Loading...
HomeMy WebLinkAboutAppendix H - Traffic Impact AnalysisAppendix H Traffic Impact Analysis kimley-horn.com 1100 Town and Country Road, Suite 700, Orange, CA 92868 714 939 1030 MEMORANDUM To: Gia Kim Engineering Manager City of Fontana From: Trevor Briggs, P.E. Kimley-Horn and Associates, Inc. Date: August 12, 2022 Subject: Trip Generation Consistency Memorandum for the Proposed Fontana Square Project in the City of Fontana Kimley-Horn and Associates, Inc. has prepared a trip generation consistency memorandum to evaluate the revised trip generation potential for the proposed Fontana Square project compared to the trip generation noted in the approved Traffic Impact Analysis (January 2022). PROJECT DESCRIPTION The project is located on the northwest corner of the intersection of Highland Avenue and Citrus Avenue, and to the east of Catawba Avenue, in the northern area of the City of Fontana. The project site is shown in its regional setting on Figure 1. The project site (approximately 8.9 acres) is bounded by the SR-210 Freeway to the north, Citrus Avenue to the east, Highland Avenue to the south, and Catawba Avenue to the west. APPROVED TRIP GENERATION A Traffic Impact Analysis (TIA, January 2022) was prepared for the proposed Fontana Square project and was approved by City staff in March 2022. The approved TIA assumed the following land use and quantities for the proposed project: • 104-room Hotel (Holiday Inn Express) • 117-room Hotel (Staybridge Suites) • 23,800-square-foot Recreational Community Center (Banquet Hall) • 5,000-square-foot High-Turnover (Sit-Down) Restaurant • 3,885-square-foot Fast-Food Restaurant W/ Drive-thru After applying internal capture and pass-by reductions, the proposed project would generate 4,573 net new trips on a daily basis, with 264 net new trips in the morning peak hour, and 259 net new trips in the evening peak hour. Trip generation rates and the resulting trip generation estimates from the approved TIA are summarized on Table 1. kimley-horn.com 1100 Town and Country Road, Suite 700, Orange, CA 92868 714 939 1030 REVISED TRIP GENERATION After the TIA was approved for the Fontana Square project, the proposed site plan was modified with following updated land use quantities: • 184-room Hotel (Holiday Inn Express/ Staybridge Suites) • 28,000-square-foot Recreational Community Center (Banquet Hall) • 5,000-square-foot High-Turnover (Sit-Down) Restaurant • 3,885-square-foot Fast-Food Restaurant W/ Drive-thru After applying internal capture and pass-by reduction, the proposed project would generate 4,393 net new trips on a daily basis, with 255 net new trips in the morning peak hour, and 245 net new trips in the evening peak hour. Trip generation rates and the resulting trip generation estimates for the revised Fontana Square project are summarized on Table 2. CONCLUSION Compared to the trip generation in the Approved TIA, the revised project is expected to generate 180 fewer net new trips on a daily basis, including 9 fewer net new during the morning peak hour and 14 fewer net new trips during the evening peak hour. Therefore, no further traffic analysis is required for the proposed project. Should you have any questions regarding this memorandum, please do not hesitate to contact me at 714-786-6117. TABLE 1 SUMMARY OF PROJECT TRIP GENERATION - APPROVED TIA (JANUARY, 2022) FONTANA SQUARE PROJECT Trip Generation Rates 1 ITE AM Peak Hour PM Peak Hour Land Use Code Unit Daily In Out Total In Out Total Hotel 310 Room 8.360 0.277 0.193 0.470 0.306 0.294 0.600 Recreational Community Center 495 KSF 28.820 1.162 0.598 1.760 1.086 1.224 2.310 High-Turnover (Sit-Down) Restaurant 932 KSF 112.180 5.467 4.473 9.940 6.057 3.713 9.770 Fast-Food Restaurant w/ Drive-thru 934 KSF 470.950 20.497 19.693 40.190 16.988 15.682 32.670 Trip Generation Estimates AM Peak Hour PM Peak Hour Land Use Quantity Unit Daily In Out Total In Out Total Hotel (Holiday Inn Express)104 Room 869 29 20 49 32 31 63 Hotel (Staybridge Suites)117 Room 978 32 23 55 36 34 70 Recreational Community Center (Banquet Hall) 23.800 KSF 686 28 14 42 26 29 55 High-Turnover (Sit-Down) Restaurant 5.000 KSF 561 27 22 49 30 19 49 Fast-Food Restaurant w/ Drive-thru 3.885 KSF 1,830 80 77 157 66 61 127 Total Before Internal Capture/Pass-by 4,924 196 156 352 190 174 364 Internal Capture (4% Daily; 4% AM; 7% PM)2 -197 -8 -6 -14 -13 -12 -25 Pass-By Reduction for High-Turnover (Sit-Down) Restaraunt - (43% PM)3 -20 0 0 0 -12 -8 -20 Pass-By Reduction for Fast-Food Restaurant w/ Drive-thru - (49% AM; 50% PM)3 -134 -38 -36 -74 -31 -29 -60 Total Net New Project Trips 4,573 150 114 264 134 125 259 1 Source: Institute of Transportation Engineers publication: Trip Generation Manual, 10th Edition 2 See Internal Capture Worksheets 3 Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition. The daily pass-by trips shown are the sum of the AM and the PM pass-by trips. Fontana Square Project Trip Generation Memorandum Kimley-Horn and Associates, Inc. August 2022 TABLE 2 SUMMARY OF PROJECT TRIP GENERATION - REVISED SITE PLAN FONTANA SQUARE PROJECT Trip Generation Rates 1 ITE AM Peak Hour PM Peak Hour Land Use Code Unit Daily In Out Total In Out Total Hotel 310 Room 8.360 0.277 0.193 0.470 0.306 0.294 0.600 Recreational Community Center 495 KSF 28.820 1.162 0.598 1.760 1.086 1.224 2.310 High-Turnover (Sit-Down) Restaurant 932 KSF 112.180 5.467 4.473 9.940 6.057 3.713 9.770 Fast-Food Restaurant w/ Drive-thru 934 KSF 470.950 20.497 19.693 40.190 16.988 15.682 32.670 Trip Generation Estimates AM Peak Hour PM Peak Hour Land Use Quantity Unit Daily In Out Total In Out Total Hotel (Holiday Inn Express/Staybridge Suites) 184 Room 1,538 51 36 87 56 54 110 Recreational Community Center (Banquet Hall) 28.000 KSF 807 33 17 50 30 34 64 High-Turnover (Sit-Down) Restaurant 5.000 KSF 561 27 22 49 30 19 49 Fast-Food Restaurant w/ Drive-thru 3.885 KSF 1,830 80 77 157 66 61 127 Total Before Internal Capture/Pass-by 4,736 191 152 343 182 168 350 Internal Capture (4% Daily; 4% AM; 7% PM)2 -189 -8 -6 -14 -13 -12 -25 Pass-By Reduction for High-Turnover (Sit-Down) Restaraunt - (43% PM)3 -20 0 0 0 -12 -8 -20 Pass-By Reduction for Fast-Food Restaurant w/ Drive-thru - (49% AM; 50% PM)3 -134 -38 -36 -74 -31 -29 -60 Total Net New Project Trips 4,393 145 110 255 126 119 245 Approved Net New Project Trips (From Approved TIA)4 4,573 150 114 264 134 125 259 Net Difference (Proposed Minus Approved Traffic Study) -180 -5 -4 -9 -8 -6 -14 1 Source: Institute of Transportation Engineers publication: Trip Generation Manual, 10th Edition 2 See Internal Capture Worksheets 4 Total net new trips from the Approved TIA for the proposed Fontana Square project (January, 2022) 3 Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition. The daily pass-by trips shown are the sum of the AM and the PM pass-by trips. Fontana Square Project Trip Generation Memorandum Kimley-Horn and Associates, Inc. August 2022 Traffic Impact Analysis for Fontana Square In the City of Fontana December 2021 TRAFFIC IMPACT ANALYSIS FOR THE PROPOSED FONTANA SQUARE PROJECT IN THE CITY OF FONTANA Prepared by: Kimley-Horn and Associates, Inc. 1100 Town and Country, Suite 700, Orange, California 92868 December 2021 TABLE OF CONTENTS Page INTRODUCTION..................................................................................................................................................................................1 Purpose and Study Objectives ...............................................................................................................................................1 Project Overview ..........................................................................................................................................................................1 ANALYSIS SCENARIOS AND METHODOLOGY ....................................................................................................................4 Analysis Scenarios .......................................................................................................................................................................4 Intersection Analysis – HCM Methodology .....................................................................................................................4 Level of Service Standards and Measure of Significance .........................................................................................6 AREA CONDITIONS ...........................................................................................................................................................................7 Study Area ........................................................................................................................................................................................7 Existing Street System ...............................................................................................................................................................7 Transit Service ............................................................................................................................................................................ 10 Existing Traffic Volumes ........................................................................................................................................................ 11 Peak Hour Operating Conditions ................................................................................................................................. 11 Daily Roadway Operating Conditions ....................................................................................................................... 11 PROJECT TRAFFIC .......................................................................................................................................................................... 15 Project Trip Generation ......................................................................................................................................................... 15 Trip Distribution and Assignment .................................................................................................................................... 15 EXISTING PLUS PROJECT............................................................................................................................................................ 19 Peak Hour Operating Conditions ...................................................................................................................................... 19 Daily Roadway Operating Conditions ............................................................................................................................. 19 FUTURE CONDITIONS .................................................................................................................................................................. 23 Opening Year 2023 Cumulative ......................................................................................................................................... 23 Cumulative Projects............................................................................................................................................................ 23 Cumulative Projects Trip Generation ........................................................................................................................ 23 Cumulative Projects Trip Distribution and Assignment ................................................................................. 23 Peak Hour Operating Conditions ................................................................................................................................. 27 Daily Roadway Operating Conditions ....................................................................................................................... 27 FUTURE CONDITIONS PLUS PROJECT................................................................................................................................. 30 Opening Year 2023 Cumulative Plus Project .............................................................................................................. 30 Peak Hour Operating Conditions ................................................................................................................................. 30 Daily Roadway Operating Conditions ....................................................................................................................... 33 HORIZON YEAR CONDITIONS .................................................................................................................................................. 35 Horizon Year 2040.................................................................................................................................................................... 35 Peak Hour Operating Conditions ................................................................................................................................. 35 Daily Roadway Operating Conditions ....................................................................................................................... 35 Horizon Year 2040 Plus Project......................................................................................................................................... 39 Peak Hour Operating Conditions ................................................................................................................................. 39 Daily Roadway Operating Conditions ....................................................................................................................... 39 SITE ACCESS ANALYSIS ............................................................................................................................................................... 43 STORAGE CAPACITY AT PROJECT DRIVEWAYS............................................................................................................. 43 TRAFFIC SIGNAL WARRANT ANALYSIS ............................................................................................................................. 46 Jacaranda Avenue at Highland Avenue (D1) ............................................................................................................... 46 Beech Avenue at SR-210 HOV Ramps (#2) .................................................................................................................. 46 IMPROVEMENTS AND RECOMMENDATIONS ................................................................................................................. 47 Intersection Improvements ................................................................................................................................................. 47 Roadway Improvements ....................................................................................................................................................... 47 VEHICLE MILES TRAVELED (VMT) ANALYSIS ............................................................................................................... 48 Introduction ................................................................................................................................................................................. 48 Vehicle Miles Traveled Screening ..................................................................................................................................... 48 DRIVE-THROUGH QUEUING ANALYSIS .............................................................................................................................. 51 Queuing Data Collection ........................................................................................................................................................ 51 Queuing Observations............................................................................................................................................................. 52 General Observations .............................................................................................................................................................. 53 SUMMARY OF FINDINGS AND CONCLUSIONS ................................................................................................................ 54 LIST OF FIGURES Page Figure 1 – Vicinity Map ...................................................................................................................................................................2 Figure 2 – Project Site Plan ...........................................................................................................................................................3 Figure 3 – Existing Lane Configuration and Traffic Control ........................................................................................8 Figure 4 – City of Fontana – Hierarchy of Streets Plan...................................................................................................9 Figure 5 – Existing Traffic Volumes ...................................................................................................................................... 12 Figure 6 – Project Trip Distribution ...................................................................................................................................... 17 Figure 7 – Project-Related Traffic Volumes ...................................................................................................................... 18 Figure 8 – Existing Plus Project Traffic Volumes ........................................................................................................... 20 Figure 9 – Location of Cumulative Projects ...................................................................................................................... 25 Figure 10 – Opening Year 2023 Cumulative Traffic Volumes.................................................................................. 26 Figure 11 – Opening Year 2023 Cumulative Plus Project Traffic Volumes ...................................................... 31 Figure 12 – Horizon Year 2040 Traffic Volumes ............................................................................................................ 36 Figure 13 – Horizon Year 2040 Plus Project Traffic Volumes ................................................................................. 40 LIST OF TABLES Page Table 1 – Summary of Intersection Operation – Existing Conditions ................................................................. 13 Table 2 – Summary of Roadway Segment Analysis – Existing Conditions........................................................ 14 Table 3 – Summary of Project Trip Generation ............................................................................................................. 16 Table 4 – Summary of Intersection Operation – Existing Plus Project ............................................................... 21 Table 5 – Summary of Roadway Segment Analysis – Existing Plus Project ..................................................... 22 Table 6 – Summary of Cumulative Projects ...................................................................................................................... 24 Table 7 – Summary of Intersection Operation – Opening Year 2023 Cumulative ........................................ 28 Table 8 – Summary of Roadway Segment Analysis – Opening Year 2023 Cumulative .............................. 29 Table 9 – Summary of Intersection Operation – Opening Year 2023 Cumulative Plus Project ............ 32 Table 10 – Summary of Roadway Segment Analysis – Opening Year 2023 Cumulative Plus Project .................................................................................................................................................................................................................. 34 Table 11 – Summary of Intersection Operation – Horizon Year 2040 ................................................................ 37 Table 12 – Summary of Roadway Segment Analysis – Horizon Year 2040 ...................................................... 38 Table 13 – Summary of Intersection Operation – Horizon Year 2040 Plus Project .................................... 41 Table 14 – Summary of Roadway Segment Analysis – Horizon Year 2040 Plus Project.......................... 42 Table 15 – Summary of Left-Turn Pocket Storage Capacity – AM Peak Hour ................................................ 44 Table 16 – Summary of Left-Turn Pocket Storage Capacity – PM Peak Hour ................................................ 45 Table 17 – SBCTA VMT Screening Tool Results .............................................................................................................. 49 APPENDICES APPENDIX A: APPROVED SCOPING AGREEMENT APPENDIX B: TRAFFIC COUNT DATA SHEETS APPENDIX C: INTERSECTION ANALYSIS WORKSHEETS APPENDIX D: INTERNAL CAPTURE WORKSHEETS APPENDIX E: CUMULATIVE PROJECTS INFORMATION APPENDIX F: SBTAM MODEL PLOTS AND B-TURNS WORKSHEETS APPENDIX G: TRAFFIC SIGNAL WARRANT ANALYSIS WORKSHEETS APPENDIX H: QUEUING ANALYSIS WORKSHEETS Fontana Square Project - 1 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 TRAFFIC IMPACT ANALYSIS FOR THE PROPOSED FONTANA SQUARE PROJECT IN THE CITY OF FONTANA INTRODUCTION Purpose and Study Objectives This traffic impact analysis has been prepared to address the traffic-related effects of the proposed Fontana Square project in the City of Fontana. This traffic impact analysis has been conducted in accordance with the City of Fontana Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (October 2020). This report includes a description of existing traffic conditions in the surrounding area, estimated project trip generation and distribution, future traffic growth, and an assessment of project-related effects on the transportation system. Where necessary, circulation system improvements have been identified to address project-related deficiencies at the study locations. Project Overview The project is located on the northwest corner of the intersection of Highland Avenue and Citrus Avenue, and to the east of Catawba Avenue, in the northern area of the City of Fontana. The project site is shown in its regional setting on Figure 1. The project site (approximately 8.9 acres) is bounded by the SR-210 Freeway to the north, Citrus Avenue to the east, Highland Avenue to the south, and Catawba Avenue to the west. The project consists of the construction of 5 buildings consisting of a 23,800 square foot (SF) banquet hall, a 104-Room Holiday Inn Express Hotel, a 117-Room Staybridge Suites, a 5,000 SF sit-down restaurant, and a 3,885 SF fast-food restaurant with drive-through. Additionally, the project will include widening along the project frontage on Highland Avenue to add a second westbound through lane along the project frontage. The project would also re-stripe the westbound approach (east leg) of the intersection of Citrus Avenue at Highland Avenue to allow for a second westbound through lane at the intersection. A copy of the project site plan is provided on Figure 2. Vehicular access for the project site would be via three driveways on Highland Avenue and one full- movement driveway on Catawba Avenue. The driveways on Highland Avenue would consist of one unsignalized full-movement driveway (across from Jacaranda Avenue), one full-movement signalized driveway (across from Tokay Avenue), and one unsignalized right-in-right-out (RIRO) driveway (across from Cherimoya Avenue). CITRUS AVE S. HIGHLAND AVEBEECH AVE WALNUT STSR-210 FREEWAYCATAWBA AVEJACARANDA AVE TOKAY AVE CHERIMOYA AVE PROJECTSITE = Project Site LEGEND: Fontana Square Project - 4 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 ANALYSIS SCENARIOS AND METHODOLOGY Analysis Scenarios Based on the City of Fontana’s Traffic Impact Analysis (TIA) guidelines, the project will be evaluated in the morning and evening peak hours for the following conditions: ·Existing Conditions ·Existing Plus Project ·Opening Year 2023 Cumulative ·Opening Year 2023 Cumulative Plus Project ·Horizon Year 2040 ·Horizon Year 2040 Plus Project Intersection Analysis – HCM Methodology This study includes evaluation of morning and evening peak hour operations at ten existing intersections located in the City of Fontana. Peak hour intersection operations at signalized and unsignalized intersections were evaluated using the methods prescribed in the Highway Capacity Manual (HCM) 2010, consistent with the City of Fontana TIA Guidelines for VMT and Level of Service Assessment (October 2020). The City of Fontana’s TIA guidelines require analysis of traffic operations to be based on the vehicular delay methodologies of the HCM (Transportation Research Board Special Report 209). The City does not designate a specific software to be used in the analysis, but allows the use of one of several software packages that are consistent with the HCM methodologies. The intersection analysis for the proposed project has been accomplished using the Vistro software program and using the specified input parameters outlined in the City’s TIA guidelines. Per the HCM Methodology, Level of Service (LOS) for signalized intersections is defined in terms of average vehicle delay. Specifically, LOS criteria are stated in terms of the average control delay per vehicle for the peak 15-minute period within the hour analyzed. The average control delay includes initial deceleration delay, queue move-up time, and final acceleration time in addition to the stop delay. The tables on the following page provide a description of the operating characteristics of each Level of Service and define the LOS in terms of average seconds of delay for signalized and unsignalized intersections. For unsignalized intersections, the HCM methodology analysis determines the average total delay for each vehicle making any movement from the stop-controlled minor street, as well as left turns from the major street. Delay values are calculated based on the relationship between traffic on major street and the availability of acceptable gaps in the traffic stream through which conflicting traffic movements can be made. Fontana Square Project - 5 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 LEVEL OF SERVICE DEFINITIONS Level of Service Description A No approach phase is fully utilized by traffic and no vehicle waits longer than one red indication. Typically, the approach appears quite open, turns are made easily and nearly all drivers find freedom of operation. B This service level represents stable operation, where an occasional approach phase is fully utilized and a substantial number are approaching full use. Many drivers begin to feel restricted within platoons of vehicles. C This level still represents stable operating conditions. Occasionally drivers may have to wait through more than one red signal indication, and backups may develop behind turning vehicles. Most drivers feel somewhat restricted but not objectionably S. D This level encompasses a zone of increasing restriction, approaching instability at the intersection. Delays to approaching vehicles may be substantial during short peaks within the peak period; however, enough cycles with lower demand occur to permit periodic clearance of developing queues, thus preventing excessive backups. E Capacity occurs at the upper end of this service level. It represents the most vehicles that any particular intersection approach can accommodate. Full utilization of every signal cycle is seldom attained no matter how great the demand. F This level describes forced flow operations at low speeds, where volumes exceed capacity. These conditions usually result from queues of vehicles backing up from a restriction downstream. Speeds are reduced substantially and stoppages may occur for short or long periods of time due to the congestion. In the extreme case, both speed and volume can drop to zero. LEVEL OF SERVICE CRITERIA FOR SIGNALIZED AND UNSIGNALIZED INTERSECTIONS Level of Service Signalized Intersection (Average delay per vehicle, in seconds) 1 Unsignalized Intersections (Average delay per vehicle, in seconds) 2 A < 10 0 – 10 B > 10 – 20 > 10 – 15 C > 20 – 35 > 15 – 25 D > 35 – 55 > 25 – 35 E > 55 – 80 > 35 – 50 F > 80 > 50 1 Source: Highway Capacity Manual (HCM 6th Edition), Exhibit 18-4. 2 Source: Highway Capacity Manual (HCM 6th Edition), Exhibits 19-1 and 20-2. Fontana Square Project - 6 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Roadway Segment Analysis The roadway segment analysis will address the project’s impact on daily operating conditions on roadway segments within the project vicinity. Roadway segments are evaluated by comparing the daily traffic volume to the daily capacity of that segment, to determine the volume-to-capacity (v/c) ratio. Daily capacity is based on the roadway classification, as shown in the following chart: CITY OF FONTANA ROADWAY CAPACITY STANDARDS Roadway Classification Number of Lanes Daily Capacity (Vehicles per day) Major Highway 6 54,000 Primary Highway 4 36,000 Secondary Highway 4 24,000 Collector Street 2 12,000 Source: Fontana Forward General Plan 2015-2035 Draft EIR Level of Service Standards and Measure of Significance The Level of Service standard in the City of Fontana for an intersection is LOS C or better. According to the City of Fontana’s TIA guidelines, a significant traffic impact would occur when the project causes the Level of Service to fall below LOS C, or causes the peak hour delay to increase as follows: CITY OF FONTANA THRESHOLDS OF SIGNIFICANT IMPACT With Project LOS Significant Impact Threshold A/B 10.0 Seconds C 8.0 Seconds D 5.0 Seconds E 3.0 Seconds F 1.0 Seconds Fontana Square Project - 7 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 AREA CONDITIONS Study Area This traffic study includes documentation of existing conditions, future conditions, and identification of project-related impacts at the following study locations: Intersections: 1.Beech Avenue at Highland Avenue 2.Beech Avenue at SR-210 HOV Ramps 3.Catawba Avenue at Highland Avenue 4.Citrus Avenue at SR-210 WB Ramps 5.Citrus Avenue at SR-210 EB Ramps 6.Citrus Avenue at Highland Avenue 7.Citrus Avenue at Walnut Street D1. Jacaranda Avenue at Highland Avenue D2. Tokay Avenue at Highland Avenue D3. Cherimoya Avenue at Highland Avenue Roadway Segments: 1.Highland Avenue from Beech Avenue to Citrus Avenue 2.Highland Avenue from Citrus Avenue to Oleander Avenue 3.Citrus Avenue from SR-210 EB Ramps to Highland Avenue 4.Citrus Avenue from Highland Avenue to Walnut Street The study locations were established in consultation with City of Fontana staff through the Scoping Letter Agreement process. A copy of the approved Scoping Letter Agreement is provided in Appendix A. Existing Street System Regional access to the site is provided primarily by the Ontario Freeway (I-15) and the Foothill Freeway (SR-210). The I-15 Freeway is located approximately 2.0 miles to the west of the site and access to the SR-210 Freeway via Citrus Avenue is located approximately 1,000 feet north of the project site. Other facilities that provide regional access to the site include the San Bernardino Freeway (SR-10), located approximately 5 miles to the south of the site; and the I-215 Freeway, located approximately 8 miles to the east of the project site. Existing lane configurations and intersection controls at the study intersections are shown on Figure 3. A copy of the City of Fontana’s Hierarchy of Streets Plan is provided on Figure 4. The following provides a description of the roadways surrounding the project site. CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 8 - 3. Catawba Ave at S. Highland Ave 1. Beech Ave at S. Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Ave at S. Highland Ave D2. Tokay Ave at S. Highland Ave 6. Citrus Ave at S. Highland Ave LEGEND: = Turn or Through Lane = Signal = Stop Sign = Study Intersection 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Ave at S. Highland Ave Fontana Square Project - 10 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Beech Avenue – Beech Avenue is a four-lane divided roadway through the study area. The posted speed limit along Beech Avenue is 40 miles per hour (mph). On-street parking is not allowed on the roadway. Beech Avenue is designated as a Primary Highway on the City of Fontana Circulation Master Plan, which would provide four travel lanes with a center median. Citrus Avenue – Citrus Avenue is a four-lane divided roadway through the study area. The posted speed limit along Citrus Avenue is 45 mph. On-street parking is not allowed on the roadway. Citrus Avenue is designated as a Major Highway north of Highland Avenue and a Primary Highway south of Highland Avenue within the project vicinity. Highland Avenue – Highland Avenue is a two to four-lane roadway through the study area. The posted speed limit along Highland Avenue is 45 mph. On-street parking is not allowed on the roadway. Highland Avenue is designated as a Primary Highway on the City of Fontana Circulation Master Plan and forms the southern boundary of the site, which would provide access to the site via a full-movement driveway. Walnut Avenue – Walnut Avenue is a two-lane divided roadway within the study area. The posted speed limit along Walnut Avenue is 35 mph, and 25 mph when children are present near Cecilia Lucero Solorio Elementary School. On-street parking is not allowed on the roadway. Walnut Avenue is designated as a Modified Secondary Highway on the City of Fontana Circulation Master Plan. Catawba Avenue – Catawba Avenue is a two-lane undivided roadway within the study area. On- street parking is not allowed on the roadway. Catawba is not designated on the Fontana Circulation Master Plan and there is no posted speed limit. Transit Service Transit service to the project area is provided via the OmniTrans transit lines, which serve many San Bernardino cities in the area. Bus stops in the project vicinity are located along Sierra Lakes Parkway, Walnut Avenue, Baseline Avenue, and Citrus Avenue. A description of the bus routes serving the project area is provided below. Route 10 operates between the City of Fontana and the City of San Bernardino, traveling through Fontana along Citrus Avenue and Walnut Avenue in the project vicinity. Route 10 operates on weekdays from approximately 5:10 AM to 8:30 PM with approximately 30-minute headways (the time between bus arrivals), on Saturdays from approximately 6:15 AM to 7:10 PM with approximately 1-hour headways, and on Sundays from approximately 7:15 AM to 6:10 PM with approximately 1-hour headways. Route 67 operates between Chaffey College and Fontana Metrolink Transit Center, traveling along Baseline Avenue, Citrus Avenue, and Walnut Avenue in the project vicinity. Route 67 operates on weekdays from approximately 5:55 AM to 8:50 PM with approximately 60-minute headways (the time between bus arrivals). Route 67 does not operate on weekends. Fontana Square Project - 11 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Route 82 operates between the City of Rancho Cucamonga and the City of Fontana, traveling along Summit Avenue, Citrus Avenue, and Sierra Lakes Parkway in the project vicinity. Route 82 operates on weekdays from approximately 4:20 AM to 10:00 PM with approximately 1-hour headways, and on Saturdays and Sundays from approximately 6:15 AM to 7:10 PM with approximately 1-hour headways. Existing Traffic Volumes Due to the current closure of schools and businesses during the COVID-19 pandemic, modifications to typical traffic count protocol was proposed. Based on information provided by a 3rd party data collection company, there is recent historical counts for the following intersections: 1.Beech Avenue at Highland Avenue 6.Citrus Avenue at Highland Avenue An ambient growth rate of two (2) percent per year was applied to this study intersection to develop existing year 2021 volumes. New morning and evening peak hour turning movement and daily roadway traffic counts were collected on a typical weekday. Based on a comparison of historical and new traffic count data, a 36% COVID adjustment factor was applied to the new traffic counts for the study intersections. Existing morning and evening peak hour volumes and daily roadway volumes are presented on Figure 5. Peak hour intersection traffic count worksheets and daily roadway volume worksheets are provided in Appendix B. Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours using the analysis procedures and assumptions described previously in this report. The results of the intersection analysis for Existing Conditions are shown on Table 1. Copies of Existing Conditions intersection analysis worksheets are provided in Appendix C. Review of this table indicates that all of the study intersections currently operate at an acceptable LOS. Daily Roadway Operating Conditions Roadway Level of Service analysis was conducted based on the roadway capacities presented previously in this report. The results of the roadway analysis for Existing Conditions are shown on Table 2. Review of this table indicates that all study roadway segments are currently operating at an acceptable Level of Service on a daily basis except for the following: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 12 - 3. Catawba Ave at Highland Ave 1. Beech Ave at Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume TABLE 1 SUMMARY OF INTERSECTION OPERATION EXISTING CONDITIONS Traffic AM Peak Hour PM Peak Hour Int. #Intersection Control Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue S 23.8 C 27.6 C 2 Beech Avenue at SR-210 HOV Ramps U 16.4 C 15.3 C 3 Catawba Avenue at Highland Avenue U 11.5 B 14.8 B 4 Citrus Avenue at SR-210 WB Ramps S 20.3 C 29.8 C 5 Citrus Avenue at SR-210 EB Ramps S 20.4 C 27.8 C 6 Citrus Avenue at Highland Avenue S 23.6 C 29.7 C 7 Citrus Avenue at Walnut Street S 11.2 B 11.9 B D1 Jacaranda Avenue at Highland Avenue U 10.4 B 11.6 B D2 Tokay Avenue at Highland Avenue U 9.4 A 10.0 A D3 Cherimoya Avenue at Highland Avenue U 9.5 A 10.0 A Notes: -Bold values indicate intersections operating at an unacceptable Level of Service - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. S = Signalized U = Unsignalized Fontana Square Project Traffic Impact Analysis - 13 -Kimley-Horn and Associates, Inc. December 2021 Beech Avenue to Citrus Avenue 3-Lane Primary Highway 7,014 27,000 0.260 A Citrus Avenue to Oleander Avenue 4-Lane Primary Highway 11,327 36,000 0.315 A SR-210 EB Ramps to Highland Avenue 4-Lane Primary Highway 36,783 36,000 1.022 F Highland Avenue to Walnut Avenue 4-Lane Primary Highway 28,628 36,000 0.795 C Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity Existing ADTSegmentRoadway LOSLOS E Capacitiy1 Existing Configuration Highland Avenue Citrus Avenue TABLE 2 SUMMARY OF ROADWAY SEGMENT ANALYSIS EXISTING CONDITIONS V/C Fontana Square Project Traffic Impact Analysis - 14 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 15 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 PROJECT TRAFFIC Project Trip Generation Trip generation estimates for the project are based on daily and peak hourly trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition). ITE trip generation estimates for the project are based on the trip generation rates for the following ITE Land Uses: Hotel (Land Use 310); Recreational Community Center (Land Use 495); High- Turnover (Sit-Down) Restaurant (Land Use 932); and Fast-Food Restaurant w/ Drive-thru (Land Use 934). Not all trips from the project are anticipated to be new. Some trips are expected to be captured by the internal land uses, or from the existing flow of traffic passing the site. Internal capture and pass- by trip reductions were applied to the project based on methodology within the ITE Trip Generation Handbook (3rd Edition) and the National Cooperative Highway Research Program (NCHRP) 684 Internal Trip Capture Estimation Tool. Trip generation rates and the resulting trip generation estimates for the Fontana Square Project are summarized on Table 3. Internal capture worksheets are included in Appendix D. After applying internal capture and pass-by, the project is estimated to generate 4,573 net new trips on a daily basis, with 264 net new trips in the morning peak hour, and 259 net new trips in the evening peak hour. Trip Distribution and Assignment Project trip distribution assumptions for the project site were developed taking into account the proposed site uses, existing travel patterns, and routes to and from the freeway system. Trip distribution assumptions are shown on Figure 6. Based on the trip distribution and assignment assumptions, the new trips to be added to the street system by the proposed project were calculated and are shown on Figure 7. TABLE 3 SUMMARY OF PROJECT TRIP GENERATION FONTANA SQUARE PROJECT Trip Generation Rates 1 ITE AM Peak Hour PM Peak Hour Land Use Code Unit Daily In Out Total In Out Total Hotel 310 Room 8.360 0.277 0.193 0.470 0.306 0.294 0.600 Recreational Community Center 495 KSF 28.820 1.162 0.598 1.760 1.086 1.224 2.310 High-Turnover (Sit-Down) Restaurant 932 KSF 112.180 5.467 4.473 9.940 6.057 3.713 9.770 Fast-Food Restaurant w/ Drive-thru 934 KSF 470.950 20.497 19.693 40.190 16.988 15.682 32.670 Trip Generation Estimates AM Peak Hour PM Peak Hour Land Use Quantity Unit Daily In Out Total In Out Total Hotel (Holiday Inn Express)104 Room 869 29 20 49 32 31 63 Hotel (Staybridge Suites)117 Room 978 32 23 55 36 34 70 Recreational Community Center (Banquet Hall)23.800 KSF 686 28 14 42 26 29 55 High-Turnover (Sit-Down) Restaurant 5.000 KSF 561 27 22 49 30 19 49 Fast-Food Restaurant w/ Drive-thru 3.885 KSF 1,830 80 77 157 66 61 127 Total Before Internal Capture/Pass-by 4,924 196 156 352 190 174 364 Internal Capture (4% Daily; 4% AM; 7% PM)2 -197 -8 -6 -14 -13 -12 -25 Pass-By Reduction for High-Turnover (Sit-Down) Restaraunt - (43% PM)3 -20 0 0 0 -12 -8 -20 Pass-By Reduction for Fast-Food Restaurant w/ Drive-thru - (49% AM; 50% PM)3 -134 -38 -36 -74 -31 -29 -60 Total Net New Project Trips 4,573 150 114 264 134 125 259 1 Source: Institute of Transportation Engineers publication: Trip Generation Manual, 10th Edition 2 See Internal Capture Worksheets 3 Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition. The daily pass-by trips shown are the sum of the AM and the PM pass-by trips. Fontana Square Project Traffic Impact Analysis - 16 -Kimley-Horn and Associates, Inc. December 2021 CITRUS AVE S. HIGHLAND AVEBEECH AVE WALNUT STSR-210 FREEWAYCATAWBA AVEJACARANDA AVE TOKAY AVE CHERIMOYA AVE PROJECTSITELEGEND:= Study Intersection= Trip Distribution CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 18 - 3. Catawba Ave at Highland Ave 1. Beech Ave at Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume Fontana Square Project - 19 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 EXISTING PLUS PROJECT Project-related traffic was added to the Existing traffic volumes, and the resulting traffic volumes at the study locations are shown on Figure 8. Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours for the Existing Plus Project conditions. The results of the intersection analysis are shown on Table 4. Review of this table indicates that, with the addition of project traffic, all of the study intersections would operate at an acceptable Level of Service. Daily Roadway Operating Conditions Roadway Level of Service analysis was conducted based on the roadway capacities presented previously in this report. The results of the roadway analysis for Existing Plus Project conditions are shown on Table 5. Review of this table indicates that the following study roadway segments would operate at an unacceptable Level of Service: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F o Citrus Avenue from Highland Avenue to Walnut Avenue: LOS D CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 20 - 3. Catawba Ave at Highland Ave 1. Beech Aveat Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume AM Peak Hour PM Peak Hour Int. #Intersection Traffic Control Delay LOS Delay LOS Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue S 23.8 C 24.9 C 1.1 No 27.6 C 28.0 C 0.4 No 2 Beech Avenue at SR-210 HOV Ramps U 16.4 C 16.6 C 0.2 No 15.3 C 15.4 C 0.1 No 3 Catawba Avenue at Highland Avenue U 11.5 B 11.0 B -0.5 No 14.8 B 13.7 B -1.1 No 4 Citrus Avenue at SR-210 WB Ramps S 20.3 C 20.7 C 0.4 No 29.8 C 30.4 C 0.6 No 5 Citrus Avenue at SR-210 EB Ramps S 20.4 C 20.7 C 0.3 No 27.8 C 30.9 C 3.1 No 6 Citrus Avenue at Highland Avenue S 23.6 C 25.8 C 2.2 No 29.7 C 31.7 C 2.0 No 7 Citrus Avenue at Walnut Street S 11.2 B 11.6 B 0.4 No 11.9 B 12.3 B 0.4 No D1 Jacaranda Avenue at Highland Avenue U 10.4 B 12.8 B 2.4 No 11.6 B 19.4 C 7.8 No D2 Tokay Avenue at Highland Avenue S 9.4 A 11.9 B 2.5 No 10.0 A 9.6 A -0.4 No D3 Cherimoya Avenue at Highland Avenue U 9.5 A 9.9 A 0.4 No 10.0 A 10.6 B 0.6 No TABLE 4 SUMMARY OF INTERSECTION OPERATION EXISTING PLUS PROJECT Without Project With Project Without Project With Project Notes: -Bold values indicate intersections operating at an unacceptable Level of Service Change in Delay Project- Related Effect? Change in Delay Project- Related Effect? S = Signalized U = Unsignalized - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. Fontana Square Project Traffic Impact Analysis - 21 -Kimley-Horn and Associates, Inc. December 2021 Roadway Segment Existing ADT Project ADT Existing Plus Project ADT LOS E Capacitiy1 V/C LOS Beech Avenue to Citrus Avenue 7,014 3,431 10,445 27,000 0.387 A Citrus Avenue to Oleander Avenue 11,327 458 11,785 36,000 0.327 A SR-210 EB Ramps to Highland Avenue 36,783 2,287 39,070 36,000 1.085 F Highland Avenue to Walnut Avenue 28,628 686 29,314 36,000 0.814 D Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity TABLE 5 SUMMARY OF ROADWAY SEGMENT ANALYSIS EXISTING PLUS PROJECT Citrus Avenue Highland Avenue Fontana Square Project Traffic Impact Analysis - 22 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 23 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 FUTURE CONDITIONS Opening Year 2023 Cumulative The Project Opening Year (the year the project would be constructed and occupied) is anticipated to be Year 2023. Based on consultation with City staff, an ambient growth rate of 2.0% per year to Opening Year 2023 was applied to existing traffic volumes. Cumulative Project traffic was also added to Opening Year 2023 volumes and is explained below. Cumulative Projects Information about Cumulative Projects in the area was provided by the City of Fontana. Cumulative Projects consist of any project that has been approved but is not yet constructed/occupied, and projects that are in various stages of the application and approval process but have not yet been approved. A summary of Cumulative Projects in the project vicinity and the trip generation associated with each is provided on Table 6. The locations of the Cumulative Projects are shown on Figure 9. Cumulative Projects Trip Generation Trip generation information for Cumulative Projects was derived either from approved traffic studies, where available; or developed by Kimley-Horn if approved traffic studies were not available. Cumulative Projects Trip Distribution and Assignment Likewise, trip distribution and assignment for the Cumulative Projects were either derived from approved traffic studies, where available; or were developed by Kimley-Horn if approved traffic studies were not available. Project information and trip distribution assumptions for Cumulative Projects are provided in Appendix E. Ambient growth and Cumulative Project trips were added to existing traffic to develop Opening Year 2023 Cumulative forecasts. The resulting peak hour turning movement volumes at the study locations are shown in Figure 10. Trip Generation Estimates Proj #Description Land Use Daily In Out Total In Out Total 1 Shady Trails PA 13 & 14 Single-Family Detached Housing 101 DU 953 19 56 75 63 37 100 2 Shady Trail Spa 16 Multifamily Housing (Mid-Rise)139 DU 756 13 37 50 37 24 61 3 Casa Grande Warehouse Warehousing 188.338 KSF 328 25 7 32 10 26 36 4 Sierra/Summit Warehouse Warehousing 92.380 KSF 161 12 4 16 5 13 18 5 Mango Avenue Industrial Warehousing 115.100 KSF 200 15 4 19 6 16 22 6 Sierra Lakes & Mango Convenience Store and Pumps Convenience Market w/ Gasoline Pumps 8 FP 2,580 83 83 166 92 92 184 7 Smile Studio Dental Building Medical-Dental Office Building 3.834 KSF 133 8 2 10 4 10 14 8 Costco Fuel Facility Expansion Gasoline/Service Station 4 FP 688 21 21 42 28 28 56 9 The Retreat Mixed Residential 196 DU 1,638 29 88 117 95 56 151 10 Citrus Crossroads Shopping Center 40.100 KSF 1,514 23 14 37 73 79 152 11 Fontana Hyundai Automobile Sales (New)26.083 KSF 726 36 13 49 25 38 63 Automobile Sales (New)44.625 KSF 1,242 61 23 84 43 65 108 Automated Car Wash 4.150 KSF 677 24 14 38 29 29 58 13 Walnut Village Senior Housing Senior Adult Housing-Detached 93 DU 397 7 15 22 17 11 28 14 Providence II Amendment Single-Family Detached Housing 96 DU 906 18 53 71 60 35 95 15 Kingston Meadow Single-Family Detached Housing 19 DU 179 4 11 15 12 7 19 16 Baseline Apartments Multifamily Housing (Low-Rise)54 DU 395 6 19 25 19 11 30 17 Multi-Family Project Multifamily Housing (Mid-Rise)60 DU 326 6 16 22 16 10 26 18 Mango Villas Single-Family Detached Housing 15 DU 142 3 8 11 9 5 14 19 Almeria Senior Housing Senior Adult Housing-Detached 72 DU 307 6 12 18 13 8 21 20 Single Family Residences Single-Family Detached Housing 5 DU 47 1 3 4 3 2 5 Total Project Trips 14,295 420 503 923 659 602 1,261 TABLE 6 SUMMARY OF CUMULATIVE PROJECTS Quantity Units AM Peak Hour PM Peak Hour FONTANA SQUARE PROJECT DU = Dwelling Unit, KSF = 1,000 square feet, FP = Fueling Position 12 Fontana CDRJ Dealership Fontana Square Project Traffic Impact Analysis - 24 -Kimley-Horn and Associates, Inc. December 2021 FOOTHILL BLVDBASELINE AVESR-210 FWYI-15 FREEW A Y S. HIGHLAND AVECITRUS AVE BEECH AVE ALDER AVE LOCUST AVE PROJECTSITELEGEND:= Cumulative Project CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 26 - 3. Catawba Ave at Highland Ave 1. Beech Aveat Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume Fontana Square Project - 27 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours for the Opening Year 2023 Cumulative conditions. The results are shown on Table 7. Intersection analysis worksheets are provided in Appendix C. Review of this table indicates that, with the addition of ambient growth and cumulative project traffic, the following study intersections would operate at an unacceptable Level of Service: o #4 – Citrus Avenue at SR-210 WB Ramps: PM – LOS D o #5 – Citrus Avenue at SR-210 EB Ramps: PM – LOS D o #6 – Citrus Avenue at Highland Avenue: PM – LOS D Daily Roadway Operating Conditions The results of the roadway analysis for Opening Year 2023 Cumulative conditions are shown on Table 8. Review of this table indicates that the following study roadway segments would continue to operate at an unacceptable Level of Service: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F o Citrus Avenue from Highland Avenue to Walnut Avenue: LOS D TABLE 7 SUMMARY OF INTERSECTION OPERATION OPENING YEAR 2023 CUMULATIVE AM Peak Hour PM Peak Hour Int. #Intersection Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue 25.7 C 29.2 C 2 Beech Avenue at SR-210 HOV Ramps 18.3 C 17.0 C 3 Catawba Avenue at Highland Avenue 12.1 B 16.0 C 4 Citrus Avenue at SR-210 WB Ramps 22.1 C 42.5 D 5 Citrus Avenue at SR-210 EB Ramps 22.7 C 42.8 D 6 Citrus Avenue at Highland Avenue 26.5 C 47.5 D 7 Citrus Avenue at Walnut Street 12.4 B 13.4 B D1 Jacaranda Avenue at Highland Avenue 10.8 B 12.2 B D2 Tokay Avenue at Highland Avenue 9.7 A 10.2 B D3 Cherimoya Avenue at Highland Avenue 9.7 A 10.3 B Note: -Bold values indicate intersections operating at an unacceptable Level of Service - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. Fontana Square Project Traffic Impact Analysis - 28 -Kimley-Horn and Associates, Inc. December 2021 Roadway Segment Existing ADT Opening Year 2023 Base ADT Cumulative Projects Opening Year 2023 Cumulative ADT LOS E Capacitiy1 V/C LOS Beech Avenue to Citrus Avenue 7,014 7,295 1,200 8,495 27,000 0.315 A Citrus Avenue to Oleander Avenue 11,327 11,780 2,500 14,280 36,000 0.397 A SR-210 EB Ramps to Highland Avenue 36,783 38,254 4,000 42,254 36,000 1.174 F Highland Avenue to Walnut Avenue 28,628 29,773 2,700 32,473 36,000 0.902 D Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity TABLE 8 SUMMARY OF ROADWAY SEGMENT ANALYSIS OPENING YEAR 2023 CUMULATIVE Citrus Avenue Highland Avenue Fontana Square Project Traffic Impact Analysis - 29 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 30 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 FUTURE CONDITIONS PLUS PROJECT Opening Year 2023 Cumulative Plus Project Project-related traffic was added to the Opening Year 2023 Cumulative traffic volumes, and the resulting peak hour turning movement volumes at the study intersections are shown on Figure 11. Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours for the Opening Year 2023 Cumulative Plus Project conditions. The results of the intersection analysis are shown on Table 9. Copies of intersection analysis worksheets for this scenario are provided in Appendix C. Review of this table indicates that, with the addition project traffic, the following study intersections would continue to operate at an unacceptable Level of Service: o #4 – Citrus Avenue at SR-210 WB Ramps: PM – LOS D o #5 – Citrus Avenue at SR-210 EB Ramps: PM – LOS D o #6 – Citrus Avenue at Highland Avenue: PM – LOS D Based on the significance thresholds presented earlier in this report, the following intersection would experience a project-related effect due to the increase in delay caused by the addition of project traffic: o D1 – Jacaranda Avenue at Highland Avenue: PM – LOS C The Level of Service for an unsignalized intersection is reported based on the single approach movement with the highest delay, which in this case, would be the southbound left-turn for intersection D1. The traffic on this approach would experience delay during the evening peak hour while waiting for an acceptable gap in traffic on Highland Avenue. While the side street approach operates at a deficient Level of Service based on the highest delay movement (southbound left-turn), the overall intersection delay would be acceptable. Any queuing that occurs on the side street is contained on the minor intersection approach, would occur only a limited period of time, and would not impact the progression of traffic on the main arterial. Intersection analysis worksheets are provided in Appendix C. CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 31 - 3. Catawba Ave at Highland Ave 1. Beech Ave at Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume AM Peak Hour PM Peak Hour Int. #Intersection Delay LOS Delay LOS Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue 25.7 C 26.6 C 0.9 No 29.2 C 29.6 C 0.4 No 2 Beech Avenue at SR-210 HOV Ramps 18.3 C 18.6 C 0.3 No 17.0 C 17.2 C 0.2 No 3 Catawba Avenue at Highland Avenue 12.1 B 11.3 B -0.8 No 16.0 C 14.8 B -1.2 No 4 Citrus Avenue at SR-210 WB Ramps 22.1 C 22.5 C 0.4 No 42.5 D 44.6 D 2.1 No 5 Citrus Avenue at SR-210 EB Ramps 22.7 C 23.4 C 0.7 No 42.8 D 47.4 D 4.6 No 6 Citrus Avenue at Highland Avenue 26.5 C 29.5 C 3.0 No 47.5 D 49.6 D 2.1 No 7 Citrus Avenue at Walnut Street 12.4 B 12.8 B 0.4 No 13.4 B 13.8 B 0.4 No D1 Jacaranda Avenue at Highland Avenue 10.8 B 13.6 B 2.8 No 12.2 B 22.6 C 10.4 Yes D2 Tokay Avenue at Highland Avenue 9.7 A 11.2 B 1.5 No 10.2 B 9.2 A -1.0 No D3 Cherimoya Avenue at Highland Avenue 9.7 A 10.2 B 0.5 No 10.3 B 10.8 B 0.5 No Project- Related Effect? Notes: -Bold values indicate intersections operating at an unacceptable Level of Service - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. TABLE 9 SUMMARY OF INTERSECTION OPERATION OPENING YEAR 2023 CUMULATIVE PLUS PROJECT Without Project With Project Change in Delay Project- Related Effect? Without Project With Project Change in Delay Fontana Square Project Traffic Impact Analysis - 32 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 33 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Daily Roadway Operating Conditions The results of the roadway analysis for Opening Year 2023 Cumulative Plus Project conditions are shown on Table 10. Review of this table indicates that the following study roadway segments would continue to operate at an unacceptable Level of Service: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F o Citrus Avenue from Highland Avenue to Walnut Avenue: LOS E Recommended Improvements for the roadway segments are presented in the Recommended Improvements section of this report. Roadway Segment Opening Year 2023 Cumulative ADT Project ADT Opening Year 2023 Plus Project ADT LOS E Capacitiy1 V/C LOS Beech Avenue to Citrus Avenue 8,495 3,431 11,926 36,000 0.331 A Citrus Avenue to Oleander Avenue 14,280 458 14,738 36,000 0.409 A SR-210 EB Ramps to Highland Avenue 42,254 2,287 44,541 36,000 1.237 F Highland Avenue to Walnut Avenue 32,473 686 33,159 36,000 0.921 E Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity TABLE 10 SUMMARY OF ROADWAY SEGMENT ANALYSIS OPENING YEAR 2023 CUMULATIVE PLUS PROJECT Citrus Avenue Highland Avenue Fontana Square Project Traffic Impact Analysis - 34 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 35 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 HORIZON YEAR CONDITIONS Horizon Year 2040 To develop the Horizon Year 2040 intersection turning movement forecasts, the San Bernardino Transportation Analysis Model (SBTAM) Base Year 2012 and Horizon Year 2040 future traffic projections were used. The raw forecasts obtained from the model output were post-processed by determining the annual growth between the base model year and the future model year, and applying the resulting growth to existing count volumes. The B-Turns analysis worksheets, developed by the Federal Highway Administration (FHWA), translate the grown volumes into peak hour turning movements. As a conservative approach, if a turning movement volume produced by this model was less than Opening Year 2023 volumes for that movement, manual adjustments were made to assure that all forecast Horizon Year volumes would be equal to or greater than the Opening Year 2023 turning movement volumes. Both SBTAM Model plots and B-Turns analysis worksheets are provided in Appendix F. The resulting traffic volumes for Horizon Year 2040 condition are shown on Figure 12. The Horizon Year lane geometries for the study intersections and roadways are assumed to be the same as Existing conditions, previously shown on Figure 3. Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours for the Horizon Year 2040 conditions. The results of the intersection analysis are shown on Table 11. Copies of intersection analysis worksheets for this scenario are provided in Appendix C. Review of this table indicates that under Horizon Year 2040 conditions, the following study intersections would operate at an unacceptable Level of Service: o #2 – Beech Avenue at SR-210 HOV Ramps: PM – LOS D o #4 – Citrus Avenue at SR-210 WB Ramps: PM – LOS D o #5 – Citrus Avenue at SR-210 EB Ramps: PM – LOS E o #6 – Citrus Avenue at Highland Avenue: PM – LOS D Daily Roadway Operating Conditions The results of the roadway analysis for Horizon Year 2040 conditions are shown on Table 12. Review of this table indicates that the following study roadway segments would continue to operate at an unacceptable Level of Service: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F o Citrus Avenue from Highland Avenue to Walnut Avenue: LOS D CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 36 - 3. Catawba Ave at Highland Ave 1. Beech Ave at Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume TABLE 11 SUMMARY OF INTERSECTION OPERATION HORIZON YEAR 2040 AM Peak Hour PM Peak Hour Int. #Intersection Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue 26.2 C 30.6 C 2 Beech Avenue at SR-210 HOV Ramps 24.7 C 25.2 D 3 Catawba Avenue at Highland Avenue 13.1 B 18.4 C 4 Citrus Avenue at SR-210 WB Ramps 23.9 C 35.4 D 5 Citrus Avenue at SR-210 EB Ramps 22.6 C 67.0 E 6 Citrus Avenue at Highland Avenue 27.4 C 48.7 D 7 Citrus Avenue at Walnut Street 13.8 B 16.9 B D1 Jacaranda Avenue at Highland Avenue 11.1 B 14.5 B D2 Tokay Avenue at Highland Avenue 9.8 A 11.1 B D3 Cherimoya Avenue at Highland Avenue 9.8 A 11.2 B Note: -Bold values indicate intersections operating at an unacceptable Level of Service - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. Fontana Square Project Traffic Impact Analysis - 37 -Kimley-Horn and Associates, Inc. December 2021 Roadway Segment Horizon Year 2040 ADT LOS E Capacitiy1 V/C LOS Beech Avenue to Citrus Avenue 16,200 27,000 0.600 A Citrus Avenue to Oleander Avenue 21,700 36,000 0.603 A SR-210 EB Ramps to Highland Avenue 42,254 36,000 1.174 F Highland Avenue to Walnut Avenue 32,473 36,000 0.902 D Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity TABLE 12 SUMMARY OF ROADWAY SEGMENT ANALYSIS HORIZON YEAR 2040 Citrus Avenue Highland Avenue Fontana Square Project Traffic Impact Analysis - 38 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 39 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Horizon Year 2040 Plus Project Project-related traffic was added to the Horizon Year 2040 traffic volumes. Horizon Year 2040 Plus Project peak hour turning movement volumes at study intersections and daily roadway volumes are shown on Figure 13. Peak Hour Operating Conditions Intersection Level of Service analysis was conducted for the morning and evening peak hours for the Horizon Year 2040 Plus Project conditions. The results of the intersection analysis are shown on Table 13. Copies of intersection analysis worksheets for this scenario are provided in Appendix C. Review of this table indicates that, with the addition of project traffic, the following study intersections would operate at an unacceptable Level of Service: o #2 – Beech Avenue at SR-210 HOV Ramps: AM – LOS D; PM – LOS D o #4 – Citrus Avenue at SR-210 WB Ramps: PM – LOS D o #5 – Citrus Avenue at SR-210 EB Ramps: PM – LOS D o #6 – Citrus Avenue at Highland Avenue: PM – LOS D o D1 – Jacaranda Avenue at Highland Avenue: PM – LOS D Based on the significance thresholds presented earlier in this report, the following intersections would experience a project-related effect due to the increase in delay caused by the addition of project traffic: o D1 – Jacaranda Avenue at Highland Avenue: PM – LOS D Daily Roadway Operating Conditions The results of the roadway analysis for Horizon Year 2040 Plus Project conditions are shown on Table 14. Review of this table indicates that the following study roadway segments would continue to operate at an unacceptable Level of Service: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue: LOS F o Citrus Avenue from Highland Avenue to Walnut Avenue: LOS E Recommended Improvements for the roadway segments are presented in the Recommended Improvements section of this report. CITRUS AVES. HIGHLAND AVE BEECH AVEWALNUT ST SR-210 FREEWAY CATAWBA AVE JACARANDA AVETOKAY AVECHERIMOYA AVEPROJECT SITE - 40 - 3. Catawba Ave at Highland Ave 1. Beech Ave at Highland Ave 2. Beech Ave at SR-210 HOV Ramps 7. Citrus Ave at Walnut St 4. Citrus Ave at SR-210 WB Ramps D1. Jacaranda Aveat Highland Ave D2. Tokay Aveat Highland Ave6. Citrus Aveat Highland Ave 5. Citrus Ave at SR-210 EB Ramps D3. Cherimoya Aveat Highland Ave LEGEND: = Study Intersection = Average Daily Traffic = AM/PM Peak Hour Turning Movement Volumes Volume AM Peak Hour PM Peak Hour Int. #Intersection Delay LOS Delay LOS Delay LOS Delay LOS 1 Beech Avenue at Highland Avenue 26.2 C 26.8 C 0.6 No 30.6 C 31.5 C 0.9 No 2 Beech Avenue at SR-210 HOV Ramps 24.7 C 25.3 D 0.6 No 25.2 D 25.7 D 0.5 No 3 Catawba Avenue at Highland Avenue 13.1 B 12.5 B -0.6 No 18.4 C 16.1 C -2.3 No 4 Citrus Avenue at SR-210 WB Ramps 23.9 C 24.3 C 0.4 No 35.4 D 36.6 D 1.2 No 5 Citrus Avenue at SR-210 EB Ramps 22.6 C 23.2 C 0.6 No 67.0 E 67.0 E 0.0 No 6 Citrus Avenue at Highland Avenue 27.4 C 29.4 C 2.0 No 48.7 D 50.5 D 1.8 No 7 Citrus Avenue at Walnut Street 13.8 B 14.2 B 0.4 No 16.9 B 17.2 B 0.3 No D1 Jacaranda Avenue at Highland Avenue 11.1 B 16.7 C 5.6 No 14.5 B 29.9 D 15.4 Yes D2 Tokay Avenue at Highland Avenue 9.8 A 10.0 A 0.2 No 11.1 B 8.6 A -2.5 No D3 Cherimoya Avenue at Highland Avenue 9.8 A 10.3 B 0.5 No 11.2 B 11.8 B 0.6 No Project- Related Effect? Notes: -Bold values indicate intersections operating at an unacceptable Level of Service - Delay values for unsignalized intersections represent the average vehicle delay on the worst (highest delay) intersection approach. TABLE 13 SUMMARY OF INTERSECTION OPERATION HORIZON YEAR 2040 PLUS PROJECT Without Project With Project Change in Delay Project- Related Effect? Without Project With Project Change in Delay Fontana Square Project Traffic Impact Analysis - 41 -Kimley-Horn and Associates, Inc. December 2021 Roadway Segment Horizon Year 2040 ADT Project ADT Horizon Year 2040 Plus Project ADT LOS E Capacitiy1 V/C LOS Beech Avenue to Citrus Avenue 16,200 3,431 19,631 36,000 0.545 A Citrus Avenue to Oleander Avenue 21,700 458 22,158 36,000 0.616 B SR-210 EB Ramps to Highland Avenue 42,254 2,287 44,541 36,000 1.237 F Highland Avenue to Walnut Avenue 32,473 686 33,159 36,000 0.921 E Notes: 1 Source: City of Fontana, Fontana Forward General Plan Update 2015-2035, Draft Environmental Impact Report LOS = Level of Service ADT = Average Daily Traffic V / C = Volume to Capacity Citrus Avenue Highland Avenue TABLE 14 SUMMARY OF ROADWAY SEGMENT ANALYSIS HORIZON YEAR 2040 PLUS PROJECT Fontana Square Project Traffic Impact Analysis - 42 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 43 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 SITE ACCESS ANALYSIS Vehicular access for the project site would be via three driveways on Highland Avenue and one full- movement driveway on Catawba Avenue. The driveways on Highland Avenue would consist of one unsignalized full-movement driveway (across from Jacaranda Avenue), one full-movement signalized driveway (across from Tokay Avenue), and one unsignalized right-in-right-out (RIRO) driveway (across from Cherimoya Avenue). STORAGE CAPACITY AT PROJECT DRIVEWAYS Queue lengths at the project driveways were assessed for the following locations and movements: ·D1 - Jacaranda Avenue at Highland Avenue o Southbound Left-Turn o Eastbound Left-Turn ·D2 – Tokay Avenue at Highland Avenue o Southbound Left-Turn o Eastbound Left-Turn ·D3 – Cherimoya Avenue at Highland Avenue o Southbound Right-Turn A summary of the driveway pocket storage capacity, as well as the 50th and 95th percentile queue lengths at the locations noted above are shown on Table 15 and Table 16. As shown in Tables 15 and 16, the 95th percentile queue exceeds the southbound left turn storage (approximately 2 vehicles) under the Plus Project scenarios during both AM and the PM peak hours. However, it should be noted that the 95th percentile queue has only a 5 percent probability of occurring during the peak hours. The 50th percentile queue, or average queue, is likely to be observed more frequently during the peak hours, and as shown in Tables 15 and 16, the southbound left turn storage is sufficient to meet average queues. Additionally, the project will provide adequate traffic control including signage and pavement markings to ensure internal circulation path is kept clear and is not blocked by turning traffic. TABLE 15 SUMMARY OF LEFT-TURN POCKET STORAGE CAPACITY - AM PEAK HOUR FONTANA SQUARE PROJECT 50th Percentile1 95th Percentile 50th Percentile1 95th Percentile 50th Percentile1 95th Percentile EBL ----1 --1 --1 SBL 40 --2 --2 --3 EBL --21 38 21 38 21 38 SBL 80 68 122 68 122 67 120 Cherimoya Avenue at Highland Avenue SBR 40 --2 --2 --2 Notes: 1 50th percentile queue not reported for unsignalized intersections Storage Capacity (ft/ln) Jacaranda Avenue at Highland Avenue Tokay Avenue at Highland Avenue Intersection Left-Turn Movement Existing Plus Project OY Plus Project HY Plus Project AM Peak Hour Queue Length (ft/ln) Fontana Square Project Traffic Impact Analysis - 44 -Kimley-Horn and Associates, Inc. December 2021 TABLE 16 SUMMARY OF LEFT-TURN POCKET STORAGE CAPACITY - PM PEAK HOUR FONTANA SQUARE PROJECT 50th Percentile1 95th Percentile 50th Percentile1 95th Percentile 50th Percentile1 95th Percentile EBL ----1 --1 --1 SBL 40 --7 --8 --11 EBL --18 32 18 32 18 32 SBL 80 67 121 67 121 67 121 Cherimoya Avenue at Highland Avenue SBR 40 --1 --1 --1 Notes: Jacaranda Avenue at Highland Avenue Tokay Avenue at Highland Avenue 1 50th percentile queue not reported for unsignalized intersections Intersection Left-Turn Movement Storage Capacity (ft/ln) PM Peak Hour Queue Length (ft/ln) Existing Plus Project OY Plus Project HY Plus Project Fontana Square Project Traffic Impact Analysis - 45 -Kimley-Horn and Associates, Inc. December 2021 Fontana Square Project - 46 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 TRAFFIC SIGNAL WARRANT ANALYSIS A signal warrant analysis was conducted based on the 2014 California Manual on Uniform Traffic Control Devices (CAMUTCD) for the following intersections. Jacaranda Avenue at Highland Avenue (D1) The warrant was conducted using Warrant 3 (Peak Hour Warrant) for the following scenarios: o Opening Year 2023 Cumulative Plus Project o Horizon Year 2040 Plus Project Traffic Signal Warrant Analysis worksheets are provided in Appendix G. Under the scenarios noted above, Warrant 3 was not met for the intersection of Jacaranda Avenue at Highland Avenue (D1). Beech Avenue at SR-210 HOV Ramps (#2) The warrant was conducted using Warrant 3 (Peak Hour Warrant) for the following scenarios: o Horizon Year 2040 o Horizon Year 2040 Plus Project Traffic Signal Warrant Analysis worksheets are provided in Appendix G. Based on the signal warrant analysis, Warrant 3 was met during both the AM and PM peak hours under with and without project Horizon Year scenarios for the intersection of Beech Avenue at SR-210 HOV Ramps (#2). The CA MUTCD specifically states that, “The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.” The reference document goes on to state a number of other factors to take into account when considering a signal for a specific location, including whether or not a signal would improve the overall safety of the intersection, whether it would benefit or disrupt progressive traffic flow (in this case, on Beech Avenue), and consideration of queuing, signal spacing, and overall delay to the main street through movements. The decision to install a traffic signal should be based on engineering judgment, and not solely upon satisfying a peak hour warrant. It is recommended that a decision about signalization at the intersection should be made based on future observations as well as engineering judgment, based on the factors listed above. Fontana Square Project - 47 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 IMPROVEMENTS AND RECOMMENDATIONS Intersection Improvements Based on the Level of Service standards and significance criteria discussed previously, intersection improvements are not required at any of the study intersections. Roadway Improvements The daily traffic volumes on the segments of Citrus Avenue from SR-210 EB Ramps to Highland Avenue will exceed the roadway capacity in the Existing conditions. Citrus Avenue is currently a four- lane divided roadway, with a capacity of 36,000 vehicles per day (vpd). The project is estimated to add 2,287 vehicles to the segment from SR-210 EB Ramps to Highland Avenue. Citrus Avenue is designated as a Major Highway (six-lane divided roadway) in the City of Fontana Circulation General Plan. With this improvement, the daily roadway capacity would be 54,000 vehicles per day, and the segment would provide sufficient capacity. Fontana Square Project - 48 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 VEHICLE MILES TRAVELED (VMT) ANALYSIS Introduction Senate Bill 743 (SB 743) was approved by California legislature in September 2013. SB 743 requires changes to California Environmental Quality Act (CEQA), specifically directing the Governor’s Office of Planning and Research (OPR) to develop alternative metrics to the use of vehicular “Level of Service” (LOS) for evaluating transportation projects. OPR has prepared a technical advisory (“OPR” Technical Advisory) for evaluating transportation impacts in CEQA and has recommended that Vehicle Miles Traveled (VMT) replace LOS as the primary measure of transportation impacts. This analysis was prepared to document the VMT analysis for the Fontana Square Project following the OPR Technical Advisory (December 2018) and the San Bernardino County Transportation Authority (SBCTA) Recommended VMT Guidelines. Vehicle Miles Traveled Screening This section documents Vehicle Miles Traveled (VMT)/SB 743 considerations for the project. OPR provides details on appropriate screening thresholds that can be used to identify when a proposed land use project is anticipated to result in a less-than-significant impact without conducting a more detailed level analysis. Screening thresholds are broken into the following three steps: 1.Transit Priority Area (TPA) Screening 2.Low VMT Area Screening 3.Low Project Type Screening 4.Project Net Daily Trips Less Than 500 ADT Screening A land use project needs only meet one of the above screening thresholds to be presumed to result in not a significant impact under CEQA pursuant to SB 743. Transit Priority Area (TPA) Screening As described in the OPR Guidelines, projects located within half mile from an existing major transit stop or within half of a mile from an existing stop along a high-quality transit corridor can be screened out. Based on San Bernardino County Transportation Authority (SBCTA) VMT Screening Tool, the project is not located in a Transit Priority Area (TPA). The TPA Screening threshold is not met. Fontana Square Project - 49 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Low VMT Area Screening The project is located in a Low VMT (15% below County Average) zone based on SBCTA VMT Screening tool, as shown in Table 18. Table 17 – SBCTA VMT Screening Tool Results Threshold Option Threshold Project % Above Threshold Potentially Significant? OD VMT per Service Population 28.2 25.69 -22.63%No The Low VMT Area Screening threshold is met. Land Use Type Screening The OPR and SBCTA VMT Guidelines identify that Project types falling under the screening criteria include the following: •K-12 Schools •Local-serving retail less than 50,000 square feet •Local parks •Day care centers •Local serving gas stations •Local serving banks •Local serving hotels (e.g. non-destination hotels) •Student housing Projects on or adjacent college campuses •Local-serving assembly uses, Community Institutions •Local serving community colleges •Affordable or supportive housing, Assisted living facilities, Senior housing •Projects generating less than 110 daily vehicle trips Based on the Project types above, all Project land uses have been identified as having the presumption of a less-than-significant impact. The proposed Holiday Inn Express Hotel and Staybridge Suites are expected to operate as local serving hotels. The proposed banquet hall is expected to operate as local serving assembly use. The proposed 5,000 SF sit-down restaurant and 3,885 SF In-N-Out Burger are less than 50,000 SF and are expected to operate as local-serving retail. They are not anticipated to lead to longer trips, thus reducing or maintaining regional VMT. The Low Project Type Screening threshold is met. Fontana Square Project - 50 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Project Net Daily Trips Less Than 500 ADT Screening Projects that generate fewer than 500 average daily trips (ADT) would not cause a substantial increase in the total citywide or regional VMT and are therefore presumed to have a less-than- significant impact on VMT. Based on Table 3 (previously mentioned), the project is estimated to generate more than 500 average daily trips. The Project Net Daily Trips Less Than 500 ADT Screening threshold is not met. Based on the Low VMT Area and Low Project Type Screening criteria, the project may be presumed to create a less-than-significant transportation impact. Fontana Square Project - 51 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 DRIVE-THROUGH QUEUING ANALYSIS City staff has requested that a drive-through queuing analysis be conducted for the proposed project to evaluate the adequacy of the drive-through lane queuing capacity. The opening to the drive-through lane would be located at the southeastern corner of the proposed building, and the drive-through lane would wrap counterclockwise along the east and north sides of the building. The drive-through would provide two side-by-side entry lanes. After the entry lanes, the two lanes would merge into a single drive-through lane prior to the order boards and pay and pick-up window. There will be approximately 340 feet of total queueing capacity from the drive-through entrance to the order board and approximately 180 feet from the order board to the pick-up window. This would provide a total drive-through queue length of approximately 520 feet, for a drive-through queuing capacity of 24-26 vehicles, assuming 20-22 feet per vehicle, from beginning of the drive-through lanes to the pick-up window. Queuing Data Collection Drive-through (DT) queuing observations were conducted at the following existing drive-through In- N-Out sites: ·City of Corona: 2305 Compton Avenue ·City of Highland: 28009 Greenspot Road ·City of Thousand Palms: 72265 Varner Road These sites were selected for queueing data collection because of the following site characteristics that are similar to the proposed project: ·An In-N-Out restaurant with a drive-through lane ·Located in Southern California ·Located adjacent to or within a larger commercial center Fontana Square Project - 52 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 The drive-through activity was observed during the following times for the In-N-Out sites on a typical weekday and weekend: ·Corona Site: o 11:00 AM – 2:00 PM (lunchtime) o 4:00 PM – 8:30 PM (commute peak hour/ dinnertime) ·Highland Site: o 11:00 AM – 2:00 PM (lunchtime) o 4:00 PM – 8:30 PM (commute peak hour/ dinnertime) ·Thousand Palms Site: o 11:00 AM – 2:00 PM (lunchtime) o 4:00 PM – 8:30 PM (commute peak hour/ dinnertime) A copy of the queuing data collection worksheets is provided in Appendix H. The results of the observations are summarized in Appendix H for a typical weekday and weekend. The data summaries in Appendix H present the number of vehicles in the drive-through lane, broken down into 15-minute periods, based on the observed average queue, 85th percentile queue, and the peak queue for each of the data collection periods. Queuing Observations The queuing activity was observed to vary with an ebb and flow pattern throughout the data collection periods. The following vehicle movement and queuing observations of the drive-through operation at the study locations were made: Corona Site ·The peak 15 minutes during the weekday lunchtime peak was 12:15 PM to 12:30 PM, with an average queue of 17 vehicles and a peak queue of 24 vehicles. ·The peak 15 minutes during the weekday dinnertime peak was from 6:30 PM to 6:45 PM, with an average queue of 22 vehicles and a peak queue of 24 vehicles. ·The peak 15 minutes during the weekend lunchtime peak was from 1:30 PM to 1:45 PM, with an average queue of 23 vehicles and a peak queue of 24 vehicles. ·The peak 15 minutes during the weekend dinnertime peak was from 6:30 PM to 6:45 PM, with an average queue of 24 vehicles and a peak queue of 25 vehicles. Fontana Square Project - 53 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 Highland Site ·The peak 15 minutes during the weekday lunchtime peak was from 12:15 PM to 12:30 PM, with an average queue of 18 vehicles and a peak queue of 21 vehicles. ·The peak 15 minutes during the weekday dinnertime peak was from 6:00 PM to 6:15 PM, with an average queue of 20 vehicles and a peak queue of 23 vehicles. ·The peak 15 minutes during the weekend lunchtime peak was from 1:45 PM to 2:00 PM, with an average queue of 20 vehicles and a peak queue of 22 vehicles. ·The peak 15 minutes during the weekend dinnertime peak was from 6:00 PM to 6:15 PM, with an average queue of 22 vehicles and a peak queue of 23 vehicles. Thousand Palms Side ·The peak 15 minutes during the weekday lunchtime peak was from 12:45 PM to 1:00 PM, with an average queue of 18 vehicles and a peak queue of 20 vehicles. ·The peak 15 minutes during the weekday dinnertime peak was from 7:15 PM to 7:30 PM, with an average queue of 18 vehicles and a peak queue of 20 vehicles. ·The peak 15 minutes during the weekend lunchtime peak was from 1:30 PM to 1:45 PM, with an average queue of 17 vehicles and a peak queue of 18 vehicles. ·The peak 15 minutes during the weekend dinnertime peak was from 6:45 PM to 7:00 PM, with an average queue of 18 vehicles and a peak queue of 20 vehicles. General Observations ·At the In-N-Out sites, spillovers outside the drive-through lane opening were observed to occur occasionally and to last briefly. ·Some customers were observed to pull into the site; evaluate the wait time, based on the vehicle queue; and choose to park and go into the building, rather than join the existing queue. ·Based on the drive-through queuing data, the peak observed queue was 25 vehicles. During peak periods, the proposed site would have a drive-through queuing capacity of 26 vehicles. Therefore, the proposed capacity would be able to accommodate the expected peak demand. Fontana Square Project - 54 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 SUMMARY OF FINDINGS AND CONCLUSIONS ·The project is located on the northwest corner of the intersection of Highland Avenue and Citrus Avenue, in the northern area of the City of Fontana. ·The project consists of the construction of 5 new buildings: Banquet Hall, Holiday Inn Express Hotel, Staybridge Suites, fast-food restaurant with drive-through, and sit-down restaurant. ·The project is estimated to generate 4,573 net new trips on a daily basis, with 264 net new trips in the morning peak hour, and 259 net new trips in the evening peak hour. ·The project would not have a project-related effect at any of the study intersections in the Existing Plus Project scenario. ·The project would have a project-related effect at the following intersection in the Opening Year 2023 Plus Project scenario: o D1 – Jacaranda Avenue at Highland Avenue: PM – LOS C ·The project would have a project-related effect at the following intersection in the Horizon Year 2040 Plus Project scenario: o D1 – Jacaranda Avenue at Highland Avenue: PM – LOS D ·Under Existing Conditions, all study roadway segments would operate at Level of Service C or better, except for the following: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue ·Under Opening Year and Horizon Year Conditions, all study roadway segments would operate at Level of Service C or better, except for the following: o Citrus Avenue from SR-210 EB Ramps to Highland Avenue o Citrus Avenue from Highland Avenue to Walnut Avenue ·Based on the storage capacity driveway queuing analysis, the proposed driveways would have enough capacity to accommodate the expected peak demand. ·Based on the site plan, there is sufficient driveway queuing storage on-site for the intersection of Jacaranda Avenue at Highland Avenue. It is recommended that the project driveway queuing be observed to see if there are any driveway queuing concerns when in operation. Fontana Square Project - 55 - Kimley-Horn and Associates, Inc. Traffic Impact Analysis December 2021 ·A signal warrant analysis was conducted for the following intersections: o D1 – Jacaranda Avenue at Highland Avenue o #2 – Beech Avenue at SR-210 HOV Ramps ·Warrant 3 (Peak Hour Warrant) was not met for the intersection of Jacaranda Avenue at Highland Avenue (D1). ·Warrant 3 was met during both the AM and PM peak hours under with and without project Horizon Year scenarios for the intersection of Beech Avenue at SR-210 HOV Ramps (#2). ·The decision to install a traffic signal should be based on engineering judgment, and not solely upon satisfying a peak hour warrant. It is recommended that a decision about signalization at the intersection should be made based on future observations as well as engineering judgment. ·The project would result in a less-than-significant finding under SB 743. Based on the considerations noted above, the project would not generate new “demand”, but meets existing demand that would shorten the distance that road users would otherwise travel. Additionally, the project is located in a low VMT area based on the SBCTA VMT Screening Tool. As such the project would result in a less-than-significant finding based on the project being a local- serving use and low VMT area ·Based on the drive-through queuing analysis, the proposed drive-through capacity would be able to accommodate the expected peak demand. APPENDIX A APPROVED SCOPING AGREEMENT Exhibit B SCOPING AGREEMENT FOR TRAFFIC IMPACT STUDY This letter acknowledges the City of Fontana Engineering Department requirements for traffic impact analysis of the following project. The analysis must follow the SBCT A Congestion Management Plan (CMP) Guidelines Updated 2016. Case No. MCN20-000083 Related Cases - SP No. EIRNo. GPA No. ---------------------------------------CZ No. Project Name: Fontana Square -------------------------------------Project Address: Northwest corner of Highland Ave and Citrus Ave Project Description: Mixed-Use Hotels and Restaurants (See Site Plan-Attachment 1) Consultant Name: Kimley-Horn and Associates, Inc. Address: 3880 Lemon Street, Suite 420 Riverside, CA 92501 Telephone: 951-543-9869 Fax: A.Trip Generation Source: Developer ACE Design, LLC 1024 Iron Point Road, Suite 1046 Folsom, CA 95630 702-396-5113 Current GP Land Use Proposed Land Use Vacant General Commercial (C-G) Current Zoning Current Trip Generation In AM Trips PM Trips 0 Internal Trip Allowance Pass-By Trip Allowance General Commercial (C-G) 0 Out 0 Yes 0 Yes Total 0 B No No Proposed Zoning General Commercial (C-G) Proposed Trip Generation 150 134 In Out 114 125 264 259 ( 4% Daily; 4% AM; 7% PM ( See Attachment 2 % Trip Discount) % Trip Discount) A pass-by trip discount is allowed for appropriate land uses per ITE trip generation handbook 3rd edition. The pass-by trips at adjacent study area intersections and project driveways shall be indicated on a report figure. (Attach table for detailed trip generation) Total % B. Trip Geographic Distribution: N 15 % S 20 % E 35 % W 30------(attach exhibit for detailed assignment) C.Background Traffic Project Opening & Future Bulld-Out Year. Annual Ambient Growth Rate: 2.0 % Phase Year(s) _20_23 ______ _ Other area projects to be analyzed: Information regarding Related Projects will be requested from the Planning Department Model/Forecast methodology Opening Year 2023: Existing+ Growth+ Cumulative Projects+ Project/ Forecast 2040: SBTAM Forecasts Traffic Impact Analysis Preparation Guide April 2021 ITE 10th Edition (see Attachment 2) (See Attachment 3) (See Attachment 4) Exhibit B -Scoping Agreement -Page 2 D.Study intersections: (NOTE: Subject to revision affer other projects, trip generation and distribution are determined, or comments from other agencies.) 1.Beech Avenue and Highland Avenue 2.Beech Avenue and 1-21 O HOV Ramps 3.Catawaba Avenue and Highland Avenue 4.Citrus Avenue and 1-21 O WB Ramps 5.Citrus Avenue and 1-210 EB Ramps 6.Citrus Avenue and Highland Avenue 7.Citrus Avenue and Walnut Street 8.Project Driveway along Highland Avenue at Jacaranda Avenue 9.Project Driveway along Highland Avenue at Tokay Avenue 10.Project Driveway along Highland Avenue and Cherimoya Avenue E.Study Roadway Segments: (NOTE: Subject to revision affer other projects, trip generation and distribution are determined, or comments from other agencies.) 1 . Citrus Avenue, between S. Highland Avenue and EB Ramps 2.Citrus Avenue, between S. Highland Avenue and Walnut Street 3.S. Highland Avenue, between Citrus Avenue and Oleander Avenue 4.S. Highland Avenue, between Citrus Avenue and Beech Avenue 5. E.Other Jurisdictional Impacts 6. 7. 8. 9. 10. Is this project within a City's Sphere of Influence or one-mile radius of City boundaries? 0 Yes D No If so, name of City Jurisdiction: Caltrans ------------------------------ F.Site Plan (please attach reduced copy) See Attachment 1 G.Specific issues to be addressed in the Study (in addition to the standard analysis describedin the Guideline) (To be filled out by Engineering Department)(NOTE: If the traffic study states that "a traffic signal is warranted" (or "a traffic signal appears to be warranted," or similar statement) at an existing unsignalized intersection under existing conditions, 8-hour approach traffic volumeinformation must be submitted in addition to the peak hourly turning movement counts for that intersection.) Pertorm signal warrants and queuing analysis at all project driveways H.Existing Conditions Traffic count data must be new or recent. Provide traffic count dates if using other than new counts. Date of counts New TMC and ADT Classification counts will be collected and a COVID-19 factor will be applied based on historical count data. I.VMT Assessment Provide VMT screening or assessment per the latest TIA & VMT Guidelines. NOTE* Traffic Study Submittal Form and appropriate fee must be submitted with, or prior to submittal of this form. Transportation Department staff will not process the Scoping Agreement prior to receipt of the fee. Recommended by: Trevor Briggs Consultant's Representative Scoping Agreement Submitted on Revised on ----------- Traffic Impact Analysis Preparation Guide Approved Scoping Agreement: 7127121 Date City of Fontana Traffic Engineer Date April 2021 4120121 7127121 SITTING AREA 05 PATIO FRONT PORCH PORTE COCHERE 05POOL PATIOOUTDOOR3,885 SF 74 indoor seats 1 4 TITLEPROJECTDWG. BY: DATE: JOB : SHEETREVISIONS:CHK. BY: OF 18 19-03FONTANA SQUARENWC CITRUS & SO. HIGHLAND AVE,FONTANA, CALIFORNIA05/03/2021 HS MG 2 ATTACHMENT 2 SUMMARY OF PROJECT TRIP GENERATION FONTANA SQUARE PROJECT Trip Generation Rates1 ITE AM Peak Hour PM Peak Hour Land Use Code Unit Daily In Out Total In Out Total Hotel 310 Room 8.360 0.277 0.193 0.470 0.306 0.294 0.600 Recreational Community Center 495 KSF 28.820 1.162 0.598 1.760 1.086 1.224 2.310 High-Turnover (Sit-Down) Restaurant 932 KSF 112.180 5.467 4.473 9.940 6.057 3.713 9.770 Fast-Food Restaurant w/ Drive-thru 934 KSF 470.950 20.497 19.693 40.190 16.988 15.682 32.670 Trip Generation Estimates AM Peak Hour PM Peak Hour Land Use Quantity Unit Daily In Out Total In Out Total Hotel (Holiday Inn Express)104 Room 869 29 20 49 32 31 63 Hotel (Staybridge Suites)117 Room 978 32 23 55 36 34 70 Recreational Community Center (Banquet Hall)23.800 KSF 686 28 14 42 26 29 55 High-Turnover (Sit-Down) Restaurant 5.000 KSF 561 27 22 49 30 19 49 Fast-Food Restaurant w/ Drive-thru 3.885 KSF 1,830 80 77 157 66 61 127 Total Before Internal Capture/Pass-by 4,924 196 156 352 190 174 364 Internal Capture (4% Daily; 4% AM; 7% PM)2 -197 -8 -6 -14 -13 -12 -25 Pass-By Reduction for High-Turnover (Sit-Down) Restaraunt - (43% PM)3 -20 0 0 0 -12 -8 -20 Pass-By Reduction for Fast-Food Restaurant w/ Drive-thru - (49% AM; 50% PM)3 -134 -38 -36 -74 -31 -29 -60 Total Net New Project Trips 4,573 150 114 264 134 125 259 1 Source: Institute of Transportation Engineers publication: Trip Generation Manual, 10th Edition 2 See Internal Capture Worksheets 3 Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition. The daily pass-by trips shown are the sum of the AM and the PM pass-by trips. Fontana - Fontana Square Kimley-Horn and Associates, Inc. 7/26/2021 Project Name:Organization: Project Location:Performed By: Scenario Description:Date: Analysis Year:Checked By: Analysis Period:Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 0 Retail 0 Restaurant 206 107 99 Cinema/Entertainment 0 Residential 0 Hotel 104 61 43 All Other Land Uses2 0 310 168 142 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office Retail Restaurant Cinema/Entertainment Residential Hotel All Other Land Uses2 Office Retail Restaurant Residential Hotel Office Retail Restaurant Cinema/Entertainment Residential Hotel Office Retail Restaurant Residential Hotel Office 0 0 0 0 Retail 0 0 0 0 Restaurant 0 0 0 2 Cinema/Entertainment 0 0 0 0 0 Residential 0 0 0 0 Hotel 0 0 4 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 310 168 142 Office N/A N/A Internal Capture Percentage 4%4%4%Retail N/A N/A Restaurant 4%2% External Vehicle-Trips5 298 162 136 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential N/A N/A External Non-Motorized Trips6 0 0 0 Hotel 3%9% NWC of Citrus/Highland in Fontana AM Street Peak Hour JPH 7/26/2021 Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 Table 5-A: Computations Summary Table 6-A: Internal Trip Capture Percentages by Land Use 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A. 1Land Use Codes (LUCs) from Trip Generation Manual, published by the Institute of Transportation Engineers. 6Person-Trips *Indicates computation that has been rounded to the nearest whole number. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual). 4Enter vehicle occupancy assumed in Table 1-A vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made to Tables 5-A, 9-A (O and D). Enter transit, non-motorized percentages that will result with proposed mixed-use project complete. Table 2-A: Mode Split and Vehicle Occupancy Estimates Table 4-A: Internal Person-Trip Origin-Destination Matrix* Destination (To)Origin (From) Origin (From)Destination (To) Cinema/Entertainment Land Use Entering Trips Exiting Trips Table 3-A: Average Land Use Interchange Distances (Feet Walking Distance) NCHRP 684 Internal Trip Capture Estimation Tool Table 1-A: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) 0 0 Cinema/Entertainment Development Data (For Information Only) 0 0 0 Estimated Vehicle-Trips3Land Use Fontana Square Fontana - Fontana Square Kimley-Horn and Associates, Inc. 7/26/2021 Project Name:Organization: Project Location:Performed By: Scenario Description:Date: Analysis Year:Checked By: Analysis Period:Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 0 Retail 0 Restaurant 176 96 80 Cinema/Entertainment 0 Residential 0 Hotel 133 68 65 All Other Land Uses2 0 309 164 145 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office Retail Restaurant Cinema/Entertainment Residential Hotel All Other Land Uses2 Office Retail Restaurant Residential Hotel Office Retail Restaurant Cinema/Entertainment Residential Hotel Office Retail Restaurant Residential Hotel Office 0 0 0 0 Retail 0 0 0 0 Restaurant 0 0 0 6 Cinema/Entertainment 0 0 0 0 0 Residential 0 0 0 0 Hotel 0 0 5 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 309 164 145 Office N/A N/A Internal Capture Percentage 7%7%8%Retail N/A N/A Restaurant 5%8% External Vehicle-Trips5 287 153 134 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential N/A N/A External Non-Motorized Trips6 0 0 0 Hotel 9%8% 1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual). 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P. Table 5-P: Computations Summary Table 6-P: Internal Trip Capture Percentages by Land Use 4Enter vehicle occupancy assumed in Table 1-P vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be 6Person-Trips 0 0 0 0 Table 4-P: Internal Person-Trip Origin-Destination Matrix* Origin (From)Destination (To) Cinema/Entertainment 0 Table 3-P: Average Land Use Interchange Distances (Feet Walking Distance) Origin (From)Destination (To) Cinema/Entertainment NCHRP 684 Internal Trip Capture Estimation Tool Fontana Square NWC of Citrus/Highland in Fontana JPH *Indicates computation that has been rounded to the nearest whole number. Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 7/26/2021 PM Street Peak Hour Table 1-P: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) Land Use Development Data (For Information Only)Estimated Vehicle-Trips3 Table 2-P: Mode Split and Vehicle Occupancy Estimates Land Use Entering Trips Exiting Trips Fontana - Fontana Square Kimley-Horn and Associates, Inc. 7/26/2021 ATTACHMENT 4 PROJECT STUDY AREA AND TRIP DISTRIBUTION Fontana – Fontana Square Kimley-Horn and Associates, Inc. 7/27/2021 PROJECT SITE PROJECT TRIP DISTRIBUTION STUDY INTERSECTION PROJECT DRIVEWAY INTERSECTION STUDY ROADWAY SEGMENT YY% 5% 20% 10%5% 20% 10% 10% 5% 10% 5% APPENDIX B TRAFFIC COUNT DATA SHEETS National Data & Surveying Services Intersection Turning Movement Count Location:Beech Ave & S Highland AveCity:Fontana Project ID:Control:Signalized Date: NS/EW Streets: 1 2 0 0 1 2 0 0 1 2 0 0 1 2 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 8 32 10 0 5 27 5 0 7 24 3 0 5 21 5 0 1527:15 AM 4 31 6 0 6 25 3 0 10 23 3 0 6 25 9 0 1517:30 AM 2 36 7 0 3 27 9 0 7 26 0 0 6 28 16 0 1677:45 AM 9 47 10 0 7 42 15 0 17 23 3 0 6 33 9 0 2218:00 AM 6 48 9 0 6 33 10 0 14 23 6 0 4 28 16 0 2038:15 AM 5 54 14 0 9 40 3 0 4 15 6 0 5 23 12 0 1908:30 AM 3 54 7 0 6 35 5 0 6 14 3 0 7 21 9 0 1708:45 AM 4 61 13 0 10 32 4 0 7 22 4 0 7 24 10 0 198 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :41 363 76 0 52 261 54 0 72 170 28 0 46 203 86 0 1452APPROACH %'s :8.54%75.63%15.83%0.00%14.17%71.12%14.71%0.00%26.67%62.96%10.37%0.00%13.73%60.60%25.67%0.00% PEAK HR :07:45 AM 40 0 0 TOTAL PEAK HR VOL :23 203 40 0 28 150 33 0 41 75 18 0 22 105 46 0 784 PEAK HR FACTOR :0.639 0.940 0.714 0.000 0.778 0.893 0.550 0.000 0.603 0.815 0.750 0.000 0.786 0.795 0.719 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 1 2 0 0 1 2 0 0 1 2 0 0 1 2 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 5 55 16 0 20 71 12 0 11 51 8 0 12 18 16 0 2954:15 PM 4 63 12 0 19 75 4 0 16 62 15 0 15 29 10 0 3244:30 PM 6 66 20 0 30 64 8 0 15 67 9 0 10 25 8 0 3284:45 PM 8 69 13 0 14 69 11 0 17 68 12 0 17 36 20 0 3545:00 PM 6 100 17 0 14 82 10 0 21 50 11 0 19 28 10 0 3685:15 PM 2 71 15 0 22 79 10 0 23 64 10 0 16 33 18 0 3635:30 PM 8 53 25 0 24 75 15 0 13 72 14 0 15 42 18 0 3745:45 PM 6 82 20 0 22 81 10 0 15 64 20 0 16 27 20 0 383 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :45 559 138 0 165 596 80 0 131 498 99 0 120 238 120 0 2789 APPROACH %'s :6.06%75.34%18.60%0.00%19.62%70.87%9.51%0.00%17.99%68.41%13.60%0.00%25.10%49.79%25.10%0.00% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :22 306 77 0 82 317 45 0 72 250 55 0 66 130 66 0 1488 PEAK HR FACTOR :0.688 0.765 0.770 0.000 0.854 0.966 0.750 0.000 0.783 0.868 0.688 0.000 0.868 0.774 0.825 0.000 Data - Totals Beech Ave Beech Ave S Highland Ave S Highland Ave 0.911 0.824 0.779 0.901 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 21-030060-0017/29/2021 05:00 PM - 06:00 PM 0.9710.823 0.974 0.952 0.873 07:45 AM - 08:45 AM 0.887 Prepared by National Data & Surveying Services ID:21-030060-001 Day: City:Fontana Date: AM 33 150 28 0 AM NOON 0 0 0 0 NOON PM 45 317 82 0 PM AM NOON PM PM NOON AM 0 2 1 0 0 66 0 46 2 130 0 105 0 0 0 0 1 66 0 22 41 0 72 1 TEV 784 0 1488 0 0 0 0 75 0 250 2 PHF 0.89 0.97 18 0 55 0 0 1 2 0 AM NOON PM PM NOON AM PM 0 22 306 77 PM NOON 0 0 0 0 NOON AM 0 23 203 40 AM Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 190 NORTHBOUND Beech Ave Totals (NOON)Totals (NOON) NONE 409 0 143 Totals (AM)438 Totals (AM)SHighlandAveEASTBOUNDWESTBOUNDSHighlandAve161 0 197 CONTROL Signalized 0 NONE 05:00 PM - 06:00 PM 444 Beech Ave & S Highland Ave Peak Hour Turning Movement Count Beech Ave Thursday SOUTHBOUND 7/29/2021 4:00 PM - 06:00 PMPEAKHOURS07:45 AM - 08:45 AM 290 7:00 AM - 09:00 AM COUNTPERIODSNOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 66 130 6655 250 72 453178277306220 0 00 0 0 00000046 105 2218 75 41 3315028402032366 130 6655 250 72 453178277306220 0 00 0 0 00000046 105 2218 75 41 33150284020323 File Name : 06_FON_Beech_210HOV AM Site Code : 10821597 Start Date : 10/14/2021 Page No : 1 City of Fontana N/S: Beech Avenue E/W: SR-210 HOV Ramps Weather: Clear Groups Printed- Total Volume Beech Avenue Southbound SR-210 HOV Ramps Westbound Beech Avenue Northbound SR-210 HOV Ramps Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 10 43 18 71 23 0 7 30 23 48 16 87 5 0 4 9 197 07:15 AM 16 62 20 98 29 0 3 32 28 64 15 107 4 0 3 7 244 07:30 AM 12 76 27 115 54 0 7 61 50 95 17 162 4 0 3 7 345 07:45 AM 7 114 19 140 57 1 9 67 47 129 13 189 7 0 7 14 410 Total 45 295 84 424 163 1 26 190 148 336 61 545 20 0 17 37 1196 08:00 AM 7 109 17 133 24 1 15 40 35 170 18 223 8 2 19 29 425 08:15 AM 11 133 8 152 10 0 13 23 17 148 11 176 9 0 17 26 377 08:30 AM 9 97 10 116 4 0 6 10 5 62 9 76 7 0 5 12 214 08:45 AM 6 53 4 63 10 0 4 14 12 51 4 67 3 0 6 9 153 Total 33 392 39 464 48 1 38 87 69 431 42 542 27 2 47 76 1169 Grand Total 78 687 123 888 211 2 64 277 217 767 103 1087 47 2 64 113 2365 Apprch %8.8 77.4 13.9 76.2 0.7 23.1 20 70.6 9.5 41.6 1.8 56.6 Total %3.3 29 5.2 37.5 8.9 0.1 2.7 11.7 9.2 32.4 4.4 46 2 0.1 2.7 4.8 Beech Avenue Southbound SR-210 HOV Ramps Westbound Beech Avenue Northbound SR-210 HOV Ramps Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 12 76 27 115 54 0 7 61 50 95 17 162 4 0 3 7 345 07:45 AM 7 114 19 140 57 1 9 67 47 129 13 189 7 0 7 14 410 08:00 AM 7 109 17 133 24 1 15 40 35 170 18 223 8 2 19 29 425 08:15 AM 11 133 8 152 10 0 13 23 17 148 11 176 9 0 17 26 377 Total Volume 37 432 71 540 145 2 44 191 149 542 59 750 28 2 46 76 1557 % App. Total 6.9 80 13.1 75.9 1 23 19.9 72.3 7.9 36.8 2.6 60.5 PHF .771 .812 .657 .888 .636 .500 .733 .713 .745 .797 .819 .841 .778 .250 .605 .655 .916 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951)268-6268 File Name : 06_FON_Beech_210HOV AM Site Code : 10821597 Start Date : 10/14/2021 Page No : 2 City of Fontana N/S: Beech Avenue E/W: SR-210 HOV Ramps Weather: Clear Beech Avenue SR-210 HOV Ramps SR-210 HOV Ramps Beech Avenue Right 71 Thru 432 Left 37 InOut Total 614 540 1154 Right44 Thru2 Left145 OutTotalIn98 191 289 Left 149 Thru 542 Right 59 Out TotalIn 623 750 1373 Left28 Thru2 Right46 TotalOutIn222 76 298 Peak Hour Begins at 07:30 AM Total Volume Peak Hour Data North Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 07:45 AM 07:15 AM 07:30 AM 07:45 AM +0 mins.7 114 19 140 29 0 3 32 50 95 17 162 7 0 7 14 +15 mins.7 109 17 133 54 0 7 61 47 129 13 189 8 2 19 29 +30 mins.11 133 8 152 57 1 9 67 35 170 18 223 9 0 17 26 +45 mins.9 97 10 116 24 1 15 40 17 148 11 176 7 0 5 12 Total Volume 34 453 54 541 164 2 34 200 149 542 59 750 31 2 48 81 % App. Total 6.3 83.7 10 82 1 17 19.9 72.3 7.9 38.3 2.5 59.3 PHF .773 .852 .711 .890 .719 .500 .567 .746 .745 .797 .819 .841 .861 .250 .632 .698 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951)268-6268 File Name : 06_FON_Beech_210HOV PM Site Code : 10821597 Start Date : 10/14/2021 Page No : 1 City of Fontana N/S: Beech Avenue E/W: SR-210 HOV Ramps Weather: Clear Groups Printed- Total Volume Beech Avenue Southbound SR-210 HOV Ramps Westbound Beech Avenue Northbound SR-210 HOV Ramps Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 04:00 PM 10 97 8 115 20 0 7 27 16 91 27 134 25 5 27 57 333 04:15 PM 12 82 5 99 25 4 12 41 14 83 12 109 20 2 27 49 298 04:30 PM 7 83 10 100 17 0 12 29 27 83 12 122 20 3 26 49 300 04:45 PM 16 106 5 127 17 2 12 31 22 123 18 163 23 5 36 64 385 Total 45 368 28 441 79 6 43 128 79 380 69 528 88 15 116 219 1316 05:00 PM 18 90 4 112 12 1 11 24 27 121 18 166 28 3 26 57 359 05:15 PM 17 85 8 110 20 1 12 33 19 119 15 153 34 4 22 60 356 05:30 PM 9 85 13 107 21 0 18 39 27 111 15 153 29 4 22 55 354 05:45 PM 12 85 6 103 19 0 3 22 15 141 11 167 42 2 31 75 367 Total 56 345 31 432 72 2 44 118 88 492 59 639 133 13 101 247 1436 Grand Total 101 713 59 873 151 8 87 246 167 872 128 1167 221 28 217 466 2752 Apprch %11.6 81.7 6.8 61.4 3.3 35.4 14.3 74.7 11 47.4 6 46.6 Total %3.7 25.9 2.1 31.7 5.5 0.3 3.2 8.9 6.1 31.7 4.7 42.4 8 1 7.9 16.9 Beech Avenue Southbound SR-210 HOV Ramps Westbound Beech Avenue Northbound SR-210 HOV Ramps Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 16 106 5 127 17 2 12 31 22 123 18 163 23 5 36 64 385 05:00 PM 18 90 4 112 12 1 11 24 27 121 18 166 28 3 26 57 359 05:15 PM 17 85 8 110 20 1 12 33 19 119 15 153 34 4 22 60 356 05:30 PM 9 85 13 107 21 0 18 39 27 111 15 153 29 4 22 55 354 Total Volume 60 366 30 456 70 4 53 127 95 474 66 635 114 16 106 236 1454 % App. Total 13.2 80.3 6.6 55.1 3.1 41.7 15 74.6 10.4 48.3 6.8 44.9 PHF .833 .863 .577 .898 .833 .500 .736 .814 .880 .963 .917 .956 .838 .800 .736 .922 .944 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951)268-6268 File Name : 06_FON_Beech_210HOV PM Site Code : 10821597 Start Date : 10/14/2021 Page No : 2 City of Fontana N/S: Beech Avenue E/W: SR-210 HOV Ramps Weather: Clear Beech Avenue SR-210 HOV Ramps SR-210 HOV Ramps Beech Avenue Right 30 Thru 366 Left 60 InOut Total 641 456 1097 Right53 Thru4 Left70 OutTotalIn142 127 269 Left 95 Thru 474 Right 66 Out TotalIn 542 635 1177 Left114 Thru16 Right106 TotalOutIn129 236 365 Peak Hour Begins at 04:45 PM Total Volume Peak Hour Data North Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 04:45 PM 04:00 PM 05:00 PM 05:00 PM +0 mins.16 106 5 127 20 0 7 27 27 121 18 166 28 3 26 57 +15 mins.18 90 4 112 25 4 12 41 19 119 15 153 34 4 22 60 +30 mins.17 85 8 110 17 0 12 29 27 111 15 153 29 4 22 55 +45 mins.9 85 13 107 17 2 12 31 15 141 11 167 42 2 31 75 Total Volume 60 366 30 456 79 6 43 128 88 492 59 639 133 13 101 247 % App. Total 13.2 80.3 6.6 61.7 4.7 33.6 13.8 77 9.2 53.8 5.3 40.9 PHF .833 .863 .577 .898 .790 .375 .896 .780 .815 .872 .819 .957 .792 .813 .815 .823 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951)268-6268 National Data & Surveying Services Intersection Turning Movement Count Location:Catawba Ave & S Highland AveCity:Fontana Project ID:Control:1-Way Stop(SB)Date: NS/EW Streets: 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 65 0 0 0 32 1 0 987:15 AM 0 0 0 0 0 0 0 0 0 65 0 0 0 27 1 0 937:30 AM 0 0 0 0 1 0 1 0 0 65 0 0 0 35 0 0 1027:45 AM 0 0 0 0 1 0 0 0 0 58 0 0 0 50 1 0 1108:00 AM 0 0 0 0 1 0 0 0 0 60 0 0 0 29 0 0 908:15 AM 0 0 0 0 1 0 0 0 0 54 0 0 0 41 0 0 968:30 AM 0 0 0 0 1 0 0 0 0 56 0 0 0 30 1 0 888:45 AM 0 0 0 0 3 0 0 0 1 41 0 0 0 36 1 0 82 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 0 0 0 8 0 1 0 1 464 0 0 0 280 5 0 759APPROACH %'s :88.89%0.00%11.11%0.00%0.22%99.78%0.00%0.00%0.00%98.25%1.75%0.00% PEAK HR :07:00 AM 37 0 0 TOTAL PEAK HR VOL :0 0 0 0 2 0 1 0 0 253 0 0 0 144 3 0 403 PEAK HR FACTOR :0.000 0.000 0.000 0.000 0.500 0.000 0.250 0.000 0.000 0.973 0.000 0.000 0.000 0.720 0.750 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 0 0 0 0 4 0 1 0 1 97 0 0 0 58 3 0 1644:15 PM 0 0 0 0 1 0 2 0 1 98 0 0 0 71 1 0 1744:30 PM 0 0 0 0 4 0 0 0 1 111 0 0 0 61 3 1 1814:45 PM 0 0 0 0 1 0 1 0 0 99 0 0 0 69 1 0 1715:00 PM 0 0 0 0 2 0 2 0 3 82 0 0 0 81 5 0 1755:15 PM 0 0 0 0 2 0 2 0 3 65 0 0 0 69 1 0 1425:30 PM 0 0 0 0 4 0 1 0 3 116 0 0 0 67 2 0 1935:45 PM 0 0 0 0 1 0 1 0 1 98 0 0 0 90 2 0 193 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 0 0 0 19 0 10 0 13 766 0 0 0 566 18 1 1393 APPROACH %'s :65.52%0.00%34.48%0.00%1.67%98.33%0.00%0.00%0.00%96.75%3.08%0.17% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :0 0 0 0 9 0 6 0 10 361 0 0 0 307 10 0 703 PEAK HR FACTOR :0.000 0.000 0.000 0.000 0.563 0.000 0.750 0.000 0.833 0.778 0.000 0.000 0.000 0.853 0.500 0.000 Data - Totals Catawba Ave Catawba Ave S Highland Ave S Highland Ave 0.375 0.973 0.721 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 21-030053-0027/27/2021 05:00 PM - 06:00 PM 0.9110.750 0.779 0.861 07:00 AM - 08:00 AM 0.916 Prepared by National Data & Surveying Services ID:21-030053-002 Day: City:Fontana Date: AM 1 0 2 0 AM NOON 0 0 0 0 NOON PM 6 0 9 0 PM AM NOON PM PM NOON AM 0 1 0 0 0 10 0 3 1 307 0 144 0 0 0 0 0 0 0 0 0 0 10 0 TEV 403 0 703 0 0 0 0 253 0 361 1 PHF 0.92 0.91 0 0 0 0 0 0 0 0 AM NOON PM PM NOON AM PM 0 0 0 0 PM NOON 0 0 0 0 NOON AM 0 0 0 0 AM Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 0 NORTHBOUND Catawba Ave Totals (NOON)Totals (NOON) NONE 370 0 255 Totals (AM)0 Totals (AM)SHighlandAveEASTBOUNDWESTBOUNDSHighlandAve145 0 313 CONTROL 1-Way Stop(SB) 0 NONE 05:00 PM - 06:00 PM 20 Catawba Ave & S Highland Ave Peak Hour Turning Movement Count Catawba Ave Tuesday SOUTHBOUND 7/27/2021 4:00 PM - 06:00 PMPEAKHOURS07:00 AM - 08:00 AM 3 7:00 AM - 09:00 AM COUNTPERIODSNOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 10 307 00 361 10 6090000 0 00 0 0 0000003 144 00 253 0 10200010 307 00 361 10 6090000 0 00 0 0 0000003 144 00 253 0 102000 National Data & Surveying Services Intersection Turning Movement Count Location:Citrus Ave & I-210 WB RampsCity:Fontana Project ID:Control:Signalized Date: NS/EW Streets: 2 2 0 0 0 2 1 0 0 0 0 0 1.5 0.5 1 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 84 81 0 0 0 75 73 0 0 0 0 0 44 0 27 0 3847:15 AM 104 103 0 0 0 89 91 0 0 0 0 0 53 0 36 0 4767:30 AM 99 109 0 0 0 113 89 0 0 0 0 0 64 0 49 0 5237:45 AM 87 126 0 0 0 106 91 0 0 0 0 0 89 0 61 0 5608:00 AM 65 144 0 0 0 127 87 0 0 0 0 0 38 1 41 0 5038:15 AM 69 128 0 0 0 88 84 0 0 0 0 0 60 0 56 0 4858:30 AM 107 150 0 0 0 82 98 0 0 0 0 0 40 0 46 0 5238:45 AM 83 172 0 0 0 122 83 0 0 0 0 0 45 0 59 0 564 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :698 1013 0 0 0 802 696 0 0 0 0 0 433 1 375 0 4018APPROACH %'s :40.79%59.21%0.00%0.00%0.00%53.54%46.46%0.00%53.52%0.12%46.35%0.00% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :324 594 0 0 0 419 352 0 0 0 0 0 183 1 202 0 2075 PEAK HR FACTOR :0.757 0.863 0.000 0.000 0.000 0.825 0.898 0.000 0.000 0.000 0.000 0.000 0.763 0.250 0.856 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 2 2 0 0 0 2 1 0 0 0 0 0 1.5 0.5 1 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 65 227 0 0 0 169 77 0 0 0 0 0 72 1 65 0 6764:15 PM 69 218 0 0 0 152 81 0 0 0 0 0 71 1 80 0 6724:30 PM 68 202 0 0 0 165 97 0 0 0 0 0 75 0 55 0 6624:45 PM 66 236 0 0 0 130 89 0 0 0 0 0 79 0 81 0 6815:00 PM 70 241 0 0 0 156 92 0 0 0 0 0 89 0 68 0 7165:15 PM 83 253 0 0 0 142 67 0 0 0 0 0 95 0 71 0 7115:30 PM 72 250 0 0 0 156 107 0 0 0 0 0 93 0 120 0 7985:45 PM 60 310 0 0 0 164 90 0 0 0 0 0 97 1 142 0 864 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :553 1937 0 0 0 1234 700 0 0 0 0 0 671 3 682 0 5780 APPROACH %'s :22.21%77.79%0.00%0.00%0.00%63.81%36.19%0.00%49.48%0.22%50.29%0.00% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :285 1054 0 0 0 618 356 0 0 0 0 0 374 1 401 0 3089 PEAK HR FACTOR :0.858 0.850 0.000 0.000 0.000 0.942 0.832 0.000 0.000 0.000 0.000 0.000 0.964 0.250 0.706 0.000 Data - Totals Citrus Ave Citrus Ave I-210 WB Ramps I-210 WB Ramps 0.893 0.901 0.832 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 21-030053-0037/27/2021 05:00 PM - 06:00 PM 0.8940.905 0.926 0.808 08:00 AM - 09:00 AM 0.920 Prepared by National Data & Surveying Services ID:21-030053-003 Day: City:Fontana Date: AM 352 419 0 0 AM NOON 0 0 0 0 NOON PM 356 618 0 0 PM AM NOON PM PM NOON AM 1 2 0 0 1 401 0 202 0.5 1 0 1 0 0 0 0 1.5 374 0 183 0 0 0 0 TEV 2075 0 3089 0 0 0 0 0 0 0 0 PHF 0.92 0.89 0 0 0 0 0 2 2 0 AM NOON PM PM NOON AM PM 0 285 1054 0 PM NOON 0 0 0 0 NOON AM 0 324 594 0 AM Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 602 NORTHBOUND Citrus Ave Totals (NOON)Totals (NOON) NONE 0 0 0 Totals (AM)992 Totals (AM)I-210WBRampsEASTBOUNDWESTBOUNDI-210WBRamps677 0 642 CONTROL Signalized 0 NONE 05:00 PM - 06:00 PM 1455 Citrus Ave & I-210 WB Ramps Peak Hour Turning Movement Count Citrus Ave Tuesday SOUTHBOUND 7/27/2021 4:00 PM - 06:00 PMPEAKHOURS08:00 AM - 09:00 AM 796 7:00 AM - 09:00 AM COUNTPERIODSNOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 401 1 3740 0 0 3566180010542850 0 00 0 0 000000202 1 1830 0 0 35241900594324401 1 3740 0 0 3566180010542850 0 00 0 0 000000202 1 1830 0 0 35241900594324 National Data & Surveying Services Intersection Turning Movement Count Location:Citrus Ave & I-210 EB RampsCity:Fontana Project ID:Control:Signalized Date: NS/EW Streets: 0 2 0 0 2 2 0 0 1.3 0.3 1.3 0 0 0 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 0 123 79 0 26 93 0 0 49 0 48 0 0 0 0 0 4187:15 AM 0 144 77 0 46 96 0 0 56 0 58 0 0 0 0 0 4777:30 AM 0 155 91 0 45 116 0 0 57 1 73 0 0 0 0 0 5387:45 AM 0 143 95 0 43 164 0 0 66 0 67 0 0 0 0 0 5788:00 AM 0 137 57 0 45 127 0 0 72 1 53 0 0 0 0 0 4928:15 AM 0 144 83 0 35 104 0 0 57 0 57 0 0 0 0 0 4808:30 AM 0 190 75 0 39 90 0 0 67 0 55 0 0 0 0 0 5168:45 AM 0 188 76 0 55 111 0 0 63 3 60 0 0 0 0 0 556 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 1224 633 0 334 901 0 0 487 5 471 0 0 0 0 0 4055APPROACH %'s :0.00%65.91%34.09%0.00%27.04%72.96%0.00%0.00%50.57%0.52%48.91%0.00% PEAK HR :07:30 AM 39 0 0 TOTAL PEAK HR VOL :0 579 326 0 168 511 0 0 252 2 250 0 0 0 0 0 2088 PEAK HR FACTOR :0.000 0.934 0.858 0.000 0.933 0.779 0.000 0.000 0.875 0.500 0.856 0.000 0.000 0.000 0.000 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 2 0 0 2 2 0 0 1.3 0.3 1.3 0 0 0 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 0 203 85 0 64 171 0 0 96 0 78 0 0 0 0 0 6974:15 PM 0 187 79 0 56 174 0 0 95 4 54 0 0 0 0 0 6494:30 PM 0 182 100 0 46 187 0 0 92 0 78 0 0 0 0 0 6854:45 PM 0 213 89 0 47 174 0 0 83 1 66 0 0 0 0 0 6735:00 PM 0 207 78 0 51 188 0 0 112 0 80 0 0 0 0 0 7165:15 PM 0 203 85 0 43 191 0 0 125 0 73 0 0 0 0 0 7205:30 PM 0 209 73 0 55 197 0 0 118 2 77 0 0 0 0 0 7315:45 PM 0 222 74 0 47 208 0 2 141 1 84 0 0 0 0 0 779 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 1626 663 0 409 1490 0 2 862 8 590 0 0 0 0 0 5650 APPROACH %'s :0.00%71.04%28.96%0.00%21.51%78.38%0.00%0.11%59.04%0.55%40.41%0.00% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :0 841 310 0 196 784 0 2 496 3 314 0 0 0 0 0 2946 PEAK HR FACTOR :0.000 0.947 0.912 0.000 0.891 0.942 0.000 0.250 0.879 0.375 0.935 0.000 0.000 0.000 0.000 0.000 21-030053-0047/27/2021 05:00 PM - 06:00 PM 0.9450.972 0.955 0.899 07:30 AM - 08:30 AM 0.903 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0.920 0.820 0.947 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Totals Citrus Ave Citrus Ave I-210 EB Ramps I-210 EB Ramps Prepared by National Data & Surveying Services ID:21-030053-004 Day: City:Fontana Date: AM 0 511 168 0 AM NOON 0 0 0 0 NOON PM 0 784 196 2 PM AM NOON PM PM NOON AM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 252 0 496 1.3 TEV 2088 0 2946 0 0 0 0 2 0 3 0.3 PHF 0.90 0.95 250 0 314 1.3 0 0 2 0 AM NOON PM PM NOON AM PM 0 0 841 310 PM NOON 0 0 0 0 NOON AM 0 0 579 326 AM 0 NONE 05:00 PM - 06:00 PM 1339 Citrus Ave & I-210 EB Ramps Peak Hour Turning Movement Count Citrus Ave Tuesday SOUTHBOUND 7/27/2021 4:00 PM - 06:00 PMPEAKHOURS07:30 AM - 08:30 AM 831 7:00 AM - 09:00 AM COUNTPERIODSNONE 509 0 496 Totals (AM)1098 Totals (AM)I-210EBRampsEASTBOUNDWESTBOUNDI-210EBRamps0 0 0 CONTROL Signalized Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 761 NORTHBOUND Citrus Ave Totals (NOON)Totals (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 0 0 0314 3 496 078419631084100 0 00 0 0 0000000 0 0250 2 252 051116832657900 0 0314 3 496 078419631084100 0 00 0 0 0000000 0 0250 2 252 05111683265790 National Data & Surveying Service Intersection Turning Movement Count Location:Citrus Ave & S Highland AveCity:Fontana Project ID:Control:Signalized Date: NS/EW Streets: 1 2 1 0 2 2 1 0 2 2 1 0 1 1 1 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 6 124 5 0 34 101 13 0 50 22 4 0 1 11 24 2 3977:15 AM 4 152 11 0 28 107 15 0 41 27 4 0 6 13 31 0 4397:30 AM 5 155 10 0 43 133 18 0 49 15 8 0 3 12 38 2 4917:45 AM 9 172 7 0 43 157 27 0 46 16 8 0 1 11 29 3 5298:00 AM 5 129 12 0 41 126 20 0 36 22 8 0 5 13 26 1 4448:15 AM 9 145 4 0 31 111 14 0 42 13 5 0 6 16 34 1 4318:30 AM 7 179 5 0 34 103 11 0 47 23 3 0 7 15 41 2 4778:45 AM 5 182 10 0 45 109 12 0 35 19 7 0 8 14 45 2 493 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :50 1238 64 0 299 947 130 0 346 157 47 0 37 105 268 13 3701APPROACH %'s :3.70%91.57%4.73%0.00%21.73%68.82%9.45%0.00%62.91%28.55%8.55%0.00%8.75%24.82%63.36%3.07% PEAK HR :07:15 AM 38 0 0 TOTAL PEAK HR VOL :23 608 40 0 155 523 80 0 172 80 28 0 15 49 124 6 1903 PEAK HR FACTOR :0.639 0.884 0.833 0.000 0.901 0.833 0.741 0.000 0.878 0.741 0.875 0.000 0.625 0.942 0.816 0.500 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 1 2 1 0 2 2 1 0 2 2 1 0 1 1 1 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 10 167 17 0 56 165 26 0 52 50 12 0 11 26 65 6 6634:15 PM 10 180 14 0 41 161 28 0 44 51 9 0 22 35 45 5 6454:30 PM 12 179 13 0 58 169 26 0 38 70 6 0 17 21 59 3 6714:45 PM 10 207 23 0 49 177 26 0 38 48 15 0 14 33 61 10 7115:00 PM 14 192 19 0 46 176 40 0 34 51 8 0 7 38 55 5 6855:15 PM 8 199 17 0 51 175 42 0 36 29 11 0 8 27 56 7 6665:30 PM 8 163 14 0 52 189 35 0 55 58 10 0 12 24 67 4 6915:45 PM 12 190 21 0 55 181 52 0 34 50 10 0 7 34 68 3 717 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :84 1477 138 0 408 1393 275 0 331 407 81 0 98 238 476 43 5449 APPROACH %'s :4.94%86.93%8.12%0.00%19.65%67.10%13.25%0.00%40.42%49.69%9.89%0.00%11.46%27.84%55.67%5.03% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :42 744 71 0 204 721 169 0 159 188 39 0 34 123 246 19 2759 PEAK HR FACTOR :0.750 0.935 0.845 0.000 0.927 0.954 0.813 0.000 0.723 0.810 0.886 0.000 0.708 0.809 0.904 0.679 Data - Totals Citrus Ave Citrus Ave S Highland Ave S Highland Ave 0.892 0.835 0.972 0.882 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 21-030053-0057/27/2021 05:00 PM - 06:00 PM 0.9620.952 0.950 0.785 0.942 07:15 AM - 08:15 AM 0.899 Prepared by National Data & Surveying Services ID:21-030053-005 Day: City:Fontana Date: AM 80 523 155 0 AM NOON 0 0 0 0 NOON PM 169 721 204 0 PM AM NOON PM PM NOON AM 1 2 2 0 1 246 0 124 1 123 0 49 0 0 0 0 1 34 0 15 172 0 159 2 TEV 1903 0 2759 0 19 0 6 80 0 188 2 PHF 0.90 0.96 28 0 39 1 0 1 2 1 AM NOON PM PM NOON AM PM 0 42 744 71 PM NOON 0 0 0 0 NOON AM 0 23 608 40 AM Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 566 NORTHBOUND Citrus Ave Totals (NOON)Totals (NOON) NONE 482 0 281 Totals (AM)794 Totals (AM)SHighlandAveEASTBOUNDWESTBOUNDSHighlandAve152 0 334 CONTROL Signalized 0 NONE 05:00 PM - 06:00 PM 1149 Citrus Ave & S Highland Ave Peak Hour Turning Movement Count Citrus Ave Tuesday SOUTHBOUND 7/27/2021 4:00 PM - 06:00 PMPEAKHOURS07:15 AM - 08:15 AM 904 7:00 AM - 09:00 AM COUNTPERIODSNOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 246 123 3439 188 159 16972120471744420 0 00 0 0 000000124 49 1528 80 172 805231554060823246 123 3439 188 159 16972120471744420 0 00 0 0 000000124 49 1528 80 172 805231554060823 National Data & Surveying Services Intersection Turning Movement Count Location:Citrus Ave & Walnut StCity:Fontana Project ID:Control:Signalized Date: NS/EW Streets: 1 2 1 0 1 2 0 0 1 1 0 0 1 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 1 118 3 0 1 98 3 0 14 3 6 0 2 3 10 0 2627:15 AM 2 140 1 0 5 125 1 0 16 3 5 0 3 0 4 0 3057:30 AM 2 137 5 0 6 138 7 0 15 2 5 0 4 3 7 0 3317:45 AM 3 129 3 0 1 146 7 0 14 3 5 0 2 1 8 0 3228:00 AM 1 107 7 0 1 124 9 0 13 7 7 0 1 2 6 0 2858:15 AM 3 142 7 0 7 109 10 0 20 6 5 0 3 4 3 0 3198:30 AM 3 147 6 0 5 96 6 0 19 4 4 0 3 4 9 0 3068:45 AM 0 157 9 0 8 133 8 0 15 5 8 0 5 8 5 0 361 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :15 1077 41 0 34 969 51 0 126 33 45 0 23 25 52 0 2491APPROACH %'s :1.32%95.06%3.62%0.00%3.23%91.94%4.84%0.00%61.76%16.18%22.06%0.00%23.00%25.00%52.00%0.00% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :7 553 29 0 21 462 33 0 67 22 24 0 12 18 23 0 1271 PEAK HR FACTOR :0.583 0.881 0.806 0.000 0.656 0.868 0.825 0.000 0.838 0.786 0.750 0.000 0.600 0.563 0.639 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 1 2 1 0 1 2 0 0 1 1 0 0 1 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 6 140 17 0 9 167 11 0 12 2 3 0 1 5 8 0 3814:15 PM 2 171 10 0 5 179 12 0 20 11 6 0 2 15 6 0 4394:30 PM 3 207 12 0 8 174 14 0 17 9 6 0 5 7 5 0 4674:45 PM 12 228 19 0 9 151 21 0 7 9 6 0 5 3 9 0 4795:00 PM 7 201 17 0 6 189 6 0 11 12 7 0 6 10 5 0 4775:15 PM 10 189 15 0 6 144 23 0 16 12 4 0 9 8 9 0 4455:30 PM 4 227 10 0 6 182 19 0 20 3 10 0 3 8 4 0 4965:45 PM 11 185 11 0 9 166 34 0 13 14 10 0 1 12 9 0 475 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :55 1548 111 0 58 1352 140 0 116 72 52 0 32 68 55 0 3659 APPROACH %'s :3.21%90.32%6.48%0.00%3.74%87.23%9.03%0.00%48.33%30.00%21.67%0.00%20.65%43.87%35.48%0.00% PEAK HR :04:45 PM 292 0 0 TOTAL PEAK HR VOL :33 845 61 0 27 666 69 0 54 36 27 0 23 29 27 0 1897 PEAK HR FACTOR :0.688 0.927 0.803 0.000 0.750 0.881 0.750 0.000 0.675 0.750 0.675 0.000 0.639 0.725 0.750 0.000 Data - Totals Citrus Ave Citrus Ave Walnut St Walnut St 0.887 0.866 0.911 0.736 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 21-030053-0067/27/2021 04:45 PM - 05:45 PM 0.9560.906 0.920 0.886 0.760 08:00 AM - 09:00 AM 0.880 Prepared by National Data & Surveying Services ID:21-030053-006 Day: City:Fontana Date: AM 33 462 21 0 AM NOON 0 0 0 0 NOON PM 69 666 27 0 PM AM NOON PM PM NOON AM 0 2 1 0 0 27 0 23 1 29 0 18 0 0 0 0 1 23 0 12 67 0 54 1 TEV 1271 0 1897 0 0 0 0 22 0 36 1 PHF 0.88 0.96 24 0 27 0 0 1 2 1 AM NOON PM PM NOON AM PM 0 33 845 61 PM NOON 0 0 0 0 NOON AM 0 7 553 29 AM Pedestrians (Crosswalks) Totals (PM)Totals (PM) 0 498 NORTHBOUND Citrus Ave Totals (NOON)Totals (NOON) NONE 124 0 72 Totals (AM)716 Totals (AM)WalnutStEASTBOUNDWESTBOUNDWalnutSt58 0 131 CONTROL Signalized 0 NONE 04:45 PM - 05:45 PM 926 Citrus Ave & Walnut St Peak Hour Turning Movement Count Citrus Ave Tuesday SOUTHBOUND 7/27/2021 4:00 PM - 06:00 PMPEAKHOURS08:00 AM - 09:00 AM 643 7:00 AM - 09:00 AM COUNTPERIODSNOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NOONPMAMNOONAMPMNOONAMPMNOONPMAM000 000 000000000 000000000 27 29 2327 36 54 696662761845330 0 00 0 0 00000023 18 1224 22 67 334622129553727 29 2327 36 54 696662761845330 0 00 0 0 00000023 18 1224 22 67 3346221295537 National Data & Surveying Services Intersection Turning Movement CountLocation:Beech Ave & Highland AveCity:Fontana Project ID:Historical Control:Signalized Date: NS/EW Streets: 1 2 0 0 1 2 0 0 1 2 0 0 1 2 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 29 148 14 0 11 105 34 0 31 20 6 0 10 52 24 0 4847:15 AM 17 201 17 0 10 154 53 0 35 32 11 0 14 66 18 0 6287:30 AM 8 100 11 0 9 161 59 0 18 25 14 0 9 87 14 0 5157:45 AM 11 69 10 0 14 108 47 0 17 41 14 0 20 64 13 0 4288:00 AM 5 53 21 0 6 91 25 0 38 79 38 0 20 51 6 0 4338:15 AM 4 52 11 0 4 45 11 0 30 42 28 0 5 32 5 0 2698:30 AM 8 47 8 0 7 44 12 0 11 24 5 0 4 21 8 0 1998:45 AM 9 55 4 0 8 27 10 0 4 14 5 0 9 23 6 0 174 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :91 725 96 0 69 735 251 0 184 277 121 0 91 396 94 0 3130 APPROACH %'s :9.98%79.50%10.53%0.00%6.54%69.67%23.79%0.00%31.62%47.59%20.79%0.00%15.66%68.16%16.18%0.00% PEAK HR :07:00 AM 37 37 44 07:15 AM TOTAL PEAK HR VOL :65 518 52 0 44 528 193 0 101 118 45 0 53 269 69 0 2055 PEAK HR FACTOR :0.560 0.644 0.765 0.000 0.786 0.820 0.818 0.000 0.721 0.720 0.804 0.000 0.663 0.773 0.719 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 1 2 0 0 1 2 0 0 1 2 0 0 1 2 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 10 85 14 0 21 98 12 0 21 66 19 0 12 29 11 0 3984:15 PM 13 102 13 0 28 73 17 0 18 71 17 0 11 28 14 0 4054:30 PM 5 97 20 0 28 97 15 0 25 61 14 0 9 35 17 0 423 4:45 PM 5 91 18 0 23 72 17 0 31 64 10 0 19 24 15 0 3895:00 PM 8 97 19 0 19 95 12 0 22 80 21 0 16 30 18 0 4375:15 PM 5 117 19 0 19 97 15 0 19 67 17 0 19 26 16 0 4365:30 PM 3 107 26 0 25 96 27 0 14 77 12 0 16 24 20 0 4475:45 PM 4 93 14 0 26 99 17 0 21 76 19 0 15 21 18 0 423 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTALTOTAL VOLUMES :53 789 143 0 189 727 132 0 171 562 129 0 117 217 129 0 3358APPROACH %'s :5.38%80.10%14.52%0.00%18.03%69.37%12.60%0.00%19.84%65.20%14.97%0.00%25.27%46.87%27.86%0.00% PEAK HR :05:00 PM 293 289 296 05:30 PM TOTAL PEAK HR VOL :20 414 78 0 89 387 71 0 76 300 69 0 66 101 72 0 1743PEAK HR FACTOR :0.625 0.885 0.750 0.000 0.856 0.977 0.657 0.000 0.864 0.938 0.821 0.000 0.868 0.842 0.900 0.000 0.818 Total 0.9750.904 WESTBOUND 0.934 SOUTHBOUND 0.908 0.924 05:00 PM - 06:00 PM SOUTHBOUNDPM AM 07:00 AM - 08:00 AM NORTHBOUND 0.676 EASTBOUND 2/19/2019 Highland Ave NORTHBOUND Highland Ave 0.889 WESTBOUND Beech Ave Beech Ave 0.835 0.846 EASTBOUND Prepared by National Data & Surveying Services ID:Historical Day: City:Fontana Date: AM 193 528 44 0 AM NOON 0 0 0 0 NOON PM 71 387 89 0 PM AM NOON PM PM NOON AM 0 2 1 0 0 72 0 69 2 101 0 269 0 0 0 0 1 66 0 53 101 0 76 1 TEV 2055 0 1743 0 0 0 0 118 0 300 2 PHF 0.82 0.97 45 0 69 0 0 1 2 0 AM NOON PM PM NOON AM PM 0 20 414 78 PM NOON 0 0 0 0 NOON AM 0 65 518 52 AM Peak Hour Turning Movement Count 522 Total Vehicles (PM)Total Vehicles (PM) Beech Ave & Highland Ave Tuesday 02/19/2019 CONTROL WESTBOUND07:00 AM - 08:00 AM Total Vehicles (NOON) Pedestrians (Crosswalks) Total Vehicles (NOON) 214 COUNTPERIODSTotal Vehicles (AM)PEAKHOURSTotal Vehicles (AM) NONE 05:00 PM - 06:00 PM 688 562 0 Signalized HighlandAveEASTBOUNDBeech Ave 626 0 Beech Ave SOUTHBOUND 04:00 PM - 06:00 PM NORTHBOUND 467 0 HighlandAve07:00 AM - 09:00 AM NONE 527 0 192 NOONAM PM 00 0000000 0000000 00 000000 PM AM AM NOON PM PM NOON AM AM NOON PM NOON `NOONPMAMNOONAMPMNOONAMPMNOONPMAM National Data & Surveying Services Intersection Turning Movement CountLocation:Beech Ave & Walnut StCity:Fontana Project ID:Historical Control:4-Way Stop Date: NS/EW Streets: 1 2 0 0 1 2 0 0 1 1 0 0 1 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL7:00 AM 19 152 5 0 9 80 12 0 6 14 3 0 20 37 25 0 3827:15 AM 9 189 2 0 21 145 17 0 8 10 7 0 18 30 32 0 4887:30 AM 16 94 4 0 13 179 15 0 11 9 5 0 14 44 12 0 4167:45 AM 36 74 10 0 8 97 33 0 5 11 20 0 13 22 6 0 3358:00 AM 49 45 5 0 9 95 53 0 23 16 24 0 10 23 10 0 3628:15 AM 7 51 4 0 5 59 9 0 7 10 6 0 7 6 8 0 1798:30 AM 6 42 2 0 6 48 4 0 8 4 4 0 2 4 6 0 1368:45 AM 2 53 3 0 2 35 3 0 6 6 1 0 9 8 9 0 137 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :144 700 35 0 73 738 146 0 74 80 70 0 93 174 108 0 2435 APPROACH %'s :16.38%79.64%3.98%0.00%7.63%77.12%15.26%0.00%33.04%35.71%31.25%0.00%24.80%46.40%28.80%0.00% PEAK HR :07:00 AM 37 37 44 07:15 AM TOTAL PEAK HR VOL :80 509 21 0 51 501 77 0 30 44 35 0 65 133 75 0 1621 PEAK HR FACTOR :0.556 0.673 0.525 0.000 0.607 0.700 0.583 0.000 0.682 0.786 0.438 0.000 0.813 0.756 0.586 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 1 2 0 0 1 2 0 0 1 1 0 0 1 1 0 0NLNTNRNUSLSTSRSUELETEREUWLWTWRWU TOTAL4:00 PM 3 89 12 1 21 94 8 1 12 19 13 0 4 17 9 0 3034:15 PM 11 99 7 0 10 79 10 0 17 24 7 0 7 13 12 0 2964:30 PM 7 99 15 0 9 95 7 2 17 22 10 0 1 12 10 0 306 4:45 PM 9 100 13 0 13 78 11 0 21 16 8 0 3 7 6 0 2855:00 PM 7 96 8 0 17 96 13 0 12 14 8 0 5 2 11 0 2895:15 PM 9 119 5 0 18 105 5 0 15 28 7 0 8 8 8 0 3355:30 PM 6 108 10 0 10 90 9 0 16 15 7 0 4 8 6 0 2895:45 PM 6 93 11 0 19 111 7 0 6 24 4 0 4 10 9 0 304 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTALTOTAL VOLUMES :58 803 81 1 117 748 70 3 116 162 64 0 36 77 71 0 2407APPROACH %'s :6.15%85.15%8.59%0.11%12.47%79.74%7.46%0.32%33.92%47.37%18.71%0.00%19.57%41.85%38.59%0.00% PEAK HR :05:00 PM 293 289 296 05:15 PM TOTAL PEAK HR VOL :28 416 34 0 64 402 34 0 49 81 26 0 21 28 34 0 1217PEAK HR FACTOR :0.778 0.874 0.773 0.000 0.842 0.905 0.654 0.000 0.766 0.723 0.813 0.000 0.656 0.700 0.773 0.000 EASTBOUND 2/19/2019 Walnut St NORTHBOUND Walnut St 0.832 WESTBOUND Beech Ave Beech Ave 0.760 0.757 EASTBOUND PM AM 07:00 AM - 08:00 AM NORTHBOUND 0.763 0.830 Total 0.9080.780 WESTBOUND 0.865 SOUTHBOUND 0.898 0.912 05:00 PM - 06:00 PM SOUTHBOUND Prepared by National Data & Surveying Services ID:Historical Day: City:Fontana Date: AM 77 501 51 0 AM NOON 0 0 0 0 NOON PM 34 402 64 0 PM AM NOON PM PM NOON AM 0 2 1 0 0 34 0 75 1 28 0 133 0 0 0 0 1 21 0 65 30 0 49 1 TEV 1621 0 1217 0 0 0 0 44 0 81 1 PHF 0.83 0.91 35 0 26 0 0 1 2 0 AM NOON PM PM NOON AM PM 0 28 416 34 PM NOON 0 0 0 0 NOON AM 0 80 509 21 AM WalnutSt07:00 AM - 09:00 AM NONE 290 0 90 Beech Ave 601 0 Beech Ave SOUTHBOUND 04:00 PM - 06:00 PM NORTHBOUND 179 0PEAKHOURSTotal Vehicles (AM) NONE 05:00 PM - 06:00 PM 614 499 0 4-Way Stop WalnutStEASTBOUNDPeak Hour Turning Movement Count 449 Total Vehicles (PM)Total Vehicles (PM) Beech Ave & Walnut St Tuesday 02/19/2019 CONTROL WESTBOUND07:00 AM - 08:00 AM Total Vehicles (NOON) Pedestrians (Crosswalks) Total Vehicles (NOON) 116 COUNTPERIODSTotal Vehicles (AM) NOONAM PM 00 0000000 0000000 00 000000 PM AM AM NOON PM PM NOON AM AM NOON PM NOON `NOONPMAMNOONAMPMNOONAMPMNOONPMAM APPENDIX C INTERSECTION ANALYSIS WORKSHEETS Intersection Analysis Summary 12/6/2021Report File: K:\...\1 EX AM.pdf Scenario 1 EX AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A9.50.016NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A9.40.015NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B10.40.018NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B11.20.387NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C23.60.632NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C20.40.650SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C20.30.624WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B11.50.005SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C16.40.600NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C23.80.280EB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.280Volume to Capacity (v/c): CLevel Of Service: 23.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 7116134271156351230436131135Total Analysis Volume [veh/h] 184087291613571115789Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.8870Peak Hour Factor 6314330241025645204385427631Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6314330241025645204385427631Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 108.90112.9738.6162.4263.7373.2242.6943.9349.7459.0460.9540.4295th-Percentile Queue Length [ft/ln] 4.364.521.542.502.552.931.711.761.992.362.441.6295th-Percentile Queue Length [veh/ln] 60.5062.7621.4534.6835.4140.6823.7224.4027.6332.8033.8622.4650th-Percentile Queue Length [ft/ln] 2.422.510.861.391.421.630.950.981.111.311.350.9050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDDEAADAADLane Group LOS 41.1140.3351.7136.6736.5155.526.886.8453.257.317.2752.45d, Delay for Lane Group [s/veh] 0.600.570.580.320.310.760.120.120.650.160.160.60X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.052.428.800.830.7313.120.230.2110.480.320.309.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.0537.9142.9135.8435.7842.406.656.6342.776.996.9742.94d1, Uniform Delay [s] 188209592202358311081180661107117258c, Capacity [veh/h] 168318701781175118701781175518701781176618701781s, saturation flow rate [veh/h] 0.070.060.020.040.040.040.080.080.020.100.100.02(v / s)_i Volume / Saturation Flow Rate 0.110.110.030.130.130.050.630.630.040.630.630.03g / C, Green / Cycle 10103111145757357573g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.45 7.28 7.31 53.25 6.86 6.88 55.52 36.57 36.67 51.71 40.54 41.11 Movement LOS D A A D A A E D D D D D d_A, Approach Delay [s/veh]11.17 13.02 42.41 42.12 Approach LOS B B D D d_I, Intersection Delay [s/veh]23.84 Intersection LOS C Intersection V/C 0.280 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.483 2.501 2.434 2.443 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 1.895 1.827 1.729 1.779 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.600Volume to Capacity (v/c): CLevel Of Service: 16.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 48215850231784724064592163Total Analysis Volume [veh/h] 12140131819118101614841Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 44214546228714323759542149Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44214546228714323759542149Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 16.37Intersection Delay [s/veh] CBCCApproach LOS 15.5011.8116.0817.27Approach Delay [s/veh] 51.6215.0771.5275.376.6694.4498.4234.4295th-Percentile Queue Length [ft] 2.060.602.863.010.273.783.941.3895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.420.170.510.520.080.590.600.32Degree of Utilization, x 494491541525489558547507Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.005Volume to Capacity (v/c): BLevel Of Service: 11.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4214376013Total Analysis Volume [veh/h] 15394001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.9160Peak Hour Factor 4196344013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4196344013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.07d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0011.01d_A, Approach Delay [s/veh] 0.000.000.000.000.500.5095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.007.669.4111.55d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.624Volume to Capacity (v/c): CLevel Of Service: 20.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 268127100041662000878479Total Analysis Volume [veh/h] 6706800010415500220120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92001.00001.00001.00000.92000.92001.00001.00000.92000.9200Peak Hour Factor 247124900038357000808441Total Hourly Volume [veh/h] 28000009600000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 275124900047957000808441Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 252.41116.53116.49233.50154.68101.45221.0895th-Percentile Queue Length [ft/ln] 10.104.664.669.346.194.068.8495th-Percentile Queue Length [veh/ln] 151.4964.7464.72137.3985.9456.36128.2350th-Percentile Queue Length [ft/ln] 6.062.592.595.503.442.255.1350th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCBBADLane Group LOS 40.7531.8731.8717.3513.905.3640.47d, Delay for Lane Group [s/veh] 0.840.380.380.520.350.350.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.090.670.672.390.530.383.81d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.500.11k, delay calibration 34.6631.2031.2014.9613.374.9836.66d1, Uniform Delay [s] 31835635680217962533561c, Capacity [veh/h] 1589178217811589356035603459s, saturation flow rate [veh/h] 0.170.080.080.260.170.250.14(v / s)_i Volume / Saturation Flow Rate 0.200.200.200.510.510.710.16g / C, Green / Cycle 18181845456415g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.47 5.36 0.00 0.00 13.90 17.35 0.00 0.00 0.00 31.87 31.87 40.75 Movement LOS D A B B C C D d_A, Approach Delay [s/veh]17.75 15.29 0.00 36.27 Approach LOS B B A D d_I, Intersection Delay [s/veh]20.29 Intersection LOS C Intersection V/C 0.624 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.200 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.679 2.494 4.132 2.497 Bicycle LOS B B D B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.650Volume to Capacity (v/c): CLevel Of Service: 20.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 000339338007702523928720Total Analysis Volume [veh/h] 00085195019263982180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.90300.90300.90301.00000.90300.90300.90300.90301.0000Peak Hour Factor 000306334306952283547870Total Hourly Volume [veh/h] 00034000008900Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000340334306952284437870Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 221.26228.09234.1574.76124.87301.30282.8995th-Percentile Queue Length [ft/ln] 8.859.129.372.994.9912.0511.3295th-Percentile Queue Length [veh/ln] 128.36133.39137.8641.5469.37188.67174.5550th-Percentile Queue Length [ft/ln] 5.135.345.511.662.777.556.9850th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADBBLane Group LOS 40.3839.7539.254.4743.8615.0513.46d, Delay for Lane Group [s/veh] 0.800.790.780.300.780.630.57X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.094.534.100.294.003.062.14d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 35.2935.2235.154.1839.8511.9911.32d1, Uniform Delay [s] 28830632226003259981107c, Capacity [veh/h] 1589169017813560345916851870s, saturation flow rate [veh/h] 0.140.140.140.220.070.370.34(v / s)_i Volume / Saturation Flow Rate 0.180.180.180.730.090.590.59g / C, Green / Cycle 1616166685353g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 13.90 15.05 43.86 4.47 0.00 39.43 39.75 40.19 0.00 0.00 0.00 Movement LOS B B D A D D D d_A, Approach Delay [s/veh]14.26 14.18 39.77 0.00 Approach LOS B B D A d_I, Intersection Delay [s/veh]20.36 Intersection LOS C Intersection V/C 0.650 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.365 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.676 2.403 2.807 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.632Volume to Capacity (v/c): CLevel Of Service: 23.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1887532421212601217912356092034Total Analysis Volume [veh/h] 471981130653019859152309Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.8990Peak Hour Factor 1696729381092341097112115482731Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1696729381092341097112115482731Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 190.8464.5836.3232.1546.13128.4048.99183.75116.1027.53248.6638.8595th-Percentile Queue Length [ft/ln] 7.632.581.451.291.855.141.967.354.641.109.951.5595th-Percentile Queue Length [veh/ln] 106.2935.8820.1817.8625.6371.3427.21102.0964.5015.29148.6821.5850th-Percentile Queue Length [ft/ln] 4.251.440.810.711.032.851.094.082.580.615.950.8650th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBBDBBDLane Group LOS 44.3834.8651.4629.0529.2143.5710.2612.4243.7012.3216.8752.21d, Delay for Lane Group [s/veh] 0.820.280.560.130.160.780.140.410.750.080.530.59X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.020.558.500.170.103.880.330.633.720.191.149.25d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 37.3534.3142.9528.8829.1139.699.9311.7939.9812.1215.7342.96d1, Uniform Delay [s] 230270573337463358721953311780174858c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.120.040.020.030.030.080.080.220.070.040.260.02(v / s)_i Volume / Saturation Flow Rate 0.140.140.030.210.210.100.550.550.090.490.490.03g / C, Green / Cycle 13133191994949844443g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.21 16.87 12.32 43.70 12.42 10.26 43.57 29.21 29.05 51.46 34.86 44.38 Movement LOS D B B D B B D C C D C D d_A, Approach Delay [s/veh]17.78 18.60 38.02 42.72 Approach LOS B B D D d_I, Intersection Delay [s/veh]23.64 Intersection LOS C Intersection V/C 0.632 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.912 3.121 2.732 2.509 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.396 2.506 1.909 2.046 Bicycle LOS B B A B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.387Volume to Capacity (v/c): BLevel Of Service: 11.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 352718383410351714334485511Total Analysis Volume [veh/h] 9759926131788112143Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.8800Peak Hour Factor 31241633309145628293975210Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 31241633309145628293975210Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 53.5516.5262.62101.9995.5497.4937.8210.03118.9814.3395th-Percentile Queue Length [ft/ln] 2.140.662.504.083.823.901.510.404.760.5795th-Percentile Queue Length [veh/ln] 29.759.1834.7956.6653.0854.1621.015.5766.107.9650th-Percentile Queue Length [ft/ln] 1.190.371.392.272.122.170.840.222.640.3250th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAAELane Group LOS 33.6637.6133.9541.235.835.8152.354.866.5356.64d, Delay for Lane Group [s/veh] 0.230.090.270.480.300.300.590.040.350.45X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.440.180.531.690.600.589.350.070.4112.58d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 33.2237.4233.4139.535.235.2343.004.786.1244.05d1, Uniform Delay [s] 26620526821312721302561078241624c, Capacity [veh/h] 1701132817111340182718701781158935601781s, saturation flow rate [veh/h] 0.040.010.040.080.210.210.020.030.240.01(v / s)_i Volume / Saturation Flow Rate 0.160.160.160.160.700.700.030.680.680.01g / C, Green / Cycle 141414146363361611g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]56.64 6.53 4.86 52.35 5.82 5.83 41.23 33.95 33.95 37.61 33.66 33.66 Movement LOS E A A D A A D C C D C C d_A, Approach Delay [s/veh]7.06 7.74 38.23 34.55 Approach LOS A A D C d_I, Intersection Delay [s/veh]11.24 Intersection LOS B Intersection V/C 0.387 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.889 2.972 2.042 2.014 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.310 2.218 1.848 1.692 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.018Volume to Capacity (v/c): BLevel Of Service: 10.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 21130365120Total Analysis Volume [veh/h] 53109130Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 20030347110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20030347110Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.25d_I, Intersection Delay [s/veh] AABApproach LOS 0.110.0010.39d_A, Approach Delay [s/veh] 0.190.190.000.001.351.3595th-Percentile Queue Length [ft/ln] 0.010.010.000.000.050.0595th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.008.020.000.0010.3912.69d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.015Volume to Capacity (v/c): ALevel Of Service: 9.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 21440377120Total Analysis Volume [veh/h] 53109430Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 20340358110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20340358110Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.24d_I, Intersection Delay [s/veh] AAAApproach LOS 0.150.009.45d_A, Approach Delay [s/veh] 0.000.260.000.001.111.1195th-Percentile Queue Length [ft/ln] 0.000.010.000.000.040.0495th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.008.070.000.009.4512.21d_M, Delay for Movement [s/veh] 0.000.000.000.000.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.016Volume to Capacity (v/c): ALevel Of Service: 9.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 21800388130Total Analysis Volume [veh/h] 54009730Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 20700369120Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20700369120Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.20d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.009.49d_A, Approach Delay [s/veh] 0.000.000.000.001.220.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.050.0095th-Percentile Queue Length [veh/ln] AAAAMovement LOS 0.000.000.000.009.490.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\1 EX PM.pdf Scenario 1 EX PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.00.011NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A10.00.010NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B11.60.013NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B11.90.481NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C29.70.806NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C27.80.847SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C29.80.873WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B14.80.034SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C15.30.543NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C27.60.468NB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.468Volume to Capacity (v/c): CLevel Of Service: 27.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 9318293773501016344411510842831Total Analysis Volume [veh/h] 2346231988251611129271078Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 901779075340986143111210541630Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 901779075340986143111210541630Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 122.26130.05102.71202.96209.41109.04101.01104.52126.00125.75132.4135.8995th-Percentile Queue Length [ft/ln] 4.895.204.118.128.384.364.044.185.045.035.301.4495th-Percentile Queue Length [veh/ln] 67.9272.2557.06115.02119.7060.5856.1258.0770.0069.8673.5619.9450th-Percentile Queue Length [ft/ln] 2.722.892.284.604.792.422.242.322.802.792.940.8050th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group DDDDDDAADBBDLane Group LOS 38.2237.6851.6742.7642.0649.769.919.8850.2612.6512.5652.22d, Delay for Lane Group [s/veh] 0.570.540.780.800.790.770.240.240.800.280.280.57X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.131.7210.355.695.068.870.550.529.630.780.719.16d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 36.0835.9541.3237.0737.0040.909.369.3540.6311.8711.8543.05d1, Uniform Delay [s] 2342631202602771321032107914491798454c, Capacity [veh/h] 166418701781175518701781179018701781174218701781s, saturation flow rate [veh/h] 0.080.080.050.120.120.060.140.140.060.150.150.02(v / s)_i Volume / Saturation Flow Rate 0.140.140.070.150.150.070.580.580.080.530.530.03g / C, Green / Cycle 13136131375252747473g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.22 12.59 12.65 50.26 9.89 9.91 49.76 42.32 42.76 51.67 37.79 38.22 Movement LOS D B B D A A D D D D D D d_A, Approach Delay [s/veh]14.77 17.36 43.81 41.41 Approach LOS B B D D d_I, Intersection Delay [s/veh]27.60 Intersection LOS C Intersection V/C 0.468 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.608 2.625 2.537 2.577 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.027 2.073 1.995 1.863 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.543Volume to Capacity (v/c): CLevel Of Service: 15.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5647411217121323886470502101Total Analysis Volume [veh/h] 1411928430897161712625Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 534701061611430366606647495Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 534701061611430366606647495Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 15.28Intersection Delay [s/veh] BCBCApproach LOS 12.8916.2314.1316.24Approach Delay [s/veh] 27.0264.8148.9550.1411.6176.9180.5919.1995th-Percentile Queue Length [ft] 1.082.591.962.010.463.083.220.7795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.270.480.410.410.140.530.540.21Degree of Utilization, x 497519516508474541527490Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.034Volume to Capacity (v/c): BLevel Of Service: 14.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1545953915913Total Analysis Volume [veh/h] 4115135423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91100.91100.91100.91100.91100.9110Peak Hour Factor 1441849114812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1441849114812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.40d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.2313.40d_A, Approach Delay [s/veh] 0.000.000.001.053.843.8495th-Percentile Queue Length [ft/ln] 0.000.000.000.040.150.1595th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.008.3611.4514.75d_M, Delay for Movement [s/veh] 0.000.000.010.010.020.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.873Volume to Capacity (v/c): CLevel Of Service: 29.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5481569000433940001603434Total Analysis Volume [veh/h] 137014200010823500401109Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89400.89400.89401.00001.00001.00000.89400.89401.00001.00000.89400.8940Peak Hour Factor 4901509000387840001433388Total Hourly Volume [veh/h] 55000009700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5451509000484840001433388Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 514.77199.07199.08351.05341.71456.83204.7995th-Percentile Queue Length [ft/ln] 20.597.967.9614.0413.6718.278.1995th-Percentile Queue Length [veh/ln] 359.33112.21112.21227.40220.07311.99116.3450th-Percentile Queue Length [ft/ln] 14.374.494.499.108.8012.484.6550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group DCCDCCDLane Group LOS 49.4422.0322.0336.1929.9521.0540.81d, Delay for Lane Group [s/veh] 0.940.440.440.780.750.830.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 21.790.460.4610.154.214.153.64d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.390.110.110.500.500.500.11k, delay calibration 27.6521.5721.5726.0425.7516.9037.17d1, Uniform Delay [s] 58165165155812501943519c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.340.160.160.270.260.450.13(v / s)_i Volume / Saturation Flow Rate 0.370.370.370.350.350.550.15g / C, Green / Cycle 33333332324913g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.81 21.05 0.00 0.00 29.95 36.19 0.00 0.00 0.00 22.03 22.03 49.44 Movement LOS D C C D C C D d_A, Approach Delay [s/veh]25.26 31.92 0.00 35.47 Approach LOS C C A D d_I, Intersection Delay [s/veh]29.80 Intersection LOS C Intersection V/C 0.873 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.187 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.240 2.772 4.132 3.495 Bicycle LOS C C D C ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.847Volume to Capacity (v/c): CLevel Of Service: 27.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00040647140112828535812110Total Analysis Volume [veh/h] 0001021179028271893030Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.94500.94500.94501.00000.94500.94500.94500.94501.0000Peak Hour Factor 00038446750106626933811440Total Hourly Volume [veh/h] 00043000008400Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00042746750106626942211440Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 360.63323.16320.91198.11156.98534.21484.3595th-Percentile Queue Length [ft/ln] 14.4312.9312.847.926.2821.3719.3795th-Percentile Queue Length [veh/ln] 234.94205.59203.84111.5287.21375.35334.4050th-Percentile Queue Length [ft/ln] 9.408.228.154.463.4915.0113.3850th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADCCLane Group LOS 47.3637.4636.928.7252.5330.6725.23d, Delay for Lane Group [s/veh] 0.910.820.810.490.930.870.81X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 15.056.115.660.7311.8211.587.26d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.240.180.180.500.110.500.50k, delay calibration 32.3031.3531.277.9940.7119.0817.97d1, Uniform Delay [s] 4124574622321307897970c, Capacity [veh/h] 1589176417813560345917311870s, saturation flow rate [veh/h] 0.240.210.210.320.080.450.42(v / s)_i Volume / Saturation Flow Rate 0.260.260.260.650.090.520.52g / C, Green / Cycle 2323235984747g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 27.14 30.67 52.53 8.72 0.00 37.18 37.46 46.59 0.00 0.00 0.00 Movement LOS C C D A D D D d_A, Approach Delay [s/veh]27.95 17.55 40.58 0.00 Approach LOS C B D A d_I, Intersection Delay [s/veh]27.83 Intersection LOS C Intersection V/C 0.847 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.478 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 2.923 2.725 3.485 4.132 Bicycle LOS C B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.806Volume to Capacity (v/c): CLevel Of Service: 29.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 34817475552662252391020288101105259Total Analysis Volume [veh/h] 87431914675660255722526315Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 335167725325621623098127797101257Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 335167725325621623098127797101257Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 319.71135.0983.6637.9494.87111.43141.17308.58145.1661.03362.9069.5295th-Percentile Queue Length [ft/ln] 12.795.403.351.523.794.465.6512.345.812.4414.522.7895th-Percentile Queue Length [veh/ln] 202.9075.0546.4821.0852.7161.9078.43194.2880.6433.90236.7438.6250th-Percentile Queue Length [ft/ln] 8.123.001.860.842.112.483.147.773.231.369.471.5450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBCDBCELane Group LOS 44.7628.7652.1724.5825.6643.9217.5121.3344.9918.4427.6856.61d, Delay for Lane Group [s/veh] 0.890.380.740.130.270.750.340.640.830.160.760.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 11.970.5210.350.130.153.781.282.005.230.563.9114.04d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.200.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 32.8028.2441.8224.4525.5140.1516.2319.3339.7617.8823.7742.57d1, Uniform Delay [s] 3904591014389823007101589346620138978c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.220.090.040.030.070.070.150.290.080.060.300.03(v / s)_i Volume / Saturation Flow Rate 0.250.250.060.280.280.090.450.450.100.390.390.04g / C, Green / Cycle 22225252584040935354g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]56.61 27.68 18.44 44.99 21.33 17.51 43.92 25.66 24.58 52.17 28.76 44.76 Movement LOS E C B D C B D C C D C D d_A, Approach Delay [s/veh]28.32 25.15 33.08 41.03 Approach LOS C C C D d_I, Intersection Delay [s/veh]29.67 Intersection LOS C Intersection V/C 0.806 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.030 3.258 2.808 2.668 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.560 2.836 2.010 2.545 Bicycle LOS B C B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.481Volume to Capacity (v/c): BLevel Of Service: 11.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 394132395176989483987120247Total Analysis Volume [veh/h] 1010810131925237102230012Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 373931374973949063783114945Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 373931374973949063783114945Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 71.0830.6580.5275.64158.15162.8344.7919.73186.1754.0995th-Percentile Queue Length [ft/ln] 2.841.233.223.036.336.511.790.797.452.1695th-Percentile Queue Length [veh/ln] 39.4917.0344.7342.0287.8690.4624.8810.96103.4330.0550th-Percentile Queue Length [ft/ln] 1.580.681.791.683.513.621.000.444.141.2050th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group DDDDAADAADLane Group LOS 35.1140.0335.4241.967.427.3853.104.857.4253.86d, Delay for Lane Group [s/veh] 0.320.180.350.410.420.420.630.080.490.68X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.720.490.841.471.041.0110.220.140.7111.15d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.3939.5434.5840.496.386.3842.884.706.7142.71d1, Uniform Delay [s] 25217725418412331275621090244169c, Capacity [veh/h] 1722130617371318180918701781158935601781s, saturation flow rate [veh/h] 0.050.020.050.060.280.280.020.050.340.03(v / s)_i Volume / Saturation Flow Rate 0.150.150.150.150.680.680.030.690.690.04g / C, Green / Cycle 131313136161362623g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.86 7.42 4.85 53.10 7.40 7.42 41.96 35.42 35.42 40.03 35.11 35.11 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]8.89 9.04 38.41 36.51 Approach LOS A A D D d_I, Intersection Delay [s/veh]11.91 Intersection LOS B Intersection V/C 0.481 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.074 3.112 2.075 2.051 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.662 2.455 1.834 1.744 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.013Volume to Capacity (v/c): BLevel Of Service: 11.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 45412052970Total Analysis Volume [veh/h] 1133013220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 43111050370Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 43111050370Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.18d_I, Intersection Delay [s/veh] AABApproach LOS 0.220.0011.63d_A, Approach Delay [s/veh] 0.880.880.000.000.970.9795th-Percentile Queue Length [ft/ln] 0.040.040.000.000.040.0495th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.008.510.000.0011.6318.78d_M, Delay for Movement [s/veh] 0.000.010.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.010Volume to Capacity (v/c): ALevel Of Service: 10.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 46513053770Total Analysis Volume [veh/h] 1163013420Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 44212051070Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44212051070Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.18d_I, Intersection Delay [s/veh] AAAApproach LOS 0.230.009.98d_A, Approach Delay [s/veh] 0.000.960.000.000.730.7395th-Percentile Queue Length [ft/ln] 0.000.040.000.000.030.0395th-Percentile Queue Length [veh/ln] AAAAACMovement LOS 0.008.550.000.009.9816.28d_M, Delay for Movement [s/veh] 0.000.010.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.011Volume to Capacity (v/c): BLevel Of Service: 10.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 4780054480Total Analysis Volume [veh/h] 1190013620Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 4540051780Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4540051780Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.08d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0010.02d_A, Approach Delay [s/veh] 0.000.000.000.000.840.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.030.0095th-Percentile Queue Length [veh/ln] AAABMovement LOS 0.000.000.000.0010.020.00d_M, Delay for Movement [s/veh] 0.000.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 1: 1 EX PM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\2 EX WP AM.pdf Scenario 2 EX WP AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A9.90.018NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 B11.90.190WB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 B12.80.019SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B11.60.398NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C25.80.653NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C20.70.677SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C20.70.632WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B11.00.005SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C16.60.607NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C24.90.300EB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.300Volume to Capacity (v/c): CLevel Of Service: 24.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 7816853271236351230518731135Total Analysis Volume [veh/h] 1942137311613571322789Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.8870Peak Hour Factor 6914947241095645204457727631Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66170700072300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6314330241025645204385427631Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 116.24121.2761.1967.2168.5673.2242.6943.9659.7064.3067.2540.4295th-Percentile Queue Length [ft/ln] 4.654.852.452.692.742.931.711.762.392.572.691.6295th-Percentile Queue Length [veh/ln] 64.5867.3733.9937.3438.0940.6823.7224.4233.1735.7237.3622.4650th-Percentile Queue Length [ft/ln] 2.582.691.361.491.521.630.950.981.331.431.490.9050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDDEAADAADLane Group LOS 41.7640.8754.4537.7137.5355.526.886.8554.807.557.5052.45d, Delay for Lane Group [s/veh] 0.640.600.710.360.350.760.120.120.710.180.180.60X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.552.8011.861.070.9513.120.230.2112.140.360.339.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.2138.0742.5936.6536.5942.406.656.6442.677.197.1742.94d1, Uniform Delay [s] 188209742052188311081180721080116658c, Capacity [veh/h] 167718701781175718701781175518701781173318701781s, saturation flow rate [veh/h] 0.070.070.030.040.040.040.080.080.030.110.110.02(v / s)_i Volume / Saturation Flow Rate 0.110.110.040.120.120.050.630.630.040.620.620.03g / C, Green / Cycle 10104101045757456563g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.45 7.51 7.55 54.80 6.86 6.88 55.52 37.60 37.71 54.45 41.09 41.76 Movement LOS D A A D A A E D D D D D d_A, Approach Delay [s/veh]11.15 14.23 42.92 43.63 Approach LOS B B D D d_I, Intersection Delay [s/veh]24.86 Intersection LOS C Intersection V/C 0.300 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.495 2.505 2.438 2.465 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 1.917 1.834 1.735 1.806 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.607Volume to Capacity (v/c): CLevel Of Service: 16.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 48215850231784794064598163Total Analysis Volume [veh/h] 12140131819120101615041Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 44214546228714393759548149Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000070060Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44214546228714323759542149Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 16.58Intersection Delay [s/veh] CBCCApproach LOS 15.5711.8516.3117.52Approach Delay [s/veh] 51.8915.1373.5177.446.6896.70100.7634.5395th-Percentile Queue Length [ft] 2.080.612.943.100.273.874.031.3895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.420.170.520.530.080.590.610.32Degree of Utilization, x 492490539524488557545506Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.005Volume to Capacity (v/c): BLevel Of Service: 11.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4246416013Total Analysis Volume [veh/h] 161104001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.9160Peak Hour Factor 4225381013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 02937000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4196344013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.06d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0010.51d_A, Approach Delay [s/veh] 0.000.000.000.000.460.4695th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.007.749.0211.01d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.632Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 268130300041663700890504Total Analysis Volume [veh/h] 6707600010415900223126Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92001.00001.00001.00000.92000.92001.00001.00000.92000.9200Peak Hour Factor 247127900038358600819464Total Hourly Volume [veh/h] 28000009600000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0030000016001123Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 275124900047957000808441Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 251.87131.59131.55237.42163.15103.81230.3495th-Percentile Queue Length [ft/ln] 10.075.265.269.506.534.159.2195th-Percentile Queue Length [veh/ln] 151.0873.1073.08140.3090.6457.67135.0550th-Percentile Queue Length [ft/ln] 6.042.922.925.613.632.315.4050th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCBBADLane Group LOS 40.5432.2532.2517.8914.415.4140.38d, Delay for Lane Group [s/veh] 0.840.430.430.530.360.350.86X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.950.800.802.500.570.393.98d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.500.11k, delay calibration 34.5931.4431.4415.3913.845.0336.41d1, Uniform Delay [s] 31935735779117712530583c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.170.090.090.260.180.250.15(v / s)_i Volume / Saturation Flow Rate 0.200.200.200.500.500.710.17g / C, Green / Cycle 18181845456415g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.38 5.41 0.00 0.00 14.41 17.89 0.00 0.00 0.00 32.25 32.25 40.54 Movement LOS D A B B C C D d_A, Approach Delay [s/veh]18.05 15.79 0.00 36.13 Approach LOS B B A D d_I, Intersection Delay [s/veh]20.69 Intersection LOS C Intersection V/C 0.632 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.212 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.710 2.508 4.132 2.550 Bicycle LOS B B D B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.677Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 000369338008212524139090Total Analysis Volume [veh/h] 000921950205631032270Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.90300.90300.90301.00000.90300.90300.90300.90301.0000Peak Hour Factor 000333334307412283738210Total Hourly Volume [veh/h] 00037000009300Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0003000046023340Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000340334306952284437870Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 228.48233.92240.0585.89124.83329.34307.0795th-Percentile Queue Length [ft/ln] 9.149.369.603.444.9913.1712.2895th-Percentile Queue Length [veh/ln] 133.67137.70142.2547.7269.35210.40193.1250th-Percentile Queue Length [ft/ln] 5.355.515.691.912.778.427.7250th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADBBLane Group LOS 39.7939.1638.534.8543.8416.5014.56d, Delay for Lane Group [s/veh] 0.800.790.780.320.780.670.61X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.924.383.850.333.993.672.50d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 34.8734.7834.684.5239.8512.8412.06d1, Uniform Delay [s] 30131733725713259831091c, Capacity [veh/h] 1589167817813560345916841870s, saturation flow rate [veh/h] 0.150.150.150.230.070.390.35(v / s)_i Volume / Saturation Flow Rate 0.190.190.190.720.090.580.58g / C, Green / Cycle 1717176585353g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 15.09 16.50 43.84 4.85 0.00 38.73 39.16 39.58 0.00 0.00 0.00 Movement LOS B B D A D D D d_A, Approach Delay [s/veh]15.53 14.00 39.14 0.00 Approach LOS B B D A d_I, Intersection Delay [s/veh]20.65 Intersection LOS C Intersection V/C 0.677 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.378 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.727 2.445 2.861 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.653Volume to Capacity (v/c): CLevel Of Service: 25.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1889232751383462247782305889885Total Analysis Volume [veh/h] 4723819348656194581422421Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.8990Peak Hour Factor 1698329671243112016992075280776Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242016-12-4-2-2022Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 016017115776000023Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1696729381092341097112115482731Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 190.7538.4336.3257.4051.67180.11111.73201.61113.6427.51249.2195.5495th-Percentile Queue Length [ft/ln] 7.631.541.452.302.077.204.478.064.551.109.973.8295th-Percentile Queue Length [veh/ln] 106.2321.3520.1831.8928.71100.0662.07114.0463.1315.28149.0853.0850th-Percentile Queue Length [ft/ln] 4.250.850.811.281.154.002.484.562.530.615.962.1250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBBDBBDLane Group LOS 44.3333.9651.4628.7428.3047.3013.6814.8543.7412.9317.5853.11d, Delay for Lane Group [s/veh] 0.820.180.560.210.170.900.280.430.750.080.530.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.990.168.500.290.107.790.860.763.700.201.1811.45d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 37.3433.8042.9528.4528.2039.5112.8214.0940.0412.7316.4141.66d1, Uniform Delay [s] 2305155735679738480317993067601701109c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.120.030.020.050.040.100.140.220.070.040.250.05(v / s)_i Volume / Saturation Flow Rate 0.140.140.030.220.220.110.510.510.090.480.480.06g / C, Green / Cycle 131332020104646843435g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.11 17.58 12.93 43.74 14.85 13.68 47.30 28.30 28.74 51.46 33.96 44.33 Movement LOS D B B D B B D C C D C D d_A, Approach Delay [s/veh]20.22 20.03 40.12 42.00 Approach LOS C C D D d_I, Intersection Delay [s/veh]25.85 Intersection LOS C Intersection V/C 0.653 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.924 3.152 2.902 2.634 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.418 2.576 2.021 1.817 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.398Volume to Capacity (v/c): BLevel Of Service: 11.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 432718383410351726404487311Total Analysis Volume [veh/h] 117599261318210112183Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.8800Peak Hour Factor 38241633309145639353976810Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 70000001160160Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 31241633309145628293975210Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 60.3316.4362.07102.29100.74102.7945.5510.54128.8214.2095th-Percentile Queue Length [ft/ln] 2.410.662.484.094.034.111.820.425.150.5795th-Percentile Queue Length [veh/ln] 33.519.1334.4856.8355.9757.1125.305.8671.577.8950th-Percentile Queue Length [ft/ln] 1.340.371.382.272.242.281.010.232.860.3250th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAAELane Group LOS 33.5437.3833.5641.516.046.0252.455.126.9455.93d, Delay for Lane Group [s/veh] 0.260.090.260.490.300.300.630.040.370.44X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.500.180.501.780.620.619.660.070.4411.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 33.0537.2033.0739.735.425.4142.795.056.5044.03d1, Uniform Delay [s] 27220927521012641293641065238525c, Capacity [veh/h] 1687132817111330182718701781158935601781s, saturation flow rate [veh/h] 0.040.010.040.080.210.210.020.030.250.01(v / s)_i Volume / Saturation Flow Rate 0.160.160.160.160.690.690.040.670.670.01g / C, Green / Cycle 151515156262360601g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.93 6.94 5.12 52.45 6.03 6.04 41.51 33.56 33.56 37.38 33.54 33.54 Movement LOS E A A D A A D C C D C C d_A, Approach Delay [s/veh]7.43 8.30 38.24 34.33 Approach LOS A A D C d_I, Intersection Delay [s/veh]11.65 Intersection LOS B Intersection V/C 0.398 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.897 2.985 2.042 2.020 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.325 2.234 1.848 1.705 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.019Volume to Capacity (v/c): BLevel Of Service: 12.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 212373039864091200Total Analysis Volume [veh/h] 55910992102300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 202253037864091100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 202500316409000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02003034700001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.49d_I, Intersection Delay [s/veh] AABAApproach LOS 0.090.1211.689.52d_A, Approach Delay [s/veh] 0.000.100.190.000.000.351.811.811.811.131.131.1395th-Percentile Queue Length [ft/ln] 0.000.000.010.000.000.010.070.070.070.050.050.0595th-Percentile Queue Length [veh/ln] AAAAAAABBABBMovement LOS 0.000.008.120.000.007.779.1714.7112.809.5214.7513.55d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.000.000.000.020.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.190Volume to Capacity (v/c): BLevel Of Service: 11.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4725140386331101181200Total Analysis Volume [veh/h] 1263109783029300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 4523840367311001121100Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000036000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 45350093110076000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02034035800001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001700140Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 032270201504300430Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 26.1426.696.7028.5728.5737.9110.14121.7110.9995th-Percentile Queue Length [ft/ln] 1.051.070.271.141.141.520.414.870.4495th-Percentile Queue Length [veh/ln] 14.5214.833.7215.8715.8721.065.6367.626.1150th-Percentile Queue Length [ft/ln] 0.580.590.150.630.630.840.232.700.2450th-Percentile Queue Length [veh/ln] NoNoYesNoYesNoNoYesNoCritical Lane Group AAEAADDDDLane Group LOS 3.813.7966.843.253.2552.5536.2742.3536.24d, Delay for Lane Group [s/veh] 0.110.110.390.140.140.590.060.610.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.180.1722.260.200.209.530.163.110.11d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.110.11k, delay calibration 3.633.6244.583.053.0543.0236.1139.2536.13d1, Uniform Delay [s] 12881361101409140956171193211c, Capacity [veh/h] 177018701781187018701781158914021589s, saturation flow rate [veh/h] 0.080.080.000.100.100.020.010.080.01(v / s)_i Volume / Saturation Flow Rate 0.730.730.010.750.750.030.110.110.11g / C, Green / Cycle 6666068683101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.24 36.24 36.24 42.35 36.27 36.27 52.55 3.25 3.25 66.84 3.80 3.81 Movement LOS D D D D D D D A A E A A d_A, Approach Delay [s/veh]36.24 41.84 7.13 4.63 Approach LOS D D A A d_I, Intersection Delay [s/veh]11.86 Intersection LOS B Intersection V/C 0.190 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 1.723 1.998 2.620 2.708 Crosswalk LOS A A B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 867 356 622 d_b, Bicycle Delay [s]14.45 14.45 30.42 21.36 I_b,int, Bicycle LOS Score for Intersection 1.579 1.772 1.905 1.809 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.018Volume to Capacity (v/c): ALevel Of Service: 9.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 9328600516016001300Total Analysis Volume [veh/h] 2372001290400300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 8827200490015001200Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 38000360000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 5065008501500000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02070036900001200Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.30d_I, Intersection Delay [s/veh] AAAAApproach LOS 0.000.009.489.95d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.490.000.001.340.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.060.000.000.050.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 0.000.000.000.000.000.009.480.000.009.950.000.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.010.000.020.000.000.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\2 EX WP PM.pdf Scenario 2 EX WP PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.60.012NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A9.60.249WB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 C19.40.074SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B12.30.490SB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C31.70.827NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C30.90.891SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C30.40.877WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B13.70.030SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C15.40.550NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C28.00.496NB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.496Volume to Capacity (v/c): CLevel Of Service: 28.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 99188112773561016344412212942831Total Analysis Volume [veh/h] 2547281989251611130321078Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 9618310975346986143111812541630Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66190600062000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 901779075340986143111210541630Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 124.33133.25121.33205.11211.62109.04105.80109.51133.05138.29146.9835.8995th-Percentile Queue Length [ft/ln] 4.975.334.858.208.464.364.234.385.325.535.881.4495th-Percentile Queue Length [veh/ln] 69.0774.0367.41116.58121.3160.5858.7860.8473.9276.8381.6519.9450th-Percentile Queue Length [ft/ln] 2.762.962.704.664.852.422.352.432.963.073.270.8050th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group DDDDDDBBDBBDLane Group LOS 36.7836.3450.1442.6842.0049.7610.5710.5449.8713.8213.7052.22d, Delay for Lane Group [s/veh] 0.540.520.790.800.790.770.250.250.800.310.300.57X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.731.429.455.695.078.870.580.569.450.910.829.16d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 35.0534.9240.6936.9936.9340.909.999.9840.4212.9112.8843.05d1, Uniform Delay [s] 2572901422632801321007105215287695054c, Capacity [veh/h] 166018701781175718701781179018701781172418701781s, saturation flow rate [veh/h] 0.080.080.060.120.120.060.140.140.070.160.150.02(v / s)_i Volume / Saturation Flow Rate 0.150.150.080.150.150.070.560.560.090.510.510.03g / C, Green / Cycle 14147131375151846463g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.22 13.74 13.82 49.87 10.55 10.57 49.76 42.26 42.68 50.14 36.43 36.78 Movement LOS D B B D B B D D D D D D d_A, Approach Delay [s/veh]15.79 18.18 43.74 40.37 Approach LOS B B D D d_I, Intersection Delay [s/veh]27.99 Intersection LOS C Intersection V/C 0.496 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.619 2.628 2.540 2.596 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.045 2.079 2.000 1.889 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.550Volume to Capacity (v/c): CLevel Of Service: 15.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5647411217121323946470508101Total Analysis Volume [veh/h] 1411928430899161712725Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 534701061611430372606648095Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000060060Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 534701061611430366606647495Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 15.44Intersection Delay [s/veh] BCBCApproach LOS 12.9316.3114.2816.45Approach Delay [s/veh] 27.1465.1650.2651.4611.6478.8182.5719.2495th-Percentile Queue Length [ft] 1.092.612.012.060.473.153.300.7795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.270.480.410.420.140.540.550.21Degree of Utilization, x 496517515507473539525489Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.030Volume to Capacity (v/c): BLevel Of Service: 13.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1549357415913Total Analysis Volume [veh/h] 4123144423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91100.91100.91100.91100.91100.9110Peak Hour Factor 1444952314812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 03132000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1441849114812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.35d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.2212.27d_A, Approach Delay [s/veh] 0.000.000.001.083.323.3295th-Percentile Queue Length [ft/ln] 0.000.000.000.040.130.1395th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.008.4710.1413.74d_M, Delay for Movement [s/veh] 0.000.000.010.010.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.877Volume to Capacity (v/c): CLevel Of Service: 30.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5481600000433955001617461Total Analysis Volume [veh/h] 137015000010823900404115Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89400.89400.89401.00001.00001.00000.89400.89401.00001.00000.89400.8940Peak Hour Factor 4901536000387854001446412Total Hourly Volume [veh/h] 55000009700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0027000014001324Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5451509000484840001433388Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 514.33209.25209.26358.36354.55464.31214.9395th-Percentile Queue Length [ft/ln] 20.578.378.3714.3314.1818.578.6095th-Percentile Queue Length [veh/ln] 358.97119.58119.59233.15230.15318.07123.7250th-Percentile Queue Length [ft/ln] 14.364.784.789.339.2112.724.9550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group DCCDCCDLane Group LOS 49.3522.2922.2937.7831.4021.3940.74d, Delay for Lane Group [s/veh] 0.940.460.460.790.780.830.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 21.710.510.5111.174.954.363.83d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.390.110.110.500.500.500.11k, delay calibration 27.6421.7821.7826.6126.4517.0336.91d1, Uniform Delay [s] 58165165154712251942543c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.340.170.170.270.270.450.13(v / s)_i Volume / Saturation Flow Rate 0.370.370.370.340.340.550.16g / C, Green / Cycle 33333331314914g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.74 21.39 0.00 0.00 31.40 37.78 0.00 0.00 0.00 22.29 22.29 49.35 Movement LOS D C C D C C D d_A, Approach Delay [s/veh]25.68 33.39 0.00 35.20 Approach LOS C C A D d_I, Intersection Delay [s/veh]30.37 Intersection LOS C Intersection V/C 0.877 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.200 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.274 2.785 4.132 3.546 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.891Volume to Capacity (v/c): CLevel Of Service: 30.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00043347140117128542512500Total Analysis Volume [veh/h] 00010811790293711063120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.94500.94500.94501.00000.94500.94500.94500.94501.0000Peak Hour Factor 00040946750110726940211810Total Hourly Volume [veh/h] 00045000004500Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0002700041025370Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00042746750106626942211440Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 373.91333.62329.66209.73156.98648.85556.9695th-Percentile Queue Length [ft/ln] 14.9613.3413.198.396.2825.9522.2895th-Percentile Queue Length [veh/ln] 245.44213.74210.65119.9387.21470.91394.1650th-Percentile Queue Length [ft/ln] 9.828.558.434.803.4918.8415.7750th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADDCLane Group LOS 49.0538.4137.469.0752.5340.4729.66d, Delay for Lane Group [s/veh] 0.920.830.820.510.930.950.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 16.787.086.260.8011.8219.8210.52d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.250.200.190.500.110.500.50k, delay calibration 32.2731.3331.208.2840.7120.6419.14d1, Uniform Delay [s] 4174604672310307885964c, Capacity [veh/h] 1589175517813560345917161870s, saturation flow rate [veh/h] 0.240.220.220.330.080.490.45(v / s)_i Volume / Saturation Flow Rate 0.260.260.260.650.090.520.52g / C, Green / Cycle 2424245884646g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 33.23 40.47 52.53 9.07 0.00 37.90 38.41 47.84 0.00 0.00 0.00 Movement LOS C D D A D D D d_A, Approach Delay [s/veh]35.06 17.58 41.64 0.00 Approach LOS D B D A d_I, Intersection Delay [s/veh]30.89 Intersection LOS C Intersection V/C 0.891 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.488 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 2.979 2.761 3.533 4.132 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.827Volume to Capacity (v/c): CLevel Of Service: 31.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 34818875872843113281006283981029106Total Analysis Volume [veh/h] 87471922717882252712425727Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 335181728427329931696827294990102Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242118-13-5-3-2225Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 014019136268000020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 335167725325621623098127797101257Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 320.9269.0883.6659.9799.57163.87220.52327.79141.6560.77362.87129.1295th-Percentile Queue Length [ft/ln] 12.842.763.352.403.986.558.8213.115.672.4314.515.1695th-Percentile Queue Length [veh/ln] 203.8538.3846.4833.3255.3191.04127.81209.1978.7033.76236.7171.7350th-Percentile Queue Length [ft/ln] 8.151.541.861.332.213.645.118.373.151.359.472.8750th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDCCDBCELane Group LOS 45.1327.2052.1724.3024.9048.5122.4524.4644.4819.1928.7761.12d, Delay for Lane Group [s/veh] 0.890.220.740.190.280.900.500.690.820.160.770.89X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 12.280.1210.350.200.148.462.752.674.780.594.2219.44d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.200.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 32.8427.0841.8224.1024.7640.0519.7021.7939.7018.6024.5541.68d1, Uniform Delay [s] 389872101459102734665314623466001343119c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.220.050.040.050.080.090.210.280.080.060.290.06(v / s)_i Volume / Saturation Flow Rate 0.240.240.060.290.290.100.410.410.100.380.380.07g / C, Green / Cycle 22225262693737934346g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]61.12 28.77 19.19 44.48 24.46 22.45 48.51 24.90 24.30 52.17 27.20 45.13 Movement LOS E C B D C C D C C D C D d_A, Approach Delay [s/veh]30.79 27.56 35.59 40.48 Approach LOS C C D D d_I, Intersection Delay [s/veh]31.75 Intersection LOS C Intersection V/C 0.827 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.040 3.286 2.965 2.765 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.577 2.894 2.122 2.064 Bicycle LOS B C B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.490Volume to Capacity (v/c): BLevel Of Service: 12.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 454132395176989614587121747Total Analysis Volume [veh/h] 1110810131925240112230412Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 433931374973949194383116345Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 60000001360140Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 373931374973949063783114945Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 76.3230.4680.0075.61164.34169.1051.8920.46195.2554.0995th-Percentile Queue Length [ft/ln] 3.051.223.203.026.576.762.080.827.812.1695th-Percentile Queue Length [veh/ln] 42.4016.9244.4442.0191.3093.9528.8311.36109.4630.0550th-Percentile Queue Length [ft/ln] 1.700.681.781.683.653.761.150.454.381.2050th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDDDAADAADLane Group LOS 34.9539.6335.0341.907.657.6253.905.067.8153.86d, Delay for Lane Group [s/veh] 0.330.180.340.410.420.420.670.080.500.68X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.760.450.781.461.081.0411.140.150.7511.15d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.2039.1834.2540.446.576.5742.774.917.0642.71d1, Uniform Delay [s] 25818226118512261267671079241669c, Capacity [veh/h] 1712130617371311181018701781158935601781s, saturation flow rate [veh/h] 0.050.020.050.060.290.290.030.050.340.03(v / s)_i Volume / Saturation Flow Rate 0.150.150.150.150.680.680.040.680.680.04g / C, Green / Cycle 141414146161361613g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.86 7.81 5.06 53.90 7.63 7.65 41.90 35.03 35.03 39.63 34.95 34.95 Movement LOS D A A D A A D D D D C C d_A, Approach Delay [s/veh]9.24 9.52 38.18 36.22 Approach LOS A A D D d_I, Intersection Delay [s/veh]12.27 Intersection LOS B Intersection V/C 0.490 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.081 3.124 2.075 2.056 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.674 2.470 1.834 1.754 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.074Volume to Capacity (v/c): CLevel Of Service: 19.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 1848012055856020700Total Analysis Volume [veh/h] 4120301391205200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 1745611053056019700Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1725002756019000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 04311105030000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.61d_I, Intersection Delay [s/veh] AACBApproach LOS 0.200.0717.4410.06d_A, Approach Delay [s/veh] 0.000.450.900.000.000.356.696.696.690.740.740.7495th-Percentile Queue Length [ft/ln] 0.000.020.040.000.000.010.270.270.270.030.030.0395th-Percentile Queue Length [veh/ln] AAAAAABCCBCCMovement LOS 0.000.008.610.000.008.4110.8222.9719.4310.0622.2119.12d_M, Delay for Movement [s/veh] 0.000.000.010.000.010.000.010.000.070.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.249Volume to Capacity (v/c): ALevel Of Service: 9.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 5349413055728160118700Total Analysis Volume [veh/h] 131233013974029200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 5046912052927150112700Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000037000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 502700192715075000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 04421205100000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001700140Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 019450194502600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 50.8652.0516.1947.5847.5832.1314.80121.336.3995th-Percentile Queue Length [ft/ln] 2.032.080.651.901.901.290.594.850.2695th-Percentile Queue Length [veh/ln] 28.2628.929.0026.4326.4317.858.2267.403.5550th-Percentile Queue Length [ft/ln] 1.131.160.361.061.060.710.332.700.1450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group AADAADDDDLane Group LOS 4.194.1854.343.823.8251.8636.4542.1636.07d, Delay for Lane Group [s/veh] 0.200.200.450.200.200.550.090.600.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.350.3410.470.320.328.740.242.950.06d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.110.11k, delay calibration 3.843.8443.873.493.4943.1236.2139.2136.01d1, Uniform Delay [s] 13201366291389138951171196211c, Capacity [veh/h] 180718701781187018701781158914081589s, saturation flow rate [veh/h] 0.150.150.010.150.150.020.010.080.00(v / s)_i Volume / Saturation Flow Rate 0.730.730.020.740.740.030.110.110.11g / C, Green / Cycle 6666167673101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.07 36.07 36.07 42.16 36.45 36.45 51.86 3.82 3.82 54.34 4.18 4.19 Movement LOS D D D D D D D A A D A A d_A, Approach Delay [s/veh]36.07 41.48 6.12 5.35 Approach LOS D D A A d_I, Intersection Delay [s/veh]9.63 Intersection LOS A Intersection V/C 0.249 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 1.724 2.000 2.721 2.833 Crosswalk LOS A A B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 333 333 d_b, Bicycle Delay [s]25.69 25.69 31.25 31.25 I_b,int, Bicycle LOS Score for Intersection 1.571 1.781 2.042 2.022 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.012Volume to Capacity (v/c): BLevel Of Service: 10.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 825480068201100800Total Analysis Volume [veh/h] 21137001710300200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 785210064801000800Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 43000370000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3567009401000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0454005170000800Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.15d_I, Intersection Delay [s/veh] AABBApproach LOS 0.000.0010.3810.57d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.230.000.000.930.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.050.000.000.040.000.0095th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.000.000.000.0010.380.000.0010.570.000.00d_M, Delay for Movement [s/veh] 0.000.010.000.000.010.000.020.000.000.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 2: 2 EX WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\3 OY CUM AM.pdf Scenario 3 OY CUM AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A9.70.017NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A9.70.015NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B10.80.019NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B12.40.458NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C26.50.748NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C22.70.754SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C22.10.710NB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B12.10.006SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C18.30.657NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C25.70.321SB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.321Volume to Capacity (v/c): CLevel Of Service: 25.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 7717637631449563247506832647Total Analysis Volume [veh/h] 19449163624166212178112Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.8870Peak Hour Factor 6815633561288456219446028942Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 2723122269744210In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6314330241025645204385427631Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 120.33125.0141.9788.9193.34103.9652.9854.9058.4169.4171.9754.6295th-Percentile Queue Length [ft/ln] 4.815.001.683.563.734.162.122.202.342.782.882.1895th-Percentile Queue Length [veh/ln] 66.8569.4523.3249.3951.8657.7629.4330.5032.4538.5639.9830.3550th-Percentile Queue Length [ft/ln] 2.672.780.931.982.072.311.181.221.301.541.601.2150th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDDDAADAADLane Group LOS 42.0741.1351.8935.9335.6550.888.088.0354.568.428.3753.92d, Delay for Lane Group [s/veh] 0.650.620.600.410.390.770.140.140.700.180.180.68X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.782.999.061.080.909.700.290.2611.890.380.3511.21d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.2938.1442.8334.8634.7541.187.797.7742.688.048.0242.71d1, Uniform Delay [s] 1892096224727412310491126711058112469c, Capacity [veh/h] 168418701781168418701781174218701781176018701781s, saturation flow rate [veh/h] 0.070.070.020.060.060.050.090.080.030.110.110.03(v / s)_i Volume / Saturation Flow Rate 0.110.110.030.150.150.070.600.600.040.600.600.04g / C, Green / Cycle 10103131365454454543g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.92 8.39 8.42 54.56 8.05 8.08 50.88 35.72 35.93 51.89 41.37 42.07 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]13.25 14.52 40.54 42.90 Approach LOS B B D D d_I, Intersection Delay [s/veh]25.66 Intersection LOS C Intersection V/C 0.321 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.506 2.524 2.473 2.463 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 1.923 1.857 1.809 1.799 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.657Volume to Capacity (v/c): CLevel Of Service: 18.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 50216552232815054167630169Total Analysis Volume [veh/h] 13141131820126101715742Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 46215148229744633861577155Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 00000001400130In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44214546228714323759542149Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 18.31Intersection Delay [s/veh] CBCCApproach LOS 16.5612.2417.9519.61Approach Delay [s/veh] 57.8916.3585.1789.767.05113.83118.7037.6695th-Percentile Queue Length [ft] 2.320.653.413.590.284.554.751.5195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.450.180.560.580.090.640.660.34Degree of Utilization, x 480476524509475542531493Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.006Volume to Capacity (v/c): BLevel Of Service: 12.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4240439013Total Analysis Volume [veh/h] 160110001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.9160Peak Hour Factor 4220402013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 01644000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4196344013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.07d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0011.45d_A, Approach Delay [s/veh] 0.000.000.000.000.540.5495th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.007.729.5612.08d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.710Volume to Capacity (v/c): CLevel Of Service: 22.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 308132200046373400996559Total Analysis Volume [veh/h] 7708000011618300249140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92001.00001.00001.00000.92000.92001.00001.00000.92000.9200Peak Hour Factor 283129600042667500916514Total Hourly Volume [veh/h] 310000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 280370003582007655In-Process Volume [veh/h] 1.04001.04001.04001.00001.00001.00001.04001.04001.00001.00001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 275124900047957000808441Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 279.61134.93134.89295.14210.10141.48251.1595th-Percentile Queue Length [ft/ln] 11.185.405.4011.818.405.6610.0595th-Percentile Queue Length [veh/ln] 172.0574.9674.94183.93120.2078.60150.5450th-Percentile Queue Length [ft/ln] 6.883.003.007.364.813.146.0250th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCCBADLane Group LOS 39.2930.2630.2622.8417.546.7240.40d, Delay for Lane Group [s/veh] 0.860.400.400.640.450.410.89X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.880.640.644.210.900.514.49d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.500.11k, delay calibration 33.4029.6229.6218.6416.646.2135.91d1, Uniform Delay [s] 36040340372816312438630c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.190.090.090.290.210.280.16(v / s)_i Volume / Saturation Flow Rate 0.230.230.230.460.460.690.18g / C, Green / Cycle 20202041416216g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.40 6.72 0.00 0.00 17.54 22.84 0.00 0.00 0.00 30.26 30.26 39.29 Movement LOS D A B C C C D d_A, Approach Delay [s/veh]18.83 19.59 0.00 34.66 Approach LOS B B A C d_I, Intersection Delay [s/veh]22.05 Intersection LOS C Intersection V/C 0.710 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.267 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.842 2.635 4.132 2.652 Bicycle LOS C B D B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.754Volume to Capacity (v/c): CLevel Of Service: 22.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0003903421088930145710080Total Analysis Volume [veh/h] 0009711050222751142520Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.90300.90300.90301.00000.90300.90300.90300.90301.0000Peak Hour Factor 000352338008032724139100Total Hourly Volume [veh/h] 000390000010300Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000370230803555920In-Process Volume [veh/h] 1.00001.00001.00001.04001.04001.04001.00001.04001.04001.04001.04001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000340334306952284437870Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 243.90247.68251.34105.11155.08413.72377.4195th-Percentile Queue Length [ft/ln] 9.769.9110.054.206.2016.5515.1095th-Percentile Queue Length [veh/ln] 145.12147.94150.6858.3986.15277.20248.2250th-Percentile Queue Length [ft/ln] 5.805.926.032.343.4511.099.9350th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADCBLane Group LOS 39.1738.2237.475.5046.6921.2117.88d, Delay for Lane Group [s/veh] 0.810.790.770.350.870.770.70X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.944.163.560.396.766.053.79d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 34.2334.0633.915.1139.9215.1714.09d1, Uniform Delay [s] 32334236225213469491054c, Capacity [veh/h] 1589168617813560345916851870s, saturation flow rate [veh/h] 0.170.160.160.250.090.430.39(v / s)_i Volume / Saturation Flow Rate 0.200.200.200.710.100.560.56g / C, Green / Cycle 1818186495151g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 18.79 21.21 46.69 5.50 0.00 37.74 38.22 38.88 0.00 0.00 0.00 Movement LOS B C D A D D D d_A, Approach Delay [s/veh]19.55 15.92 38.27 0.00 Approach LOS B B D A d_I, Intersection Delay [s/veh]22.70 Intersection LOS C Intersection V/C 0.754 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.396 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.853 2.541 2.967 4.132 Bicycle LOS C B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.748Volume to Capacity (v/c): CLevel Of Service: 26.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 22586375314629913688530568106339Total Analysis Volume [veh/h] 5621913367534221761726610Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.8990Peak Hour Factor 2027733481312691227962746195635Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 267381826957555963In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1696729381092341097112115482731Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 218.4471.8241.8938.8553.35147.8262.14227.07150.8435.86330.3344.5295th-Percentile Queue Length [ft/ln] 8.742.871.681.552.135.912.499.086.031.4313.211.7895th-Percentile Queue Length [veh/ln] 126.2939.9023.2721.5829.6482.1234.52132.6383.8019.92211.1724.7350th-Percentile Queue Length [ft/ln] 5.051.600.930.861.193.281.385.313.350.808.450.9950th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBBDBCDLane Group LOS 43.4633.1451.7327.0427.1843.4512.1515.1843.4515.0922.6352.59d, Delay for Lane Group [s/veh] 0.840.270.600.140.170.810.170.490.810.100.680.62X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.150.478.910.160.094.180.440.934.240.282.429.76d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 36.3132.6742.8226.8827.0939.2711.7114.2539.2114.8120.2242.83d1, Uniform Delay [s] 267314623828553718141824376697156263c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.140.050.020.030.040.090.090.250.090.040.300.02(v / s)_i Volume / Saturation Flow Rate 0.170.170.030.240.240.110.510.510.110.440.440.03g / C, Green / Cycle 1515322221046461040403g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.59 22.63 15.09 43.45 15.18 12.15 43.45 27.18 27.04 51.73 33.14 43.46 Movement LOS D C B D B B D C C D C D d_A, Approach Delay [s/veh]23.19 21.37 36.94 41.79 Approach LOS C C D D d_I, Intersection Delay [s/veh]26.45 Intersection LOS C Intersection V/C 0.748 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.977 3.204 2.754 2.555 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.525 2.654 1.970 2.134 Bicycle LOS B B A B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.458Volume to Capacity (v/c): BLevel Of Service: 12.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4032234141123598153552101518Total Analysis Volume [veh/h] 1086101031152049132545Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.8800Peak Hour Factor 352820363610852717314689316Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 3332513564151116In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 31241633309145628293975210Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 60.5020.7169.34121.40132.74135.6339.8713.38169.6721.5795th-Percentile Queue Length [ft/ln] 2.420.832.774.865.315.431.590.546.790.8695th-Percentile Queue Length [veh/ln] 33.6111.5138.5267.4573.7575.3522.157.4394.2611.9950th-Percentile Queue Length [ft/ln] 1.340.461.542.702.953.010.890.303.770.4850th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAADLane Group LOS 32.1536.4932.4040.727.307.2852.065.618.0653.26d, Delay for Lane Group [s/veh] 0.240.100.270.530.350.350.590.050.430.49X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.400.200.471.860.810.799.150.090.599.66d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 31.7536.2931.9338.866.506.5042.915.527.4743.60d1, Uniform Delay [s] 30322530623212201249591042233437c, Capacity [veh/h] 1703131617181328182618701781158935601781s, saturation flow rate [veh/h] 0.040.020.050.090.240.240.020.030.290.01(v / s)_i Volume / Saturation Flow Rate 0.180.180.180.180.670.670.030.660.660.02g / C, Green / Cycle 161616166060359592g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.26 8.06 5.61 52.06 7.29 7.30 40.72 32.40 32.40 36.49 32.15 32.15 Movement LOS D A A D A A D C C D C C d_A, Approach Delay [s/veh]8.69 9.02 37.39 33.20 Approach LOS A A D C d_I, Intersection Delay [s/veh]12.40 Intersection LOS B Intersection V/C 0.458 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.966 3.087 2.061 2.026 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.455 2.310 1.898 1.716 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.019Volume to Capacity (v/c): BLevel Of Service: 10.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 23630426120Total Analysis Volume [veh/h] 591010730Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 22430405110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 16004400In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20030347110Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.23d_I, Intersection Delay [s/veh] AABApproach LOS 0.100.0010.84d_A, Approach Delay [s/veh] 0.200.200.000.001.461.4695th-Percentile Queue Length [ft/ln] 0.010.010.000.000.060.0695th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.008.180.000.0010.8413.64d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.015Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 23940438120Total Analysis Volume [veh/h] 601010930Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 22740416110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 16004400In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20340358110Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.21d_I, Intersection Delay [s/veh] AAAApproach LOS 0.140.009.66d_A, Approach Delay [s/veh] 0.000.270.000.001.161.1695th-Percentile Queue Length [ft/ln] 0.000.010.000.000.050.0595th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.008.230.000.009.6613.02d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.017Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 24300451130Total Analysis Volume [veh/h] 610011330Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 23100428120Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 16004400In-Process Volume [veh/h] 1.04001.00001.00001.04001.04001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20700369120Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.18d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.009.71d_A, Approach Delay [s/veh] 0.000.000.000.001.270.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.050.0095th-Percentile Queue Length [veh/ln] AAAAMovement LOS 0.000.000.000.009.710.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\3 OY CUM PM.pdf Scenario 3 OY CUM PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.30.012NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 B10.20.010NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B12.20.014NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B13.40.548NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 D47.50.970SB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 D42.80.978SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 D42.50.979WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 C16.00.038SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C17.00.607NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C29.20.517NB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.517Volume to Capacity (v/c): CLevel Of Service: 29.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1072141071013791239546512812045366Total Analysis Volume [veh/h] 27542725953124116323011316Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 104208104983681199245212411744064Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 10241020141729488733In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 901779075340986143111210541630Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 142.25152.48116.41220.27229.69130.37129.39135.98139.17149.03157.9977.6695th-Percentile Queue Length [ft/ln] 5.696.104.668.819.195.215.185.445.575.966.323.1195th-Percentile Queue Length [veh/ln] 79.0384.7164.67127.63134.5772.4371.8875.5477.3182.8087.7743.1450th-Percentile Queue Length [ft/ln] 3.163.392.595.115.382.902.883.023.093.313.511.7350th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group DDDDDDBBDBBELane Group LOS 38.0637.5150.4842.0441.3448.3012.3312.2749.6114.7514.6455.96d, Delay for Lane Group [s/veh] 0.610.590.790.820.810.780.290.290.810.320.320.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.381.959.635.715.078.130.780.739.361.000.9213.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 35.6935.5740.8536.3336.2740.1711.5511.5440.2513.7513.7342.35d1, Uniform Delay [s] 25328413628430615894199915885792285c, Capacity [veh/h] 166618701781173718701781176218701781173718701781s, saturation flow rate [veh/h] 0.090.090.060.130.130.070.150.150.070.160.160.04(v / s)_i Volume / Saturation Flow Rate 0.150.150.080.160.160.090.530.530.090.490.490.05g / C, Green / Cycle 14147151584848844444g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.96 14.68 14.75 49.61 12.29 12.33 48.30 41.58 42.04 50.48 37.63 38.06 Movement LOS E B B D B B D D D D D D d_A, Approach Delay [s/veh]18.96 19.24 43.03 40.95 Approach LOS B B D D d_I, Intersection Delay [s/veh]29.19 Intersection LOS C Intersection V/C 0.517 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.642 2.658 2.587 2.610 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.087 2.127 2.057 1.913 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.607Volume to Capacity (v/c): CLevel Of Service: 17.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5847711718126334276673547105Total Analysis Volume [veh/h] 15119295328107161813726Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 554731101711931403626951699Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 00000002200230In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 534701061611430366606647495Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 17.01Intersection Delay [s/veh] BCCCApproach LOS 13.4817.5915.5518.54Approach Delay [s/veh] 29.6273.5659.7561.1512.4495.43100.0120.8795th-Percentile Queue Length [ft] 1.182.942.392.450.503.824.000.8395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.290.520.460.470.140.590.610.22Degree of Utilization, x 482503500493460523511476Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.038Volume to Capacity (v/c): CLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1654160516913Total Analysis Volume [veh/h] 4135151423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91100.91100.91100.91100.91100.9110Peak Hour Factor 1549355115812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 05840000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1441849114812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.38d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.2214.47d_A, Approach Delay [s/veh] 0.000.000.001.204.334.3395th-Percentile Queue Length [ft/ln] 0.000.000.000.050.170.1795th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.000.000.008.6112.2416.02d_M, Delay for Movement [s/veh] 0.000.010.010.020.020.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.979Volume to Capacity (v/c): DLevel Of Service: 42.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 62616790004801088001773523Total Analysis Volume [veh/h] 157017000012027200443131Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89400.89400.89401.00001.00001.00000.89400.89401.00001.00000.89400.8940Peak Hour Factor 5601607000429973001585468Total Hourly Volume [veh/h] 620000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 550780003399009564In-Process Volume [veh/h] 1.04001.04001.04001.00001.00001.00001.04001.04001.00001.00001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5451509000484840001433388Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 709.62231.45231.46489.17493.95592.34238.1495th-Percentile Queue Length [ft/ln] 28.389.269.2619.5719.7623.699.5395th-Percentile Queue Length [veh/ln] 505.14135.87135.87338.34342.25423.57140.8350th-Percentile Queue Length [ft/ln] 20.215.435.4313.5313.6916.945.6350th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group FCCEDCDLane Group LOS 75.8322.1222.1260.5250.1529.5240.56d, Delay for Lane Group [s/veh] 1.040.510.510.950.970.930.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 47.830.590.5930.3819.8510.004.27d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.490.110.110.500.500.500.11k, delay calibration 28.0021.5321.5330.1430.3019.5236.29d1, Uniform Delay [s] 60067367350311261899597c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.390.190.190.300.310.500.15(v / s)_i Volume / Saturation Flow Rate 0.380.380.380.320.320.530.17g / C, Green / Cycle 34343429294815g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.56 29.52 0.00 0.00 50.15 60.52 0.00 0.00 0.00 22.12 22.12 75.83 Movement LOS D C D E C C F d_A, Approach Delay [s/veh]32.03 53.32 0.00 47.86 Approach LOS C D A D d_I, Intersection Delay [s/veh]42.49 Intersection LOS D Intersection V/C 0.979 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.258 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.454 2.941 4.132 3.817 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.978Volume to Capacity (v/c): DLevel Of Service: 42.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00049747860131333142513900Total Analysis Volume [veh/h] 00012411970328831063480Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.94500.94500.94501.00000.94500.94500.94500.94501.0000Peak Hour Factor 00047047430124131340213140Total Hourly Volume [veh/h] 000520000010100Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 00078041013233641240In-Process Volume [veh/h] 1.00001.00001.00001.04001.04001.04001.00001.04001.04001.04001.04001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00042746750106626942211440Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 486.98405.92395.25246.07231.44844.33694.0095th-Percentile Queue Length [ft/ln] 19.4816.2415.819.849.2633.7727.7695th-Percentile Queue Length [veh/ln] 333.70270.95262.42146.74131.66621.59509.0050th-Percentile Queue Length [ft/ln] 13.3510.8410.505.875.2724.8620.3650th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group FDDBFFDLane Group LOS 70.5347.9445.2710.0688.4359.6440.09d, Delay for Lane Group [s/veh] 1.010.920.900.571.081.030.95X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 37.5315.8713.391.0447.4337.6419.20d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.310.260.250.500.110.500.50k, delay calibration 33.0032.0731.889.0141.0022.0020.90d1, Uniform Delay [s] 4244664752295307883956c, Capacity [veh/h] 1589174817813560345917271870s, saturation flow rate [veh/h] 0.270.250.240.370.100.530.49(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.090.510.51g / C, Green / Cycle 2424245884646g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 46.88 59.64 88.43 10.06 0.00 46.48 47.94 67.44 0.00 0.00 0.00 Movement LOS D E F B D D E d_A, Approach Delay [s/veh]49.87 25.84 54.58 0.00 Approach LOS D C D A d_I, Intersection Delay [s/veh]42.82 Intersection LOS D Intersection V/C 0.978 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.533 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 3.140 2.916 3.769 4.132 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.970Volume to Capacity (v/c): DLevel Of Service: 47.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 45321295643012522791175376121117872Total Analysis Volume [veh/h] 113532416756370294943029418Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 43620491622902422681130362116113369Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 883016724172911074158110In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 335167725325621623098127797101257Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 428.23151.27103.3440.2198.31124.83201.68454.06259.7085.71592.7982.7095th-Percentile Queue Length [ft/ln] 17.136.054.131.613.934.998.0718.1610.393.4323.713.3195th-Percentile Queue Length [veh/ln] 288.8684.0457.4122.3454.6269.35114.09309.75151.2247.62415.9345.9450th-Percentile Queue Length [ft/ln] 11.553.362.300.892.182.774.5612.396.051.9016.641.8450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDCDFCFDLane Group LOS 51.2024.8750.3321.1722.2143.8424.3736.0190.6823.4363.7254.76d, Delay for Lane Group [s/veh] 0.930.370.760.120.260.780.470.891.090.241.030.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 20.860.409.210.100.113.992.729.3850.181.0833.2412.64d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.340.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.3424.4741.1221.0722.0939.8521.6426.6340.5022.3530.4842.12d1, Uniform Delay [s] 48657212552411743255891318346513114993c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.280.110.050.040.080.070.180.330.110.080.330.04(v / s)_i Volume / Saturation Flow Rate 0.310.310.070.330.330.090.370.370.100.320.320.05g / C, Green / Cycle 28286303083333929295g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.76 63.72 23.43 90.68 36.01 24.37 43.84 22.21 21.17 50.33 24.87 51.20 Movement LOS D F C F D C D C C D C D d_A, Approach Delay [s/veh]59.70 45.47 30.93 43.75 Approach LOS E D C D d_I, Intersection Delay [s/veh]47.49 Intersection LOS D Intersection V/C 0.970 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.114 3.371 2.842 2.757 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.691 3.069 2.069 2.814 Bicycle LOS B C B C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.548Volume to Capacity (v/c): BLevel Of Service: 13.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 42483947599011711294395135954Total Analysis Volume [veh/h] 10121012152229282112434014Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 40463745568611210794191129952Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 255751014137351045In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 373931374973949063783114945Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 78.1937.1793.1789.30219.98224.2649.4724.04237.3462.7195th-Percentile Queue Length [ft/ln] 3.131.493.733.578.808.971.980.969.492.5195th-Percentile Queue Length [veh/ln] 43.4420.6551.7649.61127.42130.5727.4813.36140.2434.8450th-Percentile Queue Length [ft/ln] 1.740.832.071.985.105.221.100.535.611.3950th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAAELane Group LOS 33.8139.6634.3141.589.429.3453.575.519.1355.04d, Delay for Lane Group [s/veh] 0.320.210.370.450.510.510.660.090.570.72X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.640.560.811.621.581.5210.770.171.0112.44d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 33.1839.1033.5039.977.847.8242.805.348.1242.60d1, Uniform Delay [s] 28318628419811951236651059237175c, Capacity [veh/h] 1728128817341306180918701781158935601781s, saturation flow rate [veh/h] 0.050.030.060.070.340.340.020.060.380.03(v / s)_i Volume / Saturation Flow Rate 0.160.160.160.160.660.660.040.670.670.04g / C, Green / Cycle 151515155959360604g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.04 9.13 5.51 53.57 9.37 9.42 41.58 34.31 34.31 39.66 33.81 33.81 Movement LOS E A A D A A D C C D C C d_A, Approach Delay [s/veh]10.55 10.85 37.65 35.58 Approach LOS B B D D d_I, Intersection Delay [s/veh]13.41 Intersection LOS B Intersection V/C 0.548 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.174 3.243 2.099 2.065 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.804 2.623 1.883 1.772 Bicycle LOS C B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.014Volume to Capacity (v/c): BLevel Of Service: 12.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 53312059370Total Analysis Volume [veh/h] 1333014820Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 50611056370Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 58004000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 43111050370Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.17d_I, Intersection Delay [s/veh] AABApproach LOS 0.190.0012.22d_A, Approach Delay [s/veh] 0.930.930.000.001.051.0595th-Percentile Queue Length [ft/ln] 0.040.040.000.000.040.0495th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.008.710.000.0012.2221.82d_M, Delay for Movement [s/veh] 0.010.010.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.010Volume to Capacity (v/c): BLevel Of Service: 10.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 54513060070Total Analysis Volume [veh/h] 1363015020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 51812057070Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 58004000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44212051070Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.16d_I, Intersection Delay [s/veh] AABApproach LOS 0.200.0010.22d_A, Approach Delay [s/veh] 0.001.020.000.000.760.7695th-Percentile Queue Length [ft/ln] 0.000.040.000.000.030.0395th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.008.750.000.0010.2218.14d_M, Delay for Movement [s/veh] 0.010.010.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.012Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 5580060880Total Analysis Volume [veh/h] 1390015220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 5300057880Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 58004000In-Process Volume [veh/h] 1.04001.00001.04001.04001.04001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4540051780Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.07d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0010.26d_A, Approach Delay [s/veh] 0.000.000.000.000.880.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.040.0095th-Percentile Queue Length [veh/ln] AAABMovement LOS 0.000.000.000.0010.260.00d_M, Delay for Movement [s/veh] 0.010.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 3: 3 OY CUM PM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\4 OY CUM WP AM.pdf Scenario 4 OY CUM WP AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.20.018NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 B11.20.204EB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 B13.60.021SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B12.80.470NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C29.50.769EB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C23.40.781SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C22.50.718NB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B11.30.005SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C18.60.664NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C26.60.341SB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.341Volume to Capacity (v/c): CLevel Of Service: 26.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 8318356631529563247579432647Total Analysis Volume [veh/h] 214614163824166214238112Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.88700.8870Peak Hour Factor 7416250561358456219518328942Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66170700072300Site-Generated Trips [veh/h] 2723122269744210In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6314330241025645204385427631Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 127.50133.1065.1594.0798.62103.9652.9754.9367.8074.9778.7554.6295th-Percentile Queue Length [ft/ln] 5.105.322.613.763.944.162.122.202.713.003.152.1895th-Percentile Queue Length [veh/ln] 70.8373.9436.1952.2654.7957.7629.4330.5237.6741.6543.7530.3550th-Percentile Queue Length [ft/ln] 2.832.961.452.092.192.311.181.221.511.671.751.2150th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDEDDDAAEAADLane Group LOS 42.8141.7355.2936.9536.6250.888.098.0456.598.658.5853.92d, Delay for Lane Group [s/veh] 0.690.650.730.450.430.770.140.140.750.200.190.68X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.373.4412.731.341.119.700.290.2613.960.430.3811.21d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.4438.2942.5735.6135.5041.187.807.7842.628.228.2042.71d1, Uniform Delay [s] 1882097623425912310491126761035111969c, Capacity [veh/h] 167918701781169018701781174218701781172918701781s, saturation flow rate [veh/h] 0.080.070.030.060.060.050.090.080.030.120.120.03(v / s)_i Volume / Saturation Flow Rate 0.110.110.040.140.140.070.600.600.040.600.600.04g / C, Green / Cycle 10104121265454454543g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.92 8.61 8.65 56.59 8.05 8.09 50.88 36.71 36.95 55.29 42.00 42.81 Movement LOS D A A E A A D D D E D D d_A, Approach Delay [s/veh]13.18 15.60 41.10 44.52 Approach LOS B B D D d_I, Intersection Delay [s/veh]26.57 Intersection LOS C Intersection V/C 0.341 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.518 2.528 2.478 2.484 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 1.945 1.862 1.815 1.825 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.664Volume to Capacity (v/c): CLevel Of Service: 18.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 50216552232815134167636169Total Analysis Volume [veh/h] 13141131820128101715942Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 46215148229744703861583155Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000070060Site-Generated Trips [veh/h] 00000001400130In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 44214546228714323759542149Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 18.61Intersection Delay [s/veh] CBCCApproach LOS 16.6612.2918.2919.96Approach Delay [s/veh] 58.2616.4387.9092.617.07116.72121.7037.8195th-Percentile Queue Length [ft] 2.330.663.523.700.284.674.871.5195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.450.180.570.580.090.650.660.34Degree of Utilization, x 478473523508474540529492Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.005Volume to Capacity (v/c): BLevel Of Service: 11.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4272479013Total Analysis Volume [veh/h] 168120001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.9160Peak Hour Factor 4249439013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 02937000Site-Generated Trips [veh/h] 01644000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4196344013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.06d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0010.78d_A, Approach Delay [s/veh] 0.000.000.000.000.480.4895th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.007.809.1011.34d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.718Volume to Capacity (v/c): CLevel Of Service: 22.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 3081354000463751001008584Total Analysis Volume [veh/h] 7708900011618800252146Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92000.92000.92001.00001.00001.00000.92000.92001.00001.00000.92000.9200Peak Hour Factor 283132600042669100927537Total Hourly Volume [veh/h] 310000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0030000016001123Site-Generated Trips [veh/h] 280370003582007655In-Process Volume [veh/h] 1.04001.04001.04001.00001.00001.00001.04001.04001.00001.00001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 275124900047957000808441Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 279.04149.81149.77299.56217.81144.46261.0695th-Percentile Queue Length [ft/ln] 11.165.995.9911.988.715.7810.4495th-Percentile Queue Length [veh/ln] 171.6283.2383.21187.33125.8380.26157.9950th-Percentile Queue Length [ft/ln] 6.863.333.337.495.033.216.3250th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCCBADLane Group LOS 39.1030.6130.6123.5018.116.7940.58d, Delay for Lane Group [s/veh] 0.850.440.440.640.470.410.90X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.760.750.754.420.980.524.85d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.500.11k, delay calibration 33.3429.8629.8619.0817.136.2735.73d1, Uniform Delay [s] 36140540471816092435649c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.190.100.100.290.210.280.17(v / s)_i Volume / Saturation Flow Rate 0.230.230.230.450.450.680.19g / C, Green / Cycle 20202041416217g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.58 6.79 0.00 0.00 18.11 23.50 0.00 0.00 0.00 30.61 30.61 39.10 Movement LOS D A B C C C D d_A, Approach Delay [s/veh]19.18 20.17 0.00 34.55 Approach LOS B C A C d_I, Intersection Delay [s/veh]22.46 Intersection LOS C Intersection V/C 0.718 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.279 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.873 2.649 4.132 2.705 Bicycle LOS C B D B ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.781Volume to Capacity (v/c): CLevel Of Service: 23.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0004203421094030147710450Total Analysis Volume [veh/h] 00010511050235751192610Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.90300.90300.90301.00000.90300.90300.90300.90301.0000Peak Hour Factor 000379338008492724319440Total Hourly Volume [veh/h] 000420000010800Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0003000046023340Site-Generated Trips [veh/h] 000370230803555920In-Process Volume [veh/h] 1.00001.00001.00001.04001.04001.04001.00001.04001.04001.04001.04001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000340334306952284437870Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 251.78253.87256.54118.75155.08454.68409.2995th-Percentile Queue Length [ft/ln] 10.0710.1510.264.756.2018.1916.3795th-Percentile Queue Length [veh/ln] 151.01152.58154.5965.9786.15310.25273.6450th-Percentile Queue Length [ft/ln] 6.046.106.182.643.4512.4110.9550th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADCBLane Group LOS 38.8537.8536.915.9146.6923.7919.48d, Delay for Lane Group [s/veh] 0.820.800.770.380.870.810.73X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.954.143.410.446.767.634.54d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 33.9033.7133.505.4739.9216.1614.94d1, Uniform Delay [s] 33435337524953469371040c, Capacity [veh/h] 1589167717813560345916841870s, saturation flow rate [veh/h] 0.170.170.160.260.090.450.41(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.700.100.560.56g / C, Green / Cycle 1919196395050g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 20.65 23.79 46.69 5.91 0.00 37.22 37.85 38.52 0.00 0.00 0.00 Movement LOS C C D A D D D d_A, Approach Delay [s/veh]21.64 15.80 37.86 0.00 Approach LOS C B D A d_I, Intersection Delay [s/veh]23.42 Intersection LOS C Intersection V/C 0.781 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.408 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.904 2.583 3.022 4.132 Bicycle LOS C B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.769Volume to Capacity (v/c): CLevel Of Service: 29.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 225103378616238523887230066104189Total Analysis Volume [veh/h] 5626921419660218751626022Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.89900.8990Peak Hour Factor 2029333771463462147842705993680Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242016-12-4-2-2022Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 016017115776000023Site-Generated Trips [veh/h] 267381826957555963In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1696729381092341097112115482731Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 218.3341.6741.8964.0859.08223.50129.05240.68148.3234.99323.8599.4395th-Percentile Queue Length [ft/ln] 8.731.671.682.562.368.945.169.635.931.4012.953.9895th-Percentile Queue Length [veh/ln] 126.2123.1523.2735.6032.82129.8971.69142.7282.4019.44206.1355.2450th-Percentile Queue Length [ft/ln] 5.050.930.931.421.315.202.875.713.300.788.252.2150th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCFBBDBCDLane Group LOS 43.4132.2251.7327.4627.0361.7815.4117.2543.4515.2222.5752.64d, Delay for Lane Group [s/veh] 0.840.170.600.220.191.000.310.510.810.100.670.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.110.148.910.280.1021.781.071.104.190.272.3311.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 36.2932.0942.8227.1726.9340.0014.3416.1539.2614.9420.2441.52d1, Uniform Delay [s] 2675986238887038476217073716931552114c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.140.030.020.050.050.110.150.240.090.040.290.05(v / s)_i Volume / Saturation Flow Rate 0.170.170.030.240.240.110.480.480.110.440.440.06g / C, Green / Cycle 1515322221043431039396g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]52.64 22.57 15.22 43.45 17.25 15.41 61.78 27.03 27.46 51.73 32.22 43.41 Movement LOS D C B D B B F C C D C D d_A, Approach Delay [s/veh]24.40 22.51 48.22 41.09 Approach LOS C C D D d_I, Intersection Delay [s/veh]29.54 Intersection LOS C Intersection V/C 0.769 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.988 3.235 2.921 2.672 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.546 2.723 2.082 1.861 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.470Volume to Capacity (v/c): BLevel Of Service: 12.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4832234141123598274252103318Total Analysis Volume [veh/h] 12861010311520711132585Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.88000.8800Peak Hour Factor 422820363610852728374690916Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 70000001160160Site-Generated Trips [veh/h] 3332513564151116In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 31241633309145628293975210Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 67.1220.5668.81121.39138.46141.4447.8713.91181.1821.5795th-Percentile Queue Length [ft/ln] 2.680.822.754.865.545.661.910.567.250.8695th-Percentile Queue Length [veh/ln] 37.2911.4238.2367.4476.9278.5826.597.73100.6611.9950th-Percentile Queue Length [ft/ln] 1.490.461.532.703.083.141.060.314.030.4850th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAADLane Group LOS 31.9736.0431.9840.687.567.5452.685.898.5453.26d, Delay for Lane Group [s/veh] 0.260.100.260.530.360.360.640.050.450.49X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.440.180.441.870.840.829.930.090.639.66d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 31.5335.8531.5538.826.726.7242.755.807.9043.60d1, Uniform Delay [s] 30923231423212111240661028230337c, Capacity [veh/h] 1691131617181318182718701781158935601781s, saturation flow rate [veh/h] 0.050.020.050.090.240.240.020.030.290.01(v / s)_i Volume / Saturation Flow Rate 0.180.180.180.180.660.660.040.650.650.02g / C, Green / Cycle 161616166060358582g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.26 8.54 5.89 52.68 7.55 7.56 40.68 31.98 31.98 36.04 31.97 31.97 Movement LOS D A A D A A D C C D C C d_A, Approach Delay [s/veh]9.14 9.59 37.20 32.88 Approach LOS A A D C d_I, Intersection Delay [s/veh]12.83 Intersection LOS B Intersection V/C 0.470 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.973 3.100 2.061 2.032 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.470 2.325 1.898 1.730 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.021Volume to Capacity (v/c): BLevel Of Service: 13.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 212623045964091200Total Analysis Volume [veh/h] 566101152102300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 202493043664091100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 202500316409000Site-Generated Trips [veh/h] 01600440000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02003034700001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.45d_I, Intersection Delay [s/veh] AABAApproach LOS 0.090.1012.249.73d_A, Approach Delay [s/veh] 0.000.100.210.000.000.351.961.961.961.181.181.1895th-Percentile Queue Length [ft/ln] 0.000.000.010.000.000.010.080.080.080.050.050.0595th-Percentile Queue Length [veh/ln] AAAAAAACBACBMovement LOS 0.000.008.290.000.007.839.2715.8913.569.7315.9314.65d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.000.000.000.020.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.204Volume to Capacity (v/c): BLevel Of Service: 11.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4727640447331101181200Total Analysis Volume [veh/h] 12691011283029300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 4526240425311001121100Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000036000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 45350093110076000Site-Generated Trips [veh/h] 01600440000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.00001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02034035800001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001000100Pedestrian Clearance [s] 0500500120090Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 032270201504300430Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissPermissPermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 33.7534.490.0039.7039.7037.989.75120.1810.6495th-Percentile Queue Length [ft/ln] 1.351.380.001.591.591.520.394.810.4395th-Percentile Queue Length [veh/ln] 18.7519.160.0022.0622.0621.105.4266.775.9150th-Percentile Queue Length [ft/ln] 0.750.770.000.880.880.840.222.670.2450th-Percentile Queue Length [veh/ln] NoNoNoNoYesNoNoYesNoCritical Lane Group AAFAADCDCLane Group LOS 4.584.550.003.883.8852.6934.1941.5934.22d, Delay for Lane Group [s/veh] 0.130.1210000.00.160.160.590.050.530.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.210.190.000.260.269.670.101.950.11d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.500.500.500.110.110.110.11k, delay calibration 4.374.360.003.623.6243.0334.0839.6434.11d1, Uniform Delay [s] 1249131401372137256211223211c, Capacity [veh/h] 17771870943187018701781158914021589s, saturation flow rate [veh/h] 0.090.090.000.120.120.020.010.080.01(v / s)_i Volume / Saturation Flow Rate 0.700.700.700.730.730.030.130.130.13g / C, Green / Cycle 63636366663121212g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.002.000.000.000.000.002.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 34.22 34.22 41.59 34.19 34.19 52.69 3.88 3.88 0.00 4.56 4.58 Movement LOS C C D C C D A A A A A d_A, Approach Delay [s/veh]34.22 40.96 7.23 4.51 Approach LOS C D A A d_I, Intersection Delay [s/veh]11.22 Intersection LOS B Intersection V/C 0.204 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 16.0 13.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 30.42 32.94 I_p,int, Pedestrian LOS Score for Intersection 1.729 1.998 2.518 2.730 Crosswalk LOS A A B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 867 356 622 d_b, Bicycle Delay [s]14.45 14.45 30.42 21.36 I_b,int, Bicycle LOS Score for Intersection 1.579 1.772 1.956 1.829 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.018Volume to Capacity (v/c): BLevel Of Service: 10.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 9331200578016001300Total Analysis Volume [veh/h] 2378001440400300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 8829600549015001200Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 38000360000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 5065008501500000Site-Generated Trips [veh/h] 01600440000000In-Process Volume [veh/h] 1.04001.04001.00001.00001.04001.00001.04001.00001.00001.04001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 02070036900001200Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.28d_I, Intersection Delay [s/veh] AAABApproach LOS 0.000.009.5710.18d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.520.000.001.400.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.060.000.000.060.000.0095th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.000.000.000.009.570.000.0010.180.000.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.010.000.020.000.000.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\4 OY CUM WP PM.pdf Scenario 4 OY CUM WP PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.80.013NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A9.20.270WB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 C22.60.090SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B13.80.557NB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 D49.60.990SB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 D47.41.004SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 D44.60.983WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B14.80.034SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C17.20.615NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C29.60.545NB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.545Volume to Capacity (v/c): CLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1132201271013851239546513414145366Total Analysis Volume [veh/h] 28553225963124116333511316Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 110214123983741199245213013744064Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66190600062000Site-Generated Trips [veh/h] 10241020141729488733In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 901779075340986143111210541630Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 143.70155.15136.08222.01231.50129.73135.06141.98149.71161.31172.5677.3795th-Percentile Queue Length [ft/ln] 5.756.215.448.889.265.195.405.685.996.456.903.0995th-Percentile Queue Length [veh/ln] 79.8386.1975.60128.91135.9172.0775.0378.8883.1789.6295.8742.9850th-Percentile Queue Length [ft/ln] 3.193.453.025.165.442.883.003.163.333.583.831.7250th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group DDDDDDBBDBBELane Group LOS 36.5636.1249.2341.7741.1147.8513.1513.0951.9915.8515.7255.59d, Delay for Lane Group [s/veh] 0.580.560.800.820.810.770.300.300.850.350.340.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.921.599.015.584.967.760.830.7811.601.161.0513.26d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.6434.5340.2236.2036.1440.0912.3212.3140.3914.6914.6642.33d1, Uniform Delay [s] 27531015828931015991497015882389486c, Capacity [veh/h] 166218701781173818701781176218701781172018701781s, saturation flow rate [veh/h] 0.100.090.070.140.130.070.150.150.080.170.160.04(v / s)_i Volume / Saturation Flow Rate 0.170.170.090.170.170.090.520.520.090.480.480.05g / C, Green / Cycle 15158151584747843434g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.59 15.76 15.85 51.99 13.11 13.15 47.85 41.34 41.77 49.23 36.21 36.56 Movement LOS E B B D B B D D D D D D d_A, Approach Delay [s/veh]19.76 20.62 42.73 39.89 Approach LOS B C D D d_I, Intersection Delay [s/veh]29.60 Intersection LOS C Intersection V/C 0.545 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.653 2.661 2.591 2.629 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.104 2.132 2.062 1.939 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.615Volume to Capacity (v/c): CLevel Of Service: 17.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5847711718126334336673553105Total Analysis Volume [veh/h] 15119295328108161813826Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 554731101711931409626952299Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000060060Site-Generated Trips [veh/h] 00000002200230In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 534701061611430366606647495Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 17.22Intersection Delay [s/veh] BCCCApproach LOS 13.5417.6915.7318.83Approach Delay [s/veh] 29.7774.0061.3262.7512.4797.84102.5020.9395th-Percentile Queue Length [ft] 1.192.962.452.510.503.914.100.8495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.290.520.470.470.140.600.610.22Degree of Utilization, x 480502498492459522509474Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.034Volume to Capacity (v/c): BLevel Of Service: 14.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1657564016913Total Analysis Volume [veh/h] 4144160423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91100.91100.91100.91100.91100.9110Peak Hour Factor 1552458315812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 03132000Site-Generated Trips [veh/h] 05840000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1441849114812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.34d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.2113.03d_A, Approach Delay [s/veh] 0.000.000.001.243.673.6795th-Percentile Queue Length [ft/ln] 0.000.000.000.050.150.1595th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.008.7310.5114.77d_M, Delay for Movement [s/veh] 0.000.010.010.020.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.983Volume to Capacity (v/c): DLevel Of Service: 44.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 62617090004801104001787550Total Analysis Volume [veh/h] 157017700012027600447138Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89400.89400.89401.00001.00001.00000.89400.89401.00001.00000.89400.8940Peak Hour Factor 5601634000429987001598492Total Hourly Volume [veh/h] 620000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0027000014001324Site-Generated Trips [veh/h] 550780003399009564In-Process Volume [veh/h] 1.04001.04001.04001.00001.00001.00001.04001.04001.00001.00001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5451509000484840001433388Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 709.62241.67241.68504.39532.61605.20249.5195th-Percentile Queue Length [ft/ln] 28.389.679.6720.1821.3024.219.9895th-Percentile Queue Length [veh/ln] 505.14143.46143.46350.81374.02434.31149.3150th-Percentile Queue Length [ft/ln] 20.215.745.7414.0314.9617.375.9750th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group FCCEECDLane Group LOS 75.8322.4022.4064.3857.1730.4441.05d, Delay for Lane Group [s/veh] 1.040.530.530.971.000.940.89X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 47.830.640.6433.7926.2210.774.88d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.490.110.110.500.500.500.11k, delay calibration 28.0021.7621.7630.5930.9519.6736.18d1, Uniform Delay [s] 60067367349511081899615c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.390.200.200.300.310.500.16(v / s)_i Volume / Saturation Flow Rate 0.380.380.380.310.310.530.18g / C, Green / Cycle 34343428284816g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]41.05 30.44 0.00 0.00 57.17 64.38 0.00 0.00 0.00 22.40 22.40 75.83 Movement LOS D C E E C C F d_A, Approach Delay [s/veh]32.94 59.36 0.00 47.43 Approach LOS C E A D d_I, Intersection Delay [s/veh]44.58 Intersection LOS D Intersection V/C 0.983 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.271 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.488 2.955 4.132 3.866 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 1.004Volume to Capacity (v/c): DLevel Of Service: 47.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00052347860135733144714300Total Analysis Volume [veh/h] 00013111970339831123570Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.94500.94500.94501.00000.94500.94500.94500.94501.0000Peak Hour Factor 00049447430128231342213510Total Hourly Volume [veh/h] 000550000010600Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0002700041025370Site-Generated Trips [veh/h] 00078041013233641240In-Process Volume [veh/h] 1.00001.00001.00001.04001.04001.04001.00001.04001.04001.04001.04001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00042746750106626942211440Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 515.69428.46412.72256.97231.44950.80770.6395th-Percentile Queue Length [ft/ln] 20.6317.1416.5110.289.2638.0330.8395th-Percentile Queue Length [veh/ln] 352.12289.05276.39154.91131.66690.18574.1550th-Percentile Queue Length [ft/ln] 14.0811.5611.066.205.2727.6122.9750th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group FDDBFFDLane Group LOS 76.7851.9447.9410.3288.4370.9846.66d, Delay for Lane Group [s/veh] 1.030.940.920.591.081.060.98X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 43.7819.6215.851.1347.4348.9825.07d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.320.270.260.500.110.500.50k, delay calibration 33.0032.3332.089.1941.0022.0021.59d1, Uniform Delay [s] 4244644752295307882956c, Capacity [veh/h] 1589174117813560345917251870s, saturation flow rate [veh/h] 0.280.250.250.380.100.540.50(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.090.510.51g / C, Green / Cycle 2424245884646g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 55.02 70.98 88.43 10.32 0.00 49.71 51.94 72.73 0.00 0.00 0.00 Movement LOS E E F B D D E d_A, Approach Delay [s/veh]58.82 25.64 58.89 0.00 Approach LOS E C E A d_I, Intersection Delay [s/veh]47.35 Intersection LOS D Intersection V/C 1.004 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.544 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 3.196 2.952 3.817 4.132 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.990Volume to Capacity (v/c): DLevel Of Service: 49.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 453227959731933836811613711171155119Total Analysis Volume [veh/h] 113572424808492290932928930Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 436218919330732535411173571131111114Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242118-13-5-3-2225Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 014019136268000020Site-Generated Trips [veh/h] 883016724172911074158110In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 335167725325621623098127797101257Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 430.1076.00103.3461.72103.72195.90283.49480.10249.6483.50580.54170.9795th-Percentile Queue Length [ft/ln] 17.203.044.132.474.157.8411.3419.209.993.3423.226.8495th-Percentile Queue Length [veh/ln] 290.3742.2257.4134.2957.62109.93175.01330.93144.7846.39406.9494.9950th-Percentile Queue Length [ft/ln] 11.611.692.301.372.304.407.0013.245.791.8616.283.8050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCECDFCFFLane Group LOS 51.6823.3250.3321.3621.9858.1030.7341.5785.3223.7163.2580.95d, Delay for Lane Group [s/veh] 0.930.210.760.180.270.980.660.931.070.231.021.00X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 21.270.099.210.160.1217.716.0413.4144.821.0732.5338.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.340.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.4123.2241.1221.2021.8640.4024.6928.1540.5022.6430.7242.00d1, Uniform Delay [s] 4851086125532119234655712493465041130119c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.280.060.050.060.090.100.230.330.110.070.320.07(v / s)_i Volume / Saturation Flow Rate 0.300.300.070.340.340.100.350.350.100.320.320.07g / C, Green / Cycle 27276303093232929296g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]80.95 63.25 23.71 85.32 41.57 30.73 58.10 21.98 21.36 50.33 23.32 51.68 Movement LOS F F C F D C E C C D C D d_A, Approach Delay [s/veh]61.44 48.01 38.10 43.21 Approach LOS E D D D d_I, Intersection Delay [s/veh]49.56 Intersection LOS D Intersection V/C 0.990 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.123 3.399 2.995 2.840 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.707 3.127 2.182 2.199 Bicycle LOS B C B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.557Volume to Capacity (v/c): BLevel Of Service: 13.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 48483947599011711424995137354Total Analysis Volume [veh/h] 12121012152229286122434314Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 46463745568611210924791131352Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 60000001360140Site-Generated Trips [veh/h] 255751014137351045In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 373931374973949063783114945Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 83.2936.9392.5789.26226.25230.4956.8324.81246.9862.7195th-Percentile Queue Length [ft/ln] 3.331.483.703.579.059.222.270.999.882.5195th-Percentile Queue Length [veh/ln] 46.2720.5251.4349.59132.03135.1631.5713.78147.4234.8450th-Percentile Queue Length [ft/ln] 1.850.822.061.985.285.411.260.555.901.3950th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAADAAELane Group LOS 33.6539.2533.9241.529.729.6454.675.739.5855.04d, Delay for Lane Group [s/veh] 0.330.200.360.450.520.520.700.090.580.72X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.670.520.761.611.641.5811.960.171.0712.44d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 32.9838.7333.1639.918.078.0642.715.568.5142.60d1, Uniform Delay [s] 28919129219911881228701048234775c, Capacity [veh/h] 1718128817341299181018701781158935601781s, saturation flow rate [veh/h] 0.060.030.060.070.340.340.030.060.390.03(v / s)_i Volume / Saturation Flow Rate 0.170.170.170.170.660.660.040.660.660.04g / C, Green / Cycle 151515155959459594g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.04 9.58 5.73 54.67 9.67 9.72 41.52 33.92 33.92 39.25 33.65 33.65 Movement LOS E A A D A A D C C D C C d_A, Approach Delay [s/veh]10.95 11.36 37.41 35.27 Approach LOS B B D D d_I, Intersection Delay [s/veh]13.80 Intersection LOS B Intersection V/C 0.557 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.180 3.254 2.099 2.070 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.815 2.639 1.883 1.782 Bicycle LOS C B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.090Volume to Capacity (v/c): CLevel Of Service: 22.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 1855912062156020700Total Analysis Volume [veh/h] 4140301551205200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 1753111059056019700Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1725002756019000Site-Generated Trips [veh/h] 05800400000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 04311105030000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.60d_I, Intersection Delay [s/veh] AACBApproach LOS 0.180.0720.0810.31d_A, Approach Delay [s/veh] 0.000.480.950.000.000.388.088.088.080.770.770.7795th-Percentile Queue Length [ft/ln] 0.000.020.040.000.000.020.320.320.320.030.030.0395th-Percentile Queue Length [veh/ln] AAAAAABDCBDCMovement LOS 0.000.008.810.000.008.6511.5627.1122.6310.3125.9521.79d_M, Delay for Movement [s/veh] 0.000.010.010.000.010.010.010.000.090.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.270Volume to Capacity (v/c): ALevel Of Service: 9.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 5357413062028160118700Total Analysis Volume [veh/h] 131433015574029200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 5054512058927150112700Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000037000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 502700192715075000Site-Generated Trips [veh/h] 05800400000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 04421205100000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010007001700140Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 019450194502600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 59.9061.2516.1954.0854.0832.1314.80121.336.3995th-Percentile Queue Length [ft/ln] 2.402.450.652.162.161.290.594.850.2695th-Percentile Queue Length [veh/ln] 33.2834.039.0030.0530.0517.858.2267.403.5550th-Percentile Queue Length [ft/ln] 1.331.360.361.201.200.710.332.700.1450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group AADAADDDDLane Group LOS 4.364.3454.343.943.9451.8636.4542.1636.07d, Delay for Lane Group [s/veh] 0.230.230.450.220.220.550.090.600.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.410.4010.470.370.378.740.242.950.06d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.110.11k, delay calibration 3.943.9443.873.573.5743.1236.2139.2136.01d1, Uniform Delay [s] 13261366291389138951171196211c, Capacity [veh/h] 181518701781187018701781158914081589s, saturation flow rate [veh/h] 0.170.170.010.170.170.020.010.080.00(v / s)_i Volume / Saturation Flow Rate 0.730.730.020.740.740.030.110.110.11g / C, Green / Cycle 6666167673101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.07 36.07 36.07 42.16 36.45 36.45 51.86 3.94 3.94 54.34 4.35 4.36 Movement LOS D D D D D D D A A D A A d_A, Approach Delay [s/veh]36.07 41.48 6.01 5.36 Approach LOS D D A A d_I, Intersection Delay [s/veh]9.19 Intersection LOS A Intersection V/C 0.270 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 1.724 2.000 2.756 2.874 Crosswalk LOS A A C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 333 333 d_b, Bicycle Delay [s]25.69 25.69 31.25 31.25 I_b,int, Bicycle LOS Score for Intersection 1.571 1.781 2.094 2.088 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.013Volume to Capacity (v/c): BLevel Of Service: 10.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 826280074601100800Total Analysis Volume [veh/h] 21157001870300200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 785970070901000800Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 43000370000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3567009401000000Site-Generated Trips [veh/h] 05800400000000In-Process Volume [veh/h] 1.04001.04001.00001.04001.04001.00001.04001.00001.00001.04001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0454005170000800Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.14d_I, Intersection Delay [s/veh] AABBApproach LOS 0.000.0010.7110.84d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.310.000.000.970.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.050.000.000.040.000.0095th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.000.000.000.0010.710.000.0010.840.000.00d_M, Delay for Movement [s/veh] 0.000.010.000.000.010.000.020.000.000.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 4: 4 OY CUM WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\5 HY AM.pdf Scenario 5 HY AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A9.80.017NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A9.80.016NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B11.10.020NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B13.80.443SB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C27.40.739NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C22.60.735SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C23.90.744WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B13.10.007SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 C24.70.775NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C26.20.394SB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.394Volume to Capacity (v/c): CLevel Of Service: 26.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 72272856614288593644610943982Total Analysis Volume [veh/h] 1868211736221591122711021Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 68258816313584563464410441778Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 68258816313584563464410441778Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 169.09175.3994.3092.8497.4197.1982.7985.3953.39103.03108.8393.3995th-Percentile Queue Length [ft/ln] 6.767.023.773.713.903.893.313.422.144.124.353.7495th-Percentile Queue Length [veh/ln] 93.9497.4452.3951.5854.1154.0045.9947.4429.6657.2460.4651.8850th-Percentile Queue Length [ft/ln] 3.763.902.102.062.162.161.841.901.192.292.422.0850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDDDAADAADLane Group LOS 44.1443.1951.9438.2337.8151.609.679.6353.749.289.2353.38d, Delay for Lane Group [s/veh] 0.780.760.770.480.450.770.200.200.670.260.250.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.935.0710.401.671.3610.160.450.4211.010.590.5511.63d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.2138.1241.5536.5636.4541.449.229.2142.728.698.6841.76d1, Uniform Delay [s] 216232111212236115102310746810381113105c, Capacity [veh/h] 173818701781167718701781178118701781174418701781s, saturation flow rate [veh/h] 0.100.090.050.060.060.050.120.120.030.150.150.05(v / s)_i Volume / Saturation Flow Rate 0.120.120.060.130.130.060.580.580.040.600.600.06g / C, Green / Cycle 11116111165252354545g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.38 9.25 9.28 53.74 9.64 9.67 51.60 37.91 38.23 51.94 43.52 44.14 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]15.00 13.97 42.05 45.29 Approach LOS B B D D d_I, Intersection Delay [s/veh]26.25 Intersection LOS C Intersection V/C 0.394 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.599 2.579 2.509 2.514 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 2.079 1.947 1.804 1.914 Bicycle LOS B A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.775Volume to Capacity (v/c): CLevel Of Service: 24.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 50217652232866074167715197Total Analysis Volume [veh/h] 13144131822152101717949Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 46216148229795563861655180Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 46216148229795563861655180Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 24.70Intersection Delay [s/veh] CBDDApproach LOS 19.0413.1325.0326.79Approach Delay [s/veh] 70.4017.89134.61141.707.42167.06173.7151.0095th-Percentile Queue Length [ft] 2.820.725.385.670.306.686.952.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.510.200.700.720.090.760.780.42Degree of Utilization, x 448441497485454513505470Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.007Volume to Capacity (v/c): BLevel Of Service: 13.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4400458013Total Analysis Volume [veh/h] 1100114001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 4380435013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4380435013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.06d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0012.48d_A, Approach Delay [s/veh] 0.000.000.000.000.620.6295th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.008.1210.6113.10d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.744Volume to Capacity (v/c): CLevel Of Service: 23.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 381131800044871100983541Total Analysis Volume [veh/h] 9507900011217800246135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor 362130200042667500934514Total Hourly Volume [veh/h] 400000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 402130200053367500934514Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 345.10123.54123.51310.65220.00173.75244.2095th-Percentile Queue Length [ft/ln] 13.804.944.9412.438.806.959.7795th-Percentile Queue Length [veh/ln] 222.7368.6368.62195.88127.4496.53145.3450th-Percentile Queue Length [ft/ln] 8.912.752.747.845.103.865.8150th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCCCADLane Group LOS 41.6426.7126.7126.5920.128.6240.33d, Delay for Lane Group [s/veh] 0.890.330.330.670.480.430.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 10.130.400.405.391.100.604.28d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.190.110.110.500.500.500.11k, delay calibration 31.5026.3126.3121.2019.028.0336.06d1, Uniform Delay [s] 43048248266514902281615c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.240.090.090.280.200.280.16(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.420.420.640.18g / C, Green / Cycle 24242438385816g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.33 8.62 0.00 0.00 20.12 26.59 0.00 0.00 0.00 26.71 26.71 41.64 Movement LOS D A C C C C D d_A, Approach Delay [s/veh]19.88 22.62 0.00 34.83 Approach LOS B C A C d_I, Intersection Delay [s/veh]23.91 Intersection LOS C Intersection V/C 0.744 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.251 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.817 2.604 4.132 2.781 Bicycle LOS C B D C ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.735Volume to Capacity (v/c): CLevel Of Service: 22.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0003718340108452864359580Total Analysis Volume [veh/h] 00093211000211721092390Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor 0003527938108032724139100Total Hourly Volume [veh/h] 000390000010300Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0003917938108032725169100Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 253.74256.46257.38103.84143.74390.89359.8195th-Percentile Queue Length [ft/ln] 10.1510.2610.304.155.7515.6414.3995th-Percentile Queue Length [veh/ln] 152.48154.52155.2257.6979.85258.94234.3050th-Percentile Queue Length [ft/ln] 6.106.186.212.313.1910.369.3750th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADCBLane Group LOS 38.8237.1736.785.7144.7820.5917.67d, Delay for Lane Group [s/veh] 0.820.780.770.340.830.750.67X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 4.983.663.370.375.055.383.46d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 33.8433.5133.415.3439.7415.2014.21d1, Uniform Delay [s] 33736837724903469351038c, Capacity [veh/h] 1589173617813560345916841870s, saturation flow rate [veh/h] 0.170.170.160.240.080.410.37(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.700.100.560.56g / C, Green / Cycle 1919196395050g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 18.47 20.59 44.78 5.71 0.00 36.89 37.17 38.43 0.00 0.00 0.00 Movement LOS B C D A D D D d_A, Approach Delay [s/veh]19.13 15.59 37.57 0.00 Approach LOS B B D A d_I, Intersection Delay [s/veh]22.61 Intersection LOS C Intersection V/C 0.735 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.406 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.794 2.493 3.035 4.132 Bicycle LOS C B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.739Volume to Capacity (v/c): CLevel Of Service: 27.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 246180525119828317283830597100660Total Analysis Volume [veh/h] 62451313497143209762425215Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 23417149481882691637962909295657Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 23417149481882691637962909295657Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 232.13156.6259.8137.0773.01139.8285.28223.93150.8453.62316.0271.3395th-Percentile Queue Length [ft/ln] 9.296.262.391.482.925.593.418.966.032.1412.642.8595th-Percentile Queue Length [veh/ln] 136.3787.0133.2320.6040.5677.6847.38130.3283.8029.79200.0439.6350th-Percentile Queue Length [ft/ln] 5.453.481.330.821.623.111.905.213.351.198.001.5950th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBBDBCELane Group LOS 42.2934.5154.0626.7127.3543.4913.6216.0743.4516.1322.8057.52d, Delay for Lane Group [s/veh] 0.850.530.700.130.230.790.220.480.810.140.660.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.731.2611.480.150.134.050.650.934.240.442.2714.92d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 35.5533.2542.5826.5527.2239.4412.9815.1339.2115.6920.5442.60d1, Uniform Delay [s] 291342743888703567831755376680152378c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.150.100.030.030.060.080.110.240.090.060.280.03(v / s)_i Volume / Saturation Flow Rate 0.180.180.040.240.240.100.490.490.110.430.430.04g / C, Green / Cycle 161642222944441039394g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]57.52 22.80 16.13 43.45 16.07 13.62 43.49 27.35 26.71 54.06 34.51 42.29 Movement LOS E C B D B B D C C D C D d_A, Approach Delay [s/veh]24.04 22.10 35.87 40.64 Approach LOS C C D D d_I, Intersection Delay [s/veh]27.39 Intersection LOS C Intersection V/C 0.739 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.967 3.191 2.793 2.617 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.519 2.644 1.999 2.348 Bicycle LOS B B A B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.443Volume to Capacity (v/c): BLevel Of Service: 13.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 525236385911455755569894017Total Analysis Volume [veh/h] 13139915281418914242354Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 494934365610852717539389316Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 494934365610852717539389316Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 87.6332.5481.19112.54126.78129.5365.3828.63168.2620.5295th-Percentile Queue Length [ft/ln] 3.511.303.254.505.075.182.621.156.730.8295th-Percentile Queue Length [veh/ln] 48.6818.0845.1162.5270.4371.9636.3215.9193.4811.4050th-Percentile Queue Length [ft/ln] 1.950.721.802.502.822.881.450.643.740.4650th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAAEAADLane Group LOS 31.9536.4731.7140.767.557.5355.636.628.7753.50d, Delay for Lane Group [s/veh] 0.320.160.290.510.330.330.740.100.420.48X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.550.310.481.790.750.7313.040.190.579.84d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 31.4036.1631.2338.976.806.8042.596.438.2043.65d1, Uniform Delay [s] 32723133322411991228761007225635c, Capacity [veh/h] 1718129817491290182618701781158935601781s, saturation flow rate [veh/h] 0.060.030.060.090.220.220.030.060.260.01(v / s)_i Volume / Saturation Flow Rate 0.190.190.190.190.660.660.040.630.630.02g / C, Green / Cycle 171717175959457572g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.50 8.77 6.62 55.63 7.54 7.55 40.76 31.71 31.71 36.47 31.95 31.95 Movement LOS D A A E A A D C C D C C d_A, Approach Delay [s/veh]9.29 10.65 36.60 33.12 Approach LOS A B D C d_I, Intersection Delay [s/veh]13.81 Intersection LOS B Intersection V/C 0.443 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.965 3.040 2.069 2.076 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.430 2.274 1.908 1.791 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.020Volume to Capacity (v/c): BLevel Of Service: 11.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 40430461120Total Analysis Volume [veh/h] 1011011530Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 38430438110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 38430438110Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.18d_I, Intersection Delay [s/veh] AABApproach LOS 0.060.0011.12d_A, Approach Delay [s/veh] 0.210.210.000.001.531.5395th-Percentile Queue Length [ft/ln] 0.010.010.000.000.060.0695th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.008.280.000.0011.1216.36d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.016Volume to Capacity (v/c): ALevel Of Service: 9.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 40740473120Total Analysis Volume [veh/h] 1021011830Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 38740449110Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 38740449110Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.17d_I, Intersection Delay [s/veh] AAAApproach LOS 0.080.009.78d_A, Approach Delay [s/veh] 0.000.280.000.001.191.1995th-Percentile Queue Length [ft/ln] 0.000.010.000.000.050.0595th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.008.330.000.009.7814.53d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.017Volume to Capacity (v/c): ALevel Of Service: 9.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 41200484130Total Analysis Volume [veh/h] 1030012130Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 39100460120Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 39100460120Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with AIntersection LOS 0.14d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.009.83d_A, Approach Delay [s/veh] 0.000.000.000.001.310.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.050.0095th-Percentile Queue Length [veh/ln] AAAAMovement LOS 0.000.000.000.009.830.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\5 HY PM.pdf Scenario 5 HY PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B11.20.014NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 B11.10.012NB RightHCM 6th EditionTwo-way stopDriveway 2/Tokay Ave at Highland Ave9 B14.50.018NB RightHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B16.60.596SB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 D48.70.980SB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 E67.01.032SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 D35.40.921WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 C18.40.046SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 D25.20.807NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C30.60.690NB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.690Volume to Capacity (v/c): CLevel Of Service: 30.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1072691651674551239558012818863374Total Analysis Volume [veh/h] 276741421143124145324715819Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 1042611601624421199256312418361572Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1042611601624421199256312418361572Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 147.12158.63174.49264.18281.67129.73200.83207.90139.17261.97277.8085.1895th-Percentile Queue Length [ft/ln] 5.886.356.9810.5711.275.198.038.325.5710.4811.113.4195th-Percentile Queue Length [veh/ln] 81.7388.1396.94160.35173.6272.07113.48118.6077.31158.68170.6747.3250th-Percentile Queue Length [ft/ln] 3.273.533.886.416.942.884.544.743.096.356.831.8950th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group CCDDDDBBDCCDLane Group LOS 30.8930.7248.0140.0039.3547.8518.2018.1249.6122.9122.6754.16d, Delay for Lane Group [s/veh] 0.470.460.830.850.840.770.410.410.810.550.550.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.880.778.825.665.037.761.551.479.363.012.7812.14d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.0129.9539.1934.3534.3140.0916.6516.6440.2519.8919.8942.02d1, Uniform Delay [s] 38642719835138615980284315871777896c, Capacity [veh/h] 169318701781170118701781177918701781172518701781s, saturation flow rate [veh/h] 0.110.100.090.170.170.070.190.180.070.230.230.04(v / s)_i Volume / Saturation Flow Rate 0.230.230.110.210.210.090.450.450.090.420.420.05g / C, Green / Cycle 212110191984141837375g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.16 22.75 22.91 49.61 18.15 18.20 47.85 39.54 40.00 48.01 30.76 30.89 Movement LOS D C C D B B D D D D C C d_A, Approach Delay [s/veh]25.38 23.17 41.01 36.05 Approach LOS C C D D d_I, Intersection Delay [s/veh]30.62 Intersection LOS C Intersection V/C 0.690 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.771 2.735 2.647 2.685 Crosswalk LOS C B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.298 2.222 2.174 2.006 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.807Volume to Capacity (v/c): DLevel Of Service: 25.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5647413118149364937483688115Total Analysis Volume [veh/h] 14119335379123192117229Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 5347012417141344657078649109Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5347012417141344657078649109Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with DIntersection LOS 25.18Intersection Delay [s/veh] BCCDApproach LOS 14.7323.4119.6931.10Approach Delay [s/veh] 31.81109.9087.8489.8915.45180.77189.4625.3895th-Percentile Queue Length [ft] 1.274.403.513.600.627.237.581.0295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.300.640.570.580.170.790.810.26Degree of Utilization, x 440466462456429488478447Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.046Volume to Capacity (v/c): CLevel Of Service: 18.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1659978916813Total Analysis Volume [veh/h] 4150197423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 1556975015812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1556975015812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.34d_I, Intersection Delay [s/veh] AACApproach LOS 0.000.1716.34d_A, Approach Delay [s/veh] 0.000.000.001.264.944.9495th-Percentile Queue Length [ft/ln] 0.000.000.000.050.200.2095th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.000.000.008.7912.9618.42d_M, Delay for Movement [s/veh] 0.000.010.010.020.020.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.921Volume to Capacity (v/c): DLevel Of Service: 35.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 58916390004631024001668493Total Analysis Volume [veh/h] 147016000011625600417123Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor 5601607000440973001585468Total Hourly Volume [veh/h] 620000011000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6221607000550973001585468Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 590.80218.06218.07434.73418.35513.62226.7695th-Percentile Queue Length [ft/ln] 23.638.728.7217.3916.7320.549.0795th-Percentile Queue Length [veh/ln] 422.29126.01126.02294.10280.91358.39132.4050th-Percentile Queue Length [ft/ln] 16.895.045.0411.7611.2414.345.3050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group ECCDDCDLane Group LOS 57.8621.7621.7650.4439.2524.5940.56d, Delay for Lane Group [s/veh] 0.980.480.480.900.890.880.86X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 30.180.520.5221.3910.356.164.00d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.440.110.110.500.500.500.11k, delay calibration 27.6821.2421.2429.0528.9018.4436.56d1, Uniform Delay [s] 60067367351411521899572c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.370.180.180.290.290.470.14(v / s)_i Volume / Saturation Flow Rate 0.380.380.380.320.320.530.16g / C, Green / Cycle 34343429294815g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.56 24.59 0.00 0.00 39.25 50.44 0.00 0.00 0.00 21.76 21.76 57.86 Movement LOS D C D D C C E d_A, Approach Delay [s/veh]28.24 42.74 0.00 39.06 Approach LOS C D A D d_I, Intersection Delay [s/veh]35.39 Intersection LOS D Intersection V/C 0.921 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.237 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.342 2.877 4.132 3.690 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 1.032Volume to Capacity (v/c): ELevel Of Service: 67.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0004952978000130636742313830Total Analysis Volume [veh/h] 000124742000327921063460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor 0004702827600124134940213140Total Hourly Volume [veh/h] 000520000010100Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0005222827600124134950313140Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 747.60824.68715.12244.37310.12830.67684.0795th-Percentile Queue Length [ft/ln] 29.9032.9928.609.7712.4033.2327.3695th-Percentile Queue Length [veh/ln] 501.51562.08489.07145.47181.80612.83500.6050th-Percentile Queue Length [ft/ln] 20.0622.4819.565.827.2724.5120.0250th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group FFFBFFDLane Group LOS 127.54123.33105.4510.02135.4058.2239.28d, Delay for Lane Group [s/veh] 1.171.161.120.571.191.020.94X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 94.5490.3372.451.0394.4036.2218.48d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.400.400.370.500.110.500.50k, delay calibration 33.0033.0033.008.9841.0022.0020.80d1, Uniform Delay [s] 4244874752295307883956c, Capacity [veh/h] 1589182717813560345917271870s, saturation flow rate [veh/h] 0.310.310.300.370.110.520.48(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.090.510.51g / C, Green / Cycle 2424245884646g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 45.85 58.22 135.40 10.02 0.00 111.33 123.33 127.54 0.00 0.00 0.00 Movement LOS D E F B F F F d_A, Approach Delay [s/veh]48.75 37.52 118.68 0.00 Approach LOS D D F A d_I, Intersection Delay [s/veh]67.00 Intersection LOS E Intersection V/C 1.032 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.607 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 3.133 2.940 4.272 4.132 Bicycle LOS C C E D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.980Volume to Capacity (v/c): DLevel Of Service: 48.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 453304125884472802791175376131117877Total Analysis Volume [veh/h] 1137631221127070294943329419Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 436292120854302692681130362126113374Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 436292120854302692681130362126113374Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 428.74221.18133.1057.65156.95139.61205.18470.65259.7094.71619.8287.6095th-Percentile Queue Length [ft/ln] 17.158.855.322.316.285.588.2118.8310.393.7924.793.5095th-Percentile Queue Length [veh/ln] 289.28128.3073.9432.0387.2077.56116.62323.23151.2252.62432.3048.6750th-Percentile Queue Length [ft/ln] 11.575.132.961.283.493.104.6612.936.052.1017.291.9550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDCDFCFDLane Group LOS 51.3326.6948.6622.4124.2644.2025.2238.9290.6824.1569.9354.03d, Delay for Lane Group [s/veh] 0.930.530.790.170.400.810.490.911.090.261.040.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 20.970.778.480.160.234.542.9311.4950.181.2539.1912.10d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.340.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.3625.9240.1822.2524.0339.6622.2927.4240.5022.8930.7541.94d1, Uniform Delay [s] 48657115850311273465741285346503112899c, Capacity [veh/h] 158918701781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.280.160.070.060.130.080.180.330.110.080.330.04(v / s)_i Volume / Saturation Flow Rate 0.310.310.090.320.320.100.360.360.100.320.320.06g / C, Green / Cycle 27278292993333929295g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.03 69.93 24.15 90.68 38.92 25.22 44.20 24.26 22.41 48.66 26.69 51.33 Movement LOS D F C F D C D C C D C D d_A, Approach Delay [s/veh]64.72 47.46 30.91 42.46 Approach LOS E D C D d_I, Intersection Delay [s/veh]48.69 Intersection LOS D Intersection V/C 0.980 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.131 3.377 2.904 2.838 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.703 3.069 2.232 3.015 Bicycle LOS B C B C ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.596Volume to Capacity (v/c): BLevel Of Service: 16.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 829386478690117112960157135954Total Analysis Volume [veh/h] 20232112212229282153934014Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 788982458286112107957150129952Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 788982458286112107957150129952Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 150.7981.03110.7889.05256.47261.4471.7951.74285.3163.3295th-Percentile Queue Length [ft/ln] 6.033.244.433.5610.2610.462.872.0711.412.5395th-Percentile Queue Length [veh/ln] 83.7745.0261.5549.47154.54158.2739.8828.74176.4035.1850th-Percentile Queue Length [ft/ln] 3.351.802.461.986.186.331.601.157.061.4150th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoYesNoCritical Lane Group CDCDBBEABELane Group LOS 32.3838.1231.0941.1211.9511.8558.157.7612.1355.95d, Delay for Lane Group [s/veh] 0.490.370.360.450.550.550.780.160.620.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.010.960.601.601.951.8715.520.351.3413.29d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 31.3637.1630.4939.5210.009.9842.637.4110.7942.66d1, Uniform Delay [s] 3602343671991116115477977218973c, Capacity [veh/h] 1727125617601209180918701781158935601781s, saturation flow rate [veh/h] 0.100.070.080.070.340.340.030.100.380.03(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.210.620.620.040.620.620.04g / C, Green / Cycle 191919195656455554g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.95 12.13 7.76 58.15 11.90 11.95 41.12 31.09 31.09 38.12 32.38 32.38 Movement LOS E B A E B B D C C D C C d_A, Approach Delay [s/veh]13.20 14.03 35.14 34.27 Approach LOS B B D C d_I, Intersection Delay [s/veh]16.61 Intersection LOS B Intersection V/C 0.596 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.267 3.259 2.126 2.156 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.855 2.637 1.928 1.990 Bicycle LOS C B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.018Volume to Capacity (v/c): BLevel Of Service: 14.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveJacaranda AveName Intersection Setup 000Pedestrian Volume [ped/h] 61312080270Total Analysis Volume [veh/h] 1533020120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 58211076270Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 58211076270Base Volume Input [veh/h] Highland AveHighland AveJacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.15d_I, Intersection Delay [s/veh] AABApproach LOS 0.180.0014.55d_A, Approach Delay [s/veh] 1.111.110.000.001.391.3995th-Percentile Queue Length [ft/ln] 0.040.040.000.000.060.0695th-Percentile Queue Length [veh/ln] AAAABDMovement LOS 0.009.450.000.0014.5530.31d_M, Delay for Movement [s/veh] 0.010.010.000.010.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.012Volume to Capacity (v/c): BLevel Of Service: 11.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.00100.000.000.000.00Exit Pocket Length [ft] 001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 010000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveTokay AveName Intersection Setup 000Pedestrian Volume [ped/h] 62413080970Total Analysis Volume [veh/h] 1563020220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 59312076970Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 59312076970Base Volume Input [veh/h] Highland AveHighland AveTokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.14d_I, Intersection Delay [s/veh] AABApproach LOS 0.190.0011.12d_A, Approach Delay [s/veh] 0.001.220.000.000.890.8995th-Percentile Queue Length [ft/ln] 0.000.050.000.000.040.0495th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.009.500.000.0011.1224.08d_M, Delay for Movement [s/veh] 0.010.020.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.014Volume to Capacity (v/c): BLevel Of Service: 11.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Highland AveHighland AveCherimoya AveName Intersection Setup 000Pedestrian Volume [ped/h] 6370081780Total Analysis Volume [veh/h] 1590020420Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95001.00000.95000.95000.95001.0000Peak Hour Factor 6050077680Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6050077680Base Volume Input [veh/h] Highland AveHighland AveCherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.06d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0011.16d_A, Approach Delay [s/veh] 0.000.000.000.001.030.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.040.0095th-Percentile Queue Length [veh/ln] AAABMovement LOS 0.000.000.000.0011.160.00d_M, Delay for Movement [s/veh] 0.010.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 5: 5 HY PM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\6 HY WP AM.pdf Scenario 6 HY WP AMVistro File: K:\...\Fontana Square AM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B10.30.019NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A10.00.237WB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 C16.70.029SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B14.20.453SB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 C29.40.759NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 C23.20.761SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 C24.30.752WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 B12.50.006SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 D25.30.785NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C26.80.413SB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.413Volume to Capacity (v/c): CLevel Of Service: 26.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 782781036614988593645413443982Total Analysis Volume [veh/h] 1969261737221591133311021Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 74264986314284563465112741778Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66170700072300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 68258816313584563464410441778Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02619026190341103411Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 174.30181.70111.7298.08102.7197.1983.7886.4563.67110.87118.4493.3995th-Percentile Queue Length [ft/ln] 6.977.274.473.924.113.893.353.462.554.434.743.7495th-Percentile Queue Length [veh/ln] 96.83100.9562.0754.4957.0654.0046.5448.0335.3761.5965.8051.8850th-Percentile Queue Length [ft/ln] 3.874.042.482.182.282.161.861.921.412.462.632.0850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDDDAAEAADLane Group LOS 43.9843.0350.1939.5339.0151.609.839.7955.629.739.6653.38d, Delay for Lane Group [s/veh] 0.780.770.780.530.500.770.200.200.730.270.270.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.945.089.292.171.7710.160.450.4312.980.660.6011.63d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 38.0437.9540.9137.3537.2441.449.389.3642.649.079.0541.76d1, Uniform Delay [s] 221239133198220115101710687410141101105c, Capacity [veh/h] 173218701781168218701781178118701781172218701781s, saturation flow rate [veh/h] 0.100.100.060.060.060.050.120.120.030.160.160.05(v / s)_i Volume / Saturation Flow Rate 0.130.130.070.120.120.060.570.570.040.590.590.06g / C, Green / Cycle 11117111165151453535g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.38 9.68 9.73 55.62 9.81 9.83 51.60 39.14 39.53 50.19 43.36 43.98 Movement LOS D A A E A A D D D D D D d_A, Approach Delay [s/veh]15.16 15.00 42.84 45.00 Approach LOS B B D D d_I, Intersection Delay [s/veh]26.78 Intersection LOS C Intersection V/C 0.413 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.610 2.583 2.513 2.534 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]667 667 489 489 d_b, Bicycle Delay [s]20.00 20.00 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 2.100 1.953 1.810 1.938 Bicycle LOS B A A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.785Volume to Capacity (v/c): DLevel Of Service: 25.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 50217652232866154167722197Total Analysis Volume [veh/h] 13144131822154101718049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.91600.9160Peak Hour Factor 46216148229795633861661180Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000070060Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 46216148229795563861655180Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with DIntersection LOS 25.34Intersection Delay [s/veh] CBDDApproach LOS 19.2113.2025.7327.53Approach Delay [s/veh] 71.0418.00139.10146.387.44172.07178.8751.2395th-Percentile Queue Length [ft] 2.840.725.565.860.306.887.152.0595th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.510.200.710.730.090.770.780.42Degree of Utilization, x 446439495483452511503469Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.006Volume to Capacity (v/c): BLevel Of Service: 12.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 4431497013Total Analysis Volume [veh/h] 1108124001Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 4409472013Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 02937000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4380435013Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.05d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0011.77d_A, Approach Delay [s/veh] 0.000.000.000.000.560.5695th-Percentile Queue Length [ft/ln] 0.000.000.000.000.020.0295th-Percentile Queue Length [veh/ln] AAAAABMovement LOS 0.000.000.008.219.6312.48d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.752Volume to Capacity (v/c): CLevel Of Service: 24.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 381134900044872700995565Total Analysis Volume [veh/h] 9508700011218200249141Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor 362133200042669100945537Total Hourly Volume [veh/h] 400000010700000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0030000016001123Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 402130200053367500934514Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000031005221Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 344.33136.82136.79315.20227.68177.22253.4995th-Percentile Queue Length [ft/ln] 13.775.475.4712.619.117.0910.1495th-Percentile Queue Length [veh/ln] 222.1276.0175.99199.41133.0898.46152.3050th-Percentile Queue Length [ft/ln] 8.883.043.047.985.323.946.0950th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesCritical Lane Group DCCCCADLane Group LOS 41.4226.9726.9827.3620.748.7040.43d, Delay for Lane Group [s/veh] 0.880.360.360.680.500.440.89X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.970.460.465.711.200.614.57d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.190.110.110.500.500.500.11k, delay calibration 31.4526.5226.5221.6519.548.0935.86d1, Uniform Delay [s] 43148348365514682279634c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.240.100.100.280.200.280.16(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.410.410.640.18g / C, Green / Cycle 24242437375817g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.43 8.70 0.00 0.00 20.74 27.36 0.00 0.00 0.00 26.98 26.97 41.42 Movement LOS D A C C C C D d_A, Approach Delay [s/veh]20.19 23.26 0.00 34.50 Approach LOS C C A C d_I, Intersection Delay [s/veh]24.25 Intersection LOS C Intersection V/C 0.752 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.263 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 600 0 756 d_b, Bicycle Delay [s]9.80 22.05 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 2.847 2.617 4.132 2.832 Bicycle LOS C B D C ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.761Volume to Capacity (v/c): CLevel Of Service: 23.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0003998340108942864549940Total Analysis Volume [veh/h] 000100211000223721132480Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor 0003797938108492724319440Total Hourly Volume [veh/h] 000420000010800Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0003000046023340Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0003917938108032725169100Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000340056130430Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 262.34261.58261.91116.80143.74427.01388.8095th-Percentile Queue Length [ft/ln] 10.4910.4610.484.675.7517.0815.5595th-Percentile Queue Length [veh/ln] 158.95158.38158.6364.8979.85287.88257.2750th-Percentile Queue Length [ft/ln] 6.366.346.352.603.1911.5210.2950th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoCritical Lane Group DDDADCBLane Group LOS 38.8236.7636.226.1044.7822.8019.12d, Delay for Lane Group [s/veh] 0.830.780.770.360.830.780.71X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 5.303.613.210.415.056.664.11d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.500.50k, delay calibration 33.5233.1533.015.6939.7416.1415.01d1, Uniform Delay [s] 34837839024653469221024c, Capacity [veh/h] 1589172617813560345916841870s, saturation flow rate [veh/h] 0.180.170.170.250.080.430.39(v / s)_i Volume / Saturation Flow Rate 0.220.220.220.690.100.550.55g / C, Green / Cycle 2020206294949g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 20.12 22.80 44.78 6.10 0.00 36.37 36.76 38.27 0.00 0.00 0.00 Movement LOS C C D A D D D d_A, Approach Delay [s/veh]20.96 15.48 37.25 0.00 Approach LOS C B D A d_I, Intersection Delay [s/veh]23.21 Intersection LOS C Intersection V/C 0.761 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.418 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 1156 667 0 d_b, Bicycle Delay [s]14.45 8.02 20.00 45.00 I_b,int, Bicycle LOS Score for Intersection 2.843 2.533 3.086 4.132 Bicycle LOS C B C D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.759Volume to Capacity (v/c): CLevel Of Service: 29.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 246197528121436426882530195985107Total Analysis Volume [veh/h] 62491320539167206752424627Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 234187497720334625578428690936102Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242016-12-4-2-2022Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 016017115776000023Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 23417149481882691637962909295657Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03314033140331402910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 231.6080.1959.0259.3378.26197.33156.40235.75148.8153.36313.01131.6495th-Percentile Queue Length [ft/ln] 9.263.212.362.373.137.896.269.435.952.1312.525.2795th-Percentile Queue Length [veh/ln] 135.9844.5532.7932.9643.48110.9586.89139.0682.6729.65197.7173.1350th-Percentile Queue Length [ft/ln] 5.441.781.311.321.744.443.485.563.311.197.912.9350th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCDBBDBCELane Group LOS 42.0132.0052.8726.7726.9151.7917.1518.1343.4416.5623.2462.17d, Delay for Lane Group [s/veh] 0.840.300.690.200.240.950.370.500.810.140.660.90X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.530.2610.380.250.1412.051.411.104.190.452.2920.46d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 35.4831.7542.4926.5226.7839.7415.7417.0339.2516.1120.9441.71d1, Uniform Delay [s] 2926547640189838473216413726671495119c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.150.060.030.050.060.110.170.230.090.060.280.06(v / s)_i Volume / Saturation Flow Rate 0.180.180.040.250.250.110.460.460.110.420.420.07g / C, Green / Cycle 1616423231042421038386g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]62.17 23.24 16.56 43.44 18.13 17.15 51.79 26.91 26.77 52.87 32.00 42.01 Movement LOS E C B D B B D C C D C D d_A, Approach Delay [s/veh]26.21 23.41 40.63 39.17 Approach LOS C C D D d_I, Intersection Delay [s/veh]29.43 Intersection LOS C Intersection V/C 0.759 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.977 3.220 2.952 2.724 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 644 644 644 d_b, Bicycle Delay [s]23.47 20.67 20.67 20.67 I_b,int, Bicycle LOS Score for Intersection 2.539 2.710 2.103 1.968 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.453Volume to Capacity (v/c): BLevel Of Service: 14.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 595236385911455766629895717Total Analysis Volume [veh/h] 15139915281419216242394Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 564934365610852728599390916Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 70000001160160Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 494934365610852717539389316Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 030003000284101932Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 93.4132.3280.64112.53131.60134.4471.9929.58178.4220.5295th-Percentile Queue Length [ft/ln] 3.741.293.234.505.265.382.881.187.140.8295th-Percentile Queue Length [veh/ln] 51.9017.9644.8062.5273.1174.6940.0016.4499.1211.4050th-Percentile Queue Length [ft/ln] 2.080.721.792.502.922.991.600.663.960.4650th-Percentile Queue Length [veh/ln] NoNoNoYesNoNoYesNoYesNoCritical Lane Group CDCDAAEAADLane Group LOS 31.8036.0731.3640.737.777.7655.406.919.2253.50d, Delay for Lane Group [s/veh] 0.330.150.280.510.340.340.750.100.430.48X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.580.290.451.790.780.7612.990.200.619.84d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 31.2235.7830.9038.947.007.0042.426.718.6143.65d1, Uniform Delay [s] 3332373402241191122082995222835c, Capacity [veh/h] 1710129817491282182618701781158935601781s, saturation flow rate [veh/h] 0.060.030.060.090.220.220.030.060.270.01(v / s)_i Volume / Saturation Flow Rate 0.190.190.190.190.650.650.050.630.630.02g / C, Green / Cycle 171717175959456562g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]53.50 9.22 6.91 55.40 7.76 7.77 40.73 31.36 31.36 36.07 31.80 31.80 Movement LOS D A A E A A D C C D C C d_A, Approach Delay [s/veh]9.71 11.11 36.42 32.85 Approach LOS A B D C d_I, Intersection Delay [s/veh]14.15 Intersection LOS B Intersection V/C 0.453 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.972 3.052 2.069 2.080 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]333 533 578 578 d_b, Bicycle Delay [s]31.25 24.20 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.444 2.288 1.908 1.802 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.029Volume to Capacity (v/c): CLevel Of Service: 16.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 214313049464091200Total Analysis Volume [veh/h] 5108101232102300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 204093046964091100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 202500316409000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 03843043800001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.39d_I, Intersection Delay [s/veh] AABAApproach LOS 0.060.1014.669.86d_A, Approach Delay [s/veh] 0.000.110.210.000.000.412.612.612.611.211.211.2195th-Percentile Queue Length [ft/ln] 0.000.000.010.000.000.020.100.100.100.050.050.0595th-Percentile Queue Length [veh/ln] AAAAAAACCACCMovement LOS 0.000.008.390.000.008.289.9619.4316.749.8619.3916.77d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.010.010.000.030.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.237Volume to Capacity (v/c): ALevel Of Service: 10.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4744440482331101181200Total Analysis Volume [veh/h] 121111012183029300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 4542240458311001121100Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000036000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 45350093110076000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 03874044900001100Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001700140Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 032270201504300430Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 45.7046.666.7036.7836.7837.9110.14121.7110.9995th-Percentile Queue Length [ft/ln] 1.831.870.271.471.471.520.414.870.4495th-Percentile Queue Length [veh/ln] 25.3925.923.7220.4320.4321.065.6367.626.1150th-Percentile Queue Length [ft/ln] 1.021.040.150.820.820.840.232.700.2450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoYesNoCritical Lane Group AAEAADDDDLane Group LOS 4.154.1466.843.403.4052.5536.2742.3536.24d, Delay for Lane Group [s/veh] 0.180.180.390.170.170.590.060.610.06X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.310.3022.260.260.269.530.163.110.11d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.110.11k, delay calibration 3.853.8444.583.143.1443.0236.1139.2536.13d1, Uniform Delay [s] 13161361101409140956171193211c, Capacity [veh/h] 180818701781187018701781158914021589s, saturation flow rate [veh/h] 0.130.130.000.130.130.020.010.080.01(v / s)_i Volume / Saturation Flow Rate 0.730.730.010.750.750.030.110.110.11g / C, Green / Cycle 6666068683101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.24 36.24 36.24 42.35 36.27 36.27 52.55 3.40 3.40 66.84 4.14 4.15 Movement LOS D D D D D D D A A E A A d_A, Approach Delay [s/veh]36.24 41.84 6.55 4.65 Approach LOS D D A A d_I, Intersection Delay [s/veh]10.00 Intersection LOS A Intersection V/C 0.237 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 1.723 1.998 2.691 2.793 Crosswalk LOS A A B C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 867 356 622 d_b, Bicycle Delay [s]14.45 14.45 30.42 21.36 I_b,int, Bicycle LOS Score for Intersection 1.579 1.772 1.984 1.968 Bicycle LOS A A A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.019Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 9348000612016001300Total Analysis Volume [veh/h] 23120001530400300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 8845600581015001200Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 38000360000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 5065008501500000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 03910046000001200Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.24d_I, Intersection Delay [s/veh] AABBApproach LOS 0.000.0010.1910.32d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.730.000.001.440.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.070.000.000.060.000.0095th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.000.000.000.0010.190.000.0010.320.000.00d_M, Delay for Movement [s/veh] 0.000.000.000.000.010.000.020.000.000.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP AM Fontana Square Project Version 2021 (SP 0-6) Generated with Intersection Analysis Summary 12/6/2021Report File: K:\...\6 HY WP PM.pdf Scenario 6 HY WP PMVistro File: K:\...\Fontana Square PM.vistro Fontana Square Project V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B11.80.015NB RightHCM 6th EditionTwo-way stopDriveway 3/Cherimoya Ave at Highland Ave10 A8.60.313WB LeftHCM 6th EditionSignalizedDriveway 2/Tokay Ave at Highland Ave9 D29.90.123SB LeftHCM 6th EditionTwo-way stopDriveway 1/Jacaranda Ave at Highland Ave8 B17.20.609SB LeftHCM 6th EditionSignalizedCitrus Ave at Walnut St7 D50.51.000NB LeftHCM 6th EditionSignalizedCitrus Ave at Highland Ave6 E66.51.057SB LeftHCM 6th EditionSignalizedCitrus Ave at SR-210 EB Ramps5 D36.60.925WB RightHCM 6th EditionSignalizedCitrus Ave at SR-210 WB Ramps4 C16.10.038SB LeftHCM 6th EditionTwo-way stopCatawba Ave at Highland Ave3 D25.70.816NB ThruHCM 6th EditionAll-way stopBeech Ave at SR-210 HOV Ramps2 C31.50.717WB LeftHCM 6th EditionSignalizedBeech Ave at Highland Ave1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.717Volume to Capacity (v/c): CLevel Of Service: 31.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Beech Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0040.0040.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveBeech AveBeech AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1132751841674611239558013420963374Total Analysis Volume [veh/h] 286946421153124145335215819Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.97100.9710Peak Hour Factor 1102671791624481199256313020361572Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 66190600062000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1042611601624421199256312418361572Base Volume Input [veh/h] Highland AveHighland AveBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170017001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 02614038260261202612Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 151.70164.36208.46266.13283.68129.73201.46208.57149.71269.96287.7785.1895th-Percentile Queue Length [ft/ln] 6.076.578.3410.6511.355.198.068.345.9910.8011.513.4195th-Percentile Queue Length [veh/ln] 84.2891.31119.00161.82175.1672.07113.94119.0983.17164.72178.2847.3250th-Percentile Queue Length [ft/ln] 3.373.654.766.477.012.884.564.763.336.597.131.8950th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesYesNoNoCritical Lane Group CCEDDDBBDCCDLane Group LOS 30.9230.7456.6039.9239.2847.8518.3218.2351.9923.4523.1754.16d, Delay for Lane Group [s/veh] 0.480.470.930.850.840.770.410.410.850.570.570.77X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.920.8016.955.655.047.761.571.4911.603.273.0012.14d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.0029.9439.6534.2834.2440.0916.7516.7440.3920.1820.1842.02d1, Uniform Delay [s] 38843019835438915979984015871077596c, Capacity [veh/h] 168918701781170318701781177918701781171318701781s, saturation flow rate [veh/h] 0.110.110.100.180.180.070.190.180.080.240.230.04(v / s)_i Volume / Saturation Flow Rate 0.230.230.110.210.210.090.450.450.090.410.410.05g / C, Green / Cycle 212110191984040837375g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] CCLCCLCCLCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.16 23.26 23.45 51.99 18.27 18.32 47.85 39.47 39.92 56.60 30.79 30.92 Movement LOS D C C D B B D D D E C C d_A, Approach Delay [s/veh]25.80 23.86 40.94 39.12 Approach LOS C C D D d_I, Intersection Delay [s/veh]31.51 Intersection LOS C Intersection V/C 0.717 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 2.782 2.738 2.651 2.704 Crosswalk LOS C B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 756 489 d_b, Bicycle Delay [s]25.69 25.69 17.42 25.69 I_b,int, Bicycle LOS Score for Intersection 2.315 2.227 2.179 2.032 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.816Volume to Capacity (v/c): DLevel Of Service: 25.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Beech Ave at SR-210 HOV Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0040.0040.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Intersection Setup 0000Pedestrian Volume [ped/h] 5647413118149364997483694115Total Analysis Volume [veh/h] 14119335379125192117329Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.94400.9440Peak Hour Factor 5347012417141344717078655109Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000060060Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5347012417141344657078649109Base Volume Input [veh/h] SR-210 HOV RampsSR-210 HOV RampsBeech AveBeech AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with DIntersection LOS 25.71Intersection Delay [s/veh] BCCDApproach LOS 14.8123.6220.0131.95Approach Delay [s/veh] 32.00110.8090.1992.2815.49185.49194.3525.4695th-Percentile Queue Length [ft] 1.284.433.613.690.627.427.771.0295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.310.640.580.590.170.800.820.26Degree of Utilization, x 438464461455428486476446Capacity per Entry Lane [veh/h] Lanes Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.038Volume to Capacity (v/c): CLevel Of Service: 16.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Catawba Ave at Highland Ave Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 45.0045.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Highland AveHighland AveCatawba AveName Intersection Setup 000Pedestrian Volume [ped/h] 1663282316813Total Analysis Volume [veh/h] 4158206423Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 1560078215812Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 03132000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1556975015812Base Volume Input [veh/h] Highland AveHighland AveCatawba AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with CIntersection LOS 0.29d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.1714.07d_A, Approach Delay [s/veh] 0.000.000.001.313.953.9595th-Percentile Queue Length [ft/ln] 0.000.000.000.050.160.1695th-Percentile Queue Length [veh/ln] AAAABCMovement LOS 0.000.000.008.9210.8116.07d_M, Delay for Movement [s/veh] 0.000.010.010.020.010.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 001Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.925Volume to Capacity (v/c): DLevel Of Service: 36.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Citrus Ave at SR-210 WB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000100001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 58916670004631039001682518Total Analysis Volume [veh/h] 147016700011626000421129Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor 5601634000440987001598492Total Hourly Volume [veh/h] 620000011000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0027000014001324Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6221607000550973001585468Base Volume Input [veh/h] SR-210 WB RampsSR-210 WB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.00.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.00.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01000000700100Pedestrian Clearance [s] 050000050050Walk [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Vehicle Extension [s] 0380000032005220Split [s] 0.01.00.00.00.00.00.01.00.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.00.00.03.03.0Amber [s] 0300000030003030Maximum Green [s] 010000001000105Minimum Green [s] -----------LeadLead / Lag Auxiliary Signal Groups 040000020061Signal Group SplitSplitSplitPermissPermissPermissPermissPermissPermissPermissPermissProtecteControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 590.80227.40227.41448.18441.67522.71236.0995th-Percentile Queue Length [ft/ln] 23.639.109.1017.9317.6720.919.4495th-Percentile Queue Length [veh/ln] 422.29132.88132.89304.98299.71365.87139.3150th-Percentile Queue Length [ft/ln] 16.895.325.3212.2011.9914.635.5750th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoCritical Lane Group ECCDDCDLane Group LOS 57.8622.0122.0153.8042.9925.1040.49d, Delay for Lane Group [s/veh] 0.980.500.500.920.920.890.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 30.180.570.5724.2013.366.524.17d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.440.110.110.500.500.500.11k, delay calibration 27.6821.4421.4429.6029.6218.5836.31d1, Uniform Delay [s] 60067367350411291899594c, Capacity [veh/h] 1589178117811589356035603459s, saturation flow rate [veh/h] 0.370.190.190.290.290.470.15(v / s)_i Volume / Saturation Flow Rate 0.380.380.380.320.320.530.17g / C, Green / Cycle 34343429294815g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLRCCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]40.49 25.10 0.00 0.00 42.99 53.80 0.00 0.00 0.00 22.01 22.01 57.86 Movement LOS D C D D C C E d_A, Approach Delay [s/veh]28.72 46.32 0.00 38.81 Approach LOS C D A D d_I, Intersection Delay [s/veh]36.61 Intersection LOS D Intersection V/C 0.925 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.249 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1067 622 0 756 d_b, Bicycle Delay [s]9.80 21.36 45.00 17.42 I_b,int, Bicycle LOS Score for Intersection 3.375 2.890 4.132 3.736 Bicycle LOS C C D D ----------------Ring 4 ----------------Ring 3 --------------6-Ring 2 -------------421Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 1.057Volume to Capacity (v/c): ELevel Of Service: 66.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 5: Citrus Ave at SR-210 EB Ramps Intersection Level Of Service Report NoYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0045.0045.00Speed [mph] 49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000101001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0004622978000134936744414220Total Analysis Volume [veh/h] 000116742000337921113560Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor 0004392827600128234942213510Total Hourly Volume [veh/h] 0001100000010600Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0002700041025370Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0005222827600124134950313140Base Volume Input [veh/h] SR-210 EB RampsSR-210 EB RampsCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.00.00.00.02.00.00.02.02.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.02.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000010001400100Pedestrian Clearance [s] 000050050050Walk [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Vehicle Extension [s] 0000280062120500Split [s] 0.00.00.00.01.00.00.01.01.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.03.00.03.00.0Amber [s] 0000300030300300Maximum Green [s] 000010001050100Minimum Green [s] --------Lead---Lead / Lag Auxiliary Signal Groups 000080025060Signal Group PermissPermissPermissSplitSplitSplitPermissPermissProtectePermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 606.83874.87669.91254.96310.12931.21755.9495th-Percentile Queue Length [ft/ln] 24.2734.9926.8010.2012.4037.2530.2495th-Percentile Queue Length [veh/ln] 411.02594.36459.63153.40181.80677.50561.6250th-Percentile Queue Length [ft/ln] 16.4423.7718.396.147.2727.1022.4650th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoCritical Lane Group FFFBFFDLane Group LOS 96.80132.9696.5210.27135.4068.9045.36d, Delay for Lane Group [s/veh] 1.091.191.090.591.191.060.98X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 63.8099.9663.521.1194.4046.9023.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.360.410.360.500.110.500.50k, delay calibration 33.0033.0033.009.1641.0022.0021.47d1, Uniform Delay [s] 4244874752295307882956c, Capacity [veh/h] 1589182617813560345917251870s, saturation flow rate [veh/h] 0.290.320.290.380.110.540.50(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.090.510.51g / C, Green / Cycle 2424245884646g_i, Effective Green Time [s] 2.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090C, Cycle Length [s] RCLCLCCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 53.46 68.90 135.40 10.27 0.00 108.82 132.96 96.80 0.00 0.00 0.00 Movement LOS D E F B F F F d_A, Approach Delay [s/veh]57.13 37.03 110.10 0.00 Approach LOS E D F A d_I, Intersection Delay [s/veh]66.48 Intersection LOS E Intersection V/C 1.057 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 9.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 36.45 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.696 0.000 Crosswalk LOS F F B F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1022 1289 533 0 d_b, Bicycle Delay [s]10.76 5.69 24.20 45.00 I_b,int, Bicycle LOS Score for Intersection 3.187 2.975 4.313 4.132 Bicycle LOS C C E D ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8-2-Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 1.000Volume to Capacity (v/c): DLevel Of Service: 50.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: Citrus Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0045.0045.00Speed [mph] 0.000.000.0049.210.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 45331812512146536636811613711281155124Total Analysis Volume [veh/h] 1138031301169192290933228931Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.96200.9620Peak Hour Factor 43630612011644735235411173571231111119Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0001242118-13-5-3-2225Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 014019136268000020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 436292120854302692681130362126113374Base Volume Input [veh/h] Highland AveHighland AveCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0240021002400170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 03316030130341303110Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 428.77109.42133.1081.15164.26239.99283.85481.40249.6492.30583.01188.0795th-Percentile Queue Length [ft/ln] 17.154.385.323.256.579.6011.3519.269.993.6923.327.5295th-Percentile Queue Length [veh/ln] 289.3060.7973.9445.0891.26138.63175.29331.99144.7851.28408.40104.4950th-Percentile Queue Length [ft/ln] 11.572.432.961.803.655.557.0113.285.792.0516.344.1850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group DCDCCFCDFCFFLane Group LOS 51.3323.9848.6622.9924.4180.2030.8141.8185.3224.0663.8392.48d, Delay for Lane Group [s/veh] 0.930.290.790.240.411.060.660.931.070.251.021.04X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 20.970.158.480.240.2439.706.0713.6144.821.2133.0850.48d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.340.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.3623.8440.1822.7524.1740.5024.7328.2040.5022.8530.7542.00d1, Uniform Delay [s] 4861088158503112734655612463465031128119c, Capacity [veh/h] 158935601781158935603459158935603459158935601781s, saturation flow rate [veh/h] 0.280.090.070.080.130.110.230.330.110.080.320.07(v / s)_i Volume / Saturation Flow Rate 0.310.310.090.320.320.100.350.350.100.320.320.07g / C, Green / Cycle 27278292993232929296g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090909090C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]92.48 63.83 24.06 85.32 41.81 30.81 80.20 24.41 22.99 48.66 23.98 51.33 Movement LOS F F C F D C F C C D C D d_A, Approach Delay [s/veh]62.74 48.18 45.68 41.25 Approach LOS E D D D d_I, Intersection Delay [s/veh]50.49 Intersection LOS D Intersection V/C 1.000 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.140 3.405 3.049 2.908 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]600 667 578 644 d_b, Bicycle Delay [s]22.05 20.00 22.76 20.67 I_b,int, Bicycle LOS Score for Intersection 2.720 3.127 2.345 2.299 Bicycle LOS B C B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.609Volume to Capacity (v/c): BLevel Of Service: 17.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 7: Citrus Ave at Walnut St Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 35.0035.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Walnut StWalnut StCitrus AveCitrus AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 889386478690117114266157137354Total Analysis Volume [veh/h] 22232112212229286163934314Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 848982458286112109263150131352Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 60000001360140Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 788982458286112107957150129952Base Volume Input [veh/h] Walnut StWalnut StCitrus AveCitrus AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0170021001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 03000300019905141Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 154.2580.72109.0889.35268.69273.6977.4254.58302.7862.1195th-Percentile Queue Length [ft/ln] 6.173.234.363.5710.7510.953.102.1812.112.4895th-Percentile Queue Length [veh/ln] 85.6944.8460.6049.64163.76167.5543.0130.32189.8134.5150th-Percentile Queue Length [ft/ln] 3.431.792.421.996.556.701.721.217.591.3850th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoYesNoCritical Lane Group CDCDBBEABDLane Group LOS 31.8338.0030.4141.4512.6612.5556.528.2613.0654.16d, Delay for Lane Group [s/veh] 0.480.360.350.460.560.560.780.160.640.71X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.980.940.541.692.102.0114.130.371.4811.62d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 30.8537.0529.8639.7610.5610.5442.397.9011.5842.54d1, Uniform Delay [s] 3732363821951099113685957214576c, Capacity [veh/h] 1722125617601203181018701781158935601781s, saturation flow rate [veh/h] 0.110.070.080.070.340.340.040.100.390.03(v / s)_i Volume / Saturation Flow Rate 0.220.220.220.220.610.610.050.600.600.04g / C, Green / Cycle 202020205555454544g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Cycle Length [s] CLCLCCLRCLLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.16 13.06 8.26 56.52 12.60 12.66 41.45 30.41 30.41 38.00 31.83 31.83 Movement LOS D B A E B B D C C D C C d_A, Approach Delay [s/veh]13.99 14.79 34.86 33.81 Approach LOS B B C C d_I, Intersection Delay [s/veh]17.23 Intersection LOS B Intersection V/C 0.609 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 3.274 3.271 2.126 2.160 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1044 333 578 578 d_b, Bicycle Delay [s]10.27 31.25 22.76 22.76 I_b,int, Bicycle LOS Score for Intersection 2.866 2.653 1.928 2.000 Bicycle LOS C B A B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.123Volume to Capacity (v/c): DLevel Of Service: 29.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 8: Driveway 1/Jacaranda Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 1Jacaranda AveName Intersection Setup 0000Pedestrian Volume [ped/h] 1863912083156020700Total Analysis Volume [veh/h] 4160302081205200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 1760711078956019700Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1725002756019000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 05821107620000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 1Jacaranda AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with DIntersection LOS 0.60d_I, Intersection Delay [s/veh] AADBApproach LOS 0.170.0526.0611.22d_A, Approach Delay [s/veh] 0.000.571.150.000.000.4111.1811.1811.180.910.910.9195th-Percentile Queue Length [ft/ln] 0.000.020.050.000.000.020.450.450.450.040.040.0495th-Percentile Queue Length [veh/ln] AAAAAABEDBEDMovement LOS 0.000.009.590.000.008.9113.1638.8129.9311.2236.5230.68d_M, Delay for Movement [s/veh] 0.000.010.020.000.010.010.010.000.120.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.313Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 9: Driveway 2/Tokay Ave at Highland Ave Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 2Tokay AveName Intersection Setup Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 5365313082928160118700Total Analysis Volume [veh/h] 131633020774029200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.95000.9500Peak Hour Factor 5062012078827150112700Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 0000000037000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 502700192715075000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 05931207690000700Base Volume Input [veh/h] Highland AveHighland AveDriveway 2Tokay AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010007001700140Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 019450194502600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 030300303003000300Maximum Green [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 061025040080Signal Group PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Semi-actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 69.3370.8116.1977.8077.8032.1314.80121.336.3995th-Percentile Queue Length [ft/ln] 2.772.830.653.113.111.290.594.850.2695th-Percentile Queue Length [veh/ln] 38.5139.349.0043.2243.2217.858.2267.403.5550th-Percentile Queue Length [ft/ln] 1.541.570.361.731.730.710.332.700.1450th-Percentile Queue Length [veh/ln] NoNoYesNoYesNoNoYesNoCritical Lane Group AADAADDDDLane Group LOS 4.534.5154.344.374.3751.8636.4542.1636.07d, Delay for Lane Group [s/veh] 0.260.260.450.300.300.550.090.600.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.480.4710.470.550.558.740.242.950.06d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.500.500.110.500.500.110.110.110.11k, delay calibration 4.054.0443.873.823.8243.1236.2139.2136.01d1, Uniform Delay [s] 13301366291389138951171196211c, Capacity [veh/h] 182118701781187018701781158914081589s, saturation flow rate [veh/h] 0.190.190.010.220.220.020.010.080.00(v / s)_i Volume / Saturation Flow Rate 0.730.730.020.740.740.030.110.110.11g / C, Green / Cycle 6666167673101010g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLCCLCLCLane Group Lane Group Calculations Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]36.07 36.07 36.07 42.16 36.45 36.45 51.86 4.37 4.37 54.34 4.52 4.53 Movement LOS D D D D D D D A A D A A d_A, Approach Delay [s/veh]36.07 41.48 5.92 5.42 Approach LOS D D A A d_I, Intersection Delay [s/veh]8.61 Intersection LOS A Intersection V/C 0.313 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 1.724 2.000 2.826 2.959 Crosswalk LOS A A C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 489 333 333 d_b, Bicycle Delay [s]25.69 25.69 31.25 31.25 I_b,int, Bicycle LOS Score for Intersection 1.571 1.781 2.267 2.153 Bicycle LOS A A B B ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with 0.015Volume to Capacity (v/c): BLevel Of Service: 11.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 10: Driveway 3/Cherimoya Ave at Highland Ave Intersection Level Of Service Report NoNoYesYesCrosswalk 0.000.000.000.00Grade [%] 45.0045.0025.0025.00Speed [mph] 0.000.000.00100.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000100000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Highland AveHighland AveDriveway 3Cherimoya AveName Intersection Setup 0000Pedestrian Volume [ped/h] 827070095501100800Total Analysis Volume [veh/h] 21177002390300200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95001.00000.95000.95001.00000.95001.00001.00000.95001.00001.0000Peak Hour Factor 786720090701000800Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 43000370000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3567009401000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0605007760000800Base Volume Input [veh/h] Highland AveHighland AveDriveway 3Cherimoya AveName Volumes Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with BIntersection LOS 0.12d_I, Intersection Delay [s/veh] AABBApproach LOS 0.000.0011.0611.84d_A, Approach Delay [s/veh] 0.000.000.000.000.000.001.390.000.001.140.000.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.000.000.060.000.000.050.000.0095th-Percentile Queue Length [veh/ln] AAAABBMovement LOS 0.000.000.000.000.000.0011.060.000.0011.840.000.00d_M, Delay for Movement [s/veh] 0.000.010.000.000.010.000.020.000.000.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane FreeFreeStopStopPriority Scheme Intersection Settings Kimley-Horn and Associates, Inc. Scenario 6: 6 HY WP PM Fontana Square Project Version 2021 (SP 0-6) Generated with APPENDIX D INTERNAL CAPTURE WORKSHEETS Project Name:Organization: Project Location:Performed By: Scenario Description:Date: Analysis Year:Checked By: Analysis Period:Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 0 Retail 0 Restaurant 228 119 109 Cinema/Entertainment 0 Residential 0 Hotel 118 69 49 All Other Land Uses2 0 346 188 158 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office Retail Restaurant Cinema/Entertainment Residential Hotel All Other Land Uses2 Office Retail Restaurant Residential Hotel Office Retail Restaurant Cinema/Entertainment Residential Hotel Office Retail Restaurant Residential Hotel Office 0 0 0 0 Retail 0 0 0 0 Restaurant 0 0 0 3 Cinema/Entertainment 0 0 0 0 0 Residential 0 0 0 0 Hotel 0 0 4 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 346 188 158 Office N/A N/A Internal Capture Percentage 4%4%4%Retail N/A N/A Restaurant 3%3% External Vehicle-Trips5 332 181 151 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential N/A N/A External Non-Motorized Trips6 0 0 0 Hotel 4%8% NCHRP 684 Internal Trip Capture Estimation Tool Table 1-A: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) 0 0 Cinema/Entertainment Development Data (For Information Only) 0 0 0 Estimated Vehicle-Trips3Land Use Fontana Square Table 2-A: Mode Split and Vehicle Occupancy Estimates Table 4-A: Internal Person-Trip Origin-Destination Matrix* Destination (To)Origin (From) Origin (From)Destination (To) Cinema/Entertainment Land Use Entering Trips Exiting Trips Table 3-A: Average Land Use Interchange Distances (Feet Walking Distance) Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 Table 5-A: Computations Summary Table 6-A: Internal Trip Capture Percentages by Land Use 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A. 1Land Use Codes (LUCs) from Trip Generation Manual, published by the Institute of Transportation Engineers. 6Person-Trips *Indicates computation that has been rounded to the nearest whole number. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual). 4Enter vehicle occupancy assumed in Table 1-A vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made to Tables 5-A, 9-A (O and D). Enter transit, non-motorized percentages that will result with proposed mixed-use project complete. NWC of Citrus/Highland in Fontana AM Street Peak Hour JMC 4/8/2021 Project Name:Organization: Project Location:Performed By: Scenario Description:Date: Analysis Year:Checked By: Analysis Period:Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 0 Retail 0 Restaurant 200 100 100 Cinema/Entertainment 0 Residential 0 Hotel 200 100 100 All Other Land Uses2 0 400 200 200 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office Retail Restaurant Cinema/Entertainment Residential Hotel All Other Land Uses2 Office Retail Restaurant Residential Hotel Office Retail Restaurant Cinema/Entertainment Residential Hotel Office Retail Restaurant Residential Hotel Office 0 0 0 0 Retail 0 0 0 0 Restaurant 0 0 0 7 Cinema/Entertainment 0 0 0 0 0 Residential 0 0 0 0 Hotel 0 0 5 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 400 200 200 Office N/A N/A Internal Capture Percentage 6%6%6%Retail N/A N/A Restaurant 5%7% External Vehicle-Trips5 376 188 188 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential N/A N/A External Non-Motorized Trips6 0 0 0 Hotel 7%5% *Indicates computation that has been rounded to the nearest whole number. Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 PM Street Peak Hour Table 1-P: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) Land Use Development Data (For Information Only)Estimated Vehicle-Trips3 Table 2-P: Mode Split and Vehicle Occupancy Estimates Land Use Entering Trips Exiting Trips NCHRP 684 Internal Trip Capture Estimation Tool Table 3-P: Average Land Use Interchange Distances (Feet Walking Distance) Origin (From)Destination (To) Cinema/Entertainment Table 4-P: Internal Person-Trip Origin-Destination Matrix* Origin (From)Destination (To) Cinema/Entertainment 0 0 0 0 0 Table 5-P: Computations Summary Table 6-P: Internal Trip Capture Percentages by Land Use 4Enter vehicle occupancy assumed in Table 1-P vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be 6Person-Trips 1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual). 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P. APPENDIX E CUMULATIVE PROJECTS INFORMATION Enter only in blue cells Int. #:1 Mirror distribution?Y Entire Intersection TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Mirror distribution?AM In 10 2 4 4 0 9 0 0 0 0 7 0 AM Out 0 0 0 0 7 0 26 22 31 2 0 2 AM Tot 10 2 4 4 7 9 26 22 31 2 7 2 PM In 33 7 8 8 0 29 0 0 0 0 24 0 PM Out 0 0 0 0 4 0 17 14 20 10 0 10 PM Tot 33 7 8 8 4 29 17 14 20 10 24 10 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 5%AM In 19 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%5%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 3 0 0 0 0 0 0 0 PM In 0%5%0%0%0%0%0%0%0%0%0%PM In 63 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%5%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 2 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 13 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 4 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 37 0 4 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 2 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Beech Avenue at S. Highland Avenue Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int1 10/5/2021, 9:33 AM Int. #:1 Beech Avenue at S. Highland Avenue Zone #5 Mango Avenue Industrial Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 35%30%25%AM In 29 10 0 0 0 0 9 0 0 0 0 7 0 Y 0%0%0%0%0%0%30%25%35%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 26 22 31 0 0 0 PM In 35%0%0%0%0%30%0%0%0%0%25%0%PM In 95 33 0 0 0 0 29 0 0 0 0 24 0 PM Out 0%0%0%0%0%0%30%25%35%0%0%0%PM Out 56 0 0 0 0 0 0 17 14 20 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int1 10/5/2021, 9:33 AM Int. #:1 Beech Avenue at S. Highland Avenue Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 23 0 0 2 2 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%10%0%10% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 1 0 1 PM In 0%0%10%10%0%0%0%0%0%0%0%0%PM In 73 0 0 7 7 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%10%0%10%PM Out 79 0 0 0 0 0 0 0 0 0 8 0 8 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 5%5%AM In 36 0 0 2 2 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%5%0%5% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 1 0 1 PM In 0%0%5%5%0%0%0%0%0%0%0%0%PM In 25 0 0 1 1 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%5%0%5%PM Out 38 0 0 0 0 0 0 0 0 0 2 0 2 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int1 10/5/2021, 9:33 AM Int. #:1 Beech Avenue at S. Highland Avenue Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int1 10/5/2021, 9:33 AM Int. #:1 Beech Avenue at S. Highland Avenue Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int1 10/5/2021, 9:33 AM Enter only in blue cells Int. #:2 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 2 0 0 7 0 0 0 0 0 0 0 AM Out 0 11 0 0 7 0 0 0 0 0 0 0 AM Tot 0 13 0 0 14 0 0 0 0 0 0 0 PM In 0 7 0 0 18 0 0 0 0 0 0 0 PM Out 0 16 0 0 4 0 0 0 0 0 0 0 PM Tot 0 23 0 0 22 0 0 0 0 0 0 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 5%AM In 19 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%5%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 3 0 0 0 0 0 0 0 PM In 0%5%0%0%0%0%0%0%0%0%0%PM In 63 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%5%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 2 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 13 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 4 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 37 0 4 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 2 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Beech Avenue at I-210 HOV Ramps Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 2 10/5/2021, 9:33 AM Int. #:2 Beech Avenue at I-210 HOV Ramps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 29 0 0 0 0 3 0 0 0 0 0 0 0 Y 0%10%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 88 0 9 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%0%0%0%0%PM In 95 0 0 0 0 10 0 0 0 0 0 0 0 PM Out 0%10%0%0%0%0%0%0%0%0%0%0%PM Out 56 0 6 0 0 0 0 0 0 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 23 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%10%0%0%0%0%0%0%0%0%0%0% Related Projects Trip Distribution_AJC.xlsx, Int 2 10/5/2021, 9:33 AM Int. #:2 Beech Avenue at I-210 HOV Ramps AM Out AM Out 14 0 1 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%0%0%0%0%PM In 73 0 0 0 0 7 0 0 0 0 0 0 0 PM Out 0%10%0%0%0%0%0%0%0%0%0%0%PM Out 79 0 8 0 0 0 0 0 0 0 0 0 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 5%AM In 36 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%5%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 13 0 1 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%5%0%0%0%0%0%0%0%PM In 25 0 0 0 0 1 0 0 0 0 0 0 0 PM Out 0%5%0%0%0%0%0%0%0%0%0%0%PM Out 38 0 2 0 0 0 0 0 0 0 0 0 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 2 10/5/2021, 9:33 AM Int. #:2 Beech Avenue at I-210 HOV Ramps Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 2 10/5/2021, 9:33 AM Int. #:3 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 0 0 0 0 0 0 9 0 0 12 0 AM Out 0 0 0 0 0 0 0 35 0 0 4 0 AM Tot 0 0 0 0 0 0 0 44 0 0 16 0 PM In 0 0 0 0 0 0 0 18 0 0 38 0 PM Out 0 0 0 0 0 0 0 22 0 0 20 0 PM Tot 0 0 0 0 0 0 0 40 0 0 58 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 19 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%PM In 63 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 13 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 37 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 0 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Catawba Avenue at S. Highland Avenue Related Projects Trip Distribution_AJC.xlsx, Int 3 10/5/2021, 9:33 AM Int. #:3 Catawba Avenue at S. Highland Avenue Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 29 0 0 0 0 0 0 0 0 0 0 12 0 Y 0%0%0%0%0%0%0%40%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 0 35 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%40%0%PM In 95 0 0 0 0 0 0 0 0 0 0 38 0 PM Out 0%0%0%0%0%0%0%40%0%0%0%0%PM Out 56 0 0 0 0 0 0 0 22 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 23 0 0 0 0 0 0 0 5 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%20%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 3 0 Related Projects Trip Distribution_AJC.xlsx, Int 3 10/5/2021, 9:33 AM Int. #:3 Catawba Avenue at S. Highland Avenue PM In 0%0%0%0%0%0%0%20%0%0%0%0%PM In 73 0 0 0 0 0 0 0 15 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%20%0%PM Out 79 0 0 0 0 0 0 0 0 0 0 16 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 36 0 0 0 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%10%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 1 0 PM In 0%0%0%0%0%0%0%10%0%0%0%0%PM In 25 0 0 0 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Zone #16 Kingston Meadow Related Projects Trip Distribution_AJC.xlsx, Int 3 10/5/2021, 9:33 AM Int. #:3 Catawba Avenue at S. Highland Avenue Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 3 10/5/2021, 9:33 AM Enter only in blue cells Int. #:4 N TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 50 0 0 14 0 0 0 0 37 0 28 AM Out 55 26 0 0 68 35 0 0 0 0 0 0 AM Tot 55 76 0 0 82 35 0 0 0 37 0 28 PM In 0 63 0 0 28 0 0 0 0 78 0 55 PM Out 64 32 0 0 71 33 0 0 0 0 0 0 PM Tot 64 95 0 0 99 33 0 0 0 78 0 55 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%45%AM In 19 0 5 0 0 0 0 0 0 0 0 0 9 N 0%0%0%0%45%25%0%0%0%0%0%0% AM Out 45%25%AM Out 56 0 0 0 0 25 14 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%45%PM In 63 0 16 0 0 0 0 0 0 0 0 0 28 PM Out 0%0%0%0%45%25%0%0%0%0%0%0%PM Out 37 0 0 0 0 17 9 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%30%AM In 13 0 3 0 0 0 0 0 0 0 0 0 4 N 0%25%0%0%30%25%0%0%0%0%0%0% AM Out 30%25%AM Out 37 0 9 0 0 11 9 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%30%PM In 37 0 9 0 0 0 0 0 0 0 0 0 11 PM Out 0%25%0%0%30%25%0%0%0%0%0%0%PM Out 24 0 6 0 0 7 6 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 25 0 6 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%25%0%0%0%0%0%0%0% AM Out 25%AM Out 7 0 0 0 0 2 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 10 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 7 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 12 0 3 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%25%0%0%0%0%0%0%0% AM Out 25%AM Out 4 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 5 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 3 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Citrus Avenue at I-210 WB Ramps Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 4 10/5/2021, 9:33 AM Int. #:4 Citrus Avenue at I-210 WB Ramps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%10%AM In 15 0 3 0 0 0 0 0 0 0 0 0 2 N 0%0%0%0%20%10%0%0%0%0%0%0% AM Out 20%10%AM Out 4 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%10%PM In 6 0 1 0 0 0 0 0 0 0 0 0 1 PM Out 0%0%0%0%20%10%0%0%0%0%0%0%PM Out 16 0 0 0 0 3 2 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%10%AM In 83 0 17 0 0 0 0 0 0 0 0 0 8 N 0%0%0%0%20%10%0%0%0%0%0%0% AM Out 20%10%AM Out 83 0 0 0 0 17 8 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%10%PM In 92 0 18 0 0 0 0 0 0 0 0 0 9 PM Out 0%0%0%0%20%10%0%0%0%0%0%0%PM Out 92 0 0 0 0 18 9 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%10%AM In 8 0 2 0 0 0 0 0 0 0 0 0 1 N 0%0%0%0%20%10%0%0%0%0%0%0% AM Out 20%10%AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%10%PM In 4 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%10%0%0%0%0%0%0%PM Out 10 0 0 0 0 2 1 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 50%20%AM In 21 0 11 0 0 0 0 0 0 0 0 0 4 N 0%0%0%0%50%20%0%0%0%0%0%0% AM Out 50%20%AM Out 21 0 0 0 0 11 4 0 0 0 0 0 0 PM In 0%50%0%0%0%0%0%0%0%0%0%20%PM In 28 0 14 0 0 0 0 0 0 0 0 0 6 PM Out 0%0%0%0%50%20%0%0%0%0%0%0%PM Out 28 0 0 0 0 14 6 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%15%AM In 29 0 0 0 0 4 0 0 0 0 4 0 0 N 15%15%0%0%0%0%0%0%0%0%0%0% AM Out 15%15%AM Out 88 13 13 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%15%0%0%0%0%15%0%0%PM In 95 0 0 0 0 14 0 0 0 0 14 0 0 PM Out 15%15%0%0%0%0%0%0%0%0%0%0%PM Out 56 8 8 0 0 0 0 0 0 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%20%AM In 23 0 0 0 0 2 0 0 0 0 5 0 0 N 20%10%0%0%0%0%0%0%0%0%0%0% Related Projects Trip Distribution_AJC.xlsx, Int 4 10/5/2021, 9:33 AM Int. #:4 Citrus Avenue at I-210 WB Ramps AM Out 20%10%AM Out 14 3 1 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%0%20%0%0%PM In 73 0 0 0 0 7 0 0 0 0 15 0 0 PM Out 20%10%0%0%0%0%0%0%0%0%0%0%PM Out 79 16 8 0 0 0 0 0 0 0 0 0 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 36 0 0 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 25 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 0 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%20%AM In 61 0 0 0 0 6 0 0 0 0 12 0 0 N 20%10%0%0%0%0%0%0%0%0%0%0% AM Out 20%10%AM Out 23 5 2 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%0%20%0%0%PM In 43 0 0 0 0 4 0 0 0 0 9 0 0 PM Out 20%10%0%0%0%0%0%0%0%0%0%0%PM Out 65 13 7 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%20%AM In 24 0 0 0 0 2 0 0 0 0 5 0 0 N 20%10%0%0%0%0%0%0%0%0%0%0% AM Out 20%10%AM Out 14 3 1 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%0%20%0%0%PM In 29 0 0 0 0 3 0 0 0 0 6 0 0 PM Out 20%10%0%0%0%0%0%0%0%0%0%0%PM Out 29 6 3 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 7 0 0 0 0 0 0 0 0 0 1 0 0 N 10%0%0%0%0%0%0%0%0%0%0%0% AM Out 10%AM Out 15 2 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%10%0%0%PM In 17 0 0 0 0 0 0 0 0 0 2 0 0 PM Out 10%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 1 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 18 0 0 0 0 0 0 0 0 0 5 0 0 N 30%0%0%0%0%0%0%0%0%0%0%0% AM Out 30%AM Out 53 16 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%30%0%0%PM In 60 0 0 0 0 0 0 0 0 0 18 0 0 PM Out 30%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 11 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 4 10/5/2021, 9:33 AM Int. #:4 Citrus Avenue at I-210 WB Ramps Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 4 0 0 0 0 0 0 0 0 0 1 0 0 N 30%0%0%0%0%0%0%0%0%0%0%0% AM Out 30%AM Out 11 3 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%30%0%0%PM In 12 0 0 0 0 0 0 0 0 0 4 0 0 PM Out 30%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 2 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 6 0 0 0 0 0 0 0 0 0 1 0 0 N 20%0%0%0%0%0%0%0%0%0%0%0% AM Out 20%AM Out 19 4 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%20%0%0%PM In 19 0 0 0 0 0 0 0 0 0 4 0 0 PM Out 20%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 2 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%AM In 6 0 0 0 0 0 0 0 0 0 1 0 0 N 15%0%0%0%0%0%0%0%0%0%0%0% AM Out 15%AM Out 16 2 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%15%0%0%PM In 16 0 0 0 0 0 0 0 0 0 2 0 0 PM Out 15%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 2 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 N 10%0%0%0%0%0%0%0%0%0%0%0% AM Out 10%AM Out 8 1 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%10%0%0%PM In 9 0 0 0 0 0 0 0 0 0 1 0 0 PM Out 10%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 1 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 6 0 0 0 0 0 0 0 0 0 2 0 0 N 25%0%0%0%0%0%0%0%0%0%0%0% AM Out 25%AM Out 12 3 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%25%0%0%PM In 13 0 0 0 0 0 0 0 0 0 3 0 0 PM Out 25%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 2 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 4 10/5/2021, 9:33 AM Enter only in blue cells Int. #:5 N TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 33 0 0 47 0 23 0 37 0 0 0 AM Out 0 59 55 35 33 0 0 0 0 0 0 0 AM Tot 0 92 55 35 80 0 23 0 37 0 0 0 PM In 0 42 0 0 92 0 41 0 78 0 0 0 PM Out 0 82 64 33 40 0 0 0 0 0 0 0 PM Tot 0 124 64 33 132 0 41 0 78 0 0 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%25%AM In 19 0 4 0 0 0 0 5 0 0 0 0 0 N 0%0%0%25%20%0%0%0%0%0%0%0% AM Out 25%20%AM Out 56 0 0 0 14 11 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%25%0%0%0%0%PM In 63 0 13 0 0 0 0 16 0 0 0 0 0 PM Out 0%0%0%25%20%0%0%0%0%0%0%0%PM Out 37 0 0 0 9 7 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%25%AM In 13 0 3 0 0 0 0 3 0 0 0 0 0 N 0%0%0%25%20%0%0%0%0%0%0%0% AM Out 25%20%AM Out 37 0 0 0 9 7 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%25%0%0%0%0%0%PM In 37 0 7 0 0 0 0 9 0 0 0 0 0 PM Out 0%0%0%25%20%0%0%0%0%0%0%0%PM Out 24 0 0 0 6 5 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 25 0 6 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%25%0%0%0%0%0%0%0% AM Out 25%AM Out 7 0 0 0 0 2 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 10 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 7 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 12 0 3 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%25%0%0%0%0%0%0%0% AM Out 25%AM Out 4 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 5 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 3 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Citrus Avenue at I-210 EB Ramps Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 5 10/5/2021, 9:33 AM Int. #:5 Citrus Avenue at I-210 EB Ramps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 15 0 2 0 0 0 0 2 0 0 0 0 0 N 0%0%0%10%10%0%0%0%0%0%0%0% AM Out 10%10%AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%10%0%0%0%0%0%PM In 6 0 1 0 0 0 0 1 0 0 0 0 0 PM Out 0%0%0%10%10%0%0%0%0%0%0%0%PM Out 16 0 0 0 2 2 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 83 0 8 0 0 0 0 8 0 0 0 0 0 N 0%0%0%10%10%0%0%0%0%0%0%0% AM Out 10%10%AM Out 83 0 0 0 8 8 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%10%0%0%0%0%0%PM In 92 0 9 0 0 0 0 9 0 0 0 0 0 PM Out 0%0%0%10%10%0%0%0%0%0%0%0%PM Out 92 0 0 0 9 9 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 8 0 1 0 0 0 0 1 0 0 0 0 0 N 0%0%0%10%10%0%0%0%0%0%0%0% AM Out 10%10%AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%10%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%10%10%0%0%0%0%0%0%0%PM Out 10 0 0 0 1 1 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%20%AM In 21 0 6 0 0 0 0 4 0 0 0 0 0 N 0%0%0%20%20%0%0%0%0%0%0%0% AM Out 20%20%AM Out 21 0 0 0 4 4 0 0 0 0 0 0 0 PM In 0%30%0%0%0%0%20%0%0%0%0%0%PM In 28 0 8 0 0 0 0 6 0 0 0 0 0 PM Out 0%0%0%20%20%0%0%0%0%0%0%0%PM Out 28 0 0 0 6 6 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%15%AM In 29 0 0 0 0 4 0 0 0 4 0 0 0 N 0%15%15%0%0%0%0%0%0%0%0%0% AM Out 15%15%AM Out 88 0 13 13 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%15%0%0%0%15%0%0%0%PM In 95 0 0 0 0 14 0 0 0 14 0 0 0 PM Out 0%15%15%0%0%0%0%0%0%0%0%0%PM Out 56 0 8 8 0 0 0 0 0 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%20%AM In 23 0 0 0 0 7 0 0 0 5 0 0 0 N 0%30%20%0%0%0%0%0%0%0%0%0% Related Projects Trip Distribution_AJC.xlsx, Int 5 10/5/2021, 9:33 AM Int. #:5 Citrus Avenue at I-210 EB Ramps AM Out 30%20%AM Out 14 0 4 3 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%20%0%0%0%PM In 73 0 0 0 0 22 0 0 0 15 0 0 0 PM Out 0%30%20%0%0%0%0%0%0%0%0%0%PM Out 79 0 24 16 0 0 0 0 0 0 0 0 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 36 0 0 0 0 0 0 0 0 0 0 0 0 N 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 25 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 0 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%20%AM In 61 0 0 0 0 18 0 0 0 12 0 0 0 N 0%30%20%0%0%0%0%0%0%0%0%0% AM Out 30%20%AM Out 23 0 7 5 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%20%0%0%0%PM In 43 0 0 0 0 13 0 0 0 9 0 0 0 PM Out 0%30%20%0%0%0%0%0%0%0%0%0%PM Out 65 0 20 13 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%20%AM In 24 0 0 0 0 7 0 0 0 5 0 0 0 N 0%30%20%0%0%0%0%0%0%0%0%0% AM Out 30%20%AM Out 14 0 4 3 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%20%0%0%0%PM In 29 0 0 0 0 9 0 0 0 6 0 0 0 PM Out 0%30%20%0%0%0%0%0%0%0%0%0%PM Out 29 0 9 6 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 7 0 0 0 0 1 0 0 0 1 0 0 0 N 0%10%10%0%0%0%0%0%0%0%0%0% AM Out 10%10%AM Out 15 0 2 2 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%10%0%0%0%PM In 17 0 0 0 0 2 0 0 0 2 0 0 0 PM Out 0%10%10%0%0%0%0%0%0%0%0%0%PM Out 11 0 1 1 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%30%AM In 18 0 0 0 0 5 0 0 0 5 0 0 0 N 0%30%30%0%0%0%0%0%0%0%0%0% AM Out 30%30%AM Out 53 0 16 16 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%30%0%0%0%PM In 60 0 0 0 0 18 0 0 0 18 0 0 0 PM Out 0%30%30%0%0%0%0%0%0%0%0%0%PM Out 35 0 11 11 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 5 10/5/2021, 9:33 AM Int. #:5 Citrus Avenue at I-210 EB Ramps Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%30%AM In 4 0 0 0 0 1 0 0 0 1 0 0 0 N 0%30%30%0%0%0%0%0%0%0%0%0% AM Out 30%30%AM Out 11 0 3 3 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%30%0%0%0%PM In 12 0 0 0 0 4 0 0 0 4 0 0 0 PM Out 0%30%30%0%0%0%0%0%0%0%0%0%PM Out 7 0 2 2 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%20%AM In 6 0 0 0 0 1 0 0 0 1 0 0 0 N 0%20%20%0%0%0%0%0%0%0%0%0% AM Out 20%20%AM Out 19 0 4 4 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%20%0%0%0%20%0%0%0%PM In 19 0 0 0 0 4 0 0 0 4 0 0 0 PM Out 0%20%20%0%0%0%0%0%0%0%0%0%PM Out 11 0 2 2 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%15%AM In 6 0 0 0 0 1 0 0 0 1 0 0 0 N 0%15%15%0%0%0%0%0%0%0%0%0% AM Out 15%15%AM Out 16 0 2 2 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%15%0%0%0%15%0%0%0%PM In 16 0 0 0 0 2 0 0 0 2 0 0 0 PM Out 0%15%15%0%0%0%0%0%0%0%0%0%PM Out 10 0 2 2 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 N 0%10%10%0%0%0%0%0%0%0%0%0% AM Out 10%10%AM Out 8 0 1 1 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%10%0%0%0%10%0%0%0%PM In 9 0 0 0 0 1 0 0 0 1 0 0 0 PM Out 0%10%10%0%0%0%0%0%0%0%0%0%PM Out 5 0 1 1 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%25%AM In 6 0 0 0 0 2 0 0 0 2 0 0 0 N 0%25%25%0%0%0%0%0%0%0%0%0% AM Out 25%25%AM Out 12 0 3 3 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%25%0%0%0%25%0%0%0%PM In 13 0 0 0 0 3 0 0 0 3 0 0 0 PM Out 0%25%25%0%0%0%0%0%0%0%0%0%PM Out 8 0 2 2 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%25%AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 5 10/5/2021, 9:33 AM Int. #:5 Citrus Avenue at I-210 EB Ramps N 0%0%0%25%20%0%0%0%0%0%0%0% AM Out 25%20%AM Out 3 0 0 0 1 1 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%25%0%0%0%0%PM In 3 0 1 0 0 0 0 1 0 0 0 0 0 PM Out 0%0%0%25%20%0%0%0%0%0%0%0%PM Out 2 0 0 0 1 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 5 10/5/2021, 9:33 AM Enter only in blue cells Int. #:6 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 33 5 55 22 9 0 9 8 0 3 0 AM Out 3 63 0 0 35 0 26 9 0 3 4 26 AM Tot 3 96 5 55 57 9 26 18 8 3 7 26 PM In 0 42 15 74 68 29 0 18 7 0 10 0 PM Out 10 39 0 0 42 0 17 6 0 16 20 88 PM Tot 10 81 15 74 110 29 17 24 7 16 30 88 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 19 0 4 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 11 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%PM In 63 0 13 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 7 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 13 0 3 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 7 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%0%PM In 37 0 7 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 5 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 25 0 6 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%25%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 2 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 10 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 7 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 12 0 3 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%25%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 5 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 3 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Citrus Avenue at S. Highland Avenue Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 6 10/5/2021, 9:33 AM Int. #:6 Citrus Avenue at S. Highland Avenue Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 15 0 2 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 6 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 2 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 83 0 8 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 8 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 92 0 9 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 9 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 8 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 1 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 21 0 6 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%30%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 6 0 0 0 0 0 0 0 PM In 0%30%0%0%0%0%0%0%0%0%0%0%PM In 28 0 8 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%30%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 8 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%10%AM In 29 0 0 0 0 0 9 0 0 0 0 3 0 Y 0%0%0%0%0%0%30%10%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 26 9 0 0 0 0 PM In 0%0%0%0%0%30%0%0%0%0%10%0%PM In 95 0 0 0 0 0 29 0 0 0 0 10 0 PM Out 0%0%0%0%0%0%30%10%0%0%0%0%PM Out 56 0 0 0 0 0 0 17 6 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%50%20%AM In 23 0 0 5 12 0 0 0 5 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%20%20%50% Related Projects Trip Distribution_AJC.xlsx, Int 6 10/5/2021, 9:33 AM Int. #:6 Citrus Avenue at S. Highland Avenue AM Out AM Out 14 0 0 0 0 0 0 0 0 0 3 3 7 PM In 0%0%20%50%0%0%0%20%0%0%0%0%PM In 73 0 0 15 37 0 0 0 15 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%20%20%50%PM Out 79 0 0 0 0 0 0 0 0 0 16 16 40 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 36 0 0 0 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%10%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 1 0 PM In 0%0%0%0%0%0%0%10%0%0%0%0%PM In 25 0 0 0 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 50%10%AM In 61 0 0 0 31 0 0 0 0 6 0 0 0 Y 10%0%0%0%0%0%0%0%0%0%0%50% AM Out AM Out 23 2 0 0 0 0 0 0 0 0 0 0 12 PM In 0%0%0%50%0%0%0%0%10%0%0%0%PM In 43 0 0 0 22 0 0 0 0 4 0 0 0 PM Out 10%0%0%0%0%0%0%0%0%0%0%50%PM Out 65 7 0 0 0 0 0 0 0 0 0 0 33 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 50%10%AM In 24 0 0 0 12 0 0 0 0 2 0 0 0 Y 10%0%0%0%0%0%0%0%0%0%0%50% AM Out AM Out 14 1 0 0 0 0 0 0 0 0 0 0 7 PM In 0%0%0%50%0%0%0%0%10%0%0%0%PM In 29 0 0 0 15 0 0 0 0 3 0 0 0 PM Out 10%0%0%0%0%0%0%0%0%0%0%50%PM Out 29 3 0 0 0 0 0 0 0 0 0 0 15 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 7 0 0 0 0 1 0 0 0 0 0 0 0 Y 0%20%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 3 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%20%0%0%0%0%0%0%0%PM In 17 0 0 0 0 3 0 0 0 0 0 0 0 PM Out 0%20%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 2 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 60%AM In 18 0 0 0 0 11 0 0 0 0 0 0 0 Y 0%60%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 32 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%60%0%0%0%0%0%0%0%PM In 60 0 0 0 0 36 0 0 0 0 0 0 0 PM Out 0%60%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 21 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 6 10/5/2021, 9:33 AM Int. #:6 Citrus Avenue at S. Highland Avenue Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 60%AM In 4 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%60%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 7 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%60%0%0%0%0%0%0%0%PM In 12 0 0 0 0 7 0 0 0 0 0 0 0 PM Out 0%60%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 4 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 6 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%40%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 8 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%40%0%0%0%0%0%0%0%PM In 19 0 0 0 0 8 0 0 0 0 0 0 0 PM Out 0%40%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 4 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 6 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%30%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 5 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%0%0%0%0%PM In 16 0 0 0 0 5 0 0 0 0 0 0 0 PM Out 0%30%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 3 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 3 0 0 0 0 1 0 0 0 0 0 0 0 Y 0%20%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 2 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%20%0%0%0%0%0%0%0%PM In 9 0 0 0 0 2 0 0 0 0 0 0 0 PM Out 0%20%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 1 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 50%AM In 6 0 0 0 0 3 0 0 0 0 0 0 0 Y 0%50%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 6 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%50%0%0%0%0%0%0%0%PM In 13 0 0 0 0 7 0 0 0 0 0 0 0 PM Out 0%50%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 4 0 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 6 10/5/2021, 9:33 AM Int. #:6 Citrus Avenue at S. Highland Avenue Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 3 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%PM In 3 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 6 10/5/2021, 9:33 AM Enter only in blue cells Int. #:7 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 51 5 1 21 0 13 5 2 0 0 0 AM Out 6 60 0 0 43 5 0 0 0 3 3 3 AM Tot 6 111 5 1 64 5 13 5 2 3 3 3 PM In 0 67 5 3 65 0 10 5 7 0 0 0 PM Out 5 37 0 0 72 14 0 0 0 5 5 2 PM Tot 5 104 5 3 137 14 10 5 7 5 5 2 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 19 0 4 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 11 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%PM In 63 0 13 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 7 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 13 0 3 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 7 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%0%PM In 37 0 7 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 5 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 25 0 6 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%25%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 2 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 10 0 3 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 7 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 25%AM In 12 0 3 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%25%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%25%0%0%0%0%0%0%0%0%0%0%PM In 5 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%25%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 3 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Citrus Avenue at Walnut Street Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 7 10/5/2021, 9:33 AM Int. #:7 Citrus Avenue at Walnut Street Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 15 0 2 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 6 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 2 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 83 0 8 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 8 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 92 0 9 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 9 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 8 0 1 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%10%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%10%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%10%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 1 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 21 0 6 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%30%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 6 0 0 0 0 0 0 0 PM In 0%30%0%0%0%0%0%0%0%0%0%0%PM In 28 0 8 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%30%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 8 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 29 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 95 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 56 0 0 0 0 0 0 0 0 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 23 0 5 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%20%0%0%0%0%0%0%0% Related Projects Trip Distribution_AJC.xlsx, Int 7 10/5/2021, 9:33 AM Int. #:7 Citrus Avenue at Walnut Street AM Out AM Out 14 0 0 0 0 3 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%0%PM In 73 0 15 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 79 0 0 0 0 16 0 0 0 0 0 0 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%10%AM In 36 0 0 4 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%10%10%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 1 1 0 PM In 0%0%10%0%0%0%0%10%0%0%0%0%PM In 25 0 0 3 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%10%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 4 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%15%AM In 61 0 9 0 0 0 0 9 0 0 0 0 0 Y 0%0%0%0%15%15%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 3 3 0 0 0 0 0 0 PM In 0%15%0%0%0%0%15%0%0%0%0%0%PM In 43 0 6 0 0 0 0 6 0 0 0 0 0 PM Out 0%0%0%0%15%15%0%0%0%0%0%0%PM Out 65 0 0 0 0 10 10 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 15%15%AM In 24 0 4 0 0 0 0 4 0 0 0 0 0 Y 0%0%0%0%15%15%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 2 2 0 0 0 0 0 0 PM In 0%15%0%0%0%0%15%0%0%0%0%0%PM In 29 0 4 0 0 0 0 4 0 0 0 0 0 PM Out 0%0%0%0%15%15%0%0%0%0%0%0%PM Out 29 0 0 0 0 4 4 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%20%10%AM In 7 0 0 1 1 0 0 0 1 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%10%10%20% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 2 2 3 PM In 0%0%10%20%0%0%0%10%0%0%0%0%PM In 17 0 0 2 3 0 0 0 2 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%10%10%20%PM Out 11 0 0 0 0 0 0 0 0 0 1 1 2 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 60%10%AM In 18 0 0 0 0 11 0 0 0 2 0 0 0 Y 10%60%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 5 32 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%60%0%0%0%10%0%0%0%PM In 60 0 0 0 0 36 0 0 0 6 0 0 0 PM Out 10%60%0%0%0%0%0%0%0%0%0%0%PM Out 35 4 21 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 7 10/5/2021, 9:33 AM Int. #:7 Citrus Avenue at Walnut Street Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 60%10%AM In 4 0 0 0 0 2 0 0 0 0 0 0 0 Y 10%60%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 1 7 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%60%0%0%0%10%0%0%0%PM In 12 0 0 0 0 7 0 0 0 1 0 0 0 PM Out 10%60%0%0%0%0%0%0%0%0%0%0%PM Out 7 1 4 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 6 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%40%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 8 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%40%0%0%0%0%0%0%0%PM In 19 0 0 0 0 8 0 0 0 0 0 0 0 PM Out 0%40%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 4 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 30%AM In 6 0 0 0 0 2 0 0 0 0 0 0 0 Y 0%30%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 5 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%30%0%0%0%0%0%0%0%PM In 16 0 0 0 0 5 0 0 0 0 0 0 0 PM Out 0%30%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 3 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 3 0 0 0 0 1 0 0 0 0 0 0 0 Y 0%20%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 2 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%20%0%0%0%0%0%0%0%PM In 9 0 0 0 0 2 0 0 0 0 0 0 0 PM Out 0%20%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 1 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 50%AM In 6 0 0 0 0 3 0 0 0 0 0 0 0 Y 0%50%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 6 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%50%0%0%0%0%0%0%0%PM In 13 0 0 0 0 7 0 0 0 0 0 0 0 PM Out 0%50%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 4 0 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 7 10/5/2021, 9:33 AM Int. #:7 Citrus Avenue at Walnut Street Y 0%0%0%0%20%0%0%0%0%0%0%0% AM Out AM Out 3 0 0 0 0 1 0 0 0 0 0 0 0 PM In 0%20%0%0%0%0%0%0%0%0%0%PM In 3 0 1 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%20%0%0%0%0%0%0%0%PM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 7 10/5/2021, 9:33 AM Enter only in blue cells Int. #:8 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 0 0 0 0 0 0 9 0 0 12 0 AM Out 0 0 0 0 0 0 0 35 0 0 4 0 AM Tot 0 0 0 0 0 0 0 44 0 0 16 0 PM In 0 0 0 0 0 0 0 18 0 0 38 0 PM Out 0 0 0 0 0 0 0 22 0 0 20 0 PM Tot 0 0 0 0 0 0 0 40 0 0 58 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 19 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%PM In 63 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 13 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 37 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 0 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Jacaranda Avenue at S. Highland Avenue Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 8 10/5/2021, 9:33 AM Int. #:8 Jacaranda Avenue at S. Highland Avenue Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 29 0 0 0 0 0 0 0 0 0 0 12 0 Y 0%0%0%0%0%0%0%40%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 0 35 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%40%0%PM In 95 0 0 0 0 0 0 0 0 0 0 38 0 PM Out 0%0%0%0%0%0%0%40%0%0%0%0%PM Out 56 0 0 0 0 0 0 0 22 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 23 0 0 0 0 0 0 0 5 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%20%0% Related Projects Trip Distribution_AJC.xlsx, Int 8 10/5/2021, 9:33 AM Int. #:8 Jacaranda Avenue at S. Highland Avenue AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 3 0 PM In 0%0%0%0%0%0%0%20%0%0%0%0%PM In 73 0 0 0 0 0 0 0 15 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%20%0%PM Out 79 0 0 0 0 0 0 0 0 0 0 16 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 36 0 0 0 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%10%0% AM Out 3%AM Out 13 0 0 0 0 0 0 0 0 0 0 1 0 PM In 0%0%0%0%0%0%0%10%0%0%0%0%PM In 25 0 0 0 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 8 10/5/2021, 9:33 AM Int. #:8 Jacaranda Avenue at S. Highland Avenue Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 8 10/5/2021, 9:33 AM Int. #:8 Jacaranda Avenue at S. Highland Avenue Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 3 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%PM In 3 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 8 10/5/2021, 9:33 AM Enter only in blue cells Int. #:9 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 0 0 0 0 0 0 9 0 0 12 0 AM Out 0 0 0 0 0 0 0 35 0 0 4 0 AM Tot 0 0 0 0 0 0 0 44 0 0 16 0 PM In 0 0 0 0 0 0 0 18 0 0 38 0 PM Out 0 0 0 0 0 0 0 22 0 0 20 0 PM Tot 0 0 0 0 0 0 0 40 0 0 58 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 19 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%PM In 63 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 13 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 37 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 0 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Tokay Avenue at S. Highland Avenue Yellow cells calculate Related Projects Trip Distribution_AJC.xlsx, Int 9 10/5/2021, 9:33 AM Int. #:9 Tokay Avenue at S. Highland Avenue Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 29 0 0 0 0 0 0 0 0 0 0 12 0 Y 0%0%0%0%0%0%0%40%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 0 35 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%40%0%PM In 95 0 0 0 0 0 0 0 0 0 0 38 0 PM Out 0%0%0%0%0%0%0%40%0%0%0%0%PM Out 56 0 0 0 0 0 0 0 22 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 23 0 0 0 0 0 0 0 5 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%20%0% Related Projects Trip Distribution_AJC.xlsx, Int 9 10/5/2021, 9:33 AM Int. #:9 Tokay Avenue at S. Highland Avenue AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 3 0 PM In 0%0%0%0%0%0%0%20%0%0%0%0%PM In 73 0 0 0 0 0 0 0 15 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%20%0%PM Out 79 0 0 0 0 0 0 0 0 0 0 16 0 Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 36 0 0 0 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%10%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 1 0 PM In 0%0%0%0%0%0%0%10%0%0%0%0%PM In 25 0 0 0 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 9 10/5/2021, 9:33 AM Int. #:9 Tokay Avenue at S. Highland Avenue Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 9 10/5/2021, 9:33 AM Int. #:9 Tokay Avenue at S. Highland Avenue Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 3 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%PM In 3 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 Related Projects Trip Distribution_AJC.xlsx, Int 9 10/5/2021, 9:33 AM Enter only in blue cells Int. #:10 Y TOTAL CUMULATIVE PROJECTS TRAFFIC Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 0 0 0 0 0 0 0 9 0 0 12 0 AM Out 0 0 0 0 0 0 0 35 0 0 4 0 AM Tot 0 0 0 0 0 0 0 44 0 0 16 0 PM In 0 0 0 0 0 0 0 18 0 0 38 0 PM Out 0 0 0 0 0 0 0 22 0 0 20 0 PM Tot 0 0 0 0 0 0 0 40 0 0 58 0 Zone #1 Shady Trails PA 13 & 14 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 19 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 56 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 63 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 Zone #2 Shady Trail Spa 16 Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 13 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 37 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 37 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 24 0 0 0 0 0 0 0 0 0 0 0 0 Zone #3 Casa Grande Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 25 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 10 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 26 0 0 0 0 0 0 0 0 0 0 0 0 Zone #4 Sierra/Summit Warehouse Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 12 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 5 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 13 0 0 0 0 0 0 0 0 0 0 0 0 Zone #5 Mango Avenue Industrial Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Cherimoya Avenue at S. Highland Avenue Yellow cells calculate Int. #:10 Cherimoya Avenue at S. Highland Avenue AM In AM In 15 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 4 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 6 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 Zone #6 Sierra Lakes & Mango Convenience Store and Pumps Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 83 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 83 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 92 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 92 0 0 0 0 0 0 0 0 0 0 0 0 Zone #7 Smile Studio Dental Building Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 8 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 4 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #8 Costco Fuel Facility Expansion Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 21 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 21 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 28 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 28 0 0 0 0 0 0 0 0 0 0 0 0 Zone #9 The Retreat Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 40%AM In 29 0 0 0 0 0 0 0 0 0 0 12 0 Y 0%0%0%0%0%0%0%40%0%0%0%0% AM Out AM Out 88 0 0 0 0 0 0 0 35 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%40%0%PM In 95 0 0 0 0 0 0 0 0 0 0 38 0 PM Out 0%0%0%0%0%0%0%40%0%0%0%0%PM Out 56 0 0 0 0 0 0 0 22 0 0 0 0 Zone #10 Citrus Crossroads Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 20%AM In 23 0 0 0 0 0 0 0 5 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%20%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 3 0 PM In 0%0%0%0%0%0%0%20%0%0%0%0%PM In 73 0 0 0 0 0 0 0 15 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%20%0%PM Out 79 0 0 0 0 0 0 0 0 0 0 16 0 Int. #:10 Cherimoya Avenue at S. Highland Avenue Zone #11 Fontana Hyundai Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In 10%AM In 36 0 0 0 0 0 0 0 4 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%10%0% AM Out AM Out 13 0 0 0 0 0 0 0 0 0 0 1 0 PM In 0%0%0%0%0%0%0%10%0%0%0%0%PM In 25 0 0 0 0 0 0 0 3 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%10%0%PM Out 38 0 0 0 0 0 0 0 0 0 0 4 0 Zone #12 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 61 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 23 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 43 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 65 0 0 0 0 0 0 0 0 0 0 0 0 Zone #13 Fontana CDRJ Dealership Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 24 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 14 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 29 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 29 0 0 0 0 0 0 0 0 0 0 0 0 Zone #14 Walnut Village Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 7 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 15 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 17 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #15 Providence II Amendment Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 18 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 53 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 60 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 35 0 0 0 0 0 0 0 0 0 0 0 0 Zone #16 Kingston Meadow Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 4 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Int. #:10 Cherimoya Avenue at S. Highland Avenue PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 12 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 7 0 0 0 0 0 0 0 0 0 0 0 0 Zone #17 Baseline Apartments Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 19 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 19 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 11 0 0 0 0 0 0 0 0 0 0 0 0 Zone #18 Multi-Family Project Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 16 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 16 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 10 0 0 0 0 0 0 0 0 0 0 0 0 Zone #19 Mango Villas Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 3 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 9 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 5 0 0 0 0 0 0 0 0 0 0 0 0 Zone #20 Almeria Senior Housing Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 6 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 12 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 13 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 8 0 0 0 0 0 0 0 0 0 0 0 0 Zone #21 Single Family Residences Pk Hr NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Pk Hr T Gen NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM In AM In 1 0 0 0 0 0 0 0 0 0 0 0 0 Y 0%0%0%0%0%0%0%0%0%0%0%0% AM Out AM Out 3 0 0 0 0 0 0 0 0 0 0 0 0 PM In 0%0%0%0%0%0%0%0%0%0%0%0%PM In 3 0 0 0 0 0 0 0 0 0 0 0 0 PM Out 0%0%0%0%0%0%0%0%0%0%0%0%PM Out 2 0 0 0 0 0 0 0 0 0 0 0 0 APPENDIX F SBTAM MODEL PLOTS AND B-TURNS WORKSHEETS 39016000148010,22216,6140340044016012790016044002,963440160075013,49802,625041600000 5129021965713,250010308204,0480352118,31502,38004413514,90000057136111,6390011,96015,0100010,167017,3909,0550723406676681 11 01,323752 1011018,665012,17207,55714,8030010,3581813012,861653513,006013,626012,8690021,637014,4795913314,2970160437281914,267054747728292024500012,79359223561018,62634014312936771073644747359381390403010,18280254195500012,2885589044202121009932695361 80 1110 7971,543 0554456392773945 422419 102173 6529723344612,2880119164061955 88006598293717581 1,9212,7462862 2104251,0419114913193913769703 46400 002541,2072861 13146019 8523052712823171418308663142308115 96231153393 1019 1511 3937745356108252797312753 21711311757 6122143051,4531,92870027023462124226851,046 161130272237795230 1001501,7201,9393111970926725252500102500014,3043,4391,2608271,371 0 0 249114206136236291017,298012,61424222,3800018,8907,557016,000034007016318643613,7050189126201809,6171 1 3000 9,93800016,000046868833672948241011143 00351422,747043130535241319014,25828 1398 015,69224016725409,14301,0496851,1636629,529000141622058611320911121411470520364 268 4321,05302,9638505863421306183147743759111,0551,40301,203731586918518,27902032161823169798199147994479812820546376076942745246443700574257622364012,791112195 149931612211,247554386782290019735512127 9 3390005224 1950741832541964125282501939,143076591045107952513035473020,303220265210 4227 2541,20718,880025536211621415274295293 1911,07885200262773601161257593015,5121,024322 33381,268856206127881880053611,7231,56410,1640016,21361355230052151 012592201718018,88702,4263,6633831,03570032 3 6012336290018,646012,430186591453001393150113213133523035817926115290148220169 07950118 97193 3,1042,123018,649157014134478133 74807 351 1,4332,1923232629281,463 1 9 5455 4 161 288184842661,4581,032571090605016,4105821,135 851886502,1793,38640225535139030231392955541,73066647512,79101600306200012,430017,2989571,411 16 55491,5035954133187561962671664993 72627 88182471159217959147866453101,21606685109359254633890 012,7911,9522,1816691,2215 0112 5861,2011 2 8387 1,2119154811,1070 02,8463,230 96189 16271,1399471,10191445133 8110 15,799096242824736952243065141 6 0141 27161 8 516426754951514529299590 1,231701672 4 7292315126379157 2 337 238437189113235289115982292491148817116013588901 84 5 621283301873 868 8921,2861,5894471,2732,2591441 1 7 3132 1102271,2651,8310045224903762 0 966 270314273214297921637325916413,73901 51 1,60609968781553141432406 944 1681271 87309 46151073624171,6110545429621301186914311723663352664413422,5749571,20725495603354423843142267502 381961,0111,2291,40987229291691751,6511,023 612384 50792882715 353 003,4072,130897140147578547779733813619402,21601,011111142 39020217071002 936 3545993976212319232191,1301,54010818676238 156186132686711,48500 5592282751531,7811,309 519912277362471,4078068586474891,6182,79119219188 125186 291205652,6251,78770351113333 751663 0 8365 337132319298148563002 1 42,2 6 3 652,2433,6962,2563,7571,3609121,7061,0062,1422,8438317538577737368767323253739234380911 122324130627 5184 1031711,3792,0671,7551,26212619024880416783400 1,6503,039 200709 3,5041,699 2890 15827597156 92123 005745373015971682753184473644942593262981576696712965091,061571311 1412 118278 194239 56342721882,0282,2541672935281631,9432,278 2,4031,14316846111897 351271 112107 484321 14151147480268471113,7142,31436131 30822426234 1170 91087130 4191317416034760416259268394 361167280129851292594801381641,1821,148617268466202 324268190206353259 8601,1795483471,2691,407162617112829120422111264257 9066002362025059109 138653515414917304511734152945474526632501471,3761,166163704,1372,489815889292913134344371,312109155 5821,096682531230093116129159321231,156366 11630198442565259377189 ,166,2054105431,1711,4641180640213110011274 7129181535 4161281,8072,9405644292151394279 131118934401 2317217139 01161214 3441118177441,2431,202919 1,0101,158 705305 106981414778071,3501,16980072714802597714311601021,6071,36314359180377 359777313302002,4201,609726582205843,7131,868380255822650254310 4,1312,6902,7674,0012,5003,6432,5663,8531192611671421,9782,505 2,0521,227 2,5791,900 82125300186 329142 22213251833881219378 9821,204634266 7475259100213 3121782023720202 18187122531,2082,28481714154022651501023175062481001254221834 311255 11273351549556346221 17248 9132 3,0632,62811381,6621,4669915696279 263538644529894953073125741,5061,40733137738025511022217125900319331244214266431 4746 4902171452991,9961,7611,6111,1982561763562581,2071,112 1,7713,0321,1431,1911,9992,44021198944 005294451,2791,095 951244162271313121613369051,3438513064033119321,6802,0691,561983 199220943586 69355653291956281,371827 1653959753431,186381 2,6262901,9032121,211980521423290198 414663741022,0042,4092,2792,103470403966469338188312164 1534721,410841 169 3 0 71282,8293,0802,9892,923 231175395738121163 955748471188 2019340116 507545118113 10987 139291153213310 523600 137244 121181114327614,63402,222046811362803352661,9312,455224145 46811,2272,052251132116579631,220 65 1,1492,8639631,220 181633762163629831417024818228611,0791,12990436210987524400 36149582568714641719,67605312311527180233160417396134272206 251428 1191131,4182,5092223211,5851,134276385290211489317297299 255500521814035474754012602512,4491,798178785081935042625920299589425416051721712948 2041841,1311,25538274236215400211112156178 782964 139129637059409516238197164122 79748013061388391,3252,57247341,9852,45372168456432747923620325318524203628328761956706721,5011,08048127 1,2971,4912,1201,45089 1,2522,2133183694,2562,4651,5252,135 543180 21413314 5251 19,60809125193013401,0891,577327393 3652132,2121,06806340878331165184030492793560057787654585460 00175213 312114124369386511 961173,4722,9523225783979062495793838149881,1981,0311,22730569563999465278163050540506233446 511703 08319295 1,5602,296 128255 10411464931911532673702331871,7811,5321,4108417411,0938331,4031,4207840409571,0991,0831,3134493953,0551,0462,7522,9812,7291,885 1,7932,580 1,1125101457088828851,8361105624454902421471773112761961,4413,237 97147 1,5161,1085047141,3088742,4311,4882,79016,000029938446446769223941136354254 607335 3633 16853 2194494324183541271,0501,413 34613924880440225589597701,7216930501,7454633373227631,4751,061 02,09532832,6250202119 81971183311972621,365 110151 1,8112,0742,1353,14770530625954712832012,7912,4631,4691,2832,62648423247674242547047251,0611,475 6611,2234512831692323123637666301,3301,638302221 1,29102255863651961,3562,04065118116150149931,2631,0881,1766132,3822,187251350 46838901,125293109,938881732,5461,6493,96901,4012,675168171 1,3371,8131,0146933871621,2191,4950677 9951,482 3,616071835932252 5033801,1974219192592359480 40563152012154731392950254 386161 8482,1951,2862,150576235 1,74501,0551,699041836086315118010916201254 2 233 100288 03,969252319930001,112286297 7480343216172834958301828996030284850 6061,2894571,3282857190548014,634129451561812271892471950012123,1361,9501 2 48495169 53617003291111,46509469 0001,6572,6331,428 00015,759237148882429118330 53394444601,9961,099 6480013,1141,1712,034 640006501,0441,07718182632118306861688196204284103 1952101,4736616471,4491,4160117320153110 421014210135612 5 7445 1,1661,04532629 212658 9511202,2228129587569281336414,2970218862933551,8251,2551,197001,011301256018,6262,9583,4723831982031922,4800019,6081425472363 3502511181491,611018969421 01428 80 401,1121 ,3 0 23401,4472,4131,028094301,5221,7721,6401,84103,616002,1293,134421028319345023868751452,4551,79063571,3872,7688780212587555261 239161 01,828653946034 0366345 35676677935215131800241 1,2573,36202,031273157 4709908310133625472013,498307196001,8411,7301,4908571,0551,4032,4318743003492461402091,000716725 181813361017,2982,4201,6095625 1,5207361,8802,5112,5101,8775,6734,7001143995481,30904978119592188554571,3285064111214 1,6570245913180551,6381,33008451,6351,3302,3402,25710918701,2912424076 96447 01,309125124247239121520 5541,13904211844312019 567121500968827705716768100247992454613150943882373041191,01201,019009923027 2,1138971101583,6632,42601,828001,9741,5691,9211,65008450143 75110206140422719 16238644502212211,7102,039442308549922 2551662881711,9122,011141224 02,6251963073,0551,0461643123,2371,441 1,6683,234 01,721106245813125441293184811,10770920066104308115003,1754,01800 74404263491 ,8 47559 533636067136018632245065404523027783721,9691,112 221,1551,94525831201,03315211619422314 2,5602,03626311,0513551162512311076334115681981,8092,230288574708278132571,2638478721,409123731,2551,475 26142,6672,519 2,7291,885 1,4131,050 3806842,0641,358203079227402,09542279,9070129303 1115841621154704555117773502031733074511791,701380202236427151 68251,41601,207254233620013401,02801,1252,3651,803110354 11 1,1411,3771,3651,2281,2531,0062,1793,3866634221,0611,3082,8242,11819834919627638742 1 01 6 4640331 2,0401,35671274800 9571,411386511415498 3286281581967822582441548147621,3195841,29102,1068927823862,1501,286629668101481,9741,5692,4001,8542,3521,859007950 3142066927 18361416444690449781110325513,0370771429053485654421214528441 137340823491394769 675426255500577242135307945121,1941,0422,8862,7731,07213129811922954414154394173215193 642,3053,5912,1373,5702351471048564 156119340247377290364244088993234298114436347403397119265133459142216209783448637005013340 1,8251,25529415616,2130139258 2661213,8692,3153,6552,4777782014,267514 239692 5080252144013,2501101581342422671672,1341,8332,1292,3131,9522,18113486889815988872 5413515486226976761,4752,2141,6242,322472546194344 739376 1,135582 1,847559209119236202640331 4,0183,1752,6194,04033646167706623981,493842 09221,4406301,04550514638519099111901,3313,4443,0551,0464924084076 337334 104202 4 4 525701,189267515691652,7731,0721,6022,3272,1541,521283106 303129 1,7052,4851,0463,0552,5749574843219757492,0391,7102,2301,8082,7482,040 6431802,1303,407601224577272422314247326116 7072,3762469 1,730554 1,4650261187 3271959301,3811,2688569461,2261,2896062 8 1309 13921181446401,2039762,0301,9222,098174402335230196242125426215262226 461464141681,9171,322 1,5051,994 1481441,1681,984 62226189960992 63653387635599671,48374519640032242,9401,8071,3577543,1361,950336155 207326209113 5010001,2693,89002,2161,062363179334996050460598 1 394769 1432292,3434,0322,3583,9161,6341,182 1,7052,4856480604586501,4061,8631,4261,8442,1793,3863,2442,2643229 1,0722,7736423890001,2917502261,6381,33035611,6341,1123801711,4142,230245911,4282,6330852 349418716725 10233611158413,70508361,6161,4078062511451,7721,52206481,4602774481,0048091,343 4,2681,3792,1861,2501,9791,679 392165 019,6132,0262,7411,3577543,3033,8562816001,3102,4862,2761,66599206884681,3681,8791,0762,774 2314624671,0760996412267 5102481,4472,4132,0961,661 15424447473453661,7071,4221,0812242,4861,310295810637139346190391,3981,8731,6652,2762,6411,8782,5642,2451,503595103284 2,4318742,2762,191 693052,1462,00801,2169675591,18902,0812,153 33832411875203646,0921,4743,6592,155967559891619611,25921,63703653131,6791,9799300 4614641151622,4631,469 1,9961,099 1,701380354592,0082,146002212654583621,4751,061 553861612,1541,5211,8411,7303,7021,5021,3313,4445785061,7032,5062,4001,8541,3102,48632242862975990299384103255 31236330321762561952471,2551,8252,1861,2502532630514 1,2910129599081,767480359 40563150657801,2162 5 1303 1,4207843,2302,846 3,1342,1295,6734,70033560715,75902,7681,3879809381,0764671,7052,4851,6242,3227451,4833604684683601,7811,0013,8652,4183653133237671,3087142,0812,6536,0922,1083,4441,3313,3621,2573,8243,1751,4581,032 1,3819306 9 4449 323732371,4261,8442582972,9862,6731,6802,4769031,4331,403833 1,2341,4471,3571,8381,5061,407 4199451442522302102,5211,99532245355871,5011,080254933 4431,23311 8571 6221693693242501935 0 4333 1,4451,2331,1551,9456878252,9812,752564411748955153393 FOOTHILL FWY0 .33 .67 1MilesMap layersNodeBase Year LinksNode selection setsCentroidsBase Year Links selection setsConnectors999SBTAM 2012Fontana SiteAM Peak Period Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE 3,057010,226004,237076,85971,49603,414005,388010,019865,0610010,0685,9000013,0525,920010,19704,384098,384016,49904012000000 217225414644249352,5560117775,252021,413014213082,601020,032030735672,6950002,1692,21868,4810070,17360,1850057,974076,20849,65901,1011,0453,7853,1404 96 36,0275,888 5453081,191052,945060,76665,8720084,7068388075,52381035567,533072,712064,0300091,752069,78557754575,77801,7681,69413614261,18802,7982,65315016271665700076,322205206377251073,5563,003024181591483232991,1401,1122423662,0792,2122,3672,218077,26563687618917700074,26550647705,3671,417478001,1261,5043243542060 5354 6,7466,758 01851331552,5582,6582193281,9922,083 852803 1,3511,1741,9191,75374,26507587281714213197 404300331497169943,6113,252 13,11513,357343378 15163,8993,75778173667681341354,3103,739 16113800 003,6283,900340378 5957189258 3,6743,0894301,3226891646216422842396147581,0841,079 8488191,3891,394 6065 6158 3,2633,101236221827980515460431434 830855479453 1833661254029,3779,0712,4672,799147125123787864,7754,815 5687002201103,5573,347101267 63667410,86710,5302602642,4552,6001,9511,93600606500077,21813,97710,8745,9905,710 0 0 1,0287451,0087268911,991073,969070,553878620,0320077,03660,768071,14401717006105981,1211,64280,7240942988114115071,4583 7 8020 80,80000071,14403,2863,5013302412,8282,6982322239189 0023544314,71501,6131,7131531516768084,2681,6 2 9 1,69 2 068,2031,3891,25210412174,35404,9165,0424,7234,77774,03800076942,1192,0371,4041,3391,2891,2794154422,23 72,27 0 10387 4,2154,070013,0523,8223,5631,2551,1232,5192,4712,2172,03047485,9177,07605,42266456573763381,27301,1201,2171,4341,3705,0315,553444442384,8895,42331301,7631,6354,3094,6132,4012,6582,4282,532001,9961,9182,4632,337074,502643682 5996276060776,8967,1533,0753,0652421001,7121,63446503 ,2 0 43,3 8 100220166 4,35309568841,3631,3962,3102,3811,6871,57274,354032233328530006,4461,5451,285292291089,5091,0001,0425744 128114 3,6283,90081,97501,2001,5608828815666671,6691,583 2,8992,9444,574001,1274551,342762793555455074,3393,4383,607 1502186,0056,2959501,018706689002753409,3629,78680,3530065,60825137712512500593444 01,2863,293081979182,150019,49117,0954,3993,8764,1 094 ,4 212111,3431,1141,224079,675074,647582452172183001,1201,104403781101801,8981,9981,3871,9632282431,1891,058974916 05,061511476 639672 13,64215,106079,8651676001,2431,24860967067452134 7319 10,5869,6231,6991,8046,5006,316 1 ,6 0 91,5 6 4 1,9 0 92,16 2 394353531744446,8697,12441739305,401065,4895,0974,725 2512645,147015,63816,7661,5441,7862,0582,0991,6011,4884504257,1975,581 2 ,6 8 0 2 ,9 3 8 74,473010,06803,255975074,598073,9695,8656,308 89 2712564,9584,5779651,2913783961,4121,4301,8121,6162,7 3 02,5 8 38488693973954,6164,8624,5764,8102,4022,50710,352044445425641,6421,6714,0394,329 074,47311,83111,7945,1074,7415 2 7354 4,6604,4441 ,3 5 41,3 0 7 5,6285,2744,5244,4940 016,47916,639 808726 77825,8866,3665,6686,2161201923 4 0341 73,39303,8534,2611,5851,5491691692,2422,2098 2 9841 82778 3 17992,1392,1973783751831962 ,3 2 62,4 7 4 4,8894,80328241 ,2 4 31,4 0 21,1041,1691,3781,5051 5 8158 1,8421,6996426161,0921,12919216629321,0287458057247047385,06501 6 3144 4944861,3991,4762 8 1240 7,3987,3014,9885,0908,8019,175107103 7 4 7763 9668208,9828,7890221331202,6392,3656 7 9703 1,7371,2841,0471,4809821,0266326471,1931,13881,21902 11 9 5,766037363583451,2221,0888348022 9 3319 8418501 ,2 9 11,2 2 5 1069885850084757,22002,7892,8384854786014662683391,4811,4521,7831,8992,0311,9409,8868,4803,9003,6284504572,1133,1181,6491,6313,3072,0771 ,0651,0 777,4127,2536,5116,7021,0148936806577,0397,521 2,5442,712 3193461,4991,39942 7402 0016,39615,3884274372,3543,4482,8873,1252,7302,93871058008,06705,286761747 1,8961,576637540001 54168 1,1896185,3685,6236346321461225,6776,625835839534724 9121,0085525465,1415,59100 2,0002,0827971,2028,7588,830 4,7934,5062793522872676,5536,4324725201,3231,73711,59911,5977582449451 1,0681,218 12113405,80813,30012,6373,3623,242344342 5475491,6 3 2 1 ,7 1 7 1,1601,2141,4631,5861,2761,356004 ,8 9 05,1 6 8 181816,99018,41016,68418,0796,4636,6037,5287,79815,16614,3806456401,1557082,6343,1782,5473,1332,5222,5611,5431,4564748 1013601,5671,5571,26 5 1,348 7077119,1569,1718,4468,2466858772,7082,781713536291012,61012,152 2,8942,801 13,42313,981 293278 1,2451,195615744 655557 003363261731603712129639621,8881,7912,1402,0401,2811,3691,0961,0275945221,0931,1415,6725,4562,2882,334 6975 9841,226 1,3381,042 2112151,1811,17011,99211,9561,3011,3321,9222,06611,88211,777 9,2609,1321,6121,551494458 1,5991,642 539499 2,0862,112 24181,2478132,1251,88329634418,21916,974484369 1,5041,390301141 ,9 3 7 2 ,0 0 8 4679552552 1,3061,4826125942,7162,6105605901,4831,801 1,3351,3061,0951,0935706621,9992,3041,1176136,2626,3012,3772,3382,0711,903 1,6501,9188071,167 1,5311,472 5,6725,6352,4832,3397,3667,516838463280645228742913091,2221,193 375393001,0511,10771435461356245562,4522,5343,4283,4074094082,3842,4786793063,0303,0271,0321,0637,1726,77559861020,48217,2284,7684,9661,0208982,0491,5444,3413,968597685 4,1564,1692823421,5532,0554894885827353313114,0454,199 1,1901,03129292,7013,46554481,3471,407 ,565,5652,4752,3737,2497,175223,2503,432646600461460 2413081,9981,829 1,9092,16214,86413,4752272741,0551,1481,8061,906 64661,6591,58711 5855958951 04,8597569 ,169,22940413,9085,2675,9556,147 6,2156,075 2,0602,497 6166011,7281,6485,6315,5584,8195,1923713722,3041,9993,2603,2641,1676547,3286,6874754951,4621,380 3,0642,8981,4881,6013012,12112,8263,1633,41857471015,62816,6711,6491,6084,1063,7611,6031,583 20,22418,39018,22220,08916,92418,56717,62819,3721,2851,15895983612,62512,282 9,2139,734 12,43112,744 5715511,3671,705 1,3791,601 1061231,3601,3482152431,6531,586 6,1605,8312,4202,502 5083955448558604 1,3111,351672223161626 7547864924459,9849,465404180771,6001,7489387211,9121,8999297801,6391,534387176 1,8301,802 221,6541,8373,1013,0731,6451,745 491685 332363 15,89816,12263698,1558,2787006997711,034 2,2262,0863,2423,28029291,7571,9292,0031,9607,8567,7951,7931,8261,6491,6089947441,1341,155 12801,5631,670 1,0781,1842,0331,932 250253 2,0742,4781,2381,29410,95010,2788,2547,8681,2681,0161,4061,5056,3876,355 13,81112,6215,8906,62512,31713,1388275376400 002,1862,2706,4956,501 5866021,6421,6266767757063696,6185,7615235262,5682,72412214610,95511,1396,5067,233 1,1821,2343,7763,857 2662692,2422,1751,9871,9425,7105,990 1,5381,4906,4842,0995,7872,117 12,0901,45212,8601,6375,8406,5052,7192,7091,4321,339 2,6812,98734232912,73212,75212,71512,6892,3642,6053,9514,0701,5151,6251,3831,504 1,7471,7345,8576,122 6263 1 ,1 0 6 1 ,1 5 916,03116,20516,18515,990 1,6661,3783,2402,98239393035 4,3164,3281,6761,747 64641,1561,197 2,9732,384621565 479452 41431,1597341,4531,500 3,4363,407 1,1191,044 555753461,1731,14367,724010,81403092791,1271,0161,5721,50412,14112,9671,024999 3092799,7349,2138429704325056,3396,004 1818 11,86110,6416,3396,004 90972,6502,5382,3612,5261,4461,3451,1051,1302843005,8205,7573,2143,42447945231630700 2,3212,3164,5024,2961,5781,52486,47704434868241,3997996701,1141,3731,2651,0351,6021,385 1,9521,818 5514949,74110,1291,3571,3286,7425,7721,6561,8561,4391,2531,9351,9951,8701,6112,0052,0715745982,5862,7293,4482,3541,4291,23012,69312,5647047001,7261,7781,8501,8018096775,0635,6369691,0281,8491,808515541 8348746,6925,9652,4942,6241,2651,40900661720750712 4,5364,551 7387845,148022232,1802,1001,1311,1877817793,8153,3154484796931,29510,29510,36217918812,58112,8633,9003,7072,4922,4102,1961,9361,0679901,0149482671012,9461,9451,1109983,4633,1897,2176,671261391 6,3576,8789,78810,1064141 9,4469,4311,7251,93720,61017,4879,7019,728 1 ,9202,3 37 87499398 0953 86,34604,5064,7931,6141,6986,9147,5941,9571,864 1,7391,7328,7308,46606,31505,6954073522,5122,6072001021,5321,450003,7724,5693,6424,441471009371,4761,1141,2271,3231,3532,6422,296 40788517,58317,7492,5982,3353,7033,3272,2892,2103,7863,4086,4646,0006,5596,2109841,3065,2424,8591,8271,974811085404,0762,6521,9191,753 3,2453,362 04,329450425 10,8610,55 1,3511,081 7057114284369338881,9521,8921,3021,2498,8609,1905,8576,1224,6535,0286,0815,8175,6755,91002915,1765,2385,9096,1541,9802,59811,0589,67315,70815,87812,27113,097 12,31711,535 4,5365,0265585764814747,7167,6362,3101,8492,8242,252414357181117191,1821,25812,69212,031 759683 7,3347,5712421245,2085,2468,4399,27811,07310,97371,14401,3171,9721,9372,6412,3103,1843365331,7091,652 2,6612,735 167155 482439 2,6472,5421,8451,9601,2611,3707,0886,501 1,1811,3892,7082,7811,5441,7865,8515,33208,1461,306984010,4222,4672,6153,0272,8186,5947,159 08,24140336416,4990649604 32116215651,1691,1794,0883,780 1,0171,067 11,00210,98415,2013,753,8284,1342,1402,081289254 074,47310,1179,6639,9599,8115353174,2543,8711,7911,9104,5974,5577,1596,594 3,3596,3572,3662,4241,1771,2531,5461,5963,4523,7328,3277,8331,1831,171 8,24401,3892,2672,2871,15010,2528,2772,0712,1147528455996276,3996,6557,7257,98512,97212,5181,9461,879 2,7122,73905,377145161080,80071758512,22310,96824,346010,92311,0451,0158139,7688,9474,9785,2911,4231,2347,7137,28904,5066,9416,662 13,37102,6082,7361471351 ,6 551,63405,2721,3421,7642,1561,6222,2452,613 2,5902,5071,7092,0552922911,1311,18808711,4691,712 9,0927,6749,8809,3661,9732,183 10,42206,4656,79002,2151,1251,1322071928879298396101191 129130 1,0741,000 024,3461,9321,8965,946008,3151,6791,639 6745211741566906994,9484,7433,1752,9117,52101 521 3 62,11105,1124,8334,6204,6622,5672,39402,443067,7243874516731,0881,3519271,4591,23500465014,81316,2786 2 349 9657664 7253920401,1661,1357,9460525561 0009,83410,76910,431 00073,1011,4951,4528948058948221 ,5521,5 5 32,0614,2108,2238,509 5,7840072,8808,8718,614 2,979003,2545,0974,58085961351481,1591,0964,4594,4441,1651,1311,1431,115 1,0689395,5285,0944,9995,4377,35901,1451,080697688 3153794925163772511 ,5923,7 114,8325,3561 ,6 8 71 ,761319382441584010,8141,1931,1393,5263,7104,3874,55275,79707748231,7091,7528,7518,9645,272005,2861,5051,400073,55617,76317,6001,8011,52397593211,5470086,34695912,4952,608 1,8791,9465516167,22005215204925 163,6 043 ,31408,3154 ,0 6 94,3 1 511,04511,0596,61105,15509,8339,78410,43410,249013,371411015,19313,7212,91001,2311,324124242779890 55158912,16110,729911,37911,92911,8545,69502,0211,9243,1873,530 856842 09,6212722712,2 762 ,3091,7051,9523,2143,1413,3993,4011,1971,1990029195 11,31313,47508,6651,2011,126 3,8013,7004,32906369773758098,3841,4951,4300010,16410,4886,2727,0245,9177,0769,2788,4391,8221,7479529613,9182,9713,4623,690 8596502499073,96912,12112,826189214 5,9455,95011,20912,86612,87211,19728,84432,0793273707726066,62003,3073,4474254506815064,6204,6622823011,2891,2799,83401,2728921,312044447,8338,32705,2007,6708,09812,49211,42088085408,8622,1511,7322,8 903,036 06,6208797841,2813,8892,0551,709 5,2325,19502,9101,8101,5516464449455793,4914,4904,0083,4113,3133,8718428858328781,8231,88705,1558267721,1039634,31304,353007,438105153 8,2478,4179101,26517,09519,49109,62141109,93110,23710,02610,32705,20001,4 93 4845001,0221,0782,9252,638 1,2341,4201,27001,0631,03611,19510,4861,9962,2344,1564,1389081,0621,1211,26810,99610,8477721,339 016,4991,4301,49511,0589,6731,5041,38312,03112,692 13,42812,871 08,1462171583954811881851,1311,1244,5244,4942,8012,8944074181,0841,0790020,80722,09000 3,57901,8611,8116 ,2 347,0 91 3,0422,98303,0861,4571,4521751572,6524,0762,0902,0614,0252,8687,4049,427 889,5127,4961,3831,39604,554871051131921,9382,294 13,75714,3581391503,7104,3131,0141,2061,1389472,8822,9681,8872,15511,31611,8412,3702,2612,5912,7774784786,2206,3786,7026,5114143627,8037,217 928814,13214,749 12,27113,097 6,5017,088 2,8342,7499,3669,9911061252,3933,84108,24112811454,23301,0641,049 2,0811,7839168092,5612,6253,6323,6561,5901,5061,3681,2161,6181,5865,1095,5511,1071,0511,5041,5022823427,35903,9003,62815015469485806,61105,37712,08410,6911,3171,245 973 7,2836,4396,7977,6346,1375,92915,63816,7663,3853,1946,6435,98115,74515,2891,4241,4181,2581,1822892861,1 6 41,2512,5682,7248,27710,2523,8334,22400 5,8656,3082,6422,2962,4162,5881,9 452,94 61,0161,0842,8292,9891,0859564,0193,8054,8925,2288,86208,3388,3933,0653,0759,3669,8803,2213,2913243209,93110,23711,06612,45510,97912,34500324318 1,2211,289228250 652215125143,3193,3923,3073,44787991658,09105545544,0303,4393,4652,7011,5901,487293329 1,2321,1953,6493,4273,3302,973 3,0452,7422,0052,0712,2562,1491083,8993,6354,6914,4999,56611,84511,6539,3501,4001,3959739462612692692611,4431,5301,3381,288232716,68917,81015,90517,1741,0361,0714795422125 8389801,8491,9661,5281,6091,3171,39605,0658928421,0161,0372,1632,1192,1972,1711,1461,1941,5501,48394292268673,8283,0045,148002,328134146 8,7518,9641,2351,00965,60809451,014 97598918,76617,46518,52416,910388365061,1864952 3,1842,310 3373171,0131,089075,7019101,2651,0109671,6571,32510,86811,32812,52512,67511,83111,7944964864,9664,7685,1485,3632,5342,4523,2133,1573,2503,39510,47410,03511,21110,7812,9742,9161,93 11,745 4,1812,048 4,7255,097 6,2347,0918107791,0511,1072,5682,72422,09020,80719,41820,3692,1323,1374,50603,1913,1656,9777,071 03,2935,3465,6834,7443,5841,3261,35977481956958411,77613,90411,0589,6732,5163,526318278 1,8741,840 7837753,71 1 1,5 9 2 04,8492,3772,08457664611,6539,35011,57411,01910,27110,7559911,092 1,0491,064 12,21912,4019,67311,0589,8868,4802,0862,1124,0233,81510,48611,19511,83911,31615,69511,439 2,0392,10315,38816,3962,2271,4642,2661,4491,9382,2941,4461,4344551 9,5457,4431,047965,5817,197 7,94601,819879 1,4321,3606,7556,4666,0056,2955,6185,6504,8335,1121 ,5 5 81,5 8 6 9218673,4803,54205,4227,7188,1448,52911,1971,5411,4751,8981,9981,1351,0841 011 9 11,0101,0714967092,7382,55657560112,0686,686 9,5289,607 8208107,1679,624 49670972680807,4383,1103,0423903833,5273,9745,9295,5621,6831,65417515713,47514,8647,8195,22714,81316,2783,458943 1,0203,6061,3391,4042,32800010,33316,34608,0673,7604,3711,3121,2927,52102421244,2 913 ,9633,3302,973 1,0401,02517,93019,05117,64318,8139,2097,054 12,21912,4015,78403212595,14709,8379,2709,9439,25215,63816,76616,56715,271147130 9,35011,6532,8092,8890008,2442,0773,3077,8338,3273772518,1257,5511,3781,3839,3439,7891,27289210,43110,76904,5742,2101,9943,4623,690 18191,0172,0811,78380,59507,2037,2716,5536,4329949809,7849,83305,7844,1174,4364,3863,9556,0415,780 17,31310,1859,72910,00310,45210,799 1,4981,746 087,02310,29113,7467,8195,22719,79019,6692,2872,18611,05711,40812,51711,9537,43803,5013,2869,3958,6757,50914,321 2,9022,7774,3434,06507,5211,7042,0 65 3,0683,33811,04511,05910,65311,151 9561,0853662421,9521,7058,4518,1893,1584,11911,40811,0571,1391,19305,1481,3891,1817103299,6058,23011,95312,51714,25613,68413,63612,9254,9584,5771,1151,143 9,2788,43911,46911,237 1,30698410,81810,362010,3523,9743,5274,849011,68610,794 52,4481,5711,2742,2372,27033,13611,86021,65218,2383,9743,5271,0419807,2547,06991,75201,6031,55310,79910,4525,94602,7382,55680991610,1179,663 8,2238,509 5,1095,5511,18961810,36210,818001,5471,7552,8052,6856,5947,159 44441,4691,71210,27110,75510,16410,48815,01912,91211,77613,9043,2262,74212,32310,90711,06612,45511,05711,4081751571,6791,6393773711,3171,972879916 1,5461,5961481651,0161,2681,2351,4598,9648,7519,72910,003505449402125 8,24405294927,1587,3062,6132,245 2,5902,5072,7423,226010,3521 ,5 4 5 1 ,2 8 5 5,6755,91016,63916,479 13,72115,19328,84432,0792,7352,66173,101011,85411,9295,2145,8024,0654,34312,21912,40111,21110,7815,5625,9292,6692,8742,8742,6697,1647,75219,18117,1681,6031,5533,1332,5475,2465,20811,68613,12133,13618,17613,90411,77613,47511,31319,95423,0256,8697,124 6,4666,7552 ,8 7 4 2 ,9 7 3 2552952552959,9439,2521,4071,32815,78715,50213,28112,5716,3386,0995,8176,081 7,4467,5389,7707,8467,8567,795 4,2703,7771,0891,0131,2901,24013,37812,3451751573,7113,6227,2176,6713,8292,896 5,1614,5792,34 71,885 1,9501,9811,9541,7391,6871,5724 ,04 41,9 13 7,5327,4409,5127,4964,2964,50215,87815,7082,7822,6394,3284,3161,3891,394 FOOTHILL FWY0 .33 .67 1MilesMap layersNodeBase Year LinksNode selection setsCentroidsBase Year Links selection setsConnectors999SBTAM 2012Fontana SiteAverage Daily Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE 2,85508,651003,586026,59218,06803,071004,80008,592424,568008,5925,164003,6185,16408,65003,914032,01504,7890179630000 1051474599817113,93001464,74904,8020435120,72507,67901369519,98500060488020,6020020,13315,8330016,536018,09013,71404882151,2419751 83 11,5542,153 2321019,410013,780021,62217,6180029,7003036022,02055313118,177020,173017,4870023,243019,00922112521,0370733398455715,9230889854545845917000022,0485290292117018,6522,8130125646013681528231102266679695766702026,411317232702600022,73218713704,79963815500536678851561100 2123 2,5371,727 048122102570973139213 586699 284210 47113195452022,73203142741009447 161800141303202501,071926 4,5693,816232229 731,599886307208272233571,4021,088 10712600 001,8771,119228230 282260158 1,1861,1815197227532522701391111144224250449 373188583339 2722 2224 1,2717779576370210220137109177 286439137178 6828637243,3182,6765691,115573621833341,5211,288 21234580371,41875897267 2522014,4423,775120635641,02571448000241900021,8133,5003,8362,0841,334 0 0 339291347247235806018,732020,51333347,6790019,62821,624018,9570860025215452349223,39802803532736023,9798 7020 29,30300018,95701,2781,104182701,12861551011450 00101653,614042265455652722024,54967 3578 017,326381401374226,46301,3861,7891,3821,88225,0000002741850473456334434326131194651751 1917 1,61495903,6181,1071,2594306147871,07562470919182,0762,11701,71530715134715019,66603403925183701,3751,837181418141,3321,78610127423951,3971,71275786678785300583901760972021,325241193 1522271920231,8382,6931,2108001440060743418248 0 11,3 5 7009560 1,975039323244054372674853947926,4630891099013202,84156130411398021,5243213832912 4742 1,8771,11919,0890176464364272152302545497 1,0467371,33900306172320260269201165020,2807191,455 1781,6002,047231351279176001181083,2654,16627,7250017,548117292927800348111 0532742018527019,23907,0484,2642,0971,0981,0 511 ,6 3560558231610018,709021,874158169844800487301178738434306144261,03910351329410280285 04,568195103 279229 3,3755,532018,8901590462337270210 47932014 0119 3,1672,1784826032,2331,612 6 3 3366 4 749 33151325911319191,9002,3311569502,613016,7942,1521,182 561301,55904,7904,2573636496936525414241411403,5651,309693 1 ,0 3 8 21,32508,59201,831418021,873018,7321,6041,944 41 99951,3441,480928461021494724267653639 97679 2972031791101,3181,6221,3051,6055929743,237019192532515025821,3411,318 021,3253,4663,2882,0941,3892 2 383 1,9791,2915 5 1284 1,6661,6051,6411,0800 05,3585,061 356191 31281,6192,0351,5412,034251331 7 184 20,21609601,71657542950797755822 6 0276 28312 6 52487955741311315881789634 1,6532,1491493 8 3450263488326580 6 047 7193931982223513861032653063392913292032332821,57607 93 8 1891263705571 1 774 2,8702,3801,2081,8373,4312,3654828 2 2 1270 4061953,5502,4970143518357591 5 7314 93345036486121744316425335640723,955031 0 1,406015131521255103223952508 5127 2563004 85327 294332520031291,864079798020712118413529245893895495716216572,3793,1441,1191,8771271677461,5744135151,7983703 273793,5482,9462,3563,2133364822631491,9672,881 610990 12411152041713 7121 004,1354,8431351648161,7568061,3716371,23923317301,85801,639346264 471359175201006 566 3143792,2282,82619518633351,8531,833356296213195 3473231401921,6971,23900 4898491865002,5563,081 2,6951,88114517984872,4303,0921601672249674,4183,0632832146154 322339 346002,4323,2793,6709861,01182161 2581625 8 5626 267496427540506306001 ,8 4 11,0 7 7 684,9584,3504,8714,3211,6372,1301,8202,6265,6314,3212571793283996821,4646131,4949876025963801918 95150342435 8462 2722063,2722,5232,5882,5712832771,05860820324010104,5742,698 968501 2,8735,227 12567 472327279324 340211 001201336761190204403147525458396255434162974812361416074022,4391,629620981 2532 419508 665347 66813764293,3453,2284523546241,0933,3793,111 2,2703,663663348148174 419455 201174 538646 1253961566737131181064,6625,22126184 444397211150 7712 1633203161 2655762451551,008695138260487532 4106873426022022646557813311882,3242,088666973665811 569799235455477511 2,0041,9807609122,6272,850332819540230362222148408384 124159003183804931362111 1852108497261,1899681781108237094751201,0328533254442,3112,4681542525,4435,2141,5711,8223414867293052,4431,086181210 2,0301,330871654881,088189174187228159718531,682 55625611118001,3581420331550 ,537,4039947242,8912,423118191,381232600132164 64158866416 4749335,4923,37174135259457563797 232658441810 1921290341 03,8523225 28055517131,1941,5521,7332,043 2,0111,838 5031,179 1991947573622,7161,9121,7512,4811261247816559641,3356062732,1802,339126203579327 1,208701424541003,1724,5838741,2181232804,0416,6135076101,1141,164620529 5,3045,5935,4535,3575,0194,9635,3045,1395772983702783,8733,298 2,1593,367 3,3033,990 200148438840 451832 37534476238770605400 2,4001,961573973 2891811420188163 3845621657169165 1802771672123,9462,4011713312742065244527473552726225066427630683 597625 11534587975959430593 98380 81162 4,2004,88528152,5922,772256201423372 8925449601,11311114588228225312,4642,6026816285076105782374093401280496567308417730516 8188 3419234593223,1502,9792,1912,3415814183545571,9632,069 5,2473,0281,8472,2293,2113,2743228100158 005997931,9552,159 2062034696532626322527172,4211,6412021646261,01935333,1432,7801,6802,589 5465831,0521,390 771146509179534261,3342,084 6013642,2406271,662601 3,1464253,9786391,6632,237762851411427 9518911531403,7233,2923,5243,7297508841,0381,572433621380573 7674581,3832,142 2026 2 2 93995,1504,9875,0615,044 5204651,18472714141017 1,6451,906387694 2225257492 1,155626167247 153166 1518407235476433 1,1031,033 467297 2124231643530118,03703,4830129744742475325163,3233,189294351 129743,3672,1592403881202472,0781,837 68 4,8892,1742,0781,837 32391,1477666221,1243894973113921481271,6541,8367891,51715316614815100 8046571,6121,43563034621,0490210160351643333157485312271465478452 703511 1961693,7792,6074673861,8961,937647649518495491721828704 7485832531278588431,7568165243773,1163,7362144153847146417413821441,5382,183286449582747141243 3083812,3271,8061,00660938171300196329278268 1,4331,375 2372721,9540107769563323399183254 1,0951,148123216875883,9402,59456693,6283,3401,2591,227754983526700347320327306267979897113952311,2009682,2412,581776 2,2132,0062,5573,3411716 3,2612,3586667365,3675,3773,4242,748 4251,1 68 23837636 5242 20,91901,8812,6955045732,7242,417712537 4145842,1623,40102,72501,9342176976394919952471372001,3691,7081,3221,6528100315858 277536496293926597 152175,1456,0071,2406751,5097278985381,8149672,1201,6532,0881,7663069172,8841,94048074140374201,992808954520 1,012986 01,193141140 3,7832,798 726314 2502561351152903098617064273892,6513,0821,3832,1421,6681,4362,1311,3721,4932,27601011,4611,4831,7071,7744941,1042,6533,7594,5524,2463,1014,842 4,5352,894 1,3152,4001452401641622,9371,8531,2183611,380641741624737743524705,0962,533 345224 2,3513,124761032,2921,7033,4762,1814,3252,76218,95703927155719996141,765177189534569 692991 6556 126192 8986345356802525402,5361,906 2735891,0586083636491,8811,46902,42791730603,2077358601,2226791,7822,468 02,1412581654,7890190194 682492103734371,995680 248300 3,2223,0195,5733,3841,0401,74884153267104 021,3252,3422,8063,0572,0932591131,6389384907191,4641,4322,4681,782 1,0422,1646878204634026076887601,1453,0792,085370414 2,86105555978144284,1302,2723939151954381522272,0792,6382,0992,6754,2233,514686565 80289202,0795965029,3032851213,3613,8967,01504,3482,822366262 4,2493,0121,6592,2274525332,5332,14101,6412,3111,940 2,81906761,22556575 4146401,3383621,1651,356316814885 9626453701,114113985164320316 574894 4,1491,7004,5523,122507918 3,20701,8102,0110549204484936225836127344841 5 647 454225 07,0156385471,862002,822517435 47932072652303212,0601,5811,3006152,59806 35 760902,3231,3282,0911,2091,0595120662018,037942152283784733345764310018243,7215,9152 2 618 5256193 831840172974252,5010170253 0002,8142,7834,117 00020,11640545538220035521655 54937292,1362,0063,031 2,1300021,0443,1292,154 857008761,6381,249294157584832661,3811,504398367348647 4743141,2161,6801,6361,1872,2850460240217246 1231042362032921176 7 11,8 981,2781,73753961 877132 15520203,4837194309371,3341,1811,73421,03701803435435382,4673,5451,338001,639457459018,6526,0075,1556065173242802,8340020,9194530754910 5656862091841,86401282232362 031,4 2889 102,8228 0 41,9 7 44,2832,8212,15901,50904,2483,5834,4323,71802,81925805,5803,3809760347483103762294662051493,5513,747623424,6952,8021,93408504379061,444 265301 02,6758210566176 6529806 1,1457527491,147440290001189 4,0233,31302,498321428 1,5909541,19302717198348032,015443518002,8042,8971,7583,2542,0762,1172,1813,4766185252703762,2566861,1031,274 2941133188018,7323,1724,58354104 1,3702,2493,8943,8373,8363,8877,60910,18176176107912,08101,1288801401412112612,0911,20910592434326 2,81406434333540772,0853,07901,3772,0162,9393,6233,68531424303,0411,1704458 961,210 02,0813153013732,8401,114370 2,2331,43109767283402225 139135241,2091,2851,3839949391,38431424230923950170201,5093721812733841,26401,234002,7583859 1,8693,2603327184,2647,04802,67525803,4994,3273,5874,26901,3770642 1871683094231,223669 53345134503683243,1942,6757741,0251,4851,1513054983695883,9473,327340467 04,7895184432,6533,7595733802,5335,096 5,1432,844 02,427567710812676564642651,6411,080501968160129250449005,9525,65400 78807667101 ,2 723,3 11 940719086539053289788081,9925866991,7391,1121,8523,929 433,9031,91147041001,2723242 541316921,114 3,9064,93459601,0052,1103783623363437711,0733549123,0902,9291,1526286581,3691201932,3763,1283,2132,3561391362,6952,214 35434,0314,938 3,1014,842 1,9062,536 1,2238492,3923,40248494822,05602,141474215,0530463281 1,1162782722457828141,3491,0814986024902104226251,0082,551380318353606 871652,28501,1191,877594923641902,15902,0793,5683,719589294 951 3,2132,1732,3633,3041,8791,8704,7904,2571,0841,2593,0262,0844,0294,940570414470352117823 6 84 8 36261,0192,2724,1301,1571,37100 1,6041,944926597804790 7119893453346581,2413113051,1861,2101,2122,1473,04101,9773,2548001,2103,1224,5521,1151,044991443,4994,3272,8193,9942,8353,93700105130 31746868126 25781472221,2358021,12888033024915,33902251621,2971,2871,35880073833486139 5123011,0691,2591,390785 910975748583617833521,5151,1531,9721,1353,4562,9933,0033,31054635936725367797967432758427409 7135,0854,5384,8884,352292385150189712 23537056266449265440663101,57632718924842962774671366946835370733235826826351,0859581,954005315056 2,4673,54540741317,5480388329 2493884,7615,4574,9245,036142121015,9212821 1,765614 12895272420022,4673327183872568134883,1223,8883,6763,5543,4663,2881491831,8221,5711,6152,0407268491,0869711,0001,0013,9372,7884,1463,0421,021918605371 1,503727 1,1822,152 1,2723,3112363203183806261,0195,6545,9525,8904,8437591,5731,64108951,2581,9722,496 07421,3322,3391,4261,2445163482343501862064,1873,4462,6533,7597701,72115486 644634 3212231,89 8 67101,1349284832521763,0033,3103,5782,7642,5753,250234478 281463 3,6483,0083,7592,6532,3793,1445386461,1731,1472,6753,1942,9283,0904,7923,700 3879074,8434,1355485805884866921,1146675301322 4,6281,46927162 1,3093,565 2,5010651278 4355032,2121,7311,6002,0472,1381,9641,3282,3234 9 7515 3882558981,32501,7152,9071,9432,1423,6877664384306143653174841230355227163 8897701582524,4851,943 2,9662,880 2823112,2502,865 22716319135602,7588479401191371,3251,0501,4892,12465143889783,3715,4923,2941,9913,7215,9151,979451 4372,038334456 5310004,5704,14801,8581,0232,1364943342,5980761031,6 851 ,1241,390785 3872895,6434,7825,4744,7763,0132,277 3,6483,0082,1300971161,55904,2803,1464,3163,1414,7904,2574,3694,5235946 3,3103,0037561,0400002,8613701,7982,0853,0792921172,6162,1453785153,2642,7526434334,1172,78301,3397685781,1031,274 10892531,11627823,34003,4602,6282,4303,0922593653,5834,24802,1308202,2721,7699922,1821,588 4,2294,3602,6154,0772,6872,930 584910 021,5732,8404,1433,2941,9916,6905,7979095334,0432,7933,1683,8502,75801,1041,2783,4692,4672,5994,347 9957021,8801,02602,598418868 8811,3114,2832,8212,6963,219 3053112661028065292,5692,5476922,3362,7934,04343071901,9545892732351753,5272,2203,8503,1683,5814,4343,8904,4181,3441,480647348 2,1813,4763,5942,946 9173063,5352,74203,2371,0501,3251,13403,7742,913 08525123986517518,6863,9435,8676,6831,0501,3253802713,5762,88423,24306906112,9302,6871,86208897702452722,3422,806 2,0063,031 1,0082,5513143792,7423,535004435447968221,7822,468 775748942,5753,2502,8042,8973,7304,5484,1873,4461,0329194,1012,6292,8193,9944,0432,7938978517435151109392715330249 60768862684185814315763,5452,4672,6154,077891782437 2,86101692172,6411,748885814 9626459191,03203,2375 6 1304 1,4932,2765,0615,358 3,3805,5807,60910,18199169220,11602,8024,6951,7072,3131,0261,8803,6483,0084,1463,0422,1241,4898198088088191,9083,0725,0004,9406906111,4946131,7032,2923,7743,4448,6866,6683,4464,1873,3134,0234,8977,1691,9002,331 1,7312,2128 8 91,1 8 2 425042504,3163,1415504434,2714,5304,7193,3112,1991,4941,3722,131 2,7082,8273,8322,2212,4642,602 2,0751,0514202726065693,4663,40189781,2421,1162,2412,5812,172733 2,4061,2081,23 3374 3598547466665394792 ,00 7760 2,8252,7053,9031,9111,4351,6124,2464,5528608801,9061,645583339 FOOTHILL FWY0 .33 .67 1MilesMap layersNodeBase Year LinksNode selection setsCentroidsBase Year Links selection setsConnectors999SBTAM 2012Fontana SitePM Peak Period Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE 01,8403330023201,7491,7350023203322202,46833206,08205,073033302,35402,919000136132 04,44600 019,3140002,5244,78705078424521,63001239715,5310019,4303,010017,3580019,2346356243005,753013,81314,1310017,687015,3823671676414896 2 72 772634018,305013,894017,62710,60905862741302888484015,03100 25024712,43106,08200318,829014,1850014,61517,1260016,66027528218,340011518812,261039727116616329541693011,3060015,3728780017,15623237001,6828222597922521043927418378398789151,00616,81205841273294114,73003711551,4261,0420232646352593701598910485998,2440411213 207285 0121570488160430461502 148517 2406114,7300022,5622402162007016,906072634843026171609249416212075101929222463510012121,185617 5761,139159714660171300625271114193514341157811,092905 9304443425577527328422135165242116 14911127975178564193184002125014,6431,1241,5562857 78821,10537976108 03121160288130 015,1802,1183,0101,12801,3885284311552564881238015,9784,2531,9321,2211,446 00 721236023,4292813020214,2790252130003,01000932022,46523,5290013,89454700017276195366016,088193118986316015,8241 5 9000 0022,99700018,8290747630183558868508263 1209242862022710234282,54001,0611,042101916,917085 7317 019,1968,2440020,63930319534459296978615,85201,2501,5201,6461,370016,254001413463801133751441391,4852,260 1,3042,364 25 7272 8148 413753011822905,0731,845856161596682568083791391,3912,2032,8350331734459318,91506,80202214461,8161,5771610981,4991,7668123341351,488782104282570439620672004401,3631,38950015,1800107170 167235272193212418247231,7717440039920030822911124154149 8 9466 9581 2438506,80257150901,1976,0820015,85275965011101,05411652533251502720019,668396322236 1949 017,72354741316810434316137674351755 94826701,111071687501312019,67601,288392 01,469020,96240631,40499020913239036601,105005192572,2282,66716,84200077810 014982831912212017,84401,9232,4834,5741,23180945 41,0 6425315412333817,930014,7830302882075431,289000148338171728271,1901,62183973005,753281271,5060141361680400 2,468016547 112189 17,9860431112,108003107177 1101048 662 3,7122,0506632702,1552,040 2 63 402,5421 9 4402 1 585 0518770117716083607722,46501,4231,62996677231,753 116531,32503,0414,0922,6434,0593201,0474646083913851,3382,1411461053,1221,616884507 3320563675014,7836442621,6412,041 51 222307971,8043179947913252872666094 38761 1282981151432,1952,1692,1132,2207303422,0180844877801244503601,033650 2,5482,7881,9692,7276 7136 2,7851,9291 4 4448 1,0641,1334971,23026 61,7574,6813,703 383297 1794911,9531,5903271 8 851 019,3231,3731,02036049150262432653 0 4360 2441382 0 618926373046515038356875 1,1041,03915143 7 9231146332465216 6 13 1 7372551242132562973448345929620015825047601,2294 518 142721252588 087 1,0541,4541,5955921,9412,5085321 2 2 1194 1,7536461,606856329192125801,4232,6980022455922234 8 3436 4383583401613119993215506229016,1881 8 513 9 710105612,0361,2933351421662308 137 2281731 84496 3 7 113 7 5116387226162401,756305274131519912489221963653604363,0391,209751094,3473,9431081151,7887401 191021,4221,0751,4511,4282842342,3841,756 714767 62822884258 5111 591,1209434,0622,266840189247250005761,02401,82638097514524301,04816895 247429133104262644332871,3111,090550604262132136179 7059662738122024372164694251 3213201,8652,152165135 3140257383591,3511,35375681,0201323,6633,5901620144229 277179 714332,2663,7572,4704,0271,4131,17317736 761615 1 7391 152334271273284002 ,3 8 6375 9172,6534,5252,1791,0533,1963,8060989208101125161827277205129175114 121041930050 6197 1431581,6811,8812,0382,066 2,3291,240 1,1682,4732052284963272205401061,7943,471 379188 4,0681,859 208205 107194251137 107132142152 2826801562581883151,1093811,1973254974752344,1573,778167751153841,2321,1361,3734742343799841,417233471 178421 242303 38472751883,1793,4011943252,1531,3261627473,1843,358 3,0532,699553215287214 144167 90150 610608807594 126200 701968 275282 131225213163219624633303 5831,331 1262031,316874 1,1031,273 4,7762,73782156 612308162254 3 2882 1733539369 1132261868259219397399504245211420335270 11630739725077704422621,1131,0351,577501536293 340328477324 1,1477855971,5541,3701,2131626365826101147633342293359497 718731455272440813 149886833821,2092,020661351,5102,391172763,0095,3181,243476241338 9041,1902516111,0891,2272072028973166393311,153 460217996136697301,2199672 731773481210 ,642,4036487591,3921,327011,001478540224362423152135 6333313477 1585053,8662,7164769174349222362 23436219138400 1521132270 10100393761,012 4361213982861,2911,704 1,6701,449 2,3502,108444259564113 1201711,0752441,6169031,2211,3761101914883187705075888372,2531,596118129200498 497939380348102,5513,1898786581202564,5962,804871250953758398605 2,9975,1593,2285,3694,4032,8674,6232,945184851,4162,417 1231603,3033,337 2,4091,852 3,4013,252 14163320301 387243 246043134700 3484422268 1,3771,5499701,272,726,4753,9644,111329733 66108265102101238 6778052693402656019191695889 982223,1261,7901292415222894761412661,0836111561424059769102 375204 01150404689602309361 22864 129381034190285315453 2,0481,64217316351150 3731775637991993153121651,7801,71625087119020025618500321435321435309238 6688 6448741613151,9451,7012,3412,4945371,0094413124797101,6631,576 2,7093,8641,5911,7203,5522,441162067175113261 007938291,7381,583 21135024796915171914381322,0991,41314124055433,1582,1892,2051,400 1,149778 40731,1935062651,445942 1,3144931692321,9745821,364 3,4413602,6752401,4152,0119581,031276365 75155359482,2453,1332,2982,9423487915097516574987384055423471,8671,783 612 8 42603,5814,5074,4753,696 3063751,1896271412 704261 103139150425 570869130256 1,0211,1697567 375569 530706 365384 151215936219418,11202,07202673216417464838 3137 25721,5031,302 2461321,3621,411 1452311,6341,238 179 3,7201,8281,2381,634 264677683398644262395254301199791911,3682,0373339261,0211,16912824700 379475019,353151341136251475731640451175384 319399 98852,1042,791424226223202117155329556 1,502497229691882137756963,7242,49038577926758867439334551447945170835845124 4824361,6861,7437251,178228562548633586274 106267178118 7971,044 123141983917616668777806238336196218 6951,0716541874941303,0303,50052445613843,7152,5227649527535041,3137674740572612,26101,021597216751,2911,4401,2682,3769256 2,1871,525109283482 801251651351,5983,04677 2,8011,3688706652,7045,1831,8461,965203195 172956 26314317 0295 19,6460684383342,6591,441553352 3302412,5982,8212,00559501,15642118001531432162251,3151,2481,2591,207076 953389801,07941249328398786565 4272451,2824483718363991,0666086106662915963792,1922,2322,2202,1130587421945977955313558239601583036338411,1691,1741,413 01,0482,3600105146 2,9392,349 299266144143274169 6206632853802,1521,9861,7941,9111,2938601,7321,8591,6091,01201061,2661,12569450523,5040015,1803,9674,4172,2173,540 3,4202,142 917582546577901521451891,1452,3393592279791121,4441,4972281671383812164133222791,9474,205 218108 1,0641,12015041,0891,3443,2261,1503,5632,69621121640530480373138163 199282 3631 51131 01,6923387312564033,6834,4611463221,6772,034 3,7551,2344963271,0473201,7901,54002,062421945971232,6511,82901,9573449141,4982,116 02,213604223,504002,919129275 262002553564381,270245 323166 2,3342,6354,2733,266900234284674471823,1961,7221,6053,443701174311,070753616 3602841171591,4982,116610239 4913891,1871,4512,5401,653647662 2667762874202,1411,33851313930494167235 89571,5611,3649011,4938,24402,8872,717742356915 162114115195 1041193,0262,2034,20002,9952,081255225 3,4812,1081,0761,3753196311,2881,7531,36301,2661,655 1,94905611,4122007174682612,0331,3271,20104239831,194349022,031357651 014,998606415966256502784442502968,24401,0413,0812,5951,533230634 1,95702,4271,5520471974548131,468872281611251619599751140360 4 156 107323 4,20001,7276981,6520253311 1101041733149818258521,3131,4732971,1661,69604 1 09 0918063601,1082,1509152,14001,579831568701018,11202488303,1234193025265504493770011124,9532,6321 9 311 2180110 201,1797112283781,5450251117 2,1851,5261,73803,0532,26119,21703052029424822013441730 88647732,1802,335 918014,28602,4542,393 1,3658891,4721,17813171243361,696042414651313320,306006,802210524468287002069272,3111,1762,198978751599 704847 4,2543,252 1,8230269169107129 2,5670121412367330419006 7 1702 3 1 9345 51270223620182375 10415602,0728997052,7324,6064861,0781022899757421,4272,7111,20108851,1083244001,04802583984072822,4451,18120924619,6460198113144121 1595943381,7560211877332 361 ,62854701,6521 ,4 2 33551,5782,6381,366001,3412,2132,4162,3372,5151,949005389403032351504129415 891442,3382,981143301,5501,8912,8751,67031867801,156608258298666 501601 02,134814638 8488310289 1,1325151,188503323171482 4,8271,909315253 1,5147711,0480141319429145015,4184273438623333,0743,1631,4043,3772,2031,3913,2261,150017,1565703441492454791,4331,3381,510 13171,146510832234,1414,58124,10002,5513,18921289 3,4522,3713,3892,4495,2107,25760112211713901,4051,053817105146884642,14091585344104168 1,7380592826434023232,5401,65303,80001,0571,6532,5403911181,52901,1421,3431,3342,2897101,1 58 1,40501,256499783824256966 1,59976008941,256550323206102160121,6068560244029805,5401,2061,0379901,2143041351333012382351,34102,2451,223 37513311031401,5792933325576 4,5742,48315,41802,13405303864511,9522,4182,0612,4321,0570416327 0181 3330199105497930 31963005,753241258272358 117218 71604293213131583861991,9942,867540375 3434273,2772,7231,2343,7553515764,2051,947 2,3934,258 2,06202260112692852 2,91906101,5485051,2361883792222196291,469005,1283,81600 5714332 ,5 907164,446053741707674432774742798411,1695744591,0541,1192,7641,724 221,7572,71849331301,33716115914384635 3,0383,4032433417392,1193443304803815804382226152,1993,2211,6161,2552967761,020407001,2681,3911,4511,428643325140951,9561,901 25132,2633,177 2,2173,540 1,6772,034 2774436461,1642,5052,273002351448101,9062,21302,70104919011,720400324325137 1,6273497031,648219624199475022,0315162191,8714432654229839272440502170 7057801,823026482451202,3572,81201,3663567421,008224 401 1,1251,2031,3251,1248861,3784,0592,6436198041,0861,0533,3122,62843026027932289419 6 03 4 1 1,8292,6511,1891,06100 1,6412,041565786636395 1,02 15972381377634412101891,0001,07317164431,20201,5291,7717231,5332,5958891,5671801612,4181,9522,7252,1493,9332,6693,5903,0225789 37032289223 3818147731,3667128171,053543405309136013,755851611,4547021,2197304651163485 3741536999461,078376 7635581,5024971,629506136421,1351,1944604,0471,5431,4494,00016329837416776767676214464251237 744,5722,5862,4304,43024217528610347 1702144122657093263291,0673051,1521,22901043003191729655139225553221651374992491761637848129701,289063229 2,7111,4272521621,2423,58524,3870145214 1704302,6844,8772,8764,4589187014,6431313 4481,282 6472295228015,5685763252781954216432,8362,205881783,0532,6452,7882,548761521,2092,02068357375638292491206,802002,3242,8282,4833,0425255351,490419 8281,152 1,753723 7162,5901822724402722,0931,4444055435,1283,8163,4005,232016,9061,36305718021,92301,8501,824 4421,2011,1911,6931,1671,4051814461,1672,084176908146691071542,1364,8731,2343,75504,24422697 8501180522419 234113 7 0 267123,50405883716433252551712,7022,114023,5041,4494,0003,4513,1313,0103,244253132 325137 3,3932,1752,9303,213 1,2093,0391,0587101,1331,0641,2551,6160392,1993,2213,5483,717 508137002,2664,0627622333037432,0032,86728924063538485 4,0171,465324171 3,1221,616 1,5450930333 3902771,5561,1251,4049901,7131,7391,1082,1508381,7693 7 4317 13322280950702,8352,8972,873216470 5245821,6211,1907154581 403 6 0350725669523522658173861,8711,872 2,3022,294669523 4574381,8231,874 383297 537417202332261,1166478681,71226047358522,7163,8661,7861,8302,6324,953683810 74570913375 1,4142,15502,701604446772,542003141,5955553381951,76983815046201 ,3051,078376 2541592,7204,9594,7912,7401,5452,066 2,1753,3932534771,32503,4742,1173,4872,2124,0592,6432,6374,0003227 4,0001,449375233003514005,5400029702441,7887402,5401,6531,3771,3961,8111,9182,1052,4655928262,2613,05301,1116795571,3381,510 3399261,62734916,08801,4251,6041,3511,3531,3961,3771813022,4162,2131,3532781,4011,0351,9112,005 1,1955152,5062,99339149300200205,75110102,6503,1671,4593,2083,0803,057 19,75901,5822,7822,6983,2561,8301,7864,5645,1481884192,8051,5472,0882,7615,6141,7066307472,1481,8305825243,2431,897 1,1812,4455972881,095404619301 2966392,6381,57802,9194,6062,7323,2882,988 1892101837289310123971,3791,9671,5395211,8911,5502,8051,547892411,8142,4622,7612,0882,3283,0912,0180705125,5400002,3423,2510244029810207971,804402385 1,1503,2262,9542,767 4219452,9392,6811,1166472,8573,091 159493300350582524 2722572,2717,4692964591,11664712000010,94501981630023,00701903981,0571,2822,6503,1673,0573,080 52265888178014,6433,1961,722 2,1802,335 4431,871332872,6812,939003234683624631,4982,116 007,8980187159011,3064,9372,8931,5262,18523233,2443,0103,0743,163071410005,2522,3082,1364,8731,1801,1213,9622,3802,6693,9331,5472,805001020311253218117 701642162113091368131,468389491691143124410044937701101,4272,7111,4593,2084025197527 12,43101112931,3962,073357651 8381,7692,7821,5822,1551,4144156061,1801,1211,3771,3961,9492,6455 3 3251 7,8980187015801020001,6091,0123,7034,681 34872620001014,643006,504160013802,3341,280 4,2543,2525,2467,2932,018006,504158014005,54024400298019928219,21701000011,6702,875171400001,0954041,8911,5501,2232,2450110002,1753,3933,0422,48310,609005,7511100385402 8681,712714100001,2232,245012,2616866924774944774941,1612,0474,6432,9592,0055951,3441,0892,8573,0987602,2432,8587,4694,8732,1361,9094,8273,9154,9126511,3601,4231,629 1,1251,5561 ,1 5 3 7 0 9 1577,8981890000018901577,8981,1801,347010,609227359515757513,9852,063138016006,50403,4872,2121871792,7113,2911,8881,9081,8591,732 12,43105465771,7971,9051,2042,8245952,00583063405,7510714001010011230794,244001,8861,960 461752228295137006,5040161855893 01100058527197521,4792,6604,9372,8938672,41711 9989 1458811590201010,94507 46798 5763512,7181,7572,6511,8292,2891,334011,3064,0224,731348830FOOTHILL FWY0 .33 .67 1MilesMap layersNodeSBTAM 2040Node selection setsCentroidsConnectorsSBTAM 2040Fontana SiteAM Peak Period Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE 05,02410,049006,61905,9285,188005,12509,7059807,1149,768014,573020,17009,97606,762020,153000821875 08,56400 081,3530007,29124,592033729224538994,035096847399,2530093,42425,4130113,9680090,3513,3933,31520,360000,412082,18382,7970085,360089,9601,2901,3343,4412,6902 ,73 32,65 8 200336088,502089,906079,32157,79502,0032,2461,205997455428086,83200 1,0811,24058,718014,5730013,65786,055082,2320085,77782,04100104,6001,4101,47985,048091573568,23705333947166621,4711,41336531820,360040,3390086,5402,44800111,6541,4011,42504,7098828344814751,0831,1199981,1121572075,4614,5805,2526,070103,41107321,052248269541989,46001,7111,8006,1786,80304,9572,3514,1123,6274,32211420973341,6051,07020,08704104025020584953 05123,3042,6801,8491,7502,3702,258 1,8061,746 8151,16089,4600099,3071,4301,503876939111,85302,8262,7721,9361,67224,164015151,5841,68756357958591,3631,3464493360054554,2944,673 4,3795,0342,4091,5173563005962922083283335026112441301,2831,4074154744,8075,142 3,5183,7351992013,1872,8892,2372,437830755951648 8177627441,1242,2412,0301179338100009191068,8327,1567,209953584 4742983,7083,930632341 020,3607718049971,205 088,39013,66213,3435,34706,1036,2361,4271,5101,9101,798115116093,30618,98915,6797,8517,753 055 2,3981,9280111,3642,258900017,12383,441091912,850025,413005,272099,936106,0600089,906346324006236389011,456093,2936907364,3134,508095,9814 4 8000 00102,64800086,05503,6003,6121,7861,7141001151,9442,063 5775463,4523,40167863923821113,77405,3004,806585995,68802,40 82,6 8 1 085,84520,0870092,87013,65703,8673,5791,7471,292415374102,17007,5217,6107,2147,3090100,2420075933,2123,09888297673569610,52210,220 10,45210,039 1,29 61,34 6 308778 9381,30020,3600785808020,2257,1346,8585196282,1162,4012,2762,09362788,52310,2779,20508881,0791,1011,31991,687015,03801,9211,8259,4789,189635941488,8979,14131331,1741,3206,6446,2549851,3042,8952,4303,4063,690003,9593,9864,4054,21688,4630632597 1,0599811,114954793,6043,3626,0336,177121107001,4941,5492,0871,89244412,4562,5423 ,8 3 14,0 1 0 515536 1,0281,081015,0382,7242,74007,72714,57300102,17044343633133109,6836236501,9081,87423423317,1230096,9211,8212,091117161 123126 088,0402,6222,6521,0411,1021,0611,2559301,1142,7832,803 3,5563,51906,253024,1646331,6661,240092,03704,1234,397 07,664093,6122722747,0956,6119799361,9081,88005,310501,7962,04114,74413,272106,5190002,1302,169 01,6224,0423,371461478088,37506,43721,53419,1795,4826,8055 ,8 225,4 626341,8061,5191,38786,822085,937086979217,12302753537,6960001,2091,177493771541597,5958,0763,8315,200040,4122762888,27301,2321,5912,3082,544 7,1140606779 754728 86,99906045738,310011208819833 96790544 4494 14,84415,5232,3432,39912,44212,521 2 0 03 3608,8581 ,4 7 71,4 1 7 2,07 0 1,9 2 5433879750024,16408,6190525399,93608,1008,6964414786,4176,523 3884937,112020,65518,28018,94819,6672,8943,5283,2073,0101,8512,0349,1919,96472064511,83112,826 3 ,1 7 8 3 ,3 8 8 9,76805,2042,909085,8742,1822,3288,4629,519 76 8697365,8356,1941,5241,4923763801,8691,8232,6772,3053,2 4 93,1 2 21,0851,11463864411,34411,85011,20411,6532,6482,74416,525048358753525455722,3272,0284,1124,059 14,50815,63613,65311,4067 2 0463 11,60313,8281 ,5 7 71,5 7 0 5,2305,4705,2714,1314,2633,93824,65424,357 1,5442,014 1,8951,76710,2059,841162605 8 957 3 089,2476,3937,0742,2312,1921811831,6441,6181 ,9 0 91,9 2 6 9189749 3 59682,5042,4523693602042163 ,3 3 83,4 6 3 5,4756,186100551 ,5 2 61,4 6 41,2781,1571,6791,8812 2 924 1 2,6512,9566947111,2321,3631,1541,2981,7471,2929921,0711,8941,82706,3271 3 5154 5675881,1231,0706 3 0479 7,8217,6546,1186,20711,21711,779168181 1 ,1 1 31,1 3 2 5,9015,5986,3185,9991,1901,39452259110,32511,15016801181421,9761,5592 ,6 6 6 2 ,6 0 0 1,9151,5531,0561,4461,0001,0618468072,0042,104093,2358 6 084 7 34333263658,3429,5491,0291,1939538212 9 1300 1,0171,0601 ,9 2 01,7 9 7 1 ,4 2 21,5 5 0 1191111,5551,639728108,9541,6231,6524594595736785083381,5661,556,1532,39011,8049,83154055523,89223,7276366667,0756,5545 115397,7608,5998,4087,4601,6731,71711,04710,992 4,5344,431 4033981,7871,7436 46693 72685,9346,13218,60018,2452,1622,3231,2401,081004,7574,08407,0673,4773,25384055005,819780803 2,0592,3687566682,3282,1822929157,0546,9023,1013,778832822912846 5,1634,6718726889891,2566796782,3482,4701,4831,07411,28711,463755830 5,13503172433683578,1497,1133963622,2582,80417,79718,3187578995976 1,7551,734 1,17968117,39218,02117,33718,2907,2977,031400454 5625412 ,4 3 42,2 1 4 1,4051,3551,3191,3677488006 ,6 0 4 6 ,3 3 3 514820,27921,6839,0777,95520,62019,23207,4307908377897822,6682,8947711,136706848 1273682,0201,9981,59 8 1,773 8648619,8059,67810,56011,027 9,73410,314 10,2159,7998961,4891,9152,8221,15160201,21315,50213,965 1,7472,590 15,55217,116 1,1581,086 7277271,1071,126 8157906091,0651471406895529651,0763,3643,0923,8303,5141,9861,9571,7471,78521,95822,3536355911,3821,3907,6506,7566,2176,3981,7621,5298,1777,2642,6922,556 1,6511,659 1,5421,599 1981901,3141,21419,00119,0341,4761,5579,6539,5452,9092,50518,89218,969 14,39414,6531,8501,9271,3871,351 9381,001 537581 3,1803,7043,1963,899 835689 4,5973,911 1,4101,479 9288901,0381,5272,0552,1782,2022,441 5,1744,751 1,1858576,1365,969 6,4796,494 22,40822,047857653 2,6933,1414064364 ,7 7 74,5 2 5 1591382,5732,633 1,0048176816921,7621,847,348,1851,8131,8801,8151,5761,4991,510 1,1001,2275333943,7913,5801,4432,3455,7425,5254,8384,8002,3082,376 1,9241,9202,1922,205 5,2415,1014,9454,9986,8576,30086914,9963,05254563521124958297952,3002,291 3903831,3701,2412,0571,75864377127152,8192,7368,5968,73772983310,24410,80662363822,05025,4914,1374,6391,5781,5835,2624,9962,5482,4186,1726,1039751,0663694073804203,8753,858 1,5361,84840363,2845,0695,2656,022458455 4,8484,0271,6051,692 ,742,8384,7373,8207,0037,230223,8724,0543,6262,3992,1052,190763718 2112532,3652,341 2,0701,92517,17219,3952902541,1931,2511,7901,899 1,9082,7671,4881,44104 51541,1521,109 5,0920421535,3723,664 ,366,5731,7121,4367,9978,010 8,3118,210 12,24512,4061,9172,0151,7212,412 4586963,0023,2996,6576,4257,0746,5768317982,3522,4443,5803,7913,8723,86511,05410,2847517731,8191,718 3,9213,8091,9271,6151217,53716,1573,9773,81186296820,27022,2122,6292,9264,3154,4532,7282,584 22,45424,24523,31525,13321,68720,80422,44621,54186188810,11811,245 86892319,27919,104 11,61112,571 19,26519,339 5365591,9321,841 1,8101,866 2973162,1682,22400 2143851,7941,821 8,0307,4945,4625,574,2580,66124,41222,2432,9012,853 619544873637678711 4,5624,0861,6381,7649199061566373,5756,07688287512,79013,74562273493951,9901,8181,1161,1483,7334,1139688391,8282,149437470 1,6961,697 221,1031,5073,4713,4491,6391,808 6581,034 40946955611,4211,4702,3212,30010,12810,175849897434500 1481613,8563,70036409571,1271,1457559,7089,6742,9262,6291,1181,1761,3581,300 901,9081,985 1,9081,9851,5491,694 466421 4,1903,9881,2651,27911,0169,94514,17812,9663,6526,0082,2771,7523,3503,3698,2448,422 18,51116,5778,6829,20117,27316,65575784,2523,772505558 004,2094,4278,4598,605 1,6491,3133,1892,840777880862644519,1539,75052522,6422,66614,50814,8468,7789,524 5,0965,039 2902873,8883,7983,6017,2116,941 3,4891,7141,8052,2038,5192,6528,688 16,1751,83317,6711,8658,8908,7395,9435,1131,7441,848 3,3883,53531114315,86615,27215,57514,9052,6622,7763,2263,0853,0042,9063,2413,7402,2002,61310,69210,513 4543 8 6 985623,52023,81323,93623,664 1,9932,2544,6214,9715252 2,3582,643 6446031,4531,420 4,0343,300920909 5,8675,619245335 2,6052,647 3,8053,496 2,1651,902 626653611,4681,51482,724010,05904332831,8261,5713,5183,539 161148 4302807,6737,445 8159477,2967,560 1,0311,0417,3348,361 4851 13,99016,3558,3617,334 2,6452,3112,8812,9662,2072,3651,9381,9161,2821,3338648839,4839,8233,3013,0825,8675,6191,0711,08400 2,2502,193094,3221,1231,1869328862,6383,0962,7722,3721,5061,605 1,9601,908 53647712,30712,8571,5311,5911,2291,1858007932,3382,222 4,2094,4087507751,1931,0833,8263,93417,30917,7503,5022,9482,3912,2932,6712,5332,2271,7942,2892,5222,7342,604535522 2,4802,2699,3508,9644,9805,2612,0181,7532,9782,7482,0032,2461,0981,062936693 4,6184,149 70367141344738395976754,1374,3521,5211,5791,1311,1934,9084,8372,2332,3741,2672,21516,71716,0692162043,0193,12317,61018,0074,6554,8583,4363,3905,6915,94323622428718468,23704,7683,5839791,0897,4977,6729,53110,482354132 10,5089,70534732,2491,842 59152275583011,63312,2372827 10,81610,4104,2754,64021,27024,27810,43910,3611,1838592,7 772,424 1,0411,0741,16 21,119 95,067052281,9311,97411,69610,6562,3042,350 1,7481,73213,87813,5165,3956,37706,40339138620158538459299976,8767,8816,6097,6448513 ,9 1 1 3,9 2 75,4555,3549791,1812,1452,3103,4923,772 2,0291,9773,7305,3463,1232,8943,9443,7363,7043,1802,4752,6192,7033,58811,88811,36311,65311,20406,2774,0583,2175,8805,5822,2362,16014833303152,4412,2026,5205,3467,0327,298 05,66613,3680645720 13,6114,32 1,8441,5909559061,0211,0853,3833,9161,7671,88711,83111,41410,62110,8705,8955,55210,29310,5376,3086,64101,2135,6175,3772,6143,436102,4700088,39024,32323,91015,59414,939 14,37615,015 4,1275,2822,8283,32463863587990210,7129,6591,4301,5202,3852,8007,7637,499404340668341,6121,60527321,6411,59917,33915,670 903916 5,4615,9844862177,2796,40512,06510,44115,48716,2801,1129701,6751,8322,1161,220863848 1,3921,405 155140 513435 011,3384,3164,1311,5571,48023,22618,9131,3001,10310,3029,824 13,72711,3111,9152,8223,5282,8949,3949,33208,8074,0533,2174739689,61812,944010,2893,4283,2389,3588,994 010,115277306102,4700020,208798856 12349801,1121,7901,6913,3164,023 1,6671,514 13,31114,50019,2421,174,2854,4772,5452,442388418 13,08711,68712,65413,1067975005,5435,0073,6024,425 1,7081,8008457619,3588,9942,1372,8642,1832,0605,2625,65910,61411,4933,2593,084 1,6882,7311,5222,7759,9649,1911,7751,7081,3511,7751,059981 5326338,3147,1109,6949,39120,087014,45015,0393,2633,5768564 7538581,1681,10847277915,31314,04023,150013,58713,1701,2591,61513,48614,2117,0045,9202,5612,7498,7517,5067,53008,2017,211 4,87204,7854,4982,6712,5111,9331,9 378,8228,9036,73304,1693,1993,4044,528095,0502,6702,548 0100,6002,4892,6792,7103,1732342333,5453,29101,45120,087011,57310,82510,88311,5472,2602,031 10,28909,4958,95102,7331,4091,3256,8284,590901857846850101984,5063,6181,4811,6 43 237266 1,1641,103 23,15007,1587,05910,44201,4271,526 9679051,2501,2109551,3798574217,9156,8923,8503,6189,92509 9 31,05 27,27703,31107,9617,7887,6887,823010,0533,5603,6533,678082,7240759853018,7721,9721,9043,1442,7892,4261,94900444119,93722,1728 7 655 2709705 9341,37777451,7491,6629,14801,000835 10,23110,00610,099014,15613,62088,03401,9251,8328838181,0641,1201 ,7 4 1 1 ,8043,8986,15613,35413,335 7,277083,462014,48314,552 5,8685,3527,1186,54388831,2471,1909,92501,6021,7471,8161,30792,5920015,0381,6821,8902,0172,057002,9032,9208,7629,4457,7608,3053,6184,506 5,0364,080 19,27721,641 8,54601,1331,401932772 12,44804103732,5632,79106,544003 ,2635,5 071 ,8381 ,7 8 51,7152,0551,9401,7311,7271,399 583773010,0593,8394,03820,52422,8815,9625,7249959464,3344,85610,30811,1286,73305,5065,5172,0821,8095,81901,6321,4911,8301,85210,0329,1911,1211,08195,06701,1401,002662716 64851,9572,1128,95405656322,7 912,56 36 ,0725,9 76010,4424 ,2 9 84,7 2 411,05410,8997,322006,56513,71612,52214,39313,0944,872004795,30301,3501,6104862171,5 4 21 ,3 8859461613,88915,5062951,5119,5699,93111,99912,0822,6002,47806,4032,3722,2693,9363,534 2,6602,465 09,7513313242 ,3512,4 171,5741,4764,2284,4144,6024,6181,2711,24555159 19,89916,9471,7611,600 6,7337,0145,66601,1431,1101,6211,8270107,1442,3482,2033,7973,81717,26617,83612,73512,25410,2778,52312,06510,4410111,6542,5862,6319909865,9544,1957,7877,926 88834,5733,44487884924,45824,148105,945017,53716,157654761 17,13215,19917,20815,23536,26432,4061,4701,62492999307,3615,6855,2656457202,2131,3077,8237,6889489211,1021,04110,09903,6904,6881,752018218210,61411,493016,80306,46111,28610,5211,2511,3208,84506,5946,3509,8659,3744,8304,6 21 7,36104,9975,2126,1343,9603,1732,710 5,7846,30305,3034,8504,2091,3451,3389911,012986,3185,99902,58702,82309,1645,0165,9175,7784,8991,1461,2031,1921,1381,3711,3936,56508,7709,292 1,2911,0921,069990010,0531551202,3062,54019,17921,534107,14409,751047902,2101,98412,07011,63012,37011,9886,46101,8771,605 02,1 24 2381348737254,6834,216 2,5612,747040,4121,2071,1521,8682,034 1,207998 24,16402,1512,1531,1521,1241,4031,36612,08413,0312,7342,759 2,2032,34816,57617,55211,31113,7272,4902,57815,67017,339 18,88817,403 8,8070232170524349210199 20,15305,4765,4085,2714,1552,5901,7471,1141,1135,2195,1830027,35825,59000 2,5052,3768 ,6 448,9 438,56402,3062,28604,1831,6461,1942,1512,0156,5205,3462,8562,7545,6476,6239,55912,935 7712,9419,5642,0831,86106,98865591252722,7692,191 19,85918,5911,7531,7219,1248,1372,0171,8372,3662,3162,6122,7832,2432,04415,09815,5037,4735,6182,8082,5413,5573,87711917,0398,0538,4087,4602,5772,49462254810,23210,893 839514,86214,267 15,59414,939 10,3029,824 1,1941,6464,7014,50614,70713,521001,1891,2007,3477,57010,11506,9910126123064,0481,8092,0821,1161,146 5,5344,8945,9415,8802,0552,1781,9211,803095,0501,9041,9755,2525,9262,1812,0574134472,0571,7581,6951,7694,3794,3608,546018118789186713,92515,42807,3223,5763,2632,8153,237 43207 5,9066,8697,1516,2025,4405,36319,66718,9483,5883,6646,8335,49117,91916,9511,8342,0151,5991,6413263263,4 3 23,740 12,9449,6186,2466,08800 8,4629,5193,7723,4922,4642,6104,76 83,5 839739793,2083,4579529895,7085,71074584,2344,13408,8456,1776,03311,54710,8836,0276,1131,1121,17011,63012,07013,54513,34416,84217,77116,87417,622362370 1,9081,951800682 249685555515,7705,5895,2655,6852,6662,6421,1581,232065,8306156166,6455,9816,0225,2651,4361,615228226 1,3361,3784,5644,3354,0384,193 3,4283,5784,2094,4084,7554,8711085,2145,4834,2674,16916,87313,78713,30616,4581,3351,3631,4841,5335185315315181,6931,8491,6011,637273421,42220,33719,48520,6991,1851,1469529882622 1,2291,1452,0452,0062,8272,3993,3263,0323,4163,0596,32701,0529661,2041,1833,7864,2403,7804,2351,4411,3971,5961,5141,0531,0754896182,3142,53807,696021111123 11,12810,3081,0511,30411,14313,240101,52301,236803 1,6141,57222,19722,57120,90021,634469438068,8326250 5,3463,730 3323251,4581,418091,1372,5402,3061,2991,2802,7463,01813,16413,89269167315,49516,53615,63614,5084905428,5968,7372,8193,5573,3892,7364,9984,993015,0380014,09713,43915,06414,3632,9762,9664,8104,62 4 4,0156,371 6,5236,417 8,9438,6441,1681,1731,7582,0579,6689,3932,6422,66627,35825,59024,56825,9310111,8537,53003,5333,5056,437010,20710,618 4,2334,2517,0728,8468,9018,0791,6931,62411,40010,2227037664,4264,39574072617,70620,69811,31113,72704,794702827 1,82801,94202,4382,510 8748885,50 7 3,2 6 3 102,47002,4542,6622,5772,4941,0931,09213,47713,0030102,47013,30616,45818,27119,14718,12117,302858849 1,1161,146 15,51015,91117,64717,088 9,83111,8044,3604,4235,4705,2305,6187,4734215315,09815,49921,13121,237 1,7401,6950018,24518,6002,5561,6021,6622,69014,11414,2071,6981,4402,1912,7692744 14,05815,6511,36856811,83112,826 9,14802,7403,097 1,8571,8067,8587,3297,0956,6118,5068,2557,9617,7886,4425,6131,7 8 6 1 ,7 3 9 1,0089333,3623,55809,20516,38913,4781,7051,884 3,3393,2358,0767,5952,6042,8981,48 11,6432,7022,4313,2802,4943,3043,27670076511,6648,752 12,23511,8653,2802,4942,1832,3938,4939,630 1,5442,014 2,3152,28617,12301,1931,1994,7363,7726,0966,9162,2822,06285742119,39517,1728,74811,14122,17219,9376,2803,378 6,0803,167882976 8,9648,32006,9912103,3593,3888,858005,1355,2556,8861,3511,3725,6136,4424862175,2 355 ,1354,0384,193 1,1051,12521,50122,83522,50721,1249,38612,167 15,91115,5101,9441,7137,112013,68013,79213,74414,17919,66718,94818,79519,617129115 16,45813,3061,6061,693002,1402,1129,164002,74802,6617,0756,55410,61411,4936,4786,53810,34810,65911,42313,1063,6904,68813,62014,15606,2533,4963,6167,7877,926 40052,6975,5344,89493,08508,9337,8848,1497,1136,5386,4781,2071,19512,52213,7163,6494,0986,4647,1699,85211,423 6,0876,44215,44710,3892,0682,19112,86603,881003,613033,5933,49703,322014,89116,16911,77412,49417,09117,587 95,41909,82817,29712,81215,79111,1418,74827,42326,9151,5721,49912,05211,24313,19914,34524,14114,3113,6123,60010,22111,3253,2353,33919,55510,688 9,19110,0323,3903,5593,7923,8682,3122,4 12 3,7743,47410,89911,054020,15322,88120,52417,43518,048 9899521572071,4761,5749684738,1097,6174,5226,3869,9319,56912,05211,2432,4411,03310,59610,17014,34513,19914,93016,09316,52502,0551,7159,16404,188013,87215,58302,58002,8294,71304,75605,8356,1942,1132,343 10,44112,06514,14613,945 4,0533,21714,19813,5184,7363,77214,97418,510 2743,1981,9621,9863,2353,339 1,3461,29616,91836,7011,2921,7474,7363,7723,7023,79212,86600031,25004,6924,3960099,58302,4162,2106,9916,68714,89116,16917,58717,091 3,3043,276691673068,83213,08711,687 13,35413,335 5,9265,25229291513,51814,198002,1482,9412,0773,0879,3588,994 0012,79803,6773,613040,33924,50223,44410,00610,23118218217,30218,12117,26617,836016,2974,082003,78522,11419,12617,70620,6986,7026,61316,13217,17517,77116,84211,24312,05212,86603,76803,72601,5261,4279981,207 5865599701,1121,1581,2326,8284,5902,0602,1834894571,7522,27707,9402,4261,94904,4944,689010,30811,12811,77412,4944925541,124744 58,71809391,0319,2219,1872,6702,548 6,4425,61317,2979,8288,3208,9642,6792,4896,7026,6136,4786,53813,74113,5701 ,9 0 81,8 7 4 12,79803,75303,53704,68904,78004,18806,3086,64124,35724,654 2,7722,8263,866012,86603,628068,832009,5662,85702,61509,3029,925 19,27721,64136,44432,58616,525009,5662,82402,64809,1642,590002,82001,3921,40588,03404,5120007,9404,67112,08211,9994,00616,29703,861003,7923,8689,9319,5699,2928,77004,4864,69807,940015,91115,51014,36315,06457,7950033,5933,5103,309002,3432,113 6,0966,91616,2974,0890003,7789,2928,770068,2374,3364,3803,1193,0653,1193,0658,3298,16423,40421,1775,3956,3776,4057,27914,97418,5317,1587,41823,19536,70120,69817,70616,94719,89927,85224,4854,8325,4188,1008,696 7,3297,8584 ,5 9 4 4 ,7 6 8 3,60212,7983,688000003,68703,60312,7986,2366,783057,7951,5201,43031235735731223,93112,6282,70502,76709,566013,74414,1791,1651,59818,54917,14811,29911,01910,53710,293 58,71802,8283,32416,0409,0674,13618,1486,3775,3954,4104,474033,593016,2973,79404,07303,549003,2701,94801,8234,7940010,44910,439 4,4453,3571,4181,4582,669009,56602,8035,2354,776 04,7054,47907,94008574214,5334,60810,87911,86524,50223,44410,2099,2502,83 32,417 2,5902,1584,41704,672031,25003 ,7 055,94 2 2,5782,4909,56412,9419,61812,9449,3749,865040,33925,55525,2713,0832,829FOOTHILL FWY0 .33 .67 1MilesMap layersNodeSBTAM 2040Node selection setsCentroidsConnectorsSBTAM 2040Fontana SiteAverage Daily Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE 02,8688,217005,51803,4312,946004,24608,0504304,0028,05804,65005,10108,17803,79505,840000286352 03,73300 019,3400004,1055,2640123978822421,202069424429,8240024,1578,979033,0450023,4341,1341,11613,185007,877025,20824,2120021,426025,8093185431,2789266 8 81,17 1 99216022,394027,847021,29616,8960478928663256146133025,48200 43252316,12004,6500010,08123,096023,4540024,56121,3970031,85056559221,855036918220,04402951432911605243601519713,185013,1310024,9825760033,52853442802,732378198165171292459183586721261,7391,3391,6331,85830,637044227954115461427,54804577292,0742,84404,1236232,0361,3411,9292917548129487616,84501991052630504258 01631,203818646354826652 560285 12355527,5480023,28446556421939334,70407691,17068265114,89802735075115621824183753982391730022241,1682,006 1,6981,6261,531249147143202551238110129135521995423701721491,4861,972 8641,50780909501,002775766363243281231 2712736034193555244291171003734018,8932,2432,086258504 2571108051,621322116 013,185258242256663 025,8836,0544,4992,02701,5072,3853286486904415432026,7924,7765,5722,1481,827 055 643834027,859991186012,20225,108034371,41108,979002,082023,68825,6770027,8471269800162268351500027,2172824871,0761,573027,8288 9000 0024,61400023,09601,1421,2257813894621505824 1821681,1989965828859804,04401,9411,373241827,815061 51,2 7 5 020,6096,8450021,87210,08101,15285065649115412430,31402,3052,3352,2252,507029,1620027441,2088012023272442343,5502,573 3,8142,497 43 6460 100433 54318313,185032325605,1561,9022,9201633895221,14563774621383,3303,0422,277019662720575423,22905,28807654762,9842,903222315212,8062,86112112615521,9972,7305645451,0348101,1631,287001,9831,0111,1371,96025,9210263169 393277378351241,5247612,6221,59068190046678168660522177938269 4 21,6 2 9 181206 25845605,28886786802,3554,6500030,31414712015111104,390178241531830839712,2020024,7525538553887 5537 022,2808329283313593156771936561,074765 1,03189301,674014,898299390323024,03208251,849 02,119022,26596812,0152,02324227559958401,784505639786,1674,30531,3960001,295325 06961,0441,109160279022,45801,4127,9704,6611,7233,0792 ,2 691,3 9521280366034221,923025,278020041012,2020671452,5200005243161214849532,5302,1841,2662,421017,877133612,56604734676991,132 4,0020130348 292187 22,02602271572,037011202372256 67661515 5226 3,5515,3145449683,3693,481 9 92 1601,7645 5 1330 9 154 66131531718014,89804,0230222223,68802,3582,6521101712,6571,453 822161,82007,5174,8555,8844,8131,2427961,1668575807693,5432,9792912782,9885,275774 1 ,2 6 3 8,05802,472828025,2704929542,1943,250 13 2143351,8461,7371,277821501085855801,0695531,1 9 18 19 3952352422163,5444,0133,5813,8866411,0855,910016726722222161867617081,0691,380 4,0964,6104,5492,6243 0 6114 2,5764,5766 3 8351 1,6351,8642,1808832,3905 816,7837,505 569988 7894053,0863,104138151 3 428 3 024,0321,7322,66780062354814394256 2 6601 2644162 7 93291,00655412612472921 ,2 8 4827 1,9522,56066244 2 4503526286398756 6 010 0 5931,26926121840451228954065649126136079051101,8033 777 1552344402772 4 9179 3,1102,5211,6301,8653,8523,1615282 3 4 6388 1,6492,5001,8282,3283235491542703,9802,827123052494455368 7 9838 831573315868222469337204502809027,5302 6 229 8 15111121802,1673,7592975384502298 2128 2883897 89438 3 6 468 1 3249381613283002,419526571125202182228102416064427917632,8743,9391941676,7677,0962002181,7832,8561 852392,3703,3973,6242,8575005793,0043,751 1,4571,265 1701306774702 24236 55502,3112,7864,2605,8404101,209523432002,0001,16301,8161,5047562955501,886259352 5216082352379544921732762,7242,6381,3891,818224278365292 2,5031,6872272913624412331605531,0545223873,4453,089243363 2,1320137561161303,6152,7881531243661,7035,7906,5372929383276 457532 836945,7094,7765,6734,6132,3822,39679249 2651587 4 8687 5333343894171845001 ,5 9 0 1 ,9 3 3 25156,1625,3582,2412,4986,8845,54602,8092323543152706201,270198624197404 036255762835 9756 2822643,2552,7772,9973,821 2,4143,882 3,8012,2923195254861,06437634604685,6242,751 276889 2,9706,339 361342 313229371534 394331196464 62583431342914981,7637081,9548399136615778785,9866,6911521928534982,8662,2351,8473,0187854343,2262,142907422 605399 512505 73645094845,2895,3295575112,9664,0081,7517735,2475,360 4,5755,372428791413475 329358 216174 1,2541,5498191,501 427207 1,7571,035 565592 3652442364971,0215657021,353 2,5071,320 6832731,8362,082 2,0602,020 5,3887,241364180 6581,291511971 ,8 1 71,2 1 9 8346748934 348211175277413828654241574917976512430538 5162532951431,3829073938122,2281,9691,2672,444710942 749697629855 1,8911,9582,4351,3762,7202,34533312,693837179215571147547134807682 151125378526913480259 1872728181,0193,6322,6384885094,3823,4361622687,3566,8411,0412,322580500 2,2301,7119805512,4942,163329441116168852401,556790 37281116141,2122,4251,8522,050145209 2,1651,495371699 ,984,2292,2561,4442,4882,817119581,651958967640668237215 57118936760 9154664,3226,68113177402306762711 38495075344904 2018449298 4,0940421132,062618 2997584702962,7412,475 2,6792,744 3,4173,747537850781,025 472305671,6102,1282,8132,6522,2283312207111,0949071,3821,5511,1853,3593,797254271737395 1,496952705445025,4184,1221,2271,2633192265,0827,9177711,6881,5751,9201,004699 7,5426,3807,8506,7025,5246,4515,6656,6962493493,5443,005 3223115,7095,192 2,9844,081 5,2265,756 132217727590 532796 15010169997400 89210482655 2,8942,3102,2161,932,624,2027,6686,2871,115700 354226311350251179 1,2911,217590608243487661531,2602,7343212123,2025,3133425138367664574133351,0621,936369266786391180175 487633 113713921,1181,105473458 133493 912232413547453798663 3,0783,223278324269189 53671,2981,26614173433264083083,1232,9011,68877142442549055890727608727608523679 191132 1,5381,1884613323,4392,8834,6313,6391,4362,5381,1046881,1139202,6152,871 6,9714,6112,6752,8134,6395,43829291,3351,127133238 001,2101,4142,6802,957 8224221,8397913130283778382,3883,25418208878483,6454,8672,4043,710 1,5061,781 122851,1231,7901,9601,3341,900 7683957425802,6415653,410 4,2065485,6796693,4452,7121,8621,301587567 1,0871,436140815,2153,9775,0363,9931,2589011,2939409881,0577331,3005531,0942,7932,853 2014 3 3 32317,2426,5776,7287,281 4446601,1081,7811820 5321,128 195176597317 1,675795416274 2,2952,07330105 972850 1,5691,009 904674 2328172839456621,78003,06103251437733971,305974 6753 3231412,4492,412 2343902,3382,459 3763082,2862,706 1525 3,1316,6402,7062,286 1,0665368571,3055359645536573564883742564,2173,2971,3837082,2952,07348135100 789677024,281687397369231829858778752593490 772608 2111814,2443,422398606445401285265874547 9172,2031553235093551,3951,4764,3975,8961,5796619045779191,0679454897931,0028771,100237135 9408262,8892,6801,6801,3609144481,060798478928423235396328 1,5491,081 24420712522810211924531,1831,3875084193183271,9291,4625151,0952248446,1574,89873671,1041,2414,4715,8941,6411,4751,0881,3601,6162,40913511716010820,04401,8731,7042284332,7152,6764,1993,26412712 3,1403,5451248974426 2701542433633,9523,0441110 2,5483,5291,6892,3157,2356,2653,4373,059574343 1,5 39423 25438943 6288 24,281037125527343,5964,594636915 4575495,0884,3831,2053,32202,0481909220152842872873622,2023,1182,1173,016499 471,2 9 82,2581,9461066316656929161,218 4277588962,7431,6218731,5807731,5491,2545971,0328851,9124,0583,5443,8863,58102,2332,3131,0102,4632,086825542659501361,3537022,8141,5722,3962,384 01,7103,2490278291 3,6164,824 810615267245260429 1,5761,8706495773,4513,4452,8292,7841,7162,0942,7482,6841,7972,57304681,6861,7856941,37524,0280025,8837,3416,5275,8623,771 3,6155,644 1,3272,6121,1501,4032541813213024,0872,2634776843731,6013,0342,6957915534404735821196045726,8163,207 305387 2,0212,4421101933,0062,1152,9014,4994,3826,184436338535754612928283294 489425 6353 276127 02,9411,5681,1165913827,6004,6225492653,2422,716 3,2104,6784861,0647961,2422,8802,93602,4312,3081,0102446942,6255,52602,8851,4237253,5302,668 02,77310014224,028005,895280229 673994056565775772,145 440369 3,7134,2135,0957,2891,1632,0251,03860316193 3,2733,7604,1443,0373171802,1081,2381,0411,530 5046173812573,5302,6684801,1588698501,5911,7972,6514,6361,2661,068 7266825691,0152,9793,5433557613621,000393277 1882812,7132,4053,2132,5286,84503,9055,0349011,4704924 253402429316 1452883,9204,5436,72403,5514,691403635 4,1906,1823,3602,3011,0628012,8792,1872,23102,6752,168 97102,2631,2361,2255815206792,7753,7661,80002,3259037512,611022,8861,063719 029,7956559996231,82883971,2381,53705126,84505,0902,3313,6165,323990508 2,88503,0242,47507366322313,1911,18940022426431037311,5721,0615 81413 10286 492247 6,72401,7382,6703,1480606665 6766155023365258326972883,3412,2901,7467082,73601 9 35 692,34001,05903,2232,0752,9811,92002,7379391,2791,117021,780017640405,5887068771,3461,0181,1487400022174,5698,0652 8 819 2211275 7288848316694722,8330320387 3,2004,0322,82903,7554,72823,564054759037820329041852069 51,1682,7913,7703,589 2,340025,12204,0214,112 1,6121,9292,1222,21840315242872,73604007731,02882022,271005,288845598592801001,5665792,1053,7021,7663,3631,0611,572 1,7651,179 5,2077,810 2,2940302513349224 3,41301061711,35094603,112001 ,0292,5 246 4 2580 5761,389972498742347 21824603,0611,0451,4416,3315,6152,2701,5374262101,3181,5853,9672,7981,80001,8941,7207645371,88606163486437202,4632,98239931024,2810340339203266 24496599632,41901392859461,35 01 ,6922,7 6403,1488 3 92,2 2 54,2752,7692,255001,8875,6174,2295,8454,411971002141,5780409692110193731294 2201684,3144,1231683593,0093,0053,0154,6071,04663002,0487661,1111,635989 1,118814 02,53710012780 0783543461 9651,7951,0141,7823274474153 4,9396,496530548 1,8122,7751,7100435269440819032,9079998959641,4174,8575,2676,0263,2203,0423,3302,9014,499033,5286999203862903,0079532,8462,753 40311,2591,3103692147,3316,65424,60405,4184,122130349 4,5034,9744,6194,92412,0048,20425686621017602,2601,6791,7752782915779921,9202,981483188359331 2,82901,3972,036487031312,6514,63604,00501,7354,5122,6462795822,64502,6912,1383,6612,3392,3111,6 71 2,26001,3932,3493,4241,4311,828623 1,5272,91801,5781,2211,651387452340297421,8282,32802,17302,27602001,5572,4422,4361,4993204704653184354551,88702,1123,504 31344449923602,73750451,0228404,6617,97032,90702,537021401,0809465,0764,1175,1204,2731,7350719701 0959 151543042471,7981,097 1,062799017,877435352809911 730422 14,89806757294475414886104,3093,5699991,351 8959994,2885,4164,6783,2101,0529543,2076,816 7,0563,899 2,431015863153179662 5,84002,6341,4682,1648918892763623682,4991,436007,3577,82300 9659751 ,7 013,9 963,733076298301,2486194596086812,8141,5728508621,8632,6832,4925,643 235,6002,52657257502,1762625372301,458690 6,0285,0926215184,2202,0908195807947667751,0358404184,9804,0292,6191,8271,5257259811,94511802,7783,5283,6242,8577249442592323,0053,395 32565,3453,688 5,8623,771 3,2422,716 4596192,3871,6314,0063,637003834653,1691,9592,77301,16403755018,569537764293498 1,1262,3872,5371,5461,021565708344022,8865097989462,846775665125228913480384737 1,4211,3322,294075593624314,3154,20202,2551,4709015431,619 1205 2,2492,9182,9132,3701,8231,3714,8135,8841,3261,1793,2512,1564,9145,293551865572604911359 1 51 ,783 5,5262,6251,8381,92200 2,1943,2501,218916579951 1,87 31,7 042303348331,2973193402,0131,83032201,68096902,6451,5902,6225,3233,6162,4731,7163474164,1175,0763,6004,2904,3916,0084,7905,547148121 568641383140 92261682371,4932,1561,7751,679848887323492017,9402541812,1482,2912,0501,85230778210166 3425741,7811,3289211,813 1,0991,4549172,2031,0802,443522,0391,7841,0771,5674,1915,3495,1894,071496385381587149170170149683639480532 8165,2026,4776,2255,052357371236411127 4463666176808929091,7587281,8726671,80304132123194309831,8421,0171,7934315947503233104055326339876102,5200153853 2,7983,9673247454,5603,11124,4410720232 6493867,3545,3716,4585,349170151018,8932817 2,743896 119112523517027,6288401,0224404721,1331,0113,4834,5812741794,1075,2554,6104,0961791583,6322,6388181,3211,0201,0191,6431,74105,288004,9833,9155,3384,1699979759532,00 9 1,7932,553 1,4532,657 3,9961,7014543534809133,0763,7788878487,3577,8237,8716,661034,7042,23101,3221,0261,41202,9753,407 1,6801,0872,1982,6993,4692,5616804264,4242,6962133301,1401,2832972476,6615,3134,6783,2100168150394 1,74201,8230749932 2473742,52 4 1,0 2 9 24,02805849597249443204043,5293,957024,0285,1894,0714,9475,9485,5644,689277378 293498 3,8435,3075,1804,550 3,9392,8741,2771,6131,8641,6351,8272,619421134,9804,0256,0265,877 347755005,8404,2605916836006734,5923,6717245046901,458927 2,9596,781392273 2,9885,275 2,83308031,564 5896982,2522,2372,0152,0232,9322,6943,2232,0753,0511,5445 8 4576 4362709301,35902,2775,0663,192689647 1,1071,0352,1842,5308191,2295 814 1 31,1346531,2259381,0999731943223,9842,505 4,1573,4151,2259388299662,2082,867 569988 77198312,20203663791,4541,2402,1541,9349045526972886,6814,3222,8064,3278,0654,5693,1791,018 3,0921,036202327 3,5802,27101,1641501,1909601,764002,1321,3163,5423585131,5443,0511101932,1 191 ,3109211,813 3164236,9205,5155,5106,6983,1793,683 5,3073,8439195541,82004,2945,9504,3076,0594,8135,8845,7854,9075242 4,0715,18942665000731640200002,21902,2311,7832,8562,6514,6362,1332,0352,8833,9393,2644,1341,3972,0364,7283,75501,6741,0471,2152,8462,753 19456091,1262,38727,09603,9002,9703,6152,7882,0352,1334673374,2295,6176842,0321,7572,7083,0953,577 1,6212,4426,4273,1298548716,39403,480003,311011,9422,97002,96604,6104,2114,6973,0244,6164,991 24,48803,8635,3093,4934,8994,3272,8068,4097,4246563713,1554,0764,0843,8786,4216,4081,2251,1423,0503,4731,0351,1075,4733,105 2,9822,4638651,2659421,5696571,0 81 1,4979752,7694,27505,8405,6156,3314,6185,358 340319721264615436942442,6031,8621,0063,1933,0053,0093,1554,0767038553,4482,5383,8784,0844,6334,3355,91001,38957620001,23404,6824,37702,16202,2884,42904,41801,8461,7377721,039 4,4992,9014,5083,677 2,3081,0104,8943,6551,4541,2404,1894,759 1051,1836816101,0351,107 4604365,6079,7334916561,4541,2403,4063,3856,3940005,58503,8433,7040023,43509526193,1892,5644,6104,2114,9914,616 1,099973274179018,8933,2733,760 3,7703,589 2,8469461732763,6554,894007138426269663,5302,668 0026303,2933,289013,1316,5338,0534,0323,20031314,6895,5644,8575,26707,9143,569003,4155,6787,1856,6615,3132,0302,1283,9846,0046,0084,3914,0763,1556,39403,38003,4110665606422730 2621463384363234923,1911,1898508692111446881,10403,6091,14874004,2394,35503,9672,7984,6973,02418711041603 16,12004412923,8632,9261,063719 3,0511,5445,3093,8632,2713,5809996552,0302,1282,1332,0354,5923,6405 3 1830 26303,35103,23104,42104,42601,23401,7972,5737,5056,783 1,1707693,47906,39403,311018,893002152,62102,45202,3013,785 5,2077,81012,0528,2525,910002152,58302,49002002,158002,292048942523,56404,2610003,6094,3324,6073,0153,4957,91403,489009421,5693,0053,0093,5042,11204,2264,36803,60905,3073,8434,1695,33816,8960011,9422,9842,951001,039772 2,1541,9347,9143,5680003,4163,5042,112020,0441,3941,4389858769858763,0062,2336,3496,4721,2053,3222,1153,0064,1894,7743,7532,3667,8409,7335,3136,6616,4964,9398,9086,3101,8701,3742,3582,652 2,2372,2521 ,6 6 1 2 ,2 9 6 3,2902633,292000003,29403,2882632,3372,690016,896684477687676687,6973,5552,53002,543021504,3076,0594218525,7154,4613,0172,9142,6842,748 16,12001,1501,4037,0443,0521,2015,7593,3221,2051,0831,371011,94207,9143,41003,57403,032002,9031,82301,742168003,4103,149 2,2761,0655175232,5260021502,5481,4701,491 04,3564,23703,60906972881,4571,4944,6743,6776,5338,0534,6152,3251,61 6384 1,4823343,74903,79705,58501 ,1 762,64 3 9541,0522,5265,6002,6255,5262,3393,661013,1317,8586,8951,679914FOOTHILL FWY0 .33 .67 1MilesMap layersNodeSBTAM 2040Node selection setsCentroidsConnectorsSBTAM 2040Fontana SitePM Peak Period Traffic FlowSUMMIT AVEARROW RTEMMILLIKEN AVE DAY CREEK BLVD HAVEN AVEARCHIBALD AVE SIERRA AVE CHERRY AVEALDER AVEBASELINE AVEETIWANDA AVE EAST AVE BEECH AVE FOOTHILL BLVDWILSON AVE Intersection:Beech Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 31 SOUTH LEG BOUND THRU 276 IN ...602 RIGHT 54 OUT ...490 SOUTH LEFT 38 NORTH LEG BOUND THRU 204 IN ...427 RIGHT 45 OUT ...544 EAST LEFT 56 WEST LEG BOUND THRU 102 IN ...256 RIGHT 24 OUT ...388 WEST LEFT 30 EAST LEG BOUND THRU 143 IN ...407 RIGHT 63 OUT ...272 1,066 3,386 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 31 78 BOUND THRU 276 417 RIGHT 54 104 SOUTH LEFT 38 33 BOUND THRU 204 346 RIGHT 45 51 EAST LEFT 56 58 BOUND THRU 102 135 RIGHT 24 63 WEST LEFT 30 81 BOUND THRU 143 258 RIGHT 63 68 1,066 1,693 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Beech Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 30 SOUTH LEG BOUND THRU 416 IN ...873 RIGHT 105 OUT ...885 SOUTH LEFT 112 NORTH LEG BOUND THRU 431 IN ...715 RIGHT 61 OUT ...805 EAST LEFT 98 WEST LEG BOUND THRU 340 IN ...713 RIGHT 75 OUT ...399 WEST LEFT 90 EAST LEG BOUND THRU 177 IN ...502 RIGHT 90 OUT ...713 2,025 5,605 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 30 72 BOUND THRU 416 615 RIGHT 105 183 SOUTH LEFT 112 88 BOUND THRU 431 563 RIGHT 61 66 EAST LEFT 98 108 BOUND THRU 340 442 RIGHT 75 162 WEST LEFT 90 160 BOUND THRU 177 261 RIGHT 90 82 2,025 2,803 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Beech Ave SR-210 HOV Ramps Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 101 SOUTH LEG BOUND THRU 260 IN ...544 RIGHT 34 OUT ...426 SOUTH LEFT 0 NORTH LEG BOUND THRU 286 IN ...415 RIGHT 0 OUT ...368 EAST LEFT 0 WEST LEG BOUND THRU 0 IN ...(4) RIGHT 0 OUT ...140 WEST LEFT 0 EAST LEG BOUND THRU 0 IN ...14 RIGHT 0 OUT ...34 681 1,938 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 101 140 BOUND THRU 260 368 RIGHT 34 34 SOUTH LEFT 0 0 BOUND THRU 286 426 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 WEST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 681 969 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Beech Ave SR-210 HOV Ramps Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 602 IN ...803 RIGHT 0 OUT ...717 SOUTH LEFT 0 NORTH LEG BOUND THRU 515 IN ...629 RIGHT 0 OUT ...821 EAST LEFT 15 WEST LEG BOUND THRU 0 IN ...129 RIGHT 68 OUT ...18 WEST LEFT 23 EAST LEG BOUND THRU 0 IN ...19 RIGHT 4 OUT ...23 1,227 3,159 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 602 791 RIGHT 0 0 SOUTH LEFT 0 0 BOUND THRU 515 604 RIGHT 0 0 EAST LEFT 15 27 BOUND THRU 0 0 RIGHT 68 98 WEST LEFT 23 15 BOUND THRU 0 0 RIGHT 4 3 1,227 1,538 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Catawba Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 SOUTH LEFT 3 NORTH LEG BOUND THRU 0 IN ...4 RIGHT 1 OUT ...4 EAST LEFT 0 WEST LEG BOUND THRU 344 IN ...435 RIGHT 0 OUT ...381 WEST LEFT 0 EAST LEG BOUND THRU 196 IN ...384 RIGHT 4 OUT ...438 548 1,646 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 SOUTH LEFT 3 3 BOUND THRU 0 0 RIGHT 1 1 EAST LEFT 0 0 BOUND THRU 344 435 RIGHT 0 0 WEST LEFT 0 0 BOUND THRU 196 380 RIGHT 4 4 548 823 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Catawba Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 SOUTH LEFT 12 NORTH LEG BOUND THRU 0 IN ...20 RIGHT 8 OUT ...28 EAST LEFT 14 WEST LEG BOUND THRU 491 IN ...764 RIGHT 0 OUT ...577 WEST LEFT 0 EAST LEG BOUND THRU 418 IN ...583 RIGHT 14 OUT ...762 957 2,734 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 SOUTH LEFT 12 12 BOUND THRU 0 0 RIGHT 8 8 EAST LEFT 14 15 BOUND THRU 491 750 RIGHT 0 0 WEST LEFT 0 0 BOUND THRU 418 569 RIGHT 14 13 957 1,367 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave SR-210 WB Ramps Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 441 SOUTH LEG BOUND THRU 808 IN ...1,343 RIGHT 0 OUT ...930 SOUTH LEFT 0 NORTH LEG BOUND THRU 570 IN ...1,141 RIGHT 479 OUT ...1,336 EAST LEFT 0 WEST LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...922 WEST LEFT 249 EAST LEG BOUND THRU 1 IN ...706 RIGHT 275 OUT ...0 2,823 6,378 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 441 409 BOUND THRU 808 934 RIGHT 0 0 SOUTH LEFT 0 0 BOUND THRU 570 629 RIGHT 479 512 EAST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 WEST LEFT 249 302 BOUND THRU 1 1 RIGHT 275 402 2,823 3,189 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave SR-210 WB Ramps Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 388 SOUTH LEG BOUND THRU 1,433 IN ...1,992 RIGHT 0 OUT ...1,476 SOUTH LEFT 0 NORTH LEG BOUND THRU 840 IN ...1,515 RIGHT 484 OUT ...2,151 EAST LEFT 0 WEST LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...961 WEST LEFT 509 EAST LEG BOUND THRU 1 IN ...1,081 RIGHT 545 OUT ...0 4,200 9,176 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 388 410 BOUND THRU 1,433 1,583 RIGHT 0 0 SOUTH LEFT 0 0 BOUND THRU 840 964 RIGHT 484 550 EAST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 WEST LEFT 509 512 BOUND THRU 1 1 RIGHT 545 568 4,200 4,588 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave SR-210 EB Ramps Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 787 IN ...1,299 RIGHT 443 OUT ...1,154 SOUTH LEFT 228 NORTH LEG BOUND THRU 695 IN ...1,034 RIGHT 0 OUT ...1,224 EAST LEFT 343 WEST LEG BOUND THRU 3 IN ...756 RIGHT 340 OUT ...0 WEST LEFT 0 EAST LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...711 2,839 6,179 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 787 843 RIGHT 443 457 SOUTH LEFT 228 251 BOUND THRU 695 783 RIGHT 0 0 EAST LEFT 343 381 BOUND THRU 3 3 RIGHT 340 371 WEST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 2,839 3,089 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave SR-210 EB Ramps Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 1,144 IN ...1,677 RIGHT 422 OUT ...1,494 SOUTH LEFT 269 NORTH LEG BOUND THRU 1,066 IN ...1,462 RIGHT 0 OUT ...1,990 EAST LEFT 675 WEST LEG BOUND THRU 4 IN ...1,146 RIGHT 427 OUT ...0 WEST LEFT 0 EAST LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...800 4,007 8,570 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 1,144 1,230 RIGHT 422 447 SOUTH LEFT 269 349 BOUND THRU 1,066 1,112 RIGHT 0 0 EAST LEFT 675 760 BOUND THRU 4 4 RIGHT 427 382 WEST LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 4,007 4,285 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 31 SOUTH LEG BOUND THRU 827 IN ...979 RIGHT 54 OUT ...796 SOUTH LEFT 211 NORTH LEG BOUND THRU 711 IN ...1,150 RIGHT 109 OUT ...1,299 EAST LEFT 234 WEST LEG BOUND THRU 109 IN ...472 RIGHT 38 OUT ...391 WEST LEFT 29 EAST LEG BOUND THRU 67 IN ...455 RIGHT 169 OUT ...569 2,589 6,111 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 31 57 BOUND THRU 827 828 RIGHT 54 92 SOUTH LEFT 211 290 BOUND THRU 711 700 RIGHT 109 163 EAST LEFT 234 237 BOUND THRU 109 188 RIGHT 38 47 WEST LEFT 29 49 BOUND THRU 67 171 RIGHT 169 234 2,589 3,055 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 57 SOUTH LEG BOUND THRU 1,012 IN ...1,175 RIGHT 97 OUT ...1,172 SOUTH LEFT 277 NORTH LEG BOUND THRU 981 IN ...1,489 RIGHT 230 OUT ...1,674 EAST LEFT 216 WEST LEG BOUND THRU 256 IN ...784 RIGHT 53 OUT ...605 WEST LEFT 72 EAST LEG BOUND THRU 167 IN ...844 RIGHT 335 OUT ...841 3,753 8,583 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 57 74 BOUND THRU 1,012 973 RIGHT 97 126 SOUTH LEFT 277 285 BOUND THRU 981 967 RIGHT 230 239 EAST LEFT 216 269 BOUND THRU 256 430 RIGHT 53 85 WEST LEFT 72 120 BOUND THRU 167 292 RIGHT 335 432 3,753 4,291 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave Walnut St Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 10 SOUTH LEG BOUND THRU 752 IN ...908 RIGHT 39 OUT ...748 SOUTH LEFT 29 NORTH LEG BOUND THRU 628 IN ...772 RIGHT 45 OUT ...919 EAST LEFT 91 WEST LEG BOUND THRU 30 IN ...167 RIGHT 33 OUT ...109 WEST LEFT 16 EAST LEG BOUND THRU 24 IN ...131 RIGHT 31 OUT ...202 1,728 3,955 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 10 14 BOUND THRU 752 795 RIGHT 39 93 SOUTH LEFT 29 53 BOUND THRU 628 678 RIGHT 45 47 EAST LEFT 91 75 BOUND THRU 30 56 RIGHT 33 36 WEST LEFT 16 34 BOUND THRU 24 49 RIGHT 31 49 1,728 1,978 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Citrus Ave Walnut St Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 45 SOUTH LEG BOUND THRU 1,149 IN ...1,362 RIGHT 83 OUT ...1,093 SOUTH LEFT 37 NORTH LEG BOUND THRU 906 IN ...1,106 RIGHT 94 OUT ...1,302 EAST LEFT 73 WEST LEG BOUND THRU 49 IN ...192 RIGHT 37 OUT ...224 WEST LEFT 31 EAST LEG BOUND THRU 39 IN ...248 RIGHT 37 OUT ...289 2,580 5,817 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 45 49 BOUND THRU 1,149 1,157 RIGHT 83 150 SOUTH LEFT 37 57 BOUND THRU 906 969 RIGHT 94 87 EAST LEFT 73 68 BOUND THRU 49 82 RIGHT 37 43 WEST LEFT 31 82 BOUND THRU 39 89 RIGHT 37 78 2,580 2,909 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Jacaranda Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...11 RIGHT 11 OUT ...3 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 347 IN ...438 RIGHT 0 OUT ...384 WEST LEFT 3 EAST LEG BOUND THRU 200 IN ...387 RIGHT 0 OUT ...449 561 1,672 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 11 11 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 347 438 RIGHT 0 0 WEST LEFT 3 3 BOUND THRU 200 384 RIGHT 0 0 561 836 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Jacaranda Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...7 RIGHT 7 OUT ...11 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 503 IN ...762 RIGHT 0 OUT ...582 WEST LEFT 11 EAST LEG BOUND THRU 431 IN ...593 RIGHT 0 OUT ...769 952 2,724 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 7 7 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 503 762 RIGHT 0 0 WEST LEFT 11 11 BOUND THRU 431 582 RIGHT 0 0 952 1,362 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Tokay Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...11 RIGHT 11 OUT ...4 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 358 IN ...449 RIGHT 0 OUT ...387 WEST LEFT 4 EAST LEG BOUND THRU 203 IN ...391 RIGHT 0 OUT ...460 576 1,702 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 11 11 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 358 449 RIGHT 0 0 WEST LEFT 4 4 BOUND THRU 203 387 RIGHT 0 0 576 851 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Tokay Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...7 RIGHT 7 OUT ...12 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 510 IN ...769 RIGHT 0 OUT ...593 WEST LEFT 12 EAST LEG BOUND THRU 442 IN ...605 RIGHT 0 OUT ...776 971 2,762 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 7 7 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 510 769 RIGHT 0 0 WEST LEFT 12 12 BOUND THRU 442 593 RIGHT 0 0 971 1,381 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Cherimoya Ave S. Highland Ave Condition:2040 Build-out Peak Hour:AM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...12 RIGHT 12 OUT ...0 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 369 IN ...460 RIGHT 0 OUT ...391 WEST LEFT 0 EAST LEG BOUND THRU 207 IN ...391 RIGHT 0 OUT ...472 588 1,726 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 12 12 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 369 460 RIGHT 0 0 WEST LEFT 0 0 BOUND THRU 207 391 RIGHT 0 0 588 863 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM Intersection:Cherimoya Ave S. Highland Ave Condition:2040 Build-out Peak Hour:PM Peak Hour FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** INPUT DATA *** Modified by: COMSIS Corp. (M. Roskin) 4/9/86 Modified by: FHWA 12/21/87 TURN BY FY APPROACH MOVEMENT COUNT INTERSECTION LEG TOTAL ---------------------------------- NORTH LEFT 0 SOUTH LEG BOUND THRU 0 IN ...8 RIGHT 8 OUT ...0 SOUTH LEFT 0 NORTH LEG BOUND THRU 0 IN ...0 RIGHT 0 OUT ...0 EAST LEFT 0 WEST LEG BOUND THRU 517 IN ...776 RIGHT 0 OUT ...605 WEST LEFT 0 EAST LEG BOUND THRU 454 IN ...605 RIGHT 0 OUT ...784 979 2,778 FUTURE DIRECTIONAL TURN VOLUMES FROM FUTURE DIRECTIONAL LINK VOLUMES NCHRP 255, PAGE 105 Written by: FHWA (C. Fleet) *** RESULTS *** Modified by: COMSIS Corp. (M. Roskin) 2/13/86 TURN BY FY APPROACH MOVEMENT COUNT FORECAST ----------------------------- NORTH LEFT 0 0 BOUND THRU 0 0 RIGHT 8 8 SOUTH LEFT 0 0 BOUND THRU 0 0 RIGHT 0 0 EAST LEFT 0 0 BOUND THRU 517 776 RIGHT 0 0 WEST LEFT 0 0 BOUND THRU 454 605 RIGHT 0 0 979 1,389 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\1st Submittal - TIA\1 Analysis\Modeling\10/5/2021 9:36 AM APPENDIX G TRAFFIC SIGNAL WARRANT ANALYSIS WORKSHEETS TRAFFIC SIGNAL VOLUME WARRANT ANALYSIS (2000 MUTCD) MAJOR STREET:Highland Avenue EB WB # OF APPROACH LANES:1 MINOR STREET:Jacaranda Avenue NB SB # OF APPROACH LANES:1 CITY, STATE:Fontana, CA COMMENTS:Opening Year 2023 Cumulative Plus Project 0 ISOLATED COMMUNITY WITH POPULATION LESS THAN 10,000 (Y OR N):N 85TH PERCENTILE SPEED GREATER THAN 40 MPH ON MAJOR STREET (Y OR N):Y MAJOR ST MINOR ST WARRANT 2 WARRANT 3 TWO-WAY TRAFFIC TRAFFIC HEAVY LEG MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET Four-Hour Peak Hour THRESHOLD VALUES 350 105 525 53 280 84 420 42 06:00 AM TO 07:00 AM 0 0 07:00 AM TO 08:00 AM 0 0 08:00 AM TO 09:00 AM 0 0 09:00 AM TO 10:00 AM 714 13 Y Y Y Y 10:00 AM TO 11:00 AM 0 0 11:00 AM TO 12:00 PM 0 0 12:00 PM TO 01:00 PM 0 0 01:00 PM TO 02:00 PM 0 0 02:00 PM TO 03:00 PM 0 0 03:00 PM TO 04:00 PM 0 0 04:00 PM TO 05:00 PM 1,154 25 Y Y Y Y 05:00 PM TO 06:00 PM 0 0 06:00 PM TO 07:00 PM 0 0 07:00 PM TO 08:00 PM 0 0 08:00 PM TO 09:00 PM 0 0 09:00 PM TO 10:00 PM 0 0 1,868 38 2 0 0 2 0 0 2 0 0 2 0 0 0 0 4 HRS NEEDED 1 HR NEEDED NOT SATISFIED NOT SATISFIED 12/06/21 Kimley-Horn and Associates NOT SATISFIED 8 HOURS NEEDED 8 HOURS NEEDED NOT SATISFIED NOT SATISFIED WARRANT 1 - Condition B, Part 2 8 HOURS NEEDED for both Condition A & B WARRANT 1 - Condition A, Part 1 WARRANT 1 - Condition A, Part 2WARRANT 1 - Condition B, Part 1 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\2nd Submittal - TIA\1 Analysis\Signal Warrant\D1. OY WP Signal Warrant.xls \ Calculations Warrants 1,2,3 TRAFFIC SIGNAL VOLUME WARRANT ANALYSIS (2000 MUTCD) MAJOR STREET:Highland Avenue EB WB # OF APPROACH LANES:1 MINOR STREET:Jacaranda Avenue NB SB # OF APPROACH LANES:1 CITY, STATE:Fontana, CA COMMENTS:Horizon Year 2040 Plus Project 0 ISOLATED COMMUNITY WITH POPULATION LESS THAN 10,000 (Y OR N):N 85TH PERCENTILE SPEED GREATER THAN 40 MPH ON MAJOR STREET (Y OR N):Y MAJOR ST MINOR ST WARRANT 2 WARRANT 3 TWO-WAY TRAFFIC TRAFFIC HEAVY LEG MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET Four-Hour Peak Hour THRESHOLD VALUES 350 105 525 53 280 84 420 42 06:00 AM TO 07:00 AM 0 0 07:00 AM TO 08:00 AM 0 0 08:00 AM TO 09:00 AM 0 0 09:00 AM TO 10:00 AM 907 13 Y Y Y Y 10:00 AM TO 11:00 AM 0 0 11:00 AM TO 12:00 PM 0 0 12:00 PM TO 01:00 PM 0 0 01:00 PM TO 02:00 PM 0 0 02:00 PM TO 03:00 PM 0 0 03:00 PM TO 04:00 PM 0 0 04:00 PM TO 05:00 PM 1,429 25 Y Y Y Y 05:00 PM TO 06:00 PM 0 0 06:00 PM TO 07:00 PM 0 0 07:00 PM TO 08:00 PM 0 0 08:00 PM TO 09:00 PM 0 0 09:00 PM TO 10:00 PM 0 0 2,336 38 2 0 0 2 0 0 2 0 0 2 0 0 0 0 4 HRS NEEDED 1 HR NEEDED NOT SATISFIED NOT SATISFIED 12/06/21 Kimley-Horn and Associates NOT SATISFIED 8 HOURS NEEDED 8 HOURS NEEDED NOT SATISFIED NOT SATISFIED WARRANT 1 - Condition B, Part 2 8 HOURS NEEDED for both Condition A & B WARRANT 1 - Condition A, Part 1 WARRANT 1 - Condition A, Part 2WARRANT 1 - Condition B, Part 1 TRAFFIC SIGNAL VOLUME WARRANT ANALYSIS (2000 MUTCD) MAJOR STREET:Beech Ave NB SB # OF APPROACH LANES:3 MINOR STREET:SR-210 HOV Ramps EB WB # OF APPROACH LANES:1 CITY, STATE:Fontana, CA COMMENTS:Horizon Year 2040 0 ISOLATED COMMUNITY WITH POPULATION LESS THAN 10,000 (Y OR N):N 85TH PERCENTILE SPEED GREATER THAN 40 MPH ON MAJOR STREET (Y OR N):N MAJOR ST MINOR ST WARRANT 2 WARRANT 3 TWO-WAY TRAFFIC TRAFFIC HEAVY LEG MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET Four-Hour Peak Hour THRESHOLD VALUES 600 150 900 75 480 120 720 60 06:00 AM TO 07:00 AM 0 0 07:00 AM TO 08:00 AM 0 0 08:00 AM TO 09:00 AM 0 0 09:00 AM TO 10:00 AM 1,569 209 Y Y Y Y Y Y Y Y Y Y Y Y Y Y 10:00 AM TO 11:00 AM 0 0 11:00 AM TO 12:00 PM 0 0 12:00 PM TO 01:00 PM 0 0 01:00 PM TO 02:00 PM 0 0 02:00 PM TO 03:00 PM 0 0 03:00 PM TO 04:00 PM 0 0 04:00 PM TO 05:00 PM 1,405 282 Y Y Y Y Y Y Y Y Y Y Y Y Y Y 05:00 PM TO 06:00 PM 0 0 06:00 PM TO 07:00 PM 0 0 07:00 PM TO 08:00 PM 0 0 08:00 PM TO 09:00 PM 0 0 09:00 PM TO 10:00 PM 0 0 2,974 491 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 HRS NEEDED 1 HR NEEDED NOT SATISFIED SATISFIED 12/06/21 Kimley-Horn and Associates NOT SATISFIED 8 HOURS NEEDED 8 HOURS NEEDED NOT SATISFIED NOT SATISFIED WARRANT 1 - Condition B, Part 2 8 HOURS NEEDED for both Condition A & B WARRANT 1 - Condition A, Part 1 WARRANT 1 - Condition A, Part 2WARRANT 1 - Condition B, Part 1 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\2nd Submittal - TIA\1 Analysis\Signal Warrant\2. HY Signal Warrant.xls \ Calculations Warrants 1,2,3 TRAFFIC SIGNAL VOLUME WARRANT ANALYSIS (2000 MUTCD) MAJOR STREET:Beech Ave NB SB # OF APPROACH LANES:3 MINOR STREET:SR-210 HOV Ramps EB WB # OF APPROACH LANES:1 CITY, STATE:Fontana, CA COMMENTS:Horizon Year 2040 Plus Project 0 ISOLATED COMMUNITY WITH POPULATION LESS THAN 10,000 (Y OR N):N 85TH PERCENTILE SPEED GREATER THAN 40 MPH ON MAJOR STREET (Y OR N):N MAJOR ST MINOR ST WARRANT 2 WARRANT 3 TWO-WAY TRAFFIC TRAFFIC HEAVY LEG MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET MAIN LINE SIDE STREET BOTH MET Four-Hour Peak Hour THRESHOLD VALUES 600 150 900 75 480 120 720 60 06:00 AM TO 07:00 AM 0 0 07:00 AM TO 08:00 AM 0 0 08:00 AM TO 09:00 AM 0 0 09:00 AM TO 10:00 AM 1,582 209 Y Y Y Y Y Y Y Y Y Y Y Y Y Y 10:00 AM TO 11:00 AM 0 0 11:00 AM TO 12:00 PM 0 0 12:00 PM TO 01:00 PM 0 0 01:00 PM TO 02:00 PM 0 0 02:00 PM TO 03:00 PM 0 0 03:00 PM TO 04:00 PM 0 0 04:00 PM TO 05:00 PM 1,417 282 Y Y Y Y Y Y Y Y Y Y Y Y Y Y 05:00 PM TO 06:00 PM 0 0 06:00 PM TO 07:00 PM 0 0 07:00 PM TO 08:00 PM 0 0 08:00 PM TO 09:00 PM 0 0 09:00 PM TO 10:00 PM 0 0 2,999 491 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 HRS NEEDED 1 HR NEEDED NOT SATISFIED SATISFIED 12/06/21 Kimley-Horn and Associates NOT SATISFIED 8 HOURS NEEDED 8 HOURS NEEDED NOT SATISFIED NOT SATISFIED WARRANT 1 - Condition B, Part 2 8 HOURS NEEDED for both Condition A & B WARRANT 1 - Condition A, Part 1 WARRANT 1 - Condition A, Part 2WARRANT 1 - Condition B, Part 1 K:\ORA_TPTO\ZTBB\Projects\Fontana - Fontana Square\7 Submittals\2nd Submittal - TIA\1 Analysis\Signal Warrant\2. HY WP Signal Warrant.xls \ Calculations Warrants 1,2,3 APPENDIX H QUEUING ANALYSIS WORKSHEETS Corona (2305 Compton Ave, Corona, CA 92881) Highland (28009 Greenspot Rd, Highland, CA 92346) Thousand Palms (72265 Varner Rd, Thousand Palms, CA 92276) Location:72265 Varner Road Day:Thursday City:Thousand Palms Date:6/27/2019 11:00 12 16:00 7 21:00 10 11:05 14 16:05 6 21:05 12 11:10 15 16:10 4 21:10 14 11:15 15 16:15 9 21:15 12 11:20 16 16:20 8 21:20 15 11:25 14 16:25 10 21:25 18 11:30 18 16:30 9 21:30 18 11:35 17 16:35 7 21:35 17 11:40 17 16:40 5 21:40 16 11:45 13 16:45 10 21:45 16 11:50 12 16:50 11 21:50 19 11:55 14 16:55 10 21:55 18 12:00 17 17:00 10 22:00 19 12:05 15 17:05 9 22:05 18 12:10 14 17:10 10 22:10 19 12:15 13 17:15 14 22:15 17 12:20 16 17:20 11 22:20 20 12:25 15 17:25 12 22:25 17 12:30 14 17:30 11 22:30 19 12:35 14 17:35 13 22:35 18 12:40 16 17:40 12 22:40 19 12:45 18 17:45 9 22:45 17 12:50 20 17:50 6 22:50 14 12:55 15 17:55 7 22:55 10 13:00 10 18:00 11 13:05 9 18:05 12 13:10 9 18:10 11 13:15 12 18:15 12 13:20 9 18:20 16 13:25 8 18:25 12 13:30 11 18:30 17 13:35 12 18:35 18 13:40 13 18:40 16 13:45 10 18:45 15 13:50 7 18:50 18 13:55 10 18:55 15 14:00 14 19:00 16 14:05 13 19:05 18 14:10 19 19:10 19 14:15 21 19:15 20 14:20 18 19:20 17 14:25 17 19:25 17 14:30 14 19:30 17 14:35 14 19:35 14 14:40 6 19:40 15 14:45 7 19:45 16 14:50 9 19:50 16 14:55 12 19:55 12 15:00 12 20:00 10 15:05 13 20:05 6 15:10 7 20:10 6 15:15 8 20:15 12 15:20 10 20:20 13 15:25 9 20:25 17 15:30 11 20:30 15 15:35 13 20:35 13 15:40 14 20:40 15 15:45 13 20:45 11 15:50 11 20:50 8 15:55 9 20:55 9 In‐N‐Out, Rancho Mirage MAX Queue Study Time TimeQueue Time Queue Queue Location:72265 Varner Road Day:Saturday City:Thousand Palms Date:6/22/2019 11:00 6 16:00 12 21:00 12 11:05 6 16:05 7 21:05 11 11:10 8 16:10 7 21:10 9 11:15 7 16:15 6 21:15 13 11:20 8 16:20 7 21:20 14 11:25 7 16:25 11 21:25 15 11:30 10 16:30 12 21:30 13 11:35 9 16:35 9 21:35 16 11:40 12 16:40 12 21:40 18 11:45 12 16:45 11 21:45 15 11:50 11 16:50 10 21:50 16 11:55 14 16:55 11 21:55 14 12:00 9 17:00 12 22:00 8 12:05 9 17:05 12 22:05 12 12:10 11 17:10 11 22:10 16 12:15 9 17:15 11 22:15 19 12:20 11 17:20 8 22:20 20 12:25 12 17:25 5 22:25 14 12:30 12 17:30 2 22:30 16 12:35 12 17:35 3 22:35 14 12:40 18 17:40 6 22:40 11 12:45 14 17:45 10 22:45 9 12:50 15 17:50 16 22:50 6 12:55 16 17:55 16 22:55 10 13:00 15 18:00 19 13:05 13 18:05 16 13:10 15 18:10 12 13:15 15 18:15 11 13:20 13 18:20 13 13:25 14 18:25 17 13:30 17 18:30 14 13:35 18 18:35 15 13:40 17 18:40 15 13:45 15 18:45 15 13:50 17 18:50 18 13:55 18 18:55 20 14:00 14 19:00 19 14:05 14 19:05 15 14:10 14 19:10 16 14:15 10 19:15 13 14:20 14 19:20 12 14:25 16 19:25 11 14:30 18 19:30 12 14:35 16 19:35 12 14:40 17 19:40 12 14:45 15 19:45 12 14:50 14 19:50 14 14:55 15 19:55 10 15:00 15 20:00 10 15:05 15 20:05 10 15:10 11 20:10 13 15:15 16 20:15 13 15:20 17 20:20 17 15:25 16 20:25 15 15:30 15 20:30 12 15:35 13 20:35 16 15:40 15 20:40 17 15:45 11 20:45 19 15:50 14 20:50 17 15:55 14 20:55 16 MAX Queue Study In‐N‐Out, Rancho Mirage Time Queue Time Queue Time Queue