POLE SCHEDULE ^ EX. CL N '—
STANDARD MAST ARM SIGNAL MTGS PED PUSH ern LOCATION yT ( CURB FACE A -A
LED R.S.N.S.* REMARKS 206 110 m / \
No. TYPE HEIGHT SIGNAL LUM LUMINAIRE VEHICLE MAST PED PHASE QUAD ARW A B
5 #5
AO 26-4-100 30' 40' 15' 111W SEE BELOW(A) SV-1-T 2-MAS SP-1-Cs 6 E F 11' 4' F=20' ` i I !� \\ 1 10 \ PROP. 2"C, 2-DLC o Z j EX. R/W QI W E 2
BO 15TS 30' - 15' 111W - SV-2-T - SP-1-CS 8 S 3.2' 2' , � J I LJ / #6E 3
o� a � 5
CO 26-4-100 30' 40' 15' 111W SEE BELOW(C) SV-1-T 2-MAS SP-1-CS 8 S F 7' 4' F=20' �� I N_ B.C.R. �I -
DO 15TS 30' - 15' 1 1 1 W - SV-1-T - SP-1-CS 2 W 8' 4' Q I B $ , 10
EO 29-5-100 30' 50' 15' 111W SEE BELOW(E) SV-1-T 2-MAS SP-1-CS - - - 8' 14.2' F=20' g
c POLE LOCATION QUADRANT
FO PPB POST 4'-7" - - - - - - - 4 S 46 92 46' DETAIL PUSH POVIEW)CATION \ /
4
O PPB POST 4'-7" - - - - - - - 2 E F O 1 1 E
PROP. 2"C, 2-DLC
OH 15TS 30' - 15' 111W - SV-1-T - SP-1-cs - - - 9' 4' 1 � � Ex. R/W SIGN LEGEND: � _ _
EX. C&G PROP. 2"C, 8-DLC
O 24-4-100 30' 35' 15' 111W SEE BELOW(H) SV-1-T 2-MAS SP-1-CS 4 N F 8' 4' F=14' Z I DETAIL •A�
O 15TS 30' - 15' 111W - SV-1-T - SP-1-CS 6 E 11' 5.4' , 68
'
1. POTHOLING REQUIRED FOR ALL NEW.POLES
ALLEQUIPMENT
FURNISHED S N.S. TO BE MOUNTED ON A SHAFT MOUNTED MAST ARM SUPPLIED BY THE CONTRACTOR PER CITY OF FONTANA STANDARD PROP. 2"C, 2-DLC 12' S' 11' 11' 11' 11' S' North
I
3. *
4102, UNLESS OTHERWISE NOTED. i1; I NO U TURN
4. TRAFFIC SIGNAL POLES SHALL BE DECORATIVE PER CITY OF FONTANA STANDARDS. NOTE: POLE LOCATIONS MAY BE ADJUSTED FOR CLEARANCE BY UP TO 1'. POLES SHALL O EX. R/W , 2.
BE 2' CLEAR OF THE FACE OF CURB MINIMUM, AND SHALL PROVIDE FOR 4' ADA CLEAR 0 20 40 R73-3(CA} V/►��/yCp np/►��/
PATH OF TRAVEL MINIMUM. CONTRACTOR MAY ADJUST PULLBOX AND CONDUIT LOCATIONSE C&G SCALE 1"=20' 36"X36" rl/1��I�GfI VrV1�><f Vf7V
CONDUCTOR
®®®®®®®®®®®
y 4800
O R � �68
1r
PROP. 2"C, 1-DLC
(E) O Coyote �=yn
O SY I' TYPE QC LOOP STOP BAR OR LEADING i
' EDGE OF CROSSWALK
8' 8' 12' 11 12' 1 12'
FY BIKE LOOP PLACEMENT & SAWCUT DETAIL RAJ
Q (H) Duncan Cyn15400
O G , O w NOTE: SEE DRAWING No. 6171 FOR SIGNING AND
r J STRIPING PLAN
PROP. 2"C, 1-DLC
DETAIL Tw EX. CL to #5
FIELD. CONTRACTOR SHALL HAVE PREEMPTION CALIBRATED AND TESTED. I NTS
8 INSTALL SIGN AND HARDWARE PER CALTRANS DETAIL "U", ES-7N. FYA=FLASHING YELLOW ARROW OVERLAP (PERMISSIVE MODE) 102
SERVICE ADDRESS: 15480 Duncan Canyon Road
UNDERGROUND SERVICE ALERT USA Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA
SHOULD CONSTRUCTION OF THE REQUIRED QROFESS/ONq
O ST 3190 C Shelby Street
IT'S THE LAW! b IMPROVEMENTS NOT COMMENCE WITHIN TWO `��SF' eo<yc� Ontario, California91764 PLAN SHEET
DIAL BEFORE i YEARS OF THE DATE OF APPROVAL SHOWN HEREON a Tel: (909) 890-9693 Fax: (909) 890-9694 DRAWN BY:
SCALE:
YOU DIG! •' AND CARRIED FORTH IN A DILIGENT MANNER, THE w No. C50481 m f KT DUNCAN CANYON RD AND As Noted
z A z THE ELEVATIONS FOR THIS PROJECT ARE BASED UPON NGS BENCH MARK
CITY ENGINEER MAY REQUIRE REVISIONS TO THE ,� Exp. O6 30 23 EV9119. A 2" BRASS DISK SET IN THE THE TOP OF THE CONCRETE FOOTING DESIGNED aY: COYOTE CANYON RD Dare
CALL AT LEAST P OF THE NORTH LEG OF TOWER NUMBER 19/1, APPROXIMATELY 250' WESTERLY KT TRAFFIC SIGNAL PLAN
TWO WORKING DAYS Know what's below. REV PLANS TO BRING THEM INTO CONFORMANCE WITH sT CIV\L �� " Date : 617,``22 CHECKED BY: ARFRovEo BY:
P
BEFORE YOU DIG Call before you dig. qlf OF CRIyEp� OF THE CENTERLINE OF KNOX AVENUE, APPROXIMATELY 1500' NORTHERLY OF AO / ATE DRawiNc No.: 2
STANDARDS IN EFFECT. ;X c 7/12/2022 6170
RDOSION DESCRIPTION DATE DOOR. CITY DATE SUMMIT AVENUE. ELEV.=1,644.69' (NAVD88) CHARLES F. STEPHAN. R.C.E. C50481 TNT -RIM CITY ENGINEER R.C. 44226 2
FOR CLEARANCE UPON APPROVAL OF THE ENGINEER. or— CHANNEL
U 06 3 6 �, 6 DUNCAN CANYON RD (45 MPH)
EX. R/W EX. R/W — — — — —
��� DETAIL "A" — _ —
1,
1
��� a n. ` EX. R/W PROP. 2"C, 2-DLC i
5 N D
v — — 606 506 406 g — 5 �- - — — PROP. 2"C, 2-DLC — -
A
PROP. R21 (CA) O 05 05 0 02 0 P 8 EX. G&G
6
DETAIL B" 02&05 07 -
EX. C&G 0 P I 5. 5
"7 #
08 DETAIL "B" ao
n 8 R73-3(CA) 4 800
— — — — — — — — —
' e
a
n
08 7 03&08 DETAIL "B"
— 0 3 8
ro
a 285' TO a
EX. CL 1 19+0020 00 3 22+ 0 23+00 LIMIT LINE
N
03 - -1 3 - 0 — -�—
#10 LUMINAIRE 2 2 2 2 2 2 2 4 - - _ - - ^ _� - � - 207 - - � - - � 2 3 � _
DETAIL B"
M-138 QPTICOM CABLE - 1 1 2 1 1 2 4 - 4 DETAIL "B"
104 04&07 7 ,
107207
01 DETECTOR - - - - - 3 3 3 - 3 EX. CL
02 DETECTOR - - 5 5 - - - 5 - 5 E04
_ I 04 0 —
03 DETECTOR - - - - - - - 3 - 3 ' TO 7 01&06 4 9 IIn LINE _ _ _ — — — n
04 DETECTOR 5 5 5 5 - - - 5 - 5 —
to 03 ,
0 05 DETECTOR - - 3 3 - - - 3 - 3 #5 _ _ _ DETAIL "B" 8 R73-3(CA) 4 # ;, 'EX. G&G
e.
06 DETECTOR - - - - - 6 6 6 - 6 EX. C&G JO 4 06 06 01 DETAIL "B" — 5 —
07 DETECTOR _ _ _ _ — F
3 3 3 3 3 3 — _ — � — 3 2 402 5 2 0 11 EX. R/W EX. R/W
08 DETECTOR _
5 EX. R/WT ROP. 2"C, 2-DLC a e G PROP. R2-1(45MPH),
5 PM �
TOTAL 8 8 16 16 - 8 8 32 - 32 PROP. 2"C, 2-DLC EX. R/W _ -
CONDUIT SIZE 3" 4" 4" 4" 3" 4" 4" 2-4" 2-4" 2" 1 OI O 3 R26(S) (CA)
PERCENT FILL RATIO % ji 16 1 15 1 26 1 29 1 10 1 15 1 21 1 28 1 19 1 11 1i' � "
ALL CONDUITS AND CONDUCTORS SHALL BE NEW.
REMOVE AND SALVAGE EXISTING STREET LIGHT (BY OTHERS). REMOVE FOUNDATION 2 2 � I 5 202 9 R.S.N.S. LEGEND
TRAFFIC SIGNAL CONSTRUCTION NOTES 3' MINIMUM AND CONSTRUCT PCC PAVEMENT REPAIR. CONTRACTOR IS RESPONSIBLE EX. C
NOTE: SEE SPECIAL PROVISIONS FOR ANY CITY SUPPLIED EQUIPMENT AND/OR MATERIALS. OF DISPOSING OF ANY MATERIAL NOT SALVAGEABLE. I (A) D Duncan C n Rd
Ex. c&c y 15500 10 STUB OUT 2" CONDUIT WITHIN 6E PULLBOX FOR FUTURE INTERCONNECT. �1�11�
INSTALL CITY FURNISHED TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE `R" CABINET. EX. RfW 2 5 __ '�IYP.
CONTROLLER CABINET AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD PLAN 4001.----TYP. TYP. 1 ,
INSTALL LOOP DETECTION, FIBER OPTIC MODEM, AND MISCELLANEOUS AUXILIARY EQUIPMENT 11 CONSTRUCT 3'x3' PCC PAD AROUND TRAFFIC SIGNAL POLE.
REQUIRED TO PROVIDE OPERATION SHOWN HEREON. 46' R 10' (�+) Co �te run
Rd
46
❑2 FURNISH AND INSTALL NEW TYPE III-CF SERVICE PEDESTAL PER CITY OF FONTANA AND SOUTHERN O
CALIFORNIA EDISON COMPANY REQUIREMENTS. FURNISH AND INSTALL BASE FOR SERVICE EQUIPMENT
ENCLOSURE PER CALTRANS STANDARD ES-2F.
FURNISH & INSTALL 2"C, 2#6, 1#8 CONDUCTORS (SIGNAL SERVICE).
�4 FURNISH & INSTALL 2"C, 2#10 CONDUCTORS (LUMINAIRES).
FURNISH AND INSTALL 3" PVC CONDUIT WITH �J" POLY PULL ROPE PER SCE REQUIREMENTS.
CONDUCTORS TO BE INSTALLED BY SCE. COORDINATE SERVICE WITH SCE PLANNING DEPARTMENT
AT 909.357.6516. VERIFY PHONE NUMBERS AT TIME OF CONSTRUCTION.
❑6 REMOVE EXISTING LANDSCAPING AND MODIFY IRRIGATION SYSTEM AS AS NEEDED PER THE DIRECTION
OF THE FIELD ENGINEER. CONSTRUCT 4" THICK PCC PAD 20'X4' ON COMPACTED NATIVE AROUND
PROPOSED SIGNAL CONTROLLER AND SERVICE CABINETS. SPRINKLERS SHALL NOT SPRAY ONTO
CONTROLLER CABINET OR SERVICE PEDESTAL.
INSTALL INSTALL CITY -FURNISHED UNI-DIRECTIONAL, SINGLE CHANNEL, EMERGENCY VEHICLE PREEMPTION
OPTICOM DETECTOR ON SIGNAL MAST ARM. EXACT LOCATION TO BE DETERMINED BY THE ENGINEER IN THE
PHASE DIAGRAM
l
I
FYA
FYA, - _
��
01
02 &
02P
03
04 & 04P
FYA
I
_j
FYA
05
06 &
06P
07
08 & 08P