Loading...
HomeMy WebLinkAboutAppendix E - Traffic Impact Study APPENDIX E – TRAFFIC IMPACT STUDY 9841 Irvine Center, Suite 200 | Irvine, California 92618 | t: (949) 878-3509 www.tjwengineering.com December 7, 2021 Mr. Stan Smith RELATED CALIFORNIA 18201 Von Karman Avenue, Suite 900 Irvine, CA 92612 SUBJECT: Focused Traffic Impact Analysis – Fontana Southridge, City of Fontana Dear Mr. Smith, TJW Engineering, Inc. (TJW) is pleased to submit this Trip Generation comparison for the proposed project Fontana Southridge located on the west side of Sierra Avenue between Under Wood Drive and Jurupa Avenue in the City of Fontana. Site Plan and Trip Generation Comparison The original proposed site plan (attached for reference) consists of the following land uses: · 155 multifamily dwelling units The revised proposed site plan (attached for reference) consists of the following land uses: · 106 multifamily dwelling units The revised site plan has reduced in dwelling units by 49 multifamily dwelling units. The trip generation for the proposed project was determined using the Institute of Transportation Engineers Trip Generation Manual (10th Edition, 2017). The attached tables provide a summary of the proposed project trips for both the original and revised site plan. In general, the trip generation is lower with the revised site plan over the original site plan. Summary The revised site plan shows overall lower trip generation over the original site plan. As the original site plan has higher anticipated trip generation, it is also a more conservative estimate of the proposed Mr. Fifield Shops at Jurupa Valley Trip Gen Comparison January 7, 2021 Page 2 TJW Engineering, Inc. RCA20001 Fontana Southridge Trip Gen Comparison 12072021 project. It is recommended that analyses utilize the original site plan for analysis purposes as it provides a conservative approach. Please contact us at (949) 878-3509 if you have any questions regarding this analysis. Sincerely, Thomas Wheat, PE, TE David Chew, PTP President Transportation Planner Registered Civil Engineer #69467 Registered Traffic Engineer #2565 Daniel Flores, EIT Project Engineer Sierra AvenueCommunityRoomCommunityRoomTrash RmBike RoomUSPS PkgLoading122'-6"68'-5"120'-0"39'-5"84'-2"34'-7"67'-0"149'-5"8'-3" 120'-1"17'-8"69'-0"12'-5"MailLaundryRoomElev. #1 & 2R19'-0"R19'-0"TransformerC1A2Stair #1Trash RmVehicularGateVehicular Gate(Exit Only)10'-0" SETBACKMaint. Room61'-8"Building A3 Stories30'-0" PARKING SETBACK55'-6"55'-2"5'-0" SETBACK5'-0" SETBACK5'-0" SETBACK Line ofDedicationLeasingOffice31'-6"219'-2"377'-9"135'-4"30'-0"99'-5"Elec. Rm.Stair #2Stair #1B2C1B2B1C1B1B1TeenAreaKidsPlaygroundTurfAreaBBQ AreaB1B224'-9"150'-6"Elec.Rm.56'-2" 38'-8" 27'-2" 32'-0" 32'-0"ProposedAccess RampA1C1Bike RoomLaundryRoomB2Stair #3StorageBuilding A3 Story WingBuilding B4 StoriesStair #2PhaseLineR19'-0"R19'-0"R19'-0"R1 9 ' - 0 "183'-0"DETENTION BASIN182'-7"PHASE 2255'-8"PHASE 1330'-0"C2B2B2B2B2B2Stair #1Stair #4Stair #528'-6"B2B226'-9"GateC1 UnitsAboveC2 UnitsAboveA1 UnitsAboveA1 UnitsAbove0102040A2.060Courtplace At FontanaDNA DESIGN AND ARCHITECTURE EXPRESSLY RESERVES ITSCOMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS INTHESE DOCUMENTS. THESE DOCUMENTS ARE NOT TO BEREPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNERWHATSOEVER. NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTYWITHOUT FIRST OBTAINING THE EXPRESSED WRITTEN PERMISSIONAND CONSENT OF DNA DESIGN AND ARCHITECTURE.Density StudyOPT D LEVEL 1 FLOOR PLAN UP 42" In Out Total In Out TotalMulti-family Housing (Low Rise) (220) 155 DU 7.32 1,135 0.46 23:77 16 55 72 0.56 63:37 55 32 87Total 1,135 16 55 72 55 32 871: Rates from ITE Trip Generation (10th Edition, 2017)2: DU = Dwelling UnitsIn Out Total In Out TotalMulti-family Housing (Low Rise) (220) 106 DU 7.32 776 0.46 23:77 11 38 49 0.56 63:37 37 22 59Total 776 11 38 49 37 22 591: Rates from ITE Trip Generation (10th Edition, 2017)2: DU = Dwelling UnitsOriginal Site Plan Trip Generation TableRevised Site Plan Trip Generation TableVolumeRateIn:Out SplitVolumeProposed Land Use1QtyUnit2Daily Trips (ADTs) AM Peak Hour PM Peak HourRate Volume RateIn:Out SplitProposed Land Use1QtyUnit2Daily Trips (ADTs) AM Peak Hour PM Peak HourRate Volume RateIn:Out SplitVolumeRateIn:Out SplitVolume December 21, 2020 Prepared by: TJW ENGINEERING, INC. 6 Venture, Suite 225 Irvine, CA 92618 949.878.3509 | www.tjwengineering.com Fontana Southridge Focused Traffic Impact Analysis City of Fontana, California 6 Venture, Suite 225 | Irvine, California 92618 | 949.878.3509 |www.tjwengineering.com December 21, 2020 Mr. Stan Smith RELATED CALIFORNIA 18201 Von Karman Avenue, Suite 900 Irvine, CA 92612 Subject: Focused Traffic Impact Analysis – Fontana Southridge, City of Fontana Dear Mr. Smith: TJW ENGINEERING, INC. (TJW) is pleased to present you with this focused traffic impact analysis for the proposed multi-family residential project located on the west side of Sierra Avenue between Under Wood Drive and Jurupa Avenue in the City of Fontana. The proposed project includes 155 multi family dwelling units in its full capacity. However, the project will be built in phases. For this traffic analysis, the project will be analyzed as full built-out, with all 155 units occupied. This focused traffic study has been prepared to meet the traffic study requirements for the City of Fontana and assesses the forecast traffic operations associated with the proposed project and its impact on the local street network. This report is being submitted to you for review and forwarding to the City of Fontana Please contact us at (949) 878-3509 if you have any questions regarding this analysis. Sincerely, Thomas Wheat, PE, TE David Chew, PTP President Transportation Planner Registered Civil Engineer #69467 Registered Traffic Engineer #2565 Daniel Flores, EIT Project Engineer Fontana Southridge Focused Traffic Impact Analysis City of Fontana, California December 21, 2020 Prepared for: Mr. Stan Smith RELATED CALIFORNIA 18201 Von Karman Avenue Suite 900 Irvine, CA 92612 Prepared by: Thomas Wheat, PE, TE David Chew, PTP Daniel Flores, EIT TJW ENGINEERING, INC. 6 Venture, Suite 225 Irvine, CA 92618 949.878.3509 | www.tjwengineering.com Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 i Contents 1.0 EXECUTIVE SUMMARY ........................................................................................................................... iv 1.1 SUMMARY OF PROJECT RELATED TRANSPORTATION DEFICIENCIES ................................................ iv 1.2 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS ........................................................................ v 1.2 OFF-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS .................................................................. vi 1.3 SUMMARY OF DEFICIENCIES AND RECOMMENDED IMPROVEMENTS ............................................. vi 1.4 SUMMARY OF VEHICLE MILES TRAVELED ANALYSIS ......................................................................... vi 2.0 INTRODUCTION ....................................................................................................................................... 1 2.1 PROJECT DESCRIPTION ........................................................................................................................ 1 2.2 STUDY AREA ........................................................................................................................................ 1 2.3 ANALYSIS METHODOLOGY .................................................................................................................. 4 2.3.1 Intersection Analysis Methodology ............................................................................................. 4 2.3.2 Vehicle Miles Traveled (VMT) Analysis....................................................................................... 7 2.4 PERFORMANCE CRITERIA .................................................................................................................... 7 2.4.1 City of Fontana ........................................................................................................................... 7 2.5 CUMULATIVE PROJECTS TRAFFIC ........................................................................................................ 8 3.0 EXISTING BASELINE CONDITIONS ........................................................................................................... 9 3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS ......................................................... 9 3.2 CITY OF FONTANA GENERAL PLAN CIRCULATION ELEMENT .............................................................. 9 3.3 EXISTING TRUCK NETWORK ................................................................................................................ 9 3.4 EXISTING BICYCLE AND PEDESTRIAN FACILITIES ................................................................................. 9 3.5 EXISTING PUBLIC TRANSIT SERVICES ................................................................................................ 10 3.6 EXISTING TRAFFIC VOLUMES ............................................................................................................ 10 3.7 EXISTING BASELINE CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS .............................. 14 4.0 PROPOSED PROJECT ............................................................................................................................. 15 4.1 PROJECT DESCRIPTION ...................................................................................................................... 15 4.2 PROJECT SITE ACCESS ........................................................................................................................ 15 4.3 PROJECT TRIP GENERATION .............................................................................................................. 15 4.4 PROJECT TRIP DISTRIBUTION ............................................................................................................ 17 4.5 MODAL SPLIT ..................................................................................................................................... 17 5.0 CONSTRUCTION PHASE CONDITIONS ................................................................................................... 19 5.1 ROADWAY IMPROVEMENTS ............................................................................................................. 19 5.2 CONSTRUCTION PHASE TRAFFIC VOLUMES ..................................................................................... 19 5.3 CONSTRUCTION PHASE INTERSECTION LEVEL OF SERVICE ANALYSIS .............................................. 19 Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 ii 6.0 PROJECT OPENING YEAR PLUS CUMULATIVE CONDITIONS (OY) ......................................................... 22 6.1 ROADWAY IMPROVEMENTS ............................................................................................................. 22 6.2 PROJECT OPENING YEAR PLUS CUMULATIVE TRAFFIC VOLUMES .................................................... 22 6.3 PROJECT OPENING YEAR PLUS CUMULATIVE INTERSECTION LEVEL OF SERVICE ANALYSIS ............ 22 6.4 CUMULATIVE PROJECTS TRAFFIC ...................................................................................................... 22 7.0 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT CONDITIONS ......................................... 25 7.1 ROADWAY IMPROVEMENTS ............................................................................................................. 25 7.2 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT TRAFFIC VOLUMES............................ 25 7.3 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ...................................................................................................................................................... 25 7.4 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT SIGNAL WARRANT ANALYSIS ............ 27 8.0 PROJECT ACCESS AND CONCEPT ALIGNMENT ...................................................................................... 28 8.1 PROJECT ACCESS ............................................................................................................................... 28 8.2 CONCEPT ALIGNMENT ...................................................................................................................... 28 8.3 QUEUING ANALYSIS .......................................................................................................................... 28 9.0 VEHICLE MILES TRAVELED (VMT) ANALYSIS ......................................................................................... 30 9.1 VEHICLE MILES TRAVELED (VMT) ANALYSIS ..................................................................................... 30 Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 iii List of Tables Table 1 HCM – LOS & Delay Ranges – Signalized Intersections ......................................................................... 6 Table 2 HCM – LOS & Delay Ranges – Unsignalized Intersections .................................................................... 7 Table 3 City of Fontana Thresholds of Significance ........................................................................................... 8 Table 4 Cumulative Project List .......................................................................................................................... 8 Table 5 Roadway Characteristics within Study Area.......................................................................................... 9 Table 6 Intersection Analysis – Existing Baseline Conditions .......................................................................... 14 Table 7 Proposed Project Trip Generation ...................................................................................................... 16 Table 8 Intersection Analysis – Construction Phase Conditions ...................................................................... 21 Table 9 Intersection Analysis – Project Opening Year Plus Cumulative (OY) Conditions ................................ 24 Table 10 Intersection Analysis – Project Opening Year Plus Cumulative Plus Project (OYP) Conditions ........ 27 Table 11 Signal Warrant Analysis – Project Opening Year Plus Cumulative Plus Project (OYP) Conditions .... 27 Table 12 Queuing Analysis – OYP Conditions ................................................................................................. 28 List of Exhibits Exhibit 1 Project Location .................................................................................................................................. 2 Exhibit 2 Proposed Project Site Plan .................................................................................................................. 3 Exhibit 3 Proposed Study Area ........................................................................................................................... 5 Exhibit 4 Existing Lane Geometry and Intersection Controls .......................................................................... 11 Exhibit 5 Existing Transit Services .................................................................................................................... 12 Exhibit 6 Existing AM and PM Peak Hour Volumes ......................................................................................... 13 Exhibit 7 Trip Distribution at Study Intersections ............................................................................................ 18 Exhibit 8 Construction Phase AM and PM Peak Hour Volumes ...................................................................... 20 Exhibit 9 Project Opening Year Plus Cumulative AM and PM Peak Hour Volumes ......................................... 23 Exhibit 10 Project Opening Year Plus Cumulative Plus Project AM and PM Peak Hour Volumes ................... 26 Exhibit 11 Concept Alignment Plan.................................................................................................................. 29 Appendices Appendix A Scoping Agreement and San Bernardino Roadway Classifications and Cross Sections Appendix B Existing Traffic Counts Appendix C Cumulative Projects Appendix D HCM Analysis Sheets Appendix E Signal Warrant Analysis Sheets Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 iv 1.0 EXECUTIVE SUMMARY This focused traffic impact analysis analyzes the projected traffic operations associated with the proposed Fontana Southridge project located at on the west side of Sierra Avenue between Under Wood Drive and Jurupa Avenue in the City of Fontana. The purpose of this analysis is to evaluate potential circulation system deficiencies that may result from development of the proposed project, and to recommend improvements to achieve acceptable operations, if applicable. This analysis has been prepared in coordination with the City of Fontana via a scoping agreement (See Appendix A) and is pursuant to applicable City of Fontana and County of San Bernardino guidelines. The proposed project consists of 155 multi-family dwelling units. The site is currently zoned and classified as General Commercial (G-C) in the City of Fontana General Plan Land Use. The project site is currently vacant. The City of Fontana has a future proposed land use of Walkable Mixed-Use Urban Village (WMXU-2). The proposed project is anticipated to be built and generating trips in 2023. A growth rate of 2% was used to account for 2023 volumes. The proposed project is projected to generate 1,135 daily trips, 72 AM peak hour trips, and 87 PM peak hour trips. The following four (4) intersections in the vicinity of the project site have been included in the intersection level of service (LOS) analysis: 1. Sierra Ave/Santa Ana Ave; 2. Sierra Ave/Under Wood Dr; 3. Sierra Ave/Jurupa Ave; 4. Sierra Ave/Sierra Crossroads Access Dr; The study intersections are analyzed for the following study scenarios: · Existing Baseline Conditions (Existing); · Construction Phase (Construction); · Opening Year plus Cumulative Projects (Existing + Ambient + Cumulative); and · Opening Year plus Cumulative Projects Plus Project (Existing + Ambient + Cumulative + Project). 1.1 SUMMARY OF PROJECT RELATED TRANSPORTATION DEFICIENCIES Table ES-1 summarizes the results of the intersection level of service analysis based on the City of Fontana thresholds of significance for analyzing transportation deficiencies. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 v Table ES-1 Summary of Project Related Transportation Deficiencies Intersection Construction Phase Opening Year With Project 1 Sierra Ave/Santa Ana Ave No Deficiency No Deficiency 2 Sierra Ave/Under Wood Dr. No Deficiency No Deficiency 3 Sierra Ave/Jurupa Ave No Deficiency No Deficiency 4 Sierra Ave/Sierra Crossroads Access Dr. No Deficiency No Deficiency 1.2 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS Existing Baseline Conditions The study intersections are projected to operate at an acceptable LOS during the AM and PM peak hours for Existing baseline conditions with the exception of the following intersections. · #3 – Sierra Ave/Jurupa Ave (AM and PM Peak Hours) · #4 – Sierra Ave/Sierra Crossroads Access Dr. (AM and PM Peak Hours) Construction Phase (Construction) Conditions The study intersections are projected to operate at an acceptable LOS during the AM and PM peak hours for Construction Phase conditions with the exception of the following intersections. · #3 – Sierra Ave/Jurupa Ave (AM and PM Peak Hours) · #4 – Sierra Ave/Sierra Crossroads Access Dr. (AM and PM Peak Hours) Opening Year Plus Cumulative (OY) Conditions The study intersections are projected to operate at an acceptable LOS during the AM and PM peak hours for Opening Year Plus Cumulative conditions with the exception of the following intersections. · #3 – Sierra Ave/Jurupa Ave (AM and PM Peak Hours) · #4 – Sierra Ave/Sierra Crossroads Access Dr. (AM and PM Peak Hours) Opening Year Plus Cumulative Plus Project (OYP) Conditions Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 vi The study intersections are projected to operate at an acceptable LOS during the AM and PM peak hours for Opening Year Plus Cumulative Plus Project conditions. 1.2 OFF-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS Wherever necessary, roadways adjacent to the proposed project site and site access points will be constructed in compliance with recommended roadway classifications and respective cross-sections in the City of Fontana General Plan or as directed by the City Engineer. Sight distance at each project access point should be reviewed with respect to City sight distance standards at the time of final grading, landscaping and street improvement plans. Signing/striping should be implemented in conjunction with detailed construction plans for the project site. Site access will be provided via one (1) full access driveway along Sierra Avenue. A second driveway, located north of the main driveway, will be provided, but will be utilized for emergency access only. The primary access driveway will provide 150-feet of stacking (two 75-foot lanes) between the proposed access pad and the adjacent roadway. This meets the required stacking distance needed per City Standard No. 701 Access Management Standard. The proposed primary driveway will align with the Sierra Crossroads access driveway east of Sierra Avenue and proposes the installation of a traffic signal. Peak hour traffic signal warrants are met for the “with project” scenarios at this study intersection. 1.3 SUMMARY OF DEFICIENCIES AND RECOMMENDED IMPROVEMENTS The determination of a deficiency at an intersection is based on the project’s contribution to the intersection’s delay (in seconds) as defined in The City of Fontana Traffic Impact Study Guidelines (October 2020). Based on those thresholds, no off-site improvements were identified since the proposed project is projected to result in no deficiencies at the study intersections for “with project” analysis scenarios. 1.4 SUMMARY OF VEHICLE MILES TRAVELED ANALYSIS Consistent with the new metric of VMT for analysis of transportation impacts, this analysis follows VMT guidelines set forth by the City of Fontana Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (October, 21st, 2020). For land use projects, affordable or supportive housing is to be presumed to cause a less than significant impact. As the project falls within affordable or supportive housing, the project is presumed to have a less than significant transportation impact per City guidelines. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 1 2.0 INTRODUCTION This focused traffic impact analysis analyzes the projected traffic operations associated with the proposed Fontana Southridge project located at on the west side of Sierra Avenue between Under Wood Drive and Jurupa Avenue in the City of Fontana. The purpose of this study is to evaluate potential circulation system deficiencies that may result from development of the proposed project, and to recommend improvements to achieve acceptable operations, if applicable. This analysis has been prepared in coordination with the City of Fontana via a scoping agreement (See Appendix A) and is pursuant to applicable City of Fontana traffic study guidelines. 2.1 PROJECT DESCRIPTION The proposed project consists of 155 multi-family dwelling units. Site access is planned via one full-access driveway on Sierra Crossroads Access Driveway. The site is currently zoned and classified as General Commercial (G-C) in the City of Fontana General Plan Land Use. The project site is currently vacant. The City of Fontana has a future proposed land use of Walkable Mixed Use Urban Village (WMXU-2). The proposed project is anticipated to be built and generating trips in 2023. A growth rate of 2% was used to account for 2023 volumes. The proposed project is projected to generate 1,135 daily trips, 72 AM peak hour trips, and 87 PM peak hour trips. Exhibit 1 shows the project site location. Exhibit 2 shows the proposed project site plan. 2.2 STUDY AREA The following four (4) intersections in the vicinity of the project site have been included in the intersection level of service (LOS) analysis: 1. Sierra Ave/Santa Ana Ave; 2. Sierra Ave/Under Wood Dr.; 3. Sierra Ave/Jurupa Ave; 4. Sierra Ave/Sierra Crossroads Access Dwy. Not to Scale2Exhibit 1: Project LocationFontana Southridge Focused Traffic Impact AnalysisRCA-20-001Legend:Project Site Not to Scale3Exhibit 2: Proposed Project Site PlanFontana Southridge Focused Traffic Impact AnalysisRCA-20-001SIERRA AVENUE Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 4 This traffic analysis follows the City of Fontana Development Services Department Traffic Impact Study Guidelines (March 2013). Exhibit 3 shows the location of the study intersections which are analyzed for the following study scenarios: · Existing Baseline Year (Existing); · Construction Phase (Construction); · Opening Year plus Cumulative Projects (Existing + Ambient + Cumulative); and · Opening Year plus Cumulative Projects Plus Project (Existing + Ambient + Cumulative + Project). Traffic operations are evaluated for the following time periods: · Weekday AM Peak Hour occurring within 7:00 AM to 9:00 AM; and · Weekday PM Peak Hour occurring within 4:00 PM to 6:00 PM. 2.3 ANALYSIS METHODOLOGY 2.3.1 Intersection Analysis Methodology Level of Service (LOS) is commonly used to describe the quality of flow on roadways and at intersections using a range of LOS from LOS A (free flow with little congestion) to LOS F (severely congested conditions). The definitions for LOS for interruption of traffic flow differ depending on the type of traffic control (traffic signal, unsignalized intersection with side street stops, unsignalized intersection with all-way stops). The Highway Capacity Manual (HCM) 6 (Transportation Research Board, 2016) methodology expresses the LOS of an intersection in terms of delay time for the intersection approaches. The HCM methodology utilizes different procedures for different types of intersection control. The City of Fontana traffic impact study guidelines require signalized intersection operations be analyzed utilizing the HCM 6th Edition methodology. Intersection LOS for signalized intersections is based on the intersections average control delay for all movements at the intersection during the peak hour. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Not to Scale5Exhibit 3: Proposed Study AreaFontana Southridge Focused Traffic Impact AnalysisRCA-20-0011SANTA ANA AVEJURUPA AVESIERRA AVE UNDER WOOD DR243 Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 6 Table 1 describes the general characteristics of traffic flow and accompanying delay ranges at signalized intersections. Table 1 HCM – LOS & Delay Ranges – Signalized Intersections Level of Service Description Delay (in seconds) A Very favorable progression; most vehicles arrive during green signal and do not stop. Short cycle lengths. 0 – 10.00 B Good progression, short cycle lengths. More vehicles stop than for LOS A. 10.01 – 20.00 C Fair progression; longer cycle lengths. Individual cycle failures may begin to appear. The number of vehicles stopping is significant, though many vehicles still pass through without stopping. 20.01 – 35.00 D Progression less favorable, longer cycle length and high flow/capacity ratio. The proportion of vehicles that pass through without stopping diminishes. Individual cycle failures are obvious. 35.01 – 55.00 E Severe congestion with some long-standing queues on critical approaches. Poor progression, long cycle lengths and high flow/capacity ratio. Individual cycle failures are frequent. 55.01 – 80.00 F Very poor progression, long cycle lengths and many individual cycle failures. Arrival flow rates exceed capacity of intersection. > 80.01 Source: Transportation Research Board, Highway Capacity Manual, HCM6 Edition (Washington D.C., 2016). Collected peak hour traffic volumes have been adjusted using a peak hour factor (PHF) to reflect peak 15- minute volumes. It is a common practice in LOS analysis to conservatively use a peak 15-minute flow rate applied to the entire hour to derive flow rates in vehicles per hour that are used in the LOS analysis. The PHF is the relationship between the peak 15-minute flow rate and the full hourly volume. PHF = [Hourly Volume]/ [4 * Peak 15-Minute Volume]. The use of a 15-minute PHF produces a more detailed and conservative analysis compared to analyzing vehicles per hour. Existing PHFs, obtained from the existing traffic counts have been used for all analysis scenarios in this study. The City of Fontana traffic study guidelines also require unsignalized intersection operations be analyzed utilizing the HCM 6th Edition methodology. Intersection operation for unsignalized intersections is based on the weighted average control delay expressed in seconds per vehicle. At a two-way or side-street stop-controlled intersection, LOS is calculated for each stop-controlled minor street movement, for the left-turn movement(s) from the major street, and for the intersection as a whole. For approaches consisting of a single lane, the delay is calculated as the average of all movements in that lane. For all-way stop-controlled intersection, LOS is computed for the intersection as a whole. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 7 Table 2 describes the general characteristics of traffic flow and accompanying delay ranges at unsignalized intersections. Table 2 HCM – LOS & Delay Ranges – Unsignalized Intersections Level of Service Description Delay (in seconds) A Little or no delays. 0 – 10.00 B Short traffic delays. 10.01 – 15.00 C Average traffic delays. 15.01 – 25.00 D Long traffic delays. Multiple vehicles in queue. 25.01 – 35.00 E Very long delays. Demand approaching capacity of intersection 35.01 – 50.00 F Very constrained flow with extreme delays and intersection capacity exceeded. > 50.01 Source: Transportation Research Board, Highway Capacity Manual, HCM6 Edition (Washington D.C., 2016). This analysis utilizes Trafficware’s Vistro 2021, analysis software for all signalized and unsignalized intersections. Vistro is a macroscopic traffic software program that is based on the signalized intersection capacity analysis specified in Chapter 16 of the HCM. The level of service and capacity analysis performed within Vistro takes the optimization and coordination of signalized intersections within a network into consideration. 2.3.2 Vehicle Miles Traveled (VMT) Analysis Senate Bill (SB) 743 was adopted in 2013 requiring the Governor’s Office of Planning and Research (OPR) to identify new metrics for identifying and mitigating transportation impacts within the California Environmental Quality Act (CEQA). For land use projects, OPR has identified Vehicle Miles Traveled (VMT) as the new metric for transportation analysis under CEQA. The regulatory changes to the CEQA guidelines that implement SB 743 were approved on December 28th, 2018 with an implementation date of July 1st, 2020 as the new metric. Consistent with the new metric of VMT for analysis of transportation impacts under CEQA, this analysis follows the VMT guidelines set forth by the City of Fontana Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (October 21st, 2020). 2.4 PERFORMANCE CRITERIA 2.4.1 City of Fontana The City of Fontana has established level of service “C” or better as acceptable LOS for all intersections along the designated street and highway system in the City’s General Plan Circulation Element. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 8 For the purposes of analyzing transportation deficiencies, the City of Fontana identifies deficiencies through a comparison of “without project” and “with project” traffic conditions. Determination of a deficiency at an intersection is based on a project’s contribution to the intersection’s delay (in seconds) as defined below Table 3. Note, thresholds for LOS A, B, and C do not apply to projects consistent with the General Plan. Table 3 City of Fontana Thresholds of Significance Level of Service Significant Impact Threshold A/B 10.0 Seconds C 8.0 Seconds D 5.0 Seconds E 3.0 Seconds F 1.0 Seconds Source: City of Fontana Traffic Impact Analysis Guidelines (October 21, 2020) 2.5 CUMULATIVE PROJECTS TRAFFIC This analysis accounts for other reasonably foreseeable development projects which are either approved or are currently being processed in the study area as part of a cumulative analysis scenario. A list of cumulative projects was developed for this analysis through consultation with the City of Fontana staff. A summary of cumulative projects land uses is shown below in Table 4. Table 4 Cumulative Project List Project Land Use Qty Units1 AM Peak Hour AM Peak Hour Daily In Out Total In Out Total 1 Fontana Foothills Commerce Center Warehouse 754.41 TSF 99 29 128 39 105 144 1,313 2 Goodman Industrial Park Fontana III Warehouse 894.77 TSF 117 35 152 46 124 170 1,557 High-Cube Cold Warehouse 223.69 TSF 29 9 38 11 31 42 389 Subtotal 146 44 190 57 155 212 1,946 3 Southwest Fontana Logistics Center Warehouse 1,628.94 TSF 213 64 277 83 226 309 2,834 City Park 17.45 AC 0 0 0 1 1 2 14 Subtotal 213 64 277 84 227 311 2,848 Total 458 137 595 180 487 667 6,107 1 TSF = Thousand Square Feet; AC = Acres 2 Source: City of Fontana (See Appendix C) Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 9 3.0 EXISTING BASELINE CONDITIONS 3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS The characteristics of the roadway system in the vicinity of the proposed project site are described in Table 5. Table 5 Roadway Characteristics within Study Area Roadway Classification1 Jurisdiction Direction Existing Travel Lanes Median Type2 Speed Limit (mph) On-Street Parking Sierra Ave Major Highway Fontana North- South 5 RM 50 No Santa Ana Ave Secondary Highway Fontana East-West 4 RM 40 No Underwood Dr. Collector Fontana East-West 2 NM 35 Yes Jurupa Ave Primary Highway Fontana East-West 6 RM 40 No 1: Sources: City of Fontana General Plan (March, 2017) 2: TWLTL = Two-Way Left-Turn Lane, RM= Raised Median, PM = Painted Median, NM = No Median. Exhibit 4 show existing baseline conditions study area intersection and roadway geometry. 3.2 CITY OF FONTANA GENERAL PLAN CIRCULATION ELEMENT The proposed project site is located within the City of Fontana. Appendix A contains the current City of Fontana General Plan Circulation Plan and an explanation of roadway cross sections. 3.3 EXISTING TRUCK NETWORK Within the study area Sierra Avenue, Jurupa Avenue, and Slover Avenue are considered truck routes. 3.4 EXISTING BICYCLE AND PEDESTRIAN FACILITIES Within the study area, Jurupa Avenue has Class I bike lane, Sierra Avenue and Santa Ana Avenue Class II bike lanes. According to the City of Fontana General Plan Conceptual Bicycle Facilities, Class II bicycle routes are proposed on Sierra Avenue and Santa Ana Avenue, Class I bicycle routes are proposed on Jurupa Avenue. Appendix A contains the City of Fontana General Plan Conceptual Bicycle Facilities. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 10 3.5 EXISTING PUBLIC TRANSIT SERVICES The City of Fontana is served by Omnitrans which provides transit service throughout Fontana. Exhibit 5 shows the Omnitrans routes in the vicinity of the project site. The nearest transit route is Omnitrans Route 82 with stops at the intersections of Sierra Avenue/Santa Ana Avenue, Sierra Avenue/Under Wood Drive, and Sierra Avenue/Jurupa Avenue. 3.6 EXISTING TRAFFIC VOLUMES To determine the existing operation of the study intersections, AM and PM peak period traffic volumes were estimated based on new traffic counts collected on Wednesday, October 21, 2020 and historical data from 2018. Historical data was grown by an ambient 2% growth rate to establish 2020 existing baseline conditions. A comparison of new traffic counts and established existing baseline conditions was conducted to determine an appropriate growth rate to account for the reduction in traffic volumes due to the COVID-19 situation. The subsequent growth rate was applied to new traffic counts to represent existing baseline conditions for those intersections that did not have historical data. A 0.363 average growth rate was applied to the AM Peak Hour and a 0.124 average growth rate was applied to the PM Peak Hour. Detailed traffic count data is provided in Appendix B. Exhibit 6 shows existing AM and PM peak hour volumes at the study intersections. Legend:Project Site2-Lane Divided Roadway2D3-Lane Divided Roadway3D4-Lane Divided Roadway4D6-Lane Divided Roadway6DNot to Scale11Exhibit 4: Existing Lane Geometry and Intersection ControlsFontana Southridge Focused Traffic Impact AnalysisRCA-20-0011SANTA ANA AVEJURUPA AVESIERRA AVE UNDER WOOD DR2436D4D4D5D5D2D5D5D4D6D4D Not to Scale12Exhibit 5: Existing Transit ServicesFontana Southridge Focused Traffic Impact AnalysisRCA-20-001Legend:Project SiteRoute 82SANTA ANA AVEJURUPA AVESIERRA AVE UNDER WOOD DRTransit Stop Legend: XX Peak Hour Volumes Project Site 12356 7 4 8 910 1112 Not to Scale 13 Exhibit 6: Existing AM and PM Peak Hour Volumes Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 AM PEAK HOUR PM PEAK HOUR Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 14 3.7 EXISTING BASELINE CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS Existing baseline conditions AM and PM peak hour intersection analysis is shown in Table 6. Calculations are based on the existing geometrics at the study area intersections as shown in Exhibit 4. HCM analysis sheets are provided in Appendix D. Table 6 Intersection Analysis – Existing Baseline Conditions Intersection Control Type Peak Hour Existing Baseline Conditions Delay1 LOS 1 Sierra Ave Santa Ana Ave Signal AM 21.1 C PM 25.6 C 2 Sierra Ave Under Wood Dr Signal AM 30.6 C PM 15.3 B 3 Sierra Ave Jurupa Ave Signal AM 38.7 D PM 42.0 D 4 Sierra Ave Sierra Crossroads Access Dwy TWSC AM 39.5 E PM 86.0 F Note: TWSC = Two-Way Stop-Control, OWSC = One-Way Stop-Control; Delay shown in seconds per vehicle. 1 = Per the Highway Capacity Manual 6th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. For intersections with one-or-two-way stop-control, the delay and LOS for the worst individual movement is shown. As shown in Table 6, the study intersections are currently operating at an acceptable LOS during the AM and PM peak hours for existing baseline conditions except for the following intersections. · #3- Sierra Avenue/Jurupa Avenue (LOS D AM and PM Peak Hour). · #4- Sierra Avenue/Sierra Crossroads Access Driveway (LOS E AM and LOS F PM Peak Hour). Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 15 4.0 PROPOSED PROJECT 4.1 PROJECT DESCRIPTION The proposed project consists of 155 multi-family dwelling units. The site is currently zoned and classified as General Commercial (G-C) in the City of Fontana General Plan Land Use. The project site is currently vacant. The City of Fontana has a future proposed land use of Walkable Mixed-Use Urban Village (WMXU-2). Exhibit 2 previously showed the proposed project site plan. 4.2 PROJECT SITE ACCESS Site access will be provided via one (1) full access driveway along Sierra Avenue. A second driveway, located north of the main driveway, will be provided, but will be utilized for emergency access only. The primary access driveway will provide 150-feet of stacking (two 75-foot lanes) between the proposed access pad and the adjacent roadway. This meets the required stacking distance needed per City Standard No. 701 Access Management Standard. 4.3 PROJECT TRIP GENERATION Trip generation represents the amount of traffic, both inbound and outbound, produced by a development. Determining trip generation for a proposed project is based on projecting the amount of traffic that the specific land uses being proposed will produce. Industry standard Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition, 2017) trip generation rates were used to determine trip generation of for most of the proposed project land uses. Table 7 summarizes the projected AM peak hour, PM peak hour and daily trip generation of the proposed project. The proposed project is projected to generate 1,135 daily trips, 72 AM peak hour trips, and 87 PM peak hour trips. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 16 Table 7 Proposed Project Trip Generation Proposed Land Use1 Qty Unit2 Daily Trips (ADTs) AM Peak Hour PM Peak Hour Rate Volume Rate In:Out Split Volume Rate In:Out Split Volume In Out Total In Out Total Multi-family Housing (Low Rise) (220) 155 DU 7.32 1,135 0.46 23:77 17 55 72 0.56 63:37 55 32 87 Total 1,135 17 55 72 55 32 87 1: Rates from ITE Trip Generation (10th Edition, 2017) 2: DU = Dwelling Units Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 17 4.4 PROJECT TRIP DISTRIBUTION Projecting trip distribution involves the process of identifying probable destinations and traffic routes that will be utilized by the proposed project’s traffic. The potential interaction between the proposed land use and surrounding regional access routes are considered to identify the probable routes onto which project traffic would distribute. The projected trip distribution for the proposed project is based on anticipated travel patterns to and from the project site. Exhibit 7 shows the projected trip distribution of proposed project trips. 4.5 MODAL SPLIT The traffic reducing potential of public transit, walking and bicycling have not been considered in this analysis since transit facilities in the study area are limited. Not to Scale18Exhibit 7: Trip Distribution of Proposed Project TripsFontana Southridge Focused Traffic Impact AnalysisRCA-20-001124315%5%10%30%65%60%5%10%20%30%5% Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 19 5.0 CONSTRUCTION PHASE CONDITIONS Construction phase traffic conditions analysis is intended to identify conditions during project construction and assumes the proposed project is not yet built. 5.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for the construction phase scenario are consistent with those previously shown in Exhibit 4. It is assumed construction traffic will be limited to right- in and right-out only at the proposed driveway. 5.2 CONSTRUCTION PHASE TRAFFIC VOLUMES Construction phase include background traffic. Since the construction phase is expected to happen and generating trips in 2022, the construction phase volumes include a growth rate of 2% per year, applied to existing volumes plus the anticipated construction traffic. 2022 is the estimated start period for the construction phase, where 90,000 cubic yards of imported soil will be delivered to the project job site, and an estimated 2,000 cubic yards of dirt will be imported daily for 10 weeks. Each truck will deliver about 28 cubic yards, which will be about 72 trucks per day. When converting the trucks to passenger car equivalent (PCE) the Fontana guidelines state that 4 and more axle trucks are equivalent to 3.0 PCE. 3.0 PCE x 72 trucks = 216 PCE’s/day. Construction hours of operation will be from 7:30 AM to 4:00 PM. Although work is expected to stop after 4:00 PM. In order to calculate the peak hour trips 216 PCE’s/day over a nine (9) hour work day was used which is equivalent to 24 PCE’s/ hour. The analysis will be taking a conservative approach to anticipate trucks working through PM peak hours, so 24 peak hour trips was used in both the AM and PM peak periods. Construction Phase Volumes = (Existing (2020) Counts * 1.02^2) + Construction Trucks Exhibit 8 shows construction phase AM and PM peak hour volumes at the study intersections. 5.3 CONSTRUCTION PHASE INTERSECTION LEVEL OF SERVICE ANALYSIS Construction phase AM and PM peak hour intersection analysis is shown in Table 8. Calculations are based on the existing geometrics at the study area intersections as shown in Exhibit 3. The truck distribution does not impact the LOS at Intersection 4, and there is no significant increase in delay at any of the four intersections with the addition of the 24 peak hour trips. Intersection 4 will be a driveway with right in/out during the construction phase. HCM analysis sheets are provided in Appendix D. Legend: XX Peak Hour Volumes Project Site 12356 7 4 8 910 1112 Not to Scale 20 Exhibit 8 Construction Phase AM and PM Peak Hour Volumes Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 AM PEAK HOUR PM PEAK HOUR Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 21 Table 8 Intersection Analysis – Construction Phase Conditions Intersection Control Type Peak Hour Construction Conditions Delay1 LOS 1 Sierra Ave Santa Ana Ave Signal AM 20.1 C PM 26.5 C 2 Sierra Ave Under Wood Dr Signal AM 12.1 B PM 15.9 B 3 Sierra Ave Jurupa Ave Signal AM 39.7 D PM 42.8 D 4 Sierra Ave Sierra Crossroads Access Dwy TWSC AM 47.4 E PM 117.3 F Note: TWSC = Two-Way Stop-Control, OWSC = One-Way Stop-Control; Delay shown in seconds per vehicle. 1 = Per the Highway Capacity Manual 6th Edition, overall average delay and LOS are shown for signalized. As shown in Table 8, the study intersections are projected to continue to operate at an acceptable LOS during the AM and PM peak hours for construction phase conditions except for the following intersections: · #3- Sierra Avenue/Jurupa Avenue (LOS D AM and PM Peak Hour). · #4- Sierra Avenue/Sierra Crossroads Access Driveway (LOS E AM and LOS F PM Peak Hour) - Southbound left is the worst turning movement and causes an unacceptable LOS Construction phase calculations are based on the existing lane geometry of the study area. Intersection 4 has an existing failing LOS for both the AM and PM peak hours. The cause for the failing LOS is the southbound left turn movement into the shopping center driveway shown in Appendix D. The truck distribution does not impact the LOS as intersection 4 will provide a driveway into the proposed project which will only allow right in/out during the construction phase. Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 22 6.0 PROJECT OPENING YEAR PLUS CUMULATIVE CONDITIONS (OY) Project opening year plus cumulative (OY) traffic conditions analysis is intended identify baseline conditions in the near-term with cumulative projects and without the proposed project. 6.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for the project opening year plus cumulative scenario are consistent with those previously shown in Exhibit 4 with the exception of the proposed driveway which is proposed as a signalized intersection. 6.2 PROJECT OPENING YEAR PLUS CUMULATIVE TRAFFIC VOLUMES Project opening year plus cumulative volumes include background traffic plus the addition of traffic projected to be generated by nearby cumulative projects. Since the proposed project is expected to be built and generating trips in 2023, project opening year plus cumulative volumes include a growth rate of 2% per year, applied to existing volumes cumulative projects are also added to account for nearby projects. Project Opening Year Plus Cumulative Volumes = (Project Opening Year Volumes * 1.02^3) + Cumulative Traffic Exhibit 9 shows project opening year plus cumulative AM and PM peak hour volumes at the study intersections. 6.3 PROJECT OPENING YEAR PLUS CUMULATIVE INTERSECTION LEVEL OF SERVICE ANALYSIS Project opening year plus cumulative conditions AM and PM peak hour intersection analysis is shown in Table 9. HCM analysis sheets are provided in Appendix D. 6.4 CUMULATIVE PROJECTS TRAFFIC This analysis accounts for other reasonably foreseeable development projects which are either approved or are currently being processed in the study area as part of a cumulative analysis scenario. A list of cumulative projects was developed for this analysis through consultation with the City of Fontana staff. Legend: XX Peak Hour Volumes Project Site 12356 7 4 8 910 1112 Not to Scale 23 Exhibit 9: Project Opening Year Plus Cumulative AM and PM Peak Hour Volumes Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 AM PEAK HOUR PM PEAK HOUR Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 24 Table 9 Intersection Analysis – Project Opening Year Plus Cumulative (OY) Conditions Intersection Control Type Peak Hour OY Conditions Delay1 LOS 1 Sierra Ave Santa Ave Signal AM 22.1 C PM 29.7 C 2 Sierra Ave Under Wood Dr Signal AM 12.1 B PM 16.1 B 3 Sierra Ave Jurupa Ave Signal AM 40.1 D PM 43.6 D 4 Sierra Ave Sierra Crossroads Access Dwy OWSC AM 52.8 F PM 135.4 F Note: AWSC = All- Way Stop-Control, OWSC = One-Way Stop Control, Delay shown in seconds per vehicle. 1 = Per the Highway Capacity Manual 6th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. For intersections with one-or-two-way stop-control, the delay and LOS for the worst individual movement is shown. As shown in Table 9, the study intersections are projected to continue to operate at an acceptable LOS during the AM and PM peak hours for project opening year plus cumulative conditions with the exception of the following intersections: · #3- Sierra Avenue/Jurupa Avenue (LOS D AM and PM Peak Hour). · #4- Sierra Avenue/Sierra Crossroads Access Driveway (LOS E AM and LOS F PM Peak Hour). Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 25 7.0 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT CONDITIONS Project opening year plus cumulative plus project (OYP) conditions analysis is intended to identify the project- related impacts on both the existing and planned near-term circulation system. 7.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for the project opening year plus cumulative plus project scenario are consistent with those previously shown in Exhibit 4, with the exception of project driveway and other facilities assumed to be constructed by the proposed project to provide site access. 7.2 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT TRAFFIC VOLUMES Project opening year plus cumulative plus project volumes include background traffic plus the addition of traffic projected to be generated by nearby cumulative projects and the addition the traffic projected to be generated by the proposed project. Since the proposed project is expected to be built and generating trips in 2023, project opening year plus cumulative plus project volumes include a growth rate of 2% per year for three years, applied to existing volumes. To account for cumulative projects, volumes were grown by an additional 2% and project volumes were added. Project Opening Year Plus Cumulative Plus Project Volumes = (Existing (2020) Counts * 1.02^3) + Cumulative Project Volume + Project Volume Exhibit 10 shows project opening year plus cumulative plus project AM and PM peak hour volumes at the study intersections. 7.3 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS Project opening year plus cumulative plus project conditions AM and PM peak hour intersection analysis is shown in Table 10. HCM analysis sheets are provided in Appendix D. Legend: XX Peak Hour Volumes Project Site 12356 7 4 8 910 1112 Not to Scale 26 Exhibit 10: Project Opening Year Plus Cumulative Plus Project AM and PM Peak Hour Volumes Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 AM PEAK HOUR PM PEAK HOUR Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 27 Table 10 Intersection Analysis – Project Opening Year Plus Cumulative Plus Project (OYP) Conditions Intersection Control Type Peak Hour OY Conditions OYP Conditions Change Impact? Delay1 LOS Delay1 LOS 1 Sierra Ave Santa Ana Ave Signal AM 22.1 C 22.8 C 0.70 No PM 29.7 C 39.9 C 0.20 No 2 Sierra Ave Under Wood Dr Signal AM 12.1 B 12.2 B 0.10 No PM 16.1 B 16.2 B 0.10 No 3 Sierra Ave Jurupa Ave Signal AM 40.1 D 40.1 D 0.00 No PM 43.6 D 44.0 D 0.40 No 4 Sierra Ave Sierra Crossroads Access Drwy Signal AM 52.8 F 12.5 B (40.30) No PM 135.4 F 15.0 B (120.40) No Note: AWSC = All- Way Stop-Control, OWSC = One-Way Stop Control, Signal = Improvement, Delay shown in seconds per vehicle. 1 = Per the Highway Capacity Manual 6th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. For intersections with one-or-two-way stop-control, the delay and LOS for the worst individual movement is shown. As shown in Table 10, the study intersections are projected to continue to operate at an acceptable LOS during the AM and PM peak hours for project opening year plus cumulative plus project conditions. 7.4 PROJECT OPENING YEAR PLUS CUMULATIVE PLUS PROJECT SIGNAL WARRANT ANALYSIS Traffic signal warrants for Project opening year plus cumulative plus project conditions have been prepared based on peak-hour intersection volumes at the project site access location. The purpose of this analysis is to ensure the need for a signal that the project is proposing. Table 11 summarizes the results of the signal warrant analysis. Detailed warrant analysis sheets are contained in Appendix E. Table 11 Signal Warrant Analysis – Project Opening Year Plus Cumulative Plus Project (OYP) Conditions Intersection Peak Hour Signal Warrant Met? AM Peak Hour PM Peak Hour 4 Sierra Ave Sierra Crossroads Access Drwy Yes Yes Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 28 8.0 PROJECT ACCESS AND CONCEPT ALIGNMENT 8.1 PROJECT ACCESS Site access will be provided via one (1) full access driveway along Sierra Avenue. A second driveway, located north of the main driveway, will be provided, but will be utilized for emergency access only. The primary access driveway will provide 150-feet of stacking (two 75-foot lanes) between the proposed access pad and the adjacent roadway. This meets the required stacking distance needed per City Standard No. 701 Access Management Standard. 8.2 CONCEPT ALIGNMENT The proposed primary driveway will align with the Sierra Crossroads access driveway east of Sierra Avenue and proposes the installation of a traffic signal. Peak hour traffic signal warrants are met for the “with project” scenarios at this study intersection. As shown in Exhibit 11, the concept alignment depicts the proposed project driveway and Sierra Avenue. Sierra Avenue is a 5-lane divided roadway and will have a traffic signal installed. 8.3 QUEUING ANALYSIS A queuing analysis was conducted for OYP conditions to determine 95th percentile queues. Table 12 shows 95th percentile queue length for movements at intersection 4. As shown, the design storage lengths can adequately accommodate 95th percentile queues. Queuing analysis sheets are in Appendix D. Table 12 Queuing Analysis – OYP Conditions Intersection Movement Storage Length (ft) 95th Percentile Queue Length (ft) AM Peak Hour PM Peak Hour #4 - Sierra Avenue/Crossroads Access Driveway NBL 120 7 17 SBL 205 120 184 EB Approach 150 34 22 WB Approach 165 75 153 Not to Scale29Exhibit 11: Concept Alignment PlanFontana Southridge Focused Traffic Impact AnalysisRCA-20-001 Fontana Southridge Focused Traffic Impact Analysis RCA-20-001 30 9.0 VEHICLE MILES TRAVELED (VMT) ANALYSIS Senate Bill (SB) 743 was adopted in 2013 requiring the Governor’s Office of Planning and Research (OPR) to identify new metrics for identifying and mitigating transportation impacts within the California Environmental Quality Act (CEQA). For land use projects, OPR has identified Vehicle Miles Traveled (VMT) as the new metric for transportation analysis under CEQA. The regulatory changes to the CEQA guidelines that implement SB 743 were approved on December 28th, 2018 with an implementation date of July 1st, 2020 as the new metric. 9.1 VEHICLE MILES TRAVELED (VMT) ANALYSIS Consistent with the new metric of VMT for analysis of transportation impacts, this analysis follows VMT guidelines set forth by the City of Fontana Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (October, 21st, 2020). For land use projects, affordable or supportive housing is to be presumed to cause a less than significant impact. As the project falls within affordable or supportive housing, the project is presumed to have a less than significant transportation impact per City guidelines. APPENDIX A SCOPING AGREEMENT AND FONTANA ROADWAY CLASSIFICATIONS AND CROSS SECTIONS   6 Venture, Suite 225 | Irvine, California  92618 | t: (949) 878‐3509  www.tjwengineering.com    October 14, 2020        Mr. Stan Smith  RELATED CALIFORNIA  18201 Von Karman Ave.  Suite 900  Irvine, CA  92612    SUBJECT:  Fontana Southridge Focused Traffic Impact Analysis Scoping Agreement, City of  Fontana    Dear Mr. Smith,    TJW Engineering, Inc. (TJW) will be preparing a focused traffic impact analysis (TIA) for the proposed multi‐ family residential project located on the west side of Sierra Avenue between Under Wood Drive and Jurupa  Avenue in the City of Fontana. The proposed project includes 155 multi family dwelling units in its full capacity.  However, the project will be built in phases. For this traffic analysis, the project will be analyzed as full built‐ out, with all 155 units occupied.      Site access will be provided via one (1) full access driveway along Sierra Avenue. A second driveway, located  north of the main driveway, will be provided, but will utilized for emergency access only. The proposed site plan  has been attached to this letter. The following scope of work has been prepared based on the City of Fontana  Traffic Impact Study Guidelines. The Traffic Impact Study Scope form is also attached for reference.      SCOPE OF WORK    Trip Generation and Distribution Assumptions    Trip generation for the proposed project will be developed using rates from the Institute of  Transportation Engineers (ITE) Trip Generation Manual (10th Edition). The trip generation rates and  anticipated trip generation for the project are attached. The project is anticipated to generate 1,135  daily trips, 72 AM peak hour trips, and 88 PM peak hour trips.     Proposed Land Use1 Qty Unit2  Daily Trips (ADTs) AM Peak Hour PM Peak Hour  Rate Volume Rate In:Out  Split  Volume Rate In:Out  Split  Volume  In Out Total In Out Total  Multi‐family Housing (Low Rise) (220) 155 DU 7.32 1,135 0.46 23:77 17 55 72 0.56 63:37 55 32 87  Total         1,135      17 55 72      55 32 87  1: Rates from ITE Trip Generation (10th  Edition, 2017)   2: DU = Dwelling Units   Mr. Smith  Fontana Southridge TIA Scoping Agreement  October 14, 2020  Page 2    TJW Engineering, Inc.  RCA20001 Fontana Southridge TIA Scoping Agreement 10142020    Trip Distribution Assumptions    Project trip distributions will be based on the surrounding regional access routes to identify probable  routes onto which project traffic would distribute. The anticipated travel patterns to and from the  project site are shown in the attached exhibit.     Study Area    The study area shall generally include intersections in which the proposed project may create a  significant impact. As such, TJW proposes to include the following intersections and roadway  segment:     Study Intersections  1. Sierra Ave / Santa Ana Ave  2. Sierra Ave / Underwood Dr  3. Sierra Ave / Jurupa Ave  4. Sierra Ave / Sierra Crossroads Primary Access Driveway    Analysis Methodology and Scenarios    The analysis of traffic and level of service will be provided for the following scenarios and will include  an assessment of traffic mitigation measures if any are required.     1. Existing No Project Conditions   2. Existing with Project Conditions   3. Opening Year (2023) No Project Conditions  4. Opening Year (2023) with Project Conditions    These scenarios were chosen since the proposed project is anticipated to generate between 50 and  100 two‐way peak hour trips per the City’s TIA Guidelines.    The TIA will analyze study intersections during the AM and PM peak hours. Intersection level of  service (LOS) will be calculated using the Highway Capacity Manual 6 (HCM 6) analysis methodologies  using Synchro software.    Volume Development    Traffic volumes for existing year traffic conditions will be based on existing AM and PM peak hour  traffic counts for the study intersections identified above. New traffic counts will be conducted  between the hours of 7 AM and 9 AM for the AM peak hour and between the hours of 4 PM and 6  PM for the PM peak hour and avoiding any school/roadway closure periods.   Mr. Smith  Fontana Southridge TIA Scoping Agreement  October 14, 2020  Page 3    TJW Engineering, Inc.  RCA20001 Fontana Southridge TIA Scoping Agreement 10142020    Opening Year 2023 traffic volumes will be developed by applying an annual growth rate of two (2)  percent per year to the established existing year 2020 traffic counts (discussed above).     Project Impact Assessment and Mitigation Measures    Intersection LOS without the project will be compared to the intersection LOS with the project for  each of the analysis scenarios to determine potential traffic/infrastructure deficiencies.  Determination of traffic/infrastructure deficiencies will be made based on the City’s general plan  threshold standards (LOS C). If the level of service analysis shows that the project causes a deficiency  at a study facility, feasible improvements will be recommended. As applicable, the project’s fair share  will be estimated as part of the mitigation section (fair share is 100% for direct impacts).      Signal Warrant Analysis    The project proposes to construct and align its driveway with the Sierra Crossroad Shopping Center’s  primary access driveway. As part of this alignment, the project is also proposing the construction of  a signal light.     A peak hour signal warrant analysis will be conducted for this location to support the need to  construct a signal light. The traffic signal warrant analysis will be based on the California Manual on  Uniform Traffic Control Devices (CA MUTCD) signal warrant analysis methodology for peak hour.  Traffic counts will be conducted at this location. Proposed project traffic will be added to these  volumes and used to conduct the peak hour signal warrant analysis.     Since the existing Sierra Crossroads Driveway, the east approach or the intersection, prohibits left  turns out of the driveway, TJW would calculate the anticipated number of left turn movements that  would utilize this new traffic signal. Left turn volumes would be calculated based on ITE trip  generation rates for the shopping center. These volumes would be needed to determine signal  warrants for the intersection.     Gated Entry Stacking Review    Per the City Standard No. 701, Access Management Standard, the needed stacking distance needed  between the access pad and the adjacent roadway is 150‐feet. This is based on the 155 dwelling  units anticipated for the project. If this distance cannot be achieved, TJW would analyze the gate  operations and anticipated arrival and throughput rates for the entry. TJW would rely on the  Crommelin Methodology to determine the stacking length adequacy.      The Crommelin Methodology is a queuing analysis methodology used to determine the storage  required for vehicles at entryways to gated communities, based on Entrance‐Exit Design and Control  for Major Parking Facilities (Robert W. Crommelin, October 5, 1972). While the Crommelin  Mr. Smith  Fontana Southridge TIA Scoping Agreement  October 14, 2020  Page 4    TJW Engineering, Inc.  RCA20001 Fontana Southridge TIA Scoping Agreement 10142020  Methodology was developed many years ago, it is still in use by agencies around the county as it is  one of the only methodologies that attempts to quantify queuing at gated communities. The  Crommelin Methodology determines the minimum storage length required to provide adequate  access and control at gated entry points to ensure minimal impacts on the surrounding street  network. The methodology is based on worst case peak hour volumes, the processing rate at the  control point and the number of travel lanes.  The determination of the reservoir length required to  serve peak hour volumes is based on a Poisson distribution.    TJW would summarize the findings and recommendations in the focused traffic study.    Concept Alignment Plan    TJW would prepare a concept alignment plan showing how the proposed driveway would align  with the existing Sierra Crossroads driveway to the east on Sierra Avenue. The plan would be drawn  to scale using AutoCAD and would be designed to meet City of Fontana standards.    If you have any questions regarding this scope of work or project, please feel free to contact me at  David@tjwengineering.com or at (949) 878‐3509.     Sincerely,      David Chew, PTP  Transportation Planning Manager  TJW Engineering, Inc.  Not to ScaleRCA-20-001 Fontana Southridge Traffic Impact AnalysisProject SiteLegend:Study IntersectionExhibit 1: Trip Distribution and Study IntersectionsTrip DistributionXX%10%30%65%60%30%5%10%20%5%5%15%UNDER WOOD DRJURUPA AVESANTA ANA AVESIERRA AVESIERRACROSSROADS1234 FONTANA SOUTHRIDGE PRE-CONCEPT DESIGN REVIEW AUG 19, 2020 167 DU - L1 PLAN 1/64” = 1’-0” 167 DU - L2 PLAN 1/64” = 1’-0” FONTANA SOUTHRIDGE PRE-CONCEPT DESIGN REVIEW AUG 19, 2020 9.8 Fontana General Plan • Health data for Fontana indicate that both adults and youth have lower rates of physical activity compared with county and state averages. D. Hierarchy of Streets in Fontana A roadway functional classification or Hierarchy of Streetes (See Exhibit 9.2 Hierarchy of Streets) has been established for the City of Fontana. When planning for new de- velopment, redevelopment and City initiated Capital improvements Projects, roadway design must consider space for all users. Histor- ically streets in Fontana, like most cities, were designed according to capacity and Level of Service for automobiles with little consid- eration for the complete streets principles. Moving forward Fontana will use a Multimodal Level of Service as a measurement in the rat- ing of the performance of streets. Balancing transit, bicycle, and pe- destrians with level of service. Street Hierarchy will dictate the num- ber or travel lanes while improvements for bicycle, pedestrian and public transit connectivity. Where in the past land use would dictate transportation systems, now moving Fontana Forward, transporta- tion systems will serve land use choices. Additional right-of-way dedication beyond the approved typical travel lane requirements may be required in order to accommodate turn lanes, center medians, intersection improvements and com- plete street improvements. The roadway hierarchy of streets are briefly described in the following paragraphs. Major Highways: Major highways will have up to 6 lanes in most situations. Where Major Highways cross Freeways it may be necessary to increase capacity to 8 lanes. These streets typically have raised medians or two-way left turn lanes. These facilities can carry high volumes of traffic. The majority of the Major Highway network in the City has already been improved. Sidewalks and bike lanes should be added whenever possible and bus bays should be installed as turnouts. New development should incorporate Complete Street components as outline in the Active Transportation. Primary and Secondary Highways: These roadways will have up to 4 travel lanes. Primary Highways typically connect Major Highways and often have raised medians or two way left turn lanes. Secondary Highways also have up to 4 lanes of travel and are typically used to carry traffic along the perimeters of large developments. Because traffic volumes are not as high as compared to Major Highways, these wide roads are ideal for Com- plete Street concepts. Passengers board a midday Metrolink train at Fontana Station. Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 9.16 Fontana General Plan Collector Streets: These roadways can accomodate 2 or 4 lanes of traffic. They are typically used to take traffic from neighborhoods to Primary and Secondary Roads. Collector Roads are also used in industrial areas to funnel trucks from their point of services to the Truck Route Net- work. Whether connecting residents to Primary Roads or trucks to Truck Routes, collector streets are ideal candidates for Complete Street concepts. Where possible, physical buffers such as land- scaped parkways or solid dividers should be used to seperate vehic- ular traffic from bicycles and pedestrians. Local Streets: These are 2 lane roads in large part serving residential neighbor- hoods. In addition to Complete Street concepts, traffic calming measures should be incorporated whenever possible. Local streets should consider automobile parking curb adjacent with bike lanes striped along the road side of the parking area. CHALLENGES • Reducing traffic congestion. • Providing more transportation choice for trips within Fontana. • Creating safe, comfortable and convenient alternatives to driving. • Reducing the commuting burden for Fontana residents. • Improving transit service, coverage, reliability, convenience, and comfort. • Reducing traffic congestion. E. What the Community Said Public opinion survey Respondents who expressed that they were very satisfied or somewhat satisfied with the following public services: • Maintain local streets and roads—77.7% • Manage traffic flow in the city—74.3% Respondents ranked the following potential future priorities as high or medium priorities: • Improve the maintenance of city streets and infrastructure—90.8% • Make it easier and safer to walk to local destinations—86.7% • Improve traffic conditions in the city—83.6% • Improve local public transit services—79.6% • Create a network of safe bike routes connecting all parts of the city—74.2% (Text continues on page 9.16.) Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 9.10 Fontana General Plan [0 5,000 10,0002,500 Feet Roadway Functional ClassificationsMarch, 2017 Data Source: City of Fontana, 2017 Scale 1:75,000 City of Rancho Cucamonga City of Rialto Bloomington City of OntarioRiverside County §¨¦ ·|}þ §¨¦SIERRA AVSLOVER AV VALLEY BLVD ARROW BLVD CITRUS AVJURUPA AV FOOTHILL BLVD BASELINE AV ETIWANDA AVSANTA ANA AV MERRILL AV MILLER AV RANDALL AVCHERRY AVJUNIPER AVMANGO AVALDER AVLOCUST AVWALNUT AV HIGHLAND AV BEECH AVPALMETTO AVSAN BERNARDINO AV WHITRAM AV SUMMIT AV ELM AVCYPRESS AVMARLAY AV KNOX AVTOKAY AVFONTANA AVBANANA AVMULBERRY AVLIVE OAK AVEAST AVCATAWBA AVHEMLOCK AVSIERRA LAKES PKWY POPLAR AVTAMARIND AVMAGNOLIA AVOLEANDER AVREDWOOD AVALMERIA AVILEX AVSULTANA AVORANGE WY CURTIS AV VICTORIA AV ALMOND AVPHILADELPHIA AV CALABASH AVARMSTRONG RDLIME AVRIV E R S I D E A V WASHINGTON DR AUGUSTA DRLIBERTY PKWY DUNCAN CANYON RD SAN SEVAINE RDVOLANTE DRHILTON DR LYTLE CREEK RDBRIDLEPATH DRCOYOTE CANYO N RD VILLAGE D R ROADRUNNER RDBUSINESS DRFRONTAGE RD BAR H A R B O R R D COMMERCE WYPRODUCTION AVVALENCIA AV CASMALIA ST ALISO DR VIA LARGARILEY DRPLUMARIA DRJASMINE AVSHADOW DR ORLANDO DRPOPLAR AVBEECH AVPOPLAR AVBEECH AVJURUPA AVCITRUS AVREDWOOD AVBASELINE AV SIERRA AVELM AVHEMLOCK AVHEMLOCK AVALMOND AVREDWOOD AVMANGO AVCYPRESS AVHEMLOCK AVBANANA AVMULBERRY AVJUNIPER AVSIERRA AVCHERRY AVCALABASH AVLIVE OAK AVOLEANDER AVCYPRESS AVELM AVCHERRY AVCITRUS AVLIVE OAK A V ALDER AVLOCUST AVJURUPA AVLIVE OAK AVOLEANDER AVBEECH AV BEECH AVCATAWBA AVSAN BERNARDINO AV BANANA AVTAMARIND AVALMOND AV10 15 210 Legend Roadway Functional Class To be determined 8 lane major Highway Major Highway Modified Major Highway Primary Highway Modified Primary Highway Secondary Highway Modified Secondary Highway Industrial Collector Modified Industrial Collector Collector Street Modified Collector Street Fontana Sphere of Influence Roadway Functional Classifications March, 2017 Data source: City of Fontana, 2017 EXHIBIT 9.2 HIERARCHY OF STREETS IN FONTANA Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 Chapter 9 Community Mobility and Circulation 9.11 Æb !"a$ A³ !"`$ 22 82 SIERRACHERRYALDERVALLEY ARROW SLOVER JURUPA FOOTHILL BASELINEETIWANDA MERRILL SAN BERNARDINO HIGHLAND SUMMIT BEECHRIV E R S I D E BANYAN MULBERRYLYTLE CREEKRENAISSANCE CITRUSWILSON COYOTE CANYONRIALTO FOURTH AIRPORT DUNCAN CANYON ALDERWILSON BEECHBEECHLYTLE CREEK1019 15 67 66 61 29 20 [0 5,000 10,0002,500 Feet Mobility Map October, 2015 Data Source: City of Fontana, Metrolink, Omnitrans, SANBAG Legend Æb Fontana Metrolink Station Metrolink Passenger Rail úûü Park and Ride Lots Omnitrans Routes (Various) Omnitrans Bus Stops Bike Network Existing Class I Existing Class II Existing Class III Sidewalks Sidewalks Scale 1:75,000 City of RanchoCucamonga City of Rialto Bloomington City of OntarioRiverside County South Fontana Transfer Center Mobility October, 2015 Data source: City of Fontana, Metrolink, Omintrans, SANBAG EXHIBIT 9.3 MOBILITY Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 9.12 Fontana General Plan §¨¦ ·|}þ §¨¦10 15 210 SIERRACHERRYALDERVALLEY ARROW SLOVER JURUPA FOOTHILL BASELINEETIWANDA MERRILL SAN BERNARDINO HIGHLAND SUMMIT BEECHRIV E R S I D E BANYAN MULBERRYLYTLE CREEKRENAISSANCE CITRUSWILSON COYOTE CANYON RIALTO FOURTH AIRPORT DUNCAN CANYON ALDERWILSON BEECHBEECHLYTLE CREEK[0 5,000 10,0002,500 Feet Sidewalk Connectivity March, 2017 Data Source: City of Fontana, 2015 Legend Fontana Sphere of Influence Sidewalks Scale 1:75,000 City of RanchoCucamonga City of Rialto Bloomington City of OntarioRiverside County Sidewalk ConnectivityMarch, 2017Data source: City of Fontana, 2015 EXHIBIT 9.4 SIDEWALK CONNECTIVITY IN FONTANA Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 9.14 Fontana General Plan SIERRACHERRYALDERVALLEY ARROW SLOVER JURUPA FOOTHILL BASELINEETIWANDA MERRILL SAN BERNARDINO HIGHLAND SUMMIT BEECHRIV E R S I D E BANYAN MULBERRYLYTLE CREEKRENAISSANCE CITRUSWILSON RIALTOCOYOTE CANYONFOURTH DUNCAN CANYON ALDERWILSON BEECHBEECHLYTLE CREEK[0 5,000 10,0002,500 Feet Bicycle Facilities September, 2015 Data Source: City of Fontana, 2015 SANBAG NMTP, 2014 Legend Existing Class I Existing Class II Existing Class III Proposed Class I Proposed Class II Proposed Class III Fontana Sphere of Influence Scale 1:75,000 City of RanchoCucamonga City of Rialto Bloomington City of OntarioRiverside County Bicycle FacilitiesMarch, 2017Data sources: City of Fontana, 2015; SANBAG NMTP, 2014 EXHIBIT 9.6 BICYCLE FACILITIES IN FONTANA Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 Chapter 9 Community Mobility and Circulation 9.15 §¨¦ ·|}þ §¨¦10 15 210 SIERRACHERRYALDERVALLEY ARROW SLOVER JURUPA FOOTHILL BASELINEETIWANDA MERRILL SAN BERNARDINO HIGHLAND SUMMIT BEECHRIV E R S I D E BANYAN MULBERRYLYTLE CREEKRENAISSANCE CITRUSWILSON RIALTOCOYOTE CANYON FOURTH DUNCAN CANYON ALDERWILSON BEECHBEECHLYTLE CREEK[0 5,000 10,0002,500 Feet Truck NetworkMarch, 2017 Data Source: City of Fontana, 2014 Legend Truck Routes Fontana Sphere of Influence Scale 1:75,000 City of Rancho Cucamonga City of Rialto Bloomington City of OntarioRiverside County Truck Network March, 2017 Data source: City of Fontana, 2014 EXHIBIT 9.7 TRUCK ROUTES Approved and Adopted by City Council November 13, 2018 City Council Resolution 2018-096 City Council Resolution 2018-097 APPENDIX B EXISTING TRAFFIC COUNTS DATE:LOCATION:PROJECT #:SCWed, Oct 21, 20 NORTH & SOUTH:LOCATION #:1 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:2 3 1 2 3 0 1 2 1 1 2 1 0 0 0 0 7:00 AM 17 138 3 8 94 20 11 9 4 3 12 11 330 6 2 0 0 87:15 AM 18 166 3 14 106 14 17 3 1 3 11 14 370 4 6 0 0 107:30 AM 26 248 5 9 121 10 22 4 5 6 11 15 482 6 1 0 0 77:45 AM 17 245 11 8 129 10 15 14 12 9 9 19 498 3 1 0 0 48:00 AM 27 183 4 7 111 12 15 14 6 11 15 10 415 8 2 0 0 108:15 AM 28 212 6 10 111 17 19 7 8 6 14 16 454 7 1 0 0 88:30 AM 24 209 6 5 117 17 17 20 7 8 15 13 458 10 1 0 0 118:45 AM 30 167 17 11 115 20 23 15 14 10 11 8 441 15 3 0 0 18VOLUMES187 1,568 55 72 904 120 139 86 57 56 98 106 3,448 59 17 0 0 76APPROACH %10%87%3%7%82%11%49%30%20%22%38%41%APP/DEPART 1,810 /1,830 1,096 /1,076 282 /196 260 /346 0 BEGIN PEAK HRVOLUMES 98 888 26 34 472 49 71 39 31 32 49 60 1,849 APPROACH %10%88%3%6%85%9%50%28%22%23%35%43%PEAK HR FACTOR 0.907 0.944 0.860 0.953 0.928 APP/DEPART 1,012 /1,024 555 /559 141 /94 141 /172 0 4:00 PM 41 280 2 26 227 24 43 28 23 11 29 17 751 14 0 1 0 154:15 PM 31 289 10 15 248 20 40 28 25 9 26 14 755 9 1 0 0 104:30 PM 30 274 5 20 246 19 36 26 26 33 28 24 767 7 0 0 0 74:45 PM 37 290 11 25 208 19 29 35 29 18 20 19 740 9 1 0 1 11 5:00 PM 39 291 5 21 227 21 34 25 30 19 20 20 752 13 0 0 0 135:15 PM 36 284 14 26 277 25 38 27 23 16 25 15 806 13 1 0 0 14 5:30 PM 38 274 9 27 263 15 32 26 18 24 25 23 774 15 1 0 0 165:45 PM 35 240 10 32 248 30 41 23 23 10 23 20 735 15 2 0 0 17 VOLUMES 287 2,222 66 192 1,944 173 293 218 197 140 196 152 6,080 95 6 1 1 103APPROACH %11%86%3%8%84%7%41%31%28%29%40%31%APP/DEPART 2,575 /2,672 2,309 /2,375 708 /471 488 /562 0 BEGIN PEAK HRVOLUMES 150 1,139 39 99 975 80 133 113 100 77 90 77 3,072 APPROACH %11%86%3%9%84%7%38%33%29%32%37%32%PEAK HR FACTOR 0.982 0.880 0.930 0.847 0.953 APP/DEPART 1,328 /1,352 1,154 /1,201 346 /249 244 /270 0 Sierra NORTH SIDE Santa Ana WEST SIDE EAST SIDE Santa Ana SOUTH SIDE Sierra N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BICYCLE CROSSINGS AMPMAM7:30 AM PM4:45 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com FontanaSierra Santa Ana U-TURNS Sierra Sierra Santa Ana Santa Ana Add U-Turns to Left Turns DATE:LOCATION:PROJECT #:SCWed, Oct 21, 20 NORTH & SOUTH:LOCATION #:2 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:X 3 1 1 2 X X X X 1 X 1 0 0 0 0 7:00 AM 0 141 2 4 104 0 0 0 0 8 0 17 276 0 0 0 0 07:15 AM 0 159 4 9 97 0 0 0 0 7 0 28 304 0 0 0 0 07:30 AM 0 244 2 14 121 0 0 0 0 11 0 35 427 0 0 0 0 07:45 AM 0 244 2 15 132 0 0 0 0 6 0 29 428 0 0 0 0 08:00 AM 0 192 2 17 114 0 0 0 0 7 0 20 352 0 2 0 0 28:15 AM 0 210 2 27 101 0 0 0 0 9 0 35 384 0 1 0 0 18:30 AM 0 207 4 19 111 0 0 0 0 11 0 30 382 0 2 0 0 28:45 AM 0 204 8 22 122 0 0 0 0 5 0 17 378 0 3 0 0 3VOLUMES0 1,601 26 127 902 0 0 0 0 64 0 211 2,939 0 8 0 0 8APPROACH %0%98%2%12%87%0%0%0%0%23%0%77%APP/DEPART 1,627 /1,820 1,037 /966 0 /153 275 /0 0 BEGIN PEAK HRVOLUMES 0 890 8 73 468 0 0 0 0 33 0 119 1,594 APPROACH %0%99%1%13%86%0%0%0%0%22%0%78%PEAK HR FACTOR 0.913 0.925 0.000 0.826 0.931 APP/DEPART 898 /1,012 544 /501 0 /81 152 /0 0 4:00 PM 0 284 9 39 226 0 0 0 0 6 0 38 602 0 1 0 0 14:15 PM 0 297 6 50 228 0 0 0 0 10 0 31 622 0 2 0 0 24:30 PM 0 276 5 51 246 0 0 0 0 9 0 31 618 0 2 0 0 24:45 PM 0 308 16 42 209 0 0 0 0 15 0 29 619 1 1 0 0 2 5:00 PM 0 295 12 43 232 0 0 0 0 8 0 38 628 0 2 0 0 25:15 PM 0 288 14 58 254 0 0 0 0 10 0 44 668 0 2 0 0 2 5:30 PM 0 271 15 56 257 0 0 0 0 17 0 48 664 0 2 0 0 25:45 PM 0 259 11 52 234 0 0 0 0 17 0 30 603 0 1 0 0 1 VOLUMES 0 2,278 88 391 1,886 0 0 0 0 92 0 289 5,038 1 13 0 0 14APPROACH %0%96%4%17%82%0%0%0%0%24%0%76%APP/DEPART 2,367 /2,580 2,290 /1,979 0 /479 381 /0 0 BEGIN PEAK HRVOLUMES 0 1,162 57 199 952 0 0 0 0 50 0 159 2,587 APPROACH %0%95%5%17%82%0%0%0%0%24%0%76%PEAK HR FACTOR 0.938 0.919 0.000 0.804 0.965 APP/DEPART 1,220 /1,328 1,158 /1,003 0 /256 209 /0 0 Sierra NORTH SIDE Under Wood WEST SIDE EAST SIDE Under Wood SOUTH SIDE Sierra N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BICYCLE CROSSINGS AMPMAM7:30 AM PM4:45 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com FontanaSierra Under Wood U-TURNS Sierra Sierra Under Wood Under Wood Add U-Turns to Left Turns DATE:LOCATION:PROJECT #:SCWed, Oct 21, 20 NORTH & SOUTH:LOCATION #:3 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:2 2 1 2 2 1 2 2 1 2 2 1 0 0 0 0 7:00 AM 51 108 5 5 73 27 29 8 44 29 31 10 420 0 1 0 0 17:15 AM 66 124 7 9 52 17 39 6 36 19 31 16 422 0 4 0 0 47:30 AM 60 177 8 4 82 27 43 9 59 23 29 21 542 1 0 0 0 17:45 AM 67 186 7 8 81 28 56 15 45 27 32 13 565 0 1 0 0 18:00 AM 43 139 7 9 54 18 44 13 36 21 30 16 430 0 1 0 0 18:15 AM 30 158 12 4 58 15 41 17 31 21 25 9 421 0 1 0 0 18:30 AM 35 169 3 9 69 21 49 10 48 28 39 10 490 0 1 0 0 18:45 AM 33 137 14 3 66 21 50 15 34 14 23 15 425 0 1 0 0 1VOLUMES385 1,198 63 51 535 174 351 93 333 182 240 110 3,715 1 10 0 0 11APPROACH %23%73%4%7%70%23%45%12%43%34%45%21%APP/DEPART 1,646 /1,669 760 /1,051 777 /197 532 /798 0 BEGIN PEAK HRVOLUMES 236 626 29 30 269 90 182 43 176 90 122 66 1,959 APPROACH %26%70%3%8%69%23%45%11%44%32%44%24%PEAK HR FACTOR 0.857 0.831 0.864 0.952 0.867 APP/DEPART 891 /880 389 /536 401 /96 278 /447 0 4:00 PM 50 191 23 13 110 48 81 43 56 27 32 16 690 0 2 0 0 24:15 PM 53 210 24 14 119 42 84 37 49 34 56 12 734 0 1 0 0 14:30 PM 42 185 19 15 124 43 91 41 77 31 62 19 749 0 1 0 0 14:45 PM 65 209 23 17 122 46 108 61 64 40 56 16 827 0 1 0 0 1 5:00 PM 50 179 25 23 118 49 77 59 76 39 59 22 776 0 3 0 0 35:15 PM 57 212 26 30 121 49 76 54 72 35 59 13 804 0 4 0 0 4 5:30 PM 66 188 30 34 124 62 95 49 72 41 62 18 841 0 2 0 0 25:45 PM 88 180 28 18 132 63 86 41 53 32 51 19 791 0 3 0 0 3 VOLUMES 471 1,554 198 164 970 402 698 385 519 279 437 135 6,212 0 17 0 0 17APPROACH %21%70%9%11%63%26%44%24%32%33%51%16%APP/DEPART 2,223 /2,404 1,536 /1,768 1,602 /730 851 /1,310 0 BEGIN PEAK HRVOLUMES 238 788 104 104 485 206 356 223 284 155 236 69 3,248 APPROACH %21%70%9%13%61%26%41%26%33%34%51%15%PEAK HR FACTOR 0.951 0.903 0.926 0.950 0.966 APP/DEPART 1,130 /1,223 795 /924 863 /421 460 /680 0 Sierra NORTH SIDE Jurupa WEST SIDE EAST SIDE Jurupa SOUTH SIDE Sierra N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U-TURNS Sierra Sierra Jurupa Jurupa INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com FontanaSierra Jurupa BICYCLE CROSSINGS AMPMAM7:15 AM PM4:45 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS Add U-Turns to Left Turns DATE:LOCATION:PROJECT #:SCWed, Oct 21, 20 NORTH & SOUTH:LOCATION #:4 EAST & WEST:CONTROL:STOP W NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:X 3 0 1 2 X X X X X X 1 0 0 0 0 7:00 AM 0 140 5 14 98 0 0 0 0 0 0 9 266 0 0 0 0 07:15 AM 0 155 5 18 86 0 0 0 0 0 0 12 276 0 0 0 0 07:30 AM 0 220 6 16 116 0 0 0 0 0 0 22 380 0 0 0 0 07:45 AM 0 237 6 28 110 0 0 0 0 0 0 18 399 0 0 0 0 08:00 AM 0 174 9 36 85 0 0 0 0 0 0 11 315 0 0 0 0 08:15 AM 0 193 5 34 76 0 0 0 0 0 0 22 330 0 0 0 0 08:30 AM 0 209 16 23 97 0 0 0 0 0 0 12 357 0 1 0 0 18:45 AM 0 166 13 35 90 0 0 0 0 0 0 22 326 0 1 0 0 1VOLUMES0 1,494 65 204 758 0 0 0 0 0 0 128 2,651 0 2 0 0 2APPROACH %0%96%4%21%79%0%0%0%0%0%0%100%APP/DEPART 1,559 /1,624 964 /758 0 /269 128 /0 0 BEGIN PEAK HRVOLUMES 0 824 26 114 387 0 0 0 0 0 0 73 1,424 APPROACH %0%97%3%23%77%0%0%0%0%0%0%100%PEAK HR FACTOR 0.874 0.908 0.000 0.830 0.892 APP/DEPART 850 /897 501 /387 0 /140 73 /0 0 4:00 PM 0 261 16 57 174 0 0 0 0 0 0 23 531 0 1 0 0 14:15 PM 0 260 21 59 176 0 0 0 0 0 0 32 548 0 3 0 1 44:30 PM 0 256 23 57 193 0 0 0 0 0 0 29 558 0 5 0 0 54:45 PM 0 295 35 42 180 0 0 0 0 0 0 38 590 0 2 0 0 2 5:00 PM 0 256 12 44 194 0 0 0 0 0 0 29 535 0 2 0 0 25:15 PM 0 267 16 69 193 0 0 0 0 0 0 20 565 0 2 0 0 2 5:30 PM 0 270 23 41 228 0 0 0 0 0 0 26 588 0 3 0 0 35:45 PM 0 238 16 47 203 0 0 0 0 0 0 17 521 0 0 0 0 0 VOLUMES 0 2,103 162 416 1,541 0 0 0 0 0 0 214 4,455 0 18 0 1 19APPROACH %0%93%7%21%78%0%0%0%0%0%0%100%APP/DEPART 2,265 /2,335 1,975 /1,541 0 /579 215 /0 0 BEGIN PEAK HRVOLUMES 0 1,088 86 196 795 0 0 0 0 0 0 113 2,287 APPROACH %0%93%7%20%80%0%0%0%0%0%0%100%PEAK HR FACTOR 0.889 0.919 0.000 0.743 0.966 APP/DEPART 1,174 /1,210 1,000 /795 0 /282 113 /0 0 Sierra NORTH SIDE Sierra Crossroads Access Dwy WEST SIDE EAST SIDE Sierra Crossroads Access Dwy SOUTH SIDE Sierra N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U-TURNS Sierra Sierra Sierra Crossroads Access Dwy Sierra Crossroads Access Dwy INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com FontanaSierra Sierra Crossroads Access Dwy BICYCLE CROSSINGS AMPMAM7:30 AM PM4:45 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS Add U-Turns to Left Turns DATE:LOCATION:Fontana PROJECT #:SC 10/21/20 NORTH & SOUTH:Sierra LOCATION #:1 WEDNESDAY EAST & WEST:Santa Ana CONTROL:SIGNAL NOTES:AM ▲PCE Class 1 2 3 4 5 6 PM N Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:2 3 1 2 3 0 1 2 1 1 2 1 7:00 AM 40 219 20 7 138 20 17 20 14 14 31 25 563 0 7:15 AM 34 231 9 19 170 31 22 28 23 9 37 40 652 0 7:30 AM 29 273 10 11 165 34 32 22 30 11 24 29 666 0 7:45 AM 23 262 13 25 190 28 22 20 14 8 21 26 649 0 8:00 AM 34 275 8 23 153 22 23 13 16 17 11 26 619 0 8:15 AM 38 274 14 24 151 22 36 13 16 12 21 25 644 0 8:30 AM 26 242 17 18 174 14 26 9 15 13 14 20 586 0 8:45 AM 18 197 8 12 147 16 25 14 9 7 23 12 486 0 VOLUMES 240 1,971 97 137 1,285 185 202 138 137 89 181 201 4,862 0 0 0 0 0 APPROACH %10%85%4%9%80%12%42%29%29%19%38%43% APP/DEPART 2,308 /2,374 1,607 /1,510 477 /372 471 /606 0 BEGIN PEAK HR VOLUMES 119 1,040 39 77 677 115 98 83 83 44 92 120 2,585 APPROACH %10%87%3%9%78%13%37%31%31%17%36%47% PEAK HR FACTOR 0.945 0.895 0.789 0.747 0.971 APP/DEPART 1,197 /1,258 869 /804 264 /198 256 /325 0 4:00 PM 46 368 9 28 278 23 28 30 29 13 34 16 899 0 4:15 PM 28 297 8 29 257 25 39 20 25 21 27 10 784 0 4:30 PM 50 367 15 31 264 17 29 23 28 19 27 25 893 0 4:45 PM 53 328 14 29 263 21 31 27 21 19 30 20 852 0 5:00 PM 38 320 11 26 261 21 36 27 22 15 41 20 836 0 5:15 PM 48 353 11 23 296 20 25 26 18 16 31 19 884 0 5:30 PM 35 327 9 30 303 28 21 30 23 20 34 16 873 0 5:45 PM 36 311 12 29 240 30 32 23 25 12 34 26 807 0 VOLUMES 332 2,670 87 224 2,160 183 240 204 189 133 256 149 6,826 0 0 0 0 0 APPROACH %11%86%3%9%84%7%38%32%30%25%48%28% APP/DEPART 3,089 /3,058 2,567 /2,482 633 /515 538 /771 0 BEGIN PEAK HR VOLUMES 188 1,368 51 108 1,083 78 120 102 88 68 129 83 3,464 APPROACH %12%85%3%9%85%6%39%33%28%24%46%30% PEAK HR FACTOR 0.930 0.938 0.917 0.925 0.970 APP/DEPART 1,606 /1,571 1,269 /1,239 310 /261 280 /395 0 Sierra NORTH SIDE Santa Ana WEST SIDE EAST SIDE Santa Ana SOUTH SIDE Sierra U-TURNS Sierra Sierra Santa Ana Santa Ana AM7:15 AM PM4:30 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com DATE:LOCATION:Fontana PROJECT #:SC 10/21/20 NORTH & SOUTH:Sierra LOCATION #:2 WEDNESDAY EAST & WEST:Under Wood CONTROL:SIGNAL NOTES:AM ▲PCE Class 1 2 3 4 5 6 PM N Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:X 3 1 1 2 X X X X 1 X 1 7:00 AM 0 229 5 13 138 0 0 0 0 12 0 50 447 0 7:15 AM 0 234 7 32 183 0 0 0 0 12 0 46 513 0 7:30 AM 0 261 6 30 166 0 0 0 0 9 0 41 513 0 7:45 AM 0 257 4 23 179 0 0 0 0 7 0 41 511 0 8:00 AM 0 258 7 36 150 0 0 0 0 14 0 61 526 0 8:15 AM 0 259 10 26 149 0 0 0 0 23 0 64 530 0 8:30 AM 0 249 7 24 174 0 0 0 0 14 0 39 506 0 8:45 AM 1 207 9 22 140 0 0 0 0 12 0 16 406 0 VOLUMES 1 1,953 55 205 1,278 0 0 0 0 103 0 357 3,949 0 0 0 0 0 APPROACH %0%97%3%14%86%0%0%0%0%22%0%78% APP/DEPART 2,008 /2,309 1,482 /1,380 0 /259 459 /1 0 BEGIN PEAK HR VOLUMES 0 1,035 27 115 644 0 0 0 0 53 0 207 2,079 APPROACH %0%97%3%15%85%0%0%0%0%20%0%80% PEAK HR FACTOR 0.987 0.938 0.000 0.749 0.981 APP/DEPART 1,062 /1,241 758 /696 0 /142 259 /0 0 4:00 PM 0 354 17 64 242 0 0 0 0 11 0 52 740 0 4:15 PM 1 304 9 66 238 0 0 0 0 9 0 36 662 0 4:30 PM 0 364 10 57 224 0 0 0 0 13 0 25 692 0 4:45 PM 0 365 10 63 247 0 0 0 0 7 0 36 728 0 5:00 PM 1 369 12 39 270 0 0 0 0 14 0 28 732 0 5:15 PM 0 368 10 54 238 0 0 0 0 12 0 43 723 0 5:30 PM 0 323 10 79 253 0 0 0 0 13 0 38 716 0 5:45 PM 1 346 13 65 244 0 0 0 0 11 0 26 705 0 VOLUMES 3 2,792 91 485 1,954 0 0 0 0 89 0 283 5,695 0 0 0 0 0 APPROACH %0%97%3%20%80%0%0%0%0%24%0%76% APP/DEPART 2,885 /3,075 2,438 /2,043 0 /575 372 /3 0 BEGIN PEAK HR VOLUMES 1 1,424 42 235 1,007 0 0 0 0 46 0 145 2,898 APPROACH %0%97%3%19%81%0%0%0%0%24%0%76% PEAK HR FACTOR 0.961 0.935 0.000 0.872 0.990 APP/DEPART 1,466 /1,568 1,242 /1,053 0 /276 190 /1 0 Sierra NORTH SIDE Under Wood WEST SIDE EAST SIDE Under Wood SOUTH SIDE Sierra U-TURNS Sierra Sierra Under Wood Under Wood AM7:30 AM PM4:45 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com DATE:LOCATION:Fontana PROJECT #:SC 10/21/20 NORTH & SOUTH:Sierra LOCATION #:3 WEDNESDAY EAST & WEST:Jurupa CONTROL:SIGNAL NOTES:AM ▲PCE Class 1 2 3 4 5 6 PM N Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:2 2 1 2 2 1 2 2 1 2 2 1 7:00 AM 65 156 12 5 87 31 54 68 51 30 59 23 640 0 7:15 AM 50 149 11 13 113 36 66 57 71 42 86 24 715 0 7:30 AM 55 175 15 8 97 39 73 58 50 28 68 30 693 0 7:45 AM 73 182 19 7 117 41 56 69 48 27 72 20 729 0 8:00 AM 58 204 8 7 102 28 56 52 42 29 67 10 661 0 8:15 AM 53 169 7 11 87 41 55 25 36 33 48 17 581 0 8:30 AM 42 185 2 11 98 49 73 18 38 26 38 16 595 0 8:45 AM 50 137 13 11 67 27 73 30 42 14 46 23 531 0 VOLUMES 445 1,356 87 73 767 290 504 376 377 227 483 163 5,143 0 0 0 0 0 APPROACH %24%72%5%6%68%26%40%30%30%26%55%19% APP/DEPART 1,887 /2,022 1,129 /1,370 1,256 /535 872 /1,218 0 BEGIN PEAK HR VOLUMES 236 710 53 35 428 144 250 236 210 125 292 84 2,798 APPROACH %24%71%5%6%71%24%36%34%30%25%58%17% PEAK HR FACTOR 0.912 0.923 0.902 0.828 0.959 APP/DEPART 998 /1,043 606 /762 695 /323 500 /671 0 4:00 PM 78 184 25 19 130 43 119 56 80 44 72 18 864 0 4:15 PM 73 214 30 10 120 56 103 71 68 37 63 14 859 0 4:30 PM 62 220 27 17 117 52 99 73 94 35 64 20 878 0 4:45 PM 69 230 18 23 133 43 100 67 67 34 61 17 860 0 5:00 PM 71 254 23 23 154 50 114 79 73 27 72 14 953 0 5:15 PM 82 243 34 19 137 30 112 70 68 43 85 16 937 0 5:30 PM 73 215 23 17 145 54 120 73 42 28 73 16 877 0 5:45 PM 71 212 40 20 117 49 102 61 54 29 87 25 865 0 VOLUMES 577 1,769 220 148 1,051 376 867 548 545 277 576 139 7,090 0 0 0 0 0 APPROACH %22%69%9%9%67%24%44%28%28%28%58%14% APP/DEPART 2,566 /2,774 1,575 /1,873 1,959 /915 991 /1,529 0 BEGIN PEAK HR VOLUMES 296 923 120 79 553 183 447 282 236 127 317 71 3,631 APPROACH %22%69%9%10%68%22%46%29%24%25%62%14% PEAK HR FACTOR 0.934 0.896 0.910 0.899 0.953 APP/DEPART 1,338 /1,440 814 /916 965 /480 514 /795 0 Sierra NORTH SIDE Jurupa WEST SIDE EAST SIDE Jurupa SOUTH SIDE Sierra U-TURNS Sierra Sierra Jurupa Jurupa AM7:15 AM PM5:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com APPENDIX C CUMULATIVE PROJECTS Table 4‐3 Page 1 of 3 TAZ Land Use 1 Industrial 910.119 TSF 2 Industrial 21.726 TSF 3 Hotel 122 RMS 4 Body Shop 0.79 AC 5 Industrial 569.200 TSF 6 Residential Condo 139 DU 7 Residential Condo 20 DU 8 General Industrial 618.536 TSF 9 Residential Condo 52 DU Freeway Industrial Commercial (Central) Warehousing 761.067 TSF Office 147.786 TSF Office Park 152.213 TSF Commercial Retail 456.640 TSF Freeway Industrial Commercial (East) Warehousing 886.410 TSF Office 172.125 TSF Office Park 177.282 TSF Commercial Retail 531.846 TSF Freeway Industrial Commercial (North) Warehousing 335.885 TSF Office 65.223 TSF 10 Southwest Industrial Park (SWIP)1 Office Park 67.177 TSF Commercial Retail 201.531 TSF Freeway Industrial Commercial (West) Warehousing 747.959 TSF Office 145.241 TSF Office Park 149.592 TSF Commercial Retail 448.776 TSF Jurupa North Research & Development (West) Light Industrial 1344.901 TSF Office 478.407 TSF Office Park 847.485 TSF Research & Development 677.988 TSF Jurupa North Research & Development (Central) Light Industrial 964.045 TSF Office 342.930 TSF Office Park 607.490 TSF Research & Development 485.992 TSF PDEV13‐012 PDEV13‐007 PDEV13‐008 PDEV13‐019 PDEV13‐014 Cumulative Development Land Use Summary Project Quantity 2 PDEV14‐007 PDEV14‐010 PCUP13‐034 PCUP13‐028 Table 4‐3 Page 2 of 3 TAZ Land Use Cumulative Development Land Use Summary Project Quantity 2 Jurupa North Research & Development (East) Light Industrial 917.459 TSF Office 326.358 TSF Office Park 578.134 TSF Research & Development 462.506 TSF Jurupa South Industrial Light Industrial 70.985 TSF Warehousing 1799.899 TSF Slover Central Manufacturing/Industrial Manufacturing 1113.002 TSF Warehousing 2597.004 TSF 10 Southwest Industrial Park (SWIP)1 Slover East Industrial Light Industrial 719.464 TSF Warehousing 1006.149 TSF Office Park 503.074 TSF Slover West Industrial Light Industrial 1384.886 TSF Warehousing 3518.167 TSF Speedway Industrial Light Industrial 930.121 TSF Warehousing 762.191 TSF Office Park 13.264 TSF SWIP Residential Trucking (1,3 and 4) Single Family Detached Residential 84 DU Office 47.000 TSF Retail 44.500 TSF Fast Food w/ Drive‐Thru 8.658 TSF 12 ASP 16‐018 Retail w/ Gas Station 18.800 TSF Warehousing 1,628.936 TSF City Park 17.45 AC Free‐Standing Discount Superstore 200.000 TSF Specialty Retail Center 9.490 TSF Fast Food w/o Drive‐Thru 9.490 TSF 15 Shopping Center 140.894 TSF Industrial 30000.000 TSF Commercial Retail 1130.000 TSF Multi‐Family 800 DU Hotel 600 RMS 17 Industrial 109.197 TSF High‐Cube Warehouse / Distribution Center 477.500 TSF Manufacturing 44.500 TSF High‐Cube Warehouse / Distribution Center 360.000 TSF General Light Industrial 41.436 TSF High‐Cube Warehouse / Distribution Center 3,183.100 TSF Warehousing 290.590 TSF 19 First Redwood Logistics 20 West Valley Logistics Center 18 Pacific Freeway Center Country Village Shopping Center 16 PM 19612 PDEV16‐001 14 Walmart Shopping Center  11 Citrus Center 13 Southwest Fontana Logistics Center Project Table 4‐3 Page 3 of 3 TAZ Land Use Cumulative Development Land Use Summary Project Quantity 2 High‐Cube Warehouse (Cold Storage) 38.558 TSF Warehousing 154.232 TSF 22 Church 19.508 TSF 23 Avalon Court (Tentative Tract 33649) SFDR 24 DU SFDR 97 DU Condo/Townhomes 118 DU 25 Highland Park SFDR 398 DU 26 Tentative Tract Map 33373 (KR Land) SFDR 97 DU 27 Palm Communities Apartment 49 DU SFDR 579 DU Condo/Townhomes 290 DU Apartment 346 DU Active Park 22.2 AC School (K‐8) 600 STU 29 Flabob‐River Springs Charter School 7th‐12th Grade School 200 STU 30 Inland Empire Cold Storage Cold Storage Facility 40.800 TSF 31 Country Village Shopping Center Shopping Center 140.894 TSF High Turnover Sit‐down Restaurant 4.750 TSF Fast Food w/ Drive‐thru 2.860 TSF Gas station w/ foot mart and car wash 16 VFP 33 Pedley Crossing Shopping Center Shopping Center 255.978 TSF Shopping Center 21.600 TSF High Turnover Sit‐down Restaurant 3.000 TSF Gas/Service Station w/ Food and Car Wash 20 VFP 35 Rubidoux Commercial Development LLC General Light Industrial 306.894 TSF 36 99‐Cent Only Store Free Standing Discount Store 18.012 TSF 37 Monarch at the Quarry (Armada Armstrong) SFDR 86 DU 38 Stone Avenue (Tentative Tract 36702) SFDR 17 DU 39 Karaki‐Western States Gas/Service Station w/ Food and Car Wash 7.246 TSF 40 Boureston Medical Clinic Medical Clinic 40.000 TSF Apartments 68 DU Commercial Retail 31.375 TSF High‐Cube Warehouse 4277.000 TSF General Light Industrial 150.000 TSF Commercial Retail 25.000 TSF 43 Philadelphia Subdivision (Tentative Tract 37214) SFDR 44 DU 44 Galena Business Park Bldg. General Light Industrial 47.500 TSF Warehousing 894.768 TSF High‐Cube Cold Storage Warehouse 223.692 TSF 1 2 TSF = Thousand Square Feet; RMS = Rooms; AC = Acres; DU = Dwelling Units 32 Market Street Commercial 34 Mission Pyrite Plaza 41 Northtown Housing Development Group 42 Agua Mansa Commerce Park Specific Plan 45 Goodman Industrial Park Fontana III Source: Southwest Industrial Park (SWIP) Project TIA, RBF Consulting, September 29, 2011. St. Mary's Catholic Church 24 Emerald Ridge South 28 New Rio Vista Specific Plan 243 21 Gateway Logistics Center APPENDIX D HCM ANALYSIS SHEETS Intersection Analysis Summary 11/24/2020Report File: C:\...\E AM_v2.pdf Scenario 1 Existing AMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. E36.00.611SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D38.30.564SB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 C29.90.479SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C20.90.449WB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.449Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 100855246661117274164391320147Total Analysis Volume [veh/h] 25211312162818185161033037Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.9260Peak Hour Factor 93794843611036768659361222136Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 93794843611036768659361222136Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0491604613038903910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 132.0348.9977.5851.0635.57152.57120.58115.0840.0413.88200.2398.2295th-Percentile Queue Length [ft/ln] 5.281.963.102.041.426.104.824.601.600.568.013.9395th-Percentile Queue Length [veh/ln] 73.3527.2243.1028.3719.7684.7666.9963.9422.247.71113.0454.5650th-Percentile Queue Length [ft/ln] 2.931.091.721.130.793.392.682.560.890.314.522.1850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEAADABELane Group LOS 57.1947.2170.0443.3842.4161.689.909.5754.897.3810.3861.72d, Delay for Lane Group [s/veh] 0.750.290.780.240.150.830.270.270.510.040.440.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 8.360.5217.730.630.1611.940.640.323.110.080.4810.20d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.8246.6852.3242.7542.2549.739.269.2551.797.299.9051.52d1, Uniform Delay [s] 13329767193433134102220371269322986175c, Capacity [veh/h] 145432561629145432561629163432563163145446583163s, saturation flow rate [veh/h] 0.070.030.030.030.020.070.170.170.020.030.280.05(v / s)_i Volume / Saturation Flow Rate 0.090.090.040.130.130.080.630.630.040.640.640.05g / C, Green / Cycle 10104151596969471716g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]61.72 10.38 7.38 54.89 9.66 9.90 61.68 42.41 43.38 70.04 47.21 57.19 Movement LOS E B A D A A E D D E D E d_A, Approach Delay [s/veh]15.31 12.98 52.20 56.43 Approach LOS B B D E d_I, Intersection Delay [s/veh]20.91 Intersection LOS C Intersection V/C 0.449 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.284 3.226 2.578 2.552 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]636 618 764 818 d_b, Bicycle Delay [s]25.57 26.25 21.02 19.20 I_b,int, Bicycle LOS Score for Intersection 2.388 2.042 1.744 1.755 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.479Volume to Capacity (v/c): CLevel Of Service: 29.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 17647716111121317Total Analysis Volume [veh/h] 4412179283329Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93100.93100.93100.93100.93100.9310Peak Hour Factor 16444667103111226Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 16444667103111226Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 042889079Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 258.9462.2874.60358.443.48167.7795th-Percentile Queue Length [ft/ln] 10.362.492.9814.340.146.7195th-Percentile Queue Length [veh/ln] 156.3934.6041.45204.651.9393.2150th-Percentile Queue Length [ft/ln] 6.261.381.668.190.083.7350th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group EDAFAALane Group LOS 66.5750.183.57407.684.776.90d, Delay for Lane Group [s/veh] 0.880.210.271.740.010.39X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 11.630.460.26345.280.020.33d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 54.9449.723.3162.404.756.57d1, Uniform Delay [s] 20022426076410623403c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.120.030.220.070.010.28(v / s)_i Volume / Saturation Flow Rate 0.140.140.800.040.730.73g / C, Green / Cycle 181810459595g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]6.90 4.77 407.68 3.57 50.18 66.57 Movement LOS A A F A D E d_A, Approach Delay [s/veh]6.88 57.81 63.12 Approach LOS A E E d_I, Intersection Delay [s/veh]29.86 Intersection LOS C Intersection V/C 0.479 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.100 2.248 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]1154 1292 585 d_b, Bicycle Delay [s]11.63 8.14 32.55 I_b,int, Bicycle LOS Score for Intersection 2.291 2.242 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.564Volume to Capacity (v/c): DLevel Of Service: 38.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 101189138278652951654295147990388Total Analysis Volume [veh/h] 25473570167441107131224797Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.8740Peak Hour Factor 88165121243572581443754541865339Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88165121243572581443754541865339Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0452304119044905722Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 135.40123.12105.53366.4537.91216.75135.24174.4038.5926.58331.76265.9795th-Percentile Queue Length [ft/ln] 5.424.924.2214.661.528.675.416.981.541.0613.2710.6495th-Percentile Queue Length [veh/ln] 75.2268.4058.63239.5421.06125.0575.1396.8921.4414.76212.29161.7050th-Percentile Queue Length [ft/ln] 3.012.742.359.580.845.003.013.880.860.598.496.4750th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBBELane Group LOS 50.4449.0165.2061.0641.5763.4421.3521.4165.2312.2917.9862.08d, Delay for Lane Group [s/veh] 0.430.360.720.920.100.860.240.280.490.060.530.90X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.260.425.1610.770.066.420.830.463.460.131.086.85d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 49.1948.5960.0450.3041.5157.0220.5220.9561.7712.1616.9155.23d1, Uniform Delay [s] 23452419030468034268515341058351871432c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.070.060.040.190.020.090.110.130.020.030.300.12(v / s)_i Volume / Saturation Flow Rate 0.160.160.060.210.210.110.470.470.030.580.580.14g / C, Green / Cycle 2121827271461614757518g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]62.08 17.98 12.29 65.23 21.41 21.35 63.44 41.57 61.06 65.20 49.01 50.44 Movement LOS E B B E C C E D E E D D d_A, Approach Delay [s/veh]29.80 24.86 60.17 54.57 Approach LOS C C E D d_I, Intersection Delay [s/veh]38.34 Intersection LOS D Intersection V/C 0.564 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.140 3.157 2.869 2.723 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]815 615 569 631 d_b, Bicycle Delay [s]22.80 31.15 33.27 30.47 I_b,int, Bicycle LOS Score for Intersection 2.735 2.092 2.086 1.913 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.611Volume to Capacity (v/c): ELevel Of Service: 36.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00165.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 1130627172401270Total Analysis Volume [veh/h] 2801574310317Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89001.00000.89000.89000.89000.8900Peak Hour Factor 1010558153361130Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.002.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010558153361130Base Volume Input [veh/h] Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with EIntersection LOS 3.79d_I, Intersection Delay [s/veh] CAAApproach LOS 19.857.740.00d_A, Approach Delay [s/veh] 33.640.000.0092.680.000.0095th-Percentile Queue Length [ft/ln] 1.350.000.003.710.000.0095th-Percentile Queue Length [veh/ln] CAEAAMovement LOS 19.850.000.0035.980.000.00d_M, Delay for Movement [s/veh] 0.320.000.010.610.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 1: 1 Existing AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\E PM_v2.pdf Scenario 2 Existing PMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. F86.00.939SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D42.00.634EB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B15.30.595SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C25.60.522EB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.522Volume to Capacity (v/c): CLevel Of Service: 25.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 106117971221451681001182118511393184Total Analysis Volume [veh/h] 26292431364225296301334846Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 10111293117139161961130113491332176Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 10111293117139161961130113491332176Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0451504616038904011Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 140.5068.00133.61148.0880.70232.31235.04226.7279.0421.06238.48126.4395th-Percentile Queue Length [ft/ln] 5.622.725.345.923.239.299.409.073.160.849.545.0695th-Percentile Queue Length [veh/ln] 78.0637.7874.2382.2744.83136.51138.53132.3843.9111.70141.0870.2450th-Percentile Queue Length [ft/ln] 3.121.512.973.291.795.465.545.301.760.475.642.8150th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEBBEABELane Group LOS 57.5547.6061.9149.1544.0968.5314.2613.5261.919.0612.9264.78d, Delay for Lane Group [s/veh] 0.770.380.800.650.340.940.450.450.810.060.490.90X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 8.850.7811.723.660.4819.871.500.769.900.130.6213.61d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.7046.8350.1945.4843.6148.6612.7712.7752.018.9312.3051.17d1, Uniform Delay [s] 13730712118942317996319091468782815204c, Capacity [veh/h] 145432561629145432561629164332563163145446583163s, saturation flow rate [veh/h] 0.070.040.060.080.040.100.260.260.040.040.300.06(v / s)_i Volume / Saturation Flow Rate 0.090.090.070.130.130.110.590.590.050.610.610.06g / C, Green / Cycle 101081414126565567677g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]64.78 12.92 9.06 61.91 13.73 14.26 68.53 44.09 49.15 61.91 47.60 57.55 Movement LOS E B A E B B E D D E D E d_A, Approach Delay [s/veh]18.66 17.83 54.95 55.23 Approach LOS B B D E d_I, Intersection Delay [s/veh]25.62 Intersection LOS C Intersection V/C 0.522 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.407 3.360 2.645 2.601 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]655 618 764 745 d_b, Bicycle Delay [s]24.89 26.25 21.02 21.64 I_b,int, Bicycle LOS Score for Intersection 2.455 2.330 1.918 1.824 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.595Volume to Capacity (v/c): BLevel Of Service: 15.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 190631152236691426Total Analysis Volume [veh/h] 47162885917357Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95900.95900.95900.95900.95900.9590Peak Hour Factor 182601105226661368Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 182601105226661368Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0424824024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 197.1654.67103.36228.4826.90230.8095th-Percentile Queue Length [ft/ln] 7.892.194.139.141.089.2395th-Percentile Queue Length [veh/ln] 110.8330.3757.42133.6814.95135.3950th-Percentile Queue Length [ft/ln] 4.431.212.305.350.605.4250th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADBBLane Group LOS 44.8133.854.8345.0810.0414.39d, Delay for Lane Group [s/veh] 0.840.250.470.870.090.56X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.930.500.648.480.220.91d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 36.8833.354.1836.609.8213.48d1, Uniform Delay [s] 22725424582717912535c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.130.040.350.140.050.31(v / s)_i Volume / Saturation Flow Rate 0.160.160.760.170.540.54g / C, Green / Cycle 141468154949g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.39 10.04 45.08 4.83 33.85 44.81 Movement LOS B B D A C D d_A, Approach Delay [s/veh]14.19 11.67 42.08 Approach LOS B B D d_I, Intersection Delay [s/veh]15.32 Intersection LOS B Intersection V/C 0.595 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.268 2.291 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]444 978 844 d_b, Bicycle Delay [s]27.22 11.76 15.02 I_b,int, Bicycle LOS Score for Intersection 2.382 2.705 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.634Volume to Capacity (v/c): DLevel Of Service: 42.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 83277180342266444262576126123950290Total Analysis Volume [veh/h] 216945866611166144313123873Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96400.96400.96400.96400.96400.96400.96400.96400.96400.96400.96400.9640Peak Hour Factor 80267174330256428253555121119916280Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80267174330256428253555121119916280Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04513055230441105118Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 106.54181.51139.83440.74154.63311.56234.36245.0495.9791.35378.83211.8095th-Percentile Queue Length [ft/ln] 4.267.265.5917.636.1912.469.379.803.843.6515.158.4795th-Percentile Queue Length [veh/ln] 59.19100.8477.68298.9685.90196.59138.02145.9753.3250.75249.35121.4450th-Percentile Queue Length [ft/ln] 2.374.033.1111.963.447.865.525.842.132.039.974.8650th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBCELane Group LOS 47.1948.5166.7860.9539.4666.9626.2725.1066.3918.4724.7863.81d, Delay for Lane Group [s/veh] 0.320.480.810.920.320.960.400.400.730.170.590.86X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.700.607.1413.820.2211.871.880.825.860.511.576.63d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.170.110.110.500.500.110.500.500.11k, delay calibration 46.4947.9159.6447.1239.2455.1024.3924.2960.5317.9623.2157.18d1, Uniform Delay [s] 26058222137183246364714501727231619336c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.060.090.060.240.080.140.180.180.040.080.290.09(v / s)_i Volume / Saturation Flow Rate 0.180.180.070.260.260.150.450.450.050.500.500.11g / C, Green / Cycle 2323933331958587656514g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]63.81 24.78 18.47 66.39 25.10 26.27 66.96 39.46 60.95 66.78 48.51 47.19 Movement LOS E C B E C C E D E E D D d_A, Approach Delay [s/veh]32.51 30.82 58.05 54.40 Approach LOS C C E D d_I, Intersection Delay [s/veh]41.97 Intersection LOS D Intersection V/C 0.634 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.184 3.240 2.962 2.809 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]723 615 785 631 d_b, Bicycle Delay [s]26.50 31.15 24.00 30.47 I_b,int, Bicycle LOS Score for Intersection 2.684 2.355 2.428 2.005 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.939Volume to Capacity (v/c): FLevel Of Service: 86.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00165.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 13409642301021332Total Analysis Volume [veh/h] 3302415825333Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96401.00000.96400.96400.96400.9640Peak Hour Factor 1290929222981284Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 0.002.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1290929222981284Base Volume Input [veh/h] Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with FIntersection LOS 8.32d_I, Intersection Delay [s/veh] CCAApproach LOS 23.8416.570.00d_A, Approach Delay [s/veh] 49.140.000.00210.080.000.0095th-Percentile Queue Length [ft/ln] 1.970.000.008.400.000.0095th-Percentile Queue Length [veh/ln] CAFAAMovement LOS 23.840.000.0086.030.000.00d_M, Delay for Movement [s/veh] 0.420.000.010.940.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 2: 2 Existing PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\C AM_v2.pdf Scenario 3 Construction AMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. E42.60.674SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D39.10.587SB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B12.00.504SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C21.30.468WB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.468Volume to Capacity (v/c): CLevel Of Service: 21.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 105895449681167678266401373152Total Analysis Volume [veh/h] 26221312172919195161034338Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.9260Peak Hour Factor 97825045631077072461371271141Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000000110000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 93794843611036768659361222136Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0491604613038903910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 139.6351.2380.0254.5136.65163.73129.60123.8341.3314.38210.79103.4795th-Percentile Queue Length [ft/ln] 5.592.053.202.181.476.555.184.951.650.588.434.1495th-Percentile Queue Length [veh/ln] 77.5728.4644.4630.2820.3690.9672.0068.8022.967.99120.7057.4850th-Percentile Queue Length [ft/ln] 3.101.141.781.210.813.642.882.750.920.324.832.3050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEBADABELane Group LOS 57.8847.0769.3443.4842.4164.6610.169.8054.997.4810.7163.77d, Delay for Lane Group [s/veh] 0.780.290.780.250.160.860.280.280.520.040.460.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.090.5317.130.680.1714.760.690.353.220.090.5212.16d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.7946.5452.2142.8042.2449.909.469.4551.787.3910.1951.61d1, Uniform Delay [s] 13530369194434134101920311289282975175c, Capacity [veh/h] 145432561629145432561629163432563163145446583163s, saturation flow rate [veh/h] 0.070.030.030.030.020.070.180.180.020.030.290.05(v / s)_i Volume / Saturation Flow Rate 0.090.090.040.130.130.080.620.620.040.640.640.05g / C, Green / Cycle 10105151596969470706g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]63.77 10.71 7.48 54.99 9.90 10.16 64.66 42.41 43.48 69.34 47.07 57.88 Movement LOS E B A D A B E D D E D E d_A, Approach Delay [s/veh]15.78 13.14 53.71 56.50 Approach LOS B B D E d_I, Intersection Delay [s/veh]21.33 Intersection LOS C Intersection V/C 0.468 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.303 3.248 2.583 2.555 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]636 618 764 818 d_b, Bicycle Delay [s]25.57 26.25 21.02 19.20 I_b,int, Bicycle LOS Score for Intersection 2.420 2.068 1.752 1.764 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.504Volume to Capacity (v/c): BLevel Of Service: 12.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 18449757115121369Total Analysis Volume [veh/h] 4612189293342Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93100.93100.93100.93100.93100.9310Peak Hour Factor 17146705107111275Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0011000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 16444667103111226Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0423814024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 80Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 168.8836.8546.39109.042.99150.4195th-Percentile Queue Length [ft/ln] 6.761.471.864.360.126.0295th-Percentile Queue Length [veh/ln] 93.8220.4725.7760.581.6683.5650th-Percentile Queue Length [ft/ln] 3.750.821.032.420.073.3450th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADAALane Group LOS 39.9129.873.7245.356.279.36d, Delay for Lane Group [s/veh] 0.820.190.310.800.010.48X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.160.370.349.560.030.60d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 32.7629.503.3835.796.248.77d1, Uniform Delay [s] 22525224271448822827c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.130.030.230.070.010.29(v / s)_i Volume / Saturation Flow Rate 0.150.150.750.090.610.61g / C, Green / Cycle 12126074949g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]9.36 6.27 45.35 3.72 29.87 39.91 Movement LOS A A D A C D d_A, Approach Delay [s/veh]9.34 9.21 37.80 Approach LOS A A D d_I, Intersection Delay [s/veh]11.96 Intersection LOS B Intersection V/C 0.504 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.105 2.229 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]500 850 950 d_b, Bicycle Delay [s]22.50 13.23 11.03 I_b,int, Bicycle LOS Score for Intersection 2.319 2.279 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.587Volume to Capacity (v/c): DLevel Of Service: 39.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1051971442896830718444654491030404Total Analysis Volume [veh/h] 264936721777461121312257101Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.8740Peak Hour Factor 92172126253592681613904743900353Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000001100000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88165121243572581443754541865339Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0451804619044905722Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 140.04127.68110.32380.8339.26223.84157.30187.2540.9128.57356.75277.9895th-Percentile Queue Length [ft/ln] 5.605.114.4115.231.578.956.297.491.641.1414.2711.1295th-Percentile Queue Length [veh/ln] 77.8070.9361.29250.9321.81130.2687.39104.0322.7315.87231.88170.8150th-Percentile Queue Length [ft/ln] 3.112.842.4510.040.875.213.504.160.910.639.286.8350th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBBELane Group LOS 49.9148.4865.3861.6440.8163.4022.7322.4865.4112.8719.2363.59d, Delay for Lane Group [s/veh] 0.430.360.740.920.100.870.280.300.510.060.560.92X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.230.415.4011.840.066.581.020.513.660.141.248.31d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.120.110.110.500.500.110.500.500.11k, delay calibration 48.6848.0759.9849.8040.7556.8221.7121.9761.7512.7318.0055.28d1, Uniform Delay [s] 24254219531570535366914981078211839439c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.070.060.050.200.020.100.130.140.020.030.320.13(v / s)_i Volume / Saturation Flow Rate 0.170.170.060.220.220.110.460.460.030.570.570.14g / C, Green / Cycle 2222828281460604747418g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]63.59 19.23 12.87 65.41 22.48 22.73 63.40 40.81 61.64 65.38 48.48 49.91 Movement LOS E B B E C C E D E E D D d_A, Approach Delay [s/veh]31.11 25.94 60.32 54.27 Approach LOS C C E D d_I, Intersection Delay [s/veh]39.10 Intersection LOS D Intersection V/C 0.587 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.161 3.176 2.882 2.727 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]815 615 646 631 d_b, Bicycle Delay [s]22.80 31.15 29.78 30.47 I_b,int, Bicycle LOS Score for Intersection 2.783 2.124 2.107 1.928 Bicycle LOS C B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.674Volume to Capacity (v/c): ELevel Of Service: 42.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.00100.000.000.000.00Exit Pocket Length [ft] 000000001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00165.00100.00100.00100.00Entry Pocket Length [ft] 000000001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Si CrSierra AvenueSierra AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 118001200126521794213200Total Analysis Volume [veh/h] 2900300316345103300Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89001.00001.00000.89001.00001.00000.89000.89000.89000.89000.89001.0000Peak Hour Factor 105001100115801593711750Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00011001100000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.00001.00001.04001.00001.00001.04001.04001.04001.04001.04001.0000Growth Factor 0.002.002.002.002.002.002.000.000.000.000.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010000005581533611300Base Volume Input [veh/h] Si CrSierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with EIntersection LOS 4.39d_I, Intersection Delay [s/veh] CBAAApproach LOS 21.0611.499.050.00d_A, Approach Delay [s/veh] 37.700.000.001.620.000.000.000.00110.200.000.000.0095th-Percentile Queue Length [ft/ln] 1.510.000.000.060.000.000.000.004.410.000.000.0095th-Percentile Queue Length [veh/ln] CBAAEAAMovement LOS 21.060.000.0011.490.000.000.000.0042.630.000.000.00d_M, Delay for Movement [s/veh] 0.350.000.000.020.000.000.000.010.670.000.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane StopStopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 3: 3 Construction AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\C PM_v2.pdf Scenario 4 Construction PMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. F117.31.045SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D42.80.657NB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B15.90.618SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C26.50.543EB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.543Volume to Capacity (v/c): CLevel Of Service: 26.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1101211011281521751051241123531449191Total Analysis Volume [veh/h] 27302532384426310311336248Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 105116971221451671001186118511385183Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000000110000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 10111293117139161961130113491332176Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04515046160381003911Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 145.6270.12138.68156.8184.80250.96250.11241.0877.8022.86258.40136.0095th-Percentile Queue Length [ft/ln] 5.822.805.556.273.3910.0410.009.643.110.9110.345.4495th-Percentile Queue Length [veh/ln] 80.9038.9677.0587.1147.11150.39149.76143.0243.2212.70155.9875.5650th-Percentile Queue Length [ft/ln] 3.241.563.083.481.886.025.995.721.730.516.243.0250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEBBEABELane Group LOS 57.3947.3561.5749.8644.2175.7514.8414.0256.179.6313.9968.95d, Delay for Lane Group [s/veh] 0.780.380.810.680.360.980.470.470.700.060.530.94X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 8.860.7611.554.180.5126.861.660.845.060.140.7217.66d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.5446.5950.0345.6843.6948.9013.1813.1851.119.4913.2751.29d1, Uniform Delay [s] 14131712518942417995818991758612760204c, Capacity [veh/h] 145432561629145432561629164332563163145446583163s, saturation flow rate [veh/h] 0.080.040.060.090.050.110.270.270.040.040.310.06(v / s)_i Volume / Saturation Flow Rate 0.100.100.080.130.130.110.580.580.050.590.590.06g / C, Green / Cycle 111181414126464665657g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]68.95 13.99 9.63 56.17 14.24 14.84 75.75 44.21 49.86 61.57 47.35 57.39 Movement LOS E B A E B B E D D E D E d_A, Approach Delay [s/veh]20.06 17.80 57.93 55.00 Approach LOS C B E E d_I, Intersection Delay [s/veh]26.52 Intersection LOS C Intersection V/C 0.543 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.431 3.387 2.653 2.607 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]636 618 764 745 d_b, Bicycle Delay [s]25.57 26.25 21.02 21.64 I_b,int, Bicycle LOS Score for Intersection 2.491 2.368 1.935 1.834 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.618Volume to Capacity (v/c): BLevel Of Service: 15.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 197651210245721484Total Analysis Volume [veh/h] 49163026118371Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95900.95900.95900.95900.95900.9590Peak Hour Factor 189621160235691423Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0011000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 182601105226661368Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0424824024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 202.5156.05117.31235.1329.07248.6295th-Percentile Queue Length [ft/ln] 8.102.244.699.411.169.9495th-Percentile Queue Length [veh/ln] 114.6931.1465.17138.5916.15148.6450th-Percentile Queue Length [ft/ln] 4.591.252.615.540.655.9550th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADBBLane Group LOS 44.5733.495.2044.8910.5315.42d, Delay for Lane Group [s/veh] 0.840.250.500.880.090.60X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.920.490.728.530.241.06d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 36.6533.004.4836.3610.2914.36d1, Uniform Delay [s] 23426224422807762487c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.140.040.370.150.050.32(v / s)_i Volume / Saturation Flow Rate 0.160.160.750.170.530.53g / C, Green / Cycle 141468154848g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.42 10.53 44.89 5.20 33.49 44.57 Movement LOS B B D A C D d_A, Approach Delay [s/veh]15.19 11.88 41.82 Approach LOS B B D d_I, Intersection Delay [s/veh]15.85 Intersection LOS B Intersection V/C 0.618 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.304 2.297 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]444 978 844 d_b, Bicycle Delay [s]27.22 11.76 15.02 I_b,int, Bicycle LOS Score for Intersection 2.415 2.760 1.560 Bicycle LOS B C A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.657Volume to Capacity (v/c): DLevel Of Service: 42.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 86287187355275460283597130128986301Total Analysis Volume [veh/h] 217247896911571149333224675Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.9670Peak Hour Factor 83278181343266445274577126124953291Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000001100000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.04001.0400Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80267174330256428253555121119916280Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04513056240441105017Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 110.44188.37147.26455.28158.09315.33254.81255.3799.6697.63404.14229.7795th-Percentile Queue Length [ft/ln] 4.427.535.8918.216.3212.6110.1910.213.993.9116.179.1995th-Percentile Queue Length [veh/ln] 61.35104.6581.81310.7387.83199.51153.29153.7155.3754.24269.52134.6250th-Percentile Queue Length [ft/ln] 2.454.193.2712.433.517.986.136.152.212.1710.785.3850th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBCELane Group LOS 47.1648.5468.4160.7738.6264.1127.3225.6667.1319.2426.2771.98d, Delay for Lane Group [s/veh] 0.330.490.850.920.320.940.440.410.750.180.620.95X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.720.638.6314.240.219.682.190.886.530.561.8313.84d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.180.110.110.500.500.110.500.500.11k, delay calibration 46.4347.9159.7846.5338.4154.4325.1324.7860.6118.6824.4458.13d1, Uniform Delay [s] 26258722138486148764314391727091589318c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.060.090.060.240.080.150.190.180.040.090.300.10(v / s)_i Volume / Saturation Flow Rate 0.180.180.070.260.260.150.440.440.050.490.490.10g / C, Green / Cycle 2323934342058587646413g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]71.98 26.27 19.24 67.13 25.66 27.32 64.11 38.62 60.77 68.41 48.54 47.16 Movement LOS E C B E C C E D E E D D d_A, Approach Delay [s/veh]35.36 31.46 56.59 54.96 Approach LOS D C E D d_I, Intersection Delay [s/veh]42.77 Intersection LOS D Intersection V/C 0.657 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.206 3.261 2.977 2.816 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]708 615 800 631 d_b, Bicycle Delay [s]27.14 31.15 23.40 30.47 I_b,int, Bicycle LOS Score for Intersection 2.727 2.393 2.459 2.022 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 1.045Volume to Capacity (v/c): FLevel Of Service: 117.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.00100.000.000.000.00Exit Pocket Length [ft] 000000001000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00165.00100.00100.00100.00Entry Pocket Length [ft] 000000001000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Si CrSierra AvenueSierra AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 13900110011100224010613850Total Analysis Volume [veh/h] 3500300325160263460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96401.00001.00001.00001.00001.00001.00000.96400.96400.96400.96401.0000Peak Hour Factor 1340011001196623110213350Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00011001100000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.04001.00001.00001.04001.00001.00001.04001.04001.04001.04001.04001.0000Growth Factor 0.002.002.000.002.002.000.000.000.000.000.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1290000009292229812840Base Volume Input [veh/h] Si CrSierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with FIntersection LOS 11.02d_I, Intersection Delay [s/veh] DBCAApproach LOS 25.8013.3622.470.00d_A, Approach Delay [s/veh] 55.450.000.001.910.000.000.000.00253.950.000.000.0095th-Percentile Queue Length [ft/ln] 2.220.000.000.080.000.000.000.0010.160.000.000.0095th-Percentile Queue Length [veh/ln] DBAAFAAMovement LOS 25.800.000.0013.360.000.000.000.00117.330.000.000.00d_M, Delay for Movement [s/veh] 0.450.000.000.020.000.000.000.011.050.000.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] Flared Lane StopStopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 4: 4 Construction PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\OY AM_v2.pdf Scenario 5 Opening Year AMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. E46.80.706SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D39.40.598SB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B11.90.513SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C21.80.486WB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.486Volume to Capacity (v/c): CLevel Of Service: 21.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1079155507013316287068411398156Total Analysis Volume [veh/h] 27231412183340218171035039Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.9260Peak Hour Factor 998451466512315080663381295144Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000001479790000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 93794843611036768659361222136Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0451604617038903910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 142.2052.3181.2454.2936.91179.36170.78168.8142.6215.78227.34108.1195th-Percentile Queue Length [ft/ln] 5.692.093.252.171.487.176.836.751.700.639.094.3295th-Percentile Queue Length [veh/ln] 79.0029.0645.1330.1620.5099.6494.8893.7823.688.77132.8360.0650th-Percentile Queue Length [ft/ln] 3.161.161.811.210.823.993.803.750.950.355.312.4050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEBBEABELane Group LOS 57.8146.9569.0141.7940.8559.4711.8611.3155.108.2111.8565.80d, Delay for Lane Group [s/veh] 0.780.300.780.230.140.830.350.350.530.050.480.89X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.090.5316.860.540.1310.691.020.493.330.090.5814.12d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.7146.4352.1641.2640.7148.7810.8310.8251.778.1211.2751.67d1, Uniform Delay [s] 1383087021748616095719761299032895175c, Capacity [veh/h] 145432561629145432561629157732563163145446583163s, saturation flow rate [veh/h] 0.070.030.030.030.020.080.210.210.020.030.300.05(v / s)_i Volume / Saturation Flow Rate 0.090.090.040.150.150.100.610.610.040.620.620.05g / C, Green / Cycle 101051616116767469696g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]65.80 11.85 8.21 55.10 11.42 11.86 59.47 40.85 41.79 69.01 46.95 57.81 Movement LOS E B A E B B E D D E D E d_A, Approach Delay [s/veh]17.04 14.19 50.82 56.34 Approach LOS B B D E d_I, Intersection Delay [s/veh]21.83 Intersection LOS C Intersection V/C 0.486 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.324 3.293 2.607 2.558 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]636 618 764 745 d_b, Bicycle Delay [s]25.57 26.25 21.02 21.64 I_b,int, Bicycle LOS Score for Intersection 2.437 2.165 1.768 1.768 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.513Volume to Capacity (v/c): BLevel Of Service: 11.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 18750844117131396Total Analysis Volume [veh/h] 4713211293349Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93100.93100.93100.93100.93100.9310Peak Hour Factor 17447786109121300Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0079000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 16444667103111226Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0423814024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 80Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 171.4437.4954.96110.713.30157.1995th-Percentile Queue Length [ft/ln] 6.861.502.204.430.136.2995th-Percentile Queue Length [veh/ln] 95.2420.8330.5361.501.8387.3350th-Percentile Queue Length [ft/ln] 3.810.831.222.460.073.4950th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADAALane Group LOS 39.8129.743.9645.216.399.63d, Delay for Lane Group [s/veh] 0.820.200.350.800.010.50X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.140.370.409.490.030.63d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 32.6729.373.5635.726.369.00d1, Uniform Delay [s] 22825624201478772810c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.130.030.260.070.010.30(v / s)_i Volume / Saturation Flow Rate 0.160.160.740.090.600.60g / C, Green / Cycle 13136074848g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]9.63 6.39 45.21 3.96 29.74 39.81 Movement LOS A A D A C D d_A, Approach Delay [s/veh]9.60 8.98 37.68 Approach LOS A A D d_I, Intersection Delay [s/veh]11.93 Intersection LOS B Intersection V/C 0.513 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.138 2.231 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]500 850 950 d_b, Bicycle Delay [s]22.50 13.23 11.03 I_b,int, Bicycle LOS Score for Intersection 2.335 2.352 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.598Volume to Capacity (v/c): DLevel Of Service: 39.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1062001462956931226545555491049411Total Analysis Volume [veh/h] 275037741778661141412262103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.8740Peak Hour Factor 93175128258602732323984843917359Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000007900000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88165121243572581443754541865339Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0451704719044905722Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 140.78129.16111.91388.9339.61226.81232.71192.7041.6928.98369.36284.9395th-Percentile Queue Length [ft/ln] 5.635.174.4815.561.589.079.317.711.671.1614.7711.4095th-Percentile Queue Length [veh/ln] 78.2171.7662.17257.3822.00132.44136.80107.6323.1616.10241.84176.1150th-Percentile Queue Length [ft/ln] 3.132.872.4910.300.885.305.474.310.930.649.677.0450th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBBELane Group LOS 49.5248.1565.4362.0340.3963.3925.3922.9665.4813.1619.8865.14d, Delay for Lane Group [s/veh] 0.430.360.740.920.100.870.400.310.510.060.580.94X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.180.405.4812.500.066.661.800.543.740.141.339.72d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.130.110.110.500.500.110.500.500.11k, delay calibration 48.3447.7559.9649.5340.3456.7423.5922.4261.7413.0218.5555.42d1, Uniform Delay [s] 24755319632171935866214821078141824439c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.070.060.050.200.020.100.180.140.020.030.320.13(v / s)_i Volume / Saturation Flow Rate 0.170.170.060.220.220.110.460.460.030.560.560.14g / C, Green / Cycle 2222829291559594737318g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]65.14 19.88 13.16 65.48 22.96 25.39 63.39 40.39 62.03 65.43 48.15 49.52 Movement LOS E B B E C C E D E E D D d_A, Approach Delay [s/veh]31.99 26.81 60.45 54.05 Approach LOS C C E D d_I, Intersection Delay [s/veh]39.37 Intersection LOS D Intersection V/C 0.598 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.171 3.200 2.901 2.729 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]815 615 662 631 d_b, Bicycle Delay [s]22.80 31.15 29.11 30.47 I_b,int, Bicycle LOS Score for Intersection 2.805 2.199 2.117 1.933 Bicycle LOS C B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.706Volume to Capacity (v/c): ELevel Of Service: 46.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00165.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 1200753182431346Total Analysis Volume [veh/h] 3001884611337Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89001.00000.89000.89000.89000.8900Peak Hour Factor 1070670162381198Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0079000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.00001.06001.06001.06001.0600Growth Factor 0.002.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010558153361130Base Volume Input [veh/h] Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with EIntersection LOS 4.55d_I, Intersection Delay [s/veh] CAAApproach LOS 21.719.100.00d_A, Approach Delay [s/veh] 39.720.000.00119.780.000.0095th-Percentile Queue Length [ft/ln] 1.590.000.004.790.000.0095th-Percentile Queue Length [veh/ln] CAEAAMovement LOS 21.710.000.0046.760.000.00d_M, Delay for Movement [s/veh] 0.360.000.010.710.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 5: 5 Opening Year AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\OY PM_v2.pdf Scenario 6 Opening Year PMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. F135.41.098SB LeftHCM 6th EditionTwo-way stopSierra Avenue / Sierra Crossroads Access Driveway4 D43.60.670NB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B16.10.630SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C29.70.586WB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.586Volume to Capacity (v/c): CLevel Of Service: 29.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1121241041301542311391286126541477196Total Analysis Volume [veh/h] 28312632385835321311436949Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 107119991241472211331229120521412187Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000005031310000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 10111293117139161961130113491332176Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04623046230381004113Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 120Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 163.4279.26155.47160.4188.85304.39327.60318.4490.4728.76315.17137.2895th-Percentile Queue Length [ft/ln] 6.543.176.226.423.5512.1813.1012.743.621.1512.615.4995th-Percentile Queue Length [veh/ln] 90.7944.0386.3789.1249.36191.05209.04201.9250.2615.98199.3876.2750th-Percentile Queue Length [ft/ln] 3.631.763.453.561.977.648.368.082.010.647.983.0550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDECBEBBELane Group LOS 62.8151.7166.0246.4943.1663.4420.5419.3364.4912.0817.7061.48d, Delay for Lane Group [s/veh] 0.800.390.810.510.270.910.540.540.780.070.560.82X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.750.8011.581.590.2513.682.421.218.160.160.886.80d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.130.500.500.110.500.500.11k, delay calibration 53.0650.9154.4444.8942.9149.7618.1218.1256.3411.9316.8254.68d1, Uniform Delay [s] 14131512825456925587417511618182621239c, Capacity [veh/h] 145432561629145432561629162632563163145446583163s, saturation flow rate [veh/h] 0.080.040.060.090.050.140.290.290.040.040.320.06(v / s)_i Volume / Saturation Flow Rate 0.100.100.080.170.170.160.540.540.050.560.560.08g / C, Green / Cycle 121292121196565668689g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]61.48 17.70 12.08 64.49 19.65 20.54 63.44 43.16 46.49 66.02 51.71 62.81 Movement LOS E B B E B C E D D E D E d_A, Approach Delay [s/veh]22.49 23.37 53.10 59.74 Approach LOS C C D E d_I, Intersection Delay [s/veh]29.70 Intersection LOS C Intersection V/C 0.586 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]51.34 51.34 51.34 51.34 I_p,int, Pedestrian LOS Score for Intersection 3.451 3.425 2.679 2.614 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]617 567 700 700 d_b, Bicycle Delay [s]28.70 30.82 25.35 25.35 I_b,int, Bicycle LOS Score for Intersection 2.509 2.413 1.984 1.840 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.630Volume to Capacity (v/c): BLevel Of Service: 16.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 201671253250731512Total Analysis Volume [veh/h] 50173136318378Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95900.95900.95900.95900.95900.9590Peak Hour Factor 193641202240701450Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0031000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 182601105226661368Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0424824024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 205.5357.60127.60238.8130.03258.1895th-Percentile Queue Length [ft/ln] 8.222.305.109.551.2010.3395th-Percentile Queue Length [veh/ln] 116.8832.0070.89141.3316.68155.8250th-Percentile Queue Length [ft/ln] 4.681.282.845.650.676.2350th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADBBLane Group LOS 44.4233.315.4644.7910.8016.01d, Delay for Lane Group [s/veh] 0.840.250.520.880.100.61X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.900.490.788.560.251.16d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 36.5232.824.6836.2310.5614.85d1, Uniform Delay [s] 23826724332857682460c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.140.040.380.150.050.32(v / s)_i Volume / Saturation Flow Rate 0.160.160.750.170.530.53g / C, Green / Cycle 151567164848g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]16.01 10.80 44.79 5.46 33.31 44.42 Movement LOS B B D A C D d_A, Approach Delay [s/veh]15.77 12.00 41.64 Approach LOS B B D d_I, Intersection Delay [s/veh]16.15 Intersection LOS B Intersection V/C 0.630 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.325 2.301 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]444 978 844 d_b, Bicycle Delay [s]27.22 11.76 15.02 I_b,int, Bicycle LOS Score for Intersection 2.431 2.800 1.560 Bicycle LOS B C A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.670Volume to Capacity (v/c): DLevel Of Service: 43.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 882931903622804693096081321301004307Total Analysis Volume [veh/h] 227348907011777152333325177Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.9670Peak Hour Factor 85283184350271454299588128126971297Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0000003100000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80267174330256428253555121119916280Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04513056240441105017Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 112.37190.86150.65464.06160.01325.66281.75262.33101.56100.50417.61237.4995th-Percentile Queue Length [ft/ln] 4.497.636.0318.566.4013.0311.2710.494.064.0216.709.5095th-Percentile Queue Length [veh/ln] 62.43106.3183.69317.8688.89207.53173.69158.9556.4255.83280.32140.3450th-Percentile Queue Length [ft/ln] 2.504.253.3512.713.568.306.956.362.262.2311.215.6150th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBCELane Group LOS 46.6648.0569.2660.9638.1866.5528.8026.2667.5619.6527.1074.90d, Delay for Lane Group [s/veh] 0.330.490.860.920.320.960.490.430.770.190.640.97X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.700.619.4114.750.2111.932.650.946.910.581.9916.64d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.190.110.110.500.500.110.500.500.11k, delay calibration 45.9647.4459.8446.2237.9754.6226.1525.3260.6519.0725.1058.26d1, Uniform Delay [s] 26960322139287748763614241727021573318c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.060.090.060.250.090.150.210.190.040.090.310.10(v / s)_i Volume / Saturation Flow Rate 0.180.180.070.270.270.150.440.440.050.480.480.10g / C, Green / Cycle 2424935352057577636313g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]74.90 27.10 19.65 67.56 26.26 28.80 66.55 38.18 60.96 69.26 48.05 46.66 Movement LOS E C B E C C E D E E D D d_A, Approach Delay [s/veh]36.61 32.20 57.58 54.89 Approach LOS D C E D d_I, Intersection Delay [s/veh]43.59 Intersection LOS D Intersection V/C 0.670 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.217 3.275 2.988 2.820 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]708 615 800 631 d_b, Bicycle Delay [s]27.14 31.15 23.40 30.47 I_b,int, Bicycle LOS Score for Intersection 2.748 2.425 2.476 2.031 Bicycle LOS B B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 1.098Volume to Capacity (v/c): FLevel Of Service: 135.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00165.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 142010542441081412Total Analysis Volume [veh/h] 3602636127353Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96401.00000.96400.96400.96400.9640Peak Hour Factor 137010162351041361Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 0031000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.00001.06001.06001.06001.0600Growth Factor 0.002.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1290929222981284Base Volume Input [veh/h] Sierra Crossroads Access DrivewaySierra AvenueSierra AvenueName Volumes 11/24/202017 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with FIntersection LOS 12.46d_I, Intersection Delay [s/veh] DDAApproach LOS 26.9925.460.00d_A, Approach Delay [s/veh] 59.310.000.00275.620.000.0095th-Percentile Queue Length [ft/ln] 2.370.000.0011.020.000.0095th-Percentile Queue Length [veh/ln] DAFAAMovement LOS 26.990.000.00135.440.000.00d_M, Delay for Movement [s/veh] 0.470.000.011.100.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/24/202018 Scenario 6: 6 Opening Year PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\OYP AM_v2.pdf Scenario 7 Opening Year With Project AMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B12.40.484NB LeftHCM 6th EditionSignalizedSierra Avenue / Sierra Crossroads Access Driveway4 D39.40.599SB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B12.00.521SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C22.40.489NB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.489Volume to Capacity (v/c): CLevel Of Service: 22.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1079157507013316287668481415167Total Analysis Volume [veh/h] 27231412183340219171235442Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.92600.9260Peak Hour Factor 998453466512315081163441310155Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00200147984061511Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 93794843611036768659361222136Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0481604614038903910Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 142.1952.3183.6854.9637.32189.39168.09166.0642.6218.12225.94123.8895th-Percentile Queue Length [ft/ln] 5.692.093.352.201.497.586.726.641.700.729.044.9695th-Percentile Queue Length [veh/ln] 78.9929.0646.4930.5320.73105.2693.3892.2523.6810.07131.8068.8250th-Percentile Queue Length [ft/ln] 3.161.161.861.220.834.213.743.690.950.405.272.7550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoYesNoCritical Lane Group EDEDDEBBEABELane Group LOS 57.8046.9568.4042.6441.6365.6611.5010.9755.108.0011.5374.09d, Delay for Lane Group [s/veh] 0.780.300.780.240.150.890.350.350.530.050.480.95X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.090.5316.340.610.1516.191.000.483.330.110.5822.23d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.500.110.500.500.11k, delay calibration 48.7146.4252.0542.0341.4849.4710.5010.4951.777.8910.9551.86d1, Uniform Delay [s] 1383087320546014996719961299132924175c, Capacity [veh/h] 145432561629145432561629157732563163145446583163s, saturation flow rate [veh/h] 0.070.030.040.030.020.080.220.210.020.030.300.05(v / s)_i Volume / Saturation Flow Rate 0.090.090.040.140.140.090.610.610.040.630.630.05g / C, Green / Cycle 101051616106868469696g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]74.09 11.53 8.00 55.10 11.08 11.50 65.66 41.63 42.64 68.40 46.95 57.80 Movement LOS E B A E B B E D D E D E d_A, Approach Delay [s/veh]17.83 13.85 54.46 56.30 Approach LOS B B D E d_I, Intersection Delay [s/veh]22.35 Intersection LOS C Intersection V/C 0.489 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]46.37 46.37 46.37 46.37 I_p,int, Pedestrian LOS Score for Intersection 3.332 3.297 2.610 2.560 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]636 618 764 800 d_b, Bicycle Delay [s]25.57 26.25 21.02 19.80 I_b,int, Bicycle LOS Score for Intersection 2.456 2.168 1.768 1.770 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.521Volume to Capacity (v/c): BLevel Of Service: 12.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 18752852117161431Total Analysis Volume [veh/h] 4713213294358Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.93100.93100.93100.93100.93100.9310Peak Hour Factor 17448793109151332Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 01860332Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 16444667103111226Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0423814024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 80Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 171.3739.0555.72110.714.07163.0495th-Percentile Queue Length [ft/ln] 6.851.562.234.430.166.5295th-Percentile Queue Length [veh/ln] 95.2121.6930.9661.502.2690.5850th-Percentile Queue Length [ft/ln] 3.810.871.242.460.093.6250th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADAALane Group LOS 39.7829.793.9845.216.419.77d, Delay for Lane Group [s/veh] 0.820.200.350.800.020.51X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.120.390.409.490.040.66d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 32.6629.403.5835.726.389.10d1, Uniform Delay [s] 22825624201478772810c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.130.030.260.070.010.31(v / s)_i Volume / Saturation Flow Rate 0.160.160.740.090.600.60g / C, Green / Cycle 13136074848g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]9.77 6.41 45.21 3.98 29.79 39.78 Movement LOS A A D A C D d_A, Approach Delay [s/veh]9.73 8.96 37.61 Approach LOS A A D d_I, Intersection Delay [s/veh]11.96 Intersection LOS B Intersection V/C 0.521 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.149 2.233 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]500 850 950 d_b, Bicycle Delay [s]22.50 13.23 11.03 I_b,int, Bicycle LOS Score for Intersection 2.355 2.359 1.560 Bicycle LOS B B A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.599Volume to Capacity (v/c): DLevel Of Service: 39.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1022001462956931627546258491051411Total Analysis Volume [veh/h] 255037741779691161512263103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.87400.8740Peak Hour Factor 89175128258602762404045143919359Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 1000038763020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88165121243572581443754541865339Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0451504919044905722Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 135.30129.44112.10388.8539.60229.18241.31195.2844.0428.99370.41284.9395th-Percentile Queue Length [ft/ln] 5.415.184.4815.551.589.179.657.811.761.1614.8211.4095th-Percentile Queue Length [veh/ln] 75.1671.9162.28257.3122.00134.19143.19109.4824.4616.11242.67176.1150th-Percentile Queue Length [ft/ln] 3.012.882.4910.290.885.375.734.380.980.649.717.0450th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBBELane Group LOS 49.5048.3365.6262.0040.3963.3925.6722.9965.7013.1719.9265.14d, Delay for Lane Group [s/veh] 0.420.370.750.920.100.870.420.310.530.060.580.94X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.130.415.6212.470.066.721.920.553.970.141.339.72d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.130.110.110.500.500.110.500.500.11k, delay calibration 48.3747.9260.0049.5340.3456.6723.7622.4561.7413.0318.5955.42d1, Uniform Delay [s] 24554819532171936166214841098141823439c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.070.060.050.200.020.100.190.140.020.030.320.13(v / s)_i Volume / Saturation Flow Rate 0.170.170.060.220.220.110.460.460.030.560.560.14g / C, Green / Cycle 2222829291559594737318g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]65.14 19.92 13.17 65.70 22.99 25.67 63.39 40.39 62.00 65.62 48.33 49.50 Movement LOS E B B E C C E D E E D D d_A, Approach Delay [s/veh]32.00 27.04 60.45 54.23 Approach LOS C C E D d_I, Intersection Delay [s/veh]39.39 Intersection LOS D Intersection V/C 0.599 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.173 3.204 2.904 2.729 Crosswalk LOS C C C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]815 615 692 631 d_b, Bicycle Delay [s]22.80 31.15 27.79 30.47 I_b,int, Bicycle LOS Score for Intersection 2.806 2.215 2.121 1.929 Bicycle LOS C B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.484Volume to Capacity (v/c): BLevel Of Service: 12.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00165.00100.00100.00175.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Si CrSi CrSierra AvenueSierra AvenueName Intersection Setup 11/24/202017 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1201101933997531824313467Total Analysis Volume [veh/h] 30035110218846113372Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89000.89000.89000.89000.89000.89000.89000.89000.89000.89000.89000.8900Peak Hour Factor 107191733586701623811986Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 010173358790006Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.00001.00001.06001.00001.00001.06001.06001.06001.06001.06001.0000Growth Factor 0.002.002.002.002.002.002.000.000.000.000.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010900005581533611300Base Volume Input [veh/h] Si CrSi CrSierra AvenueSierra AvenueName Volumes 11/24/202018 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 014001400221403224Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 60Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202019 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 77.6533.7260.3660.56116.89154.80137.196.9895th-Percentile Queue Length [ft/ln] 3.111.352.412.424.686.195.490.2895th-Percentile Queue Length [veh/ln] 43.1418.7333.5333.6464.9486.0076.223.8850th-Percentile Queue Length [ft/ln] 1.730.751.341.352.603.443.050.1650th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoNoCritical Lane Group CCAACBBDLane Group LOS 25.1423.035.915.9131.9412.4311.2342.67d, Delay for Lane Group [s/veh] 0.470.210.350.350.810.550.550.39X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.220.350.880.886.792.501.3013.13d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.11k, delay calibration 23.9222.675.035.0325.169.939.9329.54d1, Uniform Delay [s] 27929110891094225863167018c, Capacity [veh/h] 14371288170317101629168332561603s, saturation flow rate [veh/h] 0.090.050.220.220.110.280.280.00(v / s)_i Volume / Saturation Flow Rate 0.150.150.640.640.140.510.510.01g / C, Green / Cycle 993939831311g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6060606060606060C, Cycle Length [s] CCCCLCCLLane Group Lane Group Calculations 11/24/202020 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]42.67 11.62 12.43 31.94 5.91 5.91 23.03 23.03 23.03 25.14 25.14 25.14 Movement LOS D B B C A A C C C C C C d_A, Approach Delay [s/veh]11.80 10.93 23.03 25.14 Approach LOS B B C C d_I, Intersection Delay [s/veh]12.43 Intersection LOS B Intersection V/C 0.484 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 0.000 0.000 Crosswalk LOS F F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]933 600 333 333 d_b, Bicycle Delay [s]8.53 14.70 20.83 20.83 I_b,int, Bicycle LOS Score for Intersection 2.327 2.338 1.660 1.776 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence 11/24/202021 Scenario 7: 7 Opening Year With Project AM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Intersection Analysis Summary 11/24/2020Report File: C:\...\OYP PM_v2.pdf Scenario 8 Opening Year With Project PMVistro File: C:\...\RCA20001 Analysis.vistro Fontana Southridge V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B15.00.596NB LeftHCM 6th EditionSignalizedSierra Avenue / Sierra Crossroads Access Driveway4 D44.00.672NB LeftHCM 6th EditionSignalizedSierra Avenue / Jurupa Avenue3 B16.20.635SB LeftHCM 6th EditionSignalizedSierra Avenue / Under Wood Drive2 C29.90.588WB LeftHCM 6th EditionSignalizedSierra Avenue / Santa Ana Avenue1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/24/20201 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.588Volume to Capacity (v/c): CLevel Of Service: 29.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: Sierra Avenue / Santa Ana Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.00500.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket 250.00100.00255.0067.00100.00221.00100.00100.00314.00210.00100.00195.00Entry Pocket Length [ft] 101101001102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/20202 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1121241101301542311391303126581486202Total Analysis Volume [veh/h] 28312732385835326311437250Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.95600.9560Peak Hour Factor 1071191051241472211331246120551421193Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 006005031480396Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 10111293117139161961130113491332176Base Volume Input [veh/h] Santa Ana AvenueSanta Ana AvenueSierra AvenueSierra AvenueName Volumes 11/24/20203 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360037002900300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04623046230381004113Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 120Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20204 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 163.4279.26163.87161.5189.36304.39332.40322.8490.4730.98317.50143.1295th-Percentile Queue Length [ft/ln] 6.543.176.556.463.5712.1813.3012.913.621.2412.705.7295th-Percentile Queue Length [veh/ln] 90.7944.0391.0489.7349.65191.05212.78205.3450.2617.21201.1979.5150th-Percentile Queue Length [ft/ln] 3.631.763.643.591.997.648.518.212.010.698.053.1850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoNoNoYesCritical Lane Group EDEDDECBEBBELane Group LOS 62.8151.7165.5847.0443.5963.4420.6919.4564.4912.1317.7662.71d, Delay for Lane Group [s/veh] 0.800.390.820.520.280.910.550.550.780.070.570.84X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 9.750.8011.401.710.2713.682.481.248.160.170.907.92d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.130.500.500.110.500.500.11k, delay calibration 53.0650.9154.1845.3343.3349.7618.2118.2156.3411.9616.8754.79d1, Uniform Delay [s] 14131513524855625587517511618182621239c, Capacity [veh/h] 145432561629145432561629162732563163145446583163s, saturation flow rate [veh/h] 0.080.040.070.090.050.140.300.300.040.040.320.06(v / s)_i Volume / Saturation Flow Rate 0.100.100.080.170.170.160.540.540.050.560.560.08g / C, Green / Cycle 1212102020196565668689g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLRCLCCLRCLLane Group Lane Group Calculations 11/24/20205 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]62.71 17.76 12.13 64.49 19.77 20.69 63.44 43.59 47.04 65.58 51.71 62.81 Movement LOS E B B E B C E D D E D E d_A, Approach Delay [s/veh]22.77 23.45 53.37 59.71 Approach LOS C C D E d_I, Intersection Delay [s/veh]29.86 Intersection LOS C Intersection V/C 0.588 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]51.34 51.34 51.34 51.34 I_p,int, Pedestrian LOS Score for Intersection 3.458 3.431 2.680 2.616 Crosswalk LOS C C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]617 567 700 700 d_b, Bicycle Delay [s]28.70 30.82 25.35 25.35 I_b,int, Bicycle LOS Score for Intersection 2.520 2.422 1.984 1.845 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/20206 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.635Volume to Capacity (v/c): BLevel Of Service: 16.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Sierra Avenue / Under Wood Drive Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 35.0050.0050.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00210.00200.00100.00Entry Pocket Length [ft] 100110No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Under Wood DriveSierra AvenueSierra AvenueName Intersection Setup 11/24/20207 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 201701277250751531Total Analysis Volume [veh/h] 50173196319383Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95900.95900.95900.95900.95900.9590Peak Hour Factor 193671225240721468Total Hourly Volume [veh/h] 000000Right Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 03540218Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 182601105226661368Base Volume Input [veh/h] Under Wood DriveSierra AvenueSierra AvenueName Volumes 11/24/20208 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoNoPedestrian Recall NoNoNoNoMaximum Recall NoNoNoNoMinimum Recall 0.02.02.02.00.02.0l2, Clearance Lost Time [s] 0.02.02.02.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.0Delayed Vehicle Green [s] 033100015Pedestrian Clearance [s] 055005Walk [s] 0.03.03.03.00.03.0Vehicle Extension [s] 0424824024Split [s] 0.01.01.01.00.01.0All red [s] 0.03.03.03.00.03.0Amber [s] 0303030030Maximum Green [s] 05105010Minimum Green [s] -Lead-Lead--Lead / Lag Auxiliary Signal Groups 072506Signal Group PermissivePermissivePermissiveProtectedPermissivePermissiveControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/20209 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 205.4760.31131.82238.8130.91262.2395th-Percentile Queue Length [ft/ln] 8.222.415.279.551.2410.4995th-Percentile Queue Length [veh/ln] 116.8433.5073.23141.3317.17158.8750th-Percentile Queue Length [ft/ln] 4.671.342.935.650.696.3550th-Percentile Queue Length [veh/ln] YesNoNoYesNoYesCritical Lane Group DCADBBLane Group LOS 44.3933.395.5544.7910.8316.14d, Delay for Lane Group [s/veh] 0.840.260.520.880.100.62X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 7.880.520.818.560.251.20d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.110.500.50k, delay calibration 36.5132.884.7436.2310.5814.94d1, Uniform Delay [s] 23826724322857672459c, Capacity [veh/h] 145416293256162914544658s, saturation flow rate [veh/h] 0.140.040.390.150.050.33(v / s)_i Volume / Saturation Flow Rate 0.160.160.750.170.530.53g / C, Green / Cycle 151567164848g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RLCLRCLane Group Lane Group Calculations 11/24/202010 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]16.14 10.83 44.79 5.55 33.39 44.39 Movement LOS B B D A C D d_A, Approach Delay [s/veh]15.89 11.98 41.55 Approach LOS B B D d_I, Intersection Delay [s/veh]16.18 Intersection LOS B Intersection V/C 0.635 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersection 0.000 3.337 2.302 Crosswalk LOS F C B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]444 978 844 d_b, Bicycle Delay [s]27.22 11.76 15.02 I_b,int, Bicycle LOS Score for Intersection 2.443 2.819 1.560 Bicycle LOS B C A ----------------Ring 4 ----------------Ring 3 -------------765Ring 2 --------------2-Ring 1 Sequence 11/24/202011 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.672Volume to Capacity (v/c): DLevel Of Service: 44.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 3: Sierra Avenue / Jurupa Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 223.00100.00213.00288.00100.00288.00144.00100.00300.00600.00100.00600.00Entry Pocket Length [ft] 102102102102No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Intersection Setup 11/24/202012 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 912931903622804783146111341301010307Total Analysis Volume [veh/h] 237348907011979153343325377Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.96700.9670Peak Hour Factor 88283184350271462304591130126977297Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 3000083632060Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.06001.0600Growth Factor 0.000.000.000.000.000.000.000.000.000.000.000.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80267174330256428253555121119916280Base Volume Input [veh/h] Jurupa AvenueJurupa AvenueSierra AvenueSierra AvenueName Volumes 11/24/202013 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0360032003500300Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 04513056240441105017Split [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 03030030300303003030Maximum Green [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 2.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 130Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202014 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 116.49190.86150.65464.06160.01337.54286.61263.62103.49100.50420.74237.4995th-Percentile Queue Length [ft/ln] 4.667.636.0318.566.4013.5011.4610.544.144.0216.839.5095th-Percentile Queue Length [veh/ln] 64.72106.3183.69317.8688.89216.80177.40159.9257.5055.83282.83140.3450th-Percentile Queue Length [ft/ln] 2.594.253.3512.713.568.677.106.402.302.2311.315.6150th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoCritical Lane Group DDEEDECCEBCELane Group LOS 46.7948.0569.2660.9638.1869.7129.0026.2968.0119.6527.2074.90d, Delay for Lane Group [s/veh] 0.340.490.860.920.320.980.490.430.780.190.640.97X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.740.619.4114.750.2114.912.730.957.320.582.0316.64d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.190.110.110.500.500.110.500.500.11k, delay calibration 46.0647.4459.8446.2237.9754.8026.2625.3560.6919.0725.1758.26d1, Uniform Delay [s] 26960322139287748763614241727021573318c, Capacity [veh/h] 145432563163145432563163145432563163145432563163s, saturation flow rate [veh/h] 0.060.090.060.250.090.150.220.190.040.090.310.10(v / s)_i Volume / Saturation Flow Rate 0.180.180.070.270.270.150.440.440.050.480.480.10g / C, Green / Cycle 2424935352057577636313g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 130130130130130130130130130130130130C, Cycle Length [s] RCLRCLRCLRCLLane Group Lane Group Calculations 11/24/202015 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]74.90 27.20 19.65 68.01 26.29 29.00 69.71 38.18 60.96 69.26 48.05 46.79 Movement LOS E C B E C C E D E E D D d_A, Approach Delay [s/veh]36.64 32.37 59.00 54.87 Approach LOS D C E D d_I, Intersection Delay [s/veh]44.02 Intersection LOS D Intersection V/C 0.672 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]56.31 56.31 56.31 56.31 I_p,int, Pedestrian LOS Score for Intersection 3.219 3.280 2.991 2.820 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]708 615 800 631 d_b, Bicycle Delay [s]27.14 31.15 23.40 30.47 I_b,int, Bicycle LOS Score for Intersection 2.753 2.433 2.484 2.033 Bicycle LOS C B B B ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 11/24/202016 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0.596Volume to Capacity (v/c): BLevel Of Service: 15.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Sierra Avenue / Sierra Crossroads Access Driveway Intersection Level Of Service Report NoNoNoNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0050.0050.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00165.00100.00100.00100.00Entry Pocket Length [ft] 000000001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Si CrSi CrSierra AvenueSierra AvenueName Intersection Setup 11/24/202017 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 14235010220271054244108141217Total Analysis Volume [veh/h] 36113315726361273534Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96401.00001.00000.96401.00001.00000.96400.96400.96400.96400.96401.0000Peak Hour Factor 13735010220261016235104136117Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 03010220263100017Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.06001.00001.00001.06001.00001.00001.06001.06001.06001.06001.06001.0000Growth Factor 0.002.002.002.002.002.002.000.000.000.000.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 12905000009292229812840Base Volume Input [veh/h] Si CrSi CrSierra AvenueSierra AvenueName Volumes 11/24/202018 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0100010001000100Pedestrian Clearance [s] 050050050050Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 014001400371903719Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 0100010001050105Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080025061Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 0.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 70Cycle Length [s] -Signal Coordination Group YesLocated in CBD Intersection Settings 11/24/202019 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with 152.1721.01117.77118.42183.47217.21202.3616.1995th-Percentile Queue Length [ft/ln] 6.090.844.714.747.348.698.090.6595th-Percentile Queue Length [veh/ln] 84.5411.6765.4365.79101.93125.39114.588.9950th-Percentile Queue Length [ft/ln] 3.380.472.622.634.085.024.580.3650th-Percentile Queue Length [veh/ln] YesNoNoNoYesYesNoNoCritical Lane Group CCAADBBDLane Group LOS 33.3026.487.297.2735.0315.5213.9143.92d, Delay for Lane Group [s/veh] 0.720.130.480.480.850.610.610.48X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.640.251.461.457.033.281.6710.01d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.500.500.110.500.500.11k, delay calibration 29.6626.245.835.8228.0012.2412.2433.91d1, Uniform Delay [s] 27024111241134287839165835c, Capacity [veh/h] 14301099169517101629164932561603s, saturation flow rate [veh/h] 0.140.030.320.320.150.310.310.01(v / s)_i Volume / Saturation Flow Rate 0.140.140.660.660.180.510.510.02g / C, Green / Cycle 101047471236361g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 2.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 7070707070707070C, Cycle Length [s] CCCCLCCLLane Group Lane Group Calculations 11/24/202020 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]43.92 14.37 15.52 35.03 7.28 7.29 26.48 26.48 26.48 33.30 33.30 33.30 Movement LOS D B B D A A C C C C C C d_A, Approach Delay [s/veh]14.78 12.39 26.48 33.30 Approach LOS B B C C d_I, Intersection Delay [s/veh]15.04 Intersection LOS B Intersection V/C 0.596 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 0.000 0.000 Crosswalk LOS F F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]943 943 286 286 d_b, Bicycle Delay [s]9.78 9.78 25.71 25.71 I_b,int, Bicycle LOS Score for Intersection 2.405 2.653 1.612 1.881 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8-65Ring 2 ------------4-21Ring 1 Sequence 11/24/202021 Scenario 8: 8 Opening Year With Project PM Fontana Southridge TJW Engineering, Inc.Version 2021 (SP 0-1) Generated with APPENDIX E SIGNAL WARRANT ANALYSIS SHEETS 11/24/2020 Peak Hour:AM Major Street: Minor Street: 2340 131 3 1 * Note: Lower Threshold Volume for a Minor Street Approach with One Lane. Source: MUTCD 2014 California Supplement Including Revision 3 (March 9, 2018) Prepared by TJW Engineering, Inc. Sierra Avenue/Sierra Crossroads Access Driveway Number of Approach Lanes: 100 vph Applies as the Lower Threshold Volume for a Minor Street Approach with Two or More Lanes and 75 vph Applies as the OYCWP Conditions AM Peak Hour Volume Warrant Sierra Crossroads Access Drwy (EW) OYCWP CONDITIONS PEAK HOUR VOLUME WARRANT Total of Both Approaches (VPH): Number of Approach Lanes: RURAL CONDITIONS Sierra Avenue (NS) (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 km/h (40 mph) ON MAJOR STREET) SIGNAL WARRANT SATISFIED Higher Volume Approach (VPH): 0 50 100 150 200 250 300 350 400 450 500 300 400 500 600 700 800 900 1000 1100 1200 1300Minor Street-Higher Volume Approach (VPH)Major Street-Total of Both Approaches (VPH) Figure 4C-4. Peak Hour Warrant (Rural) 1 Lane Major & 1 Lane Minor 2 or More Lanes Major & 1 Lane Minor 2 or More Lanes Major & 2 or More Lanes Minor Major Street Minor Street * * 11/24/2020 Peak Hour:PM Major Street: Minor Street: 2862 195 3 1 * Note: Lower Threshold Volume for a Minor Street Approach with One Lane. Source: MUTCD 2014 California Supplement Including Revision 3 (March 9, 2018) Prepared by TJW Engineering, Inc. Sierra Avenue/Sierra Crossroads Access Driveway Number of Approach Lanes: 100 vph Applies as the Lower Threshold Volume for a Minor Street Approach with Two or More Lanes and 75 vph Applies as the OYCWP Conditions PM Peak Hour Volume Warrant Sierra Crossroads Access Drwy (EW) OYCWP CONDITIONS PEAK HOUR VOLUME WARRANT Total of Both Approaches (VPH): Number of Approach Lanes: RURAL CONDITIONS Sierra Avenue (NS) (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 km/h (40 mph) ON MAJOR STREET) SIGNAL WARRANT SATISFIED Higher Volume Approach (VPH): 0 50 100 150 200 250 300 350 400 450 500 300 400 500 600 700 800 900 1000 1100 1200 1300Minor Street-Higher Volume Approach (VPH)Major Street-Total of Both Approaches (VPH) Figure 4C-4. Peak Hour Warrant (Rural) 1 Lane Major & 1 Lane Minor 2 or More Lanes Major & 1 Lane Minor 2 or More Lanes Major & 2 or More Lanes Minor Major Street Minor Street * * Know what'sbelow.before you dig.CallRTJW ENGINEERING, INC.Traffic Engineering &Transportation Planning Consultants6 Venture, Suite 225, Irvine, CA 92618t: (949) 878-3509 f: (949) 878-3593www.tjwengineering.comRSSETIREG ERNNo. 69467I L Exp. 6/30/22TAVICN AI ESOFESP RD E OINLAEINGJS AMOHT WHEATOSEPHFFCALI ORTEO N AI