.39 0.01 0.30 0.28 1,243
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Off-Road Equipment 0.02 0.19 0.23 < 0.005 0.01 0.01 34.1
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Off-Road Equipment < 0.005 0.03 0.04 < 0.005 < 0.005 < 0.005 5.64
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Offsite ———————
Daily, Summer (Max)———————
Daily, Winter (Max)———————
Worker 0.13 0.18 1.90 0.00 0.02 0.00 347
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
30 / 42
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Average Daily ———————
Worker < 0.005 < 0.005 0.05 0.00 < 0.005 0.00 9.67
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.60
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
31 / 42
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
32 / 42
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
33 / 42
Total ———————
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
34 / 42
Subtotal ———————
————————
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description
Demolition Demolition 10/1/2022 10/14/2022 5.00 10.0 —
Site Preparation Site Preparation 10/15/2022 10/28/2022 5.00 10.0 —
Grading Grading 10/29/2022 12/9/2022 5.00 30.0 —
Building Construction Building Construction 12/24/2022 2/16/2024 5.00 300 —
Paving Paving 2/17/2024 3/15/2024 5.00 20.0 —
Architectural Coating Architectural Coating 3/16/2024 4/19/2024 5.00 25.0 —
Utilities Trenching 12/10/2022 12/23/2022 5.00 10.0 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38
Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40
Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40
Grading Excavators Diesel Average 2.00 8.00 36.0 0.38
Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
35 / 42
Grading Scrapers Diesel Average 2.00 8.00 423 0.48
Building Construction Cranes Diesel Average 1.00 8.00 367 0.29
Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20
Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74
Building Construction Tractors/Loaders/Backh
oes
Diesel Average 3.00 8.00 84.0 0.37
Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45
Paving Pavers Diesel Average 2.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36
Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48
Site Preparation Crawler Tractors Diesel Average 4.00 8.00 87.0 0.43
Grading Crawler Tractors Diesel Average 2.00 8.00 87.0 0.43
Utilities Excavators Diesel Average 4.00 8.00 36.0 0.38
Utilities Plate Compactors Diesel Average 4.00 8.00 8.00 0.43
Utilities Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37
Utilities Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38
Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40
Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40
Grading Excavators Diesel Average 2.00 8.00 36.0 0.38
Grading Graders Diesel Average 1.00 8.00 148 0.41
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
36 / 42
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40
Grading Scrapers Diesel Average 2.00 8.00 423 0.48
Building Construction Cranes Diesel Average 1.00 8.00 367 0.29
Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20
Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74
Building Construction Tractors/Loaders/Backh
oes
Diesel Average 3.00 8.00 84.0 0.37
Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45
Paving Pavers Diesel Average 2.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36
Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48
Site Preparation Crawler Tractors Diesel Average 4.00 8.00 87.0 0.43
Grading Crawler Tractors Diesel Average 2.00 8.00 87.0 0.43
Utilities Excavators Diesel Average 4.00 8.00 36.0 0.38
Utilities Plate Compactors Diesel Average 4.00 8.00 8.00 0.43
Utilities Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37
Utilities Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix
Demolition ————
Demolition Worker 15.0 18.5 LDA,LDT1,LDT2
Demolition Vendor —10.2 HHDT,MHDT
Demolition Hauling 16.9 20.0 HHDT
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
37 / 42
Demolition Onsite truck ——HHDT
Site Preparation ————
Site Preparation Worker 17.5 18.5 LDA,LDT1,LDT2
Site Preparation Vendor —10.2 HHDT,MHDT
Site Preparation Hauling 0.10 20.0 HHDT
Site Preparation Onsite truck ——HHDT
Grading ————
Grading Worker 20.0 18.5 LDA,LDT1,LDT2
Grading Vendor —10.2 HHDT,MHDT
Grading Hauling 1.07 20.0 HHDT
Grading Onsite truck ——HHDT
Building Construction ————
Building Construction Worker 134 18.5 LDA,LDT1,LDT2
Building Construction Vendor 52.4 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck ——HHDT
Paving ————
Paving Worker 15.0 18.5 LDA,LDT1,LDT2
Paving Vendor —10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck ——HHDT
Architectural Coating ————
Architectural Coating Worker 26.9 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor —10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck ——HHDT
Utilities ————
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
38 / 42
Utilities Worker 25.0 18.5 LDA,LDT1,LDT2
Utilities Vendor —10.2 HHDT,MHDT
Utilities Hauling 0.00 20.0 HHDT
Utilities Onsite truck ——HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix
Demolition ————
Demolition Worker 15.0 18.5 LDA,LDT1,LDT2
Demolition Vendor —10.2 HHDT,MHDT
Demolition Hauling 16.9 20.0 HHDT
Demolition Onsite truck ——HHDT
Site Preparation ————
Site Preparation Worker 17.5 18.5 LDA,LDT1,LDT2
Site Preparation Vendor —10.2 HHDT,MHDT
Site Preparation Hauling 0.10 20.0 HHDT
Site Preparation Onsite truck ——HHDT
Grading ————
Grading Worker 20.0 18.5 LDA,LDT1,LDT2
Grading Vendor —10.2 HHDT,MHDT
Grading Hauling 1.07 20.0 HHDT
Grading Onsite truck ——HHDT
Building Construction ————
Building Construction Worker 134 18.5 LDA,LDT1,LDT2
Building Construction Vendor 52.4 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck ——HHDT
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
39 / 42
Paving ————
Paving Worker 15.0 18.5 LDA,LDT1,LDT2
Paving Vendor —10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck ——HHDT
Architectural Coating ————
Architectural Coating Worker 26.9 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor —10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck ——HHDT
Utilities ————
Utilities Worker 25.0 18.5 LDA,LDT1,LDT2
Utilities Vendor —10.2 HHDT,MHDT
Utilities Hauling 0.00 20.0 HHDT
Utilities Onsite truck ——HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00 0.00 490,225 163,408 13,721
5.6. Dust Mitigation
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
40 / 42
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic Yards)Material Exported (Cubic Yards)Acres Graded (acres)Material Demolished (Building
Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 14,670 —
Site Preparation 1.00 0.00 35.0 0.00 —
Grading 250 0.00 120 0.00 —
Paving 0.00 0.00 0.00 0.00 5.25
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction
Water Exposed Area 3 74%74%
5.7. Construction Paving
Land Use Area Paved (acres)% Asphalt
Unrefrigerated Warehouse-No Rail 0.00 0%
Parking Lot 0.93 100%
Other Asphalt Surfaces 4.32 100%
5.8. Construction Electricity Consumption and Emissions Factors
kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2022 0.00 532 0.03 < 0.005
2023 0.00 532 0.03 < 0.005
2024 0.00 532 0.03 < 0.005
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
41 / 42
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
Santa Ana & Live Oak Construction Custom Report, 5/26/2022
42 / 42
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by
5 days due to size of the building. Trenching added to account for offsite improvements.
Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and
grading phases.
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
1 / 35
Santa Ana & Live Oak Previous Operation Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
2 / 35
4.2.2. Electricity Emissions By Land Use - Mitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.3.1. Mitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.4.1. Mitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.5.1. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
3 / 35
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
4 / 35
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
5 / 35
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
6 / 35
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
7 / 35
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Previous Operation
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.0573832174187, -117.48128719045326
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
484 1000sqft 8.55 484,387 52,330 0.00 ——
Parking Lot 103 Space 0.93 0.00 0.00 0.00 ——
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
8 / 35
——0.000.000.004.32Acre4.32Other Asphalt
Surfaces
User Defined
Industrial
484 User Defined Unit 0.00 0.00 0.00 0.00 ——
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Sector #Measure Title
Construction C-13 Use Low-VOC Paints for Construction
Transportation T-8 Provide Ridesharing Program
Transportation T-35*Provide Tra c Calming Measures
Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy
Efficiency Standards
Energy E-2 Require Energy Efficient Appliances
Energy E-7*Require Higher Efficacy Public Street and Area Lighting
Water W-7 Adopt a Water Conservation Strategy
Waste S-1/S-2 Implement Waste Reduction Plan
Area AS-2 Use Low-VOC Paints
* Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results.
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.20.7 30.7 60.7 0.30 6.34 1.82 40,029
Mit.19.9 29.5 59.2 0.29 6.10 1.76 38,062
% Reduced 4%4%2%4%4%4%5%
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
9 / 35
Daily, Winter (Max)———————
Unmit.17.1 31.8 34.4 0.29 6.31 1.78 39,397
Mit.16.2 30.6 33.1 0.28 6.07 1.72 37,452
% Reduced 5%4%4%4%4%4%5%
Average Daily (Max)———————
Unmit.19.4 32.3 49.7 0.30 6.33 1.81 39,563
Mit.18.6 31.1 48.4 0.28 6.09 1.75 37,614
% Reduced 4%4%3%4%4%4%5%
Annual (Max)———————
Unmit.3.54 5.89 9.07 0.05 1.16 0.33 6,550
Mit.3.39 5.67 8.83 0.05 1.11 0.32 6,227
% Reduced 4%4%3%4%4%4%5%
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 5.47 28.0 37.5 0.28 6.12 1.60 32,304
Area 15.1 0.18 21.1 < 0.005 0.03 0.04 86.9
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Water ——————1,658
Waste ——————859
Total 20.7 30.7 60.7 0.30 6.34 1.82 40,029
Daily, Winter (Max)———————
Mobile 5.28 29.3 32.3 0.28 6.12 1.60 31,760
Area 11.6 ——————
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
10 / 35
Water ——————1,658
Waste ——————859
Total 17.1 31.8 34.4 0.29 6.31 1.78 39,397
Average Daily ———————
Mobile 5.23 29.7 33.2 0.28 6.12 1.60 31,866
Area 14.0 0.12 14.4 < 0.005 0.02 0.03 59.6
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Water ——————1,658
Waste ——————859
Total 19.4 32.3 49.7 0.30 6.33 1.81 39,563
Annual ———————
Mobile 0.96 5.42 6.06 0.05 1.12 0.29 5,276
Area 2.56 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 848
Water ——————274
Waste ——————142
Total 3.54 5.89 9.07 0.05 1.16 0.33 6,550
2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 5.25 26.9 36.0 0.27 5.88 1.53 31,012
Area 14.5 0.18 21.1 < 0.005 0.03 0.04 86.9
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
11 / 35
Total 19.9 29.5 59.2 0.29 6.10 1.76 38,062
Daily, Winter (Max)———————
Mobile 5.07 28.1 31.0 0.27 5.88 1.53 30,489
Area 11.0 ——————
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Total 16.2 30.6 33.1 0.28 6.07 1.72 37,452
Average Daily ———————
Mobile 5.02 28.5 31.9 0.27 5.88 1.53 30,592
Area 13.4 0.12 14.4 < 0.005 0.02 0.03 59.6
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Total 18.6 31.1 48.4 0.28 6.09 1.75 37,614
Annual ———————
Mobile 0.92 5.20 5.81 0.05 1.07 0.28 5,065
Area 2.44 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 840
Water ——————206
Waste ——————107
Total 3.39 5.67 8.83 0.05 1.11 0.32 6,227
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
12 / 35
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
5.04 2.17 24.4 0.06 0.40 0.15 6,506
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.43 25.8 13.2 0.22 2.08 0.90 25,798
Total 5.47 28.0 37.5 0.28 2.48 1.04 32,304
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
4.86 2.35 19.1 0.06 0.40 0.15 6,015
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.42 27.0 13.2 0.22 2.08 0.90 25,745
Total 5.28 29.3 32.3 0.28 2.48 1.04 31,760
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.88 0.44 3.65 0.01 0.07 0.03 1,010
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.08 4.98 2.40 0.04 0.38 0.16 4,266
Total 0.96 5.42 6.06 0.05 0.45 0.19 5,276
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
13 / 35
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
4.83 2.08 23.4 0.06 0.38 0.14 6,246
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.42 24.8 12.6 0.21 2.00 0.86 24,766
Total 5.25 26.9 36.0 0.27 2.38 1.00 31,012
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
4.67 2.26 18.3 0.06 0.38 0.14 5,774
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.40 25.9 12.7 0.21 2.00 0.86 24,715
Total 5.07 28.1 31.0 0.27 2.38 1.00 30,489
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.84 0.42 3.51 0.01 0.07 0.03 969
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.07 4.78 2.31 0.04 0.36 0.16 4,095
Total 0.92 5.20 5.81 0.05 0.44 0.18 5,065
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
14 / 35
2,149——————Unrefrigerated
Warehouse-No Rail
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,149
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,149
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,149
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————356
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————356
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,104
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
15 / 35
User Defined Industrial ——————0.00
Total ——————2,104
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,104
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,104
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————348
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————348
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
16 / 35
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.45 0.38 < 0.005 0.03 0.03 492
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
17 / 35
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.45 0.38 < 0.005 0.03 0.03 492
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492
4.3. Area Emissions by Source
4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 125 ——————
Consumer Products 10.4 ——————
Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9
Total 139 0.18 21.1 < 0.005 0.03 0.04 86.9
Daily, Winter (Max)———————
Architectural Coatings 125 ——————
Consumer Products 10.4 ——————
Total 135 ——————
Annual ———————
Architectural Coatings 1.78 ——————
Consumer Products 1.90 ——————
Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
18 / 35
Total 4.10 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
4.3.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 124 ——————
Consumer Products 10.4 ——————
Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9
Total 138 0.18 21.1 < 0.005 0.03 0.04 86.9
Daily, Winter (Max)———————
Architectural Coatings 124 ——————
Consumer Products 10.4 ——————
Total 135 ——————
Annual ———————
Architectural Coatings 1.66 ——————
Consumer Products 1.90 ——————
Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Total 3.99 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,658
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
19 / 35
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,658
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,658
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,658
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————274
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————274
4.4.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,243
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
20 / 35
Total ——————1,243
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,243
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,243
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————206
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————206
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————859
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————859
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
21 / 35
Unrefrigerated
Warehouse-No Rail
——————859
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————859
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————142
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————142
4.5.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————644
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————644
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————644
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
22 / 35
User Defined Industrial ——————0.00
Total ——————644
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————107
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————107
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
23 / 35
Total ———————
Annual ———————
Total ———————
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.8. Stationary Emissions By Equipment Type
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
24 / 35
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
25 / 35
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
26 / 35
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
27 / 35
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
28 / 35
Total ———————
Annual ———————
Total ———————
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
29 / 35
Subtotal ———————
Removed ———————
Subtotal ———————
————————
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
639 639 639 233,097 8,112 8,112 8,112 2,960,792
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
190 190 190 69,234 7,587 7,587 7,587 2,769,344
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
613 613 613 223,773 7,787 7,787 7,787 2,842,361
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
182 182 182 66,464 7,284 7,284 7,284 2,658,570
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
30 / 35
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 736,872 245,624 13,721
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
31 / 35
Unrefrigerated Warehouse-No
Rail
2,237,240 349 0.0330 0.0040 9,248,005
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Unrefrigerated Warehouse-No
Rail
2,189,735 349 0.0330 0.0040 9,247,203
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 112,014,494 840,374
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 84,010,870 630,280
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
32 / 35
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 455 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13.2. Mitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 341 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.14.2. Mitigated
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
33 / 35
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
——
5.18. Vegetation
5.18.1. Land Use Change
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
34 / 35
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
8. User Changes to Default Data
Screen Justification
Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022
35 / 35
Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by
5 days due to size of the building.
Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and
grading phases.
Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT.
Increased Non Res H-W Trip % to equal 100 %.
Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022)
Operations: Refrigerants No Cold Storage proposed.
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
1 / 36
Santa Ana & Live Oak Proposed Operation Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
2 / 36
4.2.2. Electricity Emissions By Land Use - Mitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.3.1. Mitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.4.1. Mitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.5.1. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
3 / 36
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
4 / 36
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
5 / 36
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
6 / 36
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
7 / 36
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Proposed Operation
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.0573832174187, -117.48128719045326
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
320 1000sqft 8.55 319,956 52,330 0.00 ——
Parking Lot 103 Space 0.93 0.00 0.00 0.00 ——
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
8 / 36
——0.000.000.004.32Acre4.32Other Asphalt
Surfaces
User Defined
Industrial
320 User Defined Unit 0.00 0.00 0.00 0.00 ——
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Sector #Measure Title
Construction C-13 Use Low-VOC Paints for Construction
Transportation T-8 Provide Ridesharing Program
Transportation T-35*Provide Tra c Calming Measures
Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy
Efficiency Standards
Energy E-2 Require Energy Efficient Appliances
Energy E-7*Require Higher Efficacy Public Street and Area Lighting
Water W-7 Adopt a Water Conservation Strategy
Waste S-1/S-2 Implement Waste Reduction Plan
Area AS-2 Use Low-VOC Paints
* Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results.
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.14.1 35.5 182 0.20 4.25 1.26 29,768
Mit.13.5 34.7 181 0.19 4.08 1.22 28,468
% Reduced 4%2%1%4%4%3%4%
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
9 / 36
Daily, Winter (Max)———————
Unmit.11.7 36.2 165 0.20 4.23 1.24 29,351
Mit.11.1 35.4 164 0.19 4.07 1.19 28,066
% Reduced 5%2%1%4%4%3%4%
Average Daily (Max)———————
Unmit.12.9 35.6 174 0.20 4.19 1.20 29,288
Mit.12.3 34.8 173 0.19 4.03 1.16 27,999
% Reduced 4%2%1%4%4%4%4%
Annual (Max)———————
Unmit.2.35 6.50 31.7 0.04 0.76 0.22 4,849
Mit.2.25 6.35 31.6 0.03 0.74 0.21 4,636
% Reduced 4%2%1%4%4%4%4%
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 3.61 18.5 24.8 0.19 4.04 1.05 21,338
Area 9.99 0.12 13.9 < 0.005 0.02 0.02 57.4
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 14.1 35.5 182 0.20 4.25 1.26 29,768
Daily, Winter (Max)———————
Mobile 3.49 19.4 21.3 0.18 4.04 1.05 20,979
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
10 / 36
Area 7.71 ——————
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 11.7 36.2 165 0.20 4.23 1.24 29,351
Average Daily ———————
Mobile 3.46 19.6 21.9 0.18 4.04 1.05 21,049
Area 9.28 0.08 9.53 < 0.005 0.01 0.02 39.3
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5
Total 12.9 35.6 174 0.20 4.19 1.20 29,288
Annual ———————
Mobile 0.63 3.58 4.00 0.03 0.74 0.19 3,485
Area 1.69 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 560
Water ——————182
Waste ——————93.9
Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517
Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 2.35 6.50 31.7 0.04 0.76 0.22 4,849
2.6. Operations Emissions by Sector, Mitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
11 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 3.47 17.7 23.8 0.18 3.88 1.01 20,485
Area 9.58 0.12 13.9 < 0.005 0.02 0.02 57.4
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 13.5 34.7 181 0.19 4.08 1.22 28,468
Daily, Winter (Max)———————
Mobile 3.35 18.6 20.5 0.18 3.88 1.01 20,139
Area 7.30 ——————
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 11.1 35.4 164 0.19 4.07 1.19 28,066
Average Daily ———————
Mobile 3.32 18.8 21.0 0.18 3.88 1.01 20,207
Area 8.86 0.08 9.53 < 0.005 0.01 0.02 39.3
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
12 / 36
Total 12.3 34.8 173 0.19 4.03 1.16 27,999
Annual ———————
Mobile 0.61 3.43 3.84 0.03 0.71 0.18 3,346
Area 1.62 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 555
Water ——————136
Waste ——————70.4
Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517
Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 2.25 6.35 31.6 0.03 0.74 0.21 4,636
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
3.33 1.43 16.1 0.04 0.26 0.10 4,298
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.29 17.1 8.69 0.15 1.38 0.59 17,041
Total 3.61 18.5 24.8 0.19 1.64 0.69 21,338
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
3.21 1.55 12.6 0.04 0.26 0.10 3,973
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
13 / 36
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.28 17.8 8.72 0.15 1.38 0.59 17,006
Total 3.49 19.4 21.3 0.18 1.64 0.69 20,979
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.58 0.29 2.41 0.01 0.05 0.02 667
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.05 3.29 1.59 0.03 0.25 0.11 2,818
Total 0.63 3.58 4.00 0.03 0.30 0.13 3,485
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
3.19 1.37 15.4 0.04 0.25 0.09 4,126
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.28 16.4 8.34 0.14 1.32 0.57 16,359
Total 3.47 17.7 23.8 0.18 1.57 0.66 20,485
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
3.08 1.49 12.1 0.04 0.25 0.09 3,814
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.27 17.1 8.37 0.14 1.32 0.57 16,326
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
14 / 36
Total 3.35 18.6 20.5 0.18 1.57 0.66 20,139
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.56 0.28 2.32 0.01 0.05 0.02 640
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.05 3.16 1.52 0.03 0.24 0.10 2,705
Total 0.61 3.43 3.84 0.03 0.29 0.12 3,346
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,420
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,420
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,420
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,420
Annual ———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
15 / 36
Unrefrigerated
Warehouse-No Rail
——————235
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————235
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,390
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,390
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,390
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,390
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————230
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
16 / 36
User Defined Industrial ——————0.00
Total ——————230
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.30 0.25 < 0.005 0.02 0.02 325
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
17 / 36
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.30 0.25 < 0.005 0.02 0.02 325
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325
4.3. Area Emissions by Source
4.3.2. Unmitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
18 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 125 ——————
Consumer Products 6.87 ——————
Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4
Total 134 0.12 13.9 < 0.005 0.02 0.02 57.4
Daily, Winter (Max)———————
Architectural Coatings 125 ——————
Consumer Products 6.87 ——————
Total 131 ——————
Annual ———————
Architectural Coatings 1.70 ——————
Consumer Products 1.25 ——————
Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Total 3.24 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
4.3.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 124 ——————
Consumer Products 6.87 ——————
Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4
Total 133 0.12 13.9 < 0.005 0.02 0.02 57.4
Daily, Winter (Max)———————
Architectural Coatings 124 ——————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
19 / 36
Consumer Products 6.87 ——————
Total 131 ——————
Annual ———————
Architectural Coatings 1.63 ——————
Consumer Products 1.25 ——————
Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Total 3.16 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,096
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,096
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,096
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,096
Annual ———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
20 / 36
Unrefrigerated
Warehouse-No Rail
——————182
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————182
4.4.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————822
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————822
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————822
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————822
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————136
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
21 / 36
User Defined Industrial ——————0.00
Total ——————136
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————567
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————567
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————567
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————567
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————93.9
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————93.9
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
22 / 36
4.5.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————425
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————425
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————425
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————425
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————70.4
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————70.4
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
23 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
24 / 36
Daily, Winter (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Annual ———————
Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517
Total 0.00 2.58 25.7 0.00 0.00 0.00 517
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Daily, Winter (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Annual ———————
Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517
Total 0.00 2.58 25.7 0.00 0.00 0.00 517
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
25 / 36
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Daily, Winter (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Annual ———————
Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Daily, Winter (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Annual ———————
Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
26 / 36
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
27 / 36
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
28 / 36
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
29 / 36
Total ———————
Annual ———————
Total ———————
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
30 / 36
Subtotal ———————
Removed ———————
Subtotal ———————
————————
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
422 422 422 153,969 5,358 5,358 5,358 1,955,716
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
125 125 125 45,731 5,012 5,012 5,012 1,829,257
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
405 405 405 147,810 5,144 5,144 5,144 1,877,487
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
120 120 120 43,902 4,811 4,811 4,811 1,756,087
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
31 / 36
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 490,225 163,408 13,721
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
32 / 36
Unrefrigerated Warehouse-No
Rail
1,477,782 349 0.0330 0.0040 6,108,658
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Unrefrigerated Warehouse-No
Rail
1,446,403 349 0.0330 0.0040 6,108,128
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 73,989,825 840,374
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 55,492,369 630,280
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
33 / 36
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 301 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13.2. Mitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 226 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.14.2. Mitigated
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
34 / 36
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Forklifts CNG Average 32.0 4.00 82.0 0.20
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Forklifts CNG Average 32.0 4.00 82.0 0.20
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
Fire Pump Diesel 1.00 1.00 50.0 238 0.73
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
——
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
35 / 36
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022
36 / 36
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by
5 days due to size of the building.
Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and
grading phases.
Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT.
Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022)
Operations: Refrigerants No Cold Storage proposed.
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
1 / 18
Santa Ana & Live Oak Existing Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
2 / 18
4.3.2. Unmitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
3 / 18
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
4 / 18
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
8. User Changes to Default Data
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
5 / 18
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Existing
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.057296706749284, -117.48127691004377
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Parking Lot 13.8 Acre 13.8 13.8 13,300 0.00 ——
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
6 / 18
No measures selected
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.3.53 17.7 21.8 0.16 3.69 0.97 17,884
Daily, Winter (Max)———————
Unmit.3.42 18.5 19.2 0.16 3.69 0.97 17,595
Average Daily (Max)———————
Unmit.3.39 18.7 19.6 0.16 3.69 0.97 17,654
Annual (Max)———————
Unmit.0.62 3.41 3.58 0.03 0.67 0.18 2,923
Exceeds (Daily Max)———————
Threshold 55.0 55.0 550 150 150 54.0 —
Unmit.No No No No No No —
Exceeds (Average
Daily)
———————
Threshold 55.0 55.0 550 150 150 54.0 —
Unmit.No No No No No No —
Exceeds (Annual)———————
Threshold ——————3,000
Unmit.——————No
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
7 / 18
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 3.40 17.7 21.8 0.16 3.69 0.97 17,883
Area 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water ——————1.09
Waste ——————0.00
Total 3.53 17.7 21.8 0.16 3.69 0.97 17,884
Daily, Winter (Max)———————
Mobile 3.28 18.5 19.2 0.16 3.69 0.97 17,594
Area 0.14 ——————
Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water ——————1.09
Waste ——————0.00
Total 3.42 18.5 19.2 0.16 3.69 0.97 17,595
Average Daily ———————
Mobile 3.25 18.7 19.6 0.16 3.69 0.97 17,653
Area 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water ——————1.09
Waste ——————0.00
Total 3.39 18.7 19.6 0.16 3.69 0.97 17,654
Annual ———————
Mobile 0.59 3.41 3.58 0.03 0.67 0.18 2,923
Area 0.03 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water ——————0.18
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
8 / 18
Waste ——————0.00
Total 0.62 3.41 3.58 0.03 0.67 0.18 2,923
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Parking Lot 3.40 17.7 21.8 0.16 1.52 0.64 17,883
Total 3.40 17.7 21.8 0.16 1.52 0.64 17,883
Daily, Winter (Max)———————
Parking Lot 3.28 18.5 19.2 0.16 1.52 0.64 17,594
Total 3.28 18.5 19.2 0.16 1.52 0.64 17,594
Annual ———————
Parking Lot 0.59 3.41 3.58 0.03 0.28 0.12 2,923
Total 0.59 3.41 3.58 0.03 0.28 0.12 2,923
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Parking Lot ——————0.00
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
9 / 18
Total ——————0.00
Daily, Winter (Max)———————
Parking Lot ——————0.00
Total ——————0.00
Annual ———————
Parking Lot ——————0.00
Total ——————0.00
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daily, Winter (Max)———————
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annual ———————
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.3. Area Emissions by Source
4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
10 / 18
Consumer Products 0.05 ——————
Architectural Coatings 0.09 ——————
Landscape Equipment < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Total 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Daily, Winter (Max)———————
Consumer Products 0.05 ——————
Architectural Coatings 0.09 ——————
Total 0.14 ——————
Annual ———————
Consumer Products 0.01 ——————
Architectural Coatings 0.02 ——————
Landscape Equipment < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
Total 0.03 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Parking Lot ——————1.09
Total ——————1.09
Daily, Winter (Max)———————
Parking Lot ——————1.09
Total ——————1.09
Annual ———————
Parking Lot ——————0.18
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
11 / 18
Total ——————0.18
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Parking Lot ——————0.00
Total ——————0.00
Daily, Winter (Max)———————
Parking Lot ——————0.00
Total ——————0.00
Annual ———————
Parking Lot ——————0.00
Total ——————0.00
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
12 / 18
Total ———————
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9. User Defined Emissions By Equipment Type
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
13 / 18
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
14 / 18
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
15 / 18
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Parking Lot 739 739 739 269,577 9,351 9,351 9,351 3,413,011
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 27,051 9,017 36,068
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
16 / 18
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Parking Lot 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Parking Lot 0.00 213,586
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Parking Lot 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.15. Operational Off-Road Equipment
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
17 / 18
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
——
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
Santa Ana & Live Oak Existing Custom Report, 5/24/2022
18 / 18
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
8. User Changes to Default Data
Screen Justification
Operations: Vehicle Data Trip Rate based on Project Trip Generation and Vehicle Miles Traveled Screening Analysis (EPD
Solutions 2022)
Operations: Fleet Mix Vehicle Mix from Project Trip Generation and Vehicle Miles Traveled Screening Analysis.
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
1 / 35
Santa Ana & Live Oak Previous LST Operation Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
2 / 35
4.2.2. Electricity Emissions By Land Use - Mitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.3.1. Mitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.4.1. Mitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.5.1. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
3 / 35
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
4 / 35
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
5 / 35
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
6 / 35
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
7 / 35
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Previous LST Operation
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.0573832174187, -117.48128719045326
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
484 1000sqft 8.55 484,387 52,330 0.00 ——
Parking Lot 103 Space 0.93 0.00 0.00 0.00 ——
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
8 / 35
——0.000.000.004.32Acre4.32Other Asphalt
Surfaces
User Defined
Industrial
484 User Defined Unit 0.00 0.00 0.00 0.00 ——
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Sector #Measure Title
Construction C-13 Use Low-VOC Paints for Construction
Transportation T-8 Provide Ridesharing Program
Transportation T-35*Provide Tra c Calming Measures
Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy
Efficiency Standards
Energy E-2 Require Energy Efficient Appliances
Energy E-7*Require Higher Efficacy Public Street and Area Lighting
Water W-7 Adopt a Water Conservation Strategy
Waste S-1/S-2 Implement Waste Reduction Plan
Area AS-2 Use Low-VOC Paints
* Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results.
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.16.6 5.47 29.2 0.02 0.29 0.25 8,423
Mit.16.0 5.36 29.0 0.02 0.29 0.24 7,721
% Reduced 4%2%1%—1%—8%
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
9 / 35
Daily, Winter (Max)———————
Unmit.13.1 5.42 8.84 0.02 0.26 0.21 8,333
Mit.12.4 5.30 8.57 0.02 0.26 0.21 7,630
% Reduced 5%2%3%—1%—8%
Average Daily (Max)———————
Unmit.15.4 5.50 23.2 0.02 0.28 0.23 8,392
Mit.14.8 5.38 23.0 0.02 0.28 0.23 7,689
% Reduced 4%2%1%—1%—8%
Annual (Max)———————
Unmit.2.82 1.00 4.24 < 0.005 0.05 0.04 1,389
Mit.2.70 0.98 4.19 < 0.005 0.05 0.04 1,273
% Reduced 4%2%1%1%1%< 0.5%8%
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 1.39 2.81 6.09 0.01 0.07 0.02 699
Area 15.1 0.18 21.1 < 0.005 0.03 0.04 86.9
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Water ——————1,658
Waste ——————859
Total 16.6 5.47 29.2 0.02 0.29 0.25 8,423
Daily, Winter (Max)———————
Mobile 1.30 2.94 6.75 0.01 0.07 0.02 695
Area 11.6 ——————
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
10 / 35
Water ——————1,658
Waste ——————859
Total 13.1 5.42 8.84 0.02 0.26 0.21 8,333
Average Daily ———————
Mobile 1.29 2.89 6.73 0.01 0.07 0.02 695
Area 14.0 0.12 14.4 < 0.005 0.02 0.03 59.6
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121
Water ——————1,658
Waste ——————859
Total 15.4 5.50 23.2 0.02 0.28 0.23 8,392
Annual ———————
Mobile 0.24 0.53 1.23 < 0.005 0.01 < 0.005 115
Area 2.56 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 848
Water ——————274
Waste ——————142
Total 2.82 1.00 4.24 < 0.005 0.05 0.04 1,389
2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 1.34 2.70 5.85 0.01 0.07 0.02 671
Area 14.5 0.18 21.1 < 0.005 0.03 0.04 86.9
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
11 / 35
Total 16.0 5.36 29.0 0.02 0.29 0.24 7,721
Daily, Winter (Max)———————
Mobile 1.24 2.82 6.48 0.01 0.07 0.02 667
Area 11.0 ——————
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Total 12.4 5.30 8.57 0.02 0.26 0.21 7,630
Average Daily ———————
Mobile 1.24 2.77 6.46 0.01 0.07 0.02 667
Area 13.4 0.12 14.4 < 0.005 0.02 0.03 59.6
Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075
Water ——————1,243
Waste ——————644
Total 14.8 5.38 23.0 0.02 0.28 0.23 7,689
Annual ———————
Mobile 0.23 0.51 1.18 < 0.005 0.01 < 0.005 110
Area 2.44 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 840
Water ——————206
Waste ——————107
Total 2.70 0.98 4.19 < 0.005 0.05 0.04 1,273
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
12 / 35
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
1.30 0.44 4.20 < 0.005 0.01 0.01 247
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.10 2.37 1.89 < 0.005 0.01 0.01 452
Total 1.39 2.81 6.09 0.01 0.02 0.01 699
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
1.21 0.47 4.81 < 0.005 0.01 0.01 240
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.09 2.47 1.95 < 0.005 0.01 0.01 455
Total 1.30 2.94 6.75 0.01 0.03 0.01 695
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.22 0.09 0.88 < 0.005 < 0.005 < 0.005 40.0
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.02 0.44 0.35 < 0.005 < 0.005 < 0.005 75.0
Total 0.24 0.53 1.23 < 0.005 < 0.005 < 0.005 115
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
13 / 35
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
1.24 0.42 4.04 < 0.005 0.01 0.01 238
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.09 2.27 1.81 < 0.005 0.01 0.01 434
Total 1.34 2.70 5.85 0.01 0.02 0.01 671
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
1.16 0.45 4.61 < 0.005 0.01 0.01 230
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.08 2.37 1.87 < 0.005 0.01 0.01 437
Total 1.24 2.82 6.48 0.01 0.02 0.01 667
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.21 0.08 0.84 < 0.005 < 0.005 < 0.005 38.4
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.02 0.42 0.34 < 0.005 < 0.005 < 0.005 72.0
Total 0.23 0.51 1.18 < 0.005 < 0.005 < 0.005 110
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
14 / 35
2,149——————Unrefrigerated
Warehouse-No Rail
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,149
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,149
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,149
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————356
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————356
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,104
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
15 / 35
User Defined Industrial ——————0.00
Total ——————2,104
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————2,104
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————2,104
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————348
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————348
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
16 / 35
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.45 0.38 < 0.005 0.03 0.03 492
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.14 2.48 2.09 0.01 0.19 0.19 2,972
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
17 / 35
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.45 0.38 < 0.005 0.03 0.03 492
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492
4.3. Area Emissions by Source
4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 125 ——————
Consumer Products 10.4 ——————
Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9
Total 139 0.18 21.1 < 0.005 0.03 0.04 86.9
Daily, Winter (Max)———————
Architectural Coatings 125 ——————
Consumer Products 10.4 ——————
Total 135 ——————
Annual ———————
Architectural Coatings 1.78 ——————
Consumer Products 1.90 ——————
Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
18 / 35
Total 4.10 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
4.3.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 124 ——————
Consumer Products 10.4 ——————
Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9
Total 138 0.18 21.1 < 0.005 0.03 0.04 86.9
Daily, Winter (Max)———————
Architectural Coatings 124 ——————
Consumer Products 10.4 ——————
Total 135 ——————
Annual ———————
Architectural Coatings 1.66 ——————
Consumer Products 1.90 ——————
Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
Total 3.99 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,658
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
19 / 35
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,658
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,658
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,658
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————274
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————274
4.4.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,243
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
20 / 35
Total ——————1,243
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,243
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,243
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————206
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————206
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————859
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————859
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
21 / 35
Unrefrigerated
Warehouse-No Rail
——————859
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————859
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————142
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————142
4.5.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————644
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————644
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————644
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
22 / 35
User Defined Industrial ——————0.00
Total ——————644
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————107
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————107
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
23 / 35
Total ———————
Annual ———————
Total ———————
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.8. Stationary Emissions By Equipment Type
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
24 / 35
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
25 / 35
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
26 / 35
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
27 / 35
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
28 / 35
Total ———————
Annual ———————
Total ———————
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
29 / 35
Subtotal ———————
Removed ———————
Subtotal ———————
————————
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
639 639 639 233,097 160 160 160 58,274
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
190 190 190 69,234 47.4 47.4 47.4 17,308
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
613 613 613 223,773 153 153 153 55,943
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
182 182 182 66,464 45.5 45.5 45.5 16,616
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
30 / 35
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 736,872 245,624 13,721
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
31 / 35
Unrefrigerated Warehouse-No
Rail
2,237,240 349 0.0330 0.0040 9,248,005
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Unrefrigerated Warehouse-No
Rail
2,189,735 349 0.0330 0.0040 9,247,203
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 112,014,494 840,374
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 84,010,870 630,280
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
32 / 35
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 455 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13.2. Mitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 341 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.14.2. Mitigated
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
33 / 35
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
——
5.18. Vegetation
5.18.1. Land Use Change
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
34 / 35
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
8. User Changes to Default Data
Screen Justification
Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022
35 / 35
Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by
5 days due to size of the building.
Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and
grading phases.
Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT.
Increased Non Res H-W Trip % to equal 100 %.
Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022)
Operations: Refrigerants No Cold Storage proposed.
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
1 / 36
Santa Ana & Live Oak Proposed LST Operation Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
2 / 36
4.2.2. Electricity Emissions By Land Use - Mitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.3.1. Mitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.4.1. Mitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.5.1. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
3 / 36
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
4 / 36
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
5 / 36
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
6 / 36
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
7 / 36
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Ana & Live Oak Proposed LST Operation
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.80
Precipitation (days)6.80
Location 34.0573832174187, -117.48128719045326
County San Bernardino-South Coast
City Fontana
Air District South Coast AQMD
Air Basin South Coast
TAZ 5310
EDFZ 10
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
320 1000sqft 8.55 319,956 52,330 0.00 ——
Parking Lot 103 Space 0.93 0.00 0.00 0.00 ——
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
8 / 36
——0.000.000.004.32Acre4.32Other Asphalt
Surfaces
User Defined
Industrial
320 User Defined Unit 0.00 0.00 0.00 0.00 ——
1.3. User-Selected Emission Reduction Measures by Emissions Sector
Sector #Measure Title
Construction C-13 Use Low-VOC Paints for Construction
Transportation T-8 Provide Ridesharing Program
Transportation T-35*Provide Tra c Calming Measures
Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy
Efficiency Standards
Energy E-2 Require Energy Efficient Appliances
Energy E-7*Require Higher Efficacy Public Street and Area Lighting
Water W-7 Adopt a Water Conservation Strategy
Waste S-1/S-2 Implement Waste Reduction Plan
Area AS-2 Use Low-VOC Paints
* Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results.
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unmit.11.4 18.8 161 0.02 0.25 0.22 8,891
Mit.10.9 18.8 161 0.02 0.25 0.22 8,427
% Reduced 4%< 0.5%< 0.5%—1%—5%
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
9 / 36
Daily, Winter (Max)———————
Unmit.9.05 18.8 148 0.02 0.23 0.20 8,831
Mit.8.60 18.7 147 0.02 0.23 0.19 8,367
% Reduced 5%< 0.5%< 0.5%—1%—5%
Average Daily (Max)———————
Unmit.10.3 17.9 156 0.01 0.19 0.16 8,697
Mit.9.82 17.8 156 0.01 0.19 0.16 8,233
% Reduced 4%< 0.5%< 0.5%—1%—5%
Annual (Max)———————
Unmit.1.87 3.27 28.5 < 0.005 0.04 0.03 1,440
Mit.1.79 3.25 28.5 < 0.005 0.03 0.03 1,363
% Reduced 4%< 0.5%< 0.5%1%1%< 0.5%5%
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 0.92 1.86 4.02 < 0.005 0.05 0.01 462
Area 9.99 0.12 13.9 < 0.005 0.02 0.02 57.4
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 11.4 18.8 161 0.02 0.25 0.22 8,891
Daily, Winter (Max)———————
Mobile 0.86 1.94 4.46 < 0.005 0.05 0.01 459
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
10 / 36
Area 7.71 ——————
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 9.05 18.8 148 0.02 0.23 0.20 8,831
Average Daily ———————
Mobile 0.85 1.91 4.45 < 0.005 0.05 0.01 459
Area 9.28 0.08 9.53 < 0.005 0.01 0.02 39.3
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383
Water ——————1,096
Waste ——————567
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5
Total 10.3 17.9 156 0.01 0.19 0.16 8,697
Annual ———————
Mobile 0.16 0.35 0.81 < 0.005 0.01 < 0.005 76.0
Area 1.69 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 560
Water ——————182
Waste ——————93.9
Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517
Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 1.87 3.27 28.5 < 0.005 0.04 0.03 1,440
2.6. Operations Emissions by Sector, Mitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
11 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Sector ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Mobile 0.88 1.78 3.86 < 0.005 0.05 0.01 443
Area 9.58 0.12 13.9 < 0.005 0.02 0.02 57.4
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 10.9 18.8 161 0.02 0.25 0.22 8,427
Daily, Winter (Max)———————
Mobile 0.82 1.86 4.28 < 0.005 0.05 0.01 441
Area 7.30 ——————
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 8.60 18.7 147 0.02 0.23 0.19 8,367
Average Daily ———————
Mobile 0.82 1.83 4.27 < 0.005 0.05 0.01 440
Area 8.86 0.08 9.53 < 0.005 0.01 0.02 39.3
Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353
Water ——————822
Waste ——————425
Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126
Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
12 / 36
Total 9.82 17.8 156 0.01 0.19 0.16 8,233
Annual ———————
Mobile 0.15 0.33 0.78 < 0.005 0.01 < 0.005 72.9
Area 1.62 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 555
Water ——————136
Waste ——————70.4
Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517
Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 1.79 3.25 28.5 < 0.005 0.03 0.03 1,363
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.86 0.29 2.78 < 0.005 0.01 < 0.005 163
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.06 1.56 1.25 < 0.005 0.01 < 0.005 298
Total 0.92 1.86 4.02 < 0.005 0.02 0.01 462
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.80 0.31 3.17 < 0.005 0.01 < 0.005 158
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
13 / 36
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.06 1.63 1.29 < 0.005 0.01 < 0.005 301
Total 0.86 1.94 4.46 < 0.005 0.02 0.01 459
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.14 0.06 0.58 < 0.005 < 0.005 < 0.005 26.4
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.01 0.29 0.23 < 0.005 < 0.005 < 0.005 49.5
Total 0.16 0.35 0.81 < 0.005 < 0.005 < 0.005 76.0
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.82 0.28 2.67 < 0.005 0.01 < 0.005 157
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.06 1.50 1.20 < 0.005 0.01 < 0.005 286
Total 0.88 1.78 3.86 < 0.005 0.02 0.01 443
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.77 0.30 3.05 < 0.005 0.01 < 0.005 152
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.06 1.57 1.23 < 0.005 0.01 < 0.005 289
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
14 / 36
Total 0.82 1.86 4.28 < 0.005 0.02 0.01 441
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.14 0.05 0.56 < 0.005 < 0.005 < 0.005 25.4
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.01 0.28 0.22 < 0.005 < 0.005 < 0.005 47.6
Total 0.15 0.33 0.78 < 0.005 < 0.005 < 0.005 72.9
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,420
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,420
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,420
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,420
Annual ———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
15 / 36
Unrefrigerated
Warehouse-No Rail
——————235
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————235
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,390
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,390
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,390
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,390
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————230
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
16 / 36
User Defined Industrial ——————0.00
Total ——————230
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.30 0.25 < 0.005 0.02 0.02 325
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
17 / 36
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
0.09 1.64 1.38 0.01 0.12 0.12 1,963
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963
Annual ———————
Unrefrigerated
Warehouse-No Rail
0.02 0.30 0.25 < 0.005 0.02 0.02 325
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325
4.3. Area Emissions by Source
4.3.2. Unmitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
18 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 125 ——————
Consumer Products 6.87 ——————
Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4
Total 134 0.12 13.9 < 0.005 0.02 0.02 57.4
Daily, Winter (Max)———————
Architectural Coatings 125 ——————
Consumer Products 6.87 ——————
Total 131 ——————
Annual ———————
Architectural Coatings 1.70 ——————
Consumer Products 1.25 ——————
Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Total 3.24 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
4.3.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Architectural Coatings 124 ——————
Consumer Products 6.87 ——————
Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4
Total 133 0.12 13.9 < 0.005 0.02 0.02 57.4
Daily, Winter (Max)———————
Architectural Coatings 124 ——————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
19 / 36
Consumer Products 6.87 ——————
Total 131 ——————
Annual ———————
Architectural Coatings 1.63 ——————
Consumer Products 1.25 ——————
Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
Total 3.16 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,096
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,096
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————1,096
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————1,096
Annual ———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
20 / 36
Unrefrigerated
Warehouse-No Rail
——————182
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————182
4.4.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————822
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————822
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————822
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————822
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————136
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
21 / 36
User Defined Industrial ——————0.00
Total ——————136
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————567
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————567
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————567
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————567
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————93.9
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————93.9
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
22 / 36
4.5.1. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Unrefrigerated
Warehouse-No Rail
——————425
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————425
Daily, Winter (Max)———————
Unrefrigerated
Warehouse-No Rail
——————425
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————425
Annual ———————
Unrefrigerated
Warehouse-No Rail
——————70.4
Parking Lot ——————0.00
Other Asphalt Surfaces ——————0.00
User Defined Industrial ——————0.00
Total ——————70.4
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
23 / 36
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
24 / 36
Daily, Winter (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Annual ———————
Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517
Total 0.00 2.58 25.7 0.00 0.00 0.00 517
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Daily, Winter (Max)———————
Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126
Total 0.00 14.1 141 0.00 0.00 0.00 3,126
Annual ———————
Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517
Total 0.00 2.58 25.7 0.00 0.00 0.00 517
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
25 / 36
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Daily, Winter (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Annual ———————
Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Daily, Winter (Max)———————
Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200
Annual ———————
Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
26 / 36
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
27 / 36
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
28 / 36
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Total ———————
Annual ———————
Total ———————
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Total ———————
Daily, Winter (Max)———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
29 / 36
Total ———————
Annual ———————
Total ———————
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species ROG NOx CO SO2 PM10T PM2.5T CO2e
Daily, Summer (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Daily, Winter (Max)———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Subtotal ———————
Removed ———————
Subtotal ———————
————————
Annual ———————
Avoided ———————
Subtotal ———————
Sequestered ———————
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
30 / 36
Subtotal ———————
Removed ———————
Subtotal ———————
————————
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
422 422 422 153,969 105 105 105 38,492
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
125 125 125 45,731 31.3 31.3 31.3 11,433
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Unrefrigerated
Warehouse-No Rail
405 405 405 147,810 101 101 101 36,953
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Industrial
120 120 120 43,902 30.1 30.1 30.1 10,976
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
31 / 36
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 490,225 163,408 13,721
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
32 / 36
Unrefrigerated Warehouse-No
Rail
1,477,782 349 0.0330 0.0040 6,108,658
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Unrefrigerated Warehouse-No
Rail
1,446,403 349 0.0330 0.0040 6,108,128
Parking Lot 0.00 349 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00
User Defined Industrial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 73,989,825 840,374
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Unrefrigerated Warehouse-No Rail 55,492,369 630,280
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
33 / 36
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 301 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.13.2. Mitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Unrefrigerated Warehouse-No Rail 226 0.00
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
User Defined Industrial 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.14.2. Mitigated
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
34 / 36
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Forklifts CNG Average 32.0 4.00 82.0 0.20
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Forklifts CNG Average 32.0 4.00 82.0 0.20
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
Fire Pump Diesel 1.00 1.00 50.0 238 0.73
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
——
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
35 / 36
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022
36 / 36
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by
5 days due to size of the building.
Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and
grading phases.
Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT.
Onsite Analysis Only
Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022)
Operations: Refrigerants No Cold Storage proposed.
Santa Ana & Live Oak Development
Air Quality/Energy/GHG Summary
19
Fuel Calculations
Model Output: OFFROAD2021 (v1.0.1) Emissions Inventory
Region Type: Sub-Area
Region: Orange (SC)
Calendar Year: 2022
Scenario: All Adopted Rules - Exhaust
Vehicle Classification: OFFROAD2021 Equipment Types
Units: tons/day for Emissions, gallons/year for Fuel, hours/year for Activity, Horsepower-hours/year for Horsepower-hours
Region Calendar Year VehClass MdlYr HP_Bin Fuel Fuel Consumption Horsepower Hours Fuel Rate
Orange (SC) 2022 Construction and Mining - Misc - Concrete/Industrial Saws Aggregate Aggregate Diesel 9186.825502 219219 0.041907
Orange (SC) 2022 Construction and Mining - Excavators Aggregate Aggregate Diesel 3784274.741 190586435.8 0.019856
Orange (SC) 2022 Construction and Mining - Rubber Tired Dozers Aggregate Aggregate Diesel 419916.1247 20382976.91 0.020601
Orange (SC) 2022 Construction and Mining - Crawler Tractors Aggregate Aggregate Diesel 2102181.937 94796008.92 0.022176
Orange (SC) 2022 Construction and Mining - Graders Aggregate Aggregate Diesel 1422427.513 67218244.51 0.021161
Orange (SC) 2022 Construction and Mining - Cranes Aggregate Aggregate Diesel 851206.2633 57145991.38 0.014895
Orange (SC) 2022 Industrial - Forklifts Aggregate Aggregate Diesel 2770097.514 265223151.2 0.010444
Orange (SC) 2022 Light Commercial - Misc - Generator Sets Aggregate Aggregate Diesel 554147.6016 11796391.2 0.046976
Orange (SC) 2022 Construction and Mining - Tractors/Loaders/Backhoes Aggregate Aggregate Diesel 5264466.136 274952330.2 0.019147
Orange (SC) 2022 Light Commercial - Misc - Welders Aggregate Aggregate Diesel 857266.051 32213629.8 0.026612
Orange (SC) 2022 Construction and Mining - Other (Cement and Mortar Mixers) Aggregate Aggregate Diesel 1073373.162 49729575.71 0.021584
Orange (SC) 2022 Construction and Mining - Pavers Aggregate Aggregate Diesel 252427.7941 11723225.69 0.021532
Orange (SC) 2022 Construction and Mining - Paving Equipment Aggregate Aggregate Diesel 146912.3058 7956463.15 0.018465
Orange (SC) 2022 Construction and Mining - Rollers Aggregate Aggregate Diesel 654711.4982 33006100.74 0.019836
Orange (SC) 2022 Light Commercial - Misc - Air Compressors Aggregate Aggregate Diesel 183476.2609 6570992.8 0.027922
Source: EMFAC2021 (v1.0.1) Emissions Inventory
Region Type: Sub-Area
Region: Orange (SC)
Calendar Year: 2022
Season: Annual
Vehicle Classification: EMFAC2007 Categories
Units: miles/year for CVMT and EVMT, trips/year for Trips, kWh/year for Energy Consumption, tons/year for Emissions, 1000 gallons/year for Fuel Consumption
Region Calendar Year Vehicle Category Model Year Speed Fuel VMT Fuel Consumption Fuel Rate
Orange (SC) 2022 LHDT1 Aggregate Aggregate Diesel 272294650 13404.42837 20.31
Orange (SC) 2022 LHDT2 Aggregate Aggregate Diesel 112926634.7 6643.13233 17.00
Orange (SC) 2022 MHDT Aggregate Aggregate Diesel 354824303 39855.09641 8.90
Orange (SC) 2022 HHDT Aggregate Aggregate Diesel 382208925.7 65300.43017 5.85
Orange (SC) 2022 LDA Aggregate Aggregate Gasoline 14788101043 513837.0107 28.78
Orange (SC) 2022 LDT1 Aggregate Aggregate Gasoline 1235805874 50940.23916 24.26
Orange (SC) 2022 LDT2 Aggregate Aggregate Gasoline 7116698572 307484.7674 23.14
Orange (SC) 2022 MDV Aggregate Aggregate Gasoline 4285534650 226701.8569 18.90
Orange (SC) 2022 LHDT1 Aggregate Aggregate Gasoline 531701698.9 40036.68554 13.28