Loading...
HomeMy WebLinkAboutAppendix B - Air Quality Energy and Greenhouse Gas Impact Analysis Urban Planning ■ Due Diligence ■ Entitlements ■ CEQA/NEPA ■ Development Services ■ Management ■ Public Outreach 2 Park Plaza, Suite 1120 ■ Irvine, CA 92614 949.794.1180 ■ info@epdsolutions.com This technical memorandum presents a comparative analysis of the air quality, energy, and greenhouse gas (GHG) impacts of the proposed Santa Ana & Live Oak Project (proposed project), located on the northwest corner of Live Oak Avenue and Santa Ana Avenue in the City of Fontana. The 13.8-acre proposed project site is within the Southwest Industrial Park Specific Plan (SWIP), which designated the site as industrial with a maximum FAR of 0.8, or 484,387 square feet (SF). This buildout was evaluated in the SWIP Final EIR (Final EIR). The proposed project would develop a 319,956 square foot unrefrigerated high-cube warehouse. The proposed project would demolish the existing structures on the site, which consist of various wooden structures. To support the CEQA document for the proposed project, this report analyzes the proposed project’s construction and net operational impacts to air quality (emission of criterial pollutants) emissions using the California Emissions Estimator Model (CalEEMod) land use emission model. Table 1 shows the estimated construction schedule, which is expected to last about 19 months. Table 1. Construction Schedule Activity Start Date End Date Total Days Demolition 10/1/2022 10/14/2022 10 Site Preparation 10/15/2022 10/28/2022 10 Grading 10/29/2022 12/9/2022 30 Trenching 12/10/2022 12/23/2022 10 Building Construction 12/24/2022 2/16/2024 300 Paving 2/17/2024 3/15/2024 20 Architectural Coating 3/16/2024 4/19/2024 25 Source: CalEEMod Sheets Summary of Air Quality, Energy and GHG Impacts Air Quality: The proposed project’s maximum daily emissions (regional and local) for construction and operation of the project would not exceed the South Coast Air Quality Management District’s (SCAQMD) regional or local thresholds of significance. The proposed project would generate less or equal regional and local emissions of ROG, SO2, PM10, and PM2.5, when compared to the approved previous SWIP, while generating less than significant but higher emissions of NOx and CO. In addition, all construction activities would be required to comply with applicable SCAQMD rules and regulations, including Rule 403 to minimize fugitive PM dust emissions and Rule 1113 which allows only Low- Volatile Organic Compounds (VOC) paints. Projects that do not exceed the regional thresholds are assumed to not have a significant impact on a project level and cumulative level. Therefore, the proposed project would have less than significant air quality impacts, and no new impacts would result. To: City of Fontana, Planning Division From: Alex J. Garber Date: 6/17/2022 Re: Air Quality, Energy, and Greenhouse Gas Impact Analysis for the Santa Ana & Live Oak Development Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 2 Energy: The proposed project’s energy consumption for construction activities related to redevelopment of the site for new industrial warehousing uses would be permitted to require compliance with existing fuel standards, machinery efficiency standards, and CARB requirements that limit idling of trucks. Through compliance with existing standards the proposed project would not result in demand for fuel greater on a per-development basis than other development projects in Southern California. There are no unusual project characteristics that would cause the use of construction equipment that would be less energy efficient compared with other similar construction sites in other parts of the State. The operation of the proposed project would consume less electricity, natural gas, gasoline, and diesel then assumed by the Final EIR due to the reduction in building size and associated vehicular/truck trips. In addition, the proposed project is similar to other industrial projects and would comply with incumbent Title 24 standards as well as all applicable City business and energy codes and ordinances. Therefore, the proposed project would not result in a new impact related to energy consumption. GHG: The proposed project would generate 4,636 MTCO2e per year, 1,557 MTCO2e less than the previous SWIP analysis. Therefore, the proposed project would not result in a new impact related to GHG emissions as compared to the approved SWIP. In addition, the proposed projects net GHG emissions when taking account for the existing emissions would be 1,747 MTCO2e, below the 3,000 MTCO2e per year screening threshold set by the City of Fontana. Therefore, net new GHG emissions would not be significant. Air Quality Impact Tables Methodology and Model Inputs To calculate the net operational impacts, the previous SWIP industrial warehouse air quality analysis emissions was run using CalEEMod (v2022.1), as the previous analysis was done using an older model not in use anymore. For the previous SWIP and proposed project, ITE Trip Generation Manual 11th Edition rates for warehouse (Land Use Code 150) was used to be consistent with the proposed project’s Trip Generation and VMT analysis1. In addition to comparing the proposed project to the previously SWIP, a net operational analysis was completed, which compared the existing trailer storage operation (existing) to the proposed project, for informational purposes. Counts were taken at the existing driveways to calculate an accurate trip generation for the existing operations on the project site. The area, energy, and mobile emissions were calculated for the maximum buildout of the site pursuant to the SWIP, proposed project, and existing site. CalEEMod defaults for area, energy, and mobile analysis (other than the trip generation) was used for the existing operation. For the maximum buildout of the site pursuant to the SWIP and proposed project analysis, CalEEMod Defaults were used other than for three and four+ axle trucks, medium heavy duty and heavy heavy duty respectively, trip lengths. A trip length of 40 miles2 was used, and the following mitigation measures from the SWIP Final EIR that are applicable to the project were incorporated: 4.2‐1a All construction equipment shall be maintained in good operating condition to reduce emissions. The construction contractor shall ensure that all construction equipment is being properly serviced and maintained as per the manufacturer’s specification. Maintenance records shall be available at the construction site for City verification. [GPEIR MM AQ‐1] 4.2‐1b Prior to the issuance of any grading permits, all applicants shall submit construction plans to the City of Fontana denoting the proposed schedule and projected equipment use. Construction 1 Trip Generation and Vehicle Miles Traveled (VMT) Screening Analysis, EPD Solutions, 2022 2 SCAQMD High-Cube Warehouse Vehicle Trip Generation Analysis (October 2016) Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 3 contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning Staff. [GPEIR MM AQ‐2] 4.2‐1c All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. [GPEIR MM AQ‐3] 4.2‐1d Projects that result in the construction of more than 19 single‐family residential units, 40 multifamily residential units, or 45,000 square feet of retail/commercial/industrial space shall be required to apply paints either by hand or high volume, low pressure (HVLP) spray. These measures may reduce volatile organic compounds (VOC) associated with the application of paints and coatings by an estimated 60 to 75 percent. Alternatively, the contractor may specify the use of low volatility paints and coatings. Several of currently available primers have VOC contents of less than 0.85 pounds per gallon (e.g., dulux professional exterior primer 100 percent acrylic). Top coats can be less than 0.07 pounds per gallon (8 grams per liter) (e.g., lifemaster 2000‐series). This latter measure would reduce these VOC emissions by more than 70 percent. Larger projects should incorporate both the use of HVLP or hand application and the requirement for low volatility coatings. [GPEIR MM AQ‐4] 4.2‐1e All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 4.2‐1f Prior to the issuance of grading permits or approval of grading plans for future development projects within the project area, future developments shall include a dust control plan as part of the construction contract standard specifications. The dust control plan shall include measures to meet the requirements of SCAQMD Rules 402 and 403. Such measures may include, but are not limited to, the following: • Phase and schedule activities to avoid high‐ozone days and first‐stage smog alerts. • Discontinue operation during second‐stage smog alerts. • All haul trucks shall be covered prior to leaving the site to prevent dust from impacting the surrounding areas. • Comply with AQMD Rule 403, particularly to minimize fugitive dust and noise to surrounding areas. • Moisten soil each day prior to commencing grading to depth of soil cut. • Water exposed surfaces at least twice a day under calm conditions, and as often as needed on windy days or during very dry weather in order to maintain a surface crust and minimize the release of visible emissions from the construction site. • Treat any area that will be exposed for extended periods with a soil conditioner to stabilize soil or temporarily plant with vegetation. • Wash mud‐covered tires and under carriages of trucks leaving construction sites. • Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by construction vehicles or mud, which would otherwise be carried off by trucks departing project sites. • Securely cover all loads of fill coming to the site with a tight‐fitting tarp. • Cease grading during periods when winds exceed 25 miles per hour. • Provide for permanent sealing of all graded areas, as applicable, at the earliest Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 4 practicable time after soil disturbance. • Use low‐sulfur diesel fuel in all equipment. • Use electric equipment whenever practicable. • Shut off engines when not in use. 4.2‐2c All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods pursuant to Title 13 of the California Code of Regulations, Section 2485, which limits idle times to not more than five minutes [GPEIR MM AQ‐9]. 4.2‐2d The City shall require that both industrial and commercial uses designate preferential parking for vanpools. [GPEIR MM AQ‐10] 4.2‐2f All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and MetroLink schedules in conspicuous areas. [GPEIR MM AQ‐12] 4.2‐2g All industrial and commercial site tenants with 50 or more employees shall be requested to configure their operating schedules around the MetroLink schedule to the extent reasonably feasible. [GPEIR MM AQ‐13] 4.2‐2j All residential, commercial, and industrial structures shall be required to incorporate light colored roofing materials. [GPEIR MM AQ‐16] 4.2‐2k Prior to approval of future development projects within the project area, the City of Fontana shall conduct project‐level environmental review to determine potential vehicle emission impacts associated with the project(s). Mitigation measures shall be developed for each project as it is considered to mitigate potentially significant impacts to the extent feasible. Potential mitigation measures may require that facilities with over 250 employees (full or part‐time employees at a worksite for a consecutive six‐month period calculated as a monthly average), as required by the Air Quality Management Plan, implement Transportation Demand Management (TDM) programs. 4.2‐2l New warehouse facilities or distribution centers that generate a minimum of 100 truck trips per day, or 40 truck trips with transport refrigeration units (TRUs) per day, or TRU operations exceeding 300 hours per week shall not be located closer than 1,000 feet from any existing or proposed sensitive land use such as residential, a hospital, medical offices, day care facilities, and/or fire stations (pursuant to the recommendations set forth in the CARB Air Quality and Land Use Handbook). This MM is satisfied by the results shown in the Santa Ana & Live Oak Heath Risk Assessment. In addition, the net truck trips generated by the proposed project is less than the existing use. 4.2-5a Prior to the issuance of building permits, future development projects shall demonstrate the incorporation of project design features that achieve a minimum of 28.5 percent reduction in GHG emissions from business as usual conditions. Future projects shall include: Energy Efficiency • Design buildings to be energy efficient and exceed Title 24 requirements by at least 5 percent. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 5 • Install efficient lighting and lighting control systems. Site and design building to take advantage of daylight. • Use trees, landscaping and sun screens on west and south exterior building walls to reduce energy use. • Install light-colored “cool” roofs and cool pavements. • Provide information on energy management services for large energy users. • Install energy-efficient heating and cooling systems, appliances and equipment, and control systems (e.g., minimum of Energy Star rated equipment). • Implement design features to increase the efficiency of the building envelope (i.e., the barrier between conditioned and unconditioned spaces). • Install light-emitting diodes (LEDs) for traffic, street, and other outdoor lighting. • Limit the hours of operation of outdoor lighting. Renewable Energy • Install solar panels on carports and over parking areas. Ensure buildings are designed to have “solar ready” roofs. • Use combined heat and power in appropriate applications. Water Conservation and Efficiency • Create water-efficient landscapes with a preference for a xeriscape landscape palette. • Install water-efficient irrigation systems and devices, such as soil moisture-based irrigation controls. • Design buildings to be water efficient. Install water-efficient fixtures and appliances (e.g., EPA WaterSense labeled products). • Restrict watering methods (e.g., prohibit systems that apply water to non-vegetated surfaces) and control runoff. • Restrict the use of water for cleaning outdoor surfaces and vehicles. • Implement low-impact development practices that maintain the existing hydrologic character of the site to manage storm water and protect the environment. (Retaining storm water runoff onsite can drastically reduce the need for energy-intensive imported water at the site). • Devise a comprehensive water conservation strategy appropriate for the project and location. The strategy may include many of the specific items listed above, plus other innovative measures that are appropriate to the specific project. • Provide education about water conservation and available programs and incentives. Solid Waste Measures • Reuse and recycle construction and demolition waste (including, but not limited to, soil, vegetation, concrete, lumber, metal, and cardboard). • Provide interior and exterior storage areas for recyclables and green waste and adequate recycling containers located in public areas. • Provide education and publicity about reducing waste and available recycling services. Transportation and Motor Vehicles • Limit idling time for commercial vehicles, including delivery and construction vehicles. • Promote ride sharing programs (e.g., by designating a certain percentage of parking spaces for ride sharing vehicles, designating adequate passenger loading and unloading and Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 6 waiting areas for ride sharing vehicles, and providing a website or message board for coordinating rides). • Create local “light vehicle” networks, such as neighborhood electric vehicle (NEV) systems. • Provide the necessary facilities and infrastructure to encourage the use of low or zero- emission vehicles (e.g., electric vehicle charging facilities and conveniently located alternative fueling stations). • Promote “least polluting” ways to connect people and goods to their destinations. • Incorporate bicycle lanes and routes into street systems, new subdivisions, and large developments. • Incorporate bicycle-friendly intersections into street design. • For commercial projects, provide adequate bicycle parking near building entrances to promote cyclist safety, security, and convenience. For large employers, provide facilities that encourage bicycle commuting (e.g., locked bicycle storage or covered or indoor bicycle parking). • Create bicycle lanes and walking paths directed to the location of schools, parks and other destination points. Table 2 provides the details used for the analysis for each facility. Table 2. Existing, SWIP Final EIR Buildout, and Proposed Project Data Inputs Metric Existing SWIP Final EIR Buildout Proposed Project Building Size 13.8 Acres 484.387 TSF 319.956 TSF Base Year 2024 2024 2024 CalEEMod Land Use Parking Lot Unrefrigerated Warehouse No Rail Unrefrigerated Warehouse No Rail Daily Trip rate From counts at project driveways. 1.71 1.71 Fleet Mix 746 Total trips: 307 Passenger trips, 140 2- Axle truck trips, 116 3- Axle truck trips, and 183 4+-Axle truck trips 822 Total trips, 596 Passenger trips, 38 2-Axle truck trips, 47 3-Axle truck trips, and 141 4+-Axle truck trips 547 Total trips, 397 Passenger trips, 25 2-Axle truck trips, 31 3-Axle truck trips, and 94 4+-Axle truck trips Trip Distances CalEEMod Defaults Passenger Vehicles and 2- Axle trucks: (CalEEMod Defaults) 3-Axle and 4+-Axle Trucks (40 miles, 100 percent primary trips) Passenger Vehicles and 2- Axle trucks: (CalEEMod Defaults) 3-Axle and 4+-Axle Trucks (40 miles, 100 percent primary trips) TSF: Thousand Square Feet DU: Dwelling Unit Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 7 Regional Emissions The SCAQMD has adopted maximum daily emission thresholds3 (pounds/day) for the criteria pollutants during construction and operation of a project. The SCAQMD regional thresholds that apply to criteria pollutants are listed in Table 3: Regional Construction Emissions Estimates, Table 4: Regional Comparative Operational Emissions Estimates, and Table 5: Regional Net Operational Emissions Estimates. The estimated CalEEMod emissions include the project emissions generated both from onsite sources (such as off-road construction equipment and fugitive dust) and offsite sources (vehicle travel leaving and arriving to the site). As shown in Table 3, Table 4, and Table 5, the proposed project would result in less than significant regional air quality impacts. In addition, the proposed project is estimated to generate less ROG, SO2, PM10, and PM2.5 emissions than the SWIP development assumptions. Table 3. Regional Construction Emission Estimates Construction Activity Maximum Daily Regional Emissions (pounds/day) ROG NOx CO SO2 PM10 PM2.5 2022 Demolition 3.1 31.8 26.4 0.0 2.9 1.5 Site Prep 5.3 51.2 40.6 0.1 8.4 5.2 Grading 4.6 44.6 35.2 0.1 4.8 3.0 Trenching 0.9 7.2 10.3 0.0 0.3 0.3 Building Construction 2.3 17.7 26.1 0.0 0.9 0.7 Maximum Daily Emissions 5.3 51.2 40.6 0.1 8.4 5.2 2023 Building Construction 2.2 15.7 27.8 0.0 0.8 0.6 Maximum Daily Emissions 2.2 15.7 27.8 0.0 0.8 0.6 2024 Building Construction 2.0 14.9 23.8 0.0 0.8 0.6 Paving 1.6 7.9 11.0 0.0 0.4 0.4 Architectural Coating 63.5 1.4 3.8 0.0 0.1 0.0 Maximum Daily Emissions 63.5 14.9 23.8 0.0 0.8 0.6 Maximum Daily Emission 2022-2024 63.5 51.2 40.6 0.1 8.4 5.2 SCAQMD Significance Thresholds 75 100 550 150 150 55 Threshold Exceeded? No No No No No No Source: CalEEMod Sheets 3 SCAQMD April 2019. Found on 9/3/2020 at http://www.aqmd.gov/docs/default- source/ceqa/handbook/scaqmd-air-quality-significance-thresholds.pdf Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 8 Table 4. Regional Comparative Operational Emission Estimates Operational Activity Maximum Daily Regional Emissions (pounds/day) ROG NOx CO SO2 PM10 PM2.5 Area 9.6 0.1 13.9 0.0 0.0 0.0 Energy 0.1 1.6 1.4 0.0 0.1 0.1 Mobile 3.5 18.6 23.8 0.2 3.9 1.0 Off Road 0.0 14.1 141.0 0.0 0.0 0.0 Stationary 0.4 1.1 1.0 0.0 0.1 0.1 Total Proposed Project Operational Emissions 13.5 35.6 181.1 0.2 4.1 1.2 Total SWIP Site Buildout Operational Emissions 19.9 30.8 59.2 0.3 6.1 1.8 Total Net Operational Emissions -6.4 4.8 121.9 -0.1 -2.0 -0.6 SCAQMD Significance Thresholds 55 55 550 150 150 55 Threshold Exceeded? No No No No No No Source: CalEEMod Sheets Table 5. Regional Net Operational Emission Estimates Operational Activity Maximum Daily Regional Emissions (pounds/day) ROG NOx CO SO2 PM10 PM2.5 Area 9.6 0.1 13.9 0.0 0.0 0.0 Energy 0.1 1.6 1.4 0.0 0.1 0.1 Mobile 3.5 18.6 23.8 0.2 3.9 1.0 Off Road 0.0 14.1 141.0 0.0 0.0 0.0 Stationary 0.4 1.1 1.0 0.0 0.1 0.1 Total Project Operational Emissions 13.5 35.6 181.1 0.2 4.1 1.2 Existing Operational Emissions 3.5 18.5 21.8 0.2 3.7 1.0 Total Net Operational Emissions 10.0 17.1 159.3 0.0 0.4 0.2 SCAQMD Significance Thresholds 55 55 550 150 150 55 Threshold Exceeded? No No No No No No Source: CalEEMod Sheets Local Emissions Localized significance thresholds (LSTs) were also adopted by the SCAQMD due to project-related construction or operational air emissions having the potential to exceed the state and national air quality standards in the project vicinity, while not exceeding the regional emission significance thresholds adopted by the SCAQMD. These thresholds set the maximum rates of daily construction or operational emissions from a project site that would not exceed a national or State ambient air quality standard4. The differences between regional thresholds and LSTs are as follows: 1. Regional thresholds include all sources of project construction and operational emissions generated from onsite and offsite emission sources whereas the LSTs only consider the emissions generated from onsite emission sources. 2. LSTs only apply to CO, NOx, PM10, and PM2.5, while regional thresholds include both ROG and SOx. 4 SCAQMD 2008: Final Localized Significance Threshold Methodology. Referenced on 9/3/2020 at http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/localized-significance-thresholds/final-lst- methodology-document.pdf Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 9 3. Regional Thresholds apply to emission sources located anywhere within the SCAQMD whereas the LSTs are location dependent and also depend on the size of the project, and emission location relative to the nearest sensitive receptor. A sensitive receptor is defined as an individual who is most susceptible to negative health affects when exposed to air pollutants including children, the elderly, and adults with chronic health issues. Such receptors include residences, schools, elderly care centers, and hospitals. SCAQMD provides screening look up tables (Appendix C of the SCAQMD 2008 Final Localized Significance Threshold Methodology)5 for projects that disturb less than or equal to 5 acres in size in a day. These tables were created to easily determine if the daily emissions of NOx, CO, PM10, and PM2.5 from a project could result in a significant impact to the local air quality. The thresholds are determined by: • Source receptor area (SRA), the geographic area within the SCAQMD that can act as both a source of emissions and a receptor of emission impacts (project is located within SRA 34, Central San Bernardino County), • Size of grading disturbance (construction)/size of the project (operation), • Distance to the nearest sensitive receptor. The project construction phase with the most ground disturbance would be the site preparation phase, which would grade 3.5 acres per day, so 3.5 acres was used for the look up tables. The thresholds for 3.5 acres were interpolated from Appendix C using the thresholds for 2 acres and 5 acres. Distance to the nearest sensitive receptor also determines the emission thresholds. The sensitive receptors closest to the project include a residence west of the project site boundary, about 32 meters (104 feet). The distance of 25 meters provided in the lookup tables was used for a conservative analysis. Table 6: Localized Construction Emission Estimates shows the thresholds and estimated maximum daily construction emissions for the proposed project. As seen in Table 5, the proposed project has a less then significant localized construction air quality impact. The LSTs for operation are determined by the size of the project site and the distance to the nearest sensitive receptor. The proposed project is 13.8 acres; therefore, the LST 5-acre thresholds were used for a conservative analysis. No credit was taken from the existing use for the LST analysis; however, the previously approved total is included for comparison. As shown in Table 7, the proposed project is estimated to generate higher emissions of NOx and CO, equivalent emissions of PM10, and less emissions of PM2.5. However, the proposed project’s emissions are below the localized significance thresholds; therefore, the proposed project has a less than significant localized operational air quality impact, and no new impacts would result. 5 SCAQMD 2008: Final Localized Significance Threshold Methodology Appendix C. Referenced on 9/16/2020 at http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/appendix-c-mass- rate-lst-look-up-tables.pdf?sfvrsn=2 Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 10 Table 6. Localized Construction Emission Estimates Construction Activity Maximum Daily Regional Emissions (pounds/day) NOx CO PM10 PM2.5 2022 Demolition 29.6 24.3 2.8 1.4 Site Prep 51.1 39.3 8.4 5.2 Grading 44.3 33.6 4.8 3.0 Building Construction 7.0 8.4 0.3 0.3 Maximum Daily Emissions 14.2 14.7 0.7 0.7 2023 Building Construction 12.8 14.3 0.6 0.6 Maximum Daily Emissions 12.8 14.3 0.6 0.6 2024 Building Construction 12.2 14.2 0.5 0.5 Paving 7.8 10.0 0.4 0.4 Architectural Coating 1.2 1.5 0.0 0.0 Maximum Daily Emissions 12.2 14.2 0.5 0.5 Maximum Daily Emission 2022-2024 51.1 39.3 8.4 5.2 SCAQMD Significance Thresholds 220 1,359 11 6 Threshold Exceeded? No No No No Source: CalEEMod Sheets Table 7. Localized Comparative Operational Emission Estimates Operational Activity Maximum Daily Regional Emissions (pounds/day) NOx CO PM10 PM2.5 Area 0.1 13.9 0.0 0.0 Energy 1.6 1.4 0.1 0.1 Total Mobile 1.9 4.3 0.1 0.0 Off Road 14.1 141.0 0.0 0.0 Stationary 1.1 1.0 0.1 0.1 Total Project LST Operational Emissions 18.8 161.6 0.3 0.2 SCAQMD Significance Thresholds 270 1,746 4 2 Threshold Exceeded? No No No No Total Previous LST Operational Emissions 5.5 29.7 0.3 0.3 Comparative LST Operational Emissions 13.3 131.9 0.0 -0.1 Source: CalEEMod Sheets Conclusion The proposed project’s maximum daily emissions (regional and local) for construction and operation of the project would not exceed the South Coast Air Quality Management District’s (SCAQMD) regional or local thresholds of significance. The proposed project would generate less or equal regional and local emissions of ROG, SO2, PM10, and PM2.5, when compared to the SWIP development assumptions, while generating less than significant but higher emissions of NOx and CO. In addition, all construction activities would comply with applicable SCAQMD rules and regulations, including Rule 403 to minimize fugitive PM dust emissions and Rule 1113 which allows only Low-Volatile Organic Compounds (VOC) paints. Projects that do not exceed the regional thresholds are assumed to not have a significant impact on a project level and cumulative level. Therefore, the proposed project would result in less than significant air quality impacts, and no new impacts would result. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 11 Energy The State CEQA Guidelines do not have specific thresholds for Energy consumption. Rather, the question in Appendix G: VI Energy (a) asks, “[Does the proposed project] Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation?”. Therefore, for the purpose of this analysis, a significant impact would occur if: • The Project design and/or location encourages wasteful, inefficient, and unnecessary consumption of energy, especially fossil fuels such as coal, natural gas, and petroleum, as well as the use of fuel by vehicles anticipated to travel to and from the project. The following assumptions were used to calculate the energy consumption of the proposed project: • The proposed project’s construction and operational energy consumption would be provided by Southern California Edison Company. • Construction equipment fuel consumption derived from Air Resources Board (ARB) Offroad2021 emission model • Fuel Consumption from vehicle travel derived from ARB EMFAC2021 emission model • Electrical and natural gas usage derived from the CalEEMod model Construction Electricity and Natural Gas Usage: Due to the proposed project’s size and the fact that construction is temporary, the electricity used would be substantially less than that required for project operation and would have a negligible contribution to the project’s overall energy consumption. The electric power used would be for as-necessary lighting, powering electric construction equipment, and electronic equipment such as computers used inside temporary construction trailers. Natural gas is not anticipated to be needed for construction activities. Any consumption of natural gas would be minor and negligible in comparison to the operation of the proposed project. Petroleum Fuel Usage: The construction equipment associated with construction activities (off-road/heavy duty vehicles) would rely on diesel fuel as would vendor and haul trucks involved in delivering building materials and removing the demolition debris from the project site. Construction workers would travel to and from the project site throughout the duration of construction, and for a conservative analysis it is assumed that construction workers would travel in gasoline-powered passenger vehicles. Table 8 used the total fuel consumption and horsepower-hour data contained within the ARB OffRoad2021 emission model for specific types of diesel construction equipment. It should be noted that the total fuel consumption is a conservative analysis and would likely overstate the amount of fuel usage, as specific construction equipment is not expected to operate during the duration of the construction activity (i.e., crane). Table 9 summarizes the project’s construction vehicle fuel usage based on vehicle miles traveled and fuel usage factors contained in the ARB EMFAC2021. The trips included are worker vehicles, vendor vehicles, and haul vehicles. Table 10 shows the overall fuel consumption for construction of the proposed project. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 12 Table 8. Construction Equipment Fuel Usage Activity Equipment Number Hours per day Horse- power Load Factor Days of Construction Total Horsepower- hours Fuel Rate (gal/hp-hr) Fuel Use (gallons) Demolition Concrete/Industrial Saws 1 8 33 0.73 10 1,927 0.041881728 81 Rubber Tired Dozers 3 8 36 0.38 10 3,283 0.01985595 65 Tractors/Loaders/Backhoes 2 8 367 0.4 10 23,488 0.020601315 484 Site Preparation Rubber Tired Dozers 3 8 367 0.4 10 35,232 0.020601315 726 Crawler Tractors 4 8 87 0.43 10 11,971 0.022175849 265 Grading Excavator 2 8 36 0.38 30 6,566 0.01985595 130 Graders 1 8 148 0.41 30 14,563 0.021161331 308 Rubber Tired Dozers 1 8 367 0.4 30 35,232 0.020601315 726 Scraper 2 8 423 0.48 30 97,459 0.024988526 2,435 Crawler Tractors 2 8 87 0.43 30 17,957 0.022175849 398 Utilities Excavator 4 8 36 0.38 10 4,378 0.045116197 198 Plate Compactors 4 8 8 0.43 10 1,101 0.024592837 27 Skid Steer Loaders 1 8 71 0.37 10 2,102 0.019369887 41 Tractors/Loaders/Backhoes 1 8 84 0.37 10 2,486 0.010444403 26 Building Construction Cranes 1 8 367 0.29 300 255,432 0.014895293 3,805 Forklifts 3 8 82 0.2 300 118,080 0.010444403 1,233 Generator Sets 1 8 14 0.74 300 24,864 0.045116197 1,122 Tractors/Loaders/Backhoes 3 8 84 0.37 300 223,776 0.022175849 4,962 Welder 1 8 46 0.45 300 49,680 0.026298689 1,307 Paving Pavers 2 8 81 0.42 20 10,886 0.021532281 234 Paving Equipment 2 8 89 0.36 20 10,253 0.018464524 189 Rollers 2 8 36 0.38 20 4,378 0.019836075 87 Architectural Coating Air Compressors 1 8 37 0.48 25 3,552 0.027796281 99 Total 18,948 Source: Fuel Calculation Sheets Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 13 Table 9. Estimated Project Vehicle Fuel Usage Construction Source Number VMT Fuel Rate Gallons of Diesel Fuel Gallons of Gasoline Fuel Haul Trucks 18 360 5.85 62 0 Vendor Trucks 52 159,120 8.94 17,789 0 Worker Vehicles 254 783,568 24.02 0 32,139 Total 17,851 32,139 Source: CalEEMod Sheets Table 10. Total Construction Fuel Usage Construction Source Gallons of Diesel Fuel Gallons of Gasoline Fuel Construction Vehicles 17,851 32,139 Off-road Construction Equipment 18,948 0 Total 36,799 32,139 Operation The operation of the proposed project would consume electricity, natural gas, and petroleum. The comparative energy consumption can be found in Table 11, which includes the estimates with project design features and mitigation from the SWIP. Electricity and natural gas consumption were found in the CalEEMod Output Sheets attached. The gasoline consumption rates utilize the same assumptions that were used for the worker vehicles. As shown in Table 11, the proposed project is estimated to require less electricity, natural gas, gasoline, and diesel fuel then the SWIP development assumptions. Table 12 shows the net energy consumption of the proposed project when accounting for the existing gasoline and diesel consumption. As can be seen in Table 12, the project would consume more electricity, natural gas, and diesel; however, would consume less gasoline. While the total VMT of gasoline consuming vehicles would increase with the proposed project, the estimated vehicle splits would favor more fuel-efficient vehicles (like automobile or passenger trucks) when compared to the existing project site uses that consist of more light heavy duty vehicles. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 14 Table 11. Project Comparative Annual Operational Energy Requirements Operational Source Energy Usage Electricity (Kilowatt-Hours) Proposed Project 1,446,403 Previous SWIP 2,189,735 Difference -743,332 Natural Gas (Thousands British Thermal Units)* Proposed Project 6,133,999 Previous SWIP 9,247,203 Difference -3,113,204 Petroleum (gasoline) Consumption Annual VMT Gallons of Gasoline Fuel Proposed Project 1,902,970 79,136 Previous SWIP 2,880,939 119,805 Difference -977,969 -40,669 Petroleum (diesel) Consumption* Annual VMT Gallons of diesel Fuel Proposed Project 1,882,003 288,904 Previous SWIP 2,849,197 436,788 Difference -967,194 -147,884 *Operational Equipment (i.e. forklifts/fire pumps) included Source: CalEEMod Sheets Table 12. Project Net Annual Operational Energy Requirements Operational Source Energy Usage Electricity (Kilowatt-Hours) Proposed Project 1,446,403 Existing 0 Difference 1,446,403 Natural Gas (Thousands British Thermal Units)* Proposed Project 6,133,999 Existing 0 Difference 6,133,999 Petroleum (gasoline) Consumption Annual VMT Gallons of Gasoline Fuel Proposed Project 1,902,970 79,136 Existing 1,755,522 84,305 Difference 147,448 -5,169 Petroleum (diesel) Consumption* Annual VMT Gallons of diesel Fuel Proposed Project 1,882,003 288,904 Existing 1,657,489 217,527 Difference 224,514 71,377 *Operational Equipment (i.e. forklifts/fire pumps) included Source: CalEEMod Sheets Conclusion The proposed project’s energy consumption for construction activities related to redevelopment of the site for new industrial warehousing uses would be permitted to require compliance with existing fuel standards, machinery efficiency standards, and CARB requirements that limit idling of trucks. Through compliance with existing standards the proposed project would not result in demand for fuel greater on a per-development basis than other development projects in Southern California. There are no unusual project characteristics that would cause the use of construction equipment that would be less energy efficient compared with other Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 15 similar construction sites in other parts of the State. The operation of the proposed project would consume less electricity, natural gas, gasoline, and diesel then the SWIP development assumptions. In addition, the proposed project is similar to other industrial projects and would comply with current Title 24 requirements as well as all applicable City business and energy codes and ordinances. Therefore, the proposed project would result in a less than significant impact on energy consumption. Greenhouse Gas SCAQMD has convened a Greenhouse Gas Emissions (GHG) CEQA Significance Threshold Working Group recommends a tiered approach, Tier 1 to Tier 5, to evaluate potential GHG impacts from various uses. This assessment will apply the Tier 3: Numerical Screening Thresholds approach. Tier three consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. Also, pursuant to SCAQMD methodology, project construction emissions are averaged over 30 years and are added to the project’s operational emissions. If a project’s emissions are below one of the following screening thresholds, then the project impact would be is less than significant: • Option 1: All land use types: 3,000 MT CO2e per year • Option 2: Based on land use type: residential: 3,500 MT CO2e per year; commercial: 1,400 MT CO2e per year; or mixed use: 3,000 MT CO2e per year Executive Order S-3-05’s year 2050 goal is the basis of SCAQMD’ draft Tier 3 screening level thresholds. The objective of the Executive Order is to contribute to capping worldwide CO2 concentrations at 450 ppm, stabilizing global climate change. The City of Fontana utilizes Option 1, and therefore the threshold is 3,000 MT CO2e per year. The project’s construction GHG emissions are shown in Table 13. Table 14 shows the overall amortized construction emissions added to the proposed projects operational emissions (with project design features and SWIP mitigation included) compared to the estimated operational emissions from the SWIP development assumptions. These emissions were calculated using the CalEEMod Model. As shown in Table 14, the proposed project generates less GHG emissions then the previous SWIP. Table 15 shows the proposed projects net GHG emissions when accounting for the existing emissions. As shown in Table 15, the proposed project would generate a net 1,747 MTCO2e, and therefore would not exceed the 3,000 MT CO2e per year threshold and generate less GHG emissions than would be produced by the SWIP development assumptions. Therefore, impacts would be less than significant, and no new impacts would occur. Table 13. Project Construction GHG Emissions Activity Annual GHG Emissions (MTCO2e) 2022 169 2023 738 2024 116 Total Emissions 1,023 Total Emissions Amortized Over 30 Years 34 Source: CalEEMod Sheets Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 16 Table 14. Project Comparative Total GHG Emissions Activity Annual GHG Emissions (MTCO2e) Project Operational Emissions Area 7 Energy 560 Mobile 3,346 Offroad 517 Stationary 5 Waste 70 Water 136 Total Proposed Project Gross Operation Emissions 4,636 Project Construction Emissions 34 Total Proposed Project Emissions 4,670 Previous SWIP Gross Operation Emissions 6,227 Comparative Emissions -1,557 Source: CalEEMod Sheets Table 15. Project Net GHG Emissions Activity Annual GHG Emissions (MTCO2e) Project Operational Emissions Area 7 Energy 560 Mobile 3,346 Offroad 517 Stationary 5 Waste 70 Water 136 Total Proposed Project Gross Operation Emissions 4,636 Project Construction Emissions 34 Total Proposed Project Emissions 4,670 Existing Gross Operation Emissions 2,923 Net Emissions 1,747 Significance Threshold 3,000 Threshold Exceeded? No Source: CalEEMod Sheets Conclusion The proposed project would generate 4,636 MTCO2e per year, 1,557 MTCO2e less than implementation of the SWIP Final EIR development assumptions. Therefore, the proposed project would not generate a new or greater impact on GHG emissions compared to the approved SWIP. In addition, the proposed projects net increase in GHG emissions when taking account for the existing emissions would be 1,747 MTCO2e, below the 3,000 MTCO2e per year screening threshold set by the City of Fontana. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 17 Figure 1: Project Site Plan Source: HPA Architects Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 18 CalEEMod Sheets Santa Ana & Live Oak Construction Custom Report, 5/26/2022 1 / 42 Santa Ana & Live Oak Construction Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds 2.2. Construction Emissions by Year, Unmitigated 2.3. Construction Emissions by Year, Mitigated 3. Construction Emissions Details 3.1. Demolition (2022) - Unmitigated 3.2. Demolition (2022) - Mitigated 3.3. Site Preparation (2022) - Unmitigated 3.4. Site Preparation (2022) - Mitigated 3.5. Grading (2022) - Unmitigated Santa Ana & Live Oak Construction Custom Report, 5/26/2022 2 / 42 3.6. Grading (2022) - Mitigated 3.7. Building Construction (2022) - Unmitigated 3.8. Building Construction (2022) - Mitigated 3.9. Building Construction (2023) - Unmitigated 3.10. Building Construction (2023) - Mitigated 3.11. Building Construction (2024) - Unmitigated 3.12. Building Construction (2024) - Mitigated 3.13. Paving (2024) - Unmitigated 3.14. Paving (2024) - Mitigated 3.15. Architectural Coating (2024) - Unmitigated 3.16. Architectural Coating (2024) - Mitigated 3.17. Trenching (2022) - Unmitigated 3.18. Trenching (2022) - Mitigated 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Santa Ana & Live Oak Construction Custom Report, 5/26/2022 3 / 42 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated 5. Activity Data 5.1. Construction Schedule 5.2. Off-Road Equipment 5.2.1. Unmitigated 5.2.2. Mitigated 5.3. Construction Vehicles 5.3.1. Unmitigated 5.3.2. Mitigated 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies 5.5. Architectural Coatings 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities Santa Ana & Live Oak Construction Custom Report, 5/26/2022 4 / 42 5.6.2. Construction Earthmoving Control Strategies 5.7. Construction Paving 5.8. Construction Electricity Consumption and Emissions Factors 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.2. Sequestration 5.18.2.1. Unmitigated 5.18.2.2. Mitigated 8. User Changes to Default Data Santa Ana & Live Oak Construction Custom Report, 5/26/2022 5 / 42 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Construction Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.0573832174187, -117.48128719045326 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Unrefrigerated Warehouse-No Rail 320 1000sqft 8.55 319,956 52,330 0.00 —— Parking Lot 103 Space 0.93 0.00 0.00 0.00 —— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 6 / 42 ——0.000.000.004.32Acre4.32Other Asphalt Surfaces 1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector #Measure Title Construction C-13 Use Low-VOC Paints for Construction 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.124 15.5 27.8 0.04 2.83 1.11 6,387 Mit.63.5 15.5 27.8 0.04 2.83 1.11 6,387 % Reduced 49%—————— Daily, Winter (Max)——————— Unmit.124 51.2 40.6 0.06 8.65 5.28 7,093 Mit.63.5 51.2 40.6 0.06 8.65 5.28 7,093 % Reduced 49%—————— Average Daily (Max)——————— Unmit.8.77 11.2 18.0 0.03 2.01 0.79 4,457 Mit.4.62 11.2 18.0 0.03 2.01 0.79 4,457 % Reduced 47%—————— Annual (Max)——————— Unmit.1.60 2.05 3.29 < 0.005 0.37 0.14 738 Mit.0.84 2.05 3.29 < 0.005 0.37 0.14 738 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 7 / 42 % Reduced 47%—————— Exceeds (Daily Max)——————— Threshold 75.0 100 550 148 150 54.0 — Unmit.Yes No No No No No — Mit.No No No No No No — Exceeds (Average Daily) ——————— Threshold 75.0 100 550 148 150 54.0 — Unmit.No No No No No No — Mit.No No No No No No — 2.2. Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10T PM2.5T CO2e Daily - Summer (Max)——————— 2023 2.14 15.5 27.8 0.04 2.83 1.11 6,387 2024 124 1.34 3.80 < 0.005 0.39 0.12 571 Daily - Winter (Max)——————— 2022 5.31 51.2 40.6 0.06 8.65 5.28 7,093 2023 2.09 15.7 24.7 0.04 2.83 1.11 6,210 2024 124 14.9 23.8 0.04 2.77 1.05 6,156 Average Daily ——————— 2022 0.67 6.41 5.44 0.01 0.81 0.46 1,020 2023 1.49 11.2 18.0 0.03 2.01 0.79 4,457 2024 8.77 1.90 3.07 < 0.005 0.31 0.13 700 Annual ——————— 2022 0.12 1.17 0.99 < 0.005 0.15 0.08 169 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 8 / 42 2023 0.27 2.05 3.29 < 0.005 0.37 0.14 738 2024 1.60 0.35 0.56 < 0.005 0.06 0.02 116 2.3. Construction Emissions by Year, Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10T PM2.5T CO2e Daily - Summer (Max)——————— 2023 2.14 15.5 27.8 0.04 2.83 1.11 6,387 2024 63.5 1.34 3.80 < 0.005 0.39 0.12 571 Daily - Winter (Max)——————— 2022 5.31 51.2 40.6 0.06 8.65 5.28 7,093 2023 2.09 15.7 24.7 0.04 2.83 1.11 6,210 2024 63.5 14.9 23.8 0.04 2.77 1.05 6,156 Average Daily ——————— 2022 0.67 6.41 5.44 0.01 0.81 0.46 1,020 2023 1.49 11.2 18.0 0.03 2.01 0.79 4,457 2024 4.62 1.90 3.07 < 0.005 0.31 0.13 700 Annual ——————— 2022 0.12 1.17 0.99 < 0.005 0.15 0.08 169 2023 0.27 2.05 3.29 < 0.005 0.37 0.14 738 2024 0.84 0.35 0.56 < 0.005 0.06 0.02 116 3. Construction Emissions Details 3.1. Demolition (2022) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Santa Ana & Live Oak Construction Custom Report, 5/26/2022 9 / 42 Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 3.02 29.6 24.3 0.03 1.31 1.21 3,434 Demolition ————1.47 0.22 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.08 0.81 0.67 < 0.005 0.04 0.03 94.1 Demolition ————0.04 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.02 0.15 0.12 < 0.005 0.01 0.01 15.6 Demolition ————0.01 < 0.005 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.08 0.11 1.14 0.00 0.01 0.00 208 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.03 2.04 0.91 0.01 0.12 0.05 1,286 Average Daily ——————— Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 5.80 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.06 0.02 < 0.005 < 0.005 < 0.005 35.3 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 0.96 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 10 / 42 Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 5.84 3.2. Demolition (2022) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 3.02 29.6 24.3 0.03 1.31 1.21 3,434 Demolition ————1.47 0.22 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.08 0.81 0.67 < 0.005 0.04 0.03 94.1 Demolition ————0.04 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.02 0.15 0.12 < 0.005 0.01 0.01 15.6 Demolition ————0.01 < 0.005 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.08 0.11 1.14 0.00 0.01 0.00 208 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.03 2.04 0.91 0.01 0.12 0.05 1,286 Average Daily ——————— Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 5.80 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 11 / 42 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.06 0.02 < 0.005 < 0.005 < 0.005 35.3 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 0.96 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 5.84 3.3. Site Preparation (2022) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 5.22 51.1 39.3 0.05 2.76 2.54 5,545 Dust From Material Movement ————5.66 2.69 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.14 1.40 1.08 < 0.005 0.08 0.07 152 Dust From Material Movement ————0.16 0.07 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.03 0.26 0.20 < 0.005 0.01 0.01 25.2 Dust From Material Movement ————0.03 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 12 / 42 Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.09 0.12 1.33 0.00 0.01 0.00 243 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 7.61 Average Daily ——————— Worker < 0.005 < 0.005 0.04 0.00 < 0.005 0.00 6.77 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.21 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.12 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.03 3.4. Site Preparation (2022) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 5.22 51.1 39.3 0.05 2.76 2.54 5,545 Dust From Material Movement ————5.66 2.69 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.14 1.40 1.08 < 0.005 0.08 0.07 152 Dust From Material Movement ————0.16 0.07 — Santa Ana & Live Oak Construction Custom Report, 5/26/2022 13 / 42 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.03 0.26 0.20 < 0.005 0.01 0.01 25.2 Dust From Material Movement ————0.03 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.09 0.12 1.33 0.00 0.01 0.00 243 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 7.61 Average Daily ——————— Worker < 0.005 < 0.005 0.04 0.00 < 0.005 0.00 6.77 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.21 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.12 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.03 3.5. Grading (2022) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 14 / 42 Off-Road Equipment 4.44 44.3 33.6 0.06 2.14 1.97 6,734 Dust From Material Movement ————2.67 0.98 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.37 3.64 2.76 0.01 0.18 0.16 553 Dust From Material Movement ————0.22 0.08 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.07 0.67 0.50 < 0.005 0.03 0.03 91.6 Dust From Material Movement ————0.04 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.11 0.14 1.52 0.00 0.02 0.00 278 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.13 0.06 < 0.005 0.01 < 0.005 81.2 Average Daily ——————— Worker 0.01 0.01 0.13 0.00 < 0.005 0.00 23.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 6.68 Annual ——————— Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 3.84 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.11 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 15 / 42 3.6. Grading (2022) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 4.44 44.3 33.6 0.06 2.14 1.97 6,734 Dust From Material Movement ————2.67 0.98 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.37 3.64 2.76 0.01 0.18 0.16 553 Dust From Material Movement ————0.22 0.08 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.07 0.67 0.50 < 0.005 0.03 0.03 91.6 Dust From Material Movement ————0.04 0.01 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.11 0.14 1.52 0.00 0.02 0.00 278 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.13 0.06 < 0.005 0.01 < 0.005 81.2 Average Daily ——————— Worker 0.01 0.01 0.13 0.00 < 0.005 0.00 23.2 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 16 / 42 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 6.68 Annual ——————— Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 3.84 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.11 3.7. Building Construction (2022) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 1.48 14.2 14.7 0.03 0.70 0.65 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.02 0.22 0.23 < 0.005 0.01 0.01 41.3 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.04 0.04 < 0.005 < 0.005 < 0.005 6.84 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.72 0.95 10.2 0.00 0.11 0.00 1,868 Vendor 0.06 2.59 1.17 0.01 0.12 0.06 1,759 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 17 / 42 Average Daily ——————— Worker 0.01 0.01 0.17 0.00 < 0.005 0.00 29.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 < 0.005 27.6 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 4.92 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 4.56 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.8. Building Construction (2022) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 1.48 14.2 14.7 0.03 0.70 0.65 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.02 0.22 0.23 < 0.005 0.01 0.01 41.3 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.04 0.04 < 0.005 < 0.005 < 0.005 6.84 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.72 0.95 10.2 0.00 0.11 0.00 1,868 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 18 / 42 Vendor 0.06 2.59 1.17 0.01 0.12 0.06 1,759 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.01 0.01 0.17 0.00 < 0.005 0.00 29.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 < 0.005 27.6 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.03 0.00 < 0.005 0.00 4.92 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 4.56 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.9. Building Construction (2023) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.97 9.15 10.2 0.02 0.43 0.39 1,885 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.18 1.67 1.86 < 0.005 0.08 0.07 312 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 19 / 42 Offsite ——————— Daily, Summer (Max)——————— Worker 0.74 0.71 12.4 0.00 0.11 0.00 2,004 Vendor 0.05 1.97 1.06 0.01 0.12 0.06 1,743 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Worker 0.69 0.83 9.35 0.00 0.11 0.00 1,831 Vendor 0.04 2.05 1.08 0.01 0.12 0.06 1,740 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.49 0.59 7.07 0.00 0.08 0.00 1,329 Vendor 0.03 1.47 0.77 0.01 0.08 0.04 1,243 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker 0.09 0.11 1.29 0.00 0.01 0.00 220 Vendor 0.01 0.27 0.14 < 0.005 0.02 0.01 206 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.10. Building Construction (2023) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Off-Road Equipment 1.36 12.8 14.3 0.03 0.60 0.55 2,639 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 20 / 42 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.97 9.15 10.2 0.02 0.43 0.39 1,885 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.18 1.67 1.86 < 0.005 0.08 0.07 312 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Worker 0.74 0.71 12.4 0.00 0.11 0.00 2,004 Vendor 0.05 1.97 1.06 0.01 0.12 0.06 1,743 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Worker 0.69 0.83 9.35 0.00 0.11 0.00 1,831 Vendor 0.04 2.05 1.08 0.01 0.12 0.06 1,740 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.49 0.59 7.07 0.00 0.08 0.00 1,329 Vendor 0.03 1.47 0.77 0.01 0.08 0.04 1,243 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker 0.09 0.11 1.29 0.00 0.01 0.00 220 Vendor 0.01 0.27 0.14 < 0.005 0.02 0.01 206 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.11. Building Construction (2024) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Santa Ana & Live Oak Construction Custom Report, 5/26/2022 21 / 42 Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 1.30 12.2 14.2 0.03 0.54 0.49 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.12 1.12 1.31 < 0.005 0.05 0.05 243 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.02 0.20 0.24 < 0.005 0.01 0.01 40.2 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.66 0.77 8.59 0.00 0.11 0.00 1,795 Vendor 0.04 1.96 1.03 0.01 0.12 0.06 1,721 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.06 0.07 0.83 0.00 0.01 0.00 168 Vendor < 0.005 0.18 0.09 < 0.005 0.01 0.01 158 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker 0.01 0.01 0.15 0.00 < 0.005 0.00 27.8 Vendor < 0.005 0.03 0.02 < 0.005 < 0.005 < 0.005 26.2 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 22 / 42 3.12. Building Construction (2024) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 1.30 12.2 14.2 0.03 0.54 0.49 2,639 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.12 1.12 1.31 < 0.005 0.05 0.05 243 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.02 0.20 0.24 < 0.005 0.01 0.01 40.2 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.66 0.77 8.59 0.00 0.11 0.00 1,795 Vendor 0.04 1.96 1.03 0.01 0.12 0.06 1,721 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.06 0.07 0.83 0.00 0.01 0.00 168 Vendor < 0.005 0.18 0.09 < 0.005 0.01 0.01 158 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker 0.01 0.01 0.15 0.00 < 0.005 0.00 27.8 Vendor < 0.005 0.03 0.02 < 0.005 < 0.005 < 0.005 26.2 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 23 / 42 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.13. Paving (2024) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 0.85 7.81 10.0 0.01 0.39 0.36 1,517 Paving 0.69 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.05 0.43 0.55 < 0.005 0.02 0.02 83.1 Paving 0.04 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 13.8 Paving 0.01 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.07 0.09 0.96 0.00 0.01 0.00 200 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker < 0.005 < 0.005 0.06 0.00 < 0.005 0.00 11.2 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 24 / 42 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.85 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.14. Paving (2024) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 0.85 7.81 10.0 0.01 0.39 0.36 1,517 Paving 0.69 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.05 0.43 0.55 < 0.005 0.02 0.02 83.1 Paving 0.04 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 13.8 Paving 0.01 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 25 / 42 Worker 0.07 0.09 0.96 0.00 0.01 0.00 200 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker < 0.005 < 0.005 0.06 0.00 < 0.005 0.00 11.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.85 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.15. Architectural Coating (2024) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179 Architectural Coatings 124 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179 Architectural Coatings 124 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 12.2 Architectural Coatings 8.48 —————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 26 / 42 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 2.03 Architectural Coatings 1.55 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Worker 0.14 0.13 2.27 0.00 0.02 0.00 393 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Worker 0.13 0.15 1.72 0.00 0.02 0.00 359 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.01 0.01 0.12 0.00 < 0.005 0.00 25.0 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 4.14 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.16. Architectural Coating (2024) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 27 / 42 Daily, Summer (Max)——————— Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179 Architectural Coatings 63.2 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Off-Road Equipment 0.18 1.21 1.53 < 0.005 0.04 0.04 179 Architectural Coatings 63.2 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.01 0.08 0.10 < 0.005 < 0.005 < 0.005 12.2 Architectural Coatings 4.33 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 2.03 Architectural Coatings 0.79 —————— Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Worker 0.14 0.13 2.27 0.00 0.02 0.00 393 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Worker 0.13 0.15 1.72 0.00 0.02 0.00 359 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker 0.01 0.01 0.12 0.00 < 0.005 0.00 25.0 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 28 / 42 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.02 0.00 < 0.005 0.00 4.14 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.17. Trenching (2022) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 0.80 6.97 8.39 0.01 0.30 0.28 1,243 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.02 0.19 0.23 < 0.005 0.01 0.01 34.1 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.03 0.04 < 0.005 < 0.005 < 0.005 5.64 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.13 0.18 1.90 0.00 0.02 0.00 347 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 29 / 42 Average Daily ——————— Worker < 0.005 < 0.005 0.05 0.00 < 0.005 0.00 9.67 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.60 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.18. Trenching (2022) - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10T PM2.5T CO2e Onsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Off-Road Equipment 0.80 6.97 8.39 0.01 0.30 0.28 1,243 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Off-Road Equipment 0.02 0.19 0.23 < 0.005 0.01 0.01 34.1 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Off-Road Equipment < 0.005 0.03 0.04 < 0.005 < 0.005 < 0.005 5.64 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite ——————— Daily, Summer (Max)——————— Daily, Winter (Max)——————— Worker 0.13 0.18 1.90 0.00 0.02 0.00 347 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 30 / 42 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily ——————— Worker < 0.005 < 0.005 0.05 0.00 < 0.005 0.00 9.67 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Worker < 0.005 < 0.005 0.01 0.00 < 0.005 0.00 1.60 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Santa Ana & Live Oak Construction Custom Report, 5/26/2022 31 / 42 Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 32 / 42 Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 33 / 42 Total ——————— 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 34 / 42 Subtotal ——————— ———————— 5. Activity Data 5.1. Construction Schedule Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 10/1/2022 10/14/2022 5.00 10.0 — Site Preparation Site Preparation 10/15/2022 10/28/2022 5.00 10.0 — Grading Grading 10/29/2022 12/9/2022 5.00 30.0 — Building Construction Building Construction 12/24/2022 2/16/2024 5.00 300 — Paving Paving 2/17/2024 3/15/2024 5.00 20.0 — Architectural Coating Architectural Coating 3/16/2024 4/19/2024 5.00 25.0 — Utilities Trenching 12/10/2022 12/23/2022 5.00 10.0 — 5.2. Off-Road Equipment 5.2.1. Unmitigated Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Concrete/Industrial Saws Diesel Average 1.00 8.00 33.0 0.73 Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38 Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40 Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 Grading Excavators Diesel Average 2.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 8.00 148 0.41 Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 35 / 42 Grading Scrapers Diesel Average 2.00 8.00 423 0.48 Building Construction Cranes Diesel Average 1.00 8.00 367 0.29 Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh oes Diesel Average 3.00 8.00 84.0 0.37 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Paving Pavers Diesel Average 2.00 8.00 81.0 0.42 Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38 Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48 Site Preparation Crawler Tractors Diesel Average 4.00 8.00 87.0 0.43 Grading Crawler Tractors Diesel Average 2.00 8.00 87.0 0.43 Utilities Excavators Diesel Average 4.00 8.00 36.0 0.38 Utilities Plate Compactors Diesel Average 4.00 8.00 8.00 0.43 Utilities Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37 Utilities Tractors/Loaders/Backh oes Diesel Average 1.00 8.00 84.0 0.37 5.2.2. Mitigated Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Concrete/Industrial Saws Diesel Average 1.00 8.00 33.0 0.73 Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38 Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40 Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 Grading Excavators Diesel Average 2.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 8.00 148 0.41 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 36 / 42 Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Grading Scrapers Diesel Average 2.00 8.00 423 0.48 Building Construction Cranes Diesel Average 1.00 8.00 367 0.29 Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh oes Diesel Average 3.00 8.00 84.0 0.37 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Paving Pavers Diesel Average 2.00 8.00 81.0 0.42 Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38 Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48 Site Preparation Crawler Tractors Diesel Average 4.00 8.00 87.0 0.43 Grading Crawler Tractors Diesel Average 2.00 8.00 87.0 0.43 Utilities Excavators Diesel Average 4.00 8.00 36.0 0.38 Utilities Plate Compactors Diesel Average 4.00 8.00 8.00 0.43 Utilities Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37 Utilities Tractors/Loaders/Backh oes Diesel Average 1.00 8.00 84.0 0.37 5.3. Construction Vehicles 5.3.1. Unmitigated Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition ———— Demolition Worker 15.0 18.5 LDA,LDT1,LDT2 Demolition Vendor —10.2 HHDT,MHDT Demolition Hauling 16.9 20.0 HHDT Santa Ana & Live Oak Construction Custom Report, 5/26/2022 37 / 42 Demolition Onsite truck ——HHDT Site Preparation ———— Site Preparation Worker 17.5 18.5 LDA,LDT1,LDT2 Site Preparation Vendor —10.2 HHDT,MHDT Site Preparation Hauling 0.10 20.0 HHDT Site Preparation Onsite truck ——HHDT Grading ———— Grading Worker 20.0 18.5 LDA,LDT1,LDT2 Grading Vendor —10.2 HHDT,MHDT Grading Hauling 1.07 20.0 HHDT Grading Onsite truck ——HHDT Building Construction ———— Building Construction Worker 134 18.5 LDA,LDT1,LDT2 Building Construction Vendor 52.4 10.2 HHDT,MHDT Building Construction Hauling 0.00 20.0 HHDT Building Construction Onsite truck ——HHDT Paving ———— Paving Worker 15.0 18.5 LDA,LDT1,LDT2 Paving Vendor —10.2 HHDT,MHDT Paving Hauling 0.00 20.0 HHDT Paving Onsite truck ——HHDT Architectural Coating ———— Architectural Coating Worker 26.9 18.5 LDA,LDT1,LDT2 Architectural Coating Vendor —10.2 HHDT,MHDT Architectural Coating Hauling 0.00 20.0 HHDT Architectural Coating Onsite truck ——HHDT Utilities ———— Santa Ana & Live Oak Construction Custom Report, 5/26/2022 38 / 42 Utilities Worker 25.0 18.5 LDA,LDT1,LDT2 Utilities Vendor —10.2 HHDT,MHDT Utilities Hauling 0.00 20.0 HHDT Utilities Onsite truck ——HHDT 5.3.2. Mitigated Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition ———— Demolition Worker 15.0 18.5 LDA,LDT1,LDT2 Demolition Vendor —10.2 HHDT,MHDT Demolition Hauling 16.9 20.0 HHDT Demolition Onsite truck ——HHDT Site Preparation ———— Site Preparation Worker 17.5 18.5 LDA,LDT1,LDT2 Site Preparation Vendor —10.2 HHDT,MHDT Site Preparation Hauling 0.10 20.0 HHDT Site Preparation Onsite truck ——HHDT Grading ———— Grading Worker 20.0 18.5 LDA,LDT1,LDT2 Grading Vendor —10.2 HHDT,MHDT Grading Hauling 1.07 20.0 HHDT Grading Onsite truck ——HHDT Building Construction ———— Building Construction Worker 134 18.5 LDA,LDT1,LDT2 Building Construction Vendor 52.4 10.2 HHDT,MHDT Building Construction Hauling 0.00 20.0 HHDT Building Construction Onsite truck ——HHDT Santa Ana & Live Oak Construction Custom Report, 5/26/2022 39 / 42 Paving ———— Paving Worker 15.0 18.5 LDA,LDT1,LDT2 Paving Vendor —10.2 HHDT,MHDT Paving Hauling 0.00 20.0 HHDT Paving Onsite truck ——HHDT Architectural Coating ———— Architectural Coating Worker 26.9 18.5 LDA,LDT1,LDT2 Architectural Coating Vendor —10.2 HHDT,MHDT Architectural Coating Hauling 0.00 20.0 HHDT Architectural Coating Onsite truck ——HHDT Utilities ———— Utilities Worker 25.0 18.5 LDA,LDT1,LDT2 Utilities Vendor —10.2 HHDT,MHDT Utilities Hauling 0.00 20.0 HHDT Utilities Onsite truck ——HHDT 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies Non-applicable. No control strategies activated by user. 5.5. Architectural Coatings Phase Name Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) Architectural Coating 0.00 0.00 490,225 163,408 13,721 5.6. Dust Mitigation Santa Ana & Live Oak Construction Custom Report, 5/26/2022 40 / 42 5.6.1. Construction Earthmoving Activities Phase Name Material Imported (Cubic Yards)Material Exported (Cubic Yards)Acres Graded (acres)Material Demolished (Building Square Footage) Acres Paved (acres) Demolition 0.00 0.00 0.00 14,670 — Site Preparation 1.00 0.00 35.0 0.00 — Grading 250 0.00 120 0.00 — Paving 0.00 0.00 0.00 0.00 5.25 5.6.2. Construction Earthmoving Control Strategies Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74%74% 5.7. Construction Paving Land Use Area Paved (acres)% Asphalt Unrefrigerated Warehouse-No Rail 0.00 0% Parking Lot 0.93 100% Other Asphalt Surfaces 4.32 100% 5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O 2022 0.00 532 0.03 < 0.005 2023 0.00 532 0.03 < 0.005 2024 0.00 532 0.03 < 0.005 Santa Ana & Live Oak Construction Custom Report, 5/26/2022 41 / 42 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1.2. Mitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.1.2. Mitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 5.18.2.2. Mitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) Santa Ana & Live Oak Construction Custom Report, 5/26/2022 42 / 42 8. User Changes to Default Data Screen Justification Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by 5 days due to size of the building. Trenching added to account for offsite improvements. Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and grading phases. Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 1 / 35 Santa Ana & Live Oak Previous Operation Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 2.6. Operations Emissions by Sector, Mitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.1.2. Mitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 2 / 35 4.2.2. Electricity Emissions By Land Use - Mitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.2.4. Natural Gas Emissions By Land Use - Mitigated 4.3. Area Emissions by Source 4.3.2. Unmitigated 4.3.1. Mitigated 4.4. Water Emissions by Land Use 4.4.2. Unmitigated 4.4.1. Mitigated 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated 4.5.1. Mitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.6.2. Mitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 3 / 35 4.7.2. Mitigated 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated 4.8.2. Mitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.9.2. Mitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 4 / 35 5.9.2. Mitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.10.4. Landscape Equipment - Mitigated 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.11.2. Mitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.12.2. Mitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.13.2. Mitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 5 / 35 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 5.14.2. Mitigated 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated 5.15.2. Mitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.1.2. Mitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 6 / 35 5.18.2. Sequestration 5.18.2.1. Unmitigated 5.18.2.2. Mitigated 8. User Changes to Default Data Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 7 / 35 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Previous Operation Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.0573832174187, -117.48128719045326 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Unrefrigerated Warehouse-No Rail 484 1000sqft 8.55 484,387 52,330 0.00 —— Parking Lot 103 Space 0.93 0.00 0.00 0.00 —— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 8 / 35 ——0.000.000.004.32Acre4.32Other Asphalt Surfaces User Defined Industrial 484 User Defined Unit 0.00 0.00 0.00 0.00 —— 1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector #Measure Title Construction C-13 Use Low-VOC Paints for Construction Transportation T-8 Provide Ridesharing Program Transportation T-35*Provide Tra c Calming Measures Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy Efficiency Standards Energy E-2 Require Energy Efficient Appliances Energy E-7*Require Higher Efficacy Public Street and Area Lighting Water W-7 Adopt a Water Conservation Strategy Waste S-1/S-2 Implement Waste Reduction Plan Area AS-2 Use Low-VOC Paints * Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results. 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.20.7 30.7 60.7 0.30 6.34 1.82 40,029 Mit.19.9 29.5 59.2 0.29 6.10 1.76 38,062 % Reduced 4%4%2%4%4%4%5% Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 9 / 35 Daily, Winter (Max)——————— Unmit.17.1 31.8 34.4 0.29 6.31 1.78 39,397 Mit.16.2 30.6 33.1 0.28 6.07 1.72 37,452 % Reduced 5%4%4%4%4%4%5% Average Daily (Max)——————— Unmit.19.4 32.3 49.7 0.30 6.33 1.81 39,563 Mit.18.6 31.1 48.4 0.28 6.09 1.75 37,614 % Reduced 4%4%3%4%4%4%5% Annual (Max)——————— Unmit.3.54 5.89 9.07 0.05 1.16 0.33 6,550 Mit.3.39 5.67 8.83 0.05 1.11 0.32 6,227 % Reduced 4%4%3%4%4%4%5% 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 5.47 28.0 37.5 0.28 6.12 1.60 32,304 Area 15.1 0.18 21.1 < 0.005 0.03 0.04 86.9 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Water ——————1,658 Waste ——————859 Total 20.7 30.7 60.7 0.30 6.34 1.82 40,029 Daily, Winter (Max)——————— Mobile 5.28 29.3 32.3 0.28 6.12 1.60 31,760 Area 11.6 —————— Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 10 / 35 Water ——————1,658 Waste ——————859 Total 17.1 31.8 34.4 0.29 6.31 1.78 39,397 Average Daily ——————— Mobile 5.23 29.7 33.2 0.28 6.12 1.60 31,866 Area 14.0 0.12 14.4 < 0.005 0.02 0.03 59.6 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Water ——————1,658 Waste ——————859 Total 19.4 32.3 49.7 0.30 6.33 1.81 39,563 Annual ——————— Mobile 0.96 5.42 6.06 0.05 1.12 0.29 5,276 Area 2.56 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 848 Water ——————274 Waste ——————142 Total 3.54 5.89 9.07 0.05 1.16 0.33 6,550 2.6. Operations Emissions by Sector, Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 5.25 26.9 36.0 0.27 5.88 1.53 31,012 Area 14.5 0.18 21.1 < 0.005 0.03 0.04 86.9 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 11 / 35 Total 19.9 29.5 59.2 0.29 6.10 1.76 38,062 Daily, Winter (Max)——————— Mobile 5.07 28.1 31.0 0.27 5.88 1.53 30,489 Area 11.0 —————— Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Total 16.2 30.6 33.1 0.28 6.07 1.72 37,452 Average Daily ——————— Mobile 5.02 28.5 31.9 0.27 5.88 1.53 30,592 Area 13.4 0.12 14.4 < 0.005 0.02 0.03 59.6 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Total 18.6 31.1 48.4 0.28 6.09 1.75 37,614 Annual ——————— Mobile 0.92 5.20 5.81 0.05 1.07 0.28 5,065 Area 2.44 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 840 Water ——————206 Waste ——————107 Total 3.39 5.67 8.83 0.05 1.11 0.32 6,227 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 12 / 35 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 5.04 2.17 24.4 0.06 0.40 0.15 6,506 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.43 25.8 13.2 0.22 2.08 0.90 25,798 Total 5.47 28.0 37.5 0.28 2.48 1.04 32,304 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 4.86 2.35 19.1 0.06 0.40 0.15 6,015 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.42 27.0 13.2 0.22 2.08 0.90 25,745 Total 5.28 29.3 32.3 0.28 2.48 1.04 31,760 Annual ——————— Unrefrigerated Warehouse-No Rail 0.88 0.44 3.65 0.01 0.07 0.03 1,010 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.08 4.98 2.40 0.04 0.38 0.16 4,266 Total 0.96 5.42 6.06 0.05 0.45 0.19 5,276 4.1.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 13 / 35 Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 4.83 2.08 23.4 0.06 0.38 0.14 6,246 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.42 24.8 12.6 0.21 2.00 0.86 24,766 Total 5.25 26.9 36.0 0.27 2.38 1.00 31,012 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 4.67 2.26 18.3 0.06 0.38 0.14 5,774 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.40 25.9 12.7 0.21 2.00 0.86 24,715 Total 5.07 28.1 31.0 0.27 2.38 1.00 30,489 Annual ——————— Unrefrigerated Warehouse-No Rail 0.84 0.42 3.51 0.01 0.07 0.03 969 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.07 4.78 2.31 0.04 0.36 0.16 4,095 Total 0.92 5.20 5.81 0.05 0.44 0.18 5,065 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 14 / 35 2,149——————Unrefrigerated Warehouse-No Rail Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,149 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,149 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,149 Annual ——————— Unrefrigerated Warehouse-No Rail ——————356 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————356 4.2.2. Electricity Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,104 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 15 / 35 User Defined Industrial ——————0.00 Total ——————2,104 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,104 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,104 Annual ——————— Unrefrigerated Warehouse-No Rail ——————348 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————348 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Daily, Winter (Max)——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 16 / 35 Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.45 0.38 < 0.005 0.03 0.03 492 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492 4.2.4. Natural Gas Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 17 / 35 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.45 0.38 < 0.005 0.03 0.03 492 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492 4.3. Area Emissions by Source 4.3.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 125 —————— Consumer Products 10.4 —————— Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9 Total 139 0.18 21.1 < 0.005 0.03 0.04 86.9 Daily, Winter (Max)——————— Architectural Coatings 125 —————— Consumer Products 10.4 —————— Total 135 —————— Annual ——————— Architectural Coatings 1.78 —————— Consumer Products 1.90 —————— Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 18 / 35 Total 4.10 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 4.3.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 124 —————— Consumer Products 10.4 —————— Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9 Total 138 0.18 21.1 < 0.005 0.03 0.04 86.9 Daily, Winter (Max)——————— Architectural Coatings 124 —————— Consumer Products 10.4 —————— Total 135 —————— Annual ——————— Architectural Coatings 1.66 —————— Consumer Products 1.90 —————— Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Total 3.99 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 4.4. Water Emissions by Land Use 4.4.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,658 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 19 / 35 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,658 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,658 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,658 Annual ——————— Unrefrigerated Warehouse-No Rail ——————274 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————274 4.4.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,243 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 20 / 35 Total ——————1,243 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,243 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,243 Annual ——————— Unrefrigerated Warehouse-No Rail ——————206 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————206 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————859 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————859 Daily, Winter (Max)——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 21 / 35 Unrefrigerated Warehouse-No Rail ——————859 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————859 Annual ——————— Unrefrigerated Warehouse-No Rail ——————142 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————142 4.5.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————644 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————644 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————644 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 22 / 35 User Defined Industrial ——————0.00 Total ——————644 Annual ——————— Unrefrigerated Warehouse-No Rail ——————107 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————107 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.6.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 23 / 35 Total ——————— Annual ——————— Total ——————— 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.7.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.8. Stationary Emissions By Equipment Type Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 24 / 35 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.8.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 25 / 35 Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 26 / 35 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 27 / 35 Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 28 / 35 Total ——————— Annual ——————— Total ——————— 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 29 / 35 Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 639 639 639 233,097 8,112 8,112 8,112 2,960,792 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 190 190 190 69,234 7,587 7,587 7,587 2,769,344 5.9.2. Mitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 613 613 613 223,773 7,787 7,787 7,787 2,842,361 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 182 182 182 66,464 7,284 7,284 7,284 2,658,570 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 30 / 35 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 736,872 245,624 13,721 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.10.4. Landscape Equipment - Mitigated Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 31 / 35 Unrefrigerated Warehouse-No Rail 2,237,240 349 0.0330 0.0040 9,248,005 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.11.2. Mitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Unrefrigerated Warehouse-No Rail 2,189,735 349 0.0330 0.0040 9,247,203 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 112,014,494 840,374 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.12.2. Mitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 84,010,870 630,280 Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 32 / 35 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 455 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13.2. Mitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 341 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.14.2. Mitigated Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 33 / 35 Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.15.2. Mitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type —— 5.18. Vegetation 5.18.1. Land Use Change Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 34 / 35 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1.2. Mitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.1.2. Mitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 5.18.2.2. Mitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 8. User Changes to Default Data Screen Justification Santa Ana & Live Oak Previous Operation Custom Report, 5/26/2022 35 / 35 Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by 5 days due to size of the building. Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and grading phases. Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT. Increased Non Res H-W Trip % to equal 100 %. Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022) Operations: Refrigerants No Cold Storage proposed. Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 1 / 36 Santa Ana & Live Oak Proposed Operation Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 2.6. Operations Emissions by Sector, Mitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.1.2. Mitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 2 / 36 4.2.2. Electricity Emissions By Land Use - Mitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.2.4. Natural Gas Emissions By Land Use - Mitigated 4.3. Area Emissions by Source 4.3.2. Unmitigated 4.3.1. Mitigated 4.4. Water Emissions by Land Use 4.4.2. Unmitigated 4.4.1. Mitigated 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated 4.5.1. Mitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.6.2. Mitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 3 / 36 4.7.2. Mitigated 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated 4.8.2. Mitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.9.2. Mitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 4 / 36 5.9.2. Mitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.10.4. Landscape Equipment - Mitigated 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.11.2. Mitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.12.2. Mitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.13.2. Mitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 5 / 36 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 5.14.2. Mitigated 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated 5.15.2. Mitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.1.2. Mitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 6 / 36 5.18.2. Sequestration 5.18.2.1. Unmitigated 5.18.2.2. Mitigated 8. User Changes to Default Data Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 7 / 36 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Proposed Operation Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.0573832174187, -117.48128719045326 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Unrefrigerated Warehouse-No Rail 320 1000sqft 8.55 319,956 52,330 0.00 —— Parking Lot 103 Space 0.93 0.00 0.00 0.00 —— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 8 / 36 ——0.000.000.004.32Acre4.32Other Asphalt Surfaces User Defined Industrial 320 User Defined Unit 0.00 0.00 0.00 0.00 —— 1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector #Measure Title Construction C-13 Use Low-VOC Paints for Construction Transportation T-8 Provide Ridesharing Program Transportation T-35*Provide Tra c Calming Measures Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy Efficiency Standards Energy E-2 Require Energy Efficient Appliances Energy E-7*Require Higher Efficacy Public Street and Area Lighting Water W-7 Adopt a Water Conservation Strategy Waste S-1/S-2 Implement Waste Reduction Plan Area AS-2 Use Low-VOC Paints * Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results. 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.14.1 35.5 182 0.20 4.25 1.26 29,768 Mit.13.5 34.7 181 0.19 4.08 1.22 28,468 % Reduced 4%2%1%4%4%3%4% Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 9 / 36 Daily, Winter (Max)——————— Unmit.11.7 36.2 165 0.20 4.23 1.24 29,351 Mit.11.1 35.4 164 0.19 4.07 1.19 28,066 % Reduced 5%2%1%4%4%3%4% Average Daily (Max)——————— Unmit.12.9 35.6 174 0.20 4.19 1.20 29,288 Mit.12.3 34.8 173 0.19 4.03 1.16 27,999 % Reduced 4%2%1%4%4%4%4% Annual (Max)——————— Unmit.2.35 6.50 31.7 0.04 0.76 0.22 4,849 Mit.2.25 6.35 31.6 0.03 0.74 0.21 4,636 % Reduced 4%2%1%4%4%4%4% 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 3.61 18.5 24.8 0.19 4.04 1.05 21,338 Area 9.99 0.12 13.9 < 0.005 0.02 0.02 57.4 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 14.1 35.5 182 0.20 4.25 1.26 29,768 Daily, Winter (Max)——————— Mobile 3.49 19.4 21.3 0.18 4.04 1.05 20,979 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 10 / 36 Area 7.71 —————— Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 11.7 36.2 165 0.20 4.23 1.24 29,351 Average Daily ——————— Mobile 3.46 19.6 21.9 0.18 4.04 1.05 21,049 Area 9.28 0.08 9.53 < 0.005 0.01 0.02 39.3 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5 Total 12.9 35.6 174 0.20 4.19 1.20 29,288 Annual ——————— Mobile 0.63 3.58 4.00 0.03 0.74 0.19 3,485 Area 1.69 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 560 Water ——————182 Waste ——————93.9 Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517 Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 2.35 6.50 31.7 0.04 0.76 0.22 4,849 2.6. Operations Emissions by Sector, Mitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 11 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 3.47 17.7 23.8 0.18 3.88 1.01 20,485 Area 9.58 0.12 13.9 < 0.005 0.02 0.02 57.4 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 13.5 34.7 181 0.19 4.08 1.22 28,468 Daily, Winter (Max)——————— Mobile 3.35 18.6 20.5 0.18 3.88 1.01 20,139 Area 7.30 —————— Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 11.1 35.4 164 0.19 4.07 1.19 28,066 Average Daily ——————— Mobile 3.32 18.8 21.0 0.18 3.88 1.01 20,207 Area 8.86 0.08 9.53 < 0.005 0.01 0.02 39.3 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 12 / 36 Total 12.3 34.8 173 0.19 4.03 1.16 27,999 Annual ——————— Mobile 0.61 3.43 3.84 0.03 0.71 0.18 3,346 Area 1.62 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 555 Water ——————136 Waste ——————70.4 Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517 Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 2.25 6.35 31.6 0.03 0.74 0.21 4,636 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 3.33 1.43 16.1 0.04 0.26 0.10 4,298 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.29 17.1 8.69 0.15 1.38 0.59 17,041 Total 3.61 18.5 24.8 0.19 1.64 0.69 21,338 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 3.21 1.55 12.6 0.04 0.26 0.10 3,973 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 13 / 36 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.28 17.8 8.72 0.15 1.38 0.59 17,006 Total 3.49 19.4 21.3 0.18 1.64 0.69 20,979 Annual ——————— Unrefrigerated Warehouse-No Rail 0.58 0.29 2.41 0.01 0.05 0.02 667 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.05 3.29 1.59 0.03 0.25 0.11 2,818 Total 0.63 3.58 4.00 0.03 0.30 0.13 3,485 4.1.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 3.19 1.37 15.4 0.04 0.25 0.09 4,126 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.28 16.4 8.34 0.14 1.32 0.57 16,359 Total 3.47 17.7 23.8 0.18 1.57 0.66 20,485 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 3.08 1.49 12.1 0.04 0.25 0.09 3,814 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.27 17.1 8.37 0.14 1.32 0.57 16,326 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 14 / 36 Total 3.35 18.6 20.5 0.18 1.57 0.66 20,139 Annual ——————— Unrefrigerated Warehouse-No Rail 0.56 0.28 2.32 0.01 0.05 0.02 640 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.05 3.16 1.52 0.03 0.24 0.10 2,705 Total 0.61 3.43 3.84 0.03 0.29 0.12 3,346 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,420 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,420 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,420 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,420 Annual ——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 15 / 36 Unrefrigerated Warehouse-No Rail ——————235 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————235 4.2.2. Electricity Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,390 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,390 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,390 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,390 Annual ——————— Unrefrigerated Warehouse-No Rail ——————230 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 16 / 36 User Defined Industrial ——————0.00 Total ——————230 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 17 / 36 4.2.4. Natural Gas Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325 4.3. Area Emissions by Source 4.3.2. Unmitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 18 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 125 —————— Consumer Products 6.87 —————— Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4 Total 134 0.12 13.9 < 0.005 0.02 0.02 57.4 Daily, Winter (Max)——————— Architectural Coatings 125 —————— Consumer Products 6.87 —————— Total 131 —————— Annual ——————— Architectural Coatings 1.70 —————— Consumer Products 1.25 —————— Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Total 3.24 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 4.3.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 124 —————— Consumer Products 6.87 —————— Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4 Total 133 0.12 13.9 < 0.005 0.02 0.02 57.4 Daily, Winter (Max)——————— Architectural Coatings 124 —————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 19 / 36 Consumer Products 6.87 —————— Total 131 —————— Annual ——————— Architectural Coatings 1.63 —————— Consumer Products 1.25 —————— Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Total 3.16 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 4.4. Water Emissions by Land Use 4.4.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,096 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,096 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,096 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,096 Annual ——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 20 / 36 Unrefrigerated Warehouse-No Rail ——————182 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————182 4.4.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————822 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————822 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————822 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————822 Annual ——————— Unrefrigerated Warehouse-No Rail ——————136 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 21 / 36 User Defined Industrial ——————0.00 Total ——————136 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————567 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————567 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————567 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————567 Annual ——————— Unrefrigerated Warehouse-No Rail ——————93.9 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————93.9 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 22 / 36 4.5.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————425 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————425 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————425 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————425 Annual ——————— Unrefrigerated Warehouse-No Rail ——————70.4 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————70.4 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 23 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.6.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 24 / 36 Daily, Winter (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Annual ——————— Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517 Total 0.00 2.58 25.7 0.00 0.00 0.00 517 4.7.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Daily, Winter (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Annual ——————— Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517 Total 0.00 2.58 25.7 0.00 0.00 0.00 517 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 25 / 36 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Daily, Winter (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Annual ——————— Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 4.8.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Daily, Winter (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Annual ——————— Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 26 / 36 Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 27 / 36 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 28 / 36 Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 29 / 36 Total ——————— Annual ——————— Total ——————— 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 30 / 36 Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 422 422 422 153,969 5,358 5,358 5,358 1,955,716 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 125 125 125 45,731 5,012 5,012 5,012 1,829,257 5.9.2. Mitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 405 405 405 147,810 5,144 5,144 5,144 1,877,487 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 120 120 120 43,902 4,811 4,811 4,811 1,756,087 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 31 / 36 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 490,225 163,408 13,721 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.10.4. Landscape Equipment - Mitigated Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 32 / 36 Unrefrigerated Warehouse-No Rail 1,477,782 349 0.0330 0.0040 6,108,658 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.11.2. Mitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Unrefrigerated Warehouse-No Rail 1,446,403 349 0.0330 0.0040 6,108,128 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 73,989,825 840,374 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.12.2. Mitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 55,492,369 630,280 Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 33 / 36 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 301 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13.2. Mitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 226 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.14.2. Mitigated Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 34 / 36 Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Forklifts CNG Average 32.0 4.00 82.0 0.20 5.15.2. Mitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Forklifts CNG Average 32.0 4.00 82.0 0.20 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor Fire Pump Diesel 1.00 1.00 50.0 238 0.73 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type —— Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 35 / 36 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1.2. Mitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.1.2. Mitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 5.18.2.2. Mitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) Santa Ana & Live Oak Proposed Operation Custom Report, 5/26/2022 36 / 36 8. User Changes to Default Data Screen Justification Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by 5 days due to size of the building. Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and grading phases. Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT. Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022) Operations: Refrigerants No Cold Storage proposed. Santa Ana & Live Oak Existing Custom Report, 5/24/2022 1 / 18 Santa Ana & Live Oak Existing Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.3. Area Emissions by Source Santa Ana & Live Oak Existing Custom Report, 5/24/2022 2 / 18 4.3.2. Unmitigated 4.4. Water Emissions by Land Use 4.4.2. Unmitigated 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Santa Ana & Live Oak Existing Custom Report, 5/24/2022 3 / 18 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 5.15. Operational Off-Road Equipment Santa Ana & Live Oak Existing Custom Report, 5/24/2022 4 / 18 5.15.1. Unmitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.2. Sequestration 5.18.2.1. Unmitigated 8. User Changes to Default Data Santa Ana & Live Oak Existing Custom Report, 5/24/2022 5 / 18 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Existing Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.057296706749284, -117.48127691004377 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Parking Lot 13.8 Acre 13.8 13.8 13,300 0.00 —— 1.3. User-Selected Emission Reduction Measures by Emissions Sector Santa Ana & Live Oak Existing Custom Report, 5/24/2022 6 / 18 No measures selected 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.3.53 17.7 21.8 0.16 3.69 0.97 17,884 Daily, Winter (Max)——————— Unmit.3.42 18.5 19.2 0.16 3.69 0.97 17,595 Average Daily (Max)——————— Unmit.3.39 18.7 19.6 0.16 3.69 0.97 17,654 Annual (Max)——————— Unmit.0.62 3.41 3.58 0.03 0.67 0.18 2,923 Exceeds (Daily Max)——————— Threshold 55.0 55.0 550 150 150 54.0 — Unmit.No No No No No No — Exceeds (Average Daily) ——————— Threshold 55.0 55.0 550 150 150 54.0 — Unmit.No No No No No No — Exceeds (Annual)——————— Threshold ——————3,000 Unmit.——————No 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Santa Ana & Live Oak Existing Custom Report, 5/24/2022 7 / 18 Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 3.40 17.7 21.8 0.16 3.69 0.97 17,883 Area 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Water ——————1.09 Waste ——————0.00 Total 3.53 17.7 21.8 0.16 3.69 0.97 17,884 Daily, Winter (Max)——————— Mobile 3.28 18.5 19.2 0.16 3.69 0.97 17,594 Area 0.14 —————— Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Water ——————1.09 Waste ——————0.00 Total 3.42 18.5 19.2 0.16 3.69 0.97 17,595 Average Daily ——————— Mobile 3.25 18.7 19.6 0.16 3.69 0.97 17,653 Area 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Water ——————1.09 Waste ——————0.00 Total 3.39 18.7 19.6 0.16 3.69 0.97 17,654 Annual ——————— Mobile 0.59 3.41 3.58 0.03 0.67 0.18 2,923 Area 0.03 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Water ——————0.18 Santa Ana & Live Oak Existing Custom Report, 5/24/2022 8 / 18 Waste ——————0.00 Total 0.62 3.41 3.58 0.03 0.67 0.18 2,923 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Parking Lot 3.40 17.7 21.8 0.16 1.52 0.64 17,883 Total 3.40 17.7 21.8 0.16 1.52 0.64 17,883 Daily, Winter (Max)——————— Parking Lot 3.28 18.5 19.2 0.16 1.52 0.64 17,594 Total 3.28 18.5 19.2 0.16 1.52 0.64 17,594 Annual ——————— Parking Lot 0.59 3.41 3.58 0.03 0.28 0.12 2,923 Total 0.59 3.41 3.58 0.03 0.28 0.12 2,923 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Parking Lot ——————0.00 Santa Ana & Live Oak Existing Custom Report, 5/24/2022 9 / 18 Total ——————0.00 Daily, Winter (Max)——————— Parking Lot ——————0.00 Total ——————0.00 Annual ——————— Parking Lot ——————0.00 Total ——————0.00 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max)——————— Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual ——————— Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.3. Area Emissions by Source 4.3.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Santa Ana & Live Oak Existing Custom Report, 5/24/2022 10 / 18 Consumer Products 0.05 —————— Architectural Coatings 0.09 —————— Landscape Equipment < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Total 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Daily, Winter (Max)——————— Consumer Products 0.05 —————— Architectural Coatings 0.09 —————— Total 0.14 —————— Annual ——————— Consumer Products 0.01 —————— Architectural Coatings 0.02 —————— Landscape Equipment < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Total 0.03 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 4.4. Water Emissions by Land Use 4.4.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Parking Lot ——————1.09 Total ——————1.09 Daily, Winter (Max)——————— Parking Lot ——————1.09 Total ——————1.09 Annual ——————— Parking Lot ——————0.18 Santa Ana & Live Oak Existing Custom Report, 5/24/2022 11 / 18 Total ——————0.18 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Parking Lot ——————0.00 Total ——————0.00 Daily, Winter (Max)——————— Parking Lot ——————0.00 Total ——————0.00 Annual ——————— Parking Lot ——————0.00 Total ——————0.00 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Santa Ana & Live Oak Existing Custom Report, 5/24/2022 12 / 18 Total ——————— 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9. User Defined Emissions By Equipment Type Santa Ana & Live Oak Existing Custom Report, 5/24/2022 13 / 18 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Santa Ana & Live Oak Existing Custom Report, 5/24/2022 14 / 18 Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Santa Ana & Live Oak Existing Custom Report, 5/24/2022 15 / 18 Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Parking Lot 739 739 739 269,577 9,351 9,351 9,351 3,413,011 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 27,051 9,017 36,068 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Santa Ana & Live Oak Existing Custom Report, 5/24/2022 16 / 18 Summer Days day/yr 250 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Parking Lot 0.00 349 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Parking Lot 0.00 213,586 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Parking Lot 0.00 0.00 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.15. Operational Off-Road Equipment Santa Ana & Live Oak Existing Custom Report, 5/24/2022 17 / 18 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type —— 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres Santa Ana & Live Oak Existing Custom Report, 5/24/2022 18 / 18 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 8. User Changes to Default Data Screen Justification Operations: Vehicle Data Trip Rate based on Project Trip Generation and Vehicle Miles Traveled Screening Analysis (EPD Solutions 2022) Operations: Fleet Mix Vehicle Mix from Project Trip Generation and Vehicle Miles Traveled Screening Analysis. Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 1 / 35 Santa Ana & Live Oak Previous LST Operation Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 2.6. Operations Emissions by Sector, Mitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.1.2. Mitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 2 / 35 4.2.2. Electricity Emissions By Land Use - Mitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.2.4. Natural Gas Emissions By Land Use - Mitigated 4.3. Area Emissions by Source 4.3.2. Unmitigated 4.3.1. Mitigated 4.4. Water Emissions by Land Use 4.4.2. Unmitigated 4.4.1. Mitigated 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated 4.5.1. Mitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.6.2. Mitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 3 / 35 4.7.2. Mitigated 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated 4.8.2. Mitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.9.2. Mitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 4 / 35 5.9.2. Mitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.10.4. Landscape Equipment - Mitigated 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.11.2. Mitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.12.2. Mitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.13.2. Mitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 5 / 35 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 5.14.2. Mitigated 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated 5.15.2. Mitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.1.2. Mitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 6 / 35 5.18.2. Sequestration 5.18.2.1. Unmitigated 5.18.2.2. Mitigated 8. User Changes to Default Data Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 7 / 35 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Previous LST Operation Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.0573832174187, -117.48128719045326 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Unrefrigerated Warehouse-No Rail 484 1000sqft 8.55 484,387 52,330 0.00 —— Parking Lot 103 Space 0.93 0.00 0.00 0.00 —— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 8 / 35 ——0.000.000.004.32Acre4.32Other Asphalt Surfaces User Defined Industrial 484 User Defined Unit 0.00 0.00 0.00 0.00 —— 1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector #Measure Title Construction C-13 Use Low-VOC Paints for Construction Transportation T-8 Provide Ridesharing Program Transportation T-35*Provide Tra c Calming Measures Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy Efficiency Standards Energy E-2 Require Energy Efficient Appliances Energy E-7*Require Higher Efficacy Public Street and Area Lighting Water W-7 Adopt a Water Conservation Strategy Waste S-1/S-2 Implement Waste Reduction Plan Area AS-2 Use Low-VOC Paints * Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results. 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.16.6 5.47 29.2 0.02 0.29 0.25 8,423 Mit.16.0 5.36 29.0 0.02 0.29 0.24 7,721 % Reduced 4%2%1%—1%—8% Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 9 / 35 Daily, Winter (Max)——————— Unmit.13.1 5.42 8.84 0.02 0.26 0.21 8,333 Mit.12.4 5.30 8.57 0.02 0.26 0.21 7,630 % Reduced 5%2%3%—1%—8% Average Daily (Max)——————— Unmit.15.4 5.50 23.2 0.02 0.28 0.23 8,392 Mit.14.8 5.38 23.0 0.02 0.28 0.23 7,689 % Reduced 4%2%1%—1%—8% Annual (Max)——————— Unmit.2.82 1.00 4.24 < 0.005 0.05 0.04 1,389 Mit.2.70 0.98 4.19 < 0.005 0.05 0.04 1,273 % Reduced 4%2%1%1%1%< 0.5%8% 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 1.39 2.81 6.09 0.01 0.07 0.02 699 Area 15.1 0.18 21.1 < 0.005 0.03 0.04 86.9 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Water ——————1,658 Waste ——————859 Total 16.6 5.47 29.2 0.02 0.29 0.25 8,423 Daily, Winter (Max)——————— Mobile 1.30 2.94 6.75 0.01 0.07 0.02 695 Area 11.6 —————— Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 10 / 35 Water ——————1,658 Waste ——————859 Total 13.1 5.42 8.84 0.02 0.26 0.21 8,333 Average Daily ——————— Mobile 1.29 2.89 6.73 0.01 0.07 0.02 695 Area 14.0 0.12 14.4 < 0.005 0.02 0.03 59.6 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,121 Water ——————1,658 Waste ——————859 Total 15.4 5.50 23.2 0.02 0.28 0.23 8,392 Annual ——————— Mobile 0.24 0.53 1.23 < 0.005 0.01 < 0.005 115 Area 2.56 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 848 Water ——————274 Waste ——————142 Total 2.82 1.00 4.24 < 0.005 0.05 0.04 1,389 2.6. Operations Emissions by Sector, Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 1.34 2.70 5.85 0.01 0.07 0.02 671 Area 14.5 0.18 21.1 < 0.005 0.03 0.04 86.9 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 11 / 35 Total 16.0 5.36 29.0 0.02 0.29 0.24 7,721 Daily, Winter (Max)——————— Mobile 1.24 2.82 6.48 0.01 0.07 0.02 667 Area 11.0 —————— Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Total 12.4 5.30 8.57 0.02 0.26 0.21 7,630 Average Daily ——————— Mobile 1.24 2.77 6.46 0.01 0.07 0.02 667 Area 13.4 0.12 14.4 < 0.005 0.02 0.03 59.6 Energy 0.14 2.48 2.09 0.01 0.19 0.19 5,075 Water ——————1,243 Waste ——————644 Total 14.8 5.38 23.0 0.02 0.28 0.23 7,689 Annual ——————— Mobile 0.23 0.51 1.18 < 0.005 0.01 < 0.005 110 Area 2.44 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Energy 0.02 0.45 0.38 < 0.005 0.03 0.03 840 Water ——————206 Waste ——————107 Total 2.70 0.98 4.19 < 0.005 0.05 0.04 1,273 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 12 / 35 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 1.30 0.44 4.20 < 0.005 0.01 0.01 247 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.10 2.37 1.89 < 0.005 0.01 0.01 452 Total 1.39 2.81 6.09 0.01 0.02 0.01 699 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 1.21 0.47 4.81 < 0.005 0.01 0.01 240 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.09 2.47 1.95 < 0.005 0.01 0.01 455 Total 1.30 2.94 6.75 0.01 0.03 0.01 695 Annual ——————— Unrefrigerated Warehouse-No Rail 0.22 0.09 0.88 < 0.005 < 0.005 < 0.005 40.0 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.02 0.44 0.35 < 0.005 < 0.005 < 0.005 75.0 Total 0.24 0.53 1.23 < 0.005 < 0.005 < 0.005 115 4.1.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 13 / 35 Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 1.24 0.42 4.04 < 0.005 0.01 0.01 238 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.09 2.27 1.81 < 0.005 0.01 0.01 434 Total 1.34 2.70 5.85 0.01 0.02 0.01 671 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 1.16 0.45 4.61 < 0.005 0.01 0.01 230 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.08 2.37 1.87 < 0.005 0.01 0.01 437 Total 1.24 2.82 6.48 0.01 0.02 0.01 667 Annual ——————— Unrefrigerated Warehouse-No Rail 0.21 0.08 0.84 < 0.005 < 0.005 < 0.005 38.4 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.02 0.42 0.34 < 0.005 < 0.005 < 0.005 72.0 Total 0.23 0.51 1.18 < 0.005 < 0.005 < 0.005 110 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 14 / 35 2,149——————Unrefrigerated Warehouse-No Rail Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,149 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,149 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,149 Annual ——————— Unrefrigerated Warehouse-No Rail ——————356 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————356 4.2.2. Electricity Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,104 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 15 / 35 User Defined Industrial ——————0.00 Total ——————2,104 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————2,104 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————2,104 Annual ——————— Unrefrigerated Warehouse-No Rail ——————348 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————348 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Daily, Winter (Max)——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 16 / 35 Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.45 0.38 < 0.005 0.03 0.03 492 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492 4.2.4. Natural Gas Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 17 / 35 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.14 2.48 2.09 0.01 0.19 0.19 2,972 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.45 0.38 < 0.005 0.03 0.03 492 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.45 0.38 < 0.005 0.03 0.03 492 4.3. Area Emissions by Source 4.3.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 125 —————— Consumer Products 10.4 —————— Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9 Total 139 0.18 21.1 < 0.005 0.03 0.04 86.9 Daily, Winter (Max)——————— Architectural Coatings 125 —————— Consumer Products 10.4 —————— Total 135 —————— Annual ——————— Architectural Coatings 1.78 —————— Consumer Products 1.90 —————— Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 18 / 35 Total 4.10 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 4.3.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 124 —————— Consumer Products 10.4 —————— Landscape Equipment 3.45 0.18 21.1 < 0.005 0.03 0.04 86.9 Total 138 0.18 21.1 < 0.005 0.03 0.04 86.9 Daily, Winter (Max)——————— Architectural Coatings 124 —————— Consumer Products 10.4 —————— Total 135 —————— Annual ——————— Architectural Coatings 1.66 —————— Consumer Products 1.90 —————— Landscape Equipment 0.43 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 Total 3.99 0.02 2.63 < 0.005 < 0.005 < 0.005 9.86 4.4. Water Emissions by Land Use 4.4.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,658 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 19 / 35 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,658 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,658 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,658 Annual ——————— Unrefrigerated Warehouse-No Rail ——————274 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————274 4.4.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,243 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 20 / 35 Total ——————1,243 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,243 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,243 Annual ——————— Unrefrigerated Warehouse-No Rail ——————206 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————206 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————859 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————859 Daily, Winter (Max)——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 21 / 35 Unrefrigerated Warehouse-No Rail ——————859 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————859 Annual ——————— Unrefrigerated Warehouse-No Rail ——————142 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————142 4.5.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————644 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————644 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————644 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 22 / 35 User Defined Industrial ——————0.00 Total ——————644 Annual ——————— Unrefrigerated Warehouse-No Rail ——————107 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————107 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.6.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 23 / 35 Total ——————— Annual ——————— Total ——————— 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.7.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.8. Stationary Emissions By Equipment Type Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 24 / 35 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.8.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 25 / 35 Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 26 / 35 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 27 / 35 Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 28 / 35 Total ——————— Annual ——————— Total ——————— 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 29 / 35 Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 639 639 639 233,097 160 160 160 58,274 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 190 190 190 69,234 47.4 47.4 47.4 17,308 5.9.2. Mitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 613 613 613 223,773 153 153 153 55,943 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 182 182 182 66,464 45.5 45.5 45.5 16,616 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 30 / 35 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 736,872 245,624 13,721 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.10.4. Landscape Equipment - Mitigated Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 31 / 35 Unrefrigerated Warehouse-No Rail 2,237,240 349 0.0330 0.0040 9,248,005 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.11.2. Mitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Unrefrigerated Warehouse-No Rail 2,189,735 349 0.0330 0.0040 9,247,203 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 112,014,494 840,374 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.12.2. Mitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 84,010,870 630,280 Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 32 / 35 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 455 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13.2. Mitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 341 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.14.2. Mitigated Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 33 / 35 Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.15.2. Mitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type —— 5.18. Vegetation 5.18.1. Land Use Change Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 34 / 35 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1.2. Mitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.1.2. Mitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 5.18.2.2. Mitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 8. User Changes to Default Data Screen Justification Santa Ana & Live Oak Previous LST Operation Custom Report, 5/26/2022 35 / 35 Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by 5 days due to size of the building. Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and grading phases. Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT. Increased Non Res H-W Trip % to equal 100 %. Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022) Operations: Refrigerants No Cold Storage proposed. Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 1 / 36 Santa Ana & Live Oak Proposed LST Operation Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 2.6. Operations Emissions by Sector, Mitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.1.2. Mitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 2 / 36 4.2.2. Electricity Emissions By Land Use - Mitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.2.4. Natural Gas Emissions By Land Use - Mitigated 4.3. Area Emissions by Source 4.3.2. Unmitigated 4.3.1. Mitigated 4.4. Water Emissions by Land Use 4.4.2. Unmitigated 4.4.1. Mitigated 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated 4.5.1. Mitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.6.2. Mitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 3 / 36 4.7.2. Mitigated 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated 4.8.2. Mitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.9.2. Mitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 4 / 36 5.9.2. Mitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.10.4. Landscape Equipment - Mitigated 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.11.2. Mitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.12.2. Mitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.13.2. Mitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 5 / 36 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 5.14.2. Mitigated 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated 5.15.2. Mitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1.2. Mitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.1.2. Mitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 6 / 36 5.18.2. Sequestration 5.18.2.1. Unmitigated 5.18.2.2. Mitigated 8. User Changes to Default Data Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 7 / 36 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Santa Ana & Live Oak Proposed LST Operation Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)2.80 Precipitation (days)6.80 Location 34.0573832174187, -117.48128719045326 County San Bernardino-South Coast City Fontana Air District South Coast AQMD Air Basin South Coast TAZ 5310 EDFZ 10 Electric Utility Southern California Edison Gas Utility Southern California Gas 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Unrefrigerated Warehouse-No Rail 320 1000sqft 8.55 319,956 52,330 0.00 —— Parking Lot 103 Space 0.93 0.00 0.00 0.00 —— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 8 / 36 ——0.000.000.004.32Acre4.32Other Asphalt Surfaces User Defined Industrial 320 User Defined Unit 0.00 0.00 0.00 0.00 —— 1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector #Measure Title Construction C-13 Use Low-VOC Paints for Construction Transportation T-8 Provide Ridesharing Program Transportation T-35*Provide Tra c Calming Measures Energy E-1 Buildings Exceed 2019 Title 24 Building Envelope Energy Efficiency Standards Energy E-2 Require Energy Efficient Appliances Energy E-7*Require Higher Efficacy Public Street and Area Lighting Water W-7 Adopt a Water Conservation Strategy Waste S-1/S-2 Implement Waste Reduction Plan Area AS-2 Use Low-VOC Paints * Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results. 2. Emissions Summary 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unmit.11.4 18.8 161 0.02 0.25 0.22 8,891 Mit.10.9 18.8 161 0.02 0.25 0.22 8,427 % Reduced 4%< 0.5%< 0.5%—1%—5% Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 9 / 36 Daily, Winter (Max)——————— Unmit.9.05 18.8 148 0.02 0.23 0.20 8,831 Mit.8.60 18.7 147 0.02 0.23 0.19 8,367 % Reduced 5%< 0.5%< 0.5%—1%—5% Average Daily (Max)——————— Unmit.10.3 17.9 156 0.01 0.19 0.16 8,697 Mit.9.82 17.8 156 0.01 0.19 0.16 8,233 % Reduced 4%< 0.5%< 0.5%—1%—5% Annual (Max)——————— Unmit.1.87 3.27 28.5 < 0.005 0.04 0.03 1,440 Mit.1.79 3.25 28.5 < 0.005 0.03 0.03 1,363 % Reduced 4%< 0.5%< 0.5%1%1%< 0.5%5% 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 0.92 1.86 4.02 < 0.005 0.05 0.01 462 Area 9.99 0.12 13.9 < 0.005 0.02 0.02 57.4 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 11.4 18.8 161 0.02 0.25 0.22 8,891 Daily, Winter (Max)——————— Mobile 0.86 1.94 4.46 < 0.005 0.05 0.01 459 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 10 / 36 Area 7.71 —————— Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 9.05 18.8 148 0.02 0.23 0.20 8,831 Average Daily ——————— Mobile 0.85 1.91 4.45 < 0.005 0.05 0.01 459 Area 9.28 0.08 9.53 < 0.005 0.01 0.02 39.3 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,383 Water ——————1,096 Waste ——————567 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5 Total 10.3 17.9 156 0.01 0.19 0.16 8,697 Annual ——————— Mobile 0.16 0.35 0.81 < 0.005 0.01 < 0.005 76.0 Area 1.69 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 560 Water ——————182 Waste ——————93.9 Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517 Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 1.87 3.27 28.5 < 0.005 0.04 0.03 1,440 2.6. Operations Emissions by Sector, Mitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 11 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Mobile 0.88 1.78 3.86 < 0.005 0.05 0.01 443 Area 9.58 0.12 13.9 < 0.005 0.02 0.02 57.4 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 10.9 18.8 161 0.02 0.25 0.22 8,427 Daily, Winter (Max)——————— Mobile 0.82 1.86 4.28 < 0.005 0.05 0.01 441 Area 7.30 —————— Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 8.60 18.7 147 0.02 0.23 0.19 8,367 Average Daily ——————— Mobile 0.82 1.83 4.27 < 0.005 0.05 0.01 440 Area 8.86 0.08 9.53 < 0.005 0.01 0.02 39.3 Energy 0.09 1.64 1.38 0.01 0.12 0.12 3,353 Water ——————822 Waste ——————425 Off-Road 0.00 14.1 141 0.00 0.00 0.00 3,126 Stationary 0.05 0.15 0.14 < 0.005 0.01 0.01 27.5 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 12 / 36 Total 9.82 17.8 156 0.01 0.19 0.16 8,233 Annual ——————— Mobile 0.15 0.33 0.78 < 0.005 0.01 < 0.005 72.9 Area 1.62 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Energy 0.02 0.30 0.25 < 0.005 0.02 0.02 555 Water ——————136 Waste ——————70.4 Off-Road 0.00 2.58 25.7 0.00 0.00 0.00 517 Stationary 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 1.79 3.25 28.5 < 0.005 0.03 0.03 1,363 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.86 0.29 2.78 < 0.005 0.01 < 0.005 163 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.06 1.56 1.25 < 0.005 0.01 < 0.005 298 Total 0.92 1.86 4.02 < 0.005 0.02 0.01 462 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.80 0.31 3.17 < 0.005 0.01 < 0.005 158 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 13 / 36 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.06 1.63 1.29 < 0.005 0.01 < 0.005 301 Total 0.86 1.94 4.46 < 0.005 0.02 0.01 459 Annual ——————— Unrefrigerated Warehouse-No Rail 0.14 0.06 0.58 < 0.005 < 0.005 < 0.005 26.4 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.01 0.29 0.23 < 0.005 < 0.005 < 0.005 49.5 Total 0.16 0.35 0.81 < 0.005 < 0.005 < 0.005 76.0 4.1.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.82 0.28 2.67 < 0.005 0.01 < 0.005 157 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.06 1.50 1.20 < 0.005 0.01 < 0.005 286 Total 0.88 1.78 3.86 < 0.005 0.02 0.01 443 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.77 0.30 3.05 < 0.005 0.01 < 0.005 152 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.06 1.57 1.23 < 0.005 0.01 < 0.005 289 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 14 / 36 Total 0.82 1.86 4.28 < 0.005 0.02 0.01 441 Annual ——————— Unrefrigerated Warehouse-No Rail 0.14 0.05 0.56 < 0.005 < 0.005 < 0.005 25.4 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.01 0.28 0.22 < 0.005 < 0.005 < 0.005 47.6 Total 0.15 0.33 0.78 < 0.005 < 0.005 < 0.005 72.9 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,420 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,420 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,420 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,420 Annual ——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 15 / 36 Unrefrigerated Warehouse-No Rail ——————235 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————235 4.2.2. Electricity Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,390 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,390 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,390 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,390 Annual ——————— Unrefrigerated Warehouse-No Rail ——————230 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 16 / 36 User Defined Industrial ——————0.00 Total ——————230 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 17 / 36 4.2.4. Natural Gas Emissions By Land Use - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.09 1.64 1.38 0.01 0.12 0.12 1,963 Annual ——————— Unrefrigerated Warehouse-No Rail 0.02 0.30 0.25 < 0.005 0.02 0.02 325 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.02 0.30 0.25 < 0.005 0.02 0.02 325 4.3. Area Emissions by Source 4.3.2. Unmitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 18 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 125 —————— Consumer Products 6.87 —————— Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4 Total 134 0.12 13.9 < 0.005 0.02 0.02 57.4 Daily, Winter (Max)——————— Architectural Coatings 125 —————— Consumer Products 6.87 —————— Total 131 —————— Annual ——————— Architectural Coatings 1.70 —————— Consumer Products 1.25 —————— Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Total 3.24 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 4.3.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Architectural Coatings 124 —————— Consumer Products 6.87 —————— Landscape Equipment 2.28 0.12 13.9 < 0.005 0.02 0.02 57.4 Total 133 0.12 13.9 < 0.005 0.02 0.02 57.4 Daily, Winter (Max)——————— Architectural Coatings 124 —————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 19 / 36 Consumer Products 6.87 —————— Total 131 —————— Annual ——————— Architectural Coatings 1.63 —————— Consumer Products 1.25 —————— Landscape Equipment 0.29 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 Total 3.16 0.01 1.74 < 0.005 < 0.005 < 0.005 6.51 4.4. Water Emissions by Land Use 4.4.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,096 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,096 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————1,096 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————1,096 Annual ——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 20 / 36 Unrefrigerated Warehouse-No Rail ——————182 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————182 4.4.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————822 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————822 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————822 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————822 Annual ——————— Unrefrigerated Warehouse-No Rail ——————136 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 21 / 36 User Defined Industrial ——————0.00 Total ——————136 4.5. Waste Emissions by Land Use 4.5.2. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————567 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————567 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————567 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————567 Annual ——————— Unrefrigerated Warehouse-No Rail ——————93.9 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————93.9 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 22 / 36 4.5.1. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Unrefrigerated Warehouse-No Rail ——————425 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————425 Daily, Winter (Max)——————— Unrefrigerated Warehouse-No Rail ——————425 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————425 Annual ——————— Unrefrigerated Warehouse-No Rail ——————70.4 Parking Lot ——————0.00 Other Asphalt Surfaces ——————0.00 User Defined Industrial ——————0.00 Total ——————70.4 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 23 / 36 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.6.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 24 / 36 Daily, Winter (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Annual ——————— Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517 Total 0.00 2.58 25.7 0.00 0.00 0.00 517 4.7.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Daily, Winter (Max)——————— Forklifts 0.00 14.1 141 0.00 0.00 0.00 3,126 Total 0.00 14.1 141 0.00 0.00 0.00 3,126 Annual ——————— Forklifts 0.00 2.58 25.7 0.00 0.00 0.00 517 Total 0.00 2.58 25.7 0.00 0.00 0.00 517 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 25 / 36 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Daily, Winter (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Annual ——————— Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 4.8.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Daily, Winter (Max)——————— Fire Pump 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Total 0.39 1.09 1.00 < 0.005 0.06 0.06 200 Annual ——————— Fire Pump 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 Total 0.01 0.03 0.02 < 0.005 < 0.005 < 0.005 4.55 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 26 / 36 Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.9.2. Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipment Type ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 27 / 36 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 28 / 36 Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Total ——————— Annual ——————— Total ——————— 4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Total ——————— Daily, Winter (Max)——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 29 / 36 Total ——————— Annual ——————— Total ——————— 4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10T PM2.5T CO2e Daily, Summer (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Daily, Winter (Max)——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Subtotal ——————— Removed ——————— Subtotal ——————— ———————— Annual ——————— Avoided ——————— Subtotal ——————— Sequestered ——————— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 30 / 36 Subtotal ——————— Removed ——————— Subtotal ——————— ———————— 5. Activity Data 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 422 422 422 153,969 105 105 105 38,492 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 125 125 125 45,731 31.3 31.3 31.3 11,433 5.9.2. Mitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Unrefrigerated Warehouse-No Rail 405 405 405 147,810 101 101 101 36,953 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User Defined Industrial 120 120 120 43,902 30.1 30.1 30.1 10,976 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 31 / 36 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.1.2. Mitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 490,225 163,408 13,721 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.10.4. Landscape Equipment - Mitigated Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 250 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 32 / 36 Unrefrigerated Warehouse-No Rail 1,477,782 349 0.0330 0.0040 6,108,658 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.11.2. Mitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Unrefrigerated Warehouse-No Rail 1,446,403 349 0.0330 0.0040 6,108,128 Parking Lot 0.00 349 0.0330 0.0040 0.00 Other Asphalt Surfaces 0.00 349 0.0330 0.0040 0.00 User Defined Industrial 0.00 349 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 73,989,825 840,374 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.12.2. Mitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Unrefrigerated Warehouse-No Rail 55,492,369 630,280 Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 33 / 36 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 301 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.13.2. Mitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Unrefrigerated Warehouse-No Rail 226 0.00 Parking Lot 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 User Defined Industrial 0.00 0.00 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.14.2. Mitigated Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 34 / 36 Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Forklifts CNG Average 32.0 4.00 82.0 0.20 5.15.2. Mitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Forklifts CNG Average 32.0 4.00 82.0 0.20 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor Fire Pump Diesel 1.00 1.00 50.0 238 0.73 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type —— Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 35 / 36 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1.2. Mitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.1.2. Mitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 5.18.2.2. Mitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) Santa Ana & Live Oak Proposed LST Operation Custom Report, 5/26/2022 36 / 36 8. User Changes to Default Data Screen Justification Construction: Construction Phases Demolition Reduced due to the limited amount of demo required. Architectural Coatings increased by 5 days due to size of the building. Construction: Off-Road Equipment Assumed 8hr workday, replaced Tractor/Loader/Backhoe with Crawler Tractors for site prep and grading phases. Operations: Vehicle Data Warehouse to analyze passenger and LHDT. User Defined Industrial to analyze MHDT and HHDT. Onsite Analysis Only Operations: Fleet Mix Vehicle Split from Project Trip Generation and VMT Screening Analysis. (EPD Solutions 2022) Operations: Refrigerants No Cold Storage proposed. Santa Ana & Live Oak Development Air Quality/Energy/GHG Summary 19 Fuel Calculations Model Output: OFFROAD2021 (v1.0.1) Emissions Inventory Region Type: Sub-Area Region: Orange (SC) Calendar Year: 2022 Scenario: All Adopted Rules - Exhaust Vehicle Classification: OFFROAD2021 Equipment Types Units: tons/day for Emissions, gallons/year for Fuel, hours/year for Activity, Horsepower-hours/year for Horsepower-hours Region Calendar Year VehClass MdlYr HP_Bin Fuel Fuel Consumption Horsepower Hours Fuel Rate Orange (SC) 2022 Construction and Mining - Misc - Concrete/Industrial Saws Aggregate Aggregate Diesel 9186.825502 219219 0.041907 Orange (SC) 2022 Construction and Mining - Excavators Aggregate Aggregate Diesel 3784274.741 190586435.8 0.019856 Orange (SC) 2022 Construction and Mining - Rubber Tired Dozers Aggregate Aggregate Diesel 419916.1247 20382976.91 0.020601 Orange (SC) 2022 Construction and Mining - Crawler Tractors Aggregate Aggregate Diesel 2102181.937 94796008.92 0.022176 Orange (SC) 2022 Construction and Mining - Graders Aggregate Aggregate Diesel 1422427.513 67218244.51 0.021161 Orange (SC) 2022 Construction and Mining - Cranes Aggregate Aggregate Diesel 851206.2633 57145991.38 0.014895 Orange (SC) 2022 Industrial - Forklifts Aggregate Aggregate Diesel 2770097.514 265223151.2 0.010444 Orange (SC) 2022 Light Commercial - Misc - Generator Sets Aggregate Aggregate Diesel 554147.6016 11796391.2 0.046976 Orange (SC) 2022 Construction and Mining - Tractors/Loaders/Backhoes Aggregate Aggregate Diesel 5264466.136 274952330.2 0.019147 Orange (SC) 2022 Light Commercial - Misc - Welders Aggregate Aggregate Diesel 857266.051 32213629.8 0.026612 Orange (SC) 2022 Construction and Mining - Other (Cement and Mortar Mixers) Aggregate Aggregate Diesel 1073373.162 49729575.71 0.021584 Orange (SC) 2022 Construction and Mining - Pavers Aggregate Aggregate Diesel 252427.7941 11723225.69 0.021532 Orange (SC) 2022 Construction and Mining - Paving Equipment Aggregate Aggregate Diesel 146912.3058 7956463.15 0.018465 Orange (SC) 2022 Construction and Mining - Rollers Aggregate Aggregate Diesel 654711.4982 33006100.74 0.019836 Orange (SC) 2022 Light Commercial - Misc - Air Compressors Aggregate Aggregate Diesel 183476.2609 6570992.8 0.027922 Source: EMFAC2021 (v1.0.1) Emissions Inventory Region Type: Sub-Area Region: Orange (SC) Calendar Year: 2022 Season: Annual Vehicle Classification: EMFAC2007 Categories Units: miles/year for CVMT and EVMT, trips/year for Trips, kWh/year for Energy Consumption, tons/year for Emissions, 1000 gallons/year for Fuel Consumption Region Calendar Year Vehicle Category Model Year Speed Fuel VMT Fuel Consumption Fuel Rate Orange (SC) 2022 LHDT1 Aggregate Aggregate Diesel 272294650 13404.42837 20.31 Orange (SC) 2022 LHDT2 Aggregate Aggregate Diesel 112926634.7 6643.13233 17.00 Orange (SC) 2022 MHDT Aggregate Aggregate Diesel 354824303 39855.09641 8.90 Orange (SC) 2022 HHDT Aggregate Aggregate Diesel 382208925.7 65300.43017 5.85 Orange (SC) 2022 LDA Aggregate Aggregate Gasoline 14788101043 513837.0107 28.78 Orange (SC) 2022 LDT1 Aggregate Aggregate Gasoline 1235805874 50940.23916 24.26 Orange (SC) 2022 LDT2 Aggregate Aggregate Gasoline 7116698572 307484.7674 23.14 Orange (SC) 2022 MDV Aggregate Aggregate Gasoline 4285534650 226701.8569 18.90 Orange (SC) 2022 LHDT1 Aggregate Aggregate Gasoline 531701698.9 40036.68554 13.28