Loading...
HomeMy WebLinkAboutAddendum to the Program Environmental Impact Report for SWIP and Annexation    ADDENDUM  TO THE   PROGRAM ENVIRONMENTAL IMPACT REPORT   FOR THE   SOUTHWEST INDUSTRIAL PARK SPECIFIC PLAN UPDATE AND ANNEXATION   (State Clearinghouse #2009091089)     Banana & Rose Industrial Commerce  Center  Master Case No. 22‐025  Design Review No. 22‐017  Tentative Parcel Map No. 20529  Prepared For:  City of Fontana  Planning Department  8353 Sierra Avenue  Fontana, CA 92335  Contact: Candida Neal    Prepared By:  T&B Planning, Inc.  3200 El Camino Real Suite 100  Irvine, CA 92602  Contact: David Ornelas    Project Applicant:  LDC Industrial Realty, LLC    November 2022  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  Banana & Rose Commerce Center i  Table of Contents    Section Number/Title Page  1.0 INTRODUCTION .......................................................................................................................... 1‐1  1.1 Project Overview .................................................................................................................................... 1‐1  1.2 California Environmental Quality Act ..................................................................................................... 1‐1  1.3 Format and Content of this EIR Addendum ........................................................................................... 1‐4  1.4 Review and Consideration of this EIR Addendum .................................................................................. 1‐5  2.0 ENVIRONMENTAL SETTING ............................................................................................................ 2‐1  2.1 Project Location ...................................................................................................................................... 2‐1  2.2 Existing Condition of Project Site ........................................................................................................... 2‐1  2.3 Environmental Setting and Surrounding Land Uses ............................................................................... 2‐1  2.4 Existing General Plan and Zoning ........................................................................................................... 2‐2  3.0 PROJECT DESCRIPTION ................................................................................................................. 3‐1  3.1 Project Components ............................................................................................................................... 3‐1  3.2 Project Improvements ............................................................................................................................ 3‐2  3.3 Construction Characteristics ................................................................................................................ 3‐10  3.4 Operational Characteristics .................................................................................................................. 3‐11  3.5 Summary of Requested Actions ........................................................................................................... 3‐13  4.0 ENVIRONMENTAL ANALYSIS .......................................................................................................... 4‐1  4.1 Aesthetics ............................................................................................................................................... 4‐2  4.2 Agriculture and Forestry Resources ....................................................................................................... 4‐4  4.3 Air Quality ............................................................................................................................................... 4‐5  4.4 Biological Resources ............................................................................................................................. 4‐14  4.5 Cultural Resources ................................................................................................................................ 4‐18  4.6 Energy ................................................................................................................................................... 4‐21  4.7 Geology and Soils ................................................................................................................................. 4‐25  4.8 Greenhouse Gas Emissions ................................................................................................................... 4‐30  4.9 Hazards and Hazardous Materials ........................................................................................................ 4‐33  4.10 Hydrology and Water Quality ............................................................................................................... 4‐40  4.11 Land Use and Planning ......................................................................................................................... 4‐45  4.12 Mineral Resources ................................................................................................................................ 4‐46  4.13 Noise ..................................................................................................................................................... 4‐46  4.14 Population and Housing ....................................................................................................................... 4‐50  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  Banana & Rose Commerce Center ii  4.15 Public Services ...................................................................................................................................... 4‐51  4.16 Recreation ............................................................................................................................................ 4‐54  4.17 Transportation ...................................................................................................................................... 4‐55  4.18 Tribal Cultural Resources ...................................................................................................................... 4‐59  4.19 Utilities and Service Systems ................................................................................................................ 4‐60  4.20 Wildfire ................................................................................................................................................. 4‐62  4.21 Mandatory Findings of Significance ..................................................................................................... 4‐63  5.0 REFERENCES .............................................................................................................................. 5‐1       Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  Banana & Rose Commerce Center iii  List of Figures    Figure Number/Title Page  Figure 2‐1 Regional Map .................................................................................................................................. 2‐3  Figure 2‐2 Vicinity Map .................................................................................................................................... 2‐4  Figure 2‐3 USGS Topographic Map .................................................................................................................. 2‐5  Figure 2‐4 Aerial Photograph ........................................................................................................................... 2‐6  Figure 2‐5 Site Photographs – Views 1 – 4 ...................................................................................................... 2‐7  Figure 2‐6 Site Photographs – Views 5 ‐ 7 ....................................................................................................... 2‐8  Figure 2‐7 Southwest Industrial Park Specific Plan Land Use Plan .................................................................. 2‐9  Figure 3‐1 Conceptual Site Plan ....................................................................................................................... 3‐3  Figure 3‐2 Conceptual Architectural Elevations .............................................................................................. 3‐4  Figure 3‐3 Conceptual Material Board ............................................................................................................ 3‐5  Figure 3‐4 Conceptual Landscape Plan ............................................................................................................ 3‐6  Figure 3‐5 Tentative Parcel Map No. 20529 .................................................................................................... 3‐7  Figure 3‐6 Conceptual Utility Plan ................................................................................................................... 3‐8  Figure 3‐7 Proposed Grading Plan ................................................................................................................. 3‐12    List of Tables    Table Number/Title Page  Table 3‐1 Construction Schedule ...................................................................................................................... 3‐10  Table 3‐2 Construction Equipment Fleet .......................................................................................................... 3‐10  Table 3‐3 Summary of Project Approvals/Permits ........................................................................................... 3‐13  Table 4‐1 Project Construction Emissions Summary .......................................................................................... 4‐7  Table 4‐2 Project Operational Emissions Summary ........................................................................................... 4‐8  Table 4‐3 Project Construction Localized Emissions Summary ........................................................................ 4‐12  Table 4‐4 Project Operational Localized Emissions Summary .......................................................................... 4‐12  Table 4‐5 Summary of Project‐Related Construction Health Risks .................................................................. 4‐13  Table 4‐6 Summary of Project‐Related Operational Health Risks .................................................................... 4‐13  Table 4‐7 Construction‐Related Greenhouse Gas Emissions ........................................................................... 4‐31  Table 4‐8 Annual Project Greenhouse Gas Emissions ...................................................................................... 4‐31    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  Banana & Rose Commerce Center iv  List of Appendices  Appendix Document/Reference Title     A SWIP SP PEIR Mitigation Monitoring and Reporting Program     B Air Quality Impact Analysis     C Mobile Source Health Risk Assessment     D Habitat Assessment     E Cultural Resources Study     F Energy Analysis     G Geotechnical Investigation     H Paleontological Assessment     I Greenhouse Gas Analysis     J Phase I Environmental Site Assessment     K Phase II Environmental Site Assessment     L Preliminary Water Quality Management Plan     M Preliminary Hydrology Report     N Noise Impact Analysis     O Trip Generation Assessment    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  List of Acronyms    Acronym Definition    Banana & Rose Commerce Center v  AB Assembly Bill  AB 32 Assembly Bill 32  AB 2185 Assembly Bill 2185  ACMs Asbestos‐Containing Materials  ACOE Army Corps of Engineers  ADT average daily trips  AIA Airport Influence Area  ALUCP Airport Land Use Compatibility Plan  Alden Alden Environmental  AM Morning  APN Assessor Parcel Number  AQMP Air Quality Management Plan  AQIA Air Quality Impact Analysis  amsl above mean sea level  BFSA Brian F. Smith and Associates, Inc.  BMP Best Management Practice  CalGreen California Building Standards Code  CalTrans California Department of Transportation  CARB California Air Resources Board  CAGN California gnatcatcher  CBC California Building Code  CBSC California Building Standards Code  CCR California code of Regulations  CDFG California Department of Fish and Game  CDFW California Department of Fish and Wildlife  CEQA California Environmental Quality Act  cfs Cubic Feet per Second  CMP Congestion Management Program  CNEL Community Noise Equivalent Level  CO Carbon Monoxide  CO2 Carbon Dioxide  cy Cubic Yards  dB decibel  dBA Leq decibel A‐weighted equivalent sound level  DOC California Department of Conservation  DRP Design Review Project  DTSC Department of Toxic Substances Control  e.g. “exempli gratia” meaning “for example”  EIR Environmental Impact Report  EPA Environmental Protection Agency  EV Electric Vehicle  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  List of Acronyms    Acronym Definition    Banana & Rose Commerce Center vi  FEMA Federal Emergency Management Agent  FWC Fontana Water Company  GHG Greenhouse Gas(es)  gpd gallons per day  HMBEP Hazardous Materials Business Emergency Plan  HVAC Heating, Ventilation, and Air Conditioning  I‐10 Interstate 10  I‐15 Interstate 15  Ibid “in the same place”  I‐L Light Industrial  IEUA Inland Empire Utilities Agency  in/sec Inches per Second  ITE Institute of Transportation Engineers  i.e. “is est” meaning “that is”  JND Jurupa North Research and Development District   kBTU/yr kilo‐British thermal units per year  kWh kilowatt hours  LBP Lead‐Based Paint  Lbs pounds  LOS Level of Service  MBTA Migratory Bird Treaty Act  MM Mitigation Measure  MMRP Mitigation Monitoring and Reporting Program  MRZ‐3 Mineral Resource Zone 3  MTCO2eq/year Metric Tons of Carbon Dioxide Equivalents per Year  No. Number  NOx Nitrogen Oxide  NPDES National Pollution Discharge Elimination System  ONT Ontario International Airport  PCB polychlorinated biphenyls  PCE Passenger Car Equivalent  PEIR Program Environmental Impact Report  Phase I ESA Phase I Environmental Site Assessment  PM Evening  PM Particulate Matter  PM2.5 Particulate Matter (2.5 microns in diameter)  PM10 Particulate Matter (10 microns in diameter)  POC Point of Connection  PPV Peak Particle Velocity  REC Recognized Environmental Conditions  ROG Reactive Organic Gas(es)  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Table of Contents  List of Acronyms    Acronym Definition    Banana & Rose Commerce Center vii  RWQCB Regional Water Quality Control Board  SANBAG San Bernardino Associated Governments  SB Senate Bill  SB 18 Senate Bill 18  SB 32 Senate Bill 32  SBCTA San Bernardino County Transportation Authority  SBKR San Bernardino kangaroo rat  SCAB South Coast Air Basin  SCAQMD South Coast Air Quality Management District  SCE Southern California Edison   SCG Southern California Geotechnical  SCH State Clearinghouse  s.f. Square Feet  SGMA Sustainable Groundwater Management Act  SP Specific Plan  Sq. ft. Square Foot  SWD Slover West Industrial District  SWIP Southwest Industrial Park  SWPPP Stormwater Pollution Prevention Plan  TPM Tentative Parcel Map  USDA United States Department of Agriculture  UST Underground Storage Tanks  UWMP Urban Water Management Plan  VEC Vapor Encroachment Condition  VMT Vehicles Miles Traveled  VOCs Volatile Organic Compounds  Waterstone Waterstone Environmental, Inc.  WQMP Water Quality Management Plan  WS Water of the State  WUS Water of the United States      1.0 INTRODUCTION  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Introduction  Banana & Rose Commerce Center  1‐1  1.0 INTRODUCTION  1.1 Project Overview  The City of Fontana (hereinafter “City”) received applications from LDC Industrial Realty (hereinafter “Project  Applicant”) to redevelop an approximately 4.03‐gross‐acre (approximately 4.04‐net‐acre), rectangular‐shaped site  (Project Site) with an 87,590 square‐foot (sq. ft.) industrial commerce center building, inclusive of 8,000 s.f. ground  floor office and mezzanine space, and associated site improvements.  The Project Site abuts Banana Avenue to  the east and Rose Avenue to the south.  The Project Site consists of two (2) parcels including Assessor Parcel  Numbers (APNs) 0236‐161‐58 and ‐59.  The northern portion of the Project Site is vacant and most recently used  for a wooden pallet supply/storage business.  The southern portion of the Project Site contains an occupied legal  non‐conforming single‐family residence and commercial truck and truck trailer storage business.  The Project  involves clearing the Project Site of existing structures and ornamental landscaping to construct and operate the  proposed warehouse building.  Site improvements associated with the Project include, but are not limited to,  parking and loading areas, public utility connections, landscaping, and exterior lighting.  The Project Applicant also  would construct improvements to Rose Avenue and Banana Avenue along the Project Site’s frontages.     1.2 California Environmental Quality Act  The California Environmental Quality Act (CEQA), a statewide environmental law contained in Public Resources  Code Sections 21000‐21177, applies to most public agency decisions to carry out, authorize, or approve actions  that have the potential to adversely affect the environment.  CEQA requires that public agencies inform their  decision‐makers of the environmental consequences of their discretionary actions and to consider alternatives  and mitigation measures (MMs) that could avoid or reduce the discretionary actions’ significant, adverse  environmental effects.  CEQA also gives other public agencies and the public an opportunity to participate in the  environmental review process.    1.2.1 Prior CEQA Compliance  The Project Site is located within the Southwest Industrial Park (SWIP) Specific Plan (SP) area.  The City adopted  the original SWIP SP in 1983.  The SWIP SP was comprehensively updated in 2012, which included the addition of  1,318 acres to the SWIP SP area (bringing the total SP area to 3,111 acres).  The SWIP SP establishes the overall  vision and development plan for the SP area and acts as a bridge between the City’s General Plan and individual  development proposals.  The SWIP SP combines development standards and guidelines, capital improvement  programs, and financing methods, which are tailored to meet the needs of the SWIP SP area, into a single,  comprehensive plan.      Potential environmental impacts associated with buildout of the SWIP SP were evaluated by the SWIP SP Update  and Annexation Program Environmental Impact Report (PEIR).  The SWIP SP PEIR was prepared as a PEIR pursuant  to CEQA Guidelines Section 15168.  As defined by CEQA Guidelines Section 15168, a PEIR is “…an EIR which may  be prepared on a series of actions that can be characterized as one large project and are related…”.  The Fontana  City Council certified the PEIR on May 8, 2012 (State Clearinghouse [SCH] Number [No.] 2009091089; hereinafter  “SWIP SP PEIR”).      Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Introduction  Banana & Rose Commerce Center  1‐2  In certifying the SWIP SP PEIR, the City Council found that the SWIP SP PEIR adequately addressed the potential  environmental impacts associated with planned buildout of the SWIP SP area.  The SWIP SP PEIR identified the  following seven (7) significant and unavoidable environmental impacts (identified as Impacts 4.1‐1, 4.2‐1, 4.2‐2,  4.2‐4, 4.7‐3, 4.8‐5, and 4.9‐1) that would result from implementation of the SWIP SP:     Aesthetics: The SWIP SP PEIR found that buildout of the SWIP SP would result in significant and  unavoidable impacts to scenic vistas, because the long‐term buildout of industrial, commercial, and office  uses would result in a significant alteration in views of the Jurupa Mountains to the south and the San  Gabriel/San Bernardino Mountains to the north.   Air Quality: The SWIP SP PEIR found that development within the SWIP SP would generate short‐term  construction‐related emissions of dust (particulate matter [PM]) and vehicle/equipment exhaust that  could exceed South Coast Air Quality Management (SCAQMD) thresholds which would result in a  significant and unavoidable impact.  Additionally, the SWIP SP PEIR concluded long‐term operations within  the SWIP SP area would generate emissions that would exceed SCAQMD daily thresholds for reactive  organic gases (ROGs), nitrogen oxides (NOX), carbon monoxide (CO), and particulate matter (PM10 and  PM2.5), resulting in a significant and unavoidable impact.  Furthermore, the SWIP SP PEIR concluded that  because emissions associated with buildout of the SWIP SP would exceed SCAQMD thresholds, the  emissions from the SWIP SP would result in a conflict with the Air Quality Management Plan (AQMP).   Accordingly, the SWIP SP PEIR concluded that implementation of the SWIP SP would result in significant  and unavoidable short‐term and long‐term air quality impacts.   Noise: The SWIP SP PEIR determined that buildout of the SWIP SP would result in significant and  unavoidable mobile‐source (traffic‐related) noise impacts.   Public Services: The SWIP SP PEIR determined that implementation of the SWIP SP would generate  additional demand for parks and recreational facilities.  However, no development impact fees for parks  and recreation facilities would be collected as part of the development of the SWIP SP because the SWIP  would only include non‐residential land uses.  Therefore, the SWIP SP PEIR concluded that a significant  and unavoidable impact would occur.   Transportation and Traffic:  The SWIP SP PEIR determined that the SWIP SP’s addition of traffic would  result in deficient operations at 9 roadway segments and 19 intersections within the study area under the  Existing with Approved Project scenario and would contribute to deficient operations at 10 roadway  segments and 19 intersections under the Forecast Year 2030 with Project scenario.  Because the City of  Fontana could not assure the installation of all needed traffic improvements, the SWIP SP PEIR concluded  that impacts to these facilities would be significant and unavoidable.  In conjunction with certifying the SWIP SP PEIR, the City Council adopted a Statement of Overriding  Considerations, which stated that the benefits of the SWIP SP outweighed the significant and unavoidable  environmental impacts summarized above.     Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Introduction  Banana & Rose Commerce Center  1‐3  1.2.2 CEQA Rules and Requirements for an Addendum  The CEQA Guidelines allow for the updating and re‐use of the previously approved/certified CEQA document when  a subsequent project is within the scope of the analysis of the earlier approved CEQA document and when some  changes or additions to the original CEQA document are necessary but none of the following conditions are met:    a. Substantial changes are proposed in the project which will require major revisions of the previous EIR due  to the involvement of environmental effects or a substantial increase in the severity of previously  identified significant effects;  b. Substantial changes occur with respect to the circumstances under which the project is undertaken, which  will require major revisions of the previous EIR due to the involvement of new significant environmental  effects or a substantial increase in the severity of previously identified significant effects; or  c. New information of substantial importance, which was not known and could not have been known with  the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of  the following:  1. The project will have one or more significant effects not discussed in the previous EIR;  2. Significant effects previously examined will be substantially more severe than shown in the previous  EIR;  3. MMs or alternatives previously found not to be feasible would in fact be feasible, and would  substantially reduce one or more significant effects of the project, but the project proponents decline  to adopt the MM or alternatives; or  4. MMs or alternatives which are considerably different from those analyzed in the previous EIR would  substantially reduce one or more significant effects on the environment, but the project proponents  decline to adopt the MM or alternative.  (See CEQA Guidelines Section 15162)  If none of the circumstances listed above occur and only minor technical changes or additions are necessary to  update the previously approved/certified CEQA document, an Addendum may be prepared (See CEQA Guidelines  Section 15164).    1.2.3 Finding for the Project  The City, serving as the CEQA Lead Agency for the Project (See CEQA Guidelines Sections 15050–15051),  determined in its independent judgment that the Project does not meet any of the circumstances from CEQA  Guidelines Section 15162 and that an Addendum to the previously‐certified SWIP SP PEIR is the appropriate CEQA  compliance document for the Project.  The City’s finding is based on the following facts:    a. As demonstrated in detail in Section 4.0 of this document, the Project would not require major revisions  to the previously‐certified SWIP SP PEIR because implementation of the Project would neither result in  any significant impacts to the physical environment that were not already disclosed in the SWIP SP PEIR  nor result in substantial increases in the severity of the environmental impacts previously disclosed in the  SWIP SP PEIR.  b. Subsequent to the certification of the SWIP SP PEIR, no substantial changes in the circumstances under  which the Project would be undertaken have occurred that would require major revisions to the SWIP SP  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Introduction  Banana & Rose Commerce Center  1‐4  PEIR due to the involvement of new significant environmental effects or a substantial increase in the  severity of previously identified significant effects.  c. There is no evidence in the public record that new information of substantial importance has become  available that is applicable to the Project and/or Project Site, was not known and could not have been  known with the exercise of reasonable diligence at the time the SWIP SP PEIR was certified and would  alter the conclusions of the SWIP SP PEIR.    1.3 Format and Content of this EIR Addendum  The following components comprise the EIR Addendum in its totality:  a. This Introduction (Section 1.0), the Environmental Setting (Section 2.0), and the Project Description  (Section 3.0).  b. The environmental impact analysis (Section 4.0), which concludes that implementation of the Project  would neither result in any new, significant environmental impacts that were not previously disclosed in  the SWIP SP PEIR nor substantially increase the severity of the significant environmental impacts beyond  the levels disclosed in the SWIP SP PEIR.  c. Fifteen (15) technical reports and other documentation that evaluate the Project, which are attached as  EIR Addendum Technical Appendices B‐O.    Appendix B Air Quality Impact Analysis  Appendix C Mobile Source Health Risk Assessment  Appendix D Habitat Assessment   Appendix E Cultural Resources Study  Appendix F Energy Analysis  Appendix G Geotechnical Investigation  Appendix H Paleontological Assessment  Appendix I Greenhouse Gas Analysis  Appendix J Phase I Environmental Site Assessment  Appendix K Phase II Environmental Site Assessment  Appendix L Preliminary Water Quality Management Plan  Appendix M Preliminary Hydrology Report  Appendix N Noise Impact Analysis  Appendix O Trip Generation Assessment  d. The Draft and Final SWIP SP PEIR, accompanying Mitigation Monitoring and Reporting Program (MMRP),  Technical Appendices to the SWIP SP PEIR, Findings and Statement of Facts, Statement of Overriding  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Introduction  Banana & Rose Commerce Center  1‐5  Considerations, and City Council Resolution No. 2012‐035, as well as all associated staff reports,  memoranda, public comments and other materials relating to the originally approved project and SWIP  SP PEIR, which are all herein incorporated by reference pursuant to CEQA Guidelines Section 15150 and  are available for review at City of Fontana Planning Division; 8353 Sierra Avenue, Fontana, CA 92335.    1.4 Review and Consideration of this EIR Addendum  The City of Fontana Planning Department, directed and supervised the preparation of this EIR Addendum.   Although prepared with assistance of the consulting firm T&B Planning, Inc., the content contained within, and  the conclusions drawn by this EIR Addendum reflect the sole independent judgment of the City.    This EIR Addendum will be forwarded, along with the previously certified SWIP SP PEIR, to the Fontana Planning  Commission for review as part of their deliberations concerning the Project.  A public hearing will be held before  the Planning Commission to evaluate the merits of the Project and the adequacy of this EIR Addendum.  Public  comments will be heard at the hearing.  At the conclusion of the public hearing, the Planning Commission will take  action to approve, conditionally approve, or deny approval of the Project.  If no appeal is filed, then the decision  of the Planning Commission would be final.  However, if the Planning Commission’s decision is appealed, the  Fontana City Council will hold a public hearing to consider the Project.  As part of their review of the Project, if  appealed, the City Council would review and consider the report of the Director of Planning Department, the  minutes of the Planning Commission, the Project’s staff report, and any comments made by members of the  public.  At the conclusion of the public hearing for the appeal, the City Council would sustain, modify, reject, or  overrule the decision of the Planning Commission, based on its own independent judgment.        2.0 ENVIRONMENTAL SETTING  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Setting  Banana & Rose Commerce Center  2‐1  2.0 ENVIRONMENTAL SETTING  2.1 Project Location  The Project Site is at the northwest corner of the Banana Avenue and Rose Avenue intersection in the City of  Fontana, San Bernardino County, California.  The Project Site is in the southwest portion of the City within an area  referred to as the “Southwest Industrial Park” or “SWIP.”  The Project Site is located approximately 1.6 roadway  miles southwest of the Cherry Avenue on/off‐ramps to Interstate 10 (I‐10) and approximately 3.4 roadway miles  east of the Jurupa Street on/off‐ramps to Interstate 15 (I‐15).  The Project’s location is illustrated in Figure 2‐1,  Regional Map, Figure 2‐2, Vicinity Map, and Figure 2‐3, USGS Topographic Map.     2.2 Existing Condition of Project Site  As shown on Figure 2‐4 through Figure 2‐6, the Project Site contains a mixture of uses, including legal non‐ conforming residences (one occupied and one vacant) and industrial uses (tractor and tractor‐trailer storage).   These uses were present at the time the SWIP SP PEIR was certified in 2012 and the demolition of these uses were  included within the scope of the project evaluated by the SWIP SP PEIR. The Project Site is heavily disturbed,  mostly paved with concrete and asphalt, and has patches of bare dirt and ornamental landscaping. Chain link  fencing is installed along portions of the Site’s southern and northern boundaries; wrought iron fencing is installed  along portions of the Site’s eastern boundary.     2.3 Environmental Setting and Surrounding Land Uses  The Project area was historically used for rural residential and agricultural land uses before transitioning to  commercial/industrial land uses beginning in the 1950s.  In recent years, the Project area has begun to transition  to a hub of warehousing and distribution land uses.  Existing land uses surrounding the Project Site include the  following:    North: The City is reviewing a development application to re‐develop an approximately 15‐gross‐acre property  that abuts the Project Site on the north with an approximately 342,000 sq. ft. commerce center facility.   Further north is Santa Ana Avenue. Properties north of Santa Ana Avenue, consist of industrial uses  (vehicle and truck/trailer storage) and legal non‐conforming residential uses.     South: Rose Avenue abuts the Project Site on the south.  Properties further south, on the opposite side of Rose  Avenue, are occupied by an under construction industrial complex that will contain two buildings with a  combined total building area of approximately 157,000 sq. ft.  East: Banana Avenue is immediately east of the Project Site. Properties east of the Project Site, on the opposite  side of Banana Avenue, consist of two commerce center buildings – one building with approximately  297,000 sq. ft. of building area and the other with approximately 200,000 sq. ft. of building area – both of  which are operational under existing conditions.    West: Properties immediately west of the Project Site consist of industrial commercial uses (truck repair, tire  shop), industrial uses (manufacturing)., and legal non‐conforming residential uses. Calabash Avenue is  located further west of the Project Site. Properties further west, on the opposite side of Calabash Avenue,  consist of industrial uses (vehicle storage) and legal non‐conforming residential uses.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Setting  Banana & Rose Commerce Center  2‐2  2.4 Existing General Plan and Zoning  The City of Fontana General Plan and SWIP SP are the prevailing long‐range planning documents that pertain to  the Project Site.  The City of Fontana General Plan Land Use Map identifies the Project Site as being within the  SWIP SP area and designates the Project Site for Light Industrial (I‐L) land uses.  The SWIP SP establishes the  specific zoning regulations, including development standards and design guidelines, for each of its nine (9)  development districts.  The Project Site is located within the Slover West Industrial District (SWD) (refer to Figure  2‐7, Southwest Industrial Park Specific Plan Land Use Plan).  The SWD occupies 289.1 acres in the central‐western  portion of the SWIP SP area.  The SWD is intended to promote the continued use and expansion of existing  industrial development and logistics‐based warehousing, along with strategically located service commercial uses.  The SWIP SP assumes that almost the entirety of the SWD area will be re‐developed with a mixture of  development types and uses including industrial, manufacturing and processing, general manufacturing  warehousing, logistics‐based distribution, and service commercial, with only 88,068 s.f. of existing development  to be retained and a maximum of 4,937,885 s.f. of new development (for a total of 5,025,953 s.f. of total building  area within the SWD area). As a result, the SWIP SP PEIR assumed that the Project Site would be re‐developed,  with the proposed commerce center use as an allowable use for the subject property and analyzed the potential  impacts of such re‐development accordingly.        3.0 PROJECT DESCRIPTION  Addendum to the   SWIP Specific Plan Update and Annexation PEIR  Project Description  Banana & Rose Commerce Center 3‐1  3.0 PROJECT DESCRIPTION  The Project evaluated by this EIR Addendum consists of two discretionary proposals: a Design Review Project (City  Case No. DRP 22‐017) and a Tentative Parcel Map (City Case No. TPM 22‐003).  The proposed discretionary actions  are collectively referred to as Master Case No. 22‐025.  The application materials for the Project are herein  incorporated by reference pursuant to CEQA Guidelines Section 15150 and copies are available for review at the  City of Fontana Planning Department located at 8353 Sierra Avenue, Fontana, California, 92335.  The individual  components of the Project are discussed below.  3.1 Project Components  3.1.1 Design Review Project No. 22‐017 (DRP 22‐017)  The Project entails the redevelopment of the Project Site in conformance with the property’s I‐L General Plan land  use designation and SWIP SP SWD zoning designation.  DRP 22‐017 provides the following:  A.Conceptual Site Plan As illustrated in Figure 3‐1, Conceptual Site Plan, the Project is designed as a rectangular‐shaped building with its longer walls oriented parallel to the Project Site’s eastern and western boundaries and its shorter walls oriented parallel to the Site’s northern and southern boundaries.  The proposed 87,590 sq. ft. building would consist of approximately 79,590 square feet (s.f.) of warehouse space and 8,000 s.f. of supporting office space on the ground level and mezzanine.  A gate‐secured truck court with twelve (12) dock doors and three (3) trailer parking stalls would be provided west of the building (2 on the west side of the building and one along the western property line).  As shown on Figure 3‐1, the Project would provide 66 automobile parking spaces on the north and west sides of the building.  Metal fencing and a concrete block retaining wall enclose the truck courts on the north and west property lines. A retaining wall extends approximately 200 feet from the northwest corner of the site south and a 14‐foot‐tall solid concrete screen wall is provided along the southern edge of the truck court to screen the loading docks and trailer parking spaces from view of the Rose Avenue public right‐of‐way.  Additionally, 8‐foot‐ tall metal fencing is provided at the northern entrance to the truck court and along the segment of the western and northern Project Site boundary that abuts the truck court.  The building’s trash enclosures would be located inside the secured truck court and would not be visible from the public streets that abut the Project Site. Access to/from the Project Site would be provided by two private driveways, one driveway connecting to Banana  Avenue (at the northeast corner of the Site) and one driveway connecting to Rose Avenue (at the southwest corner  of the Site).  Both driveways would be open to both passenger vehicles and trucks and would allow full access (left  and right turns in and out of the Site).  B.Conceptual Architecture Plan The proposed building would feature a varied roofline for visual interest and to reduce the perceived bulk and scale of the building; the building height would vary between 41 feet and 6 inches and 43 feet and 6 inches above the finished floor elevation.  The building would be constructed with painted concrete tilt‐up panels and low‐ reflective, grey‐glazed glass.  The exterior color palette for the proposed building is comprised of various neutral colors, including shades of white, tan, and gray with a blue accent color.  Additionally, the proposed building would feature articulated building elements, mullions, vintage wood fiber cement wood siding, and aluminum canopies as decorative elements.  The proposed architectural elevations for the warehouse building are illustrated on Figure Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐2  3‐2, Conceptual Architectural Elevations, and the proposed materials are illustrated on Figure 3‐3, Conceptual  Material Board.     C. Conceptual Landscape Plan  The Project Site has minimal ornamental plant/tree cover under existing conditions, all of which would be  removed during Project construction.  Proposed landscaping would be ornamental in nature and would feature  drought‐tolerant trees, shrubs, and accent plants in addition to a variety of groundcovers.  As shown on Figure 3‐ 4, Conceptual Landscape Plan, trees, shrubs, and groundcover are proposed along the Project Site’s interfaces  with Banana Avenue and Rose Avenue, respectively; landscaping covers 15 percent of the Project Site.   Landscaping also would occur at building entries and in and around automobile parking areas.  The truck court  would be devoid of plant materials to avoid inference with truck movements.  Prior to building permit issuance,  the Project Applicant would be required to submit final planting and irrigation plans to the City of Fontana for  review and approval.  The plans are required to comply with the “Landscape and Water Conservation Ordinance”  from Chapter 28, Article IV, Section 28‐91 through 28‐119 of the Fontana Municipal Code, which establishes  requirements for landscape design, automatic irrigation system design, and water‐use efficiency.    3.1.2 Tentative Parcel Map No. 20529 (TPM 22‐003)  The proposed tentative parcel map would consolidate the Project Site’s two existing parcels – APNs 0236‐161‐58,  and ‐59 – into one parcel consisting of 4.03‐gross‐acres (4.04‐net‐acres), as shown on Figure 3‐5, Tentative Parcel  Map No. 20529.    3.2 Project Improvements  3.2.1 Public Road Improvements  The Project Site abuts two public streets: Banana Avenue to the east and Rose Avenue to the south.  As part of  the Project, frontage improvements would be made to each of these streets, as follows:    Banana Avenue  Under existing conditions, three driveways connect the Project Site to Banana Avenue; these existing driveways  would be removed as part of the Project and the west side of Banana Avenue would be improved along the Project  Site’s frontage to provide its ultimate half‐width, including a 28‐foot‐wide paved vehicular travel way, curb and  gutter, and a 12‐foot‐wide parkway that includes a curb adjacent park strip and a 5‐foot and 6‐inch‐wide sidewalk.    Rose Avenue  Under existing conditions, one driveway connects the Project Site to Rose Avenue; this existing driveway would  be removed as part of the Project and the north side of Rose Avenue would be improved along the Project Site’s  frontage to provide its ultimate half‐width, including a 20‐foot‐wide paved vehicular travel way, curb and gutter,  and a 12‐foot‐wide parkway that includes a curb adjacent park strip and 5‐foot and 6‐inch‐wide sidewalk.      3.2.2 Utility Improvements  The Project’s proposed utility plan is depicted on Figure 3‐6, Conceptual Utility Plan and described below.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐9  Water Infrastructure  The Fontana Water Company (FWC) provides water service to all structures on the Project Site under existing  conditions.  As part of Project construction, all existing points of connections (POCs) would be abandoned and  removed and five (5) new POCs would be constructed, as described further below. The Project would include the  installation of three (3) POCs within the northeast corner of the Project Site consisting of one domestic water line,  one fire flow line, and one irrigation water line (for on‐site landscaping). The proposed POCs at the northeast  corner of the Site would connect to an existing 8‐inch‐diameter water main beneath Banana Avenue. The Project  also includes the installation of two (2) POCs within the southwest corner of the Project Site consisting of one  domestic water line and one fire flow line.  The POCs at the southwest corner of the Project Site would connect  to a water main beneath Banana Avenue (Note: The existing 6‐inch‐diameter water main beneath Banana Avenue  is being upsized to 12‐inch‐diameter as part of the under‐construction warehouse project to the south of the  Project Site and is expected to be fully operational by the time the Project becomes operational.) Additionally, the  Project would provide new public fire hydrants and relocate them along Banana Avenue and Rose Avenue. All  proposed water facilities would be designed and constructed in accordance with FWC standards.      Sanitary Sewer Infrastructure  The City of Fontana provides wastewater conveyance services to all structures on the Project Site under existing  conditions.  As part of Project construction, all existing POCs would be abandoned and removed.  The proposed  building would connect to an existing 8‐inch‐diameter sewer line within Banana Avenue through a proposed sewer  lateral within the southeast corner of the Project Site. The new sewer line connection to the existing sanitary  sewer line would be constructed in accordance with City standards.      Stormwater Drainage Infrastructure  An on‐site storm drain system that consists of a network of catch basins, private storm drainpipes, and an  underground infiltration basin is proposed as part of the Project.  On‐site “first flush” stormwater runoff flows  (i.e., typically the first ¾‐inch of initial surface runoff after a rainstorm, which contains the highest proportion of  waterborne pollution) would be collected by the proposed catch basins and routed via the on‐site storm drain  lines into the underground infiltration basin located within the truck court on the western portion of the Project  Site.  The stormwater that flows into the underground infiltration basin would percolate into the ground (and  would be filtered of waterborne pollutants in the process).  Stormwater runoff captured after the first flush would  bypass the underground infiltration basin and be discharged to the future 24‐inch diameter storm drain line to be  installed beneath Rose Avenue.  A flow discharge device would be installed to ensure that stormwater runoff flows  discharged into the future 24‐inch diameter storm drain line beneath Rose Avenue would not exceed existing 100‐ year flow rates.  Flows entering the future 24‐inch diameter storm drain line would ultimately flow into the existing  72‐inch diameter storm drain line beneath Banana Avenue and conveyed downstream.    Dry Utilities  The Project would entail the removal of the two (2) existing above‐ground transmission line poles along Banana  Avenue and the undergrounding of the associated above‐ground electric distribution lines.  The undergrounding  of the power lines would be performed in coordination with Southern California Edison (SCE).  The Project also  provides for the construction of two (2) streetlights along the Project Site’s frontage with Banana Avenue and two  (2) streetlights along the Project Site’s frontage with Rose Avenue.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐10  3.3 Construction Characteristics  The Project Applicant anticipates that Project construction will span a period of approximately 8 months.  The  expected duration of each stage of construction is summarized in Table 3‐1, Construction Schedule.  The  composition of the construction equipment fleet that the Project Applicant intends to use to construct the  warehouse facility is summarized in Table 3‐2, Construction Equipment Fleet. Project construction activities and  equipment would be required to comply with the applicable sustainability standards established by City of  Fontana Ordinance No. 1891.    Table 3‐1 Construction Schedule  Construction Activity Start Date End Date Days  Demolition 08/01/2022 08/19/2022 15  Grading 08/20/2022 09/09/2022 15  Building Construction 09/10/2022 05/05/2023 170  Paving 04/20/2023 05/05/2023 12  Architectural Coating 04/24/2023 05/05/2023 10  Source: (Urban Crossroads, 2022d, Table 3‐2)    Table 3‐2 Construction Equipment Fleet  Construction Activity Equipment Amount Hours Per Day  Demolition  Concrete/Industrial Saws 2 8  Excavators 1 8  Rubber Tired Dozers 1 8  Grading  Crawler Tractors 1 8  Graders 3 8  Rubber Tired Dozers 1 8  Building Construction  Cranes 1 8  Crawler Tractors 1 8  Welders 1 8  Paving  Pavers 1 8  Paving Equipment 1 8  Rollers 1 8  Architectural Coating Air Compressors 1 8  Source: (Urban Crossroads, 2022d, Table 3‐3)    The Project’s proposed grading activities would result in physical disturbance to the entire Project Site.  Other  than the roadway and utility improvements described above, no other off‐site physical impacts are anticipated as  part of the Project.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐11  Prior to the start of grading, all existing vegetation and debris, including structures, footings, foundations, rubbles,  trees, and root systems shall be removed from the site.  Earthwork activities associated with Project construction  would result in approximately 5,640 cubic yards (cy) of cut and 7,025 cy of fill with an import of 1,385 cy. When  grading is complete, the property would be in a generally flat condition with the highest point of the Project Site  located at the northeastern corner of the Project Site (approximately 944.5 feet above mean sea level [amsl]) and  the lowest point located at the southwestern corner of the Project Site (approximately 924.1 feet amsl); the  Project Site would have a slight downward slope from north to south.  Underground utilities would be installed to  a depth of approximately ten feet below grade.  The Project grading concept is illustrated on Figure 3‐7, Proposed  Grading Plan.    3.4 Operational Characteristics  The user of the Project is not known at this time, but the Project Applicant anticipates that the proposed building  will be operated as a commerce center, with the potential for up to 25 percent of the building’s floor area to be  used for cold/refrigerated storage uses. For purposes of this Addendum, the potential operational impacts from  the building were analyzed under the most conservative assumption, that it would operate 24 hours per day,  seven days per week, with exterior loading and parking areas illuminated at night.  Lighting would be subject to  compliance with Fontana Municipal Code Section 30‐544, which states that exterior lighting shall be energy‐ efficient, shielded or recessed, and directed downward and away from adjoining properties.       The building is designed such that business operations would be conducted within the enclosed building, except  for traffic movement, parking, and the loading and unloading of tractor trailers at designated loading bays.  As a  practical matter, dock doors on warehouse buildings are not occupied by a truck at all times of the day.  There are  typically many more dock door positions on warehouse buildings than are needed for receiving and shipping  volumes.  The dock doors that are in use at any given time are usually selected based on interior building operation  efficiencies.  In other words, trucks ideally dock in the position closest to where the goods carried by the truck are  stored inside the warehouse.  As a result, many dock door positions are frequently inactive throughout the day.   Pursuant to State law, on‐road diesel‐fueled trucks are required to comply with various air quality and greenhouse  gas emission standards, including but not limited to the type of fuel used, engine model year stipulations,  aerodynamic features, and idling time restrictions.  Compliance with State law is mandatory.  In addition, Project  operational activities and equipment would be required to comply with the applicable sustainability standards  established by City of Fontana Ordinance No. 1891.    During long‐term operating conditions, employees, visitors, and vehicles hauling goods will travel to and from the  Project Site daily.  Using the trip generation rates given in the Institute of Transportation Engineers (ITE) Trip  Generation Manual (11th Edition) and based on calculations from the Project’s transportation analysis (Appendix  N.1), the Project is calculated to generate approximately 370 total vehicle trips per day, including 49 trips during  the morning (a.m.) peak hour and 44 during the evening (p.m.) peak hour.  The proposed commerce center is  estimated to demand approximately 8,866 gallons of water per day12.  For purposes of analysis herein, the Project  is estimated to generate approximately 8,866 gallons of wastewater per day.  The wastewater generation rate       1 FWC standard demand rates for industrial warehouse/distribution land use are 2,200 gallons per acre per day.  2 4.03 acres x 2,200 gallons/acre/day   Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐13  used is conservative because it assumes that all water used by the Project enters the wastewater system. The  Project’s water demand includes landscape irrigation, which does not flow into the sewer system or require  wastewater treatment. Based on calculations from the Project’s energy report (Appendix F), the Project’s energy  use is estimated at approximately 1,046,623 kilo‐Watt hour (kWh) per year and natural gas usage is estimated at  approximately 1,459,841 thousand British thermal units per year (kBTU/yr)3.  3.5 Summary of Requested Actions  The City of Fontana has the primary approval responsibility for the Project.  As such, the City is serving as the Lead  Agency for this EIR Addendum pursuant to CEQA Guidelines Section 15050.  The City will consider the information  contained in this EIR Addendum and this EIR Addendum’s Administrative Record in its decision‐making processes.   In the event of approval of the Project and this EIR Addendum, the City subsequently would issue administrative  permits to implement the Project.  A list of the primary actions related to the Project under City jurisdiction and  the jurisdiction of other agencies is provided in Table 3‐3, Summary of Project Approvals/Permits.  This EIR  Addendum covers all federal, state, local government, and quasi‐government approvals which may be needed to  construct or implement the Project, whether or not they are explicitly listed in Table 3‐3, or elsewhere in this EIR  Addendum (CEQA Guidelines Section 15124(d)).    Table 3‐3 Summary of Project Approvals/Permits  Public Agency Approvals and Decisions  City of Fontana  Project – City of Fontana Discretionary Approvals  City of Fontana Planning Commission  DRP 22‐017   TPM No. 20529 (Case No. TPM 22‐03)   EIR Addendum along with the appropriate CEQA Findings  Subsequent City of Fontana Discretionary and Ministerial Approvals  City of Fontana Implementing Approvals  Final Maps, parcel mergers, or parcel consolidations as may be  appropriate   Precise site plan(s) and landscaping/irrigation plan(s), as may  be appropriate   Grading Permits   Building Permits   Encroachment/Construction Permits   Road Improvement Plans   Public right‐of way dedications   Sewer and storm drain infrastructure   Water Quality Management Plan (WQMP)  Other Agencies – Subsequent Approvals and Permits  Fontana Water Company  On and off‐site water infrastructure   Removal of existing water meters  Southern California Edison  Undergrounding existing power lines  Santa Ana Regional Water Quality Control Board  Construction Activity General Construction Permit   National Pollutant Discharge Elimination System (NPDES)  Permit    3 Although the Project will not receive natural gas service, to provide the most conservative analysis, this Addendum assumes the Project  will utilize natural gas based on the default demand projections of the California Emissions Estimator Model (CalEEMod).  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Project Description  Banana & Rose Commerce Center  3‐14  Public Agency Approvals and Decisions   WQMP        4.0 ENVIRONMENTAL ANALYSIS  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐2  4.1 Aesthetics  Would the Project:    a. Have a substantial adverse effect on a scenic vista?  SWIP SP PEIR Finding: The SWIP SP PEIR identified scenic vistas adjacent to the southeastern portion of the SWIP  SP area in the form of uninterrupted, panoramic views of the San Gabriel/San Bernardino Mountains to the north  and Jurupa Mountains to the south, as well as scenic vistas in the form of isolated windrows viewed across large  open spaces and along several roadways within the southern portion of the SWIP SP.  The SWIP SP PEIR concluded  that although the SWIP SP includes various design features to minimize impacts to scenic vistas and would comply  with existing local requirements related to scenic vistas, implementation of the SWIP SP would result in significant  and unavoidable direct and cumulatively considerable impacts to scenic vistas and there were no feasible MMs  that would reduce the impacts to a level below significance. The City of Fontana adopted a Statement of  Overriding Considerations for this impact in conjunction with certification of the SWIP SP EIR.       Analysis of Project:  The Project Site is in the western portion of the SWIP SP area, which is not an area identified  within the SWIP SP PEIR as having scenic vistas.  The Project Site does not contain contiguous, undisturbed stands  of trees (windrows) that offer scenic vistas (the Project Site has sparse ornamental vegetation) and does not  provide prominent views of local scenic resources.  As viewed from Rose and Banana Avenues, the San Gabriel/San  Bernardino Mountains are partially obstructed under existing conditions by existing structures and trees on and  around the Project Site; with the construction of the Project, views of the San Gabriel/San Bernardino Mountains  would remain partially obstructed from public view. However, the type and character of development that would  occur on the Project Site is similar to what was anticipated by the SWIP SP PEIR and the obstruction/loss of views  of the San Gabriel/San Bernardino Mountains from public viewpoints within the SWIP SP area was previously  anticipated and disclosed in the SWIP SP PEIR.  Implementation of the Project would not result in any new or more  severe significant impacts to scenic vistas than the significant and unavoidable direct and cumulative considerable  impacts previously disclosed in the SWIP SP PEIR.    b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic  buildings within a state scenic highway?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP area does not contain any geologic  formations or historic structures that could be characterized as scenic resources.  Further, the SWIP SP PEIR  concludes that compliance with Article III ‐ Preservation of Heritage, Significant and Specimen Trees of the City of  Fontana Municipal Code would minimize impacts to mature trees within the SWIP SP.  The SWIP SP PEIR concluded  that impacts to scenic resources would be less than significant.      Analysis of Project: According to the California Department of Transportation (CalTrans), there are no State‐ designated scenic highways in the vicinity of the Project Site (Caltrans, 2022). Furthermore, the Project Site does  not contain any scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings.   Accordingly, the Project would have no impact on any scenic resources, including scenic resources within a State  scenic highway corridor.  Implementation of the Project would not result in any new or more severe significant  impacts to scenic resources within a State scenic highway than previously disclosed in the SWIP SP PEIR.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐3  c. In non‐urbanized areas, substantially degrade the existing visual character or quality of public views of the  site and its surroundings?  (Public Views are those that are experienced from publicly accessible vantage  point).  If the project is an urbanized area, would the project conflict with applicable zoning and other  regulations governing scenic quality?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that construction activities within the SWIP SP area that  occur near residentially zoned property would result in temporary significant impacts to the visual  quality/character of the SWIP SP area.  However, the SWIP SP PEIR included a MM (MM 4.1‐3a) that would require  development projects located within or near residentially zoned property to incorporate practices during  construction to minimize visual impact.  With application of the identified mitigation, the SWIP SP PEIR concluded  that impacts to visual quality/character during construction would be less than significant.  The SWIP SP PEIR  concluded that long‐term impacts to visual quality/character would be less than significant with mandatory  adherence to the land use and development regulations established in the SWIP SP.    Analysis of Project: Project‐related changes to local visual character would be less than significant during near‐ term construction activities because construction activity is common in the City (and in the SWIP SP area), would  be temporary in nature, and would not substantially degrade the visual character of the area.  Because the Project  Site is neither zoned for residential land uses nor abuts residentially zoned properties, the City of Fontana  determined that SWIP SP PEIR MMs 4.1‐3a is not applicable to the Project and that the Project would not be  required to implement any special construction practices to address adverse aesthetics impacts.  The proposed  building would feature a contemporary architectural design with an exterior color palette comprised of various  neutral colors, including shades of white, tan, and gray with a blue accent color.  Additionally, the proposed  building would feature articulated building elements, mullions, vintage wood fiber cement wood siding, and  aluminum canopies as decorative elements. The Project Site would be planted with an attractive selection of  plants, including trees, shrubs, and groundcovers, which would improve the visual condition of the Project Site  relative to existing conditions.  The City conducted a thorough review of the Project’s design and determined that  the Project would be consistent with the applicable development standards and design guidelines from the SWIP  SP.  Accordingly, there are no components of the Project that would degrade the existing visual character or  quality of the site and surroundings beyond what was evaluated and disclosed in the SWIP SP PEIR.   Implementation of the Project would not result in any new or more severe significant impacts to visual character  and quality than previously disclosed in the SWIP SP PEIR.    d. Create a new source of substantial light or glare, which would adversely affect day or nighttime views in  the area?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that implementation of the SWIP SP would have the potential  to create new sources of outdoor light and glare in the form of streetlights, exterior lighting, and security lighting,  as well as glare effects caused by reflective surfaces.  However, the SWIP SP PEIR determined that light and glare  impacts would be less than significant because development within the SWIP SP area would be required to comply  with the lighting requirements of the Fontana Municipal Code Chapter 30 which would minimize the potential for  light and/or glare effects to occur.  Accordingly, the SWIP SP PEIR concluded that light and/or glare impacts from  implementation of the SWIP SP would be less than significant.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐4  Analysis of Project: The Project would be required to comply with the SWIP SP design guidelines applicable to  outdoor lighting.  In addition, the Project would be required to comply with the outdoor lighting standards  contained in the Fontana Municipal Code Chapter 30.  The Municipal Code lighting standards govern the  placement and design of outdoor lighting fixtures to ensure adequate lighting for public safety while also  minimizing light pollution and glare and precluding public nuisances (e.g., blinking/flashing lights, unusually high  intensity, or bright lighting).  Through mandatory compliance with these standards, Project implementation would  result in a less‐than‐significant impact related to lighting and glare by 1) ensuring that the Project would be  compatible with the setting of the surrounding area; 2) preventing substantial light or glare from falling on public  streets or property adjoining the Project Site; and 3) preventing “spillover” effects from the Project Site that could  interfere with day or nighttime views in the area.  Implementation of the Project would not result in any new or  more severe significant impacts related to lighting/glare than previously disclosed in the SWIP SP PEIR.    4.2 Agriculture and Forestry Resources  Would the project:    a. Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown  on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California  Resources Agency, to non‐agricultural use?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that implementation of the SWIP SP would not convert any  “Prime Farmland,” “Unique Farmland,” or “Farmland of Statewide Importance” to non‐agricultural use, as there  is no prime farmland, unique farmland, or farmland of statewide importance located within the SWIP SP  boundaries.  The SWIP SP PEIR concluded that no impact would occur.    Analysis of Project: The Project Site is mapped by the California Department of Conservation (CDC) as “Urban and  Built‐Up Land” (CDC, 2018).  Implementation of the Project would, therefore, not result in the conversion of Prime  Farmland, Unique Farmland, or Farmland of Statewide Importance to non‐agricultural use.  No impact would  occur.  Implementation of the Project would not result in any new or more severe significant impacts to  agricultural resources than previously disclosed in the SWIP SP PEIR.    b. Conflict with existing zoning for agricultural use, or a Williamson Act contract?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that none of the lands within the SWIP SP area were designated  or zoned for agricultural use, or subject to a Williamson Act contract.  Therefore, the SWIP SP PEIR concluded that  no impacts would occur.    Analysis of Project: The Project Site is not zoned for agricultural use. The SWIP SP PEIR determined that there are  no Williamson Act contracts within the SWIP SP area; therefore, under existing conditions, the Project Site is not  subject to a Williamson Act contract.  Accordingly, the Project would not conflict with existing zoning for  agricultural use or with a Williamson Act contract.  Implementation of the Project would not result in any new or  more severe significant impacts to agricultural resources than previously disclosed in the SWIP SP PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐5  c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code  section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned  Timberland Production (as defined by Government Code section 51104(g))?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that there are no areas zoned for forest land, timberland, or  Timberland Production exist within the vicinity of the SWIP SP.      Analysis of Project: The Project Site is not zoned for forest land or timberland.  Additionally, there are no lands in  the Project Site vicinity that are zoned for forest land or timberland.  Therefore, implementation of the Project  would not conflict with, or cause the rezoning of, forest land or timberland.  Implementation of the Project would  not result in any new or more severe significant impacts to forestry resources than previously disclosed in the  SWIP SP PEIR.    d. Result in the loss of forest land or conversion of forest land to non‐forest use?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that the SWIP SP exists within an urbanized area, occupied  primarily by industrial uses, and that no forest land exists within the site vicinity.      Analysis of Project: The Project Site is not zoned for forest land nor does any forest land exist in the vicinity of the  SWIP SP.  The Project Site, and the surrounding area, is highly urbanized and is used primarily for industrial  purposes (Google Earth Pro, 2022).  Therefore, the Project would not result in the loss of forest land, nor will any  forest land be converted to non‐forest land.  Implementation of the Project would not result in any new or more  severe significant impacts to forestry resources than previously disclosed in the SWIP SP PEIR.    e. Involve other changes in the existing environment which, due to their location or nature, could result in  conversion of Farmland, to non‐agricultural use or conversion of forest land to non‐forest use?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that there are no active agricultural areas or forest land areas  within the SWIP SP area.  Accordingly, the SWIP SP PEIR concluded that no impacts would occur.    Analysis of Project:  As previously discussed above, the current Project Site does not include Farmland (defined  as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance) or forest land and, therefore, the  Project would not result in the conversion of Farmland to non‐agricultural use of forest land to non‐forest use.   The Project would not result in any impacts to agricultural and/or forestry resources.  Implementation of the  Project would not result in any new or more severe significant impacts to agricultural/forestry resources than  previously disclosed in the SWIP SP PEIR.    4.3 Air Quality  An Air Quality Impact Analysis (dated February 15, 2022) (Urban Crossroads, 2022a) and Mobile Health Risk  Assessment (date February 15, 2022) (Urban Crossroads, 2022b) were prepared for the Project by Urban  Crossroads, Inc. (Urban Crossroads) to evaluate potential criteria and hazardous air pollutant emissions that could  result from the Project’s construction and operation.  These reports are included as Appendices B and C,  respectively, to this EIR Addendum and their findings are incorporated into the analysis presented herein.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐6  Would the project:    a. Conflict with or obstruct implementation of the applicable air quality plan?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that emissions resulting from buildout of the SWIP SP would  exceed SCAQMD thresholds and would potentially result in a long‐term impact on the region’s ability to meet  State and Federal Ambient Air Quality Standards.  Therefore, the SWIP SP PEIR concluded that buildout of the  SWIP SP would conflict with the 2007 Air Quality Management Plan (AQMP) for the South Coast Air Basin (2007  AQMP).  The SWIP SP PEIR included mitigation to minimize the SWIP SP’s air pollutant emissions; however, the  SWIP SP PEIR concluded that air quality impacts related to a conflict with or obstruction of the implementation of  the 2007 AQMP would be significant and unavoidable.  The City of Fontana adopted a Statement of Overriding  Considerations for this impact in conjunction with certification of the SWIP SP EIR.       Analysis of Project:  The Project Site is located within the South Coast Air Basin (SCAB or “Basin”).  The SCAQMD  is principally responsible for air pollution control in the SCAB.  The SCAQMD has adopted a series of AQMPs to  reduce air emissions in the Basin. When the SWIP SP PEIR was certified, the SCAQMD’s 2007 AQMP was the  applicable air quality plan for the SCAB.  Since that time, the SCAQMD has adopted the 2016 AQMP which was  approved in March 2017 and is in effect at this time.  For purposes of evaluation and to determine whether the  Project would result in any new or more severe significant air quality impacts than disclosed in the SWIP SP PEIR,  consistency with both the 2007 AQMP, which was applicable at the time the SWIP SP PEIR was written, and the  2016 AQMP, which is applicable today, are discussed below.    The SWIP SP PEIR concluded that buildout of the SWIP SP would conflict with the 2007 AQMP due to the resulting  operational emissions that would impede the region’s ability to meet State and Federal Ambient Air Quality  Standards.  The Project would implement the SWIP SP land use plan but would, in fact, generate substantially  fewer net daily traffic trips than the land uses assumed by the SWIP SP PEIR (the Project’s daily traffic is discussed  in further detail in EIR Addendum Subsection 4.17).  Thus, the Project would reduce vehicle tailpipe emissions  within the SWIP SP area relative to the levels disclosed in the SWIP SP PEIR, although the emissions reductions  provided by the Project would not be sufficient to avoid the significant and unavoidable conflict with the 2007  AQMP that was disclosed in the SWIP EIR. Further, the Project will be required to comply with much stricter  regulations than those that existed in 2012, including regulations applicable to truck and other vehicle emissions  that are much more protective of the environment, which will incrementally reduce emissions when compared to  the emissions that the SWIP SP PEIR assumed would occur from the development of the Project Site.  Implementation of the Project would contribute to a significant and unavoidable conflict with the 2007 AQMP;  but would neither result or contribute to a new, significant conflict with the 2007 AQMP nor increase the severity  of the conflict previously disclosed in the SWIP SP EIR and would instead generally result in less severe air quality  impacts.    The Project is consistent with the SWIP SP, which was approved by the City of Fontana in 2012, reflected on the  City of Fontana’s General Plan Land Use Map, and accounted for by the growth projections utilized by SCAQMD  during preparation of the 2016 AQMP.  Thus, the Project would be consistent with the 2016 AQMP, which relies  on adopted local General Plans for growth (and emissions) projections.  Furthermore, the Project would not  increase the severity of existing air quality violations; cause or contribute to new violations; or delay the timely  attainment of the air quality standards established in the 2016 AQMP (as discussed under the responses to Items  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐7  “b” and “c” of Subsection 4.3, below).  Based on the foregoing analysis, the Project would not conflict with or  obstruct implementation of the 2016 AQMP.  Implementation of the Project would not result in any new or more  severe significant impacts to related to air quality than the significant and unavoidable impacts previously  disclosed in the SWIP SP PEIR.    b. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is  non‐attainment under an applicable federal or state ambient air quality standard?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that implementation of the SWIP SP would result in  cumulatively considerable net increases of criteria pollutants, including ozone precursors, for which the SCAB is  in non‐attainment of applicable federal and/or state ambient air quality standards.  The SWIP SP PEIR included  mitigation to minimize the SWIP SP’s air pollutant emissions; however, the SWIP SP PEIR concluded that  cumulative air quality impacts would be significant and unavoidable.  The City of Fontana adopted a Statement of  Overriding Considerations for this impact in conjunction with certification of the SWIP SP EIR.    Analysis of Project: The Project Applicant would redevelop the Project Site with a land use (i.e., industrial  commerce center) that was planned by the SWIP SP and evaluated in the SWIP SP PEIR; therefore, the Project  would not generate air pollutant emissions that were not already anticipated by the SWIP SP PEIR.  Further, as  stated above, regulations enacted since 2012 would generally reduce the Project’s emissions when compared to  the emissions assumed in the SWIP SP PEIR.  Notwithstanding, an Air Quality Impact Analysis (AQIA, Appendix B)  was prepared to quantify air pollutant emission associated with the implementation of the Project.  The Project’s  maximum construction‐related criteria pollutant emissions and operational criteria pollutant emissions are  summarized in Table 4‐1, Project Construction Emissions Summary, and Table 4‐2, Project Operational Emissions  Summary, respectively.  The methodology used to calculate the air pollutant emissions associated with the Project  is described in detail in Appendix B of this EIR Addendum.  It should be noted that although the Project would be  required to comply with all applicable MMs from the SWIP SP PEIR that were required to reduce air pollution, the  analysis below does not take credit for any emission reductions that would result from the implementation of the  SWIP SP PEIR MMs.  Thus, the actual construction and operational emissions associated with the Project is  expected to be less than the quantities disclosed in Table 4‐1 and Table 4‐2.     Table 4‐1 Project Construction Emissions Summary  Year Emissions (lbs/day)  VOC NOX CO SOX PM10 PM2.5  Summer  2022 2.56 29.04 14.59 0.04 5.49 2.64  2023 44.79 16.33 19.77 0.04 2.08 1.10  Winter  2022 2.55 29.10 14.52 0.04 5.49 2.64  2023 44.77 16.40 19.13 0.04 2.08 1.10  Maximum Daily Emissions 44.79 29.10 19.77 0.04 5.49 2.64  SCAQMD Regional Threshold 75 100 550 150 150 55  Threshold Exceeded? NO NO NO NO NO NO  Source: (Urban Crossroads, 2022a, Table 3‐3)    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐8  Table 4‐2 Project Operational Emissions Summary  Source Emissions (lbs/day)  VOC NOX CO SOX PM10 PM2.5  Summer  Area Source 1.99 1.60E‐04 0.02 0.00 6.00E‐05 6.00E‐05  Energy Source 0.04 0.34 0.29 2.04E‐03 0.03 0.03  Mobile Source 1.45 6.50 16.05 0.06 4.33 1.22  TRU Source 0.12 0.98 1.33 0.00 0.02 0.02  On‐Site Equipment Source 0.22 2.07 1.50 0.01 0.08 0.07  Total Maximum Daily Emissions  3.82 9.90 19.18 0.07 4.46 1.33  SCAQMD Regional Threshold 55 55 550 150 150 55  Threshold Exceeded?  NO NO NO NO NO NO  Winter  Area Source 1.99 1.60E‐04 0.02 0.00 6.00E‐05 6.00E‐05  Energy Source 3.74E‐02 0.34 0.29 2.04E‐03 2.58E‐02 2.58E‐02  Mobile Source 1.29 6.85 14.30 0.06 4.33 1.22  TRU Source 0.12 0.98 1.33 0.00 0.02 0.02  On‐Site Equipment Source 0.22 2.07 1.50 0.01 0.08 0.07  Total Maximum Daily Emissions  3.66 10.24 17.43 0.07 4.46 1.33  SCAQMD Regional Threshold 55 55 550 150 150 55  Threshold Exceeded?  NO NO NO NO NO NO  Source: (Urban Crossroads, 2022a, Table 3‐8)    As shown in Table 4‐1 and Table 4‐2, Project‐related construction and operational activities would not exceed the  SCAQMD significance threshold for any criterial pollutant.  The SCAQMD considers any project‐specific criteria  pollutant emissions that exceed applicable SCAQMD significance thresholds also to be cumulatively considerable.   Conversely, if a project does not exceed the SCAQMD regional thresholds, then SCAQMD considers that project’s  air pollutant emissions to not be cumulatively considerable because criteria pollutant emissions that fall below  the significance threshold would not adversely affect SCAQMD’s ability to meet air quality standards within the  SCAB.  Thus, because Project construction and operation would not exceed the SCAQMD significance thresholds,  implementation of the Project would not result in a cumulatively considerable net increase of any criteria  pollutant, including any pollutants for which the SCAB does not attain applicable federal or State ambient air  quality standards. Furthermore, it bears noting that the Project operations would generate substantially fewer  net daily traffic trips than the land uses assumed by the SWIP SP PEIR (the Project’s daily traffic is discussed in  further detail in EIR Addendum Subsection 4.17).  Thus, the Project would reduce vehicle tailpipe emissions within  the SWIP SP area relative to the levels disclosed in the SWIP SP PEIR, although the emissions reductions provided  by the Project would not be sufficient to avoid the significant and unavoidable cumulative impact that was  disclosed in the SWIP EIR.  Implementation of the Project would not result in any new or more severe significant  impacts to related to air quality than the significant and unavoidable direct and cumulative considerable impacts  previously disclosed in the SWIP SP PEIR.    Mitigation:  Although the Project would not contribute cumulatively considerable volumes of criteria pollutant  emissions, the Project would be required to comply with applicable MMs identified in the SWIP SP PEIR to reduce  cumulative air pollutant emissions across the SWIP SP area, as presented below in the Mitigation Monitoring and  Reporting Program (MMRP) for the SWIP SP PEIR (attached hereto as Appendix A).    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐9  MM 4.2‐1a All construction equipment shall be maintained in good operation condition so as to reduce  emissions. The construction contractor shall ensure that all construction equipment is being  properly serviced and maintained as per the manufacturer’s specification. Maintenance records  shall be available at the construction site for City verification.      The following additional MMs, as determined applicable by the City Engineer, shall be included as  conditions of the Grading Permit issuance:     Provide temporary traffic controls such as flag person, during all phases of construction to  maintain smooth traffic flow.   Provide dedicated turn lanes for movement of construction trucks and equipment on‐ and  off‐site.   Reroute construction trucks away from congested streets or sensitive receptor areas.   Appoint a construction relations officer to act as a community liaison concerning on‐site  construction activity including resolution of issues related to PM10 generation.   Improve traffic flow by signal synchronization, and ensure that all vehicles and equipment will  be properly tuned and maintained according to manufactures’ specifications.   Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil  import/export).  If the lead agency determines that 2010 model year or newer diesel trucks  cannot be obtained the lead agency shall use trucks that meet EPA 2007 model year NOX and  PM emissions requirements.   During project construction, all internal combustion engines/construction equipment  operating on the Project Site shall meet EPA‐Certified Tier 3 emissions standards, or higher  according to the following:  o January 1, 2012 to December 31, 2014: All off‐road diesel‐powered construction  equipment greater than 50 hp shall meet Tier 3 off‐road emissions standards.  In addition,  all construction equipment shall be outfitted with BACT devices certified by CARB.  Any  emissions control device used by the contractor shall achieve emissions reductions that  are no less than what could be achieved by a Level 3 diesel emissions control strategy for  a similarly sized engine as defined by CARB regulations.  o Post‐January 1, 2015: All off‐road diesel‐powered construction equipment greater than  50 hp shall meet the Tier 4 emissions standards, where available.  In addition, all  construction equipment shall be outfitted with BACT devices certified by CARB.  Any  emissions control device used by the contractor shall achieve emissions reductions that  are no less than what could be achieved by a Level 3 diesel emissions control strategy for  a similarly sized engine as defined by CARB regulations.  o A copy of each unit’s certified tier specification, BACT documentation, and CARB or  SCAQMD operating permit shall be provided at the time of mobilization of each applicable  unit of equipment.    MM 4.2‐1b Prior to the issuance of any grading permits, all Applicants shall submit construction plans to the  City of Fontana denoting the proposed schedule and projected equipment use. Construction  contractors shall provide evidence that low emission mobile construction equipment will be  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐10  utilized, or that their use was investigated and found to be infeasible for the project. Contractors  shall also conform to any construction MMs imposed by the SCAQMD as well as City Planning  Staff.    MM 4.2‐1c All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113.   Specifically, the following MMs shall be implemented, as feasible:      Use coatings and solvents with a VOC content lower than that required under AQMD Rule  1113.   Construct or build with materials that do not require painting.   Require the use of pre‐painted construction materials.    MM 4.2‐1d Projects that result in the construction of more than 19 single‐family residential units, 40  multifamily residential units, or 45,000 square feet of retail/commercial/industrial space shall be  required to apply paints either by hand or high volume, low pressure (HVLP) spray. These MMs  may reduce volatile organic compounds (VOC) associated with the application of paints and  coatings by an estimated 60 to 75 percent. Alternatively, the contractor may specify the use of  low volatility paints and coatings. Several of currently available primers have VOC contents of less  than 0.85 pounds per gallon (e.g., dulux professional exterior primer 100 percent acrylic). Top  coats can be less than 0.07 pounds per gallon (8 grams per liter) (e.g., lifemaster 2000‐series). This  latter measure would reduce these VOC emissions by more than 70 percent. Larger projects  should incorporate both the use of HVLP or hand application and the requirement for low  volatility coatings.    MM 4.2‐1e All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108.    MM 4.2‐1f Prior to the issuance of grading permits or approval of grading plans for future development  projects within the project area, future developments shall include a dust control plan as part of  the construction contract standard specifications. The dust control plan shall include MMs to  meet the requirements of SCAQMD Rules 402 and 403. Such MMs may include, but are not limited  to, the following:     Phase and schedule activities to avoid high‐ozone days and first‐stage smog alerts.   Discontinue operation during second‐stage smog alerts.   All haul trucks shall be covered prior to leaving the site to prevent dust from impacting the  surrounding areas.   Comply with AQMD Rule 403, particularly to minimize fugitive dust and noise to surrounding  areas.   Moisten soil each day prior to commencing grading to depth of soil cut.   Water exposed surfaces at least twice a day under calm conditions, and as often as needed  on windy days or during very dry weather in order to maintain a surface crust and minimize  the release of visible emissions from the construction site.   Treat any area that will be exposed for extended periods with a soil conditioner to stabilize  soil or temporarily plant with vegetation.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐11   Wash mud‐covered tires and under carriages of trucks leaving construction sites.   Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by  construction vehicles or mud, which would otherwise be carried off by trucks departing  Project Sites.   Securely cover all loads of fill coming to the site with a tight‐fitting tarp.   Cease grading during periods when winds exceed 25 miles per hour.   Provide for permanent sealing of all graded areas, as applicable, at the earliest practicable  time after soil disturbance.   Use low‐sulfur diesel fuel in all equipment.   Use electric equipment whenever practicable.   Shut off engines when not in use.    MM 4.2‐2c All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling  for prolonged periods pursuant to Title 13 of the California Code of Regulations, Section 2485,  which limits idle times to not more than five minutes.    MM 4.2‐2d The City shall require that both industrial and commercial uses designate preferential parking for  vanpools.    MM 4.2‐2e The proposed commercial and industrial areas shall incorporate food service.    MM 4.2‐2f All industrial and commercial site tenants with 50 or more employees shall be required to post  both bus and MetroLink schedules in conspicuous areas.    MM 4.2‐2g All industrial and commercial site tenants with 50 or more employees shall be requested to  configure their operating schedules around the MetroLink schedule to the extent reasonably  feasible.    MM 4.2‐2j All residential, commercial, and industrial structures shall be required to incorporate light colored  roofing materials.    Note:  The City determined that the following SWIP SP PEIR MMs do not apply to the Project or have been satisfied  as part of the City’s review of the Project’s proposed entitlement applications: MMs 4.2‐2a and 4.2‐2b do not  apply to the Project based on the location of the Project Site within the SWIP SP area; MMs 4.2‐2h and 4.2‐2i do  not apply to the Project because these MMs only apply to residential and commercial buildings; and MMs 4.2‐2k  and 4.2‐2l were satisfied by the Air Quality Impact Analysis and Mobile Source Health Risk Assessment prepared  for the Project.    c. Expose sensitive receptors to substantial pollutant concentrations?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that construction and operation of the SWIP SP would not  expose any sensitive receptors to substantial, localized pollutant concentrations.  The SWIP SP PEIR concluded  that air quality impacts related to localized pollutant concentrations would be less than significant and no  mitigation was required.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐12  Analysis of Project: The Project would redevelop the Project Site with land uses planned by the SWIP SP;  therefore, the types of air pollutant emissions generated by the Project already were anticipated by the SWIP SP  PEIR.  Further, as stated above, regulations enacted since 2012 would generally reduce the Project’s emissions  when compared to the emissions assumed in the SWIP SP PEIR. Notwithstanding, an air quality impact analysis  was performed to quantify localized criteria air pollutant emissions associated with construction and operation of  the Project. The methodology used to calculate the localized criteria air pollutant emissions associated with the  Project is described in detail in Appendix B.      Project‐related construction localized emissions are presented in Table 4‐3, Project Construction Localized  Emissions Summary.  The data presented in Table 4‐3 confirms the Project would not exceed the SCAQMD  significance thresholds for localized air pollutant emissions during construction.  Therefore, Project construction  would expose sensitive receptors near the Project Site to less‐than‐significant localized criteria pollutant  concentrations.    Table 4‐3 Project Construction Localized Emissions Summary  Construction Phase Year Emissions (lbs/day)  NOX CO PM10 PM2.5  Demolition 2022 16.17 14.17 0.87 0.77  Grading 2022 27.80 11.23 5.20 2.55  Building Construction 2022 8.88 6.07 0.50 0.46  Building Construction 2023 8.25 5.97 0.45 0.42  Building Construction,  Paving, and Architectural  Coating  2023 15.08 15.68 0.80 0.75  Maximum Daily Emissions 27.80 15.68 5.20 2.55  SCAQMD Localized Threshold 238 1,496 12 7  Threshold Exceeded? NO NO NO NO  Source: (Urban Crossroads, 2022a, Table 3‐10)    Project‐related operational localized emissions are presented in Table 4‐4, Project Operational Localized Emissions  Summary.  The data presented in Table 4‐4 confirms the Project would not exceed the SCAQMD significance  thresholds for localized air pollutant emissions during operation.  Therefore, Project operation would expose  sensitive receptors near the Project Site to less‐than‐significant localized criteria pollutant concentrations.    Table 4‐4 Project Operational Localized Emissions Summary  Scenario Emissions (lbs/day)  NOX CO PM10 PM2.5  Summer 3.37 5.74 0.61 0.24  Winter 3.43 5.73 0.61 0.24  Maximum Daily Emissions 3.43 5.74 0.61 0.24  SCAQMD Localized Threshold 238 1,496 3 2  Threshold Exceeded? NO NO NO NO  Source: (Urban Crossroads, 2022a, Table 3‐12)  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐13  Additionally, a mobile source health risk analysis was prepared to evaluate the potential for localized diesel  emissions associated with Project (i.e., operation of off‐road construction equipment and heavy‐duty trucks) to  result in carcinogenic and non‐carcinogenic health risk impacts to nearby residential, worker, and school child  receptors near the Project Site.  It should be noted that there are no schools located within 0.25‐mile (1,320 feet)  of the Project Site.  Because proximity to toxic emissions is the primary factor for carcinogenic and non‐ carcinogenic health risk impacts and because approximately 80 percent of toxic emissions settle out of the air  1,000 feet from the source, the Project would not result in substantial adverse impacts to any schools or school  child in the vicinity of the Project Site (Urban Crossroads, 2022b, p. 2).  The methodology used to calculate Project‐ related localized diesel particulate emissions is described in detail in Appendix C.  The results of the mobile source  health risk analysis are summarized Table 4‐5, Summary of Project‐Related Construction Health Risks and Table 4‐ 6, Summary of Project‐Related Operational Health Risks; the findings of the analyses show that the Project’s  construction and operation would result in less‐than‐significant carcinogenic and non‐carcinogenic health risks to  sensitive receptors in the Project Site vicinity.     Table 4‐5 Summary of Project‐Related Construction Health Risks  Time Period Location  Maximum  Lifetime  Cancer Risk  (Risk per  Million)  Significance  Threshold  (Risk per Million)  Exceeds  Significance  Threshold  2 Year  Exposure Maximum Exposed Sensitive Receptor 7.32 10 NO  Time Period Location  Maximum  Hazard  Index  Significance  Threshold  Exceeds  Significance  Threshold  Annual Average Maximum Exposed Sensitive Receptor 0.03 1.0 NO  Source: (Urban Crossroads, 2022b, Table ES‐1)    Table 4‐6 Summary of Project‐Related Operational Health Risks  Time Period Location  Maximum Lifetime  Cancer Risk  (Risk per Million)  Significance  Threshold  (Risk per Million)  Exceeds  Significance  Threshold  30 Year  Exposure Maximum Exposed Sensitive Receptor 2.45 10 NO  25 Year  Exposure Maximum Exposed Worker Receptor 0.10 10 NO  Time Period Location Maximum Hazard  Index  Significance  Threshold  Exceeds  Significance  Threshold  Annual Average Maximum Exposed Sensitive Receptor ≤0.01 1.0 NO  Annual Average Maximum Exposed Worker Receptor ≤0.01 1.0 NO  Source: (Urban Crossroads, 2022b, Table ES‐2)  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐14  Lastly, the Air Quality Impact Analysis concluded that the Project would not produce the volume of traffic required  to cause or contribute to the formation of a CO “hot spot” (Urban Crossroads, 2022a, pp. 53‐54).    Based on the foregoing analysis, the Project would not expose sensitive receptors near the Project Site to  significant pollutant concentrations during construction and operation.  Implementation of the Project would not  result in any new or more severe significant impacts to related to air quality than previously disclosed in the SWIP  SP PEIR    d. Result in other emissions (such as those leading to odors) adversely affecting substantial number of  people?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that implementation of the SWIP SP would not expose a  substantial number of people to objectionable odors.    Analysis of Project: Project construction activities could produce odors resulting from construction equipment  exhaust, application of asphalt, and/or the application of architectural coatings; however, standard construction  practices would minimize the odor emissions and their associated impacts.  Furthermore, any odors emitted  during construction would be temporary, short‐term, and intermittent in nature, and would cease upon the  completion of the respective phase of construction.  In addition, construction activities on the Project Site would  be required to comply with SCAQMD Rule 402, which prohibits the discharge of odorous emissions that would  create a public nuisance.  Accordingly, the Project would not create objectionable odors affecting a substantial  number of people during construction.    During long‐term operation, the Project would include commerce center land uses, which are not typically  associated with objectionable odors.  The temporary outdoor storage of refuse associated with the proposed  Project’s long‐term operational use could be a potential source of odor; however, Project‐generated refuse is  required to be stored in covered containers and removed at regular intervals in compliance with the City’s solid  waste regulations, thereby precluding any substantial odor effects.  Furthermore, the Project would be required  to comply with Fontana Municipal Code Section 30‐261, Odors, and SCAQMD Rule 402, which prohibits the  discharge of odorous emissions that would create a public nuisance, during long‐term operation.  As such, long‐ term operation of the Project would not create objectionable odors affecting a substantial number of people.    The Project would not create objectionable odors affecting a substantial number of people during either  construction or long‐term operation; impacts would be less than significant.  Implementation of the Project would  not result in any new or more severe significant impacts to related to objectional odors than previously disclosed  in the SWIP SP PEIR.    4.4 Biological Resources  A Biological Resources Letter Report (dated March 22, 2022) (Alden, 2022) was prepared for the Project by Alden  Environmental (Alden).  The Biological Resources Letter evaluates the existing biological resources on the Project  Site and evaluates the potential impacts to these resources that may occur because of Project implementation.   The Habitat Assessment is included as Appendix D to this EIR Addendum, and its findings are incorporated into  the analysis herein.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐15  Would the Project:    a. Have a substantial adverse effect, either directly or through habitat modifications, on any species  identified as a candidate, sensitive, or special status species in local or regional plans, policies, or  regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that implementation of the SWIP SP had the potential to  result in direct and/or indirect impacts to sensitive species, including the Delhi Sands flower loving fly, burrowing  owl, northwestern San Diego pocket mouse, western pocket mouse, western mastiff bat, western yellow bat, and  San Diego desert woodrat.  The SWIP SP PEIR also determined that portions of the SWIP SP area contain habitat  for the San Bernardino kangaroo rat, California gnatcatcher, and sensitive pocket mice.  Lastly, the SWIP SP PEIR  determined that construction activities within the SWIP SP area could disturb/destroy active raptor and/or  migratory bird nests, which would be a violation of the Migratory Bird Treaty Act (MBTA).  The SWIP SP PEIR  included MMs 4.3‐1a through 4.3‐1h to reduce potential impacts to sensitive species and migratory birds  (including the burrowing owl) to a level below significance.    Analysis of Project: The entire Project Site is developed and does not support any native or sensitive vegetation  communities.  Existing uses on‐Site included residences, truck/vehicle areas, pavement, structures, and storage  areas.  There is one vacant residential structure along Banana Avenue.  Another residential structure occurs along  Rose Avenue that is currently occupied.  Due to the developed condition of the Project Site and the amount of  human activity that occurs on the Site daily, the Project Site has a low likelihood of supporting any of the sensitive  species identified in the SWIP SP PEIR as potentially occurring within the SWIP SP area (Alden, 2022, pp. 3‐4).  No  bird nests were observed on‐Site; however, birds have the potential to build nests on‐site (Alden, 2022, p. 4).   Accordingly, the Project would be required to comply with SWIP SP PEIR MM 4.3‐1b to preclude substantial  impacts to nesting birds – this MM requires pre‐construction nesting bird surveys if construction activities occur  during the avian nesting season.  In addition, the Project would be required to comply with MM 4.3‐1c to preclude  potential impacts to bats that may roost in trees on‐Site.  Implementation of the Project would not result in any  new or more severe impacts to sensitive wildlife or plant species than previously disclosed in the SWIP SP PEIR.    Mitigation:  No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce  impacts related to sensitive plant and animal species continue to apply to the Project, as presented below and in  the MMRP for the SWIP SP PEIR (attached hereto as Appendix A).    MM 4.3‐1b Any future land disturbance for site‐specific developments within the Project Site shall be  conducted outside of the State‐identified bird nesting season (February 15 through September  1). If construction during the nesting season must occur, the site shall be evaluated by a City‐ approved biologist prior to ground disturbance to determine if nesting birds exist on‐site. If any  nests are discovered, the biologist shall delineate an appropriate buffer zone around the nest,  depending on the species and type of construction activity. Only construction activities approved  by the biologist shall take place within the buffer zone until the nest is vacated.    MM 4.3‐1c Prior to any ground disturbance, trees scheduled for removal shall be evaluated by a City‐ approved biologist for roosting bats. If a roost is present the biologist will develop a plan to  minimize impacts to the bats to the greatest extent feasible.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐16  Note:  The City determined that the following SWIP SP PEIR MMs do not apply to the Project or have been satisfied  as part of the City’s review of the Project’s proposed entitlement applications: MMs 4.3‐1a, 4.3‐1d, 4.3‐1e, 4.3‐1f,  4.3‐1g, 4.3‐1h do not apply due to the Project Site’s condition as fully developed/disturbed and the lack of natural  or sensitive habitat on‐site; MM 4.3‐3a does not apply due to the lack of natural drainage courses or wetlands on  the Project Site.    b. Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified  in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or  U.S. Fish and Wildlife Service?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that implementation of the SWIP SP would not result in the  loss of riparian habitat but could result in the loss or degradation of Designated Critical Habitats of two Federally‐ listed species: the San Bernardino kangaroo rat (SBKR) and the California gnatcatcher (CAGN).  The SWIP SP PEIR  applied mitigation (i.e., MMs 4.3‐1a through 4.3‐1h) to future development projects within the SWIP SP area to  reduce potential impacts to sensitive natural communities to less than significant.    Analysis of Project: The Project Site is completely developed/disturbed, as it was in 2012 when the SWIP SP PEIR  was certified.  The Project Site is mostly paved with concrete and asphalt or covered with gravel, with patches of  bare dirt.  The Project Site does not have any riparian/riverine communities, vernal pools, or potential waters of  United States (WUS) or waters of the State (WS) and the Site does not support any aquatic features necessary for  the development of these resources (Alden, 2022, p. 3).  Accordingly, the Project would not result in significant  impacts to riparian habitat or other sensitive natural communities.  The City determined that the Project would  not be subject to MMs 4.3‐1a through 4.3‐1h, except for MMs 4.3‐1b and 4.3‐1c as described in the preceding  subsection, due to the lack of riparian habitat or potentially sensitive natural communities on the Project Site.   Implementation of the Project would not result in a new or more severe significant impacts to riparian habitats or  sensitive natural communities than previously disclosed in the SWIP SP PEIR.    c. Have a substantial adverse effect on State or federally protected wetlands (including, but not limited to,  marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that there is a potential for streambeds, wetlands, and/or  riparian areas to occur within the SWIP SP area, and that impacts to these water features and vegetation may  require compliance with permit requirements of the U.S. Army Corps of Engineers (ACOE), Regional Water Quality  Control Board (RWQCB), and California Department of Fish and Game (CDFG).  The SWIP SP PEIR included MM  4.3‐3a requiring jurisdictional delineations be performed for future development proposals that could potentially  affect jurisdictional drainages or wetlands.  The SWIP SP PEIR concluded that implementation of SWIP SP PEIR MM  4.3‐3a would reduce potential impacts to streambeds, wetlands, and/or riparian to a level below significance.    Analysis of Project: The Project Site is completely developed/disturbed, as it was in 2012 when the SWIP SP PEIR  was certified.  The Project Site does not have any streambeds, wetlands, and/or riparian habitat (Alden, 2022, p.  3).  Accordingly, the Project would not result in significant impacts to State or federally protected wetland and  SWIP SP MM 4.3‐3a would not be applicable to the Project due to the lack of potential streambeds, wetlands,  and/or riparian habitat on the Project Site.  Implementation of the Project would not result in any new or more  severe significant impacts to State or federally protected wetlands than previously disclosed in the SWIP SP PEIR.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐17  d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or  with established native resident or migratory wildlife corridors, or impede the use of wildlife nursery sites?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that because the SWIP SP is surrounded by urban  development (paved roads, industrial, commercial, and residential development, and the I‐10 freeway) no  migratory corridors exist within or near the SWIP SP area that would be affected by the development of the SWIP  SP.  The SWIP SP PEIR concluded impacts would be less than significant.    Analysis of Project: Under existing conditions, the Project Site has no wildlife habitat value due to its  developed/disturbed condition and minimal vegetation (Alden, 2022, p. 3).  Moreover, no local or regional wildlife  corridors are present within or adjacent to the Project Site (Alden, 2022, p. 4).  As such, implementation of the  Project would not interfere with the movement of any native resident or migratory wildlife species or with  established native resident or migratory wildlife corridors.  Implementation of the Project would not result in any  new or more severe significant impacts to wildlife movement corridors than previously disclosed in the SWIP SP  PEIR.    e. Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation  policy or ordinance?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that implementation of the SWIP SP could involve the  removal of heritage, significant, or specimen trees.  However, the SWIP SP PEIR concluded that all development  within the SWIP SP would be subject to compliance with Chapter 28 Article III of the City’s Municipal Code (which  establishes regulations for the protection and preservation of heritage trees, significant trees, and specimen trees  on public and private property).  Accordingly, the SWIP SP PEIR concluded that mandatory compliance with  Chapter 28 Article III of the City’s Municipal Code would ensure that impacts associated with tree removals would  be less than significant.    Analysis of Project: The Project Applicant would be subject to mandatory compliance with Chapter 28 Article III,  Preservation of Heritage, Significant, and Specimen Trees (Tree Preservation Ordinance) of the Fontana Municipal  Code and would be required to demonstrate compliance to the City as part of the City’s standard grading and  building permit review and inspections processes.  Accordingly, the implementation of the Project would not  conflict with the City’s Tree Preservation Ordinance.  There are no other local policies or ordinances protecting  biological resources that are applicable to the Project.  Implementation of the Project would not result in any new  or more severe significant impacts due to a conflict with a local policies or ordinances protecting biological  resources than previously disclosed in the SWIP SP PEIR.      f. Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation  Plan, or other approved local, regional, or state habitat conservation plan?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that buildout of the SWIP SP would not conflict with an  adopted habitat conservation plan because there were no adopted/approved habitat conservation plans  applicable to the SWIP SP area at the time that the SWIP SP PEIR was prepared.  A recovery plan was released in  1997 for the Delhi Sands flower‐loving fly that included the SWIP SP area; however, an assessment of the recovery  of Delhi Sands flower‐loving fly in 2008 indicated that much of the Jurupa Recovery Unit may no longer provide  conservation value for Delhi Sands flower‐loving fly.  Regardless, the SWIP SP PEIR concluded that compliance  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐18  with the MMs included in the EIR would reduce potential impacts to the Delhi Sands flower‐loving fly to a level  below significance.    Analysis of Project: There are no habitat conservation plans or Natural Community Conservation Plans that are  applicable to the Project Site (CDFW, 2019). As disclosed in the SWIP SP PEIR, a recovery plan for the Delhi Sands  flower‐loving fly was released in 1997 that included the SWIP SP area.  However, based on soil data published by  the United States Department of Agriculture (USDA) Natural Resources Conservation Service and the Project’s  Biological Resources Assessment, the Project Site does not contain Delhi series soils, which are a requirement for  the species (Alden, 2022, p. 3). Because there is no potential for the Project Site to support the Delhi Sands flower‐ loving fly, implementation of the Project would not conflict with the provisions of the recovery plan for the species.  Accordingly, the Project would not conflict with the provisions of an applicable habitat conservation plan or other  approved local, regional, or State habitat conservation plan. Implementation of the Project would not result in  any new or more severe impacts related to conflicts with an adopted habitat conservation plan, natural  community conservation plan or other approved habitat conservation plan than previously disclosed in the SWIP  SP PEIR.    4.5 Cultural Resources  A Cultural Resources Study (dated March 16, 2022) (BFSA, 2022a) was prepared for the Project by Brian F. Smith  and Associated (BFSA) to identify potential archaeological and historical resources that may be affected by the  Project. This report includes the findings from an archaeological pedestrian survey; a cultural records search and  sacred lands search, and an inventory of all recorded archaeological and historical resources located on the Project  Site and within a one‐mile radius of the Project Site.  This report is included as Appendix E to this EIR Addendum,  and its findings are incorporated into the analysis presented herein.    Would the Project:    a. Cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?  SWIP SP PEIR Finding: The SWIP SP PEIR identified nine (9) historical resources in the SWIP SP area, none of which  were identified as significant historical resources under CEQA.  Additionally, the SWIP SP PEIR determined that  the SWIP SP area has low sensitivity for historical resources.  The SWIP SP PEIR included MMs that require future  development projects within the SWIP SP area to perform a pre‐construction historical resources survey (and  implement a mitigation program if important resources are present) and to implement safeguards during grading  to protect/preserve historical resources that may be uncovered during grading activities (MMs 4.4‐1a and 4.4‐1b).   With application of the required MMs, the SWIP SP PEIR concluded that impacts to historic resources would be  less‐than‐significant.    Analysis of Project: In conformance with SWIP SP PEIR MM 4.4‐1a, a historic resources assessment was conducted  for the Project by BFSA.  BFSA did not find any historic archaeological artifacts on the Project Site or evidence of  any important historic events or individuals associated with any of the structures on the Project Site and, also, did  not observe distinctive characteristics of type, period, region, or method of construction in any of the structures  on the Project Site (BFSA, 2022a, pp. 19, 22).  BFSA conducted a records search with the South Central Coastal  Information Center (SCCIC) at California State University, Fullerton, which resulted in the identification of 12  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐19  previously recorded historic structures within one mile of the Project Site, including Southern Pacific Railroad  alignments, single‐family residences, transmission lines, and the Kaiser Steel Mill – none of which are located on  the Project Site (BFSA, 2022a, p. 18). Accordingly, the Project would result in less‐than‐significant impacts to  known historical resources.  Notwithstanding, BFSA recommended the implementation of a historic artifact  recovery program during grading in the event that buried historic artifacts are uncovered.  As a standard practice  for all development projects in Fontana, the City would require the Project Applicant to comply with conditions  of approval that establish protocols for consultation, monitoring, and resource recovery programs during  construction.  The City’s standard conditions of approval would satisfy BFSA’s recommendations and would be   consistent with the requirement of SWIP SP PEIR MM 4.4‐1b.  With application of the City’s standard conditions  of approval and SWIP SP PEIR MM 4.4‐1b, the potential for Project construction activities to adversely impact  important, previously unknown/buried historic resources would be less than significant.  This determination is  consistent with the conclusion from the SWIP SP PEIR, which assumed that the Project Site would be fully  developed.  The Project would not result in a new or more severe significant impact to historical resources than  previously disclosed in the SWIP SP PEIR.    Mitigation:  No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce  impacts to cultural resources continue to apply to the Project as listed below and in the MMRP for the SWIP SP  PEIR (attached hereto as Appendix A).    MM 4.4‐1b If any historical resources are encountered before or during grading, the developer shall retain a  qualified archaeologist to monitor construction activities and to take appropriate MMs to protect  or preserve them for study.    Note:  The City determined that MM 4.4‐1a was satisfied by the Cultural Resources Study that was prepared for  the Project.    b. Cause a substantial adverse change in the significance of an archaeological resource pursuant to  §15064.5?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that no archaeological resources or Native American sites  exist within the SWIP SP area, and that the likelihood of encountering potentially significant prehistoric  archaeological resources within the SWIP SP area is considered low.  The City of Fontana consulted with the  Soboba Band of Luiseño Indians and the Morongo Band of Mission Indians as part of the Senate Bill 18 (SB 18)  Native American tribal consultation process for the SWIP SP.  The Soboba Band of Luiseño Indians identified the  site as being located within the tribe’s Tribal Traditional Use Area.  The SWIP SP PEIR included MMs to minimize  impacts related to Native American resources and previously undiscovered archaeological resources that could  be encountered during ground disturbing activities (MMs 4.4‐2a through 4.4‐2c).  Following implementation of  mitigation, the SWIP SP PEIR concluded that implementation of the SWIP SP would result in less‐than‐significant  impacts to prehistoric archaeological resources.    Analysis of Project: The Project Site was surveyed by BFSA for the presence/absence of prehistoric archaeological  resources in accordance with SWIP SP PEIR MM 4.4‐2a.  No prehistoric archaeological artifacts were observed  within the Project Site and no prehistoric sites have been recorded within one mile of the Project Site (BFSA,  2022a, p. 19). Accordingly, the Project is not anticipated to result in substantial adverse impacts to any known  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐20  prehistoric archeological resources.  However, as a standard practice for all development projects in Fontana, the  City would require the Project Applicant to comply with conditions of approval that establish protocols for  consultation, monitoring, and resource recovery to protect inadvertent discoveries of buried/masked prehistoric  archaeological resources.  The City’s standard conditions of approval are consistent with SWIP SP PEIR MM 4.4‐ 2b, which requires the Project Applicant to retain a qualified archaeological monitor during grading activities and  implement a mitigation recovery program and SWIP SP PEIR MM 4.4‐2c, which requires the Project Applicant to  consider the requests of the Soboba Band of Luiseño Indians and Morongo Band of Mission Indians concerning  procedures for the treatment of any Native American cultural resources.  Compliance with the City’s standard  conditions of approval, which would ensure compliance with mitigation measures from the SWIP SP PEIR would  ensure the Project’s potential impacts to archaeological resources would be less than significant. The SWIP SP EIR  assumed that the Project Site would be fully developed. Implementation of the Project would not result in any  new or more severe significant impacts to archaeological resources than previously disclosed in the SWIP SP PEIR.    Mitigation: No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce  impacts to cultural resources continue to apply to the Project as listed below and in the MMRP for the SWIP SP  PEIR (attached hereto as Appendix A).    MM 4.4‐2b If any prehistoric archaeological resources are encountered before or during grading, the  developer shall retain a qualified archaeologist to monitor construction activities and to take  appropriate MMs to protect or preserve them for study. With the assistance of the archaeologist,  the City of Fontana shall:     Enact interim MMs to protect undesignated sites from demolition or significant modification  without an opportunity for the City to establish its archaeological value.   Consider establishing provisions to require incorporation of archaeological sites within new  developments, using their special qualities at a theme or focal point.   Pursue educating the public about the area’s archaeological heritage.   Propose MMs and recommend conditions of approval (if a local government action) to  eliminate adverse project effects on significant, important, and unique prehistoric resources,  following appropriate CEQA guidelines.   Prepare a technical resources management report, documenting the inventory, evaluation,  and proposed mitigation of resources within the project area.  Submit one copy of the  completed report, with original illustrations, to the San Bernardino County Archaeological  Information Center for permanent archiving.    MM 4.4‐2c Where consistent with applicable local, State and federal law and deemed appropriate by the City,  future site‐specific development projects shall consider the following requests by the Soboba  Band of Luiseño Indians and Morongo Band of Mission Indians:     In the event Native American cultural resources are discovered during construction for future  development, all work in the immediate vicinity of the find shall cease and a qualified  archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work  on the overall project may continue during this period;  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐21   Initiate consultation between the appropriate Native American tribal entity (as determined  by a qualified archaeologist meeting Secretary of Interior standards) and the City/project  applicant;   Transfer cultural resources investigations to the appropriate Native American entity (as  determined by a qualified archaeologist meeting Secretary of Interior standards) as soon as  possible;   Utilize a Native American Monitor from the appropriate Native American entity (as  determined by a qualified archaeologist meeting Secretary of Interior standards) where  deemed appropriate or required by the City, during initial ground disturbing activities, cultural  resource surveys, and/or cultural resource excavations.    Note:  The City of Fontana determined that MM 4.4‐1a was satisfied by the Cultural Resources Study prepared for  the Project.    c. Disturb any human remains, including those interred outside of formal cemeteries?  SWIP SP PEIR Finding: The SWIP SP PEIR did not identify any cemeteries or archaeological sites that may contain  human remains within the SWIP SP area.  The SWIP SP PEIR concluded that with mandatory compliance with the  California Health and Safety Code Section 7050.5‐7055 and Section 5097.98 of the California Public Resources  Code, the SWIP SP would result in less‐than‐significant impacts with respect to disturbance of human remains.    Analysis of Project: The Project Site does not contain a known cemetery.  While not anticipated, in the unlikely  event that human remains are discovered during Project grading or other ground‐disturbing activities, the Project  would be required to comply with the applicable provisions of California Health and Safety Code Section 7050.5  as well as Public Resources Code Section 5097 et. seq.  Mandatory compliance with these provisions of California  state law would require that human remains, if unearthed during construction activities, to be appropriately  treated thereby ensuring that Project impacts would be less than significant.  The SWIP SP PEIR assumed that the  Project Site would be fully developed. Implementation of the Project would not result in new or more severe  significant impacts related to the potential discovery of human remains than previously disclosed in the SWIP SP  PEIR.    4.6 Energy  An Energy Analysis (dated February 15, 2022) (Urban Crossroads, 2022c) was prepared for the Project by Urban  Crossroads to quantify anticipated energy usage associated with the construction and operation of the Project,  determine if the usage amounts are efficient, typical, or wasteful for the land use type, and identify any potential  methods of avoiding or reducing inefficient, wasteful, and unnecessary consumption of energy. This report is  included as Appendix F to this EIR Addendum and its findings are incorporated into the analysis presented herein.      Would the Project:    a. Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary  consumption of energy resources, during project construction or operation?    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐22  SWIP SP PIER Finding: While energy was not a specifically called out topic at the time, the SWIP SP PEIR was  prepared, it nonetheless analyzed potential impacts in this regard and concluded that implementation of the SWIP  SP, including construction and operation, would not result in wasteful or unjustifiable consumption of energy  resources.    Analysis of Project:  The Project would implement the SWIP SP land use plan and the Project’s proposed land use  and development intensity is consistent with the development regulations contained within the SWIP.  Therefore,  the development proposed by the Project – and its energy use – is within the scope of the project that was  evaluated in the SWIP SP PEIR.  Furthermore, the Project would be required to comply with SWIP SP PEIR MM 4.2‐ 5 to minimize the amount of energy consumed during operation.    Project construction would represent a “single‐event” electric energy and fuel demand and would not require on‐ going or permanent commitment of energy or diesel fuel resources for this purpose.  In summary, the Project’s  construction process is estimated to consume approximately 24,592‐kWh of electricity, approximately 30,866  gallons of fuel (diesel and gasoline) (Urban Crossroads, 2022c, pp. 23‐32).  The amount of energy anticipated to  be consumed during the Project’s construction is typical for a construction project at the Project’s scale (ibid.).   Further, the Project’s energy demand can be accommodated within the context of available resources and energy  delivery systems and Project construction equipment would conform to applicable California Air Resources Board  (CARB) emissions standards which act to promote equipment fuel efficiencies (ibid.).  As supported by the  foregoing analysis, Project construction energy consumption would not be considered inefficient, wasteful, or  otherwise unnecessary.    During Project operation, energy would be consumed by building operations and maintenance (electricity and  natural gas) and by vehicles traveling to/from the Project Site (diesel fuel and gasoline).  The Project’s building  operations and maintenance energy demands are estimated to be 1,459,841 kBTU/year of natural gas and  1,048,623 kWh/year of electricity (Urban Crossroads, 2022c, p. 31).  The Project’s anticipated operations are not  inherently energy intensive, and the Project’s anticipated energy demands are comparable to, or less than, other  warehouse project of similar scale and configuration.  Additionally, the Project is required by law to comply with  the California building Standards Code (CalGreen), which will minimize the Project’s demand for energy, including  energy produced from non‐renewable resources.  These regulations have become more protective of the  environment since the certification of the SWIP SP PEIR, and as a result the Project’s energy use will generally be  less than was assumed in the SWIP SP PEIR.  Project‐related traffic is anticipated to consume 110,488 gallons of  fuel annually (Urban Crossroads, 2022c, p. 30). The trips generated by the Project and the miles traveled by those  trips (vehicle miles traveled [VMT]) are consistent with other warehouse uses in the Inland Empire of similar scale  and configuration.  Also, it bears noting that the Project is expected to result in a reduction in daily vehicle trips  to/from the Site relative to what was assumed by the SWIP SP PEIR; therefore, implementation of the Project is  anticipated to result in lower gasoline and diesel fuel consumption compared to the condition that was disclosed  in the SWIP SP PEIR (refer to EIR Addendum Subsection 4.17 for more information regarding the Project’s traffic).   The Project is not anticipated to result in excessive and wasteful vehicle trips or VMT or associated excess and  wasteful vehicle energy consumption (Urban Crossroads, 2022c, p. 31).    Based on the foregoing, implementation of the Project would not result in a significant environmental impact due  to wasteful, inefficient, or unnecessary consumption of energy resources, during Project construction and  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐23  operation. Implementation of the Project would not result in new or more severe significant impacts related to  energy resources than previously disclosed in the SWIP SP PEIR.    Mitigation: No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to maximize  energy efficiency continue to apply to the Project as listed below and included in the MMRP for the SWIP SP PEIR  (attached hereto as Appendix A).    MM 4.2‐5a Prior to the issuance of building permits, future development projects shall demonstrate the  incorporation of project design features that achieve a minimum of 28.5 percent reduction in GHG  emissions from business as usual conditions. Future projects shall include, but not be limited to,  the following list of potential design features.    Energy Efficiency   Design buildings to be energy efficient and exceed Title 24 requirements by at least 5 percent.   Install efficient lighting and lighting control systems. Site and design building to take  advantage of daylight.   Use trees, landscaping and sun screens on west and south exterior building walls to reduce  energy use.   Install light colored “cool” roofs and cool pavements.   Provide information on energy management services for large energy users.   Install energy efficient heating and cooling systems, appliances and equipment, and control  systems (e.g., minimum of Energy Star rated equipment).   Implement design features to increase the efficiency of the building envelope (i.e., the barrier  between conditioned and unconditioned spaces).   Install light emitting diodes (LEDs) for traffic, street and other outdoor lighting.   Limit the hours of operation of outdoor lighting.     Renewable Energy   Install solar panels on carports and over parking areas. Ensure buildings are designed to have  “solar ready” roofs.   Use combined heat and power in appropriate applications.   Water Conservation and Efficiency   Create water‐efficient landscapes with a preference for a xeriscape landscape palette.   Install water‐efficient irrigation systems and devices, such as soil moisture‐based irrigation  controls.   Design buildings to be water‐efficient. Install water‐efficient fixtures and appliances (e.g., EPA  WaterSense labeled products).   Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces)  and control runoff.   Restrict the use of water for cleaning outdoor surfaces and vehicles.   Implement low‐impact development practices that maintain the existing hydrologic character  of the site to manage storm water and protect the environment. (Retaining storm water  runoff on‐site can drastically reduce the need for energy‐intensive imported water at the site).  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐24   Devise a comprehensive water conservation strategy appropriate for the project and location.  The strategy may include many of the specific items listed above, plus other innovative MMs  that are appropriate to the specific project.   Provide education about water conservation and available programs and incentives.    Solid Waste MMs   Reuse and recycle construction and demolition waste (including, but not limited to, soil,  vegetation, concrete, lumber, metal, and cardboard).   Provide interior and exterior storage areas for recyclables and green waste and adequate  recycling containers located in public areas.   Provide education and publicity about reducing waste and available recycling services.    Transportation and Motor Vehicles   Limit idling time for commercial vehicles, including delivery and construction vehicles.   Promote ride sharing programs (e.g., by designating a certain percentage of parking spaces  for ride sharing vehicles, designating adequate passenger loading and unloading and waiting  areas for ride sharing vehicles, and providing a web site or message board for coordinating  rides).   Create local “light vehicle” networks, such as neighborhood electric vehicle (NEV) systems.   Provide the necessary facilities and infrastructure to encourage the use of low or zero‐ emission vehicles (e.g., electric vehicle charging facilities and conveniently located alternative  fueling stations).   Promote “least polluting” ways to connect people and goods to their destinations.   Incorporate bicycle lanes and routes into street systems, new subdivisions, and large  developments.   Incorporate bicycle‐friendly intersections into street design.   For commercial projects, provide adequate bicycle parking near building entrances to  promote cyclist safety, security, and convenience. For large employers, provide facilities that  encourage bicycle commuting (e.g., locked bicycle storage or covered or indoor bicycle  parking).   Create bicycle lanes and walking paths directed to the location of schools, parks and other  destination points.    b. Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?    SWIP SP PEIR Finding: Although the SWIP SP PEIR did not specifically address this question, the SWIP SP PEIR  disclosed that all future development within the SWIP SP area would be required to comply with Title 24 of the  California Code of Regulation (of which Part 6 establishes the State’s Building Energy Efficiency Standards),  development standards and design requirements related to sustainability and energy conservation contained in  the City of Fontana Municipal Code, and current and future State legislation, executive orders, and regulatory  guidance to maximize energy efficiency.  Furthermore, the SWIP SP PEIR also acknowledged that it was probable  that new technologies would emerge and be incorporated into future development to reduce energy  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐25  consumption.  Lastly, the SWIP SP PEIR included a MM (MM 4.2‐5a) that would require future development to  incorporate design features that would minimize the consumption of energy.    Analysis of Project: The Project would not conflict with or obstruct a State or local plan for renewable energy or  energy efficiency, as discussed in detail in the Project’s Energy Analysis (refer to Appendix F), and the Project  would be required to comply with SWIP SP PEIR MM 4.2‐5 to minimize the amount of energy consumed by the  Project.  Implementation of the Project would not result in new or more severe significant impacts related to  energy resources than previously disclosed in the SWIP SP PEIR.    Mitigation: No new or updated MMs are required.  SWIP SP PEIR MM 4.2‐5a, as presented above and in the MMRP  for the SWIP SP PEIR, attached hereto as Appendix A, continue to apply to the Project.    Monitoring: Monitoring shall occur as specified in the MMRP for the SWIP SP PEIR; refer to Appendix A.    4.7 Geology and Soils  A Geotechnical Investigation (dated July 21, 2021) (SCG, 2021) was prepared for the Project by Southern California  Geotechnical (SCG) to evaluate the geotechnical conditions of the subject property, identify any geological  hazards, and provide recommendations for the future development of the Project.  Additionally, a Paleontological  Resources Assessment (March 16, 2022) (BFSA, 2022b), was prepared by BFSA to evaluate the potential for the  Project Site to contain significant, non‐renewable paleontological (fossil) resources.  These reports are included  as Appendices G and H, respectively, to this EIR Addendum and their findings are incorporated into the analysis  presented herein.     Would the Project:    a. Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death  involving:  i. Rupture of a known earthquake fault, as delineated on the most recent Alquist‐Priolo Earthquake  Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence  of a known fault?  Refer to Division of Mines and Geology Special Publication 42.  SWIP SP PEIR Finding: The SWIP SP PEIR determined that there are no Alquist‐Priolo earthquake faults located  within the SWIP SP area.  The nearest fault to the SWIP SP area is the Cucamonga Fault which traverses through  the northern portion of the City of Fontana approximately 7.0 miles north of the SWIP SP area.  The SWIP SP PEIR  concluded that because no known earthquake faults are known to exist beneath the SWIP SP area, impacts related  to fault rupture would be less than significant.    Analysis of Project:  SCG did not observe any evidence of faulting on the Project Site and the Site is not located in  an Alquist‐Priolo Earthquake Zone (SCG, 2021, p. 9).  Accordingly, the Project would not expose people or  structures to adverse effects related to the rupture of an earthquake fault.  The SWIP SP PEIR assumed the Project  Site would be developed with employment‐generating (i.e., industrial) land uses; thus, based on the foregoing  analysis, implementation of the Project would not result in any new or more severe significant impacts related to  fault rupture than previously disclosed in the SWIP SP PEIR.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐26  ii. Strong seismic ground shaking?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that development within the SWIP SP area could be exposed  to strong seismic ground shaking due to the numerous active faults located in the southern California region.  The  SWIP SP PEIR concluded that future development’s adherence to standard engineering practices and design  criteria relative to seismic and geologic hazards in accordance with the California Building Code (CBC) would  reduce the significance of impacts related to seismic ground shaking to a level below significance.    Analysis of Project: The Project Site is in a seismically active area of Southern California and is anticipated to  experience moderate‐to‐severe ground shaking during the Project’s lifetime. This risk is not considered  substantially different than that of other similar properties in the Southern California area.  Consistent with the  conclusion in the SWIP SP PEIR concerning impacts related to seismic ground shaking, the Project is required to  adhere to standard engineering practices and design criteria relative to seismic and geologic hazards in accordance  with the CBC, including the California Building Standards Code (CBSC), also known as California Code of  Regulations (CCR), Title 24 (Part 2), and the Fontana Building Code, which is based on the CBSC with local  amendments.  The CBSC and Fontana Building Code provide standards that must be met to safeguard life or limb,  health, property, and public welfare by regulating and controlling the design, construction, quality of materials,  use and occupancy, location, and maintenance of all buildings and structures, and these standards have been  specifically tailored for California earthquake conditions.  In addition, SCG provided recommendations for  construction of the Project to minimize on‐site hazards from strong seismic ground shaking, which will be  implemented as one of the City’s conditions of Project approval.  With mandatory compliance with State and local  building standards, the Project would not expose people and structures to substantial adverse effects, including  loss, injury, or death, involving seismic ground shaking.  The SWIP SP PEIR assumed the Project Site would be  developed with employment‐generating (i.e., industrial) land uses; thus, based on the foregoing analysis, the  Project would result in new or more severe significant impacts related to seismic ground‐shaking than previously  disclosed in the SWIP SP PEIR.    iii. Seismic‐related ground failure, including liquefaction?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that although the potential exists for liquefaction to occur  within the SWIP SP area, future development within the SWIP SP would be subject to site‐specific geotechnical  investigations and would comply with existing CBSC standards to minimize any potential ground failure or  liquefaction hazards.  Accordingly, the SWIP SP PEIR concluded that implementation of the SWIP SP would not  expose people or structures to potential impacts related to seismic ground failure or liquefaction.    Analysis of Project: According to SCG’s examination of the Project Site and regional information sources, the  Project Site is not within an area of liquefaction susceptibility (SCG, 2021, p. 11).  Accordingly, the Project would  not expose people or structures to substantial adverse effects, including loss, injury, or death, involving  liquefaction. The SWIP SP PEIR assumed the Project Site would be developed with employment‐generating (i.e.,  industrial) land uses; thus, based on the foregoing analysis, the Project would not result in new or more severe  significant impacts related to liquefaction than previously disclosed in the SWIP SP PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐27  iv. Landslides?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that the risk of landslides in the SWIP SP area is low due to the  relatively flat topography of the SWIP SP area.  The SWIP SP PEIR concluded that no impact would occur with  regard to landslides.    Analysis of Project: The Project Site is flat and has no substantial natural or man‐made slopes under existing  conditions.  Additionally, there are no substantial natural or man‐made slopes in proximity to the Project Site.   Therefore, the potential for landslides on‐ or off‐site is low.  Proposed grading would not create manufactured  slopes; therefore, implementation of the Project would not create a landslide risk to surrounding properties. The  SWIP SP PEIR assumed the Project Site would be developed with employment‐generating (i.e., industrial) land  uses; thus, based on the foregoing analysis, the Project would not result in new or more severe significant impacts  related to landslide than previously disclosed in the SWIP SP PEIR.    b. Result in substantial soil erosion or the loss of topsoil?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that compliance with all requirements set forth in the National  Pollutant Discharge Elimination System (NPDES) permit for construction activities (e.g., implementation of BMPs  through preparation of a Stormwater Pollution Prevention Plan [SWPPP]) would preclude potential soil erosion  impacts.    Analysis of Project: The analysis below summarizes the likelihood of the Project to result in substantial soil erosion  during temporary construction activities and/or long‐term operation.  As demonstrated in the analysis below,  implementation of the Project would not result in substantial effects related to soil erosion or the loss of topsoil.   Implementation of the Project would not result in any new impacts or more severe significant impacts related to  soil erosion than previously disclosed in the SWIP SP PEIR, which assumed the Project Site would be fully  developed.      Construction Activities  Project construction would involve demolition, grading, paving, utility installation, building construction, and  landscaping installation, which has the potential to temporarily expose on‐site soils that are currently covered by  concrete and could be subject to erosion during rainfall events or high winds.    Pursuant to State Water Resources Control Board requirements, the Project Applicant would be required to obtain  coverage under the State’s General Construction Storm Water Permit for construction activities (NPDES permit).   The NPDES permit is required for all projects that include construction activities, such as clearing, grading, and/or  excavation that disturb at least one (1) acre of total land area.  Compliance with the NPDES Permit requires the  Project Applicant to prepare and submit to the City for approval a Project‐specific SWPPP.  The SWPPP would  identify a combination of erosion control and sediment control MMs (i.e., BMPs) to reduce or eliminate sediment  discharge to surface water from stormwater and non‐stormwater discharges during construction.  In addition, the  Project would be required to comply with SCAQMD Rule 403, which establishes requirements for the control of  dust during construction (including wind erosion) (SCAQMD, 2005). With mandatory compliance to the  requirements noted in the Project’s SWPPP, as well as applicable regulatory requirements, there would be no  potential for substantial water and/or wind erosion impacts during Project construction. Implementation of the  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐28  Project would not result in any new or more severe significant impacts related to soil erosion than previously  disclosed in the SWIP SP PEIR.      Operational Activities  Upon Project build‐out, the Project Site would be redeveloped with an industrial building, landscaping, and  impervious surfaces.  Stormwater runoff from the Project Site would be captured and treated to reduce  waterborne pollutants (including sediment).  A portion of the runoff that occurs on the Project Site would be  routed to an on‐Site underground infiltration basin, where it would percolate into the ground, while excess runoff  would be conveyed off‐Site via an on‐site storm drain system.    The City’s Municipal Storm Water Permit will require the Project Applicant to prepare and implement a WQMP  (see City of Fontana Municipal Code Section 5‐14 & Chapter 23, Article IX).  The WQMP is required to identify an  effective combination of erosion control and sediment control MMs (i.e., BMP) to reduce or eliminate sediment  discharge to surface water from stormwater and non‐stormwater discharges.  The Preliminary WQMP for the  Project is attached hereto as Appendix L.  Compliance with the WQMP would be required as a condition of Project  approval and long‐term maintenance of on‐site water quality features is required.  Because the Project would be  required to utilize erosion and sediment control MMs to preclude substantial, long‐term soil erosion and loss of  topsoil, substantial soil erosion would not occur.  Implementation of the Project would not result in any new or  more severe significant impacts related to soil erosion than previously disclosed in the SWIP SP PEIR.      c. Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the  project, and potentially result in on‐ or off‐site landslide, lateral spreading, subsidence, liquefaction, or  collapse?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP area is not located on a geologic unit or soil  that is unstable, or that would become unstable as a result of the project and potentially result in on‐ or off‐site  landslide, lateral spreading, subsidence, liquefaction, or collapse.  The SWIP SP EIR concluded that a less‐than‐ significant impact would occur.    Analysis of Project: As previously discussed under the response to Item “a,” of Subsection 4.7, the Project Site’s  soils are not susceptible to landsliding, liquefication, and subsidence (a phenomenon associated with  liquefaction). Therefore, the Project would not be subjected to these geologic phenomena.  Additionally,  according to SCG, the potential for lateral spreading occurring on the Project Site is considered low (SCG, 2021, p.  9). The Project Site does contain undocumented fill that could experience settlement/collapse; however, the  settlement/collapse hazard can be attenuated through the removal of near surface soils down to competent  materials and replacement with properly compacted fill, which is included as a recommendation in the Project’s  Geotechnical Investigation (SCG, 2021, pp. 11‐12). The Project would be required to implement the design,  grading, and construction recommendations within its Geotechnical Investigation pursuant to Chapter 26, Division  4 of the City of Fontana Municipal Code, which would ensure that the Project Site’s soils remain stable post‐ development.  (The City will assign a condition of approval to the Project requiring implementation of the  Geotechnical Investigation pursuant to Municipal Code Chapter 26, Division 4.)  Implementation of the Project  would not expose people or structures to significant hazards related to unstable soils.  The SWIP SP PEIR assumed  the Project Site would be developed with employment‐generating (i.e., industrial) land uses; thus, based on the  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐29  foregoing analysis, the Project would not result in any new impacts or more severe significant impacts related to  unstable soils than previously disclosed in the SWIP SP PEIR.      d. Be located on expansive soil, as defined in Table 18‐1‐ B of the Uniform Building Code (since renamed as  the California Building Code), creating substantial direct or indirect risks to life or property?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that soils in portions of the SWIP SP area are susceptible to  expansion.  However, the SWIP SP PEIR concluded that because future development within the SWIP SP would be  subject to site‐specific geotechnical investigations and would be required to comply with CBSC standards  addressing expansive soil hazards, impacts associated with expansive soils would be less than significant.    Analysis of Project: Soils on the Project Site soils generally consist of gravelly sands, sands, and silty sands with no  appreciable clay content; these materials are classified as non‐expansive (SCG, 2021, p. 12). Accordingly, the  Project would not create substantial risks to life or property through locating structures on expansive soil. The  SWIP SP PEIR assumed the Project Site would be developed with employment‐generating (i.e., industrial) land  uses; thus, based on the foregoing analysis, implementation of the Project would not result in any new impacts or  more severe significant impacts related to expansive soil than previously disclosed in the SWIP SP PEIR.      e. Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal  systems where sewers are not available for the disposal of wastewater?  SWIP SP PEIR Finding: The SWIP SP PEIR did not identify any significant adverse effects related to septic systems,  because the SWIP SP would be served by sewer facilities and therefore not entail the installation of septic tanks  or alternative wastewater disposal systems.      Analysis of Project: The Project would connect to the existing municipal sewer system and does not propose the  use of septic tanks or alternative wastewater disposal systems.  Implementation of the Project would not result  in any new impacts or more severe significant impacts related to septic tanks or alternative wastewater disposal  systems than previously disclosed in the SWIP SP PEIR.      f. Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that the southern portion of the SWIP SP area is underlain by  Pleistocene older fan deposits, which have a high potential to contain important fossil resources.  The SWIP SP  PEIR included MMs 4.4‐3a and 4.4‐3b which require future development projects within the SWIP SP to analyze  potential impacts to paleontological resources on a site‐specific basis prior to construction and then, implement  any recommended mitigation program (if required).  The SWIP SP PEIR concluded that with implementation of  mitigation, the SWIP SP would result in less‐than‐significant impacts to paleontological resources.     Analysis of Project: In accordance with SWIP SP PEIR MM 4.4‐3a, a Paleontological Resources Assessment (see  Appendix H), was prepared for the Project Site by BFSA.  The Paleontological Assessment concluded that  fossiliferous, late Pleistocene alluvial fan deposits underlie the Holocene young alluvial fan sediments that are on  the Project Site (BFSA, 2022b, p. 9). Older Pleistocene deposits, specifically in the Inland Empire, have a high  paleontological sensitivity.  Accordingly, BFSA concluded that the strata underlying the Project Site has the  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐30  potential to contain important fossil deposits and, thusly, recommended paleontological monitoring be  performed during the Project’s grading, excavation, or utility trenching activities that occur at or below 5 feet  below the existing ground surface (ibid.).  The Project’s monitoring program would be required to comply with  the performance standards established by SWIP SP PEIR MM 4.4‐3b.  With compliance with SWIP SP PEIR MM 4.4‐ 3b, the Project would minimize the significance of the Project’s potential effects to important paleontological  resources to less‐than‐significant levels.  This conclusion is consistent with the conclusion from the SWIP SP PEIR,  which assumed the Project Site would be fully developed.  Implementation of the Project would not result in any  new or more severe significant impacts to paleontological resources than previously disclosed in the SWIP SP PEIR.      Mitigation: No new MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce impacts to  paleontological resources continue to apply to the Project, as listed below and included in the MMRP for the SWIP  SP PEIR (attached hereto as Appendix A).    MM 4.4‐3b Should mitigation monitoring be recommended for a specific project within the Project Site, the  program shall include, but not be limited to, the following MMs:     Assign a paleontological monitor, trained, and equipped to allow the rapid removal of fossils  with minimal construction delay, to the site full‐time during the interval of earth‐disturbing  activities.   Should fossils be found within an area being cleared or graded, earth‐disturbing activities shall  be diverted elsewhere until the monitor has completed salvage. If construction personnel  make the discovery, the grading contractor shall immediately divert construction and notify  the monitor of the find.   All recovered fossils shall be prepared, identified, and curated for documentation in the  summary report and transferred to an appropriate depository (i.e., San Bernardino County  Museum).   A summary report shall be submitted to City of Fontana. Collected specimens shall be  transferred with copy of report to San Bernardino County Museum.    Note:  The City determined that MM 4.4‐3a was satisfied by the Paleontological Resources Assessment that was  prepared for the Project.    4.8 Greenhouse Gas Emissions  A Greenhouse Gas Analysis (dated February 15, 2022) (Urban Crossroads, 2022d) was prepared for the Project by  Urban Crossroads to quantify the GHG emissions that would result from Project‐related construction and  operational activities.  This report is included as Appendix I to this EIR Addendum and its findings are incorporated  into the analysis presented herein.    Would the Project:    a. Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the  environment?  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐31  b. Conflict with any applicable plan, policy, or regulation of an agency adopted for the purpose of reducing  the emissions of greenhouse gases?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that implementation of the SWIP SP would result in GHG  emissions equal to 1,147,515.21 MTCO2eq/year absent project design features and mitigation.  The SWIP SP PEIR  included mitigation (MM 4.2‐5a) that would require the individual development projects within the SWIP SP area  to incorporate sustainable practices related to water usage, energy usage, solid waste generation, and  transportation.  The SWIP SP PEIR determined that implementation of the reduction MMs required by MM 4.2‐5a  would reduce GHG emission from buildout of the SWIP SP to 774,572.77 MTCO2eq/year (an approximate 32.5  percent reduction relative to the unmitigated emissions).  The SWIP SP PEIR determined that because MM 4.2‐5  would result in GHG reductions that would exceed the mandate of Assembly Bill (AB) 32, that implementation of  the SWIP SP would not generate GHG emissions that have a significant impact on the environment and, also, that  the SWIP SP would be consistent with applicable plans and policies related GHG emissions reductions.    Analysis of Project: The Project’s construction phase GHG emissions are summarized in Table 4‐7, Construction‐ Related Greenhouse Gas Emissions. The GHG emissions reported in Table 4‐7 are unmitigated and do not account  for mitigation required by the SWIP SP PEIR. Construction phase GHG emissions were amortized over a 30‐year  period and added to the annual operational phase GHG emissions. The methodology used to quantify the Project’s  construction phase GHG emissions is described in the Project’s Greenhouse Gas Analysis (see Appendix I).    Table 4‐7 Construction‐Related Greenhouse Gas Emissions  Year Emissions (MT/yr)  CO2 CH4 N2O Total CO2e  2022 128.84 0.02 4.48E‐03 130.74  2023 103.61 0.02 4.16E‐03 105.24  Total GHG Emissions 232.45 0.04 0.01 235.98  Amortized Construction Emissions (MTCO2e) 7.75 0.00 0.00 7.87  Source: (Urban Crossroads, 2022d, Table 3‐4)    The Project’s annual GHG emissions are summarized in Table 4‐8, Annual Project Greenhouse Gas Emissions.  The  GHG emissions reported in Table 4‐8 are unmitigated and do not account for any mitigation required by the SWIP  SP PEIR.  The methodology used to quantify the Project’s annual GHG emission is described in the Project’s  Greenhouse Gas Analysis (see Appendix I).     Table 4‐8 Annual Project Greenhouse Gas Emissions  Emission Source  Emissions (MT/yr)  CO2 CH4 N2O Total CO2e  Annual construction‐related emissions amortized  over 30 years 7.75 1.28E‐03 2.88E‐04 7.87  Area Source 4.40E‐03 1.00E‐05 0.00 4.69E‐03  Energy Source 253.11 1.70E‐02 3.14E‐03 254.47  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐32  Emission Source  Emissions (MT/yr)  CO2 CH4 N2O Total CO2e  Mobile Source 995.02 0.04 0.09 1,024.18  TRU Source       22.05  On‐Site Equipment 101.50 0.03 0.00 102.32  Waste 16.72 0.99 0.00 41.43  Water Usage 54.58 0.66 1.61E‐02 75.98  Total CO2e (All Sources) 1,528.30  Source: (Urban Crossroads, 2022d, Table 3‐7)    The Project would implement the SWIP SP land use plan and the Project’s proposed land use and development  intensity is consistent with the development plan and regulations contained within the SWIP.  Therefore, the GHG  emissions produced by the Project are within the scope of the project that was evaluated in the SWIP SP PEIR.  Of  note, the proposed industrial building would generate fewer daily traffic trips than the land uses assumed for the  Site by the SWIP SP PEIR (the Project’s daily traffic is discussed in further detail in EIR Addendum Subsection 4.17);  therefore, the Project would reduce vehicle tailpipe emissions within the SWIP SP area relative to the levels  disclosed in the SWIP SP PEIR (vehicle tailpipe emissions represent a substantial share of GHG emissions).  Senate  Bill 32 (SB 32), which was not in effect at the time the SWIP SP EIR was certified, establishes a more stringent GHG  reduction target than the regulations that were in effect at the time (i.e., Assembly Bill 32 [AB 32]).  The Project  will have to comply with these more stringent GHG reduction targets, as well as other regulations that have been  enacted since 2012 that are more protective of the environment and will reduce the Project’s GHG emissions  when compared to the emissions levels the SWIP SP PEIR assumed would occur from the development of the  Project Site.  Accordingly, the Project’s GHG emissions do not represent a new, significant air quality impact or an  increase in the severity of a significant air quality impact previously disclosed in the SWIP SP PEIR.      Additionally, the Project’s GHG Analysis demonstrates that the Project would be consistent with and would not  conflict with implementation of the goals and objectives established by applicable GHG emissions reductions  plans, and policies, including AB 32, SB 32, and the CARB Scoping Plan.  Refer the Project’s Greenhouse Gas Analysis  (see Appendix I) for a detailed analysis of the Project’s consistency with the consistency GHG emissions reductions  plans and policies.    Lastly, the Project would be required to comply with MM 4.2‐5a from the SWIP SP PEIR, which would reduce the  Project’s GHG emissions below the levels listed in Table 4‐8 (and further reduce GHG emissions below the levels  disclosed by the SWIP SP PEIR).    Based on the foregoing analysis, the Project’s GHG emissions would be less than significant and would be further  reduced by after the application of required mitigation from the SWIP SP PEIR.  Implementation of the Project  would not result in any new or more severe significant impacts related to conflicts with goals and objectives  established by applicable GHG emissions reductions plans, and policies than previously disclosed in the SWIP SP  PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐33  Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MM 4.2‐5a, as presented previously in EIR  Addendum Subsection 4.6 applies to the Project.    4.9 Hazards and Hazardous Materials  A Phase I Environmental Site Assessment (ESA), (dated July 20, 2021) (V3, 2021a) and a Phase II ESA (dated  September 3, 2021) (V3, 2021b) were prepared by V3 Companies (V3) to determine the presence/absence of  hazards and hazardous materials on the Project Site.  These reports are included as Appendix J and K, to this EIR  Addendum and their findings are incorporated in the analysis presented herein.    Would the Project:    a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal  of hazardous materials?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the land uses proposed by the SWIP SP could entail the  routine transport, use, storage, and/or disposal of hazardous materials.  The SWIP SP PEIR disclosed that all future  development within the SWIP SP would be required to comply with applicable federal, state, and local regulations  related to handling, transport, and disposal of hazardous materials and waste.  Additionally, the SWIP SP PEIR  established mitigation that prohibits the siting of facilities that handle hazardous materials near sensitive  receptors (i.e., schools, childcare facilities, and senior centers) and requires businesses that handle hazardous  materials to submit hazardous materials inventories to the San Bernardino County Fire Department (MM 4.5‐1a  and 4.5‐1c, respectively).  The SWIP SP PEIR concluded that mandatory compliance with applicable regulations  and implementation of the MMs included in the SWIP SP PEIR would ensure that the SWIP SP would not create a  significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous  materials.  Impacts would be less than significant.    Analysis of Project: As demonstrated in the analysis below, the Project would not result in a hazard to the public  or the environment through the routine transport, use, or disposal of hazardous materials.  The Project would not  result in any new impacts, or increase the severity of previously identified significant impacts, as compared to the  analysis presented in the SWIP SP PEIR.    Existing Conditions  V3 performed a comprehensive Phase I ESA to identify recognized environmental conditions (RECs) that may pose  potential environmental risks associated with the Project Site.  The Phase I ESA identified two RECs for the Project  Site: 1) potential soil contamination related to the Project Site’s historic use for automobile/truck repair and  maintenance; and 2) the undocumented removal of a 5,000‐gallon diesel underground storage tank (UST) in the  1990s (V3, 2021a, pp. 21‐22).  V3 performed a Phase II ESA, including soil testing and soil vapor sampling, to assess  environmental conditions associated with the previously mentioned RECs.  According to the Phase II ESA, no  volatile organic compounds (VOCs) or polynuclear aromatic hydrocarbons (PNAs) were detected in any of the soil  samples; soil gas samples were all non‐detect for VOCs; and arsenic, barium, chromium, and lead (all naturally  occurring metals) were detected at levels below background concentrations (V3, 2021b, p. 5).  The sampling  conducted as part of the Phase II ESA demonstrates that the soil conditions at the Project Site do not pose a  potential hazard for development of the Project Site.  Notwithstanding, the Project Applicant would be required  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐34  to comply with SWIP SP PEIR MM 4.5‐2b, which requires the excavation/removal, remediation, and off‐site  transport and disposal of hazardous materials in accordance with applicable Federal, State, and local  requirements, should any contamination be discovered on the Project Site during construction.  Compliance with  SWIP SP PEIR MM 4.5‐2b would ensure that any potentially hazardous materials that may present on the Project  Site under existing conditions would not present a substantial hazard to people or the environment. The Project  would not result in any new impacts, or increase the severity of previously identified significant impacts, as  compared to the analysis presented in the SWIP SP PEIR.    Construction Activities  Heavy equipment would be used on the Project Site during the Project’s construction, which would be fueled and  maintained by substances such as oil, diesel fuel, gasoline, hydraulic fluid, and other liquid materials that would  be considered hazardous if improperly stored or handled. In addition, materials such as paints, roofing materials,  solvents, and other substances typically used in building construction would be present on the Project Site during  construction. Improper use, storage, or transportation of hazardous materials could result in accidental releases  or spills, potentially posing health risks to workers, the public, and the environment.  This is a standard risk on all  construction sites, and there would be no greater risk for improper handling, transportation, or spills associated  with the Project than would occur on any other similar construction site.  Construction contractors would be  required to comply with all applicable federal, state, and local laws and regulations regarding the transport, use,  and storage of hazardous construction‐related materials, including but not limited requirements imposed by the  Environmental Protection Agency (EPA), California Department of Toxic Substances Control (DTSC), SCAQMD,  Santa Ana RWQCB, and the San Bernardino County Fire Protection District.  With mandatory compliance with  applicable hazardous materials regulations, the Project would not create a significant hazard to the public or the  environment through routine transport, use, or disposal of hazardous materials during the construction phase.  The Project would not result in any new impacts, or increase the severity of previously identified significant  impacts, as compared to the analysis presented in the SWIP SP PEIR.    Operational Activities  The Project would redevelop the Project Site with an industrial building. The future building occupant(s) for the  Project Site are not yet identified; however, the Project is designed to house commerce center and light industrial  occupants, and it is possible that hazardous materials could be used during a future building users’ daily operation.  State and federal Community‐Right‐to‐Know laws allow the public access to information about the amounts and  types of chemicals in use at local businesses. Laws also are in place that require businesses to plan and prepare  for possible chemical emergencies. Any business that occupies a building on the Project Site and that handles  hazardous materials (as defined in Section 25500 of California Health and Safety Code, Division 20, Chapter 6.95)  will require a permit from the San Bernardino County Fire Protection District – Hazardous Materials Division to  register the business as a hazardous materials handler. Such businesses also are required to comply with  California’s Hazardous Materials Release Response Plans and Inventory Law, which requires immediate reporting  to the San Bernardino County Fire Protection District – Hazardous Materials Division and the State Office of  Emergency Services regarding any release or threatened release of a hazardous material, regardless of the amount  handled by the business. In addition, any business handling at any one time, greater than 500 pounds of solid, 55  gallons of liquid, or 200 cubic feet of gaseous hazardous material, is required, under Assembly Bill 2185 (AB 2185),  to file a Hazardous Materials Business Emergency Plan (HMBEP). A HMBEP is a written set of procedures and  information created to help minimize the effects and extent of a release or threatened release of a hazardous  material. The intent of the HMBEP is to satisfy federal and State Community Right‐To‐Know laws and to provide  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐35  detailed information for use by emergency responders. Lastly, the Project would be required to comply with City  of Fontana Municipal Code Section 9‐1, which establishes development and performance standards, as well as  reporting and permitting requirements for the use, handling, storage, and transportation of hazardous materials.  If businesses that use or store hazardous materials occupy the Project, the business owners and operators would  be required to comply with all applicable federal, State, and local regulations to ensure proper use, storage, use,  emission, and disposal of hazardous substances (as described above and as required by SWIP SP EIR MM 4.5‐1c).  With mandatory regulatory compliance, the Project is not anticipated to pose a significant hazard to the public or  the environment through the routine transport, use, storage, emission, or disposal of hazardous materials.  Implementation of the Project would not result in any new impacts or more severe impacts related to hazardous  materials than previously disclosed in the SWIP SP PEIR.      Mitigation: No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce  hazards and hazardous materials impacts continue to apply to the Project, as presented below and in the MMRP  for the SWIP SP PEIR, attached hereto as Appendix A.    MM 4.5‐1c The City shall require all businesses that handle hazardous materials above the reportable  quantity to submit an inventory of the hazardous materials that they manage to the San  Bernardino County Fire Department – Hazardous Materials Division in coordination with the  Fontana Fire Protection District.    MM 4.5‐2b Prior to potential remedial evacuation and grading activities within the site (if remediation is  required), impacted areas shall be cleared of all maintenance equipment and materials (e.g.,  solvents, grease, waste‐oil), construction materials, miscellaneous stockpiled debris (e.g., scrap  metal, pallets, storage bins, construction parts), above ground storage tanks, surface trash, piping,  excess vegetation and other deleterious materials. These materials shall be removed off‐site and  properly disposed of at an approved disposal facility.  Once removed, a visual inspection of the  areas beneath the removed materials shall be performed. Any stained soils observed underneath  the removed materials shall be sampled. In the event concentrations of materials are detected  above regulatory cleanup levels during demolition or construction activities, the project applicant  shall comply with the following MMs in accordance with Federal, State, and local requirements:     Excavation and disposal at a permitted, off‐site facility;   On‐site remediation, if necessary, or   Other MMs as deemed appropriate by the County.    MM 4.5‐2c Prior to the issuance of a grading or building permit, a Certified Environmental Professional shall  confirm the presence or absence of asbestos‐containing materials (ACMs) and lead‐based paint  (LBPs) prior to structural demolition/renovation activities. Should ACMs or LBPs be present,  demolition materials containing ACMs and/or LBPs shall be removed and disposed of at an  appropriate permitted facility.    MM 4.5‐2d In the event any electrical transformers require relocation as a result of future development  associated with the project, the relocation shall be conducted under the purview of the local  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐36  electricity purveyor to identify property‐handling procedures regarding potential polychlorinated  biphenyls (PCBs).    Note:  The City determined that the following SWIP SP PEIR MMs do not apply to the Project or have been satisfied  as part of the City’s review of the Project’s proposed entitlement applications: MMs 4.5‐1a, 4.5‐1b, 4.5‐1d were  addressed during City review; MM 4.5‐2a was addressed by the Phase I & Phase II ESAs that were prepared for  the Project; MMs 4.5‐2e and 4.5‐2f are not applicable to the Project due to the Project Site’s location.    b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and  accident conditions involving the release of hazardous materials into the environment?  SWIP SP PEIR Finding:   Short‐Term Construction Activities  The SWIP SP PEIR determined that the existing structures within the SWIP SP area likely contain LBP, ACMs, and/or  other contaminants, and therefore demolition of the buildings would potentially create a significant hazard to the  public or the environment through reasonably foreseeable upset and accident conditions involving the release of  hazardous materials into the environment, which presents a potentially significant impact.  The SWIP SP PEIR  concluded that compliance with SWIP SP PEIR MM 4.5‐2c requiring an ACM/LBP survey and any necessary  abatement be conducted prior to issuance of grading and/or building permits, as well as compliance with SCAQMD  Rule 1403, would reduce potential impacts associated with demolition to the existing buildings to a less‐than‐ significant level.    The SWIP SP PEIR also determined that grading and excavation for future development within the SWIP SP area  could expose construction workers and the public to unidentified hazardous substances present in the soil or  groundwater associated with the I‐10 freeway, Union Pacific Railroad alignment, and unidentified underground  storage tanks (USTs).  The SWIP SP PEIR included MMs to ensure that future development projects evaluate  potential, site‐specific hazardous conditions and implement remediation programs, as needed, to ensure that  development activities within the SWIP SP area would not increase the potential for accident conditions that could  result in the release of hazardous materials into the environment (i.e., MM 4.5‐2a, 4.5‐2b, 4.5‐2d‐4.5‐2f).  The  SWIP SP PEIR concluded that compliance with the required MMs and applicable regulatory requirements would  reduce potential construction‐related impacts to a level below significance.    Long‐Term Operational Activities  The SWIP SP PEIR determined that the operation of future development associated with the SWIP SP could create  a significant hazard to the public or the environment through reasonably foreseeable upset and accident  conditions involving the release of hazardous materials into the environment.  The SWIP SP PEIR disclosed that  typical incidents associated with operations of typical commercial and industrial development projects that could  result in accidental release of hazardous materials include leaking storage tanks, spills during transport,  inappropriate storage, inappropriate use, and/or natural disasters.  The SWIP SP PEIR concluded that compliance  with mandatory regulations and SWIP SP PEIR MM 4.5‐1a through 4.5‐1d, which prohibit the siting of facilities  that handle hazardous materials near sensitive receptors (i.e., schools, childcare facilities and senior centers) and  the transportation of hazardous materials near sensitive receptors, and requires businesses that handle hazardous  materials to submit hazardous materials inventories to the San Bernardino County Fire Department would ensure  that operational impacts are less than significant.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐37  Analysis of Project: As discussed above under the preceding response, if hazardous materials are used or stored  on the Project Site under near‐term construction or long‐term operational activities, the Project would be required  to comply with applicable federal, State, and local regulations and MMs from the SWIP SP EIR to ensure the safe  handling of hazardous materials. Mandatory compliance with these regulations and MMs would ensure that, if an  accident involving hazardous materials occurs on‐site, it would be treated appropriately to avoid a significant  hazard to the public or the environment.  With mandatory compliance with applicable hazardous materials  regulations and implementation of the applicable SWIP SP EIR MMs related to hazardous materials that are  discussed herein, the Project would not create a significant hazard to the public or the environment in the event  an accident on‐site results in the release of hazardous materials.  The SWIP SP PEIR assumed the Project Site would  be fully developed.  Implementation of the Project would not result in any new impacts or more severe impacts  related to hazardous materials than previously disclosed in the SWIP SP PEIR.      Mitigation: No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to mitigate  hazards and hazardous materials impacts continue to apply to the Project, as listed above.  Refer to the MMRP  for the SWIP SP PEIR, attached hereto as Appendix A.    Note:  The City determined that the following SWIP SP PEIR MMs do not apply to the Project or have been satisfied  as part of the City’s review of the Project’s proposed entitlement applications: MMs 4.5‐1a, 4.5‐1b, 4.5‐1d were  addressed during City review; MM 4.5‐2a was addressed by the Phase I & II ESAs prepared for the Project; MMs  4.5‐2e and 4.5‐2f are not applicable to the Project due to the Project Site’s location.    c. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste  within one‐quarter mile of an existing or proposed school?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that there are four (4) schools located either inside or within  one‐quarter mile of the SWIP SP boundaries and that hazardous emissions or the handling of hazardous materials  or substances would occur within one‐quarter mile of an existing or proposed school.  The SWIP SP PEIR concluded  that compliance with standard regulatory requirements and MMs from the SWIP SP PEIR would ensure that  impacts associated with construction and operation of the SWIP SP are less than significant.    Analysis of Project: There are no schools within one quarter of a mile of the Project Site.  The closest school to  the Project Site is Henry J. Kaiser High School, which is approximately 0.27‐mile southeast from the Project Site.   As such, the Project would not emit hazardous emission or handle hazardous or acutely hazardous materials,  substances, or waste within one‐quarter mile of an existing or proposed school.  Nonetheless, the Project would  comply with standard regulatory requirements and MMs from the SWIP SP PEIR to ensure safe handling of  hazardous materials, substances, or waste (as described in previous responses).  Implementation of the Project  would not result in any new impacts or more severe significant impacts related to hazardous materials than  previously disclosed in the SWIP SP PEIR.      d. Be located on a site which is included on a list of hazardous materials sites compiled pursuant to  Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the  environment?  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐38  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that there are various hazardous material sites listed on federal,  State, and local records databases located within the SWIP SP area.  As previously discussed under the analysis for  Items “a” and “b,” above, the SWIP SP PEIR included mitigation that requires future development projects within  the SWIP SP area to conduct site‐specific investigations (i.e., Phase I ESAs) and perform remedial activities, as  necessary, prior to construction to correct any identified environmental conditions (SWIP SP PEIR MM 4.5‐2a and  4.5‐2b, respectively).  The SWIP SP PEIR concluded that with the required mitigation, impacts would be reduced  to a level below significance.    Analysis of Project:  Government Code Section 65962.5 requires DTSC, the State Department of Health Services,  State Water Resources Control Board, and the State Department of Resources Recycling and Recovery to maintain  a list of hazardous materials sites that fall within specific, defined categories.  According to the records search  conducted by V3, the Project Site was listed in 13 environmental databases; these listings show that the Project  Site generated small amounts of hazardous waste but do not identify the Project Site as having an undocumented  release (V3, 2021a, pp. 9‐13).  Although the Project Site is listed on 13 environmental/hazardous materials  databases, none of the databases where the Project Site is listed fall within the categories regulated by  Government Code Section 65962.5.  Implementation of the Project would not result in any new impacts or more  severe significant impacts related to hazardous materials than previously disclosed in the SWIP SP PEIR.      e. For a project located within an airport land use plan or, where such a plan has not been adopted, within  two miles of a public airport or public use airport, would the project result in a safety hazard or excessive  noise for people residing or working in the project area?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that the Ontario Airport is located approximately three miles  west of the SWIP SP Area and that the southwestern portion of the SWIP SP area is located within the Ontario  Airport’s “Airport Influence Area.”  The SWIP SP PEIR determined that development within the SWIP SP area would  consist of industrial, commercial, and office development and would not result in a safety hazard for people  working in the SWIP SP area.  Accordingly, the SWIP SP PEIR concluded that a less‐than‐significant impact would  occur.    Analysis of Project: The Project Site is located within the “Airport Influence Area” (AIA) for the Ontario Airport.   However, the Project Site is not located in any of the Ontario Airport’s safety or noise impact zones, and the height  of the Project’s buildings would be consistent with the applicable airspace protection zones in the Project area.  (City of Ontario, 2011, Map 2‐1)  Therefore, development of the Project would neither introduce a hazard to the  Ontario Airport nor would the Ontario Airport pose a hazard to future employees on the Project Site.   Implementation of the Project would not result in any new impacts or more severe significant impacts related to  air travel than previously disclosed in the SWIP SP PEIR.      f. Impair implementation of or physically interfere with an adopted emergency response plan or emergency  evacuation plan?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that construction activities associated with future development  could temporarily impact traffic on streets that would serve as evacuation routes due to roadway improvements  and extension of construction activities into the rights‐of‐way.  The SWIP SP PEIR included MMs 4.5‐6a and 4.5‐ 6b, which require the implementation of a traffic control plan during construction of future development projects  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐39  within the SWIP SP area and, also, require coordination between the City of Fontana Engineering Department and  City of Fontana Police Department to ensure adequate access for emergency vehicles during the construction of  future development projects within the SWIP SP area.  The SWIP SP PEIR concluded that with implementation of  the recommended mitigation, future construction activities related to the SWIP SP would result in less‐than‐ significant impacts with regard to emergency access.  Additionally, the SWIP SP PEIR disclosed that all future  development would be required to provide sufficient emergency access, as required by the City’s Zoning Code.   Accordingly, the SWIP SP PEIR concluded that compliance with regulatory requirements would ensure the  operational impacts of the SWIP SP would be less than significant with regard to emergency access.    Analysis of Project: The Project Site does not have any emergency facilities nor is it identified as an emergency  evacuation route by any emergency response plans or emergency evacuation plans (City of Fontana, 2018a)   During construction and at Project build out, adequate emergency vehicle access would be required to be always  maintained.  As part of the City’s discretionary review process, the City reviewed the Project’s plans and found  that appropriate emergency ingress and egress is available to and from the site to ensure public safety, and that  the Project would not substantially impede emergency response times in the local area.  Furthermore, the Project  would be required to ensure adequate access for emergency vehicles is maintained throughout the Project’s  construction activities pursuant to SWIP SP PEIR MM 4.5‐6a; mandatory compliance with this MM would ensure  the Project’s impacts regarding interference with the City’s emergency response plan and evacuation routes  would be less than significant.  Implementation of the Project would not result in any new impacts or more severe  impacts related to emergency response plans than previously disclosed in the SWIP SP PEIR.      Mitigation:  No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to mitigate  hazards and hazardous materials impacts – as presented below – continue to apply to the Project.  Refer to the  MMRP for the SWIP SP PEIR, attached hereto as Appendix A.    MM 4.5‐6a Prior to the issuance of grading permits, future developers shall prepare a Traffic Control Plan for  implementation during the construction phase. The Plan may include the following provisions,  among others:     At least one unobstructed lane shall be maintained in both directions on surrounding  roadways.   At any time only a single lane is available, the developer shall provide a temporary traffic  signal, signal carriers (i.e., flagpersons), or other appropriate traffic controls to allow travel in  both directions.   If construction activities require the complete closure of a roadway segment, the developer  shall provide appropriate signage indicating detours/alternative routes.    MM 4.5‐6b Prior to construction, the City of Fontana Engineering Department shall consult with the City of  Fontana Police Department to disclose temporary closures and alternative travel routes, in order  to ensure adequate access for emergency vehicles when construction of future projects would  result in temporary lane or roadway closures.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐40  g. Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving  wildland fires?   SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP is located in an urbanized area, and no  wildlands exist in the vicinity of the SWIP SP area.  The SWIP SP PEIR concluded that no impact related to wildland  hazards would occur.    Analysis of Project: The Project Site is in an urbanized area and is not located adjacent to wildlands (Google Earth  Pro, 2022).  The SWIP SP PEIR assumed the Project Site would be fully developed.  Therefore, the Project would  not expose people or structures, either directly or indirectly to a significant risk of loss, injury, or death involving  wildland fires.  Implementation of the Project would not result in any new impacts or more severe significant  impacts related to wildland fires than previously disclosed in the SWIP SP PEIR.      4.10 Hydrology and Water Quality  A Preliminary Water Quality Management Plan (WQMP) (dated January 27, 2022, revised May 24, 2022) (JLC,  2022a) and Preliminary Hydrology Report (dated January 28, 2022, revised May 24, 2022) (JLC, 2022b) were  prepared for the Project by JLC Engineering & Consulting, Inc. (JLC).  The purpose of the Preliminary WQMP is to  help identify pollutants of concern, establish the BMP for the Project to minimize the release of pollutants of  concern, and establish long term maintenance responsibilities for the Project’s water quality features.  The  Preliminary Hydrology Report identifies drainage patterns and off‐site flow tributary to the Project Site and  evaluates post‐development runoff conditions.  The hydraulic calculations are intended to be used to design the  Project’s storm drain system.  These reports are included as Appendices L and M, respectively, to this EIR  Addendum and their findings are incorporated into the analysis presented herein.    Would the Project:    a. Violate any water quality standards or waste discharge requirements or otherwise substantially degrade  surface or ground water quality?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that development of the SWIP SP could adversely affect  water quality through the discharge of various waterborne pollutants.  The SWIP SP PEIR concluded that future  development projects within the SWIP SP would be required to comply with National Pollutant Discharge  Elimination System (NPDES) regulations and implement Best Management Practices (BMPs) to reduce water  pollution from urban runoff.  The SWIP SP PEIR concluded that with adherence to existing State water quality  requirements, impacts to water quality would be less than significant.    Analysis of Project: As demonstrated in the analysis below, the Project would not violate any water quality  standards or waste discharge requirements.  The Project would not result in any significant impacts that were not  disclosed in the SWIP SP PEIR or increase the severity of any significant impacts identified in the SWIP SP PEIR.    Construction Activities  Construction of the Project would involve clearing and demolition, grading, paving, utility installation, building  construction, and landscaping activities.  Construction activities would result in the generation of potential water  quality pollutants such as silt, debris, and construction chemicals (such as paints and solvents), and other  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐41  chemicals with the potential to adversely affect water quality (should these materials come into contact with  water that reaches the groundwater table or flows off‐site).      Pursuant to the requirements of the Santa Ana RWQCB and Fontana Municipal Code Section 5‐14 & Chapter 23,  Article IX, the Project Applicant would be required to obtain coverage under the State’s General Construction  Storm Water Permit for construction activities (NPDES permit).  The NPDES permit is required for all development  projects that include construction activities, such as clearing, grading, and/or excavation, which disturb at least  one (1) acre of total land area.  In addition, the Project Applicant would be required to comply with the Santa Ana  RWQCB’s Santa Ana River Basin Water Quality Control Program.  Compliance with the NPDES permit and the Santa  Ana River Basin Water Quality Control Program involves the preparation and implementation of a SWPPP for  construction‐related activities.  The SWPPP will specify the BMPs that the Project’s construction contractors would  be required to implement during construction activities to ensure that potential pollutants of concern are  prevented, minimized, and/or otherwise appropriately treated prior to being discharged from the subject  property.  Examples of BMPs that may be utilized during construction include, but are not limited to sandbag  barriers, geotextiles, storm drain inlet protection, sediment traps, rip rap soil stabilizers, and hydro‐seeding.  Mandatory compliance with the SWPPP would ensure that the Project does not violate any water quality  standards or waste discharge requirements during construction activities.    Operational Activities  To meet the requirements of the City’s Municipal Storm Water Permit – and in accordance with Fontana Municipal  Code Chapter 23, Article IX – the Project Applicant would be required to prepare and implement a WQMP.  A  WQMP is a site‐specific post‐construction water quality management program designed to minimize the release  of potential waterborne pollutants, including pollutants of concern for downstream receiving waters, under long‐ term conditions via BMPs.  Implementation of the WQMP ensures on‐going, long‐term protection of the  watershed basin.  The Project’s Preliminary WQMP is included as Appendix L to this EIR Addendum.  As identified  in the Preliminary WQMP, the Project is designed to include structural source control BMPs consisting of catch  basins, and an underground infiltration basin, as well as operational source control BMPs (including but not limited  to: activity restrictions, landscape management BMPs, employee training, catch basin inspection program) to  minimize, prevent, and/or otherwise appropriately treat stormwater runoff flows before they are discharged into  the City’s storm drain system (JLC, 2022a, pp. 4‐2 ‐ 4‐5).  Compliance with the Preliminary WQMP would be  required as a condition of approval for the Project.  Long‐term maintenance of on‐site water quality features also  would be required as a condition of approval to ensure the long‐term effectiveness of all on‐site water quality  features.    Additionally, the NPDES program requires certain land uses, including certain industrial land uses, to prepare a  SWPPP for operational activities and to implement a long‐term water quality sampling and monitoring program,  unless an exemption has been granted (Industrial General Permit).  Under this currently effective NPDES Industrial  General Permit, the Project would be required to prepare a SWPPP for operational activities and implement a  long‐term water quality sampling and monitoring program or receive an exemption.  Because the permit is  dependent upon a detailed accounting of all operational activities and procedures, and the Project’s building users  and their operational characteristics are not currently known, details of the operational SWPPP (including BMPs)  or potential exemption to the SWPPP operational activities requirement cannot be determined with certainty at  this time.  However, based on the performance requirements of the NPDES Industrial General Permit, the Project’s  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐42  mandatory compliance with all applicable water quality regulations would further reduce potential water quality  impacts during long‐term operation.      Based on the foregoing analysis, the Project would not violate any water quality standards or waste discharge  requirements or otherwise substantially degrade surface or ground water quality during long‐term operation.  Implementation of the Project would not result in any new or more severe significant impacts related to water  quality than previously disclosed in the SWIP SP PEIR.    b. Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such  that the project may impede sustainable groundwater management of the basin?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the majority of the SWIP SP area is developed and  urbanized and, therefore, that implementation of the SWIP SP would not introduce substantial new impervious  surfaces to the SWIP SP area.  The SWIP SP PEIR also disclosed that no groundwater extraction would occur as  part of the SWIP SP.  Accordingly, the SWIP SP PEIR concluded that implementation of the SWIP SP would result  in less‐than‐significant impacts related to depletion of groundwater supplies or interference with groundwater  recharge.    Analysis of Project: The Project would be required to connect to the City of Fontana’s municipal water system;  therefore, no water wells would be constructed on the Project Site and Project operations would not directly draw  from groundwater supplies.  The Project Site is underlain by the Chino Groundwater Basin.  Most of the  groundwater recharge in the Chino Groundwater Basin occurs within percolation basins located mostly in the  northern and western portions of the Basin (and north and west of the City of Fontana) (CBWCD, 2022). The  Project would not physically impact any of the major groundwater recharge facilities in the Basin.  The Project  includes design features that would maximize the percolation of on‐site storm water runoff into the groundwater  basin, such as the proposed underground infiltration basin and permeable landscape areas.  Accordingly, buildout  of the Project with these design features would not interfere substantially with groundwater recharge or impede  sustainable groundwater management of the Chino Groundwater Basin.  Implementation of the Project would  not result in any new impacts or more severe significant impacts related to groundwater supplies and  management than previously disclosed in the SWIP SP PEIR.      c. Substantially alter the existing drainage pattern of area, including through the alteration of the course of  a stream or river or through the addition of impervious surfaces, in a manner which would:  i.  result in substantial erosion or siltation on‐ or off‐site?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that the SWIP SP area is located within an urbanized area that  is served by existing stormwater drainage facilities operated by the City of Fontana and the County of San  Bernardino.  The SWIP SP PEIR concluded that the drainage infrastructure proposed by the SWIP SP would  adequately serve future development within the SWIP SP area and would minimize impacts related to erosion or  siltation, resulting in less‐than‐significant impacts regarding erosion or siltation.    Analysis of Project: As previously discussed in Subsection 4.7 (refer to response to Item “b”), implementation of  the Project would not result in substantial soil erosion or the loss of topsoil.  Implementation of the Project would  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐43  not result in any new or more severe significant impacts related to soil erosion or siltation than previously  disclosed in the SWIP SP PEIR.      ii. Substantially increase the rate or amount of surface run off in a manner which would result in  flooding on‐ or off‐site?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that implementation of the SWIP SP would not result in a  substantial increase in surface runoff and would result in less‐than‐significant impacts related to flooding.    Analysis of Project: The Project would develop a commerce center on the Project Site in accordance with the  SWIP SP land plan. Therefore, the site development activities proposed by the Project (and the resulting surface  runoff flows) were planned by the SWIP SP (and its storm drain master plan) and anticipated by the SWIP SP PEIR,  which assumed the entire Project Site would be developed.  According to the Project’s Preliminary Hydrology  Report, the Project would be required to reduce peak stormwater discharge to no more than 90 percent of peak  existing conditions and the existing Banana Avenue storm drain is appropriately sized to convey flows from the  Project Site under developed conditions (industrial land use) (JLC, 2022b, p. 3). Therefore, implementation of the  Project would not substantially increase the rate or amount of surface runoff in a manner that would result in  flooding on‐ or off‐site.  Implementation of the Project would not result in any new or more severe significant  impacts related to flooding on‐ or off‐site than previously disclosed in the SWIP SP PEIR.      iii. Create or contribute runoff water which would exceed the capacity of existing or planned  stormwater drainage systems or provide substantial additional sources of polluted runoff?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that implementation of the SWIP SP would require the  installation of drainage infrastructure improvements; but that existing and planned stormwater drainage systems  would have adequate capacity to convey surface runoff flows from the SWIP SP area.  The SWIP SP PEIR also  concluded that the SWIP SP would not generate substantial, additional sources of polluted runoff.    Analysis of Project: As discussed in the response to Item “a,” above, the Project will be required to comply with a  SWPPP and a site‐specific WQMP, which will identify BMPs that are required to ensure that near‐term  construction activities and long‐term post‐development activities would not result in substantial amounts of  polluted runoff.  The Project proposes to redevelop the Project Site with a land use with the same impervious area  as existing conditions; thus, the Project would generate stormwater runoff that neither exceeds existing runoff  discharges from the Project Site nor the capacity of existing and planned master planned storm drain facilities  (JLC, 2022b, p. 3).  Implementation of the Project would not result in any new or more severe significant impacts  related to existing or planned stormwater drainage systems than previously disclosed in the SWIP SP PEIR.      iv. Impede or redirect flood flow?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that although portions of the SWIP SP area would be located  within the 100‐year base flood plain, the SWIP SP area is already developed with urbanized uses, and future  development of structures within the SWIP SP area would not occur within an existing floodway or otherwise  impede or redirect flood flows.  Therefore, the SWIP SP PEIR concluded that the SWIP SP would result in a less‐ than‐significant impact.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐44  Analysis of Project: According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map  (FIRM) No. 06071C8665H, the Project Site and surrounding area are within FEMA Zone X (unshaded), which is  identified as an area of minimal flooding (FEMA, 2008) .  Accordingly, the Project would not place structures within  a 100‐year flood hazard area that could impede or redirect flood flows, which the same area that the SWIP SP  PEIR assumed would be developed with structures.  Implementation of the Project would not result in any new or  more severe significant impacts related to flood flows than previously disclosed in the SWIP SP PEIR.      d. In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP area is not located near a major dam or  within a dam inundation area.  Additionally, the SWIP SP PEIR did not identify any significant effects within the  SWIP SP area related to inundation by seiche, tsunami, or mudflow.      Analysis of Project: The Pacific Ocean is located over 42 miles southwest of the Project Site; consequently, there  is no potential for the Project Site to be impacted by a tsunami as tsunamis typically only reach up to a few miles  inland.  The Project Site is not subject to flooding hazards associated with a seiche as the nearest large body of  surface water (Prado Reservoir) is located approximately more than 10 miles southwest of the Project Site. Due  to distance, the Project would not be affected by inundation caused by a seiche.  Furthermore, as noted in the  City of Fontana General Plan EIR on Figure 4‐2, Dam Inundation Areas in Fontana, the Project Site is not located  within any mapped dam inundation area, which the same area that the SWIP SP PEIR assumed would be developed  with structures (City of Fontana, 2018b).  Implementation of the Project would not result in any new or more  severe significant impacts related to inundation than previously disclosed in the SWIP SP PEIR.      e. Conflict with or obstruct implementation of water quality control plan or sustainable groundwater  management plan?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that future development within the SWIP SP area would be  required to adhere to State water quality requirements and would not result in substantial adverse water quality  effects.  Although the SWIP SP PEIR did not specifically address the potential for the SWIP SP PEIR to conflict with  or obstruct implementation of a sustainable groundwater management plan, the PEIR did address the potential  for the SWIP SP to deplete groundwater supplies or interfere with groundwater recharge (and concluded that  such impacts would be less than significant).    Analysis of Project: As discussed in the response to Item “a,” above, the Project Site is located within the Santa  Ana River Basin and Project‐related construction and operational activities would be required to comply with the  Santa Ana RWQCB’s Santa Ana River Basin Water Quality Control Plan by preparing and adhering to a SWPPP and  WQMP.  Implementation of the Project would not conflict with or obstruct the Santa Ana River Basin Water  Quality Control Plan.      The Project Site is located within the Chino Groundwater Basin, which is an adjudicated groundwater basin.   Adjudicated basins, like the Chino Groundwater Basin, are exempt from the 2014 Sustainable Groundwater  Management Act (SGMA) because such basins already operate under a court‐ordered management plan to ensure  their long‐term sustainability.  It should be noted that the Project includes an underground infiltration basin, which  is anticipated to help recharge the basin.  No component of the Project would obstruct with or prevent  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐45  implementation of the management plan for the Chino Groundwater Basin.  As such, the Project’s construction  and operation would not conflict with any sustainable groundwater management plan.      Based on the foregoing information, implementation of the Project would not result in any new or more severe  significant impacts related to the implementation of water quality control plans or sustainable groundwater  management plans than previously disclosed in the SWIP SP PEIR.      4.11 Land Use and Planning  Would the Project:    a. Physically divide an established community?  SWIP SP PEIR Finding: The SWIP SP PEIR determined the SWIP SP would not divide an established community, as  it would implement a range of industrial, commercial, public, and residential land uses similar to the land uses  that already existed within the SWIP SP boundaries.  Additionally, the SWIP SP PEIR determined that existing  development within the SWIP SP area was already divided by the existing local roadway network, and the SWIP  SP would not create additional physical barriers between these land uses.  Therefore, the SWIP SP PEIR concluded  impacts in this regard would be less than significant.    Analysis of Project: The Project would implement the land use plan for the SWIP SP.  While there are legal non‐ conforming residences scattered on non‐contiguous properties adjacent to and throughout the vicinity of the  Project Site, the Project would not divide an established community, nor would the Project prevent or obstruct  access to an established community.  Implementation of the Project would not result in any new or more severe  significant impacts related to physically dividing an established community than previously disclosed in the SWIP  SP PEIR.      b. Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation  adopted for the purpose of avoiding or mitigating an environmental effect?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP would not directly conflict with the policy  or regulations adopted for the purpose of avoiding or mitigating an environmental effect, including the City’s  General Plan and Zoning and Development Code.  Accordingly, the SWIP SP PEIR concluded that the SWIP SP would  result in a less‐than‐significant impact.    Analysis of Project: The Project Site would be developed in accordance with the land use regulations and  development standards contained within the SWIP SP; therefore, the development activities proposed by the  Project were anticipated by the SWIP SP PEIR, and in fact, the Project would implement the vision of the SWIP SP,  making the Project Site more much consistent with applicable land use policies, plans and regulations that existing  uses.  As noted above, the SWIP SP PEIR concluded that implementation of the SWIP SP would not conflict with  any land use policies or regulations adopted for the purpose of mitigating or avoiding an environmental impact.   Thus, because the Project is consistent with the SWIP SP and because the SWIP SP was previously found to not  conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an  environmental effect, implementation of the Project would not cause a significant environmental impact due to  a land use planning conflict.  Implementation of the Project would not result in any new or more severe significant  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐46  impacts related to conflicts with a land use plan, policy, or regulation than previously disclosed in the SWIP SP  PEIR.       4.12 Mineral Resources  Would the Project:    a. Result in the loss of availability of a known mineral resource that would be of value to the region and the  residents of the state?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that according to the City’s General Plan, no known deposits  of precious gemstones, ores, or unique, or rare minerals have been identified within the vicinity of the SWIP SP  area.  Thus, no impact would occur in this regard.    Analysis of Project: The Project Site is located within the mineral resource zone 3 (MRZ‐3), which is classified as  an area where the significance of mineral deposits cannot be determined from available data (DOC, 1984).  As  such, the Project Site does not contain a “known mineral resource.”  Additionally, the Project Site is not zoned for  mining. The Project, which would develop an area that the SWIP SP PEIR assumed would be developed, would not  result in the loss of availability of a known mineral resource that would be of value to the region and the residents  of the state.  Implementation of the Project would not result in any new or more severe significant impacts related  to mineral resources than previously disclosed in the SWIP SP PEIR.      b. Result in the loss of availability of a locally‐important mineral resource recovery site delineated on a local  general plan, specific plan or other land use plan?  SWIP SP PEIR Finding: The SWIP SP PEIR did not identify any significant environmental effects within the SWIP SP  area related to the loss of availability of a locally‐important mineral resource recovery site delineated on a local  general plan, specific plan or other land use plan.  The SWIP SP PEIR concluded that no impact would occur.    Analysis of Project:  The Project Site is not located in an area that the City’s General Plan or the SWIP SP have  identified as being of local importance for mineral resources.  Accordingly, implementation of the Project would  not result in the loss of availability of a locally‐important mineral resource recovery site delineated on a local  general plan, specific plan, or other land use plan.  Implementation of the Project would not result in any new  impacts or more severe impacts related to the loss of availability of a locally‐important mineral resource recovery  site than previously disclosed in the SWIP SP PEIR.      4.13 Noise  A Noise Impact Analysis (dated February 18, 2022) (Urban Crossroads, 2022e) was prepared for the Project by  Urban Crossroads to evaluate Project‐related long‐term operational and short‐term construction noise impacts.   This report is included as Appendix N to this EIR Addendum, and its findings are incorporated into the analysis  presented herein.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐47  Would the Project result in:    a. Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the  project in excess of standards established in the local general plan or noise ordinance, or applicable  standards of other agencies?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that although the construction of future development and  improvements in the SWIP SP Area would be required to adhere to the hours permitted by the City’s Municipal  Code (between 7:00 a.m. and 6:00 p.m. on weekdays and between 8:00 a.m. and 5:00 p.m. on Saturdays), due to  the proximity of residential and institutional uses to the SWIP SP area, such construction could result in temporary,  localized increases in noise levels and vibration that may exceed established standards.  As such, the SWIP SP PEIR  included mitigation to minimize potential adverse effects to sensitive receptors (SWIP SP PEIR MMs 4.7‐1a and  4.7‐1b).  The SWIP SP PEIR concluded that compliance with the City’s permitted hours of construction and  implementation of SWIP SP PEIR MMs 4.7‐1a and 4.7‐1b would ensure construction‐related noise levels do not  exceed regulatory standards, and impacts would be less than significant.    The SWIP SP PEIR determined that future development in the SWIP SP area could, potentially, result in a  permanent exposure of sensitive receptors to ambient noise from stationary sources that exceeds established  standards.  The SWIP SP PEIR included MM 4.7‐2a, which requires industrial facilities in proximity to existing  sensitive receptor land uses to implement design MMs such as noise walls and berms to minimize operational  noise levels.  Additionally, the SWIP SP includes design guidelines and development standards that are aimed at  reducing noise impacts, including building orientation, wall placement, lot dimensions, maximum intensity,  outdoor storage, setbacks, buffers, edge conditions, and landscaping that would serve to minimize noise impacts  on sensitive land uses in the vicinity.  The SWIP SP PEIR concluded that with implementation of the SWIP SP design  guidelines and development standards and implementation of mitigation, the SWIP SP would result in less‐than‐ significant stationary source noise impacts.    The SWIP SP PEIR determined that future development in the SWIP SP area could result in a permanent increase  in ambient noise levels from mobile sources (vehicular traffic and rail) in excess of established standards.  The  SWIP SP PEIR concluded that future mobile noise source impacts from buildout of the SWIP SP would be significant  and unavoidable.    Analysis of Project: The analysis below summarizes the potential for Project‐related activities to generate or  expose sensitive receptors to noise levels in excess of applicable standards during temporary construction  activities and/or long‐term operation.  As demonstrated in the analysis below, implementation of the Project  would not result in any new or increase the severity of previously identified significant impacts, as compared to  the analysis presented in the SWIP SP PEIR.  Refer to the Project’s Noise Impact Analysis (see Appendix N) for a  detailed discussion of the methodologies and assumptions used to calculate the Project’s construction and  operational noise.    Construction Activities  The Project would generate short‐term noise during construction ranging between 46.4 and 69.5 decibels  equivalent sound level (dBA Leq) at sensitive receiver locations nearest the Project Site, which would not exceed  the City’s daytime noise standard of 70 dBA Leq (Urban Crossroads, 2022e, p. 37).  The Project would implement  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐48  the land uses planned for the Project Site by the SWIP SP land use plan; therefore, the construction activities that  would occur on‐site would be similar to those anticipated by the SWIP SP PEIR, which disclosed that construction  within the SWIP SP area could expose sensitive receptors to high‐noise levels.  The Project would be required to  comply with SWIP SP PEIR MMs 4.7‐1a and 4.7‐1b, which requires the Project’s construction contractor to comply  with the permitted daytime hours of construction as defined in Section 18‐63 of the City’s Municipal Code and  with defined performance criteria to minimize noise emissions from the Project Site during construction.   Compliance with applicable mitigation from the SWIP SP PEIR and applicable standards from the City’s Municipal  Code would ensure that the Project’s construction activities.  Implementation of the Project would not result in  any new or more severe impacts from construction noise than previously disclosed in the SWIP SP PEIR.      Operational Activities – On‐Site Stationary Noise  The Project would generate long‐term stationary noise from routine outdoor activities (e.g., utilization of loading  docks) and the operation stationary mechanical equipment (e.g., building heating/cooling equipment).  The long‐ term stationary noise from Project operation during the day would range from 43.7 to 61.3 dBA Leq at nearby  receiver locations, and at night would range from 42.6 to 60.2 dBA Leq, which would not exceed the City’s standards  for residential uses of 70 dBA Leq (daytime) or 65 dBA Leq (nighttime), respectively (Urban Crossroads, 2022e, p.  32).  Additionally, the implementation of the Project would increase ambient noise levels by 0.0 to 1.4 dBA Leq  during daytime hours and by 0.1 to 2.3 dBA Leq during nighttime hours at the nearest receiver locations (Urban  Crossroads, 2022e, p. 34).  The Project‐related operational noise level increases would not exceed the significance  criteria used by the City (Urban Crossroads, 2022e, p. 34).  Accordingly, operation of the Project would not result  in the generation of a substantial permanent increase in ambient noise levels in the vicinity of the Project Site in  excess of the standards from the City of Fontana’s Noise Ordinance.  Implementation of the Project would not  result in any new or more severe significant impacts from on‐site stationary operational noise sources than  previously disclosed in the SWIP SP PEIR.      Operational Activities – Off‐Site Traffic Noise  The Project would implement the SWIP SP land use plan; therefore, the mobile‐source noise emissions (i.e., traffic  noise) produced by the Project were anticipated by the SWIP SP PEIR.  The Project’s proposed land uses would  generate fewer daily traffic trips than the land uses assumed by the SWIP SP PEIR (the Project’s daily traffic is  discussed in further detail in Subsection 4.17); therefore, the Project would reduce mobile‐source noise emissions  within the SWIP SP area relative to the levels disclosed in the SWIP SP PEIR but the mobile‐source noise reductions  afforded by the Project would not be sufficient to avoid the significant and unavoidable mobile‐source noise  impact, as identified in the SWIP SP PEIR.  Notwithstanding and based on the foregoing, the Project would not  result in any new or more severe significant impacts from mobile sources than the significant and unavoidable  impacts that were previously disclosed in the SWIP SP PEIR.      Mitigation:  No new or updated MMs are required.  All applicable MMs identified in the SWIP SP PEIR to reduce  noise impacts continue to apply to the Project, as listed below and in the MMRP for the SWIP SP PEIR (attached  hereto as Appendix A).    MM 4.7‐1a The following MMs shall be implemented when construction is to be conducted within 500 feet  of any sensitive structures or has the potential to disrupt classroom activities or religious  functions.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐49   The City shall restrict noise intensive construction activities to the days and hours specified  under Section 18‐63 of the City of Fontana Municipal Code. These days and hours shall also  apply any servicing of equipment and to the delivery of materials to or from the site.    All construction equipment shall be equipped with mufflers and sound control devices (e.g.,  intake silencers and noise shrouds) no less effective than those provided on the original  equipment and no equipment shall have an unmuffled exhaust.    The City shall require that the contractor maintain and tune‐up all construction equipment to  minimize noise emissions.   Stationary equipment shall be placed so as to maintain the greatest possible distance to the  sensitive use structures.    All equipment servicing shall be performed so as to maintain the greatest possible distance  to the sensitive use structures.   If construction noise does prove to be detrimental to the learning environment, the City shall  allow for a temporary waiver thereby allowing construction on Weekends and/or holidays in  those areas where this construction is to be performed in excess of 500 feet from any  residential structures.    The construction contractor shall provide an on‐site name and telephone number of a contact  person. Construction hours, allowable workdays, and the phone number of the job  superintendent shall be clearly posted at all construction entrances to allow for surrounding  owners and residents to contact the job superintendent. If the City or the job superintendent  receives a complaint, the superintendent shall investigate, take appropriate corrective action,  and report the action taken to the reporting party. In the event that construction noise is  intrusive to an educational process, the construction liaison will revise the construction  schedule to preserve the learning environment.    MM 4.7‐1b Should potential future development facilitated by the proposed project require offsite  import/export of fill material during construction, trucks shall utilize a route that is least disruptive  to sensitive receptors, preferable major roadways (Interstate 10, Interstate 15, State Route 60,  Sierra Avenue, Beech Avenue, Jurupa Avenue, and Slover Avenue).  Construction trucks should,  to the extent practical, avoid the weekday and Saturday a.m. and p.m. peak hours (7:00 a.m. to  9:00 a.m. and 4:00 p.m. to 6:00 p.m.)    Note:  The City of Fontana determined that the following SWIP SP PEIR MMs do not apply to the Project or have  been satisfied as part of the City’s review of the Project’s proposed entitlement applications; MMs 4.7‐2a and 4.7‐ 3b were satisfied by the Noise Impact Analysis prepared for the Project; MM 4.7‐3a does not apply to the Project  due to the proposed land use for the Project and location of the Project Site.    b. Generation of excessive ground borne vibration or ground borne noise levels?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that construction activities associated with the SWIP SP could  potentially expose sensitive receptors to sporadic, high vibration levels.  However, the SWIP SP PEIR concluded  that with implementation of SWIP SP PEIR MMs 4.7‐1a and 4.7‐1b (previously described under Threshold “a”), the  SWIP SP would generate less‐than‐significant ground borne vibration or ground borne noise during construction  activities.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐50  Analysis of Project: During peak Project construction activities, the maximum vibration levels at the nearest  sensitive receptor would be 0.035 inches per second (in/sec) peak particle velocity (PPV) at the nearest receptor  (Urban Crossroads, 2022e, p. 42).  Based on the CalTrans Transportation and Construction Vibration Guidance  Manual threshold of 0.3 PPV in/sec, Project‐related construction activities would not produce excessive vibration  levels (Caltrans, 2020; Urban Crossroads, 2022e, p. 42).  During long‐term operation, vibration levels from truck  activity on the Project Site and along the public streets that abut the Project Site is anticipated to be similar to  existing conditions due to the substantial amount of truck activity that already occurs on the Project Site.   Accordingly, there is no potential for operation of the Project to expose persons to or generate excessive (i.e.,  significant) ground borne vibration or noise.  Implementation of the Project would not result in any new or more  severe significant impacts related to excessive ground borne vibration or noise levels than previously disclosed in  the SWIP SP PEIR.    c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a  plan has not been adopted, within two miles of a public airport or public use airport, would the project  expose people residing or working in the project area to excessive noise levels?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that people residing or working within the SWIP SP area  would not be exposed to excessive aircraft noise levels from operations at the Ontario International Airport  (located approximately 11 miles to the west of the SWIP SP area).  Therefore, the SWIP SP PEIR concluded that a  less‐than‐significant impact would occur.    Analysis of Project: The Project Site is within the Airport Influence Area (AIA) of the Airport Land Use Compatibility  Plan (ALUCP) for the Ontario International Airport (ONT) and is subject to the 60‐65 decibel community noise  equivalent level (dB CNEL) Noise Impact Zone.  According to Table 2‐3 of the ONT ALUCP, light industrial uses –  like the one proposed by the Project – are compatible within the 60‐65 dB CNEL noise contour (City of Ontario,  2011, Table 2‐3). Implementation of the Project would not result in any new or more severe significant impacts  related to noise from air travel than previously disclosed in the SWIP SP PEIR.      4.14 Population and Housing  Would the Project:    a. Induce substantial unplanned population growth in an area, either directly (for example, by proposing new  homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that the SWIP SP would be a growth‐inducing project due to  the following factors: development of infrastructure improvements that would provide additional capacity  necessary to support development within the SWIP SP area; the creation of 39,416 new employment positions  that would foster economic expansion and growth within the City of Fontana; and direct growth in the City’s  population due to the potential for future employees (and their families) to relocate to the City of Fontana.   Accordingly, the SWIP SP PEIR concluded the SWIP SP would result in a significant and unavoidable impact related  to growth inducement.    Analysis of Project: The Project does not include a residential component and, therefore, would not directly  induce population growth within the area.  The Project would create additional employment opportunities and  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐51  foster economic growth within the City which, could indirectly induce population growth in the area.  However,  the Project is merely implementing the approved SWIP SP land plan – which designates the Project Site for  industrial land uses – and development proposed by the Project was anticipated by the SWIP SP PEIR.  Accordingly,  the Project would not induce population growth in the SWIP SP area to a greater degree than previously disclosed  in the SWIP SP PEIR, but instead implements the predicted development analyzed therein.  Implementation of the  Project would not result in any new impacts or more severe impacts related to substantial unplanned population  growth than previously disclosed in the SWIP SP PEIR.      b. Displace substantial numbers of existing people or housing, necessitating the construction of replacement  housing elsewhere?  SWIP SP PEIR Finding: The SWIP SP PEIR determined the SWIP SP would not result in any direct impacts to existing  residences located within the SWIP SP area that would necessitate construction of replacement housing.  The  SWIP SP PEIR concluded impacts in this regard would be less than significant.    Analysis of Project:  There is one occupied dwelling unit and one vacant and abandoned dwelling unit on the  Project Site under existing conditions.  These residences were present at the time the SWIP SP PEIR was certified  in 2012 and the demolition of these units was included within the scope of the project evaluated by the SWIP SP  PEIR.  Implementation of the Project would not result in any new impacts or more severe impacts related to the  displacement of substantial numbers of existing people or housing than previously disclosed in the SWIP SP PEIR.      4.15 Public Services  Would the project result in substantial adverse physical impacts associated with the provision of new or physically  altered governmental facilities, need for new or physically altered governmental facilities, the construction of  which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times  or other performance objectives for any of the public services:    a. Fire Protection?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that future development associated with the SWIP SP would  increase the need for fire protection and emergency medical services within the SWIP SP area.  However, all future  development projects located within the SWIP SP area would be required to pay the City’s development impact  fee and the SWIP SP PEIR included MMs 4.8‐2a through 4.8‐2c that established performance goals for the City to  monitor to ensure that acceptable fire protection resources, service ratios, and response times are met.  The SWIP  SP PEIR concluded that with payment of development impact fees and implementation of the required mitigation,  the SWIP SP would result in less‐than‐significant impacts regarding fire protection services.    Analysis of Project: The Project Applicant would develop the Project Site in accordance with the SWIP SP land use  plan.  Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus,  the Project’s demand for fire protection services was anticipated by the SWIP SP PEIR.  The Project Applicant  would also be required to pay applicable development impact fees, as specified in the SWIP SP PEIR, to offset its  demand for fire protection services.  (The City uses a portion of collected development impact fees to fund fire  protection facilities.)  Implementation of the Project would not result in any new impacts or more severe impacts  related to fire protection services than previously disclosed in the SWIP SP PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐52  Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MMs 4.8‐2a through 4.8‐2c, which address  impacts to fire protection services, are policy‐level actions that fall under the City’s responsibility and do not  require any actions from private development projects.  No component of the Project would prevent or obstruct  the City’s implementation of SWIP SP PEIR MMs 4.8‐2a through 4.8‐2c.    b. Police Protection?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that future development associated with the SWIP SP would  increase the need for police protection services within the SWIP SP area.  However, all future development  projects located within the SWIP SP area would be required to pay the City’s development impact fee and the  SWIP SP PEIR included MMs 4.8‐1a through 4.8‐1i that established performance goals and identified community  outreach and involvement programs to ensure that acceptable police protection resources, service ratios, and  response times are met.  The SWIP SP PEIR concluded that with payment of development impact fees and  implementation of the required mitigation, the SWIP SP would result in less‐than‐significant impacts regarding  police protection services.    Analysis of Project: The Project would develop the Project Site in accordance with the SWIP SP land use plan.   Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus, the  Project’s demand for police protection services was anticipated by the SWIP SP PEIR.  The Project Applicant would  also be required to pay applicable development impact fees, as specified in the SWIP SP PEIR, to offset its demand  for police protection services.  (The City uses a portion of collected development impact fees to fund police  protection services/facilities.)  Implementation of the Project would not result in any new impacts or more severe  impacts related to police protection services than previously disclosed in the SWIP SP PEIR.      Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MMs 4.8‐1a through 4.8‐1i, which address  impacts to police protection services, are policy‐level actions that fall under the City’s responsibility and do not  require any actions from private development projects.  No component of the Project would prevent or obstruct  the City’s implementation of SWIP SP PEIR MMs 4.8‐1a through 4.8‐1i.    c. Schools?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that future development associated with the SWIP SP could  increase the demand for public school services.  However, all future development projects located within the SWIP  SP area would be required to pay the applicable school district development impact fee and the SWIP SP PEIR  included MM 4.8‐3a through 4.8‐3f to ensure that acceptable public‐school resources are available.  The SWIP SP  PEIR concluded that with payment of development impact fees and implementation of the required mitigation,  the SWIP SP would result in less‐than‐significant impacts regarding public school services.    Analysis of Project: The Project would develop the Project Site in accordance with the SWIP SP land use plan.   Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus, the  Project’s indirect demand for public school services was anticipated by the SWIP SP PEIR.  The Project Applicant  would be required to pay all applicable development impact fees, as required by State law, to offset its demand  for public school services.  Implementation of the Project would not result in any new impacts or more severe  impacts related to school facilities than previously disclosed in the SWIP SP PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐53  Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MMs 4.8‐3a through 4.8‐3f, which address  impacts to public schools, are policy‐level actions that fall under the City’s responsibility and do not require actions  from private development projects.  No component of the Project would prevent or obstruct the City’s  implementation of SWIP SP PEIR MMs 4.8‐3a through 4.8‐3f.    d. Parks?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that future development associated with the SWIP SP could  attract new residents to the City of Fontana that would increase the demand for parks and recreation facilities in  the City.  The SWIP SP does not propose any new neighborhood and community park facilities nor does the SWIP  SP propose any development that would directly contribute park development impact fees to the City (i.e.,  residential); therefore, existing recreational facilities within the City would be accessed by new residents indirectly  generated by the SWIP SP without the addition of new revenue sources to offset the potential deterioration of  such facilities.  The SWIP SP PEIR concluded that future park and recreational facility impacts resulting from future  development associated with the SWIP SP would be significant and unavoidable.  The SWIP SP PEIR included MMs  4.8‐5a through 4.8‐5g to ensure the City achieves park design requirements and parkland standards in other areas  of the City; nevertheless, the SWIP SP PEIR concluded that impacts would be significant and unavoidable after  mitigation.    Analysis of Project: The Project would develop the Project Site in accordance with the SWIP SP land use plan.   Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus, would  not create a demand for public park areas that was not previously anticipated by the SWIP SP PEIR.  (Although it  should be noted that, as a proposed industrial use, the Project is not anticipated to create a substantial demand  for public park facilities.)  Implementation of the Project would not result in any new impacts or more severe  impacts related to park facilities than the significant and unavoidable impacts previously disclosed in the SWIP SP  PEIR.      Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MMs 4.8‐5a through 4.8‐5g, which address  impacts to public parks, are policy‐level actions that fall under the City’s responsibility and do not require actions  from private development projects.  No component of the Project would prevent or obstruct the City’s  implementation of SWIP SP PEIR MMs 4.8‐5a through 4.8‐5g.    e. Other Public Facilities?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that future industrial, commercial, and office development  associated with the SWIP SP would create substantial employment opportunities within the SWIP SP area, which  could, in turn, lead to a population increase within the City and an associated increase in demand for library  facilities.  However, the SWIP SP PEIR determined that future development associated with the SWIP SP would  not significantly increase the demand for library services to the extent that would require construction of  additional library facilities.  Additionally, library facility impact fees would be imposed on future development  projects within the SWIP SP area that would fund improvements to the library system.  The SWIP SP PEIR also  included MM 4.8‐4a, which tasked the City with pursuing opportunities to expand library services.  The SWIP SP  PEIR concluded that with payment of library facility impact fees and implementation of mitigation, the SWIP SP  would result in less‐than‐significant impacts to library facilities.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐54  Analysis of Project: The Project Applicant would develop the Project Site in accordance with the SWIP SP land use  plan.  Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus,  would not create a demand for public library services that was not previously anticipated by the SWIP SP PEIR.   The Project Applicant would be required to pay all applicable development impact fees, as specified in the SWIP  SP PEIR, to offset its demand for public library services and ensure that impacts to public library services remain  less than significant. (The City uses a portion of collected development impact fees to fund public library facilities.)   Implementation of the Project would not result in any new impacts or more severe impacts related to other public  facilities than previously disclosed in the SWIP SP PEIR.      Mitigation:  No new or updated MMs are required.  SWIP SP PEIR MM 4.8‐4a, which addresses impacts to other  public services, is a policy‐level action that falls under the City’s responsibility and does not require actions from  private development projects.  No component of the Project would prevent or obstruct the City’s implementation  of SWIP SP PEIR MM 4.8‐4a.    4.16 Recreation  Would the Project:    a. Increase the use of existing neighborhood and regional parks or other recreational facilities such that  substantial physical deterioration of the facility would occur or be accelerated?  b. Include recreational facilities or require the construction or expansion of recreational facilities, which  might have an adverse physical effect on the environment?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that future development associated with the SWIP SP could  attract new residents to the City of Fontana that would increase the demand for parks and recreation facilities in  the City.  The SWIP SP does not propose any new neighborhood and community park facilities nor does the SWIP  SP propose any development that would directly contribute park development impact fees to the City (i.e.,  residential); therefore, existing recreational facilities within the City would be accessed by new residents indirectly  generated by the SWIP SP without the addition of new revenue sources to offset the potential deterioration of  such facilities.  The SWIP SP PEIR concluded that future park and recreational facility impacts resulting from future  development associated with the SWIP SP would be significant and unavoidable.  The SWIP SP PEIR included MMs  4.8‐5a through 4.8‐5g (which are policy‐level actions that fall under the City’s responsibility, as noted above) to  ensure the City achieves park design requirements and parkland standards in other areas of the City; nevertheless,  the SWIP SP PEIR concluded that impacts would be significant and unavoidable after mitigation.    Analysis of Project: The Project would develop the Project Site in accordance with the SWIP SP land use plan.   Accordingly, the development activities proposed by the Project were planned by the SWIP SP and, thus, the  Project’s indirect demand for parks was anticipated by the SWIP SP PEIR.  As a proposed commerce center, the  Project is not anticipated to create a substantial demand for public park facilities and is not anticipated to include  any action that would increase the availability of park land in the City.  Implementation of the Project would not  result in any new impacts or more severe impacts related to recreational facilities than previously disclosed in the  SWIP SP PEIR.      Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐55  4.17 Transportation  A Trip Generation Assessment (dated February 17, 2022) (Urban Crossroads, 2022f) was prepared for the Project  by Urban Crossroads to quantify the total daily and peak hour traffic expected during Project and to analyze the  Project’s consistency with the City’s VMT standards.  The Trip Generation Assessment is included as Appendix O  to this EIR Addendum and its findings are incorporated into the analysis presented herein.    Would the Project:    a. Conflict with an applicable plan, ordinance or policy addressing the circulation system, including transit,  roadway, bicycle, and pedestrian facilities?  SWIP SP PEIR Finding:  At the time the SWIP SP PEIR was certified, the Project Site was located within the JND of  SWIP SP.  The JND is divided into three subzones, JND West, JND Central, and JND East.  The Project Site is located  within the JND West subzone.  The SWIP SP provides for the development 3,348,781 sq. ft. of new development  within the JND West subzone.  According to the SWIP SP PEIR, buildout of the JND West would generate  approximately 29,278 new net daily traffic trips, including 4,214 net AM peak hour trips and 3,946 net PM peak  hour trips.  (Net traffic represents total traffic volumes after then‐existing traffic within the JND area was  subtracted from traffic volumes that were expected upon buildout of the JND pursuant to the SWIP SP).  The traffic  projections from the SWIP SP PEIR for the JND West subarea correlate to 8.74 net daily traffic trips, including 1.25  net AM peak hour trips and 1.18 PM peak hour trips, for every 1,000 s.f. of new industrial building area in the JND.      The SWIP SP PEIR disclosed that the addition of traffic from the SWIP SP would cause nine (9) roadway segments  and 19 deficient intersections within the study area to operate deficiently (“Existing with Project” traffic analysis  scenario).  However, the SWIP SP PEIR determined that upon implementation of SWIP SP PEIR MMs 4.9‐1a through  4.9‐1cc, which include a range of new roadway improvements, including roadway widenings, signalizations, and  intersection improvements, the study area intersections and roadway segments would operate at a satisfactory  level of service (LOS).  Notwithstanding, because the majority of the recommended improvements were either  unfunded ‐ or only partially funded ‐ at the time the SWIP SP was approved and several of the needed  improvements are situated outside of the City’s jurisdiction, the SWIP SP PEIR concluded the full implementation  of the needed improvements could not be assured and, therefore, impacts would be significant and unavoidable  in the short‐term.    The SWIP SP PEIR disclosed that, under long‐term conditions, the addition of trips from the SWIP SP would  contribute to deficient operations at 10 roadway segments and 19 intersections within the study area (“2030 with  Project” traffic analysis scenario).  However, the SWIP SP PEIR determined that upon implementation of SWIP SP  PEIR MMs 4.9‐1dd through 4.9‐1ll, which include a range of new roadway improvements, including roadway  widenings, signalizations, and intersection improvements, the study area intersections and roadway segments  would operate at a satisfactory LOS.  Notwithstanding, because the majority of the recommended improvements  were either unfunded ‐ or only partially funded ‐ at the time the SWIP SP was approved and several of the needed  improvements are situated outside of the City of Fontana’s jurisdiction, the SWIP SP PEIR concluded the full  implementation of the needed improvements could not be assured and therefore impacts would be significant  and unavoidable.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐56  Analysis of Project: At the time the SWIP SP PEIR was certified, the Project Site was located within the JND of  SWIP SP; as such, the analysis herein addresses the Project's impacts against the conditions that were existing at  the time the SWIP SP PEIR was certified. According to the Project’s Traffic Study and using trip generation rates  from the 11th Edition of the Institute of Traffic Engineers’ Trip Generation Manual, the Project is calculated to  generate 370 vehicle trips per day (334 passenger vehicles and 36 truck trips) (Urban Crossroads, 2022f, p. 4).   When converted to passenger car equivalent (PCE), which reports passenger cars and trucks as a single, weighted  metric, the Project is calculated to generate 424 trips per day with 51 trips during the AM peak hour and 48 trips  during the PM peak hour (ibid.).  For comparison, the Project would be expected to generate 766 PCE trips per  day, including 109 PCE AM peak hour and 103 PCE PM peak hour using the traffic generation factors from the  SWIP SP PEIR (Urban Crossroads, 2022f, p. 5). The Project would result in a net reduction of 342 two‐way PCE trips  (45 percent reduction) with 58 fewer PCE AM peak hour trips (53 percent reduction) and 55 fewer PCE PM peak  hour trips (53 percent reduction) as compared to the traffic levels assumed by the SWIP SP PEIR.  Because the  Project would result in a substantial reduction in total daily and peak hour traffic relative to the assumptions used  in the SWIP SP PEIR, implementation of the Project would neither result in new significant transportation impacts  that were not disclosed in the SWIP SP PEIR nor substantially increase the severity of the significant transportation  effects previously identified in the SWIP SP PEIR.  Although the Project would generate substantially less traffic  than assumed by the SWIP SP PEIR, the reduction in traffic would not avoid any of the significant and unavoidable  traffic impacts (i.e., level of service [LOS]) identified in the SWIP SP PEIR; LOS impacts are longer considered an  environmental impact under CEQA.      Mitigation: In accordance with Senate Bill (SB) 743, the California Natural Resources Agency (CNRA) adopted  changes to the CEQA Guidelines in December 2018 related to the evaluation of transportation impacts from  development projects. As of December 2018, when the revised CEQA Guidelines were adopted, automobile delay,  as measured by “level of service” (LOS) and other similar metrics, no longer constitutes a significant environmental  effect under CEQA. Accordingly, the following information is disclosed for informational purposes but does not  relate to an environmental impact or mitigation under CEQA.  Due to the relatively small volume of peak hour  traffic generated by the Project and the Project Site’s location (which does not abut any roadway facility identified  in the SWIP SP PEIR as requiring improvement), the City of Fontana Engineering Department determined the  Project was not responsible for directly implementing any of the transportation improvements identified in the  SWIP SP PEIR.  However, prior to the issuance of building permits, the Project Applicant would be required to pay  applicable development impact fees to the City of Fontana, from which the City would reserve a portion to fund  the design and construction roadway improvements that would improve traffic conditions within the City  generally and within the SWIP SP area specifically.  Additionally, as part of construction of the Project, the Project  Applicant would improve the segments of Rose Avenue and Banana Avenue abutting the Project Site’s frontage,  thereby implementing the SWIP SP Circulation Master Plan and improving local vehicular and non‐vehicular  circulation.    b. Conflict or be inconsistent with CEQA Guidelines section 15064.3 or will conflict with an applicable  congestion management program, including, but not limited to, level of service standards and travel  demand MMs, or other standards established by the county congestion management agency for  designated roads or highways?  SWIP SP PEIR Finding: The topic of vehicle miles traveled (VMT) was not specifically addressed in the SWIP SP PEIR  as this threshold of significance was not in place at the time the SWIP SP PEIR was certified.  Notwithstanding,  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐57  VMT was assessed as part of the air quality impact analysis included as part of the SWIP SP PEIR.  Thus, the SWIP  SP PEIR contained sufficient information was available to the public about projected VMT resulting from vehicle  trips originating from or terminating within the SWIP SP area that associated effects could be determined with  the exercise of reasonable diligence.    The SWIP SP PEIR determined that because the City has a standard program (Circulation Development Fees) to  fund regional improvements, the San Bernardino Associated Governments (SANBAG) considers the City exempt  from congestion management plan (CMP) traffic impact analysis and no CMP analysis was required for the SWIP  SP.  (Since certification of the SWIP SP PEIR, SANBAG was re‐organized as the San Bernardino County  Transportation Authority [SBCTA].)      Analysis of Project:  CEQA Guidelines Section 15064.3(c) is clear that “[t]he provisions of [Section 15064.3] shall  apply prospectively as described in [CEQA Guidelines] Section 15007.”  CEQA Guidelines Section 15007(c)  specifically states: “[i]f a document meets the content requirements in effect when the document is sent out for  public review, the document shall not need to be revised to conform to any new content requirements in  Guideline amendments taking effect before the document is finally approved.”  The CEQA Guidelines changes  with respect to VMT took effect on July 1, 2020, whereas the SWIP SP PEIR was certified in 2012.  As such, and in  accordance with CEQA Guidelines Sections 15064.3(c) and 15007(c), revisions to the SWIP SP PEIR are not required  under CEQA in order to conform to the new requirements established by CEQA Guidelines Section 15064.3.      Once a project is approved, CEQA does not require that it be analyzed anew every time another discretionary  action is required to implement the project.  Quite the opposite, where an EIR or MND has previously been  prepared for a project, CEQA expressly prohibits agencies from requiring a subsequent or supplemental EIR or  MND, except in specified circumstances (Pub. Res. Code Section 21166.).  Under CEQA, “Section 21166 comes into  play precisely because in‐depth review has already occurred, the time for challenging the sufficiency of the original  EIR has long since expired, and the question is whether circumstances have changed enough to justify repeating  a substantial portion of the process.”  (Citizens Against Airport Pollution v. City of San Jose (“CAAP”) (2014), 227  Cal.App.4th at 796.)  There was no CEQA requirement to analyze VMT at the time the SWIP SP PEIR was certified;  thus, there is no need to analyze VMT impacts in connection with this EIR Addendum.      Furthermore, the new VMT requirements set forth by CEQA Guidelines Section 15064.3 do not relate to a different  type of impact, but merely a different way of analyzing transportation impacts.  The SWIP SP PEIR included a  detailed assessment of potential impacts, including potential impacts to air quality as a result of projected VMT.  As this information was disclosed as part of the SWIP SP PEIR, VMT associated with buildout of the SWIP SP do  not comprise “new information” that was not known or could not have been known at the time the SWIP SP PEIR  was certified.  Because VMT impacts were known, the adoption of the requirement to analyze VMT therefore  does not constitute significant new information requiring preparation of a subsequent or supplemental EIR.  Concerned Dublin Citizens v. City of Dublin (2013) 214 Cal.App.4th 1301, 1320.    In the case of the Project, there are no changed circumstances that would warrant additional analysis under Public  Resources Code Section 21166.  Even if an analysis was conducted, the results of such an analysis would show that  VMT from the Project is less than what would occur under the development assumptions utilized in the SWIP SP  PEIR, based on the Project’s substantial reduction in passenger vehicle and heavy truck traffic relative to the  calculations utilized in the SWIP SP PEIR.  As shown in the preceding response, the Project is calculated to eliminate  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐58  342 daily vehicle traffic trips within the SWIP SP area based on the original traffic generation factors that were  assumed in the SWIP SP PEIR. Therefore, there is substantial evidence that the Project as proposed would result  in reduced VMT as compared to the project evaluated by the SWIP SP PEIR.      Regarding the Project’s potential to conflict with the applicable congestion management program (the San  Bernardino County Congestion Management Program), the Project would not contribute substantial traffic, which  is defined as 50 or more peak hour trips, to any San Bernardino County Congestion Management Program facility  and, therefore, would have no potential to result in substantial adverse effects/conflicts to appliable level of  service standards. Implementation of the Project would not result in any impacts that were not previously  disclosed in the SWIP SP PEIR.      Therefore, and based on the foregoing analysis, the Project would not result in any new impacts not already  analyzed in the SWIP SP PEIR, and the Project would not increase the severity of a significant impact as previously  identified and analyzed in the SWIP SP PEIR.    c. Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous  intersections) or incompatible uses (e.g., farm equipment)?  SWIP SP PEIR Finding: The SWIP SP PEIR did not identify any safety hazards related to a design feature or land use  proposed by the SWIP SP.    Analysis of Project: Based on the City staff’s review of the Project’s application materials, no unsafe design  features are proposed as part of the Project.  All improvements planned as part of the Project would be in  conformance with applicable City engineering/design standards and would not result in any hazards due to a  design feature.  Additionally, the Project Applicant would not introduce an incompatible use to the Project Site.   Impacts would be less than significant.  Implementation of the Project would not result in any new impacts or  more severe impacts related to hazards due to a geometric design feature than previously disclosed in the SWIP  SP PEIR.      d. Result in inadequate emergency access?  SWIP SP PEIR Finding: The SWIP SP PEIR did not identify substantial adverse impacts related to inadequate  emergency access.  The SWIP SP PEIR concluded that potential impacts to emergency access caused by  construction activities associated with the SWIP SP would be addressed through the required implementation of  a traffic management plan, which would reduce impacts to less than significant.  The SWIP SP PEIR concluded that  the improvements proposed by the SWIP SP would be implemented in a manner that would improve local  circulation and emergency access, and, therefore, impacts would be less than significant without the need for  mitigation.    Analysis of Project: The Project would construct industrial land uses on the Project Site, which would require the  need for emergency access to‐and‐from the Site.  The City reviewed the Project’s design to ensure that adequate  access to‐and‐from the site would be provided for emergency vehicles.  The City also will require the Project to  provide adequate paved access to‐and‐from the site (via a condition of approval) and will review all future Project  construction drawings to ensure that adequate emergency access is maintained along abutting public streets  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐59  during temporary construction activities. Implementation of the Project would not result in any new impacts or  more severe impacts related to inadequate emergency access than previously disclosed in the SWIP SP PEIR.      4.18 Tribal Cultural Resources  Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in  Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically  defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California  Native American tribe, and that is:    a. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of  historical resources as defined in Public Resources Code Section 5020.1(k)?  SWIP SP PEIR Finding: Although the SWIP SP PEIR did not specifically address this subject, the SWIP SP PEIR  disclosed all recorded historical resources in the SWIP SP area and identified the potential for discovery of historic  and archaeological resources during earth moving construction activity.  Mitigation was included in the SWIP SP  PEIR to reduce impacts to historical and archaeological resources to a level below significance.      Analysis of Project: The Project Site – which the SWIP SP PEIR assumed would be fully developed – does not have  any resources listed or eligible for listing in the California Register of Historical Resources, or in any local register  of historical resources.  Accordingly, the Project would not impact a tribal cultural resource is listed or eligible for  listing in the California Register of Historical Resources, or in a local register of historical resources as defined in  Public Resources Code Section 5020.1(k).  Implementation of the Project would not result in any new or more  severe significant impacts related to tribal cultural resources than previously disclosed in the SWIP SP PEIR.      b. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be  significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1?  In  applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency  shall consider the significance of the resource to a California Native American tribe.  SWIP SP PEIR Finding: Although the SWIP SP PEIR did not specifically address this subject, the SWIP SP PEIR  contained sufficient information related to the SWIP SP’s cultural setting to conclude that there was the potential  for tribal cultural resources to be located within the SWIP SP area.    Analysis of Project: The Project Site is highly disturbed, and no known tribal cultural resources were determined  to occur on the Project Site or in the Project Site’s immediate vicinity (refer to Item “b” under Subsection 4.5 of  this EIR Addendum).  Notwithstanding, as a standard practice for all development projects in Fontana, the City  would require the Project Applicant to comply with conditions of approval that establish protocols for  consultation, monitoring, and resource recovery to protect inadvertent discoveries of buried/masked prehistoric  archaeological resources.  The City’s standard conditions of approval would be consistent with SWIP SP PEIR MMs  4.4‐1b, 4.4‐2b, and MM 4.4‐2c..  Mandatory compliance with the City’s standard conditions of approval (which  would ensure implementation of SWIP SP EIR MMs 4.4‐1a, 4.4‐1b, 4.4‐2a, and 4.4‐2b) would preclude potential  impacts to tribal cultural resources as defined in Public Resources Code 5024.1(c). Implementation of the Project  would not result in any new or more severe significant impacts related to tribal cultural resources than previously  disclosed in the SWIP SP PEIR.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐60  Mitigation:  No new or updated MMs are required.  SWIP SP EIR MMs 4.4‐2b and 4.4‐2c apply to the Project, as  presented in Subsection 4.5 of this EIR Addendum and in the MMRP for the SWIP SP PEIR, attached hereto as  Appendix A.    4.19 Utilities and Service Systems  Would the Project:    a. Require or result in the relocation or construction of new or expanded water, wastewater treatment or  storm water drainage, electric power, natural gas, telecommunication facilities, the construction or  relocation of which could cause significant environmental effects?  SWIP SP PEIR Finding: The SWIP SP PEIR disclosed that each future development proposal within the SWIP SP area  will be reviewed by the City staff to confirm that utility/infrastructure improvements would be available to serve  the project or that improvements planned by the SWIP SP would be installed as part of development.    Analysis of Project: The utility and infrastructure improvements proposed by the Project Applicant are discussed  in Section 3.0 of this EIR Addendum.  The installation of the infrastructure improvements proposed by the Project  Applicant would result in physical environmental impacts; however, these impacts have already been disclosed  throughout this EIR Addendum and were determined to be within the scope of the analysis for the SWIP SP PEIR.    b. Have sufficient water supplies available to serve the project and reasonably foreseeable future  development during normal, dry, and multiple dry years?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that the City would have sufficient water supply to meet the  water demands of the SWIP SP in addition to the City’s existing and projected future service obligations.    Analysis of Project:  The Project would implement industrial land uses on the Project Site in accordance with the  SWIP SP land plan.  Accordingly, the development activities – and water demand – proposed by the Project were  planned by the SWIP SP and, therefore, anticipated by the SWIP SP PEIR.  Furthermore, the FWC’s 2020 Urban  Water Management Plan (UWMP), which anticipates buildout of the SWIP SP and its associated water demand,  indicates that the FWC has sufficient water supplies to meet its service demand for normal, single‐dry year, and  multiple‐dry year conditions through at least the year 2045 (FWC, 2021, pp. 7‐6 ‐ 7‐8).  Accordingly, the Project  would not require new or expanded water entitlements. Implementation of the Project would not result in any  new impacts or more severe impacts related to water supplies than previously disclosed in the SWIP SP PEIR.      c. Result in a determination by the wastewater treatment provider, which serves or may serve the project,  that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing  commitments?  SWIP SP PEIR Finding: The SWIP SP PEIR determined that existing wastewater treatment facilities could  accommodate the SWIP SP’s demand for wastewater treatment services.      Analysis of Project: For purposes of analysis herein, the Project is estimated to produce approximately 8,866  gallons of wastewater per day.  Wastewater generated by the Project would be conveyed to the Inland Empire  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐61  Utilities Agency (IEUA) RP‐1 for wastewater treatment. The RP‐1 facility has an existing treatment capacity of  approximately 44 million gallons of wastewater per day and treats approximately 28 million gallons of wastewater  per day (gpd)on average (IEUA, 2022). The RP‐1 facility has approximately 16 million gallons of excess treatment  capacity under existing conditions (44 million gpd ‐ 28 million gpd = 16 million gpd). The wastewater generated by  the Project would represent less than one percent of the excess daily treatment capacity of RP‐1; therefore, it is  anticipated that RP‐1 has adequate treatment capacity to provide service to the Project. The Project would not  require the construction of new or expanded wastewater treatment. Implementation of the Project would not  result in any new or more severe significant impacts related to wastewater treatment than previously disclosed  in the SWIP SP PEIR.      d. Generate solid waste in excess of State or local standards, or in excess of the capacity of local  infrastructure, or otherwise impair the attainment of solid wastes reduction goals?  SWIP SP PEIR Finding: Solid waste from the SWIP SP area would be disposed at the Mid‐Valley Landfill.  The SWIP  SP PEIR determined that the Mid‐Valley Landfill has sufficient capacity to accommodate the solid waste disposal  needs of the SWIP SP.  The SWIP SP PEIR incorporated mitigation from the City of Fontana General Plan EIR that  pertain to solid waste as MMs 4.8‐9a through 4.8‐9d to further reduce the amount of solid waste that would be  diverted to the Mid‐Valley Landfill. (SWIP SP PEIR MMs 4.8‐9a through 4.8‐9d are policy‐level actions that are the  responsibility of the City that do not require any actions of development projects.)      Analysis of Project: The Project Site would receive landfill services from the Mid‐Valley Landfill.  The Mid‐Valley  Landfill is permitted to receive 7,500 tons of refuse per day and has a total capacity of 101,300,000 cy.  According  CalRecycle, the Mid‐Valley Landfill has a total remaining capacity of 61,219,377 cy as of June 30, 2019.  The Mid‐ Valley Landfill is estimated to reach capacity, at the earliest time, in the year 2045 (CalRecycle, 2022a). In  December 2021, the peak daily disposal at the Mid‐Valley Landfill was 4,272.78 tons, which correlates to an excess  daily disposal capacity of 3,227.22 tons (CalRecycle, 2022b).    The analysis below summarizes the Project’s potential to generate solid waste during construction and/or  operation that would exceed the disposal capacity of local landfill facilities.  As demonstrated in the analysis below,  the Project would generate less‐than‐significant volumes of solid waste and would not result in any new impacts,  or increase the severity of previously identified significant impacts, as compared to the analysis presented in the  SWIP SP PEIR.    Construction Impact Analysis  The existing structures would be demolished during Project construction (the demolished asphalt/concrete is  anticipated to be re‐used on‐site as fill material).  According to Project Applicant assumptions, the Project’s  construction phase is anticipated to generate 111 tons of mixed construction and demotion solid waste.  CalGreen  requires a minimum of 65 percent of all solid waste be diverted from landfills (by recycling, reusing, and other  waste reduction strategies); therefore, the Project is estimated to generate approximately 67 tons of construction  and demolition waste requiring landfill disposal.     The Project’s construction phase is estimated to have a duration of approximately 222 days; therefore, the Project  is estimated to generate approximately 0.2 tons of solid waste per day requiring landfill during construction.  The  Project’s daily solid waste generation during construction would utilize less than one‐tenth of one percent of the  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐62  excess daily disposal capacity at the Mid‐Valley Landfill.  Accordingly, the Mid‐Valley Landfill would have sufficient  daily capacity to accept solid waste generate by the Project’s construction phase. Implementation of the Project  would not result in any new impacts or more severe impacts related to solid waste generation than previously  disclosed in the SWIP SP PEIR.      Operational Impact Analysis  Based CalRecycle’s daily waste generation rate for industrial uses, which is 1.42 lbs/100 s.f., long‐term operation  of the Project would generate approximately 0.6 tons (1.42 lbs/100 s.f. x 87,590 s.f. ≈ 1,243.8 lbs x 1 ton/2,000 lbs  ≈ 0.6 tons) of solid waste per day (CalRecycle, 2021).  CalGreen requires a minimum of 65 percent of all solid waste  be diverted from landfills (by recycling, reusing, and other waste reduction strategies); therefore, the Project is  estimated to generate approximately 0.24 tons per day of waste requiring landfill disposal.  The Project’s daily  solid waste generation during construction would utilize less than one‐tenth of one percent of the excess daily  disposal capacity at the Mid‐Valley Landfill.  Accordingly, the Mid‐Valley Landfill would have sufficient daily  capacity to accept solid waste generate by the Project’s operation. Implementation of the Project would not result  in any new or more severe significant impacts related to solid waste generation than previously disclosed in the  SWIP SP PEIR.      e. Comply with federal, State, and local management and reduction statutes and regulations related to solid  wastes?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that SWIP SP would be in compliance with all State and local  requirements related to solid waste.  Therefore, impacts would be less than significant.    Analysis of Project: The Project would be required to comply with Chapter 24 of the City’s Municipal Code, which  would require future tenants of the Project to segregate and place solid waste generated by the Project into  containers for collection.  There are no components of the Project that would result in non‐compliance with  federal, state, or local statutes or regulations related to solid waste.  Implementation of the Project would not  result in any new or more severe significant impacts related to conflicts with federal, State, and local management  and reduction statues than previously disclosed in the SWIP SP PEIR.      4.20 Wildfire  If located in or near state responsibility areas or lands classified as very high fire hazard severity zones would the  project:    a. Substantially impair an adopted emergency response plan or emergency evacuation plan?  b. Due to slope, prevailing winds, and other factors exacerbate wildfire risks and thereby expose project  occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?  c. Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency  water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary  ongoing impact to the environment?  d. Expose people or structures to significant risks, including downslope or downstream flooding or landslides,  as a result of runoff, post‐fire slope instability, or drainage changes?    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐63  SWIP SP PEIR Finding: The SWIP SP PEIR determined that the SWIP SP is located in an urbanized area, and no  wildlands exist in the vicinity of the SWIP SP area.  The SWIP SP PEIR concluded that no impact related to wildland  hazards would occur.    Analysis of Project: The Project Site is not located in or near a state responsibility area or lands classified as very  high fire hazard severity zones (Cal Fire, 2008; City of Fontana, 2018a); therefore, implementation of the Project  would not exacerbate existing wildfire hazard risks or expose people or the environment to adverse environmental  effects related to wildfires within a state responsibility area or very high fire hazard severity zone. The SWIP SP  PEIR assumed the Project Site would be developed. Implementation of the Project would not result in any new or  more severe significant impacts related to wildfire hazards than previously disclosed in the SWIP SP PEIR.      4.21 Mandatory Findings of Significance  Does the Project:    a. Have the potential to substantially degrade the quality of the environment, substantially reduce the  habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self‐sustaining levels,  threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range  of a rare or endangered plant or animal, or eliminate important examples of the major periods of California  history or prehistory?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that, following mitigation, the SWIP SP would result in less‐ than‐significant impacts to sensitive plant and animal species as well as habitats.  Additionally, the SWIP SP PEIR  concluded that, with mitigation, the SWIP SP would result in less‐than‐significant impacts to archaeological,  historical, and paleontological resources, and, therefore, would not eliminate important examples of major  periods of California history or prehistory.    Analysis of Project: As indicated throughout the analysis presented herein, implementation of the Project would  not substantially degrade the quality of the environment, substantially reduce the habitat of fish or wildlife  species, cause a fish or wildlife populations to drop below self‐sustaining levels, threaten to eliminate a plant or  animal community, or reduce the number or restrict the range of a rare or endangered plant or animal, or  eliminate important examples of the major periods of California history or prehistory, to a greater degree than  previously disclosed in the SWIP SP PEIR.      b. Have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable”  means that the incremental effects of a project are considerable when viewed in connection with the  effects of past projects, the effects of other current projects, and the effects of probable future projects)?  SWIP SP PEIR Finding: The SWIP SP PEIR addressed cumulative impacts for each of the environmental topics  evaluated.  The SWIP SP PEIR concluded the SWIP SP would result in significant and unavoidable cumulative  impacts regarding the following issues:     Aesthetics (scenic vistas);   Air Quality (construction‐related and operational emissions);   Noise (long‐term mobile noise and increases to incremental noise levels);  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  4‐64   Recreation (parks/recreation facilities); and   Transportation/Traffic (roadway segments/intersections performance).    Analysis of Project: As described throughout this analysis, implementation of the Project would not result in new  environmental impacts that were not previously disclosed in the SWIP SP PEIR and would not increase the severity  of environmental impacts disclosed in the SWIP SP PEIR.  There is also no new information of substantial  importance since the time the SWIP SP PEIR was certified that was not already known and analyzed in the SWIP  SP PEIR.  Therefore, there is no potential for the Project to result in cumulatively considerable effects to the  environment beyond those previously disclosed in the SWIP SP PEIR (and already disclosed throughout this  analysis), and instead, the Project’s impacts are generally less than the impacts assumed and analyzed in the SWIP  SP PEIR.  The SWIP SP PEIR concluded that cumulative effects would be significant and unavoidable for the topics  of aesthetics, air quality, noise, recreation, and transportation and traffic.      c. Have environmental effects, which will cause substantial adverse effects on human beings, either directly  or indirectly?  SWIP SP PEIR Finding: The SWIP SP PEIR concluded that while changes to the environment that could indirectly  affect human beings would be possible in all of the designated CEQA issue areas, those changes to the  environment that the SWIP SP would cause that could directly affect human beings include:     Air Quality (construction‐related and operational emissions);   Hazards and Hazardous Materials (contaminated soil and groundwater [SWIP SP PEIR concluded impacts  in this issue area would be less than significant with implementation of MMs]);   Noise (long‐term mobile noise and increases to incremental noise levels);   Recreation (parks/recreation facilities); and   Transportation/Traffic (roadway segments/intersections performance).    Analysis of Project: Implementation of the Project would not result in environmental effects that would cause  substantial adverse effects on human beings, either directly or indirectly, beyond those disclosed in the SWIP SP  PEIR, and instead, the Project’s impacts are generally less than the impacts assumed by the SWIP SP PEIR.      5.0 REFERENCES  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  5‐1  5.0 REFERENCES  This Addendum was prepared by:    City of Fontana  Contract Planner ..................................................................................................................................... Candida Neal    T&B Planning, Inc.  Principal‐in‐Charge ............................................................................................................................. Tracy Zinn, AICP  Senior Project Manager ......................................................................................................................... David Ornelas  Environmental Analyst .................................................................................................................... Christhida Mrosla   Graphics Specialist ................................................................................................................................ Cristina Maxey    The following information sources were used during the preparation of this Addendum:    Cited As Reference  Alden, 2022 Alden Environmental, Inc. (Alden), 2022. Banana Avenue and Rose Avenue Biological  Resources Letter. March 22, 2022. (Appendix D).    BFSA, 2022a Brian F. Smith and Associates, 2022a.  Cultural Resources Study for the Banana and Rose  Avenues Project.  March 16, 2022.  (Appendix E).     BFSA, 2022b Brian F. Smith and Associates, 2022b.  Paleontological Assessment for the Banana and Rose  Avenues Project.  March 16, 2022.  (Appendix H).     CalFire, 2008 California Department of Forestry and Fire Protection, 2008.  Fire Hazard Severity Zones.   Web.  Available at: https://osfm.fire.ca.gov/media/5943/fontana.pdf. Accessed: March 30,  2022.    CalRecycle,  2022a  California Department of Resources Recycling and Recovery (CalRecycle), 2022. Facility/Site  Summary Details: Mid‐Valley Sanitary Landfill (36‐AA‐0055). Web. Available at:  https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1880?siteID=2662.  Accessed: March 20, 2022.     CalRecycle,  2022b  California Department of Resources Recycling and Recovery (CalRecycle), 2022.  SWIS  Facility/Site Inspection Details: Mid‐Valley Sanitary Landfill (36‐AA‐0055). Web.  Available at:  https://www2.calrecycle.ca.gov/SolidWaste/SiteInspection/Details/336713.  Accessed April  6, 2022.    CalRecycle, 2021 California Department of Resources Recycling and Recovery (CalRecycle), 2021.  Estimated  Solid Waste Generation Rates.  Web.  Available at:   https://www2.calrecycle.ca.gov/WasteCharacterization/General/Rates.  Accessed August  04, 2021.  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  5‐2  Cited As Reference  Caltrans, 2020 California Department of Transportation, 2020.  Transportation and Construction Vibration  Guidance Manual. Web. Available at: https://dot.ca.gov/‐/media/dot‐ media/programs/environmental‐analysis/documents/env/tcvgm‐apr2020‐a11y.pdf  Accessed: March 30,2022.  Caltrans, 2022 California Department of Transportation, 2022.  Scenic Highways.  Web.  Available at:  https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8 e8057116f1aacaa. Accessed: March 30, 2022.    CBWM, 2022 Chino Basin Watermaster, n.d.  District Map.  Web.  Available at:  https://www.cbwcd.org/241/District‐Maps.  Accessed March 29, 2022.    CDFW, 2019 California Department of Fish and Wildlife California Natural Community Conservation Plans  – April 2019. Web.  Available at:  https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=68626&inline.  Accessed March 30,  2022.    CDC, 2018 Department of Conservation, 2018.  San Bernardino County Important Farmland Finder.   Web.  Available at: https://maps.conservation.ca.gov/dlrp/ciff/.  Accessed March 30, 2022.  City of Fontana,  2018a  City of Fontana, 2018.  Fontana Forward General Plan Update 2015‐2035.  Adopted  November 13, 2018.  Web.  Available at: https://www.fontana.org/2632/General‐Plan‐ Update‐2015‐‐‐2035.  Accessed March 30, 2022.    City of Fontana,  2018b  City of Fontana, 2018.  Fontana Forward General Plan Update 2015‐2035 Draft  Environmental Impact Report.  June 8, 2018.  Web.  Available at:  https://www.fontana.org/DocumentCenter/View/29524/Draft‐Environmental‐Impact‐ Report‐for‐the‐General‐Plan‐Update.  Accessed March 30, 2022.    City of Ontario,  2011  City of Ontario, 2011.  Ontario International Airport Land Use Compatibility Plan.  Adopted  April 19, 2011.  Web.  Available at: http://www.ontarioplan.org/wp‐ content/uploads/sites/4/2015/05/chapter‐2.pdf.  Accessed March 30, 2022.    County of San  Bernardino,  2021  County of San Bernardino, 2021. Public San Bernardino County Parcel Viewer. Web. Available  at:  https://www.arcgis.com/apps/webappviewer/index.html?id=87e70bb9b6994559ba75127 92588d57a     DOC, 1984 Department of Conservation, 1984.  Special Report 143 Mineral Land Classification of the  Greater Los Angeles Area Part VII Classification of Sand and Gravel Resource Areas, San  Bernardino Production – Consumption Region.  Web.  Available at:  ftp://ftp.consrv.ca.gov/pub/dmg/pubs/sr/SR_143/PartVII/SR_143_PartVII_Text.pdf.   Accessed April 6, 2022.    Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  5‐3  Cited As Reference  FEMA, 2008 Federal Emergency Management Agency (FEMA), 2008.  FEMA Flood Map Service Center.   Web.  Available at:  https://msc.fema.gov/arcgis/rest/directories/arcgisjobs/nfhl_print/mscprintb_gpserver/j1 73c9e62c4674ce5a480c74cc2738eed/scratch/FIRMETTE_d98eee0e‐e0a7‐4526‐b265‐ 89486810fb2a.pdf. Accessed March 30 2022.    FWC, 2021 Fontana Water Company (FWC), 2021. 2020 Urban Water Management Plan. Web.  Available at: https://www.fontanawater.com/wp‐content/uploads/2021/07/FWC‐2020‐ UWMP‐June‐2021‐Final.pdf. Accessed March 20, 2022.    Google Earth  Pro, 2022    Google Earth Pro. Google Earth. Web. Available at: https://www.google.com/earth/  IEUA, 2022 Inland Empire Utilities Agency (IEUA), 2019. Regional Water Recycling Plant No. 1. Web.  Available at https://www.ieua.org/facilities/regional‐water‐recycling‐plant‐no‐1/.  Accessed  August March 30, 2022.    JLC, 2022a JLC Engineering and Consulting (JLC), 2022. Preliminary Water Quality Management Plan for  Banana Ave & Rose Ave. January 27, 2022. (Appendix L)  JLC, 2022b JLC Engineering and Consulting (JLC), 2022. Preliminary Hydrology and Hydraulics Study for  Banana Avenue & Rose Avenue Industrial Project. January 28, 2022. (Appendix M)  SCAQMD, 2005 South Coast Air Quality Management District (SCAQMD), 2005. Rule 402. Web. Available at:  http://www.aqmd.gov/docs/default‐source/rule‐book/rule‐iv/rule‐403.pdf. Accessed  March 30, 2022.     SCG, 2021a Southern California Geotechnical, 2021a.  Geotechnical Investigation Proposed Warehouse  NWC of Banana Avenue and Rose Avenue, Fontana, California for Molto Properties, LLC c/o  LDC Industrial Realty, LLC.  July 21, 2021.  (Appendix G).    Urban  Crossroads,  2022a    Urban Crossroads, Inc (Urban Crossroads), 2022a.  Banana & Rose Warehouse Air Quality  Impact Analysis City of Fontana.  February 15, 2022.  (Appendix B)  Urban  Crossroads,  2022b    Urban Crossroads, Inc (Urban Crossroads), 2022b.  Banana & Rose Warehouse Mobile  Source Health Risk Assessment City of Fontana.  February 15, 2022.  (Appendix C).  Urban  Crossroads,  2022c    Urban Crossroads, Inc (Urban Crossroads), 2022c.  Banana & Rose Warehouse Energy  Analysis City of Fontana.  February 15, 2022.  (Appendix F).  Addendum to the   SWIP Specific Plan Update and Annexation PEIR    Environmental Analysis  Banana & Rose Industrial Commerce Center  5‐4  Cited As Reference  Urban  Crossroads,  2022d    Urban Crossroads, Inc (Urban Crossroads), 2022d.  Banana & Rose Warehouse Greenhouse  Gas Analysis City of Fontana.  February 15, 2022.  (Appendix I).  Urban  Crossroads,  2022e  Urban Crossroads, Inc (Urban Crossroads), 2022e.  Banana & Rose Warehouse Noise  Impact Analysis.  February 18, 2022.  (Appendix N).  Urban  Crossroads,  2022f  Urban Crossroads, Inc. (Urban Crossroads), 2021e. Banana & Rose Warehouse Trip  Generation Assessment. February 17, 2022. (Appendix O)  USDA, 2019 United States Department of Agriculture, 2019.  Web Soil Survey.  Web.  Available at:  https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx.  Accessed August 04,  2021.    V3, 2021a V3 Companies (V3), 2021a. Phase I Environmental Site Assessment. July 20, 2021.  (Appendix J)    V3, 2021b V3 Companies (V3), 2021a. Limited Phase II Environmental Site Assessment – Report  Findings. September 3, 2021. (Appendix K)