HomeMy WebLinkAbout18.1_Inspector's Daily ReportsCITY OF FONTANA �. REPOR). INSPECTOR'S DAILY REPORT DATE APRIL 21 2001 CIRCLE DAY M T WTF (S) S SHIFT HOURS START STOP ST OVPR F/C) CHERRY SPWPR PROJECT FTSCTTFR PT LTMRTNf CONTRACTOR HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION P. CLOUDY COLD 58 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER E/O CHERRY AND TO CHERRY AT SLOVER AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR INSPECTOR CITY OF FONTANA REPOR•. INSPECTOR'S DAILY REP RT DATE APRIL 22, 200I CIRCLE DAY _ M T W T F S (S) SHIFT HOURS START STOP 4T QVPR Fin CTTFRRY SFWFR PROJECT PTSCT-TFR PT TTMRTNI`r CONTRACTOR HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION CLEAR WARMER 80 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER E/O CHERRY AND TO CHERRY AT SLOVER AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS. 48-ti CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS ST (1VFR P/(1 CTTFRRY SFWFR PROJECT PTSCNFR PT UMRTNG EQUIP CONTRACTOR MEN DESCRIPTION REPOROO. DATE 'APRIL 15, 2001 MT WTFS (S) START STOP HOURS -ITEM NO. WEATHER CLEAR WARM 80 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AND CHERRY AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS CT (1VPR F/(1 CHERRY CFWFR PROJECT FTCCHFR PT TM/RING CONTRACTOR REPOR•O. DATE APRIL 14, 2001 M T W T F (S) S START STOP HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION CLEAR WARM 80 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AND CHERRY AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR CITY OF FONTANA • REPOR•. INSPECTOR'S DAILY REPORT DATE APRIL 07 , 2001 CIRCLE DAY M T W T F (S) S SHIFT HOURS START STOP - ST flVFR F/0 CT-TFRRY SFWFR PROJECT FTSCHFR PT LTMRTNC, CONTRACTOR HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION CLOUDY RAIN COLD 54 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER EAST AND WEST OF CHERRY, AFTER-A.M. & P.M. . INSPECTION, AS PER APPROVED PLANS. CONTRACTOR INSP CTOR CITY OF FONTANA INSPECTOR'S DAILY REP RT CIRCLE DAY SHIFT HOURS CT fVFR Fin CTTFRRY .SPWPR PROJECT PT.SCNFR PT TTMRTNG CONTRACTOR REPOROD. DATE APRIL 08 , 2001 M T W T F S (S) START STOP HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION CLEAR WINDY COOL 60 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER EAST AND WEST OF CHERRY, AFTER A.M. & P.M. . INSPECTION, AS PER APPROVED PLANS. CONTRACTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS CT-TFRRY ST OVPR SPWFR PROJECT FTSCNFR PT TTMRTNG EQUIP CONTRACTOR MEN DESCRIPTION REPOR•. DATE MARCH 25, 2001 MTW T F S (S) START STOP HOURS -ITEM NO. WEATHER P. CLOUDY COOL 72 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AT AND E/O CHERRY, FOR SEWER INSTALLATION. AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS.. CONTRACTOR INSPECTOR CITY OF FONTANA • REPORS. INSPECTOR'S DAILY REPORT DATE MARCH 24, 2001 CIRCLE DAY M T W T F (S) S SHIFT HOURS START "' STOP "' C'TNPRRY ST C)VPR SPWPR PROJECT PTSC'NPR PT T,JMRTNCI CONTRACTOR HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION P. CLOUDY COOL 81 REMARKS TRA} NIC CONTROL PROPERLY APPLIED TO SLOVER AT AND EEO CHERRY, FOR SEWER INSTALLATION. AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS.. CONTRACTOR INSPECTOR CITY OF FONTANA REPORJ. INSPECTOR'S DAILY REP RT DATE MARCH 17, 2001 CIRCLE DAY MTW T F (S) S SHIFT HOURS START - STOP ST OVPR SFWPR F/Q CHFRRY PROJECT FTSCHFR PT TTMRTNft CONTRACTOR HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION OVERCAST WARM 78 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO CHERRY/SLOVER AFTER A.M.& P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REP RT CIRCLE DAY SHIFT HOURS ST ClVPR SPWFR F/C) CTTPPPY PROJECT PTSCNFR PT LTMRTNC`t CONTRACTOR REPORJ. DATE MARCH 18, 2001 MTWT F S (S) START HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION CLEAR WARM 88 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO CHERRY/SLOVER AFTER A.M.& P.M. INSPECTION AS PER APPROVED PLANS. 6 A a,. CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS QT fVFR CFWFR F/Q (`T-TFRRY PROJECT FT' C'NFR PT TTMRTNfl CONTRACTOR REPORf0O. DATE MARCH 10, 2001 M T W T F (S) S START "" STOP -- HOURS-ITEM NO. WEATHER EQUIP MEN DESCRIPTION . P. CLOUDY COOL 64 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AT CHERRY AFTER AN A.M. AND P.M. INSPECTION AND AFTER PICKING UP CONES, PICKING UP KEEP RIGHT, AND NO LEFT TURN SIGNS AND PUTTING THEM BACK TO THEIR PROPER PLACE. CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS ST OVPR SFWFR P/fl CTIRRRY PROJECT FTSCTTFR PT UMRTNG CONTRACTOR REPOR.O. DATE MARCH 11, 2001 MTWT F S (S) START STOP - HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION . P. CLOUDY COOL 69 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AT CHERRY AFTER AN A.M. AND P.M. INSPECTION AND AFTER PICKING UP CONES, PICKING UP KEEP RIGHT, AND NO LEFT TURN SIGNS AND PUTTING THEM BACK TO THEIR PROPER PLACE. CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS ST C1VFR P/C) C'NFRRY SPWFR PROJECT FTSCT-TPR PT TTIVTRTNG CONTRACTOR REPORJ. DATE MARCH 04, 2001 M T W T F S (S) START STOP HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION P. CLOUDY COOL 65 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AT CHERRY AS PER APPROVED PLANS, AFTER PICKING UP SIGNS AND DELINEATION AND PLACING THEM BACK TO THEIR ORIGINAL SPOT.. AD CONTRACTOR INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS CT OVPP F/Cl CTTFRRY SPWFR PROJECT FTSCT-1FR PT TTMRTNOr CONTRACTOR REPORJ. DATE MARCH 03, 2001 M TWT F (S) S START STOP HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION P. CLOUDY COOL 67 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO SLOVER AT CHERRY AS PER APPROVED PLANS, AFTER PICKING UP SIGNS AND DELINEATION AND PLACING THEM BACK TO THEIR ORIGINAL SPOT. CONTRACTOR INSPECTOR CITY OF FONTANA • INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS CTTFRRY/ST OVFR .CPWPR PROJECT FISC ITPR PT UMRTNG CONTRACTOR REPORJ. DATE FEB. 17, 2001 M TWTF (S) S START - STOP " HOURS -ITEM NO. WEATHER EQUIP MEN DESCRIPTION P. CLOUDY 71 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO CHERRY AND SLOVER AFTER A.M. & P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR D.A1.1--zt-,ut._ INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS CTTFRRY/ST OVFR SPWPR PROJECT FTSCNFR PT TTMRTN('t CONTRACTOR REPORJ. DATE FEB. 18, 2001 M TWT F S (S) START ' STOP "- HOURS -ITEM NO. WEATHER EQUIP MEN. DESCRIPTION P. CLOUDY 72 REMARKS TRAFFIC CONTROL PROPERLY APPLIED TO CHERRY AND SLOVER AFTER A.M. &'P.M. INSPECTION AS PER APPROVED PLANS. CONTRACTOR INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS ST OVPR AVP SPWFR PROJECT FTSCNFR PT TTMRTNC'T EQUIP CONTRACTOR MEN DESCRIPTION I REPORJ. DATE FEB. 03 , 2001 MTWT F(S)S START """ STOP - HOURS -ITEM NO. WEATHER CLEAR WARM 82 REMARKS TRAFFIC CONTROL PRO PERLY APPLIED TO SLOVER E/O CHERRY, AFTERPICKING UP AND ADJUSTING BLOWN OVER DELINEATION , AND SIGNS,AS PER APPROVED. INSPECTION PERFORMED, ONCE IN THE MORNING, AND ONCE IN THE EVENING. CONTRACTOR INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT CIRCLE DAY SHIFT HOURS ST QVFR AVF SFWFR PROJECT FT.4CT-11 R PT UMRTNC't EQUIP CONTRACTOR MEN DESCRIPTION fi REPORT. DATE FEB. 04 , 2001 MTWT F S (S) START " STOP HOURS -ITEM NO. WEATHER CLEAR WARM 87 REMARKS TRAFFIC CONTROL PRO PERLY APPLIED TO SLOVER E/O CHERRY, AFTERPICKING UP AND ADJUSTING BLOWN OVER DELINEATION , AND SIGNS,AS PER APPROVED. INSPECTION PERFORMED, ONCE IN THE MORNING, AND ONCE IN THE EVENING. I INFORMED PROJECT MANAGER, DON DGUDA, THAT THE CONTRACTOR NEEDS TO BETTER SECURE THE TRAFFIC CONTROL TO PREVENT THE WIND FROM BLOWING EVERYTHING OVER. CONTRACTOR INSPECTOR Jul 09 01 09:15a FISoER PLUMBING (909) 881-5761 p.2 FISCHER. PLUMBING DAILY REPORT - • DATE: ' O 1 REPORT NO: WEATHER: C4(JG.'D PROJECT: iLUrt7 4 Cpi INSPECTOR: `?AvbE., LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 2 I rO #trniiitts EQUIP LABOR DESCRIPTION OF TASK HOURS'yZ)i M NO. COMMENTS .4( 1,Aciet-31. S •1 . . M MAX1<Y I OPG-Fl e-2- 'R • I r' • • - -rEiz7 --6? I -6 e eoew&IIJ Pi Pc (A,� qi 11 T S S. LL GS PI Pe LAB re- r-43i q I ) . & &r.IrCoi �I�o� rtnial�� g I 1 • RENTAL EQUIPMENT COMPANY I EQUIP OPERATOR HOURS ITEM NO. l SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: ' veo r TITLE: Jul 09 01 09:15a e FISCHER PLUMBING (909) 881-5761 p.3 FISCHER PLUMBING DAILY REPORT DATE: —I ' S "G I REPORT NO: WEATHER: PROJECT: INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: .t'SChef. P�umb�nn STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 51E�E�JS (05ER.rsotil SgLIJA rs vr-I1✓GUi (L) c)r RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 09 01 09:16a FISCH R PLUMBING (909) 881-5761 p.4 FISCHER PLUMBING DAILY REPORT DATE: —I -1 •0 ) REPORT NO: WEATHER: PROJECT: INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t-1 a,g C0 sogrsod r'Jr RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO, COMMENTS:. SIGNATURE: TITLE: Jul 09 01 09:16a FISCHER PLUMBING 4 (909) 881-5761 p.5 FISCHER PLUMBING DAILY REPORT DATE: T— - REPORT NO: WEATHER: lvoo •(� PROJECT: Si.GUi'to INSPECTOR: S' '' A u (Z LOCATION AND DESCRIPTION OF OPERATIONS: Le c1z (Jt-k CL P`' To {-6- M CGC,L STATION NO. '1 R TO '2.1 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS // $ . MAx g •1 6 Pa, TE'L g i ex.r5oz.rsed Pipe i.A-C� 53' 9 SriLLACS riP L"-((314- T x jcr T' q . & I:Gt►J i,''oP -reixrJ&E 4 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. .SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: p.6 Jul 09 01 09: 16a FISCHER PLUMBING I FISCHER PLUMBING DAILY REPORT DATE: -1" - (, 1 REPORT NO: WEATHER: PROJECT: E,Ste- 1 INSPECTOR: ''A:+J. LOCATION AND DESCRIPTION OF OPERATIONS: SLouG E AAA (4, 'h'_c f . STATION NO. 1-1 TO 21 (909) 881-5761 S t�YI CUCr EQUIP . LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS r;uf' . L..A6ozCV., `fS 9 MAgtY DP -re-- l 1 STE%/En11-7 -- I - • Co5ER.r5e J 191Re7 LR-?k - 9 Sfs-L.,Aes Ft i7-:'r LA'-t? ' i P.s�Inl,-�-� $ 1 . l��Itrrld .L/a(3ol - i CT irJE6 $ 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY • FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE; TITLE: Jul 03.01 02:16p FISCER PLUMBING (909) 881-5761 p.6 FISCHER PLUMBING DAILY REPORT DATE: (8' 24 -01 Fevr>AY REPORT NO: WEATHER:h1 PROJECT: INSPECTOR: 5 • FAQ Er, LOCATION AND DESCRIPTION OF OPERATIONS: etS het Phinliv•t1 STATION NO. (00 TO 41 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS v.Nr (.(60g6 % S ' 5T V J� -�-- -&- CD goy sod P‘ Pe L,.YEIZ % `d . S;LLAcs —9— Clg-Ircid L 4eoc TzAwee- 8 3 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: Lo6ATED Le-Adf,4, SIGNATURE: TITLE: Jul 03 01 02:16p FISC1-IER PLUMBING • V 8 (909:81-5761 p.5 FISCHER PLUMBING DAILY REPORT DATE: t`Q -21 REPORT NO: WEATHER: iT PROJECT: INSPECTOR: S BA•skJ Z, LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 41 TO 37 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS M MAXEY oPcK.aceV- T T6t/64,1z -0-- -8 eo 5 satJ FIFE- l-i ' 8 sgilpcs Pi Pg. 1,A. Ye-g.,-MA ICE c vttrcia GAtsoe- -11ZAwcce 8 • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: j-t TITLE: Jul 03 01 02:16p FIsER PLUMBING (909) 891-5761 411 p.4 FISCHER PLUMDING DAILY REPORT DATE: i0 REPORT NO: WEATHER: PROJECT: INSPECTOR: -�ii ' 'AU LOCATION AND DESCRIPTION OF OPERATIONS: ‘S r her Plumbing STATION NO. 2e TO V EQUIP LADOK DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS k41 (ARO e.e' g q PIAXg Y oPe�f.., I S-51.1017 L-.(GDIZ ; d —44— CD trod PLCII Csf.LAI_ ?I,PE L&- - -MAIN RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: WSO('-tc (GF 1 1-6-16R,-LS SIGNATURE: TITLE: Jul 03 01 02:16p Fir PLUMBING t (909 881-5761 p.3 FISCHER PLUMBING DAILY REPORT DATE: GI - I q -O REPORT NO: WEATHER: l Jar PROJECT: INSPECTOR: t✓• 5p,J02- LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. c�c� TO al EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS r LASoP�tz f MAXgY G'F T TE‘/Fslz UNG0?EV 40e R144l PI Pe LA-(�� . -4:i.►,Aes Pt P6 t,A'r�.e, -` 'tJ C . RENTAL EQUIPMENT COMPANY EQUIP •OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: t4orgg'D bid SIGNATURE: .• TITLE: Jul 03 01 02:15p FISCHER PLUMBING (909•) 881-5761 p.2 FISCHER PLUMBING DAILY REPORT DATE: 16 6' REPORT NO: WEATHER: PPROJECT: �,(.OII� caEl.� INSPECTOR: S /1J,T16t1"S LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO 3� EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM Na COMMENTS r1 g 1-1AXEY O WAT ' 1-6%/Kn)4, t A > etse r644 PIPe LA-( s}=,LL e ?(Pc LA.Yet, ia,a65' RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 03 01 02:16p FISC ER PLUMBING (909) 881-5761 410 p.7 FISCHER PLUMBING DAILY REPORT DATE: (S "p REPORT NO: WEATHER: PROJECT: SLaJ- ‘011.Ttrti INSPECTOR: ‘-2' 136.-007-) LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 0 TO -51 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS K D.rr L-c4.-y_- 1 1 1✓1 AX Y 0 Pc 4at-i-i TOVEhlz? LaPor-6 . go5etus04 PtpC l' ?- • S S4sLLAc 1 tPC l a-&-tZ 71zAkoaT• vr-JrrNJ Lix- lA U UJ%5E RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN • EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 03 01 02:17p FISCHER PLUMBING (909) 881-5761 p.8 FISCHER PLUMBING DAILY REPORT DATE: ( 4 -6( REPORT NO: WEATHER: PROJECT: 47Lb1/ Leto' INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. irk TO 34 • EQUIP . LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS D.r.r i.Aeog co q NIA)Wf DFGEa.A..—j- dog tr6dd 'tP6 t, YGt S4;t..LACs P1?E LA-fgtz i�Fk • t RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 03.01 02:17p FISC ER PLUMBING (909) 881-5761 p.9 FISCHER PLUMBING DAILY REPORT DATE: (o - (s - 4 I� REPORT NO: WEATHER: PROJECT: Lc1�C�Z INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. A-1 ro 3� EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS 1.-1AX Y D = P1L�z, t eo5a-fsonl Pt '1 1,�qtre. SisLL s Fc PC L - .AINLIV • C_.IVC.te1 (,A60 - 4uJ( RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: Jul 09 01 10:41a FISCHER PLUMBING 4 (909) 881-5761 S P.5 FISCHER PLUMBING DAILY REPORT DATE: (0 ' 12 'O REPORT NO: WEATHER: PROJECT: Sew. INSPECTOR: 4 13'AUS-R. LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 91 TO 31 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS K EWr L er...- $ 9 viAs_ - oii'✓ nTe - eo5 sod VCt'E LA -ea SgLLAES 'IPE LA-ec - TF-AiOW r RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU6 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE:Y-(31-riTITLE: Jul 09 01 10:41a FISCHER PLUMBING (909) 881-5761 p.6 i FISCHER PLUMBING DAILY REPORT DATE: (0 -11 - ° REPORT NO: WEATHER: PROJECT: _.‘"ve-Z r%w INSPECTOR: �' •F.' iJ( � LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. ' (OD TO 41 EQUIP LABOR DESCRIPTION OF TASK HOURS , ITEM NO. COMMENTS w LAFoIz e cl MAREY 0Fazo-Tt Cob rsobl 17 Pc� L '( ' ) . <4LLA ES rife I,A,1/� 1.AI rJCC . Gr•trrid Lace- TrgA►.J • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: f SIGNATURE: TITLE: Jul 09 01 10:41a FISCHER PLUMBING • • • (909) 881-5761 P • 7 FISCHER PLUMBING DAILY REPORT DATE: 6' � " O I REPORT NO: WEATHER: • PROJECT:-1.611 ]? /stik!! INSPECTOR: S' BAUe LOCATION AND DESCRIPTION OF OPERATIONS: (_•I�� tz�`f -TT) 14+stilatK_. rher Phirniiog STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS e5r5VetI4 o F_A L Se-LIAgG B4?: Li.-{i5g. i ig#tt-iI cog,Il Fid I.AF o'cz, --vr...4.10e-6 t-m- EG -1 _ i. i,aYar, • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Ju1.09 01 10:41a FISCHER PLUMBING (909) 881-5761 p.8 • •. ♦' , . . . FISCHER PLUMBING DAILY REPORT DATE: 1 " U REPORT NO: WEATHER: • PROJECT: clk.6' 1Z A J INSPECTOR: S'-2Pf eF. LOCATION AND DESCRIPTION OF OPERATIONS: 1, CIZ? 1' "i"t) P7V1 La6K— Isriter filinnijoq STATION NO. TO EQUIP ' LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS >,IT Lab..-, 9 MA-Ae-( oP64-,4-trtz SIFVet-16 awP-. - r- Colaa 1 g \ W L >( • SCU.sct25 pf r3 -A i 1 A i t41; 5 G'KiifFini UkBoe T�ge CAit.lG ► t 1 P i FP L•A `(G r, -9- "e 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: crvF Jul 09 01 10:42a FISCHER PLUMBING • (909) 881-5761 p.9 FISCHER PLUMBING DAILY REPORT DATE: (0' (o' a REPORT NO: WEATHER: • PROJECT: 4_.61. L' AU S. UJE� INSPECTOR: S aAvEg, LOCATION AND DESCRIPTION OF OPERATIONS: -n) \4 i5'm LOGS. STATION NO. TO .1srhef '/ijm6tS EQUIP LABOR DESCRIPTION OF TASK • HOURS ITEM NO. COMMENTS M M a , S- rsVel-16 o A-- 7--. 0 0:)t e i A 1==1 Pry i.�,-( S SCLL.kg', piPLA„--(e-l` jAifJ155' Cg,i'FFNI Lvt80Fz •Alr.18e t c ee-cti 1 i' i Ah -(6' -64' -C,)- i RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU6 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE:' TITLE: ,A-)p- Jul 09 01 10:42a FISCHER PLUMBING (909) 881-5761 p.10 • e • .1 FISCHER PLUMOING DAILY REPORT . DATE: tD' 'O I • REPORT NO: WEATHER: • PROJECT: eAL.6P. _AV,`; Sr✓ul��, INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: -rT) STATION NO. TO rhef 1%401 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS L4.&'g (4 9 BELT 4 ; l Fis (.�JC �+ . CL.i.& PL r L.A %g Af41576 C Cog, ifFinJ LABo2 IVAWet. L L C Gt 'Li-'t i-e%:'(t-i P + - . RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5U5 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: S il �. Ju1'09 01 10:42a FISCHER PLUMBING I909) 881-57G1 p.11 • FISCHER PLUMBING DAILY REPORT DATE: (0 l REPORT NO: WEATHER: • PROJECT: StAki 1 t. AJ/G, S.rule?_. INSPECTOR: S• 'B. 'J LOCATION AND DESCRIPTION OF OPERATIONS: "JAC la?Y 'TO 14rsm�z' STATION NO. TO rhel. P�umbinn EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS a aiac i sl t iFf."'t.�`-(Etz • S Se:Likv?5 PI1 L� gg . igAU4t;� . GgiifFINI L So-Z Tr-.4Were W . L LeEECH Pi I-(G .. -e,- • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 09 01 10:42a • FISCHER PLUMBING (909) 881-5761 p.12 • • FISCHER PLUMBING DAILY REPORT DATE: 6-61 / o) F if REPORT NO: WEATHER: • PROJECT: c4L..6\Jr'. Actl c.; INSPECTOR: S 2LPioe n LOCATION AND DESCRIPTION OF OPERATIONS: i) 141571-nLo • STATION NO, 100 TO '1- EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS i iv1A- E- oQ ,b. l, i ice iq IMP LiNs!Eg, S ScLLk , A L4s•"-ft51? j �A f 1.41;15 C C'iFFIINI 1rocBoR i i it JEr6 L LeC 1 l L.A- i, \ \ij 6 u.kftr--- . _ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: ' �(�[J I TITLE: Jul 09 01 10:42a • FISCHER PLUMBING (909) 881-5761 p.13 • FISCHER PLUMBING DAILY REPORT DATE: - 3► - 6 I REPORT NO: WEATHER: • PROJECT: c-1,:-Air1', Mir; SctJJe?_ INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: ?ANe--1-6 l mLUGK.- STATION NO. TO • isrh41. fikm6itxt1 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t,4A)(E'( oP 95a tz 4:•D-r_FV5146 OF -CAA a f)14 %iPl-L `{Eg-, seu.,kg. RI,,---... Lfr - "MAri466 C Cog, i FEI N' LA o'R i I N-16e i.-M-I tli- LhY7tU . RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO, COMMENTS: SIGNATURE: -01 TITLE: Jul 09 01 10:43a FISCHER PLUMBING • (909) 881-5761 p. 14 FISCHER PLUMBING DAILY REPORT DATE: ' SO - U REPORT NO: WEATHER: • PROJECT: 1 r r iu1E� INSPECTOR: 's' SAveF LOCATION AND DESCRIPTION OF `OPERATIONS: I'�Cia f To sriLULK. STATION NO. v TO 4'rnbinn EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS m mANAE'f of ,A -rem 5 51TE et.t6 0wFLAr a aF.SC>✓ I A l'r l ks(6iG " "u P5 PI P75. L - TW rvll;E C Ccg;FEW LikE T Alr lrri✓ f f:.eEGhi I'rc 1-A- 77 - . • .. I •I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: FISCHER PLUMBING (909) 881-5761 p . 15 FISCHER PLUMBING DAILY REPORT DATE REPORT NO: WEATHER: • PROJECT: (1-% 'LAM?. A‘g; INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: ?•%'( "T) PTMLOG<— STATION NO. bu To C *is Chef' Alurn6111(1 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS l le-i-t-f- 1,4,_,L.,-,te-E) t t•e1A-.A6-( OPegoevrE. 1 . i . v5146 a-r Z ZD,13.6viA PI*P5'Llk.%-(61?-, , • S Seu,scp PI P-6-i-A`(e'g -"1-A 1466 Gg,1 Feld 1,R-60\z 1AiJ t t:.-ea-i-t i't•'-'t' LA:-(6"'.., () .• . i . I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Jul 09 01 10:43a FISCHER PLUMBING • • (909) 881-5761 p.16 • FISCHER PLUMBING DAILY REPORT DATE: /7' L i) ^ CI REPORT NO: WEATHER: • PROJECT: c4U'iri-P. Aq,. INSPECTOR: S• ueF, LOCATION AND DESCRIPTION OF OPERATIONS: -rr) rsm Lace. • STATION NO. 6 LU TO °Ischet, "/LItTl6inn EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 1 rV5146 OBI'-A-rP-- S� Likg. A_ L1,5g l 4 f F`f f1 a✓ • Gg,iFFINI IAaBOR ilrA106.6 cee-E4,14 lOY LA:-(1 ., 1 D F),,....7 / i,( ' . :1\,.. a.) I c D_ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: fir-• tti✓. FISCHER PLUMBING DAILY REPORT DATE 6' 25 ' 0 Y I REPORT NO: WEATHER: • PROJECT: (-L.(..)'iSZ AJ% INSPECTOR: S• 2,P$U 6 LOCATION AND DESCRIPTION OF ,OPERATIONS: -r-r) t4pTrnLo.r STATION No. (0 To 1\ • rhep /1/417,13001 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS e e T Ve 4.6 oFEw.A 7 a alacv 1 •*1 •Pe 1.,4`-(az ` `j-6U..kg- P r� c.A - g j MA. lf1F;6 C C ifFIN1 Liksm, it l6re L Lee {�I•k. LA--(t • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5U5 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: IL TITLE: .: • FISCHER PLUMBING DAILY REPORT DATE: • 6 REPORT NO: WEATHER: • PROJECT: e---(Atikle. AJ! uJE?., INSPECTOR: S• -2A\J ems, LOCATION AND DESCRIPTION OF OPERATIONS: , STATION NO. CO TO 471 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS - --tl.'re 6 o\ G 1-,r- a aea v j A I; vpr:l.A.`(C . S Seu. g- P1 P Lk`eg "i 4 t41-16 c ceg,tfFINI Likiso z T AI►.16- RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: • • • • FISCHER PLUMBING DAILY REPORT DATE: 5 ' :--), • 0) W!D, REPORT NO: WEATHER: • PROJECT: >t..t)kfiSt. Agr-7, INSPECTOR: S• IPA) eE LOCATION AND DESCRIPTION OF OPERATIONS: .rn (.ac,<. STATION NO. 60 To 59 EQUIP LASOR. DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS m mA-Ae-f OPM6,-r617, . e e5r Y Y I,N4 ergATC . a a j` t� }o C" 1yrki,- I.,s-•?e S SeLIAR- Pi 1� L Y g i gA tf,f 15I✓ C CgIFFIr4 LikBo2 1 AINIge RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM N0. COMMENTS: SIGNATURE: TITLE: • • FISCHER PLUMBING DAILY REPORT DATE: .S/'0I REPORT NO: WEATHER: • PROJECT: 1.61��! �•-FUJE�, INSPECTOR: S• Sock) I✓ LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 6:0 To 5 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 14-gi-ti LAeome q 01 MANAS'( apse. -rem . S5T V I4 OF5P-ArAT. a50 j Ni -pFf l./,`(C , se-u.isp. 1Pi p r-:: Lk- i' a t1-161 CePI FIN1 LAIESMFR, DJ e-e-e5Gi-t I « 1.• --(6' .• i RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: uY\ TITLE: •FISCHER PLUMBING DAILY REPORT DATE: S' ZI ' 0 REPORT NO: WEATHER: PROJECT: c t..) Jq . , 'J uJC INSPECTOR: S• 2,AU eg, LOCATION AND DESCRIPTION OF OPERATIONS: -1 t) 141t . STATION NO. % 0 TO S '3 F►Schot. ittnion EQUIP. LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS a aF1i r- A 1:,Pi 1" c .,-(6 1v �Y ter/, 14 �6 6 C Ccg, 1 FFtnr UKEM T iJ C 1 c c'ee-EG1-1 I LAY&r., . ,- ,.e9 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: ' •••::.::1 s FISCHER PLUMBING DAILY REPORT DATE: 5 a.- (J U I 1�� �:1 REPORT NO: WEATHER: • PROJECT: c--4_61,5Z INSPECTOR: S' 2AAJce LOCATION AND DESCRIPTION OF ,OPERATIONS: ( � rt �Sr)LdG<- STATION NO. 00 To EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS M MA-AEY cP ,a.-ro 5 5T Vey. OF5 a a i t 1'Pe.. i..&:4c tz S Sei.i. try R 1'.l I-kSz'g TV, rrSl; ' G Gg,ifFINI L-bc80R AitJe-c C C P 1 l.A'(k , . RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY • FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: C:',!?.?,'i.:,.,:•:,:.,:g4,1';7,!;:;1,17.,.7:7.-41:•W:77.;74".:.,;:.:•: • ----- • "7" ••• • • '' ' • •': •" *.t7 7 . .... • . . • • • * ( FISCHER PLUMBING DAILY REPORT DATE: 5- 11 i --t14) REPORT NO: WEATHER: • PROJECT: c4../Vr."-i. Ack INSPECTOR: 2iNvez LOCATION AND DESCRIPTION OF OPERATIONS: TO 14 PT'VY) LOG‹.- STATION NO. Cot; TO • •• rho, Pkm EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Y--11" LA'EoteZ q ci 1 1•11Ag1( OPer-A-reiZ. , . ..--3TFV5t4 6 OF-e-gAT17. a aez-or5A 117.eue...--(elz, S Se*LIAPG Pi PLA"-ceg. MA I g 156 C Cv•P i fFir4 lAskiSoVZ, 11r-A iN1 8-C RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: ' "*. • ' ' '' 7 • ' ' ' ••• • Npe,,,,,,,,,Tr,7.761.4,:Knr`C,.......• • FISCHER PLUMBING DAILY REPORT DATE: LP Lt)gt-?. REPORT NO: WEATHER: PROJECT: c4...1%/^4e4 AVde?... INSPECTOR: • 2,Avee LOCATION AND DESCRIPTION OF OPERATIONS: ?.4-1 12, STATION NO. 4"0 TO • Vischet, itrniictS EQUIP LABOR. DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 14-04-r LAC‘e-ge q q mA-Ae-f oFevAcree. . 4 45rsVer46 6117:7-4A-r-r=-. a ai2-vri1/41 t:IWI.i.,,-?-6, s seu-kg-. Pi P•t•:;:LA-ce-g "1"4WM' G Gjg,IFFINI Leosm, -ry_A 1Kle-C e e..eere-14 1 LA---(ev., RENTAL EQUIPMENT COMPANY . EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: • • FISCHER PLUMBING DAILY REPORT DATE: ') < • v 1 -11)6 REPORT NO: WEATHER: • PROJECT: �-L {)�i �, ill r•U1 INSPECTOR: S• 2pcv ee LOCATION AND DESCRIPTION OF OPERATIONS: ? 4- \-r.' Lot ' • STATION NO. Co U TO S4 rc4 ir; .. T . Kit a n •. :.y.• ischet, p�umbinn EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t-tr. 1-4,e1- z 2 G, t t,e1A-A Y upegAcrez. . S SZGV5144 6Fe-- . a aecj ,1/41 1 Lik.`;G g, S SGLIA PG PIPE LA-cZg i Argl;6 C Ccivt1FINI iAcBo211rAt1.16e RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: ..Sr .fit.''" _:K �` Y;S•„__. _ . .. , • • • • I FISCHER PLUMBING DAILY REPORT DATE: S' 14 - 0 ( Mo REPORT NO: WEATHER: • PROJECT: c LAIge. /Alj % q-EUJE?„ INSPECTOR: S• 13e,v 6E. LOCATION AND DESCRIPTION OF ,OPERATIONS: T O t4-4LocX.. • STATION NO. ceD ro • Visrhot. AZiniaiog EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM M NO. COMMENTS ' ' EVet,t6 6F- P-a-r a i A 1:=1Pe-L,.--(Elz ) s seLt gG P1 P LA-(e'g T 4tI-I;I✓' g Cg,IFrrn//ini' 'ABM, s�1u .0 L LeCI {�IFt I.ft`(U>fv. 2 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS __ITEM. NO. SUS CONTRACTORS COMPANY FOREMAN EQUIP HOUR ITEM NO. COMMENTS: SIGNATURE: TITLE: • • FISCHER PLUMBING DAILY REPORT DATE: 5 ✓ �i 0/ REPORT NO: WEATHER: (oc�D • PROJECT: UUr tS U is . S ilJEp� INSPECTOR: EAU G� LOCATION AND DESCRIPTION OF OPERATIONS: C.DUL'- ,L . i',a'e-( STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 4 41- LA9)0.2-e-f. 11 ; ;Ta7 n PV 201- ; ;oB r) PSFe(,40.(6'� • S Svl.i.eh Pt PG L /0.(6�- -CPI ttJ C. K4' '? t Pc; Lip,.(M , RENTAL EQUIPMENT COMPANY SUB CONTRACTORS EQUIP OPERATOR HOURS ITEM NO. COMPANY FOREMAN EQUIP HOURS ITEM NO. N COMMENTS: /Sc-, 'P r-I L-t eJJ Z)�V_ SIGNATURE: L4)t TITLE: • • FISCHER PLUMBING DAILY REPORT DATE: `J " l U ' o REPORT NO: WEATHER: • PROJECT: SLDVI'r, INSPECTOR: A U a - LOCATION AND DESCRIPTION OF OPERATIONS: •4-o11OF, /6%U&. Gt--1cg�-r STATION NO. TO 4- () -rz) EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS M MAXC`( oPCR•a-z 4,TaJet33 o Pe'0 -Tr, reG g r ) p (P=;1 •(c`g, S GL1-0145 pi PC 1��; E0 '1 A it Jer & g.tFrrJ LA kZ-MA roe B Lizeu4 PIPE Le&-ec✓ • • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: - Wr) iz h flit/ SIGNATURE: TITLE: U P , • FISCHER PLUMBING DAILY REPORT DATE: 5 `c •d/ W REPORT NO: WEATHER: 6C.Po t� • PROJECT: S(.o0C1Z A.J Sc WE INSPECTOR: 4 • P e LOCATION AND DESCRIPTION OF OPERATIONS: .SLvuc (Z Au t. C tle STATION NO. & U TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS K Ka=m� [sEGoeep $ 5 H HmC`i Dre- -TEi✓ S STev O P -TCP $ rog6 rsaa<1 pI PC I,areg. c . eD6LL Ze2 -Di PE L,,s-(t TrAIN16E S GRtrf1/�J k,NF.ce. p,cr�t t` �d - &gr RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP -HOURS ITEM NO. COMMENTS: CI hi r4ten TIE Ovt odt SAL Gu7 roe LAfe-e,A1.5 "p 56v-ra 5hce SIGNATURE: I ro-)- TITLE: • • • FISCHER PLUMING DAILY REPORT DATE: �' 8'0I REPORT N0: %" i S hep WEATHER: • PROJECT: Stoty.rit, Aue , 6 INSPECTOR: S f106 Phvmbinn LOCATION AND DESCRIPTION OF OPERATIONS: ,, �� GJLOtJL�� ,&VLF Gliiei F9 TV f•t'EJ" iCoGi STATION No. (i() To 55 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t t4 LAeofZe.e. 4 5 • 4)1-N e•i, Q Pc -Tt`� 6 s se LLA.K.'S Ft PC LAY T-F__A- I kier G Glz)re • C,4soe- TEA Ise .2 crEc24-1' Ft Pc: 1,AYG r- 5-- 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5U5 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: (Dge PeiLL &D l`4, R1,95,E SIGNATURE: TITLE: STATION NO. • FISCHER PLUMBING DAILY REPORT DATE: `� r - 7 'v I ti REPORT NO: WEATHER: &O 'D • PROJECT: SLv tJ iZ $ Ery INSPECTOR: <S• /34tier, LOCATION AND DESCRIPTION OF OPERATIONS: SCau9 AU t.Ale—ZZcf -ra 41714l�,�� 6 , TO 6�� EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS T TEv6I , 6 eL'ZaTn . R f,DRg-egt.13 PtF caY,-p, I.A•V-, PiPe- L,L-(e " A-IO cze--60- Ft PC (,..Yeiz. S C1 CAII✓Frnl Calf z.-nzA-fIJKF 8 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: iltief44C f J7' A it) t> 4 ; t,--0 (t1 e; ,S/D -9C se tUe 114TC4a! S DUG igeou 1) Cyr e5771uG G'c) l-Et tocCUvc SIGNATURE: TITLE: • FISCHER PLUMBING DAILY REPORT DATE: S ' •01 147 REPORT NO: WEATHER: (A r--, PROJECT: CI rrg- �'W r3'✓ INSPECTOR: `7• 6a U LOCATION AND DESCRIPTION OF OPERATIONS: v&`j"C /6,10V�t vt i STATION NO. ri ro 190 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS e eTf;U 6 e A-Tc g goF 1_ p ?I f C LA,{L' . 6 6g Up rr Pi P6 t,poia- 1-40 rn.--b-- 6VAq'fiu LAC )1± - elAib b Izil PI P6 L A-f� 4 i I 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITE, NO. l / SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: -- )t.,& r) P g 1(4 -r I ►J6 M f-���& ,� IJ t 1fi Do r S o J a r 0 p 1-9q' 4 1e-s-r f to FOI.0, t • 13,4 UM SIGNATURE: 12' • LLB TITLE: • • • FISCHER PLUMBING DAILY REPORT DATE: `5 . • G) `('CPU R5 _ REPORT NO: WEATHER: Gb'Y, • PROJECT: INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: .tschet. #tm6•0t1 STATION NO. 51 TO (0 0 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS tMej 0PeeckTe S -vTEI ti—x-, C P612-44-Tt? 5 ..' f0i3CIL-r i3 PI PA.AEG, 5 . StL1J If, PtPELrat ad -7_44.4,jc t 2 r..Izt.5c4 PI PE r_ei (,c_tt= c) L.At3o - -mil idc 3 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. fJ L'W f 3. ri LS ., U.�� 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: AS ALtei) 5(ziu6 WJ`4' li GGJ MA(ti)C.1&JG Ai -JD LotTt-ed7,� C,\lr%r UR ta)(33M P.) C,AtAC or Lie ND SIGNATURE: r TITLE: • FISCHER PLUMBING DAILY REPORT DATE: ' O I REPORT NO: WEATHER: C,Goov<{ • PROJECT: `S l avv'1"L St W t -' INSPECTOR: S. StnutsF-- LOCATION AND DESCRIPTION OF OPERATIONS: 4)CoU C:R- AOC fZ STATION NO. 6 f,/ TO SDI r hep '%ITI 6on L EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS sTEUENS o n frzCr, biztrrIN.) L �• ¶ o/NE'E Lg 0-1- 'LB LP -tee-- -09.;- • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: 5 W GV'i I f-) EIZDNT �v1 Ao �' c0'T" t4GIG At-1ci SIGNATURE:' -r TITLE: j% • • FISCHER PLUMBING DAILY REPORT DATE: 5 1 - v ( '1(.)c-3. REPORT NO: WEATHER: GoorD • PROJECT: 13 f .,' %.; Sc%C•� a� INSPECTOR: &.bec) LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. / TO ------- EQUIP LABOR DESCRIPTION OF TASK HOURS ITEMLNO. COMMENTS 8, 4 MAilEY ape: (2-Gre ., STEUENS 6 P -R Tr?, 1 cu,A'25 Pi PE LAVE?.- -'- (NEE rRI' F s.) La g i RA r Uzu.% f Pi P61. -fCa RENTAL EQUIPMENT 1 COMPANY EQUIP OPERATOR HOURS ITEM NO. N r 'P Red-'t"N 1.e- gvu-00.' 5UB CONTRACTORS COMPANY FOREMAN �EQf�if� HOURS / ITEM N COMMENTS: (_,LON hr7 1)P INnRI6 �6iiUc`7 Sw� r A.r..�p P2F�a grip re_ e. 'P/4aLT reDoioaO A n v ( SIGNATURE: F. '1,61-)( TITLE: • • FISCHER PLUMBING DAILY REPORT DATE: 4- so-0 N1 Of�l REPORT NO: WEATHER: (A000 • PROJECT: Lwc Sit✓& - INSPECTOR: J • 6/avi LOCATION AND DESCRIPTION OF OPERATIONS: isrhEt• P/uintiol STATION NO. 61 ro EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS K51•17- L A E0F..6 a $ Ma/ccl d Pc-l~a-r ,. -$ Mg6moN PtPeCb-(eg. -15- s8CLAPs PIPE Lk`t' ITAwe56 $ (i FFi (-Aft t✓ Tgtoi NeE % c P(Pts Ga�� $ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. t r-1l,k-Li'7 (.ONG, COMMENTS: ')11. 6,IZ, G I L.L_, 577 %T 1-10L6 W"-CFsC Kt'P SIGNATURE:TITLE: Apr 30 01 05:56a FISCHER PLUMBING (909) 881-5761 , p . 2 FISCHER PLUMING DAILY REPORT DATE: r1,01 cV-S REPORT NO: WEATHER: O7OI7 PROJECT: 4-/(2)tit INSPECTOR.: - LOCATION AND DESCRIPTION OF OPERATIONS: Piumlitog STATION No. `; 1 TO 6i; I • EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS 4, S 6Teuelsx., o P614-I :Ove4'050t-N . nFE (,),,,?e e- e76 (IA Ft P e 1,/5-%? a- -t-v-b,ipet 'I e-aOEtiA PI Pe li- *A7-- (6) 6P cruLl C/5•601-- TTLIAAK,E,--C RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUO CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. 1---4-1L.-)T7 (-60C. '2-- • COMkIENT5: 1-Ak-r f-)-11/14/ee-T) U.) Aatt („0- P7PPIl SIGNATURE: TITLE: Filar 30 01 05:56a FISCHER PLUMBING (909) 881-5761 P • 3 ••••,•• • • • FISCHER PLUMBING DAILY REPORT DATE: REPORT NO: WEATHER! C:0 D • PROJECT: 5i-aJO:r- INSPECTOR: S• 130.101-5F-. LOCATION AND OESCRIPTION OF OPERATIONS: .1Sa Chef iitog STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Kepi L-i., 6.:g.. S 3 tA•A*1 6 Qt/511..-PvCel?... g ! S-TeV6ILIS 6 e.5124-Irc.- % P4-geffi-sois) p l Pe Lp-t, ze. --t9 . St-F.15-411Z.5 'F1PC' (.. ANI. et)— 01'ieC 2 6PIFFrk) L it4(2.61z- Tr-puJeC 3 . • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: SON?• Apr 30 01 05:56a FISCHER PLUMBING (909) 881-5761 • p.4 FISCHER PLUMDING DAILY REPORT DATE: 4 L - G i UJ3t' REPORT NO: WEATHER: tgot,T> PROJECT: SL A.J C' S r✓ J g INSPECTOR: S g4•06-z LOCATION AND DESCRIPTION OF OPERATIONS: ' ` ✓V C AV C/16 l' To c urc,� STATION NO. TO . EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS MM - 0 Pc (2,41--f-- 3 ; atia4S Ptl-,- Ll-.; ce.. t ►,w�6 G2t rod ck)-v- c,J $ c et2 w -6 Feu:Al . 8 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UD CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: r TITLE: Rpr 30 01 05:56a FISCHER PLUMBING • (909) 881-5761 p.5 • FISCHER PLUMBING DAILY REPORT DATE: " I I REPORT NO: WEATHER: • PROJECT: SL-04/3-0 INSPECTOR: 4. • LOCATION AND DESCRIPTION OF OPERATIONS: ischett Piumlog STATION NO. 65 TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS kcc`T t,IAAO-r . 5 ° 5" U' l PC L E- - . 6u.'I.LA-c6 fi? l I.RU L (s . - AilJhUr • ? Gt pi rot.) Lino 2. 71-roujcrSs G4-E15L1-1 '1 f Lam"( e-e, "6 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE TITLE: �-0. Apr 30 01 05:56a FISCHER PLUMBING (909) 881-5761 p.6 FISCHER PLUMBING DAILY REPORT DATE: 4' 1727 I -M00. REPORT NO: • WEATHER: ( 5-4-V--, • PROJECT 42Lb 1 7Wi;'T, INSPECTOR: •l3 %J LOCATION AND DESCRIPTION OF OPERATIONS: �L 0& AS,lJe (-1- c j •rj STATION NO. 3 2/ • TO 65 F�Sch�� 6inn EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Ka _ 1 � A tote `4--- . U 'a-V N47 oeff- .A- cr_. 02 I at, rp'Tst ri Pt PC LiN' - • LLA('h Pi Fe' LA,,t co. TZAitAcir i%(P1(IV L/ArloG jpIh3eg . cz G14 rare (, -' c b I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. ;tNLW-N 1 Ce ti& I t C._ COMMENTS: SIGNATURE: Y`"' TITLE: �-�'� Apr 16 01 05:38a FISCHER PLUMBING [909� 81-5761 p.6 FISCHER PLUMI3ING DAILY REPORT DATE: Z\ ' 13- 01 REPORT NO: WEATHER: (..roo17 PROJECT: e)(AU4'- INSPECTOR: - V LOCATION AND DESCRIPTION OF OPERATIONS: { 614001L- STATION NO. 15 TO (.0 EQUIP . LABOR DESCRIPTION OF TASK • HOURS ,ITEM NO. COMMENTS s sTl`s YENS 0 rat", �� i� �i�UET~'I`x10 17ti7fi Lam:. ' e• �, \ if l � (r � tp r�E 614,Pfzc7 PI Pt iic.n,fe2 ` P.1Net • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU6 CONTRACTORS COMPANY FOREMAN. EQUIP HOURS ITEM NO. COMMENTS: -- -r 15 r L Ug nAic 1(. I` 1if" l iP141,0 14E-.� (01\1 F f N SIGNATURE: TITLE: Apr 16 01 05:38a FISCHER PLUMBING (909) 881-5761 • p.5 FISCHER PLUMBING DAILY REPORT DATE: L • 1 �1 - CU 1 u 4p. REPORT NO: WEATHER: L 00 PROJ ECT: INSPECTOR: (S— LOCATION AND DESCRIPTION OF OPERATIONS: liscitef Phi lioq STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Kr-iisr LPG, eoz. q • 5 M /IVA 0 Pr= YZ.,A1-w Si t) 0 P( PT1 r_n�v.�Tar., ?(P� I -( tie. SF GokV-5� :PI PC l�.ta-14s12, 11Z1-1N(E (1�1+''r1tJ LAB.z. °k!":,tD..► 'E RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: fN6F'-r TITLE: Apr 16 01 05:38a FISCHER PLUMBING (909) 881-5761 p.4 111 FISCHER PLLUM6ING DAILY REPORT DATE: 11" I REPORT NO: WEATHER: C L a)L7`( PROJECT: Sl.r1v( S W0-e" INSPECTOR: S. Baku e• LOCATION AND DESCRIPTION OF OPERATIONS: �615cher, P/4111604 STATION 'NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 14c4,'1' (,,ACC 'E-ce. $ S S't 5oeP5 0 ?.;:zivl, e , —e R;r%.4)r,NJ F1 Pe LA-f GT.1 t5ELLAr.6 • • P1 P I� LA"(e 2: MA 1 NE'G-" cg dFPl!J LAL,C,:tt "1RA:r;. ' RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. TRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. i COMMENTS: SIGNATURE; iDpoq l-Att TITLE: Apr 16 01 05:37a • FISCHR PLUMBING (909) 881-5761. p.3 FISCHER PLUMDING DAILY REPORT DATE: ' - 10 - 01 REPORT NO: WEATHER: (_LDU i PROJECT: .I,Oa jc?tiA ) INSPECTOR: . g1JL.= LOCATION AND DESCRIPTION OF OPERATIONS: izchet. P�umb�nn STATION NO. 4? TO EQUIP LABOR DESCRIPTION OF. TASK HOURS ITEM NO. COMMENTS H-i / O Pc 1U-P 1 4 i r li r•3- v i'0'. -• VU G 7,•MOij 7t?Et- efMc+ S� t.V I✓ i Ft PC LA�6-P Tr: ;Ai tJCC.; 6-FI Fr'i J 1J1 30e. 'T"�P(tJCf • • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. __ _ COMPANY FOREMAN EQUIP HOURS ITEM NO. �`f/hL4 5,i1-1 /' t 1 0.44 : !_c v-L. f O COMMENTS: . • Pf\ 0 f \ 7e.�0 ti • 1) `H I (-17-'V �t-1 SIGNATU RE: TITLE: Apr 16 01 05:37a FISCHER PLUMBING • (909) 881-5761 p.2 FISCHER PLUMBING DAILY REPORT DATE: - 9 ' REPORT NO: WEATHER: PROJECT: (.DU 6-7UWL-`L INSPECTOR: &) ' At 1 LOCATION AND DESCRIPTION OF OPERATIONS: giSchPp Ph/ 1310q STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Apr 09 01 05:49a FISCHER PLUMBING 4111 (909) 881-5761 p.2 FISCHER PLUMBING DAILY REPORT DATE: l w ' O f REPORT NO: WEATHER: LLuoDq (4vL PROJECT: SC.oU T. 5i-we"% INSPECTOR:. S t3 UC . 'tschef. P�umbi�n LOCATION AND DESCRIPTION OF OPERATIONS: �jC vJ e-E, GL� STATIONNO. S TO I� EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 5rtc-J�nY� O rc=.6-ce-r, bt TeK. ecv'rsor.Y S��rs, C17? 1 Fri.) et - e'lPe- Y�r+iN�SE (- -& TPr ltJEt RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU6 CONTRACTORS COMPANY COMMENTS; t5C)TZ-lf'Je..r . FOREMAN EQUIP 65(,) 15" MIaINLuJe HOURS nuf' &U-/- Per ITEM NO. SIGNATURE: }� arw TITLE:up Apr 09 01 05:49a FISCHER PLUMBING • (909)'881-5761 • . p.3 FISCHER PLUMBING DAILY REPORT DATE: 1 • J ` U REPORT NO: WEATHER: LU,tIJI?( PROJECT: 4LOUt3F- u < ) INSPECTOR: �• i;165-UECIF-' LOCATION AND DESCRIPTION OF OPERATIONS: if; rh�� Phirn blog STATION NO. 4 TO ` 3 EQUIP LABOR 1M'I/vCe'f 4 rV&0b DESCRIPTION OF TASK 0 Fee..l g.. PIPE 1-0&:--cr L HOURS ITEM NO. COMMENTS i s RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY 1 FOREMAN EQUIP HOURS 3- S laouzS ITEM NO. 11 COMMENTS: - 1-1 6\) HAI fti1 t. f rJ�� '&-i fJ6r SIGNATURE: TITLE: U\7: i Apr 09 01 05:50a FISCHER PLUMBING • • (909) 881-5761 p.4 FISCHER PLUMDING DAILY REPORT DATE: Lt . 9 • 0 I Lj l-TD REPORT NO: WEATHER: (bi,,c) PROJECT: INSPECTOR: S. Be u& E- LOCATION AND DESCRIPTION OF OPERATIONS: 51 cug- A�l� C. is tntz•f 'TCC (ace Jo I,cGC STATION NO. !( 0 - TO 4 EQUIP LABOR • DESCRIPTION OF TASK HOURS L r' t?) ITEM NO. COMMENTS Ms.,�eY SL1.LA Cr FL-4i`e i tit ret 'I- L) PeZic r d' . P 1 PC LANK e 2- -1- /i; cJc'y Lrt Bz. -rep. wet I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS SU6 CONTRACTORS COMPANY COMMENTS: �l1 iI'- Li J(• FOREMAN v�Cii� (lJi 11. EQUIP HOURS 3 M.wU faun r i ITEM NO. Al`10 tS$ TA uiff fm. ITEM NO. ii • SIGNATURE: TITLE: eS. u r i Apr 09 01 05:50a FISCHER PLUMBING i (909) 881-5761 • p.5 r• FISCHER PLUMOING DAILY REPORT DATE: 4 " . U REPORT NO: WEATHER: PROJECT: %t.0 INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: sischet. /31/4m6-0q STATION NO. ' ! �— TO 0 EQUIP LABOR ;I.jT• DESCRIPTION OF TASK HOURS t� a ITEM NO. COMMENTS 7u`%(rk'Qi� FI-(}6 Pi. Pe .-r th-Znkcs 61Pr( ( J 1 RENTAL EQUIPMENT COMPANY EQUIP i OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY A'(AtA •FOREMAN EQUIP COMMENTS; k(A'k. -pclf i HOURS ITEM NO. 1I rr4t 1.,o•E6 �OG� SIGNATURE: TITLE: i Apr 09 01 05:50a FISCHER PLUMBING 411 S (909) 881-5761 p.6 FISCHER PLUMBING DAILY REPORT DATE: 11' 2 -01 1-40t3 REPORT NO: WEATHER:. PROJECT: `: (/x INSPECTOR: ' '• �lSLif��k.I LOCATION AND DESCRIPTION OF OPERATIONS: VISE' hef Plumbinn STATION NO. 31 EQUIP LABOR dr.4 (It) DESCRIPTION OF TASK Lapc, f-rl b 1961-e T&V pf l lFe' -rt.4 1 ni 6`r l,wa-?�(- ~CI t1Jc�E HOURS ITEM NO. 5 COMMENTS RENTAL EQUIPMENT COMPANY 5UB CONTRACTORS COMPANY L / I N(, COMMENTS: Nbp, P6 Copt, L\ •pa »\77 EQUIP FOREMAN OPERATOR EQUIP HOURS HOURS .) ITEM NO. ITEM NO, (Q1 v u g5T? INN) t;$ TAC4 D Vv11-1 SIGNATURE: TITLE: Mar 28 01 07:42a • FISCHER PLUMBING • (909) 881-5761 • P.6 FISCHER PLUMBING DAILY REPORT DATE: '2J' 2 J' v I" I. REPORT NO: WEATHER: PROJECT: INSPECTOR: •i4`'U LOCATION AND DESCRIPTION OF OPERATIONS: isrhef Phimbiog STATION NO. 317) L TO EQUIP . .LA5OR. DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS --vri. sr 4". bJ: n r7L, V ,n •t c: i 41 11':A:1 .) Um2,og. - gA e joe 4 o o Fopc: j P► re 1A 1 71 - �. S SELzd, l'-,, Pt?r✓ A- z.A k o ez- • • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM. NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: fc7WCrPn A44,-) SL663 CDIGG r.niGt SIGNATURE: TITLE: Mar 28 01 07:42a FISCHER PLUMBING r (909) 881-5761 p.5 • • FISCHER PLUMING DAILY REPORT DATE: nJ /n . I REPORT NO: WEATHER: PROJECT; INSPECTOR; 4?- pw1A•0 LOCATION AND DESCRIPTION OF OPERATIONS: lisrhef /thTl 6�s STATION NO. TO EQUIP LA6OR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t t44 9 S ST1=01; 7) C CaR.I FF•,, S SG uh A • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5U8 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Mar 28 01 07:41a FISCHER PLUMBING • (909) 881-5761 • p.4 FISCHER PLUM6ING DAILY REPORT DATE: � - 2) • 0) Vs/t51a. REPORT NO: WEATHER: PROJECT: INSPECTOR: `5• 1 4'01 " ' LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. 32 .._.- TO �"JJT(66 EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM Na COMMENTS yk, L60.06 . oI,I;IA,.) o ptlizpt- 1. . S ScGI-r4Ezs PIPeF 17Z-A-IN6•Ll . RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU6 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: n SIGNATURE: \ 1 1 j TITLE: Mar 28 01 07:41a FISCHER PLUMBING • (909) 881-5761 • P.3 • FISCHER PLUMING DAILY REPORT DATE: /5 " - REPORT NO: WEATHER: PROJECT: Cv 'jam 4ji,gr/,! INSPECTOR: 5 .&elje:ee e LOCATION AND DESCRIPTION OF OPERATIONS: FiSch�,� Phim litog STATION NO. ✓V ?-"" EQUIP LADOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS e earr Lb' CxL MAY- El( OPL-5tz2a.rl e. LbA+r7t ' 4)1mA Ni o POZ-15 rtflZ I I;LL,A" es P+� LAq iz c cf3 6-g l 0 \71 Ye L,�r(isiz. TIC. n' t-it r ` c cry.' ( A 11J .14:54)e f?.' IF -VG RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY �t►cx.a�S(, FOREMAN EQUIP HOURS ITEM N0. r0 COMMENTS: SIGNATURE: TITLE: Mar 28 01 07:41a FISCHER PLUMBING • (909) 881-5761 • p.2 FISCHER PLUMBING DAILY REPORT DATE: REPORT NO: WEATHER: PROJECT:LL�V��. SLe+ INSPECTOR: ¶a• u Z. LOCATION AND DESCRIPTION OF OPERATIONS: Chef 11JtTi6it‘n STATION NO. 2b TO J 0 _-- EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS r ic. i‘-tA/ctr' op6v..py-ems ('1G STt tl et45 t 91/4.' `1. 't c , 1=:k-: ? P Pr. Lfo'Af:r' L.ia(l, ee-.7 PPe1:.: L4,+—fet. TgartJ(:e (7(-ic-rit.) LA(c..:(1; }2.A iM(!K 1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS IO. 1Jer-r 5Oz3 f7 w 6-STL A) b-¢ q SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: t 1` TITLE: Mar 23 01 06:53a Fischer Plumbing I (909) 881-5761 p. 2 FISCHER PLUMBING DAILY REPORT DATE: 5-f(r•C'/ FlZI REPORT NO: WEATHER: PROJECT: a, 5 - INSPECTOR: E U t tZ LOCATION AND DESCRIPTION OF OPERATIONS: Chef 6.10t1 STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS M A`FC"c' oi'e:. fzilar., STD=„ t NS o �-v c►Tt- et_i 14-5 CoL�ir+j� G-F- 'TP�>(r a' . y 'o 6 T• *) Pip Gis-(CTL Ge.(Fr( n1 l.Ha�. `(g.�,..(N " RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5UB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: 5 U C'd 1 Mar 23 01 06:53a Fischer Plumbing • (909) 881-5761 • p.3 r; FISCHER PLUMBING DAILY REPORT DATE: 3't6'bI REPORT NO: WEATHER: PROJECT: SLou��- 521v� INSPECTOR: S• LOCATION AND DESCRIPTION OF OPERATIONS: STATION. NO. TO EQUIP LABOR • DESCRIPTION OF TASK HOURS ITEM NO; COMMENTS 1,444e1/ b 6g4:115r-.) i Ica Sii:UC h P .a'1 - IQ. f_v r4 ,0) L is e-e., • 19. • go Gc5f-Tc o-) lµ.{ �' ( ) 5 i,L44S Fi ?6 LA' Ee, -mil( t..)6/ l Ci.gt k3 _LA ' 1-1-w5 4 lip; • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: �'' t'�h' i TITLE: Mar 23 01 06:53a Fistr Plumbing (909 881-5761 p.4 FISCHER PLUMBING DAILY REPORT DATE: 1 4\ • L' 1 WE'D REPORT NO: WEATHER: PROJECT: SI,p0 0P� S CW INSPECTOR: S' M." LOCATION AND DESCRIPTION OF OPERATIONS: izchPt. Phim6it•t1 STATION NO. 21 To S EQUIP LABOR DESCRIPTION OF TASK • HOURS ITEM NO. COMMENTS ANT LA GoZet, g S-;o 1 J5 8Fcr.A fiGP- . g li m Ai.) 0,96r%a ca— S 41 + BCRiSon.) Ft P 1.A-fi 8 4 5611.445 'leg LA'( -- Tpoac- $ 4 6Zit=%cti Lion? ''11.�ILi R 4 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: " �� TITLE: �7 U Q0'• Mar 23 01 06:54a Fisc er Plumbing (909.881-5761 p.5 FISCHER PLUMBING DAILY REPORT vArE: 3 12) - ! TUc-'S REPORT NO: WEATHER: (c rJ PROJECT: Scve-P— S t'w INSPECTOR: 5- E3A-'E? LOCATION AND DESCRIPTION OF OPERATIONS: ptmb.0t1 STATION NO, TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 71.0 Ptix- tYY a ?�72 p � g �j CoBae or-) ?i a L,A,f e 56UAe5 ?I_Fr l *-R- -,Ai , JE6 . B (I XIFFirj LAec.?- l-g.nuacr✓ 8 y Ol'ul LA.IOg . g s RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. ypL mr'l7 (opcgere (U COMMENTS: SIGNATURE: t-- 1' TITLE: -)r Mar 23 01 06:54a Fisr Plumbing (901881-5761 p.6 FISCHER PLUMBING DAILY REPORT DATE: 5' 12 - b REPORT NO: WEATHER: PROJECT: LiPtirQ Se—Lo INSPECTOR: S• gltu LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO EQUIP LABOR DESCRIPTION OP TASK HOURS ITEM NO. COMMENTS L4wgr-P- • 6 1 M1kNail O_PE e. S - . �-tM-‘1 a_P g 8 a;5• e-re,orj "+r1:Fr. t.,A-"({ , 6 • Scui;PS ?iPE' keAY6-C, p(1‘/Er 43 •1 gow►arJ i,.A.66 v. €-E g g • 4g 1.t.i LP2e)1" -iti6r,cJeC S 1 • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. i JLM i o►x. ( 0 COMMENTS: SIGNATURE: 1(( 1 TITLE: <7 0174 Mar 15 01 07:57a Fischer Plumbing • (909) 881-5761 • p.6 FISCHER PLUMBING DAILY REPORT DATE: REPORT NO: WEATHER: PROJECT: 7L.CA/Jr 4,EvJelz INSPECTOR: 17' 0Au- LOCATION AND DESCRIPTION OF OPERATIONS: r heft Plum 6ios STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS tsp-0'1 LA& z g 0 . .1-5ver-le-, OPPPA-t M MAie`< O Pe -r P e : ? ?01564i J f1 P6 Lrl `EEe c 6 6bt piP6 LA'Ce'e- its 0 e el'iwit,1 tie -n 401(0" b RENTAL EQUIPMENT COMPANY SUB CONTRACTORS EQUIP OPERATOR HOURS ITEM NO. f COMPANY FOREMAN EQUIP HOURS ITEM NO. N 4df*) V Jtrl �— -T-- ° ` COMMENTS: 1 SIGNATURE: TITLE: SO1? Mar 15 01 07:56a Fischer Plumbing [909) 881-5761 p.5 • • INSPECTOR: 7'3,4i0 " FISCHER PLUMBING DAILY REPORT DATE: -01 IISChepREPORT NO: WEATHER: 400C PROJECT: SCDU GCL sew arm � LOCATION AND DESCRIPTION OF OPERATIONS: A STATION NO. 1.5 -- TO Zb. EQUIP LABOR DESCRIPTION OF TASK HOURS IT M NO. COMMENTS M Mm 0'PE 4TE . 01,0 oPew--1-eR- G Gaiiitkr6 PI PE lAsf X Tril 1 i of 6 61picerA LArF3o "trpr(mg • o ggfsco PI Pe 1...A.+4 Oa I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR OURS ITEM NO. SUS CONTRACTORS OMPANY OREMAN QUIP OURS ITEM NO. COMMENTS: SIGNATURE:TITLE: Mar 15 01 07:56a Fischer Plumbing (909) 881-5761 p.4 FISCHER PLUMOING DAILY REPORT DATE: 3 " 1 REPORT NO: WEATHER: PROJECT: INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS fi� Wad, VIA RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5US CONTRACTORS COMPANY FOREMAN. EQUIP HOURS ITEM NO, COMMENTS: SIGNATURE. TITLE: Mar 15 01 07:56a Fischer Plumbing • (909) 881-5761 p.3 FISCHER PLUM DING DAILY REPORT DATE: ' I REPORT NO: WEATHER: PROJECT: INSPECTOR: L% • Q F/A LOCATION AND DESCRIPTION OF OPERATIONS: Visc he, /ijrnis STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK 0 HOURS ITEM NO. COMMENTS FAA RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN . EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Mar 15 01 07:56a Fischer Plumbing • • (909) 881-5761 P• FISCHER PLUMI3ING DAILY REPORT DATE: 7;5'' ' C5 I REPORT NO: WEATHER: C:.L(be%, PROJECT: c)L i s I?' jG1).s(%� INSPECTOR: S- .g p U (,5:Q.% LOCATION AND DESCRIPTION OF OPERATIONS: Ilsr het. liog STATION NO, 4TO 9,—. 4i ) EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS M M 64E9 v?+✓ -� g 1 S STFki e Cy f'r%k. relP t 9 • ( (.pt, k,kgvs_ --t At,JG $ 1 S Set.(G eS ?l CV UA f aackie R 44 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPA FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: 1' TITLE: �•J pi 1-01-1995 6:50AM FROM • P. 6 FISCHER PLUMBING DAILY REPORT DATE: 'O 1 REPORT NO: WEATHER: L1,Q PROJECT: S%OV 4?a✓U►Je INSPECTOR: VAAJ�' LOCATION AND DESCRIPTION OF OPERATIONS: Vis chef Aim iitots STATION NO. TO . EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS tva,) 171Pe a s satAq.e, rit ��m. .117-1,40 f fik(J LA6;)'Q •'fibIfiEE RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: , 145 R4gn 6Ju LWP.A1-2,1 -- 23 SIGNATURE: c• HEN 1 TITLE: 1-01-1995 6:50AM FROM • P. 5 FISCHER PLUMBING DAILY REPORT DATE: J'I''0i REPORT NO: WEATHER: L .) PROJECT: 614V6C> 4e Lfev INSPECTOR: »' Ge&U e-e LOCATION AND DESCRIPTION OF OPERATIONS: i s- tRdA6 lh 2 STATION NO. TO �5ClIit, Phmliots EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM N0, COMMENTS • 't l0 Mik,(ev( OP5 -`t) 0 q CA • ' toreVel v Pe e p 0 rg i TEAS ttak-t6r S • GLL.is PO. likf.EI✓-Valt.16E °1 IMF i,.l GA&x, Tr/5. t,_ • _ RENTAL EQUIPMENT COMPANY 5UB CONTRACTORS EQUIP OPERATOR HOURS ITEM NO. COMPANY ,FOREMAN EQUIP HOURS 3 ITEM NO, v) SIGNATURE: s TITLE: ei l) 1-01-1995 G:4.9AM FROM • • P. 4 ' FISCHER PLUMBING DAILY REPORT DATE: 2 "7 7� - p I v Lri • REPORT NO: WEATHER: (/Lb°r"'{ PROJECT: cNLcx/3'-'Se1Ai�r1 INSPECTOR: Sly LOCATION AND DESCRIPTION OF OPERATIONS: 1 .tSchPt. iftin6ittg STATION NO. TO 234,0 EQUIP ' LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Ail T' M ie f_ 0 Pe'% -re q 044 'ea.4110 o Pt/+'r'e'C... r r56-mo J PI P.61.k( 'e./Ar-erN LA o t cnl V I RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: P %P E Ct.) v pF i H PZE eb Fcrt-to m d MA. & C7 f .. SIGNATURE: TITLE: ' 0 7e,, 1-01-1995 6:49AM FROM • • P. 3 , FISCHER PLUMBING DAILY REPORT DATE: ) REPORT NO: WEATHER: FA IN PROJECT: INSPECTOR: s� • LOCATION AND DESCRIPTION OF OPERATIONS: ischef Plumbinn STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 1.10 \do ef_. RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: - 1-01-1995 6:49AM FROM • • P. 2 FISCHER PLUMBING DAILY REPORT DATE: S Sao '6 I M REPORT NO: WEATHER: PROJECT; INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: Phimiilog STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 110 �b gAriJ RENTAL EQUIPMENT COMPANY, EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE:, \ \ \ , TITLE: Feb-26-01 05:17P • • P.06 FI5CHER PLUMBING DAILY REPORT DATE: ' 2 y S ' L' REPORT NO: WEATHER: 'a '1.1 PROJECT: INSPECTOR: LOCATION AND DESCRIPTION OF OPERATIONS: ►5chef. 'Um 6s STATION NO. TO EQUIP LADOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS Q QC U r,,,, _ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 5U5 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO, COMMENTS: SIGNATURE: TITLE: A �Q , Feb-26-01 05:17P • P.05 FISCHER PLUMBING DAILY REPORT DATE: 2 Z U REPORT NO: WEAT'rIER: CAJ:rti Q. PROJECT: `5I_ivr% . `;e013- INSPECTOR: 13D+k Qr.= LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO, TO EQUIP LABOR DESCRIPTION OF TASK . HOURS ITEM NO. iir VA6uPe-e.• 6 �l JlGUa 7 V 3iL%sTUr. LiPIFFIes) G[►Ba� TC'e0-106; S 05 , i c y -n1/1(N01" .01MI=VADIJ Pi PG U#tc E- ` `L'`c, e L..Gt+ (2d:.�... RENTAL EQUIPMENT COMPANY COMMENTS EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ' ITEM NO. COMMENTS: ri -r-sk,.)l kokra, Zeipry f4h) SIGNATURE: • ''rar- TITLE: p Feb-26-01 05:.17P P.04 FISCHER PLUMBING DAILY REPORT DATE: 2. Zl • O 't r, REPORT NO: WEATHER: OOP C,,(-A7-• PROJECT: e�(.b GC- Seu)6F- INSPECTOR: 'S • ?DAL) et - LOCATION AND DESCRIPTION OF OPERATIONS: SCovaT� • AJ6 STATION NO. ' It16 TO ZZ -t-t EQUIP • LASOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS ' '. HA,r:E' 0 E O- -T t. ?, 1_ C C• STr; JAL 0 r(wA,.o g- b f f. F �0 ci f o g.A- o J J •bv.irrt,-) 1 ikoxie, -VN1N;:g 93 . C. FaMezrew.N P1 r 1.,A`fet, ':e. c cl "1-.4u.0.e.; ? r L° ei. TPA Nib .� I TV- (G-./. Glh-vt4-rtip • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. • 5U3 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMEN 5: 4 - Gol TI;s-c- TM: -t q SIGNATURE: r kr( TITLE: 5-0 y Feb-26-01 05:17P FISCHER PLUMBING DAILY REPORT PAT'c: '1. ' IC). L' • UcP� REPORT NO: WEATHER: c�Gup , PROJECT: 471.0452— �:01. )Z� • INSPECTOR: J - d61%0 LOCATION AND DESCRIPTION OF OPERATIONS: /7 uo UM. Se-4) c-- STATION NO. 'Z Iy J TO 'Z ) it lc TO -1.0: EQUIP LABOR F. (-tot J- L i rrou L.' eilCic; of <,LLCAr4i €,CCU vA-rcr-- DESCRIPTION OF TASK LA r. GPCP-41-0?- I,-crof 'ee fITC l 1.- pi E't' LAB T RtA (t.-1CC HOURS P_03 ITEM NO. COMMENTS S 6 4) 4 4441 `t RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: f- TITLE: �v�I, Feb-26-01 05:16P P_02 FISCHER PLUMBING DAILY REPORT DAM: '2' Ig-vP REPORT NO: WEATHER: C.. LOU Di. PROJECT: 4:-.i..) J C.:;_kL)E INSPECTOR: AUCr- LOCATION AND DESCRIPTION OF OPERATIONS: LLB kit; j. /k.`Il: (.1-1 0 600 stschep Pkmbon 5TA noN NO. ro EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS % % • 'f'b1/G Nk-, ei I L EA' `() f - - p liAtaer, 14 " -1 LAsug, *-/kIIJ/' 0 3 ripkMml ' '-- _1 1�.� , CHAT I 1 RENTAL EQUIPMENT COMPANY Lc4J' T, EQUIP �,,uJ Co' OPERATOR rfilkki HOURS z ITEM NO. i BUI3 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: LL ] FVWCC! A-t-) Ze-move ri S" ASP itAL 'r 11.4 Z I — lip' PO [wl,0) U T I I,I're? SIGNATURE: • 60f- TITLE: Feb-19-01 08:30A P_04 FISCHER PLUMBING DAILY REPORT vATE: •2.- • 1 F¢.•k REPORT NO: 9 WEATHER: PROJECT: \r./k%F-- INSPECTOR: 'S .60 U%r•, LOCATION AND DESCRIPTION OF OPERATIONS: Ve Av't f , 4i CM12---'( STATION NO. TO �schet. Plum6siog EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 2- E E' M 16( (2 c /1 •[ ce- • • gLi,letki l,.)A, .:' •ZE' r.'. 0 fir! 2- , ,•616IF:r-id (4\k c:,cc• W(PO ` `F.lA lre4. PlYr L '(M.• - wet. q ( (. '• :1,0eTiAI ?i l't= t-.%`<E ' te:1 2- _ r i RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. � SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: Fl *—tee i LP irJ4. SIGNATURE: V• kTITLE: v r . Feb-19-01 08:30A 11. P.03 FISCHER PLUMBING DAILY REPORT • DATE: 7, - 1 -0 1 I el U �s REPORT NO: IS WEATHER: (.LefA PROJECT: (.5L-L v; ]Z Si%vICAL INSPECTOR: `,) • At) LOCATION AND DESCRIPTION OF OPERATIONS: 5Lc) ✓6e. CvJ6.14 fig`( 1) lleP Lct*.� Visr her mb�on STATION NO, TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS ... t'6UG 6 Gr'evA'cuiz- ei 2 M MP16Y 0Fe Ph. 1ue— y1 Z• ,L g� isivg.T4.4.! i' 1 I' Liv.1 a• iG .0 'ti HHtS L,c,c,w.eIv 0 a. J • L• :V Int Lh.fx,E-I-gel IP c't: g+ 2' t) `, b l.l./• 17,i PP i Idh-f6I - 1-w%I oee e, 1C_.�_ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. 1.4-- ' l' r5 6ft:I0 `e> 2. SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: } t3{�Lr OF '-CLP J ( `1 t,Fr I! r CfiEr12=T A\% c,Lc, yr L %GL--1 L.i k L c). •.t5 1 SIGNATURE: F 41 - TITLE: Feb-19-01 08:29A P.02 FISCHER PLUMBING DAILY REPORT DATE: AO 101'0 5.c3 ► -t4 REPORT NO: k `I WEATHER: PROJECT:_27l0‘/ ';L SCA4c 1 - INSPECTOR: '3I-O L �Z LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO -to is Chef Pkinliog EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS RENTAL EQUIPMENT . _ COMPANY EQUIP OPERATOR HOURS ITEM NO, SUi3 CONTRACTORS' COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: ,e "24)4 TITLE: ,/(4 Feb-O6-01 07:52A • P_06 FISCHER PLUMBING DAILY REPORT DATE: % REPORT NO: nk3 WEATHER: (...1L)DP PROJECT: U )\/ V % 1�1 INSPECTOR: e._) A lil':s %SCI1fpp Pitumbioq LOCATION AND DESCRIPTION OF OPERATIONS: t\\.; t L.14G LF-`( 17) A‘2; 1-1 I,) .• ' STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS l'-' t72. t FlA1: 1;1( ,-.7.- 1\i-, RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SU13 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Feb-06-01 07:52A P_05 FISCHER PLUMDING DAILY REPORT DATE: REPORT NO: WEATHER: \i l r-u :.;'( INSPECTOR: PROJECT: �,1,c.iti '..�• ����i�f-�= � • �q LOCATION. AND DESCRIPTION OF OPERATIONS: �ischc�. STATION NO. TO EQUIP LADOR DESCRIPTION OF TASK HOUR ITEM NO, COMMENTS RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUI3 CONTRACTORS COMPANY FOREMAN EQUIP HOURS I ITEM NO, COMMENTS: SIGNATURE: •r kJ I TITLE: Feb-06-01 07:51A P_04 FISCHER PLUMI3ING DAILY REPORT DATE: 1 ' ' ••) l ' 0 REPORT NO: l'6 g''42,'✓4i WEATHER: Vf PROJECT: ,I/t / 17., v '9'L INSPECTOR: ' t)HJ LOCATION AND DESCRIPTION OF OPERATIONS: ischet, fielum6sol STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS •LAB RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: TITLE: Feb-O6-01 07:51A P_03 FISCHER PLUMi3ING DAILY REPORT DATE: ',, )O - 0 11164,i7/N{ REPORT .NO: 11 WEATHER: PROJECT: !)LA.A1LI? INSPECTOR: 67 15/t-:4(3k. LOCATION AND DESCRIPTION OF OPERATIONS: `,LtVC t? /LEI - t li? ki -Tt) Yv►l,aC . STATION NO. ' TO EQUIP LABOR DESCRIPTION OF TA5K HOURS ITEM NO. COMMENTS i 120K1 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR .00 ITEM NO. COMPANY: ,: -= --- FOREMAN _ EQUIP HOURS ITEM NO, - �� _ CO MENTS:II ' 1 %'[\1 SIGNATURE: 40-1T. TITLE: P. Feb-06-01 07:51A P_02 FISCHER PLUMOING DAILY REPORT DATE: U • IA 'O I '''I0I.117A'( REPORT NO: WEATHER: P. LUP-n "( PROJECT: (a\a'JCle, A1/L: w):S� INSPECTOR: `.?• FAvlid LOCATION AND DESCRIPTION OF OPERATIONS: 14 I ,.;14 Lf - �ti, c•1-_6r.R ? -fV 14EMGa6K- STATION NO, TO Pifumbiog EQUIP LAI3OR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS t 611f. 1,AIz)iUe t' Wa(SUN ? l-ftvt e - F--z..)..v v �i., OP e,ko � £ . • i'tAtti'( "P-K. ATU 0 COMPANY EQUIP OPERATOR HOURS ITEM NO. vyr _ COMPANY FOREMAN EQUIP HOURS ITEM NO: COMMENTS: 1\11 147c11 OLJ LLA� T�7�I,I�/� gEc> ,il'r1_ 4,2/_\ Ezy D(;1:\;z: v:-) U)►--rk uer) PoTI-19l,U4 . t \ Jai) 1-ile511 N1�1 i7 _'it.i k Ltl041 ruir',64,Ii: t • 'IZ.r;&bh .D -TenE-1-=v„. 'r)E OUty SIGNATURE: �� TITLE' ljv?. Jan-26-01 1O:40A P.03 • FISCHER PLUMBING DAILY REPORT DATE: j • REPORT NO: I5- WEATHER: EAJp PROJECT: 4LL*J w 5p INSPECTOR: ' FAO dig LOCATION AND DESCRIPTION OF OPERATIONS: ,La\kR AVE -to NGvuLc( STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS \Ain tc_. <114 1N1 RENTAL EQUIPMENT COMPANY Q� UIP OPE HOURS ITEM NO. SUB CONTRACTORS COMPANY FOREMAN HOURS ITEM NO. COMME T5: I WGam . VA, It� ti-IE1Xt;D 1'1E'4FF11 Co ge SIGNATURE: F. N-r TITLE: �v p ki-J1.67 A4t,_A_1 _42-it _/..‘4414(.. ,3ft_____A.lek ID- r4.e,e 7L19,1_. r_,d,a2 _e.,.,,,,_,,‘",.., • ��� Jan-26-0.1 10:40A P_04 • FISCHER PLUMBING DAILY REPORT DATE: -' D ' 01 REPORT NO: 1` WEATHER: (•KtUb PROJECT: `'✓�r. tr INSPECTOR: • rOLf-( LOCATION AND DESCRIPTION OF OPERATIONS: /arc, is - 1--e-vAL STATION NO, TO EQUIP LADOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS r• f►J'r LAf c`e., I Q. '11 P - AAA oaTZ- Tom/ I . -1 TE,IEIJ`7 C. F6g6,t-Ce. 9, 1- J- sEaAvs %A i rt14/1iJGE ?[t'OL9I✓7c '%' �N� J ,1T12«FI1.� L&LGe 7izpitJ G ' L' Zp4: r C �71' Q' I `1 (,44 - /Asper• 0 \--1 �I.LE. 4 11 RENTAL EQUIPMENT COMPANY QPERATOR f HOURS ITEM NO. N. �UIP SU6 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: Tln1i si-\ECG TOUR PAW iJ( GLEAK) P gin- STD F�ll`1C>� ADDED (( Ji) '11J;D :FT SIGNATURE: P-T TITLE: S J?. Jan-26-01 10:40A P_05 • FISCHER PLUMBING DAILY REPORT DATE: l' IA' D �J REPORT NO: I WEATHER: ttJ PROJECT: 4,.,W tZ INSPECTOR: L . J t; Le-ti LOCATION AND DESCRIPTION OF OPERATIONS: ,(1) Je -• /M(( ( R>z-! -rG nnl,c • IS diet. '%rTIbors STATION NO. TO EQUIP LAi30R DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 0 w 0 r (Is RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. SUE!) CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: e761.01eEt> job rLl. n O P SIGNATURE: TITLE: Jan-26-01 10:40A • P_06 • FISCHER PLUMBING DAILY REPORT DATE: b REPORT NO: t'Jr WEATHER_ (P,:'r :> PROJECT: 4)�4�r� SE: H C INSPECTOR: S - SAO EP.) N' ILvI.--( LOCATION AND DESCRIPTION OF OPERATIONS: l_> k/ ',it: e 4.1.1 I.;:, tA I i' -1%) M iSrhet. filurniios STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS 4-• s'teqgl rs O $.TO 11 Z. A0 I.A I:.76 R 1: v., QJ 1 1• F. NAME`( D rc.:pi vi,;z. 9_. 11 J. Ltt=1FFln! Lhf'xi2--nzAioec ,g) Ei • 6: ?,F36E,r 11 C'l?G La-CdtZ-• qi 17 ScU,&gz, kAl>C I,A•'cl` `Crz-(N*: I - D 1 7 (4 I;Aci6P & I 11 SIT S 1-1 fps, 40' Q Il i.,)Li, e.P ciP % Erl • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. V1AI1(., PPV € WJL --- ..--.• II J,4.g, cuu 1ikU L rA 5U13 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: 6\1ul.Jv -f44r;11 �1 � 1Aue•p ` toUL O PT SIGNATURE: • ' 4-161-3-‹ TITLE: 40 0 ? 1f2 Jan-26-01 10:40A P.07 • F15CHER PLUMDING DAILY REPORT DATE: I 2, 4 .0 1 REPORT N0: i I WEATHER: LOc'' PROJECT': SLc VLE flat%• INSPECTOR:/1-1A chi Y iS Chef. ftmiiit‘q LOCATION AND DESCRIPTION OF OPERATIONS: Slav' 13:+/G• [,Nceg•-f • -Tr D i-1 1-4l.v c4. STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS 16 STEJtOS OPe; suc- Q) pHAOY 6PLF(LAruq., j 1 E. )4. ;NIA IJ Vit TuzT.-e V t,. g,3%eTS.N1 P1 PC, Lk-( 1', 0 � • `x`U.r.izA PIPS' LP'4 ire -Pi `1 c 0 J 4elr-Fml 1,ArS:Jr• e.It46E (AAA u/.PC�. J \El-• • RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. I J*'e, 201P. IAO tii .g.. L�,.,rJT.S Yj 1 —5,q , r N T �' V'( c- L G -- � I SUB CONtRACTORS COMPANY FOREMAN •HOURS ITEM NO. I `EQUIP COMMENTS: eM) p EDc.o Si--OuLlx?. 1 n.6"-' t•-1< Pef..? Ze D Su B 6 gp•A Ae-P1VI.l-4- SIGNATURE:' �"� iJT TITLE: ') �. 'Jan-22-01 07:58A • FISCHER PLUMBING (DAILY REPORT DATE: i `" lc\ ' L l F: IZ117 ,s4 REPORT NO: WEATHER: C&UcII PROJECT: &Lol - /-,61.0ePr INSPECTOR: • SAJC LOCATION AND DESCRIPTION OF OPERATIONS: 4\l c L_ f4_ ?-"f STATION NO. ZO +S(: To 24 •i 5.6 P_05 EQUIP LABOR DESCRIPTION -OF TASK HOURS ITEM NO. COMMENTS J - `iG r7 PIPE' t!t'?�'�.• TI<2h I t.l 6• 9, t'1 .3•&CLL5CiN1 liARr,_. 'Y IdEC U I K•i.irV ►J4 6PeL> Ire)r 11 -li0 6iK.II.LUG' 11 &4' Luov 4 , Q, 17 W:1. 6 - i" 2- 1 -� RENTAL EQUIPMENT COMPANY EQUIP OPERA - HOURS ITEM NO. /' . ! 5U6 CONTRACTORS COMPANY FOREMAN _, EQUIP HOURS ITEM NO. COMMENTS: • VI ? P t-iat61/,14T F'L6 N 1I PiV L"T E= E A Z AP LT.n2 A?Ca. I►.9 -E4ra ��u N2kr>k; :QH P6'4(r IOJ 02:) SIGNATURE:. "Y—TITLE: 'Jan-'22-01 07:58A • P_06 FISCHER PLUMBING DAILY REPORT DATE: i' U • U I TOO 'D.`i REPORT NO: c' WEATHER: (J0O(7 PROJECT: l.)Vi vcieg INSPECTOR_ VI G,4 VCs \ANZ L•f �vLEY LOCATION AND DESCRIPTION OF OPERATIONS: I..(,;)\/ l'; AVE G OE zr..`f -co #�Ji h� LGCrk STATION NO. SC) t` o TO 2 + SU 'tscher, itintios EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. . COMMENTS 7 :' u1Ah1 Lkapz'1v S' r r r1A e,,( u t-L5 ..ATGz, eb i . ..• `-T.0V>r4,J c)f'L' 1?-/NTDR, 1 A Ali 64 gd i= PO . LMV t - TAi JJ , S) l 57- L1-Ar-h RYE L A`(67E. ua o tL 1 G G =; r f�r1 17 i PL UA--CCe. o 1 4 ti,Afxf., 0 r 1LO g L' 6 1 W'Y 1 RENTAL EQUIPMENT COMPANY SUB CONTRACTORS COMPANY EQUIP F.QREMAN OPERATOR HOURS .HOURS ITEM NO. COMMENTS: ;*r1tJdt TJ � 1-/l eQiA tj • (7l.f,‘ : C7 1'i'O, Aq7•1-)ALT t vM PAt inb T( C,T TA r C. S T Af: C Cot} o 1, `�' 4 t J'; ; '1' I t l Ur SIGNATURE:.544%.117--)--(" TITLE: Ad P 74, 1;1V '6 (te1.1`�' SIN of Uwt�1i✓{ZS AB U r 2., too — 3;3.to S‘ gAk.)crle. at) For -LE T Jan-22-01 07:57A • FISCHER PLUMING DAILY REPORT DATE: I' 11' I ' fD REPORT NO: - WEATHER: %116-1c7•1 PROJECT: c,U60" (~?, INSPECTOR: ' 3/4 op LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO, TO P_04 EQUIP . LA5OR DESCRIPTION OF TASK - HOURS ITEM NO. COMMENTS r Viik-101 L, P6V-1ta? Z d . 5tekleta u Po-Daer 't? _ 2 7 S%Cfr N n Pi: Laicg- `7. I 1 F-Lf P.110 lw. c r- 1121+10a 5 v , .j '-N;LIA RFE. t -. 1 e► t0ee '3 .- WT . n s-- RENTAL EQUIPMENT COMPANY EQUIP EQUIP HOURS ITEM NO, cJ,i) , kbV 1Y 1 ) v T7 IOPERATOR Cam• • ✓'JNN1:r7 '2/ SUB CONTRACTORS COMPANY FOREMAN. EQUIP.,... HOURS • ITEM NO. / .� COMMENTS: t,Z u' in6l)( p4 1-60 'c7-flowt) 'Cgzk I C O Li SIGNATURE: LvNTfZ.v<17-/7_,bm'uu 56cutz t) iJ TITLE: Jan-22-01 07:57A P.03 FISCHER PLUMOING DAILY REPORT DATE: L-\ ' L)) 't J '7 REPORT NO: WEATHER: £(x)I2 PROJECT: ?1.,0:1/ , 4RlAjetL. INSPECTOR: '1 ?At) 6 LOCATION AND DESCRIPTION OF OPERATIONS: /\46 STATION NO. TO • EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS . iei,f' LAcs02. 0 I p 1-1/47( vftrivici 9, 1 K-V4Pti►J Litter✓ 2.y ?, . . .. (,t'IT1 0 1itkX Ihzt: 0 / c. lr?<,i,EPt' ?WC 1 A-(c z ( I . J (,LU liPC 'kr- TeE►' oec S i 044 / 'oil- L' i RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS . ITEM NO. J g L• ►, Qui. ;Aot, g.. (H� - I SUB CONTRACTORS COMPANY FOREMAN EQUIP HOURS' ITEM NO. . . . ." _ J COMMENTS: u MPO l) z?IP r AID /NscoV A t ()1v) ft:►g-. A 1)1,►J LrlPv \Jeiiix1T<. • SIGNATURE:_ : 'F° N T TITLE: � U P. Jan-22-01 07:57A • P.02 F15CHER PLUMBING DAILY REPORT DATE: `." h5 ' 0 1 mc J REPORT NO: WEATHER: l';7 PROJECT: `4,1Avfi5[,. W1 INSPECTOR: 1n Vt 2AVL� ischef. P�um6���1 LOCATION AND DESCRIPTION OF OPERATIONS: IA/0'40'P AVE CEt62 -- l:Wll,c.64 STATION NO, To EQUIP LAI3OR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 1`7- s &Jr I./\Cxil✓ % i i4- hrr'ct , 0 PG My7Ug. S S _ P. 1,AAk '( oPt7I2.-rug _ g l 6 w>isc pre Pu't I,, -se- :. .1• �x5uf+ta, nee i/tV4EP-'-il?ai�hE 1 J (7ICI rro,1 - LAgor, TV.iia1rs ei5 �.) LolkL4 S. 1 410 S ,3 V.\1 j RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS • ITEM NO. ...sl`l QuiF. 40LI C . 1,-046'7 (?) 1 5U5 CONTRACTORS COMPANY FOREMAyI EQUIP HOURS ITEM NO. • .� ! COMMENTS: C,LZI":: Soo? SAOuL L,Lo Avg" Foe, T)E to op SIGNATURE:1J' 1�U�JT TITLE: 41( ? l , Jan-26-01 10:39A P.02 FISCHER PLUMBING DAILY REPORT Dais: l - U REPORT NO: 6- WEATHER.. I K1 PROJECT: e' AVG 4CAAJ cG INSPECTOR: t3a,)eV, •i5cher him6'$ LOCATION AND DESCRIPTION OF OPERATIONS: ;,'r e .. A\) C l ri tZ'{ TG It-1- e,144t oc STATION NO. TO EQUIP LABOR DESCRIPTION OF TASK HOURS I ITEM NO. COMMENTS too \-\.1 u R.4 RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO, SUB CONTRACTORS COMPANY FOTAN EQUIP HOURS. ITEM NO. COMMENTS: t.06ET) SIGNATURE: TITLE: 1 Jan-12-01 04:39P FISCHER PLUMING DAILY REPORT r DATE: � � I� �' " I ,� REPORT NO: itel WEATHER: gib ltI PROJECT: 21I.&1ILe• wu INSPECTOR: 6. aNO fihnin6.01 LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. ro EQUIP LABOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS L i C124c,\I 1 i ( RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO, 5U6 CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO. COMMENTS: SIGNATURE: GN� TITLE: -5 v P Jan-12-01 04:39P• • P.04 FISCHER PLUMING DAILY REPORT 1 DATE: '" 10-0\ REPORT NO: '3 WEATHER: fiL:� PROJECT: I,OVC(2.- 47W E) INSPECTOR: 1 &. ischet. Pium6iO4 LOCATION AND DESCRIPTION OF OPERATIONS: (CL vu o v.- Ask- Gta 15z STATION NO, TO EQUIP LAI3OR DESCRIPTION OF TASK HOURS ITEM NO, COMMENTS 1 tiliVe v ? g 1 hf&Je O ' b j, fa-la:N.43 IF ?G L�'Z fi y ,)• voti,,,hNI 1_AG. -1--en1P• PJ .7 76►.i.etk_, P‘r?e. Tca>s, ?? 1 e RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO, SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS _ ITEM NO...._• COMMENTS: • ul r YVLeD • 6tJ -T Acc-v, C r T 2 ' AN t) SIGNATURE: • TITLE: 6 e F Jan-12-01 04:39P • P.03 FISCHER PLUMF3ING DAILY REPORT DATE: '' ot. ` ' 6 1 REPORT NO: WEATHER: LLCriss.c. PROJECT: hL�'L°'� INSPECTOR: h? V6 •F,ALAZ LOCATION AND DESCRIPTION OF OPERATIONS: STATION NO. TO EQUIP' LADOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS V. _OT Lb L L1Z 3 1 V-•6;Teler.1 ()' iATVp 0 1 1 WA CE'l 0 FEtsA' *C . b t L • t-v'2�e MM ?IPL`CV _e, 1' a. U.i F� �� 1i-; .1N6-t z ,,cu.,dt4 F i tia-le -- Iwo tJe' ; :_10_______ RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. ITC Vouxt-if* 14J et 1.• L rJr► e5 t• SUS CONTRACTORS COMPANY FOREMAN EQUIP HOURS ITEM NO• COMMENTS: D ot- S L - At) rimpAC TIGN `TF T Ti6.4EQ1 SIGNATURE: f i:1 - TITLE: .6 U Jan-12-01 04:38P P 02 FISCHER PLUMBING DAILY REPORT DATE: i=v REPORT NO: 1 WEATHER: FA,1 PROJECTS I.oJeu�i�s INSPECTOR: 1.K6\4 17,06.0 •isc ef Piumlog LOCATION AND DESCRIPTION OF OPERATION5: SI.bVL='�, AyL': LILY -i'r)N�vc,• STATION NO. TO EQUIP LADOR DESCRIPTION OF TASK HOURS ITEM NO. COMMENTS 14• ait 1-Atzid 5 , ��? I i! . I YL0N2 O PsZAToR.. 3 1 4d, VA.Ar,c0N44 PiQG 1.A(VVI 5 J i,.>r1,144 ft'EE TrAvari 3 2 J &i�011a I-A13,bP Tp-Alt465 3 •7 IcA4 '3 i . : � 5 l . RENTAL EQUIPMENT COMPANY EQUIP OPERATOR HOURS ITEM NO. J �• / �� '� 5UD CONTRACTORS COMPANY FOREMAN HOURS ITEM NUJ, 7 7 COMMENTS: 5"T'AC.-'EU 11) N. C•t, SC) AM Nlon r Imo. D it4,6PECToZ 10 : t",L) 1 9 4 ELv C 6D Jo P., gv I,Lc D u ,a? SIGNATURE: P{••••51-1°41TITLE. 'SOP Report No. CITY OF FONTANA 11, SLOVER AVE SEWER, FROM le Date INSPECTOR'S DAILY REPORT .. CHERRY AVE TO HEMLOCK Day AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: CAj io ejat,PinjG— 1-4A-a -rkiev IiU Cieet43 SAluj $ t.,64s r7Af l,. C t s ri) " (R.)C s /4 -t' L %�S oAl &rr14. S iprS' of �(2A- Ac_S t�o� 2 S��TiE� - LtvEOA-tom. 'D►�ur NatAl � E STA11,1 3st// s4, NetN L 4-M. S HOURS - ITEM NO. it q: f N I D L E i D O W N Contractor: FISCHER PLUMBING Sub .: CA70/U01•3 S'TIZelit.lt - EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) a in�ic -4exeder Backhee- 1 P.ipeleyer t�- Pi e1er3�) Sells... Arden aLw.,' ' U20 Mick J.-6.iiri i h'aiiee) ! 6LIXSI ieLC‹ 0 rc t l r — J I S-r21PE ?Hain 0 INI l M U)ML Hours Worked: 0700-1600 (Steve Bauer) CITY OF FONTANA • INSPECTOR'S DAILY REPORT Report No. t 60 SLOVER AVE SEWER, FROM 0 Date e726/0 l CHERRY AVE TO HEMLOCK Day AVE, FONTANA, CA shift Hours: start 0700 1600 v t.'j� SAND Location & Description of Operation: C V A) . �v rr - t (�/ h7� Q� Igi?AA- 1 -)c: C LfV 7>ov$L- S-rt2L fuc,_. t S-nry 6— (5L 4c.V HOURS - ITEM NO. 0 --* \ 1 D L E D O W N Contractor: FISCHER PLUMBING Sub : Cm.?'b..).%'J Sr'f „4 (41,3 6- EQUIPMENT AND/OR LABOR: REMARKS • (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) .1---3/4 T__ P:_,__i Ramp -superintend nt P Leader „...1--axekhur Ken -Stevens - pera or 1--Pipet Y C.-Robertson- -4--rip -37Se11ais ayer (irameej' ' 1 H2O Truck I `[, r 774)ct -- �-re-- -.4--• Z� ) j-A l7 L/kS? L • 4— , Lei /nJ /4t62..... Hours Worked: 0700-1600 (Steve Bauer) Signature Report No. 'CITY OF FONTANA • SLOVER AVE SEWER, FROM • Date INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: A.X7 o ST 2 ..12 /l`L G.. 6,7L) S ("rE_ 1 tt cM,v[,. A-L.4._ O L—gL GY DvT- S-1I •l eat./ G, U S'At 6— Gel A.) C L � n et_A-5 ,u 6. Ao 4-s9,,a i > Lip-SS /kCb I A-o\ v 1-1-eM Lib CV__ 1 t -r14 s i es , • HOURS - ITEM NO. i` .\-i I I D L E D 0 W N Contractor: FISCHER PLUMBING Sub : rAtiur....07 v - I Qi,J6. EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Trna—iekup.. _ 1 Baslzhoe -r2.J G\G 4- Ken Stevens - Operator .1.—FipeiayEr C ebet sea- _ Sc11nrs • .T. 4----bebcrer Ronan - II2O TrnJ,k 1 DO 1 6-c - PE, -re... 0 `i t A c-Vd1/1tNEIM62.-siziodz- v , Z VT — f77(14ET.4A-,..1 Qt 4 J2c c., 5`r-2APE+2 1 0 1- _o 1 $LAS-r-cP u oe__ g 1 gi 6014tcf- SL-45-ree- Kf Smi s d E•Scoere - S t� Hours Worked: 0700-1600 (Steve Bauer) Signature Report No. CITY OF FONTANA • SLOVER AVE SEWER, FROM • Date INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day AVE, FONTANA, CA Shift Hours: Start 0700 1600 • Location & Description of Operation: NJUl7� 5'r1Z t �,l/ -- [ S' 7 • ^2D '' � � CeArcwA44 LtIZ6 E01;5-a" s,off o F Ac-reTSE-1D), A-c 6i 54ND 8tA-s-i d- ,4iW 2 av hu• .. o t= ESc HOURS - ITEM NO. _O \\ �1 N I n L E D 0 W N Contractor: FISCHER PLUMBING Sub : ('A'7NN../011.S'112.-tQaiVG EQUIPMENT AND/OR LABOR: REMARKS • (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) -1-3/4 T.,n Flatly- Lund,' 1 Paell6falft,= otr iar 1 4 Ken Stevens - Operator DrtJdwnr 1-2/Jet C. Rebertoea• 1 Fipclayer T• Laborer 1 R. Rurrta1t I o g 1 STRAPilw. -TTZ- C 2--ZA- = ftleftvIA4 1 d C. ) naf-ei Mil-s-rrztPere. z', 491F — 1-r�PC� I2a I iS i SIA9rz2 1 5, 6 ✓ 4 DN - 6 ta)s 2_• • 5 � S ON - c -rE .ecsi2. t_uM.Y IN 6-, Hours Worked: 0700-1600 (Steve Bauer) Signature CITY OF FONTANA S SLOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA ,Report No. Date (3 —4 1---0 Day Shift Hours: Start 0700 1600 Location & Description of Operation: /1/4(0/f riz!ie 2s f 1 S ; W CTEI- -TWO-MAM CP--6 r-) -Tb QA4 r4T S'R2.► /At 014 Ci4 TC--u ct.! S o'F k-c SSG 2 _ Y C-44M0 nu 6. S rtt G. 1 X! l�n(L _ • �i.`� 5c Ikc�L CP.Ew .-i,rz->..�P. ,1/41& . U cbboNIEZ, C7�CC.c� e4 Contractor: FISCHER LUMBING Sub l2 EQUIPMENT AND/OR LABOR: EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) IA)A4 CJA) A—f Tfigt.F 40— U$ t- '• I l i - HOURS - ITEM NO. -ri 4 q-r-falikGrad 62 “ 11 -§\ I D I: E D 0 W N -rt1-E A) &Jul PA[-cq.-re&, REMARKS (Reason for Idleness or other remarks) 1 3/4 Ton Pickup Lvadci (O Ken Stevens - Operator 1 Pipclarr J. SL11aas 1 I12O Hulk S-12tPiC, 112. 1 _sr2‘Pea ) Pb,u. Arz7ess-T-A VI/xis er4 ST'(L Ie_Cy2S (C rLiji .A) irn f i.' J4.S(-1- tv H rrE,- tnC,(J UG (krrM- 4 A.5 W Cu- fp_5 . .Ak S-r ¢o 0i.1 a 67- o u iu, +S' V Air Midi, -n-i- -G- I i 3 f '4" RRDki WN rTE 22-• t e.Ji ) 50, . q" sflu.c. wu176 I o©' - c) aim- sr Sri 51Wi4-ir / 3? + L' cA 4 4" t i uiJ wc}1T 3 19 1 b oVeR__ t57/ 1G 46.5' . g" "Wu6L..c_ow 4gsf -r-w,(3'it.�.a . (2 i PE A i2 .Fla w C2 " r Pi: %• A oi, Hours Worked: 0700-1600 C3 Ty Anus c Je csteve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT Report No. Date Day Shift Hours: Start l51 eivo &eD Location & Description of Operation LM i 1 ZZ v 2 CS1 GP 2- A-5 048vc.r e,itrrt.) C Q S c-o Ai 64r LDc k (44( Terus GT-Q- 4- 4 (a, sA-Me L4A4c'r'a• HOURS - ITEM NO. Contractor: Sub: EQUIPMENT AND/OR LABOR: EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) WARM AND CLEAR REMARKS (Reason for Idleness or other remarks) CITY OF FONTANA INSPECTOR'S DAILY REPORT Report No. a Date Day Shift Hours: Start 6 Location & Description of Operation r Lk- A,)G- c 2,4-j? a<T i7,L,kzr 1 HOURS - ITEM NO. Contractor: Sub: EQUIPMENT AND/OR LABOR: EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) WARM AND CLEAR REMARKS (Reason for Idleness or other remarks) (Steve Bauer) Sigffature CITY OF FONTANA SLOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT " CHERRY AVE TO,HEMLOCK AVE, FONTANA, CA Report No. S— Date gf 2c • l O ( Day Shift Hours: Start 0700 1600 Location & Description of Operation: frtPr —I ?)6,4(2 Mi C D in't/e ktia Ge1T Oc C,64-621711 HOURS - ITEM NO. I D L E D 0 W N Contractor: FISCHER PLUMBING Sub : EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO, MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup • Randy Kent - Superintendent 1 Loader Paul Maxey - Operator 1 Backhoe Ken Stevens - Operator 1 Pipelayer C. Robertson 1 Pipelayer (Trainee) J. Sellars V 1 Laborer R. Roman 1 H2O Truck J. Griffin - Laborer (Trainee) • GS,6O4)CI 1 % ()°C1,l.ZGar — 4o.41 ci (L s)(tS) C ,, gB . o ce (IA ��- Hours Worked: 0700-1600 (Steve Bauer) Signature I; 0 •. CRY OF FONTANA INSPECTOR'S DAILY REPORT Slaver Ave Sewer, btwn Cherry and Hemlock. EQUIPMENT AND/OR LASOit EQUIPMENT NO.' NO. OF MEN DESCRIPTION (Of Equipment or Labor) HOURS ITEM NO. Report No. biS5 Day 9,e0 Date: $'' (?''v \ t fTWTFSS��,n�rry�Circle Day ',r� Shift Hours: Starti371.(Jstop ((r�r�r�i WEATHER • i '1 91J C If �44 L.oAoE IAC o8 La fi 12E1 LAUXZE12.T A► REMARKS (Reason for Maness or Other Remarks) �. • G.(-r'" — u49T. gyp.M QP it �`. SeLtA2-.6 oMA•4. Tr? - tAR- i L II-�u�u 'V4 " 12c i � k O 1` t L ('.cam ifti - C r' CONTRACTOR TITLE Report No. 152 CITY OF FONTANA MOVER AVE SEWER, FROM Date 10-Aug-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 899 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation ebtjegr �� J 'J /Ve--- r — •CA-G4W HOURS - ITEM NO. Median Imp ITEM # 16 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral =I E 00 90 co Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz * All traffic control measures and signage were set and in place as per planar close of day. (Steve Bauer) Signature Report No. 151 CITY OF FONTANA .OVER AVE SEWER, FROM • Date 9-Aug-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 898 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Pe, 2vp cj c b 5 19 )46 (.1) t Ccxwwri- l�s6 cA) j Ltr6 tovt,c. piA9-6.r HOURS - ITEM NO. Median Imp ITEM # 16 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee _ 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz 44_5yo 14vOr-, --Iver‘-krIA(24-z-5 * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 150 • CITY OF FONTANA OVER AVE SEWER, FROM • Date 8-Aug-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 897 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation (1,C3r j 1_,Q141) /4-C 4f-nJ HOURS - ITEM NO. Median Imp ITEM # 16 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: • • WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 149 CITY OF FONTANA .OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT "• CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation -f Z 2 /l) CAL CPi1ovt. A-fie1Lrol mat 4113 cus& r Date 7-Aug-01 • Day 896 Shift Hours: Start 0700 1600 HOURS - ITEM NO. 3 m su'EQUIPMENT a ITEM # 16 R&R 4" PCC Sidewalk m 3 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader _ Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee • 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman . 1 Laborer A. Salgado 1 Laborer T. Ruiz * All traffic control measures and signage were set and in place as per plant close of day. (Steve Bauer Signature Report No. 148 CITY OF FONTANA AVER AVE SEWER, FROM Date 6-Aug-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 895 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation - 11? ice'T t,t r HOURS - ITEM NO. 3 m P z 3 a ITEM # 16 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA •LOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 147 • Date 3-Aug-01 Day 894 Shift Hours: Start 0700 1600 Lotion �& Description of Op/ration�,,, r!� �??'(,. �59f`�' dM- Ls) C-1,+2+v61 er J HOURS - ITEM NO.• Median Imp ITEM # 16 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz • * All traffic control measures and signage were set and in place as per pla t close of day. Steve Bauer Signature CITY OF FONTANA *LOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation eakiC1R.0et,.'t • Report No. 146 Date 2-Aug-01 Day 893 Shift Flours: Start 0700 1600 ota(LeD S t1 .,k- 4 nua HOURS - ITEM NO. • 8" Curb & Gutter ITEM # 13 R&R 4" PCC Sidewalk ITEM # 14 n C. a gy ITEM8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING • Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman Excavator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 3/4 ton pickup P. Shaw - Foreman 1 Laborer A. Salgado 1 Laborer T. Ruiz AN 5 I4S3S 4 543 1s{(poi 14-4t1 14s4Z 44g 01 2.3) ' 5111.4r) S 1482b 1440� 41tt 1460A 4543 l4S3 S" 410. 115,c K * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 145 CITY OF FONTANA *LOVER AVE SEWER, FROM Date 1-Aug-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 892 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor stripped forms from 8" curb at median. Building forms for sidewalks, driveway approaches, and curb & gutter at various locations. HOURS - ITEM NO. 8" Curb ITEM # 15 R&R 4" PCC Sidewalk ITEM # 14 6" VCP Lateral ITEM 8 & 9 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR:• REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman Excavator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 3/4 ton pickup 8.0 P. Shaw - Foreman 1 Laborer 8.0 A. Salgado 1 Laborer 8.0 T. Ruiz Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature • Report No. 144 CITY OF FONTANA *OVER AVE SEWER, FROM Date 31-Jul-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 891:„1 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation � Se,1,4-rzre___ / /QS 174 A _ 'rf-I- 6 << \ / C'.I� S r4Al1Z__ + Z 5~ {�00a6� 1�Aa� SZ— CS%- u r)26 Q2 IvI 1 Ai /� ver-1-} S I be 'r 22 -Ho a ,ro 21.-hes- 1-e`IL?bSF - Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. '143 Date 30-Jul-01 Day 890 Shift Hours: Start 0700 1600 Location & Description of Operation e5c.A.A.rz-. 6Nsv.t L sit.-1, ' t t��: l .� L15,'0 `' /Vlt iAFL /1tL cc. OS . HOURS - ITEM NO. J _ ✓I 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral -i m 3 90 CO Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR = C.0D EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup ej Randy Kent - Foreman 1 Excavator w/ wheel , Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer 1 LAyeacirrat S A. 1 e, . -1-1 Zi-t:.2...__445`7: metes v\tre26 c s , Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation C.U(Zl3 Q_ hit 6OLAit\ C1912.Ms • Report No. 142 Date 27-Jul-01 Day 889 Shift Hours: Start 0700 1600 .40 (.0-r.04 4c2oue6t COI& 2-44--eo HOURS - ITEM NO. l _ _ ` 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: • WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 ./1r J. Sellars -Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer i p s c IA.41,) — ()_i�.M, t Llk$ ,�- . �Ati..r�.ln i LA ���N 0 T, 201-2.- Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per pla at close of day. (Steve Bauer) Signature Report No. 141 CITY OF FONTANA *OVER AVE SEWER, FROM • Date 26-Jul-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 888 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation rl cCEi ✓ / - /4156 5� lit.-E'r'C�i�t (J4) 690A S 4Za nJE--) culeG au Me> sA-m (2" 40 TrD 21-t--cX), 2O Zs%A N D0-14 St t , M tJIA/U ere-0 PI24 STA -ik --ice HOURS - ITEM NO. R l,, 3 31 15" Extra Strength VCP Sewer ITEM#5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer 1 LA -Caro 1- i A . 1 is l c 120 l 2_ Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA OVER AVE SEWER, FROM Report No. 140 • Date 25-Jul-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 887 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation "S S'e; Ga4., /Ai -77,0 o t —A V UM fS - t 't E t.J 1. �, �f 5 c c_ 'Es a.*) -rb S J VtA- - >TV -AN PkO Ft)(21‘45 F(tMM AA CST L 4 Y rani- - /I- Zo ----4 -cu. 2. . HOURS - ITE NO. I `" ( /�� � \ 15" Extra Strength VCP Sewer ITEM #5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or ' other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 0 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator _ 1 Loader 2 ,, Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck %J. Griffin - Laborer trainee 1 Creech - Pipelayer L A6O( xZ 8 A . S4z.G.Ar .k g Ti 2t)t iz._ Q6'U(2- `t r L (6)_ M Dl 4i( CS45t t .si �a✓ cz ove2. v22.71-440 -I-C' 244-c o . 1Sy1C -E--- se • ' .crlPe.lo Vim, . WtLLACc5T(E i4t& Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT Location & Description of Operation .OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA r" • Report No. 139 Date 24-Jul-01 Day 886 Shift Hours: Start 0700 1600 irD { ; `` nAJ243 pa: -5f3rort4 oc M dA 62,204 S 20 +1-4 TV 22-k-40 --• �cJM HOURS - ITEM NO. 64•r-E3@ioD , 0(1 -, 15" Extra Strength VCP Sewer ITEM#5 .6" VCP Lateral ITEM#8&9 Traffic Control, signing and strioina ITEM#2 Contractor: FISCHER PLUMBING Sub:...„.4 WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer I i-z eu1�--} Litp S-cYL� p0 Nr�,uc. y eatue c tl - A-t'Pu D CitA0A-1.& v�wc cAth213 0-) ' o 2r 4 ‘6 cf1- Me)( -z-o 24 -i--:c' , Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. • All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Si'—ature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 138 Date 23-Jul-01 Day 885 Shift Hours: Start 0700 1600 Location Description of Operation (S' CreC—Lk.) Tret, /. 5 t bc- 6 f f Vr,P I IlJ7v '�t6> — '� Irn '.! �fKr�-- 1 v'v.I-\ I T%J Um. �i .1II-I I V1I/ I- Y L.X..L /�..I �.-�� i tdiA . `51-4 ?A-}- L5 HOURS - ITEM NO. -rp -f-/S. Contractor: FISCHER PLUMBING Sub: M , D1Q. WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS EQPT. NO. NO. DESCRIPTION (Reason for Idleness or MEN (Of Equipment or Labor) other remarks) 1 3/4 Ton Pickup e Randy Kent Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader i Paul Maxey - Operator . 1 e C. Robertson - Pipelayer 1 t J. Sellars - Pipelayer trainee 1 h2o truck a J. Griffin - Laborer trainee 1 Creech - Pipelayer 43k l. inn., ti,) — emitni ° 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM #,8&9 Traffic Control, signing and strinina 'ITEM #2 -SC..bfeibUl i , C-e 2- 1,O3a E4 .S TbMbtZ2-atrD — Sc 3 M cf.n 1,wjNt (S R c .� t s t1-C S t -r ' i t Y,G cr1.Sc%t a(L- \/ 1S t r> s i r6- •t g oa {.-ttz-5 4 we, e-� w.rr cue c:�. nrr V ES`ri wpm Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plat close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY'REPxORT *OVER AVE SEWER, FROM CHERRY AVE ..TO..HEMLOCK AVE, FONTANA, CA Location & Description of Operation \IYIP Report No. 137 Date 20-Jul-01 Dav 884 Shift Hours: Start 0700 1600 1 JAL c't c_c_ t� #c ty0,4c [_ocAST4ti v+l✓���� v ' ,sl'r u'tri-t. 2..-ti Lam- Ta_ �t2 CtJ"'ST' � HOURS -ITEM NO. 15" Extra Strength VCP Sewer ITEM#5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: MISS/04 (t: etmuss' WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS " (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) I ' 3/4 Ton Pickup g Randy Kent - Foreman 1 Excavator w/ wheel - Randy Stevens - Operator 1 Loader e Paul Maxey- Operator 1 e . C. Robertson - Pipelayer 1 IS J. Sellars '- Pipelayer trainee 1 h2o truck ;:::g J. Griffin - Laborer trainee 1 Creech - Pipelayer mid 4 4 s koiL tr 'ratnvx M 14 # /, GDP— �rM A ng, ell s..n,a-f u- - mkt- 1_, W t-Lc. 9 Erv2nt -r'o t tmiteL,F 1 'ems i�i (cam d L (Z _. DAPI Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as . e Ian at close of day. (Steve Bauer) Signature Report No. 136 CITY OF FONTANA .OVER AVE SEWER, FROM INSPECTOR'S DAILY- REPORT ----CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Date 19-Jul-01 883 r Shift Hours: Start 0700 1600 Location & Description of Operation L.A-(li ('" VcP 5',ii ScOv6L- . -t-74- 36, +2, 34. Q, '6 w/kc LA -it /.Lc �1= r 4 s ttE c... S.. (fStn.& G- SA/Ca— S40C vr . HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) I 3/4 Ton Pickup a Randy Kent - Foreman 1. Excavator w/ wheel Randy Stevens - Operator 1 Loader & Paul Maxey - Operator 1 C. Robertson -Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck no J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature O CITY OF FONTANA OVER AVE SEWER, FROM • Date 18-Ju1-01 Report No. 135 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 882 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Cvl-Tral.c _ ii.,s77g 6" Nice „,, . US mi G- - 5/kr 6t.g U I� 7D St>. fLA G'�j -Mi c HOURS - ITEM NO. • 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) .. EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup I' Randy Kent - Foreman 1 Excavator w/ wheel . Randy Stevens - Operator 1 Loader S Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 1 J. Sellars -Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per p n at close of day. Steve Bauer Signature Location & Description of Operation CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 134 Date 17-Jul-01 Day Shift Hours: Start 881 0700 1600 (_a�N rpm ftt44 itL6L- -n4- 2430---7-4 ,- 2,...4- -4- cz-Z MebtitAi 4(I - Q.-1 M cam- L C2 -- iT r� c (Z. ,c / ?fly /ANn.4 , ab7►4P e'A(. 4 c Ste(o`t vc_P L-A1-0241_, 5 ©u-r-R 3 t er, v°r o'G /444.114o1 F. 3 Sirs. -f-2o Tf�J1/4.14- 1.-195 I54c 1Gf-t4.1. J 47.14- IA% L E K- `6.`-�j' Oil -rz HOURS - ITEM NO. �, 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#88,9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 9 Randy Kent - Foreman 1 Excavator w/ wheel - r ' 1 Loader 9 Paul Maxey - Operator 1 9 C. Robertson - Pipelayer 1 9 J. Sellars - Pipelayer trainee 1 h2o truck l J. Griffin - Laborer trainee 1 61 Creech - Pipelayer PeR C.U2.6 crx) NtEl AAL N-aPGK,iti -441 w C Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA 1POVER AVE SEWER, FROM • Report No. 133 Date 16-Jul-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 880 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation cr 4}- ,_ 0_,(264.) 1144.(C./it G,_ csi ) �j rT-� �,1160140 5J1-452A S-c»r 2-4- HOURS - ITEM NO. / Cs 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING _, Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: .d REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup e Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader g Paul Maxey - Operator I o C. Robertson - Pipelayer 1 $ J. Sellars - Pipelayer trainee 1 h2o truck fj J. Griffin - Laborer trainee 1 _ Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature IR CITY OF FONTANA OVER AVE SEWER, FROM Report No. 132 Date 13-Ju1-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 879 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation S i� L,C_ loss t:Le ti!t (,- r P-O Lk- rj t LAIAI"-' tOct Vc'AV S1Ail,i,i r-k SLIALeti �1 c., (�G,r_n i Th �(? .,t,� tts. A-e _ .-,r,, , S.�r �t.,� 2L,a� I►.A c✓. t HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9- Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION' (Of Equipment or Labor) 1 3/4 Ton Pickup a Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results: * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) c.. Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT Locion & Description Operation ' , 'g c Dom) Q5suovr VER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 131 Date 12-Jul-01 Day 878 Shift Hours: Start 0700 1600 "311,4- 4 3 wL--74- — IrcKLE- AAA HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 6 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 59 Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 5 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 _ _ -A Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and In place as per plan at close of day. (Steve Bauer Signature Report No. 130 GLOVER AVE SEWER, FROM Date 11-Ju1-01 CITY OF FONTANA INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 877 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: Continuedwith the installation of the 6" sewer laterals on the south side of Slover Avenue. Station 27+60 and Station 59+50. Repairing PCC curb and gutter at various locations. HOURS - ITEM NO. • Item 17 AC Paving Project Clean-up Item 2 Traffic Control Item 9 Sewer Lat. S/S Contractor: FISCHER PLUMBING Sub: Sunny and Hot EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 1.0 7.0 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 1.0 7.0 J. Griffin - Laborer trainee Because the Gas Company will start the relocation of their facilities on the north side of Stover I instructed Foreman Randy Kent to delete the 0.1' AC overlay from station 20+80 to station26+75. I also instructed him to modify the median island deleting the grouted rip -rap and substitute 2" of AC over compacted native soil or sand. These changes will be transmitted in wirting to the Project Manager Neil Reilly. LOR Geotech was also testing and oberving backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Don Gdula) Signature CITY OF FONTANA 1POVER AVE SEWER, FROM + Report No. 129 Date 10-Ju1-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 876 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation '"ga- _ i /k) griku,eb, �(,¢�Q�-f-�.{ . '11 cL,, ST,y ten) 14- Ze for, - r0 arc-ccr- t�h-rbf �iccY77, �L, Sf rtCT?yc.fE'� Pr4. l 4' HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral `I m E O° 90 CO Traffic Control, signing and strinina ITEM -# 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEARqt EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) , EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage'were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 128 CITY OF FONTANA �VER AVE SEWER, FROM Date 9-Jul-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 875 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation c ! _ 4mitr uP 5 t -rr 0./6u t c... *moo A4 /rJor [ 5 ill eepili c y /At /445. HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR:• REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 4-- Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 4, 4- Paul Maxey - Operator 1 4' 4- C. Robertson - Pipelayer 1 4- -- J. Sellars - Pipelayer trainee 1 h2o truck 4" J. Griffin - Laborer trainee 1 t Creech - Pipelayer ÷ Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 127 CITY OF FONTANA AVER AVE SEWER, FROM . Date 6-Jul-Q1 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day , 874 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation At(- CWQ (2,-A 4,01-6 bef 1I i& cot/go-Lai • e.,--g-,____(7_hdee-ft_ip HOURS - ITEM NO. t — 15" Extra Strength VCP Sewer ITEM #5 6" VCP Lateral ITEM #8 & 9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: "O WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel . Randy Stevens - Operator 1 Loader Z j Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 4 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin -Laborer trainee 1 Creech - Pipelayer • • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) ignature Report No. 126 CITY OF FONTANA OVER AVE SEWER, FROM• Date 5-Jul-01 INSPECTOR`S DAILY REPORT CHERRY AVE TO HEMLOCK Day 873 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation ( x ,TE72 r (as���� Woes -rp TJ1 iJ ricsr-i,-LCa(LM CA-1,Pi ` ro 11448 E „ I s1-4-ra►J ) e. 14 Loe (z v P. HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM #5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: 11 EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 • C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT. - CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation-iln • Report No. 125 Date 3-Jul-01 Day Shift Hours: Start 872 0700 1600 t' L.A�b 't,f�C� `i1rE6 ► G A.4 CrCsc 15 J• Ct oMPL LAt 1//4 G. 7-3 L-V- Cp S��nv. �►� h-4.-11-trsiwg6 A- [�S�u .V `T12.�LGdI u .2+zJ t�'t 5�-(� /t�lb L6 el- � 5 HOURS - ITEM NO. J,-iW- C -L IM 1 x. '1`' 15" Extra Strength VCP Sewer _ -� E 3 tit 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina 1 ITEM # 2 Contractor: FISCHER PLUMBING G.. Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: "..-11 REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 0 Randy Kent - Foreman 1 Excavator w/ wheel Sr" 4 Randy Stevens - Operator 1 Loader . S 4 Paul Maxey - Operator 1 S"' 4- C. Robertson - Pipelayer 1 S J. Sellars - Pipelayer trainee 1 h2o truck $' 4- J. Griffin - Laborer trainee 1 ,--'- Creech - Pipelayer 4.. /' _- fTl/A i..w.7�'I . • A_. ITl/ ...•N'-J ... (/I. -t• A . Zit I %1•. .. i../. !,1'•-�••T) am.- -% A 1K i'V 1 G�Ir C,rv(5 ,i C.J^LV yy1 K� `� 'LVI\J V1 Yv 11 -1-410 - rc) 2 4 i-w 05e- 655CL'1-12ktle.Ctaxn261,. i.J/SG Lt) t�w�d I'�tn14-S 2!?1fr� J� -r0 Mi4ic ' 7 Rrr_A--K S77�G ;b MAM1Yrf (E,f?.B K LJNr j eJ - - n7b 1,4+443b. L22 FAL 4-`A DV AT1(4ua 4E- i a e,7* Ta /nte_ 4—S Gtl4654/Wc. Oa-r.c= Lac_ /xl AIDien4 �iCw) ��- S74 y Note: 'Kim) I aPG t li ( Fit (CPC �t ' s iivFo teD*All All traffic control measures and signage we set and in place as per plan at close of day. (J/tt6Gt (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT GLOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 124 Date 2-Jul-01 ,Day 871 Shift Hours: Start 0700 1600 Location & Description of Operation: Continued with the installation of the 6" sewer laterals on the south side of Stover Avenue. Station 21+00 to Station 27+00. HOURS - ITEM NO. Item 17 AC Paving Project Clean-up Item 2 Traffic Control Item 9 Sewer Lat. S/S Contractor: FISCHER PLUMBING Sub: Clear and Warm EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 1.0 7.0 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee• 1 R. Roman - Laborer 1 h2o truck 1.0 7.0 J. Griffin - Laborer trainee LOR Geotech was also testing and oberving backfill operations. See his diary for exact test locations andresults. *All traffic control measures and signage were set and in place as per plan at close of day. (Don Gdula) Signature CITY OF FONTANA OVER AVE SEWER, FROM • Report No. 123Date 29-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 870 Location & Description of Operation AVE, FONTANA, CA Shift Hours: Start 0700 1600 U T4- li)%`' VG'P 2-2 + 8�rgrc Ft c� HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM#5 6"VCP Lateral ITEM#8&9 Traffic Control, signing and strinina m 3 N Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup O Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 8 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per pin at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation cenfri+ S'11 5 • Report No. 122 Date 28-Jun-01 Day 869 Shift Hours: Start 0700 1600 & ���+\fr- ii4 ZZ fiSD ynr- 1 / J - c;.�-�-1� A�v� � �A'it� HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 . Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 1 Paul Maxey - Operator 1 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck 0 J. Griffin - Laborer trainee 1 6 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 121 4111 Date 27-Jun-01 Day 868 Shift Hours: Start 0700 1600 Location & Description of Operation 4 (t.A- MA r-e- Cal -6 HOURS - ITEM NO. c.‘ b r / r, 15" Extra Strength VCP Sewer =1 M al 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: . WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator — 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM • Report No. 120 Date 26-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 867 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation (22o'iviri_4e � . jAt6-- 604.,) i20lU,A.J& - L� N� IX C3h� 94-t k rzAtietrm ^ pr 'at( LA-Tz ra-C 3/ g-f _ (&-t E= - ( octlL rtift0. ,( h HOURS - ITEM NO. " ti V t 1" 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING ,t^- Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup f.13Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 g J. Sellars - Pipelayer trainee 1 h2o truck ) J. Griffin - Laborer trainee 1 Creech - Pipelayer • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plat close of day. (Steve Bauer) Signature CITY OF FONTANA &OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation No. Report Date 119 25-Jun-01 Day Shift Hours: Start 866 0700 1600 HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader ,g Paul Maxey - Operator 1 g C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck i J. Griffin - Laborer trainee I 151 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 118 CITY OF FONTANA AVER AVE SEWER, FROM 411 Date 22-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 865 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location Si Description of OperationCoyureke,r2pa_N i.� ]126oki,f2 c ,(0 SIFT 43 fi ,vd t-1-b26 627m m c . -CIF J HOURS - ITEM NO. 15" Extra Strength VCP Sewer --I m 3 m m 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader g . Paul Maxey - Operator 1 g C. Robertson - Pipelayer I R J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA .OVER AVE SEWER, FROM Report No. 117 Date 21-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 864 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation n Ce 7t4( ,g-o / rJ ? - es-4-1 Q. 6(4t.4 4- GaMP4-vrGi . Ta ern9,1-i12 4-1 -1— cS7 HOURS - ITEM NO. • 15" Extra Strength VCP Sewer ITEM#5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 116 CITY OF FONTANA OVER AVE SEWER, FROM Date 20-Jun-01 INSPECTOR'S DAILY REPORT HERRY AVE TO HEMLOCK Day 863 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation C: ytyr acirz,Z_ k a_ /0 ± ?p ac-prite omicfb��1 czedo, HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral -=1 3 4 0o c Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup e Randy Kent - Foreman 1 Excavator w/ wheel e Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 9 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plat close of day. (Steve Bauer) Signature CITY OF FONTANA IP- OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT HERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 115 Date 19-Jun-01 Day 862 Shift Hours: Start 0700 1600 Location & Description of Operation </Az te..6vioe_.s tiL T 1 P , Si* 5S-fr o . Lam. ktiia-S / Su.A 22P4i g+-mow 2_ vIAi5 c.D1,3 r I-78 HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or _ other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup . e Randy Kent - Foreman 1 Excavator w/ wheel g Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 B J. Sellars - Pipelayer trainee 1 h2o truck J. J. Griffin - Laborer trainee 1 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 114 CITY OF FONTANA *OVER AVE SEWER, FROM1110 Date 18-Jun-01 INSPECTOR'S DAILY REPORT . ,...,,,. HERRY AVE TO HEMLOCK Day 861. AVE, FONTANA, CA Shift Hours: Start 0700 1600 ' Location & Description of Operation ( /, ft rr. rg rya-u,cC, " 1l e, SF C.4-77*24,-L- %v6 -43•96+ 241 -1•- e o) CACAt_i cy f Tr - HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM#5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 0 Randy Kent - Foreman 1 Excavator w/ wheel g Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 ( Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Sig ature CITY OF FONTANA INSPECTOR'S DAILY REPORT 03 LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE,FONTANA,CA • Report No. 113 Date 15-Jun-01 Day 860 Shift Hours: Start 0700 1600 Location & Description of Operation: Continued with the installation of the 6" sewer laterals on the south side of Slover Avenue and paved the south half of the intersection of Slover Avenue and Redwood Avenue, due to poor paving by the Fontana Water Company contractor. HOURS - ITEM NO. Item 17 AC Paving Project Clean-up Item 2 Traffic Control Item 9 Sewer Lat. S/S Contractor: FISCHER PLUMBING Sub: Hot and Sunny EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 3.0 1.0 3.0 Randy Kent - Foreman 1 Excavator w/ wheel . 3.0 . 5.0 Randy Stevens - Operator 1 Loader 3.0 5.0 Paul Maxey - Operator 1 • 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 4.0 1.0 3.0 R. Roman - Laborer 1 h2o truck 4.0 1.0 3.0 J. Griffin - Laborer trainee LOR Geotech was also testing and oberving backfill operations. * All traffic control measures and signage were set and in place as per plan at close of day. (Don Gdula) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT Location & Description of Operation: LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. Date Day Shift Hours: Start It 112 14-Jun-01 859 0700 1600 4 "Ind CCD HOURS - ITEM NO. 6" VCP Lateral o ITEM 8 & 9 15" Extra Strength VCP Sewer ITEM #5 Traffic Control, signing and striping ITEM #2 Contractor: FISCHER PLUMBING Sub: , CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent -Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 Creeehr--Pipelayer 1 h2o truck 6 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and In place as per plan at c ose o a . (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description • f Operation 3,}-+S. 4110 Report No. 111 Date 13-Jun-01 Day 858 Shift Hours: Start 0700 1600 t0 " V a e HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing - and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup j Randy Kent - Foreman 1 Excavator w/ wheel a Randy Stevens - Operator 1 Loader S Paul Maxey - Operator 1 6 C. Robertson - Pipelayer 1 >2 J. Sellars - Pipelayer trainee 1 h2o truck g J. Griffin - Laborer trainee 1 8 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer). Signature. CITY OF FONTANA *AVER AVE SEWER, FROM • Report No. 110 Date 12-Jun-01. INSPECTOR'S DAILY REPORT... CHERRY AVE TOMEMLOCK Day 857 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation CODJ112q-ci-trg_ ,_CN LAI(_4 / A) 74-(4 t' V c S7-4. 3' -1-g a telrul 414 7o , S�ts�u Sr D HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader or Paul Maxey - Operator 1 41/ C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck Griffin - Laborer trainee I PJ. Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Sign : ure CITY OF FONTANA • &OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation -r ry (200.-116x) %` VU-ctiM4-r(A) t 1;- -r7 Ai D (GkIT )P S7)Z tocceM • Report No. 109 Date 11-Jun-01 Day 856 Shift Hours: Start 0700 1600 vikm%re, PaQ l/ST(-K-t-I *JG- HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM #5 )u v I 6 VCP Lateral ITEM # " Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 e Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) ignature CITY OF FONTANA INSPECTOR'S DAILY REPORT OMER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 108 Date 8-Jun-01 Day 855 Shift Hours: Start0700 1600, Location & pescription of Operation Co e4/A'T'�Jl. ,4i 411 I -. rAc��G `'jTc7� S.S-1- Zo C - i-l4ll (4- `� ,v& i rt / NJ To MAN HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM #8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup e Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 9 C. Robertson - Pipelayer 1 c J. Sellars - Pipelayer trainee 1 h2o truck 0 J. Griffin - Laborer trainee I $ Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Sig CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & DOARYNIfescription Op� t�1 c " - 41- -1- ( j • Report No. 107 Date 7-Jun-01 Day 854 Shift Hours: Start 0700 1600 si- . (119 A vnrr0� c HOURS - ITEM NO. ,-. ` I 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING 'JO ....— Sub: WARM AND CLEAR f..--.. EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) � 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 g i C. Robertson - Pipelayer 1 J. Sellars -Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 8 Creech - Pipelayer • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as perelan at close of day. (Steve Bauer) Signature CITY OF FONTANA .OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA I/0 Report No. 106 Date 6-Jun-01 Day 853 Shift Hours: Start 0700 1600 Location & Description of • peration , [ Apt b 46 tl UCAQ /�{/a�J�-i"�tl✓ %;%nri �nr� t -t- — i-- 1 ct.2 . crc- ._ r i t).L-L.. /milt�l� lC_" &9d2Tbs- I L�b(s 4pt�T HOURS - ITEM NO. M �- — 5 e#:i 14 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: /..-.. REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 p J. Sellars - Pipelayer trainee 1 h2o truck • J. Griffin - Laborer trainee 1 Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per pJ n at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation V _r g- -n t✓ / #ssT40 wt cx2- JW , 41111 Report No. 105 Date 5-Jun-01 Day Shift Hours: Start 852 0700 1600 HOURS - ITEM NO. 15" Extra Strength VCP Sewer =i m 3 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM' AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel 6 Randy Stevens - Operator 1 Loader S Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 104 CITY OF FONTANA *AVER AVE SEWER, FROM 40 Date 4-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 851 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation 1/ G 14 G-- C'N) $J b& T5QtAirsa /� LJf r 'f(9 A LA "-Mtn . - Swill- - ("IDS, E L -? RA-Cr—PI U 1!5 /vV U'- Tom/C�L-t - 9A-G '<24-3V1 2 HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 $ Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM • Report No. 103 Date • 1-Jun-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 850 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation �(� �,( cJt" Gj1Le__ �^l7 HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck J. Griffin - Laborer trainee 1 Creech - Pipelayer • FbRov1 1 Aziwav KB.1 -t ,`i 14C r 1 E F AL RPJ LIS AM TCdfij OMAI, INI• 1.1f5T v.102,141. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA OVER AVE SEW Report No. R, FROM102 Date 31-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 849 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Coro-r I CAvAv-N-17 T7<12 _ 4 / t / AJ (.! 14- YI. D & (, << k1 c-50 (5.1„,a_- l Lunt. Se-e- c5'r-A- 53 4-rx7 G O HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8 Randy Kent -Foreman 1 Excavator w/ wheel a Randy Stevens - Operator 1 Loader 8 Paul Maxey - Operator 1 S C. Robertson - Pipelayer 1 13 J. Sellars - Pipelayer trainee 1 h2o truck • 8 J. Griffin - Laborer trainee 1 8 Creech - Pipelayer Mot:: LO.R. R Geotech on site full time to observ1e and test all backfill operations.' See his diary for exact test locations and results. A!!traffic centre: measures an.J c ne were ce+ and in place a. r :tlasn a+ close !.4 days .aa traffic xva_�a va aaaa_-a eaa _y and �Q�i:a'aM� r.5.� ..w. ua....ae place c+ �_- a E..sa.a.a ,n: va=r..� •... -...�. Report No. 101 CITY OF FONTANA INSPECTOR'S DAILY REPORT Location & Description of Operation _OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Date 30-May-01 Day 848 Shift Hours: Start 0700 1600 EL S PT1,✓.711 S3-&D. HOURS - ITEM NO. 75" Extra Strengthl7CP Sewer ITEM # 5 6" VCP Lateral • ITEM#8&9 Traffic Control, signing] and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 0 Randy Kent - Foreman 1 Excavator w/ wheel 8 Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck 9 J. Griffin - Laborer trainee 1 Creech - Pipelayer • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as • r pan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER,, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation uteraeA,Ls Tb 145g3 gut! Report No. 100 • Date 29-May-01 Day Shift Hours: Start 847 0700 1600 HOURS - ITEM NO. 15" Extra Strength VCP Sewer ITEM # 5 6" VCP Lateral ITEM#8&9 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING IS''.• .....1 r �J / Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup a Randy Kent -Foreman 1 Excavator w/ wheel S Randy Stevens - Operator 1 Loader IS Paul Maxey - Operator 1 r C. Robertson - Pipelayer 1 6 J. Sellars - Pipelayer trainee 1 h2o truck ? J. Griffin - Laborer trainee 1 O Creech - Pipelayer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) ignature CITY OF FONTANA OVER AVE SEWER, FROM Report No. 99 Date 25-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 846 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation C L,i-CA1,(2.-- / k) n4- (_ c 611 VCAP �,r �) -av SfZ /ram -ra- �� +1st -r Lei-- art- 14R, 8, AvS, HOURS - ITEM NO. ' (* a y Fv - l) v� Sewer Manhole ITEM # 10 /5" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 O C. Robertson - Pipelayer 1 b J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffm - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per pl • at close of day. (Steve Bauer) Signature Report No. 98 CITY OF FONTANA •LOVER AVE SEWER, FROM Date 24-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 845 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: Sewer laterals on the north and south side of Slover Avenue and general project clean-up of debris and borrow removal. HOURS - ITEM NO. Project Clean-up Item 9 Sewer Lat. S/S Item 8 Sewer Lat. N/S Contractor: FISCHER PLUMBING Sub: Hot and Sunny EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 4.0 4.0 Randy Kent - Foreman 1 Excavator w/ wheel 4.0 4.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 4.0 4.0 C. Robertson - Pipelayer 1 2.0 3.0 3.0 J. Sellars - Pipelayer trainee 1 4.0 4.0 R. Roman - Laborer 1 h2o truck 2.0 3.0 3.0 J. Griffin - Laborer trainee 4.0 4.0 D. Creech- Laborer LOR Geotech was also testing and observing backfill operations. *All traffic control measures and signage were set and in place as per plan at close of day. Signature CITY OF FONTANA OVER AVE SEWER, FROM • Report No. 97 Date 23-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 844 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation — T7A.CL`-• Q.c-.-PA- L It5 veP mils 1, / 1J5TDi.3 4 "1--\,,o{ (2 5 , 'T%) L -IGS e-R44 csem 64 j, C i--0 r 5 cram: -7 Me. • HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer rn M Traffic Control, signing and strioina ITEM #2 Contractor: FISCHER PLUMBING Sub: 1-1021Stl334 tTF WARM AND CLEAR EQUIPMENT AND/OR LABOR:• REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup E% Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 93 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1---- r 1 h2o truck g J. Griffin - Laborer trainee ' Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA .OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation • Report No. 96 Date 22-May-01 Day Shift Hours: Start 843 0700 1600 1 k1 7A ,Yrne_Ac- &L ‘. Lor, (Atari Akt c, S-A/Lene-rt-tc1i6 Cu. �-7'" 1...) t 7-64 (J L It41>c HOURS - ITEM NO. 4, Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer -I & u• Traffic Control, signing and strioina ITEM#2 Contractor: FISCHER PLUMBING V� Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: n REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 61 C. Robertson - Pipelayer 1 R J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 2 J. Griffin - Laborer trainee l.N pe1> V-en,e -ram C-AS,52T &uc pri L., /"t 1rrvu ,4c -ri -J er., .Foe_ Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT .OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 95 Date 21-May-01 Day 842 Shift Hours: Start 0700 1600 Location & Description of Operation I' 1jc v CA\J/4T7".1, (a. * Lqa,) /1'46_ ('p". vkP ,14•7V0144-L, I-bC I So3a DAInt4t1-79, - DiNtit u C.1-4-'rj 1.16- • 1A i 1 r--t I n.T!/M 4'i'� If-Jw t`t L' r`-)4e-4 lC CW Al Z- �' APP215C- HOURS - ITEM NO. • 141 /4 As SiC14 , — i Sewer Manhole ITEM #10 15" Extra Strength VCP Sewer rn v, Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup f Randy Kent - Foreman • 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 $ J. Sellars - Pipelayer trainee �._ 1 h2o truck j J. Griffin - Laborer trainee iver6 o L )M 7C 3 4 S"r7Ai G- 0i /-•O . "bib/ '-,- s 4 vi Z1 /dosT t i E j� cctJsl A*1 044,60.t cam (. / Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA OVER AVE SEWER, FROM • Report No. 94 Date 18-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 841 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation rX L.TJ,UUi,v - r0 TLE. / oe1M eL r N t:,"Ui& I r i - v Z- lAc r dZ4'L ' -Obj ( �LOv 1j2 ��- Sb 4 . 11446 l.trlg'`� /�tsbo '5LA. . ,��9-ci�-Cl. L HOURS - ITEM NO. 1 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer q E vt al Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING R (4 Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) •EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup e Randy Kent - Foreman 1 Excavator w/ wheel 0 Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck e J. Griffm - Laborer trainee e)r-cl-c=- : Pocen,n)D t% LM -ro l era_ l•5o 4- S r c 2. Avv 4d { 1•5 ( i c>u P e-r 5A1 PL 3T ' 2D/d-IiZ_-r-a - N e-r. . 6. .& Ii r i r, 114 Gt44-if L ,60 , Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 93 CITY OF FONTANA *OVER AVE SEWER, FROM • Date 17-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 840 AVE, FONTANA, CA Shift Hours: start 0700 . 1600 Location & Description of Operation Cf:9/'7-24-t rt, Z I'ttat'c• • 4Nt -IL- Q- fjArc,t - ` 7J l tirTr rL- L.Or 5-' + `tS rr / LAT— HOURS - ITEM NO. Sewer Manhole ITEM #10 / 5" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing. and strinina ITEM # 2 Contractor: FISCHER PLUMBING ,� T. ` / v • Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 40 Randy Kent - Foreman 1 Excavator w/ wheel S Randy Stevens - Operator 1 Loader gj Paul Maxey - Operator 1 e C. Robertson - Pipelayer 1 g J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 0 J. Griffm - Laborer trainee I 1 A fD 8 ( CAA cri : 'S Ug5-rt`Rir awl Ls Ta=ti4 C pN 5 r r 1, sr-s4rc:) !7� C J7 kD. CS0-rl-i- , 4-26 1J(z___ & .rr1 Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per p_ n at close of day. (Steve Bauer) Signature 1111 Report No. 92 Date ' 16-May-01 Day Shift Hours: Start 839 0700 1600 CITY OF FONTANA . *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation A1/ Ci1G.i C.-PTV✓1—d `.d l V /4tr+"-.r ' 1 ) —Ix—, 1., 1U% 7S 1 % J�� L.-" I �`�l vr1V L......,L......,V'l - `7�? ' V C... J i C.-61 j� HOURS - ITEM NO. (-err—l 5Cc33 (-p-1GRA d� C R T \.� \) -i Sewer Manhole ITEM # 10 / 5" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strioina rn N Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. ' NO. MEN DESCRIPTION , (Of Equipment or Labor) 1 3/4 Ton Pickup f Randy Kent - Fox wan 1 Excavator w/ wheel t1 Randy Stevens - Operator 1 Loader g Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee ..-1-- R.ou—babefor, 1 h2o truck g J. Griffm - Laborer trainee • ( LA-gue6. e as i , 40 W i S �► (.cam Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT .OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 91 • Date 15-May-01 Day Shift Hours: Start 838 0700 1600 Locattioj & Description of Operation A. 1[.� s ,. ,.� � S 12) !it it _ c i2 @- jr3171A 2 iFs /,Sa4 5v5�t gc e- LE-. V7)12/4-erme Ski&G2 \ iG 1 is - Co 4c�Uz-r s b +4 n (±) , PA-c--6c-, Lthn, Airets6b 4 , ,4-, , HOURS - ITEM NO. V") 1 Sewer Manhole ITEM #10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING .. V 4 Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Qj Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 A . C. Robertson - Pipelayer 1 pj J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck i J. Griffin - Laborer trainee I LeigOtrfA. g ,-, .ram . JAAc : ( rn419- L /.h1 && > A- l (, w a- ,airy, �n/ Co �� = 60ar fru4 N. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation • Report No. Date Day Shift Hours: Start 90 14-May-01 837 0700 1600 yV 0 t �Ssr 4 Pat - - yam pair- ' Larry- -t t, J $ LA4.0 -To /1- rI?ti1'>✓_/DLGS'lI� i %ii�J t%i3�r__G__ 1�. � �[O 7D yl4-6 HOU(2S -.'TEM NO. ,gp19a2_ LAIA5 P,etb(& 4 7:- 4 Sewer Manhole ITEM #10 15" Extra Strength VCP1 Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: g[7U5'R7'IJ 4 (-b i2tc WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup g Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson -Pipelayer 1 J. Sellars - Pipelayer trainee 1 h2o truck j J. Griffin - Laborer trainee • • Ng tJ STT.) 4 /1- 224 r,J Srr� r C ,vl� o-iM ' lv .C) LI du F,( �M [ifrl I 7-1) I-&mt_t c4G, 1-I84t 1J <iG. —2- t-o S ol< Sl ni61- -VA - ()644cteAc c_ S I N•f, CA-' Z M'- . -rP- I GN- ual95 .Pt..A ) S w izet) -11460 ‹,(Aire- tog- Sim ,14 Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 89 Date 11-May-01 Day 836 Shift Hours: Start 0700 1600 Location & Description of Operation v7rlAcL M,9-ichtiG... S LI 6I 41.)E (�Ao t i$ �//G A-�F^'� /AS J/h �rQ(, rcc.- a Pa-ti ME / n1� `,Q i - t htfre �,C;�:x^ 4,7J� fie; SiBl [ �I v1 / CJ/�7�--'/ v - /f t v f e S�r � t1 l.(.�_ ll HOURS - ITEM NO. ', ' 4 � \1 Sewer Manhole ITEM # 10 /5" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 - Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8 Randy Kent - Foreman 1 Excavator w/ wheel f3 - Randy Stevens - Operator 1 Loader S Paul Maxey - Operator 1 C. Robertson -Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck j J. Griffin - Laborer trainee i /--i p,4„Q) ai€ , ? a- - I4; i s / . � � ts qo T� Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA .OVER AVE SEWER, FROM • Report No. 88 Date 10-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 835 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation 1, e4vcWL i.A1r �i? c� ('pc tt V cX 4 VC gn4 A s +C 0, �c PP WA-S C�iu Darr- / 4.4 ktk L 4- e P . Xxa. u P Lit t me. - v e P& tAA �/-)4A-ra� w rrbf /2erac l f 4ft fL 1 $ Cer-tP/c�'c5) HOURS - ITEM NO. lz. t1 \- 1 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup q Randy Kent - Foreman 1 Excavator w/ wheel g Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 g J. Sellars - Pipelayer trainee 1 h2o truck e J. Griffin - Laborer trainee 1 L4& tz - 0 61e -ck - Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA •OVER AVE SEWER, FROM Report No. 87 Date 9-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 834 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation P IS" vC f � 770 IA! W ITU -)c.t S'TJAI %- /1 Ar)H-oz ze_Ca S{ L-, vv 6 O +-D t) . 0,vaCA eo .AA-1l A-6 .o us.p Or ti l ,S " V C.P ecsri t. M.ftrJHOL VI �' bfS.-J -rlv- Vim• Y••.vrV� •••••-.. J•••--L7-' IIv HOURS - Uvvk•y•V ITEM NO. • �-.••• Wv•r • U..y•• C...'.J • 4....4/ I vJ. )4 L W Sewer Manhole ITEM #10 /5" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: - C VA WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup e Randy Kent - Foreman 1 Excavator w/ wheel g Randy Stevens - Operator 1 Loader gj Paul Maxey - Operator 1 g C. Robertson - Pipelayer 1 g J. Sellars - Pipelayer trainee rer .il 1 h2o truck a J. Griffm - Laborer trainee I l_A(R-(Lta9.. e �f ,,,a, • — ro coC It t 016' RAiL- /cGo LaNGFa - 3Eiiv us gE man, Za -ry e5 S'r-ri L . c14t-1 t t . Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT 0.0VER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation srzt,PItitr,.; A-5 Peg, Report No. 86 Date 8-May-01 Day 833 Shift Hours: start 0700 1600 Al ut P40.4211--02.61 AA AST-, O� Ali -fG i QiAic, /i-1 TV «9iSE -oc HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 tic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup gj Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 'g C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Romax Lebefer 1 h2o truck g J. CrrifTm - Laborer trainee 1 1-Mr2tlL- g 0-aEr-1,4 • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. Date 7-May-01 Day Shift Hours: Start 0700 1600 Location & Description of Operation: Preparing to connect to the existing sewer manhole at station 60+01 at the intersection of Hemlock and Slover Avenues. Also doing general clean-up of the project. HOURS - ITEM NO. . ITEM #9 General Clean-up ITEM # Connect to txisting Manhole ITEM # 12 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: Hot and Sunny EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 2.0 6.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 2.0 6.0 J. Sellars - Pipelayer trainee 1 6.0 2.0 R. Roman - Laborer 1 h2o truck 6.0 2.0 J. Griffin - Laborer trainee Project Manager Greg Bucknell directed the Randy Kent, Pro'ectForeman to re -stripe the entire project. Public Works Inspector Steve Bauer did not work today. * All traffic control measures and signage were set and in place as per plan at close of day. Signature CITY OF FONTANA OVER AVE SEWER, FROM Report No. 84 4-M• Date ay -May • INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 831 Location & Description of Operation AVE, FONTANA, CA Shift Hours: Start 0700 1600 (1 (f t yfn+n. -- fn /v& I*t_) 09‘-' E e-tS77M 6 /' I/1 fir .., HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. • NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 b C. Robertson - Pipelayer 1 gj . J. Sellars - Pipelayer trainee ,..-r--- - re 1 h2o truck Griffin - Laborer trainee LAl3� t.. -i53J. Cl2C--Zti • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA .OVER AVE SEWER, FROM Report No. 83 Date 3-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 830 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location Description of Operation L� A 4-a0 );:. ,-C. ( c -) .x co 4 Sco-elz, /41--S N >✓i� ¶'- 4-tir' tz -(-cc. LA] J$-c.O S, HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 J Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: Ai ON — Wee Ki,i (.�✓�'L `-lnn /`16) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer • 1 h2o truck J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * AU traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) 7 Signature CITY OF FONTANA &OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation aefirMiatift.fr (_ Report No. 82 Date 2-May-01 Day 829 Shift Hours: Start 0700 1600 Of HOURS - ITEM NO. Sewer Manhole ITEM # 10 T5" Extra Strength VCP Sewer ITEM #5 Traffic Control, signing and strinina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR • EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 0 Randy Kent - Foreman 1 Excavator w/ wheel Pj Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 0 C. Robertson - Pipelayer 1 e J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per ply at close of day. (Steve Bauer) Sign —ture CITY OF FONTANA 4110aReport No. 81 VER AVE SEWER, FROM •Date 1-May-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 828 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation CoNri24-cA-2_ eLsemyr v e PrI L- w t � j ,?'t2joot C 1� a attxt,,4 $ A� A-C— -ram P2&P/d R Avt ,4vc�c !rV � - M c�Jt-4 grnoves 1.4► 1 za t� r-rc� t S'' P i ►?pw, �-i-� Ste- -I-Sb t� 54-E-� I HOURS - ITEM NO. Bore and jack 36" Steel Casino ITEM # 11 Sewer Manhole -I 3 0 15" Extra Strength VCP Sewer ITEM #5 Traffic Control, signing and strioina ITEM #2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 1 h2o truck 8.0 J. Griffin - Laborer trainee t acw(--,2. 8 /Uri Q T,4-LX U Q L z -tn MA tc.E cS- 12 4c-n,v-13 Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA •.)VER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 80 Date 30-Apr-01 Day 827 Shift Hours: Start 0700 1600 Location & Description of Operation ( J(j2G-G7LY . LF Ote. l A-N vice se3.urvie.- TXiG/Lt� HOURS - ITEM NO. ITEM # 11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: AAA -Ng) (1T) .. WARM AND CLEAR EQUIPMENT AND/OR LABOR: id jack 36" r Casino REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 ) C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee I LAger/k2 a (:ogge b4 Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation M ClIZ M 1-1 - eri- . 1611./AvlE e `7-+c o 7-0 1--1-40. (' orvwer*., cbvarb Gerarm r 14-61 17 • Report No. 79 Date 27-Apr-01 Day Shift Hours: Start 826 0700 1600 A • (.,OYUI lat.c'-�— 5 t7 111V UN M > tit Z_ \X__ I U ',JU(oV[-MI l cinrhi-rAlt Q- f .) ' (;d HOURS - ITEM NO. CANt6 our--- geeAyi�cjf t , Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina m E N Contractor: FISCHER PLUMBING Sub:'Qui &t b C.9'UG• WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup1 Randy Kent -Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 $ J. Sellars - Pipelayer trainee 1 1 h2o truck J. J. Griffin - Laborer trainee / Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA *OVER AVE SEWER. FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMtO K, AVE, FANA, CA Location & Description of 07tication C- N 571--455,1 91, P-�, Stsm- , - • Report No. 78 Date 26-Apr-01 Day Shift Hours: Start 825 0700 1600 -ort (4o r_.F s— /I HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup TS Randy Kent - Foreman 1 Excavator w/ wheel e Randy Stevens - Operator 1 Loader gj Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 0 J. Sellars - Pipelayer trainee 1 1 h2o truck J. Griffin - Laborer trainee 1 a CieraeltH Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) — Signature CITY OF FONTANA OVER AVE SEWER, FROM • Report No. 77 Date 25-Apr-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 824 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation an4c�L (A,, (�_ LF t.G lS`' v(,e et PEA (2e.M 4i-'t ,4-. S`S�►-oo 'TO `55'+(c. 0 , 4LSo ->� C-tsvAPAe'r 70 ‹- 4- — HOURS - ITEM NO. Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM #5 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Q Randy Kent - Foreman 1 Excavator w/ wheel (g Randy Stevens - Opergor 1 Loader 8 Paul Maxey' Operator 1 C. Robertson - Pipelayer 1 0 J. Sellars -*Pipelayer trainee 1 T be 1 h2o truck IR J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation: Sewer Main from Station 55+00 to Station 56+00. Report No. 76 Date 24-Apr-01 Day 823 Shift Hours: Start 0700 1600 HOURS - ITEM NO. Project Clean-up Item 5 15" Sewer Main Contractor: FISCHER PLUMBING Sub: Sunny and Clear EQUIPMENT AND/OR LABOR: . REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 • h2o truck 8.0 J. Griffin - Laborer trainee 8.0 D. Creech- Laborer LOR Geotech was also testing and observing backfill operations. See his reports for exact test locations and results. All traffic control measures and signage were set and in place as per plan at close of day. (Don Gdula) Signature Report No. 75 CITY OF FONTANA OVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Date 23-Apr-01 Day 822 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 100 LF of 15" VCP sewer pipe form Slover Ave station 54+00 to 55+00. Had substantial cleanup work to do caused by overnight rain flooding the open excavation. HOURS - ITEM NO. Bore and jack 36" Steel Casing ITEM #11 Sewer Manhole ITEM#10 15" Extra Strength VCP Sewer ITEM #5 Traffic Control, sianina and stripina ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as der plan at lose of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 74 Date 20-Apr-01 Day 821 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 125 LF of 15" VCP sewer pipe form Slover Ave station 52+75 to 54+00. Set box for Manhole # 11. HOURS - ITEM NO. Bore and jack 36" Steel Casina ITEM #11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, sianina and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 73 CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Date 19-Apr-01 Day 820 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 175 LF of 15" VCP sewer pipe form Stover Ave station 51+00 to 52+75. HOURS - ITEM NO. ITEM # 11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM#2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR and jack 36" eel Casino EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 . R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of da (Steve Bauer) Signature Report No. 72 CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Date 18-Apr-01 Day • 819 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 125 LF of 15" VCP sewer pipe form Slover Ave station 49+75 to 51+00. Set box for Manhole # 10. HOURS - ITEM NO. Bore and jack 36" Steel Casing ITEM #11 Sewer Manhole ITEM #10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer . 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan t close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT OOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 71 Date 17-Apr-01 Day 818 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 175 LF of 15" VCP sewer pipe form Slover Ave station 48+00 to 49+75. HOURS - ITEM NO. Bore and jack 36" Steel Casing ITEM #11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. ' NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per pla at close of da (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT Ilk_OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 70 Date 16-Apr-01 Day 817 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 70 LF of 15" VCP sewer pipe form Stover Ave station 47+30 to 48+00. Removed bore pit shoring and laid pipe out of Manhole # 9. Note: LD King surveyors on site and shot elevation of existing invert at station 60+10,and found it to be 0.44' lower than is shown on the plans. Steve Nix apprised and directed contractor to continue, with new slope to be considerably flatter. Fontana H2O Co repairing broken 10" water main from last Friday. HOURS - ITEM NO. Bore and jack 36" Steel Casing ITEM#11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at lose of da (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Location & Description of Operation: I did not work today; See Don Gdula's diary this date. Report No. 69 Date 13-Apr-01 Day 816 Shift Hours: Start 0700 1600 HOURS - ITEM NO. ITEM # 11 Sewer Manhole ITEM#10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR and jack 36" eel Casing EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. *Alltraffic control measures and signage were set and in place as per plan at c se of da . (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 68 Date 12-Apr-01 Day 815 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 80 LF of 15" VCP sewer pipe from Stover Ave station 46+00 to 45+20 HOURS - ITEM NO. Bore and jack 36" Steel_Casina ITEM # 11 Sewer Manhole ITEM#10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, sianina and striping ITEM # 2 Contractor: FISCHER PLUMBING• Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT 'OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 67 Date 11-Apr-01 Day 814 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer laid 100 LF of 15" VCP sewer pipe from Stover Ave station 43+20 to 44+20 Inland Concrete poured Manholes # 8 & 9 Inland Concrete stacked Manholes # 6 & 7. Began working down from receiving pit, excavated to Manhole # 8. Ayala clearing out all their equipment. HOURS - ITEM NO. • Bore and jack 36" Steel Casina ITEM#11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, ._signing and striping_ ITEM # 2 Contractor: FISCHER PLUMBING Sub: Ayala Boring COOL AND CLOUDY EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Laborer 6.0 Inland Concrete Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of da (Steve Bauer) Signature CITY OF FONTANA OVER AVE SEWER, FROM • Report No. 66 Date 10-Apr-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 813 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: Ayala jacked 96 LF of 15" VCP through 36" steel casing and blew sand in around it. Contractor air tested sewer main line on Slover Ave from station 34+00 to 44+00 Inland Concrete poured Manholes # 6 & 7. HOURS - ITEM NO. • Bore and jack 36" Steel Casing ITEM #11 Sewer Manhole ITEM #10 15" Extra Strength VCP Sewer _ -'t rn E cn Traffic Control, signing and strinina ITEM #.2 Contractor: FISCHER PLUMBING Sub: Ayala Boring COOL AND CLOUDY Inland Concrete EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Drill rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 Eduardo Soto - Laborer 1 8.0 Rafael Sandez -Laborer 1 Laborer 6.0 Inland Concrete Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signa, a were set and in • lace as •er • la; at close of da Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 65 Date 9-Apr-01 Day 812 Shift Hours: Start 0700 1600 Location & Description of Operation: No Item work performed today due to inclement weather. Rain over the weekend had caused substantial caving around the trench excavation. Contractor spent most of the day making repairs. Ayala could not jack any pipe through the casing due to having incorrectly sized pipe support brackets: HOURS - ITEM NO. Bore and jack 36" Steel Casina ITEM # 11 Sewer Manhole ITEM # 10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, sianina and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Ayala Boring NON -WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee 1 Drill rig/truck Ismael Cervantes - Foreman 1 Boring rig and bits Eduardo Soto - Laborer 1 Rafael Sandez - Laborer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 64 Date 6-Apr-01 Day 811 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer excavated and laid 40 LF of 15" VCP sewer pipe from Slover Ave station 42+80 TO 43 Ayala jacked remaining 26 LF of 36" steel casing through to receiving pit. HOURS - ITEM NO. Bore and jack 36" Steel Casino ITEM #11 Sewer Manhole ITEM#10 15" Extra Strength VCP Sewer ITEM #5 Traffic Control, sianina and striping ITEM #2 Contractor: FISCHER PLUMBING Sub: Ayala Boring CLOUDY AND COOL EQUIPMENT AND/OR LABOR: • REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION . (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens •- Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Drill rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 Eduardo Soto - Laborer 1 8.0 Rafael Sandez - Laborer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and si • na • e were set and in •lace as • er • Ian at close of da Report No. 63 CITY OF FONTANA OOVER AVE SEWER, FROM Date 5-Apr-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 810 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer excavated and laid 160 LF of 15" VCP sewer pipe from Slover Ave station 41+20 to 42 Also set box for Manhole # 7. Ayala hit rock during bore, spent much of day making repairs. Total of 10 LF of 36" steel casing was jacked today. HOURS - ITEM NO. ITEM#11 Sewer Manhole ITEM #10 15" Extra Strength VCP Sewer ITEM # 5 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: Ayala Boring CLOUDY AND COOL and jack 36" eel Casing EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Drill rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 Eduardo Soto - Laborer 1 8.0 Rafael Sandez - Laborer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at lose of da (Steve Bauer) Igna ure CITY OF FONTANA INSPECTOR'S DAILY REPORT OOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 62 Date 4-Apr-01 Day 809 Shift Hours: Start 0700 1600 Location & Description of Operation: Fischer excavated receiving pit for railroad bore; also excavated and laid 120 LF of 15" VCP sewer pipe from Slover Ave. station 40+00 to 41+20 Ayala had to make an alignment correction, only 20 LF of 36" casing was jacked today. HOURS - ITEM NO. Bore and jack 36" Steel Casina ITEM # 11 Sewer Manhole ITEM # 10 /5" Extra Strength VCP Sewer ITEM #5 Traffic Control, sianina and striping ITEM #2 Contractor: FISCHER PLUMBING Sub: Ayala Boring CLOUDY AND COOL EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator • 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Drill rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 • Eduardo Soto - Laborer 1 8.0 Rafael Sandez - Laborer • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and si nage were set and in place as per plan at close of da (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, 'FONTANA, CA Report No. 61 Date 3-Apr-01 Day 808 Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 110 LF of 15" VCP sewer pipe from Stover Ave station 38+90 to 40+00. Ayala Boring jacked 40 LF of 36" steel casing under railroad tracks. Fischer to excavate receiving pit tomorrow (Wednesday); Ayala expects to complete bore/jack operation on Thursday. Gave Randy (Fischer supt) copy of cut sheets through 43+00. HOURS - ITEM NO. Bore and Jack 36" Stee► Casino ITEM # 11 15" Extra Strength VCP Sewer ITEM#5 -. m at CD "- O0 tD ITEM # 10 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: AyalaBoring WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer • 1 h2o truck 8.0 • J. Griffin - Laborer trainee 1 Drill Rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 Eduardo Soto - Laborer 1 8.0 Rafael Sandez - Laborer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. Steve Bauer Signature CITY OF FONTANA *LOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK AVE, FONTANA, CA • Report No. 60 Date 2-Apr-01 Day 807 Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 225 LF of 15" VCP sewer pipe from Slover Ave station 36+65 to 38+90 Ayala Boring setting up in bore pit to jack 36" steel casing under railroad tracks. Marcie Goodman (Cal -OSHA Mining and Tunneling Assoc Engineer) on site running through checklist with Ayala workers. Said all is HOURS - ITEM NO. Bore and Jack 36" Steel Casina ITEM # 11 15" Extra Strength VCP Sewer ITEM # 5 Sewer Manhole (5' diameter) ITEM #10 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Ayala Boring WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Drill Rig/truck 8.0 Ismael Cervantes - Foreman 1 Boring rig and bits 8.0 Eduardo Soto - Laborer Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. *All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 59 CITY OF FONTANA ("OVER AVE SEWER, FROM Date 30-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 806 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 65 LF of 15" VCP sewer pipe from Slover Ave station 36+00 to 36+65. Boxes and plates set in manholes # 4B and 5. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 15" Extra Strength VCP Sewer ITEM #5 Sewer Manhole (5' diameter) ITEM #10 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Screening running just ahead to provide clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. Steve Bauer Signature Report No. 58 CITY OF FONTANA ...OVER AVE SEWER, FROM • Date 29-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 805 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor excavating bore pit at Slover Ave station 47+23 to 47+68 as per plan. Mike Fischer visited site. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 15" Extra Strength VCP Sewer ITEM # 5 Sewer Manhole (5' diameter) ITEM #10 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Screening running just ahead to provide clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 57 CITY OF FONTANA •OVER AVE SEWER, FROM . Date 28-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 804 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 150 LF of 15" VCP sewer pipe from Slover Ave station 34+50 to 36+00. Edison had PAR Electrical contractor on site with drill rig to securely hold Edison power pole while Fischer trenched and laid pipe adjacent to it. No movement of pole was detected, and PAR truck was on site from 08:00 - 10:00 hrs. Broke irrigation line at station 36+15 at 09:50 hrs, repairs made immediately. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM #9 15" Extra Strength VCP Sewer ITEM # 5 Sewer Manhole (5' diameter) ITEM #10 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete• WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 drill rig 2.0 John Phillips - PAR Electrical ' • Screening running just ahead to provide clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. Steve Bauer Signature Report No. 56 CITY OF FONTANA ...OVER AVE SEWER, FROM >� Date 27-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 803 AVE, FONTANA, CA Shift Hours: Start 0700 1600 • • Location & Description of Operation Contractor laid 50 LF of 15" VCP sewer pipe out of manhole # 4A to Slover Ave station 341 Backfilled and compacted remainder of Redwood Ave and picked up closure. Inland Concrete stacked manholes # 4 and 4A. Pulled shields around manholes and backfilled. HOURS - ITEM NO. . ITEM # 9 15" Extra Strength VCP Sewer ITEM #5 Sewer Manhole (5' diameter) ITEM # 10 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: Inland Concrete WARM AND CLEAR 2 Sewer lateral 'out!? side) • EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 truck 2.0 Inland Concrete Screening running just ahead to provide clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 55 CITY OF FONTANA .OVER AVE SEWER, FROM • Date 26-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 802 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Contractor laid 75 LF of 15" VCP sewer pipe out of manhole #4 north on Redwood Ave and plugged end with cap. Inland Concrete poured bottoms of manholes # 4 and 4A. Backfilled and compacted northernmost 50' of 15" VCP on Redwood Ave. 12' wide lane was left open for emergency vehicle access to Redwood, north of Slover. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM #9 15" Extra Strength VCP Sewer ITEM # 5 Sewer Manhole (5' diameter) ITEM#10 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer . 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 truck 6.0 Inland Concrete • Don Gdula (city of Fontana) onsite locating laterals with Mr. Wetzel. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 54 CITY OF FONTANA ()LOVER AVE SEWER, FROM Date 23-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 801 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 40 LF of 15" VCP sewer pipe from Slover Ave station 33+60 to 34+00. Pipe was laid between manholes 4 and 4a. Set manhole boxes in both manholes. Numerous potholes were used to locate various utility crossings. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 15" Extra Strength VCP Sewer ITEM # 5 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: PARTLY CLOUDY EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan close of day. Th (Steve Bauer) Si nature Report No. 53 CITY OF FONTANA •OVER AVE SEWER, FROM • Date 22-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 800 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 210 LF of 18" VCP sewer pipe from Slover Ave station 31+70 to 33+60. Also excavated for manhole #4 in intersection of Redwood and Stover. Note: Requested load tickets for AC placed on 3/16/01 from Randy. He says he will bring from the office. Also directed Randy to OBLITERATE (as per plan) any striping that had been blacked out or painted previously. He will do tomorrow Fiber-optic rep was contacted by Randy, and will be onsite tomorrow to observe work around their trunks. HOURS - ITEM NO. 6" VCP Sewer lateral (Snutth side) ITEM # 9 Sewer Manhole (5' diameter) ITEM#10 78 a ren Sewer ITEM # 4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks)• EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee . • • Note: L.O.R. Geotech onsite full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 52 CITY OF FONTANA LOVER AVE SEWER, FROM S Date 21-Mat-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 799 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Contractor spent entire day moving k-rail and signage from east of Cherry Ave to east of Redwood Ave, station 33+30 to 35+30. Everything went smoothly, and contractor cleaned up area where k-rail had been placed usin H2O truck. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 � 'm v!• co 3 C z 0 ITEM#10 00 co)II) '1 0 0.MEN ITEM # 4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer ignature Report No. 51 CITY OF FONTANA OLOVER AVE SEWER, FROM Date 20-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 798 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 150 LF of 18" VCP sewer pipe from Slover Ave station 30+20 to 31+70. Also Inland Concrete had one man crew form and 'pour bottom of Manhole #3 at station 30+20. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 Sewer Manhole (5' diameter) ITEM #10 118" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 76 1 truck 3.0 Art Navarro - Inland Concrete Note: Contractor has screen operation running just in front of heading to generate clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * Alltraffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 50 CITY OF FONTANA 4Ip_OVER AVE SEWER, FROM • Date 19-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 797 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Contractor laid 220 LF of 18" VCP sewer pipe from Slover Ave station 28+00 to 30+20. Also excavated for manhole at station 30+20, and set box. HOURS - ITEM NO. ITEM#9 Asphalt Concrete Pavement ITEM#17 18" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR ' Sewer lateral 'outh side) EQUIPMENT AND/OR LABOR: • REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee • Note: Contractor has screen operation running just in front of heading to generate clean backfill material. Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer Signature Report No. 49 CITY OF FONTANA ...OVER AVE SEWER, FROM Date 16-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 796 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid AC paving in Slover Ave sewer main and laterals sta 21+00 to 23+25. Also paved existing water main trench with same section. Previously built H2O line had been brought to subgrade with a class II base, so only some compactive effort was necessary in that trE HOURS - ITEM NO. ITEM #9 Asphalt Concrete Pavement ITEM # 17 18" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strioina ITEM #2 Contractor: FISCHER PLUMBING Sub: CLEAR J Sewer lateral outh side) EQUIPMENT AND/OR LABOR: • REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee AC (AR4000) Quantities: SEWER MAIN: (0.375')(6.0')(225') = 506.2; 506.2/27=18.75cy Sewer laterals: (0.375)(7.0)(19) = 49.9; 49.9/27= 1.85cy times two = 3.69ch H2O main (0.375)(2.5)(225) = 210.93; 210.93/27 = 7.81cy Picked up closure and had Al Girardot restore left turn function to the traffic light at Cherry and Slover, back to it's typical s Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plap at close of day. (Steve Bauer) Signature Report No. 48 CITY OF FONTANA .OVER AVE SEWER, FROM • Date 15-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 795 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Contractor placed class II aggregate base course on previously prepared native subgrade. Base section was placed in a 6" minimum thickness from sta 21+00 to 23+25. Compaction was achieved using vibratory drum roller: as well as wheel rolling with loader. Previously built H2O line had been brought to subgrade with a class II base, so only some compactive effort was necessary in that to HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 Class 2 Aggregate Base ITEM #18 1a" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strinina ITEM #2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. Report No. 46 CITY OF FONTANA &OVER AVE SEWER, FROM • Date 13-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 793 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor poured new curb and gutter at stations 21+62 and 22+49 Removed temp AC and backfill within limits of trench main line and laterals to depth of 1 foot. Subgrade was then h2o conditiioned and compacted prior to being tested by. LOR geotech. Contractor also removed cold mix used previously by the Fontana Water Co to cap off their trench excavation. The limits for both the sewer main and the h2o main are Sloyer Ave sta 21+00 to 23+25 HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 6" VCP Sewer lateral (North side) ITEM #8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR • EQUIPMENT AND/OR LABOR:• REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0. J. Griffin - Laborer trainee REMbVAL'<LIMITS FOR TODAY: Sewer main = 225' X 6' X 1" (sta 21+00 to 23+25) twosewer laterals (ea) = 19' X 7' X 1' (sta 21+62 & 22+49) Limits of Extra Work on existing H2O main = 225 X 2.5 X .5 (sta 21+00 to 23+25) (See Extra Work Diary for further info) Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 45 CITY OF FONTANA OVER AVE SEWER, FROM • Date 12-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 792 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation Laid 29 LF of 8" VCP out of manhole #1. Pipe was backfilled using single sack slurry. 'Contractor broke a VCP wye that had been previousluy installed. Attempt was made to epoxy the repair, but it didn't appear it would be adequate. Repair was then made using couplers and bands. HOURS - ITEM NO. 6" VCP Sewer lateral /North side) ITEM # 8 8 "VCP Sewer wisoecial backfill ITEM # 7 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) . EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader ' 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Contractor has screening operation running just in front of the heading to generate clean fill material. Note:.L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 44 CITY OF FONTANA •OVER AVE SEWER, FROM • Date 9-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 791 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Inland Concrete on site with one man to pour manhole #2. Also worked on cleaning up and backfilling and compacting laterals. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete CLEAR ' Sewer lateral outh side) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee • Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. *All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 43 CITY OF FONTANA *OVER AVE SEWER, FROM • Date 8-Mar-01- INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 790 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Contractor laid 300 LF of 18" VCP sewer main from Slover Ave station 25+00 to 28+00. Randy asked about what paving section is required to replace the existing AC removed within trench limits. 4.5" of AC over 6* of compacted base course is specified as per plan. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR ° Sewer lateral outh side) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee Note: L.O.R. Geotech on site full time to observe and test all backfill operations. See his diary for exact test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 42 CITY OF FONTANA &OVER AVE SEWER, FROM • Date 7-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 789 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation No work performed due to inclement weather. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM #9 6" VCP Sewer lateral (North side) ITEM #8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strioina ITEM #2 Contractor: FISCHER PLUMBING Sub: NON WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 41 CITY OF FONTANA 411111..OVER AVE SEWER, FROM • Date 6-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 788 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation No work performed due to inclement weather. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM#9 6" VCP Sewer lateral (North side) . ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and strioina ITEM # 2 Contractor: FISCHER PLUMBING Sub: NON -WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman • 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 40 CITY OF FONTANA *OVER AVE SEWER, FROM • Date 5-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 787 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Excavated and laid 200 LF of 18" VCP sewer main at Slover Ave station 23+00 to 25+00. Contractor requested the city to provide video testing of the pipe laid to date. Request denied, as the city does not provide this servic Requested Randy to replace the cones presently being utilized for traffic control with channelizers, epoxied in place (as per plan). HOURS - ITEM NO. 4 iG ITEM #9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strioina ITEM#2 Contractor: FISCHER PLUMBING Sub: COLD AND WET 0 0 EQUIPMENT AND/OR LABOR: s Q: E rai �D a) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee • Contractor has screening operation working just in front of the heading to generate select backfill material. Note: L.O.R. geotech on site full time to observe and test all backfill operations. See his daily for test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 39 CITY OF FONTANA 411110LOVER AVE SEWER, FROM • Date 2-Mar-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 786 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Excavated and laid 16 LF of 6" VCP sewer lateral at Slover Ave station 22+49 (north side) Note: Because the city was not in receipt of a signed "right of entry" release form from the property owner, the referenced lateral was only extended to the limit of the existing county right of way, and no clean -out was installed. . HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM #4 Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer. 1 h2o truck 8.0 J. Griffin - Laborer trainee Contractor has screening operation working just in front of the heading to generate select backfill material. . Note: L.O.R. geotech on site full time to observe and test all backfill operations. See his daily for test locations and results. * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) Signature Report No. 38 CITY OF FONTANA •OVER AVE SEWER, FROM • Date 1-Mar-01 INSPECTOR'S DAILY REPORT ' CHERRY AVE TO HEMLOCK Day 785 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation Excavated and laid 18 LF of 6" VCP sewer lateral at Slover Ave station 21+62 (north side) Poured base of manhole #1 Pipe was shaded using 3/4" rock, then backfilled and compacted with screened native spoils. HOURS - ITEM NO. 6" VCP Sewer lateral (South side) 3 co m 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer 3 .la Traffic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: Inland Concrete WARM AND CLEAR EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or othet remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 • C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 4.0 4.0 J. Griffin - Laborer trainee • Contractor has screening operation working just in front of the heading to generate select backfill material. Note: L.O.R. geotech on site full time to observe and test all backfill operations. See his daily for test locations and results. * All traffic control measures and signage were set and in place as per pl at close of day. (Steve Bauer) Sig i dire Report No. 37 CITY OF FONTANA OVER AVE SEWER, FROM • Date 28-Feb-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 784 AVE, FONTANA, CA Shift Hours: start 0700 1600 Location & Description of Operation No work today due to inclement weather. • HOURS - ITEM NO. 6" VCP Sewer lateral (South side) ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 tic Control, signing and strinina ITEM # 2 Contractor: FISCHER PLUMBING Sub: NON -WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per pl at close of day. (Steve Bauer) Signature Report No. 36 CITY OF FONTANA OLOVER AVE SEWER, FROM Date 27-Feb-01 INSPECTOR'S DAILY REPORT CHERRY AVE TO HEMLOCK Day 783 AVE, FONTANA, CA Shift Hours: Start 0700 1600 Location & Description of Operation: No work today due to inclement weather. Set manhole box protection around MH # 1. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" txtra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: NON -WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: ewer lateral -- th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per plan at close of da (Steve Bauer) Signature Report No. 35 CITY OF FONTANA INSPECTOR'S DAILY REPORT LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation: No work today due to inclement weather. Date 26-Feb-01 Day 782 Shift Hours: Start 0700 1600 NOTE: Advised Randy of need to obliterate existing striping immediately, as rain had washed away black paint over the weekend. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM#8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: NON -WORKING DAY (RAIN) • EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader • Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee • * All traffic control measures and signage were set and in place as per plan at plose of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT 4IPLOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Location & Description of Operation: No work performed today due to inclement weather. Report No. 34 Date 23-Feb-01 Day 781 Shift Hours: Start 0700 1600 HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: NON -WORKING DAY (RAIN) EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup Randy Kent - Foreman 1 Excavator w/ wheel Randy Stevens - Operator 1 Loader Paul Maxey - Operator 1 C. Robertson - Pipelayer 1 J. Sellars - Pipelayer trainee 1 R. Roman - Laborer 1 h2o truck J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per plan at close a of day. (Steve Bauer) Signature Report No. 33 CITY OF FONTANA INSPECTOR'S DAILY REPORT OVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Date 22-Feb-01 Day 780 Shift Hours: Start 0700 1600 Location & Description of Operation: Contractor laid 84 LF of 18" VCP sewer main from Stover Ave station 22+16 to 23+00. Broke h2o service line at sta 22+70. Fontana Water Co contacted and repaired. Reset K-rail as per approved plan. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: PARTLY CLOUDY • EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION . (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 . 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee NOTE: L.O.R. geotech on site to observe and test all backfill operations. See his diary this date for compaction results. * All traffic control measures and signage were set and in place as per plan atclose of da (Steve Bauer) Signature Report No. 32 CITY OF FONTANA LOVER AVE SEWER, FROM INSPECTOR'S DAILY REPORT • CHERRY AVE TO HEMLOCK AVE,FONTANA,CA Date 21-Feb-01 Day 779 Shift Hours: Start 0700 1600 Location & Description of Operation: Contractor laid 100 LF of 18" VCP sewer main from Slover Ave station 21+16 to 22+16. Reset K-rail as per approved plan. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer -=I m E Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: PARTLY CLOUDY EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee NOTE: L.O.R. geotech on site to observe and test all backfill operations. See his diary this date for compaction results. * All traffic control measures and signage were set and in place as per plat at close of day. (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 31 Date 20-Feb-01 Day 778 Shift Hours: Start 0700 1600 Location & Description of Operation: Contractor laid 16 LF of 18" VCP sewer main from Slover Ave station 21+00 to 21+16. Potholed ahead for utility crossings. Removed existing AC within saw -cut mainline and lateral trenches, and stockpiled for export. Reset K-rail as per approved plan. HOURS - ITEM NO. ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee ' 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee * All traffic control measures and signage were set and in place as per plan at close of day. (Steve Bauer) atu re CITY OF FONTANA INSPECTOR'S DAILY REPORT OLOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 30 Date 19-Feb-01 Day Shift Hours: Start 0700 1600 Location & Description of Operation: Contractor saw -cutting and removing existing AC section on Slover sta. 21+00 to 26+00. Existing AC was observed to be over 8" thick in many sections. Potholing for utilities. HOURS - ITEM NO. ITEM # 9 Potholes ITEM # 3 R&R 4" PCC Sidewalk ITEM # 14 Traffic Control, signing and striping ITEM #2 Contractor: FISCHER PLUMBING Sub: Bonnet Const. HOLIDAY EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader. Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 1 Saw -cutting AC 8.0 Bonnet Const. Reminded Randy of need to obliterate existing striping asap. * All traffic control measures and signage were set and in place as per plan at, lose of da (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT *LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 29 Date 16-Feb-01 Day 777 Shift Hours: Start 0700 1600 Location & Description of Operation: Met with Randy Kent and Eric Lewis at city of Fontana office in AM to go over plan for placement of k-rail on Stover construction area. Submitted plan was approved for immediate installation. Striping was completed on Stover Ave from Redwood to Cherry, including 300 LF of K-rail. HOURS - ITEM NO. ITEM#9 6" VCP Sewer lateral (North side) ITEM # 8 18" txtra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping -i m E It N Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee 8.0 B. Stein - Laborer Reminded Randy of need to obliterate existing striping asap. * All traffic control measures and signage were set and in place as per pla at close of da (Steve Bauer) Signature CITY OF FONTANA INSPECTOR'S DAILY REPORT 'LOVER AVE SEWER, FROM CHERRY AVE TO HEMLOCK AVE, FONTANA, CA Report No. 28 Date 15-Feb-01 Day 776 Shift Hours: Start 0700 1600 Location & Description of Operation: Contractor painted white fog line along westbound Slover Ave from Redwood to Cherry. NOTE: Existing lane striping was painted black temporarily, but Randy will obliterate as per plan next week. Met in field with traffic reps Al Giardot in AM and Tom Neary in PM to review proposed traffic plan. After observing the approved closure under afternoon traffic conditions it was determined to be unsatisfactory, due to safety factors. Following meetings with Clyde Sweet and Greg Bucknell the use of K-rail as necessary was approved under contract change order. Contractor to submit new plan to me in the AM prior to meeting with Eric Lewis and myself HOURS - ITEM NO. for approval. Clyde mentioned 45 degree tapers on all k-rail placed near edge of traveled w ITEM # 9 6" VCP Sewer lateral (North side) ITEM # 8 18" Extra Strength VCP Sewer ITEM # 4 Traffic Control, signing and striping ITEM # 2 Contractor: FISCHER PLUMBING Sub: CLEAR EQUIPMENT AND/OR LABOR: ewer lateral th side) REMARKS (Reason for Idleness or other remarks) EQPT. NO. NO. MEN DESCRIPTION (Of Equipment or Labor) 1 3/4 Ton Pickup 8.0 Randy Kent - Foreman 1 Excavator w/ wheel 8.0 Randy Stevens - Operator 1 Loader 8.0 Paul Maxey - Operator 1 8.0 C. Robertson - Pipelayer 1 8.0 J. Sellars - Pipelayer trainee 1 8.0 R. Roman - Laborer 1 h2o truck 8.0 J. Griffin - Laborer trainee K-rail delivered today and will be placed following meeting with Eric Lewis Reminded Randy of need to obliterate existing striping asap. Note: L.O.R. geotech onsite to observe and test all backfill operations. * All traffic control measures and signage were set and in place as er plan at c se of day. (Steve Bauer) Signature t: 6 CITY OF FONTANA INSPECTORS DAILY REPORT Report No. 2_•- Day 7 7 Dats: 14 M T/ I F S 8 CVd. Day �f Shift Nouns: Statb Stop r 400 Stover Ave Sewer, HOURS �,I NO. WEATHER btwn Cherry and Hemlock. CONTRACTOR: PSCNe-2... PWM6UI6. • cam/ �� • EQUIPMENTANDOR LIBOR: • REMARKS EQUIPMENT NO. ' NO. OF MEN DESORPTION (Of Equlpmsrt or labor) • (Reason for Idleness or Other Remarks) I • 'nay c.<„, • {Z.. c-(— — sc.),Pr. I a LoaDE Q . C� PC?''e-10 f� AG[c ffoa- Kil �r 1 ? { PGLAV E:'2 C. • geerccf4 • i e)P6 IVAII46 d% SeuA 2 5 I L.A A iP._.Fr R • .oM A I LA&Ofl +2..TiAA► .,:r. ,cets.k. es.c. V 1C(Sel 2 .eL 54 ice M � IL 4I ,.s Pa1LC-. •L.J t-r}.I- 12A-rLSu c . ii ko `(LF a V cSG- �C21rNC . 45, ! S C-e1<!'NG- `TbFie.c S O. Tot t Luc cab d,0 < ( rE -rz:3 P ec. e.-455P- -ra/Nlo e €31,0 .-15 TES r . • • • CONTRACTOR TTTLE INSPECTOR !; .. CITY OF FONTANA • Report No. ZJb INSPECTORS DAILY REPORT Date: t 3 'O 1 M f T F S 8��i,rr �MDay�ete D sw ours: Sbatb7C Stop (i3OO Stover Ave Sewer, btwn Cherry and Hemlock. . ... __ CPI /,.. G CONTRACTOR: HOURS ITEM NO. WEATHER . p_A44 ierti R9 ARKS (Reason for idleness or Other Remres) EQUIPMEMAMOR LABOTt EQUIPMENT NO. • NO. OF MEN DESCRIPTION (Of Equipment or Labor) I • 2_• 1rr — "suPT. Sg oo Q . N�- P tt� � •-Mt)CA AG(�o= K 1 p ! PGLAV�2. iJr-sa G•€EPT5o, • l P,PE . *JEC� d% SEt.:L 2 6 1 LARr' ee& R.•oMA I g. S . LA&Ol .1T AIM : _ _i . ••4.F,.-1,F° 1*-a. • 7-t - A-AM177M g (Zed IS Pc s .- 0-vaiA/6 - AtiL SUM w Al-S2_ l 12A-pl: (t= CO JT 2-OL / N Vc.4-CS L6co K--t fr,I, 6 a , • • - ` /1 CONTRACTOR INSPECTOR CRY OF FONTANA INSPECTORS DAILY REPORT • Report No. Day T 7- Die: 12- 0 1 AA T W T F S$ Cfrd° Day SI MRHours: SIa,IO7COSIOF (&Oa Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: >�SCN . 80048ini6 HOURS ITEM NO. • WEATHER PA) IL) Mil REMARKS • (Reason for Idleness or Other Remarks) EQUIPMENT ANDOR LABOR EQUIPMENT NO. • NO. OF MEN DESCRIPTION Equipment or Labor) 1 • .�(Of I 2.) C.1. j /� {`►. • v ii'.E'!r — 'J l.�i''ri FNI' a g,, LOOM Q . p PC2/kT�'� (L i 1gAGtLffo- K. lT� if p I Pr LI 4E& w-oo • I viPe.-re tfa C.. set.:Ls:frLs 1 LA A Qfr1Z. R. '' �.oMAfa 1 LA&Of1 2. I .T'.l F'�It4 _ • 100 u (rfa(C — ."-ri st..C. A 4-rr ►t2 , I.5 PLA S 01-710 1,4,11 k - 4-+—erk Ai vz _-7724F(C.- N.G4-5%)12E5 fiu P1utl-CE il-AvLeirrlG4/ J G._ 6.-cxc, CONTRACTOR TITLE INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT HOURS ITEM No. PROJECT: .--IntrrIZ AVE.R CONTRACTOR: Ftatiln CIA a 14M-tuirK cg ault PS1t&Q EQUIPMENT ANDIOR LABOR: EQUIPMENT NO.OF' DESCRIPTION NO, MEN (Of:Equirmsnt ar.Lai/or) Report No. 04 • Day Data Z^1{— 01 M T W TOSS Mole Da; Shift Hours: Start Stop WEATHER* REMARKS (Reason for Idleness or • •• Other R marks). t\sD VJc2KTTDDP'1 0.1Gcte0 I01R\C w4K.:ct-- 61 CONTRACTOR TITLE INSPECTOR 1; / CITY OF FONTANA INSPECTOR'S DAILY REPORT • Report No. 2* M T Y(2)12 9 8 Crete Day 9nnt Noun: Sfardb709Stop ((e Da Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: ISc14 Q.. Pwt1t 3 inG HOURS I NO. WEATHER REMARKS • (Roman for Idleness or Other Remarks) EQUIPMENT AMON LABOit EQUIPMENT NO. ' NO. OF MEN DESORPTION (Of Equipment or tabor) ( • c_ 12_ • G1/4(-r- -- l��-r LOA E4 . b e • 1- 0 PC' ' "C'o (_ AG(�f{o� K- it A �BeerSANs, I PIPEt-Mar4EC� 6'. SEL:1Al2..6 I L4P veeke R. c�MAt�At I LA& ►t t Cgs l S .. 6.e x °Pit•1. • C f S03-0 Sc-a)Vc-✓Z / w TI r liJ (-F �i et1M- e b i (_ %--PNl 2 - 6U - 'To f-or Aert0-:52_ co..., G-�L lji e A-C,2rC--Z Dom( -r}4 To Cg6s + -- 4-c'e bt-i-wr- 'Mt. E it. ci,J Chu t c�.-75 ► vim. c5 , CA-5 Psz . 024,,,,t,..16., Ccif) Tge (--AcC'" t(; -r- c9 i ei�4-r . � (b2M (2. ( ur Co Cw�S ca-PAr� _eL la -1$ I — t 4:k 0 48o I S ') , -ritt Stir 1--o c 6c xe- 1,(A -r L.../r . • • • CONTRACTOR TITLE f. 0 CRY OF FONTANA INSPECTOR'S DAILY REPORT • RepofNo. Z' Day 7 7'v Y T F S 8 Circle Day MMus: slaRb'T4(JSIoF ((ram00 Stover Ave Sewer, btwn Cherry and Hemlock. • • comuzron: iScN . L(JM1i/NG HOURS ITEM NO. WEATHER• RHIARKS • (Reason for Idleness or Mar Remake) EQUIPMENT MINOR LABOR: EQUIPMENT NO. • NO. OF MEN DESCRIPTION (Of Equlpment or labor) • I 44 Lok<oeiL� Q ef- — cpsPG-2 `TZ'� ►SAG( o1= K. $ p 1 PGLAV G . k•-•ge trscps • I PIP • ' TQP4►JEC-s �. Set-Li42.5 I l._.A:R Q iZ R•• R� oMAf.1 I LA& 7fg(C.TI2A►Maw .: -1i9))a. , • IA)M t7 LL ti.l (5-_. to-74 (G (I s PLA-NS is 2C-�I, aV ,'J1 (0L5 , • • • • CONTRACTOR TITLE INSPECTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. coNrw►croR €e__ r/�Mern G HOURS REM NO. • (/// (� Reim Na Day ��J — I ONE M�WTF S 8 ands Day umHosn: slaMaDstap ((,Oa WEATHER EOUIPYENTIWD OR LABOR: EQUIPMENT NO. • NO. OF MEN DESCRPTfON (Of Equipment or tabor) FIB/ARKS (Roman far Idleness or Other Rsmsrb) I 1TJ) C� 044 Lotkoefl- (SACt ow PIP 1PULAVrR2 ega L f &fXlg2.-T AI P • p CI't't� fL C.gra4 R.. oMA ge.A.5.904 F i /.0 er2k / i 'rl c u t&J Ai-rii (--94 1 l Sl b i5 1s P CITY OF FONTANA Repot No. al Day --(Qv INSPECTOR'S DAILY REPORT Stover Ave Sewer, btwn Cherry and Hemlock. cormuctort: �'ISCN t�UJM6inIG EQUIPMENT AND/OR LABOR EQUIPMENT NO.' NO. OF M9�1 DESCRIPTION (Of EgWpment or labor) HOURS ITEM NO. • Dme Z-S- 0 vrWTFSs��yy��codeDay Shift Hours: SIandtOStop (600 WEATHER REMARKS (Roman for Menem or Other Remarks) 1 4,4 l.Cutozze l- AG(Jo- IPILA . elf ^rQp IrJE LA�i�C� 2 L 60 k..Ti1Att p. M r PG2A-r02_ K._v(Sper S�trLAT.S.1 CZ.,oMA CFI P4 /U 0 1,JC ( gz-I n� d lvsv(S t T2.frert - Suet/ G�J ce aA) tn.) , s t rE -nn 'r v Czao (1ZCC-E( v A1c -' Cvf4ic-r- cgs62vc_ C? �t►2dc- M vr7c%S . !E- J - lA) E L J f . Aprei (d i P-4-Nuf a f p ) errvD 5Ael S'..(3 c - ro (2 i { , R-E- tJ) t (-- t: d c(Y OF FONTANA' INSPECTORS DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. CONTRAcrOR: ISCN€� f j/ 16(N6 EQUIPMENT AND/OR LABOR EQUIPMENT NO. NO. OF IIEN DESCRIPTION (Of Equlpernt or Labor) 044 Lot>rD&. 8 A -ifo HOURS ITEM NO. II T W 1 )S 8 Crete Day Shift Hours: Sledb700Step (400 WEAThER PIpi 176LAVE4 P ,-reA4PEC� AA egIZ L, Of 2.' 1 A)$. REMARKS (Reason for Idleness or Other Rrnerb) fL. L.2+PT ttlAxEy —. i c tt seas om r,e,vt r21I-Ur?XT c)i .r) iv -or- we) t2(>= —fit 6j JbJ) n1 tr,) Cam-/ -LC-- ce CRY OF FONTANA INSPECTOR'S DAILY REPORT • Report No. l 4 D. — fi T 11S B Haim Circle Ow d� ShiftHSlatt(�TC Stop ((�,OO Slover Ave Sewer, btwn Cherry and Hemlock. ... _ . :.. CONTRACTOR: �'1 S C(4 €(JM ( M 6. HOURS IMI O. WEATHER /U Off. — ld C re- A'C. I 6AJ 1WD REMARKS • (Reason for Idleness or Other Rmurb) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or labor) I • cY� • V—• (-r- -- si�Pr. aeu l.oAtze t Q p Pc4'� (_ K.it ��- 1-gGto� p1PGI.Av G. 83E4L13 • PIP TPieu4E d`. SeutAiLs I Ll b JZ 12.. C.oMAh1 I LALO( lZ.i12A)ME: . . Zr. .a,911.4. • • /Qc h5\. (A-z - r � 'TO C G �� -7 7"-- C' J 4- S t aeos GNLM.GI� I �pt.,,ttat-C_ 1--e, c"� f , 4tL_ TP Fi 4 src ✓- -G ,,i 04.4-ce, As" _ Pee— AM) i • • CONTRACTOR TITLE INSPE r: A CITY OF FONTANA INSPECTOR'S DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: tISCNaz. Pw,16l111G. EQUIPMENT AND/OR LABOR EQUIPMENT NO.' NO. OF MEN DESCRIPTION (Of Equipment or Labor) HOURS ITEM NO. Report No. LB Day —01 U T®T F S,,��s��ii,r���crrsb Day SA1RNours: Start072 stop r (o0 WEATHER 61.1-11,10 REMA (Reiman for Idleness or Other Remarks) 1 -nay C.1� 0,4 LoAoGrL 8 AG(C t(oE ?1PU11V P)P lQ-t EvrJEG LA rir'a126(Z LAFa iZEIL.^fl Ais P. M pc-cam,Z- �`. SGL:LLA �..6 (?.. oMAF.t Nt MrI -�w A-t,eA s Ar, rrr \ C.bcft1� al }I 1� G t'� act- (e:re �F�✓�,. W- 'r- LJ& L e tYC-G �► c_ _ � f��� c AL LAAA Ot" l,c c-T- G W�9-S /�-t�2 7� I F !moo t4t 4i'f -E 6 h) J4 <i �( �-,Z EA-S — 4I; , �u 7 �G ! ^L c_ cRwIror - ' it4 As L$ I; CITY OF FONTANA INSPECTOR'S DAILY REPORT • Report No. ('T Day Data: I 3 - 01 M TUN T F S B Circle Day SMft Hours: Startd7t Stop (47 [tr �f I'i Slover Ave Sewer, btwn Cherry and Hemlock. __.... : > Sctae� �/�JmativG HOURS ENO, WEATHER /u� - w' ' 6- z 1 Wl lj REIAARKS (Reason for Idleness or Other Remarks) EQUIPMENT AMOR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or Labor) 1 • T2.0 c. R. • ,(-r" — 5ti+P-r ; A. L0Ab 9. - o Pf 6_ 8Ic f{oE. AG $vtAyzy K � if IM�P KnC�f3�'Se�1. I I P)9 -rQA»4EG ,s'. SCf..LAr'L.6 I I LACSc7rI_'F R.•�oMA►.l 1 LJ.1W. l2." 12At .X e.A ett4 146srp- C� t 3 3 0 t-t25 coif f=ftGG Loom �.A: C���'� £ G DvLA 4 Mk/sal`. ` o A-- J ",-6_. , Or- F0m17 44 �l'L • W"H-o S"( T ' 4T A-L. •_ 1A f4 uht.c. /v1 t ?r W 2 4 A-1-c_ V4 /, Pu ' & f ai . s''• 7D NO v O A ) • A-CN... WA--c reeg er- L1---.4/4-'1(----/ 7-(2.4-(=rvt_44c—,43,C_OWCLej 0( 41‘ ji=ii<1, • / ,t CONTRACTOR TITLE • • CRY OF FONTANA INSPECTOR'S DAILY REPORT Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: ISCn� YLuMQIive, EQUIPMENT ANDIOR LABOtt EQUIPMENT NO. ' NO. OF MEN I DESCRIPTION (Of Equipment or Labor) 1244 LOArzea(L ? I PGLA1y( PIe-rext-IEG L 6ok 6l�-r r�lmes HOURS ITEM NO. Report No. 1 1� • Dat. 2:1 — 0 f(A)T WTFS S CIrde Day Shift Hours: StartaC Stop ((n 00 WEATHER 265 uJ A 4 REMARKS (Reason for Idleness or Other Remarks) • c J. r '� — 'S l?49T. e ► M r'r.TO s2_ EA, $T& &(5- if G . W-v60-tt5c C`. SteU-44.6 12- OM AM CSCfir' i r efk-"'t5Q t1 F�T'�i lSL(1� G E�G(ST1 ( Ur( � 1.c7-7,q,A�- 14-LO Co ���.. '�4V�i).te�. -TU& 2 k_'tae om Q'Vilvtie.. i/��S cP 6 'T1-4-fie /L 14.Ln /'IA-t N th 2ofbsaN Lc c Pert- 'ilk->3 �e21L t S S-I?oPPE , (yp-Dr1 I Qcselu- i,or.3 A.gcsve C6,4, r.- -. C rioete. ac- 5 RAJ ssL_ �crT—sbt( `�'S• . fJ-t.L_ c ,gtc t tnc C>- Z PLA-cam /4--s 1P&z CONTRACTOR INS I; CITY OF FONTANA INSPECTORS DAILY REPORT • Report No. 1 5 Day Data: (-2 (� o \ M T W T�s S circle Day Shift Hours: Start OT /Stop (4 0 Stover Ave Sewer, . btwn Cherry and Hemlock. coNntacroR: hSC(-Iee, lLav16/J4G HOURS ITEM NO • WEATHER V J d>J „J . v,) Q ---L1 . EQUIPMENT ANDIOR LABOR REMARKS (Reason for Idleness or Other Remarks) EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or Labor) I . 'nat.) Gay ' .. •• Jr"1.(-r" — '5LJ42T. 1244 a_ot�c ;- Q. Iv1 p P ( ( / ACK- f4o� K.,T it I F t PaA eft. G I PIPE -re 4EG Zs. SL 4..S I I L-Afi Ie F_ . . 12..,.OMAfA I tJ GOage;T A►t S. R. 3 FIs a. N n w o P Q 4=o(2-1A.-r-ob41 0 UG - 0 2A-,k . I • CONTRACTOR INSPECT CRY OF FONTANA INSPECTORS DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. coNTRnCron: CPI .. ,f ? /M (3 /.N G. EQUIPMENTANDPOR LABOR: EQUIPMENT NO.' NO. OF MEN DESCRIPTION • (Of Equipment or Labor) HOURS ITEM NO. • RepodH 1 _l Day I �7 Date: - 2S --- M T WOF S 8 Circle Day ShIflHours: st.Ra7i.Ostop (t,O WEATHER REMARKS (Reason for Idleness or Other Remarks) 1 fLUc. 44 Loixt3614- 8 AGK#Ho� { PGLAw. PtPELA4{Cz.-ceeALNE . L.AR eg LAErX1.gR..-ri2AINIC m Pl"r7� a t it G (e-0 �`. seut./k,R...S I`zoM�W S'. �'�� FF►1.1. .a -ram 10)✓� �l ( . !: r • CITY OF FONTANA INSPECTOR'S DAILY REPORT Report Nor. V 3 DaY -7'6) ( Date - 24 -o AI T Mf T F S,r�S�i,ryCircle Day SNB Hours: Start6Ta.OStop ! (, OO Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: CCNE12 L(JMCi�.NG. HOURS ITEM NO. WEATHER I REMARKS • (Reason for Idleness or Other Remarks) EQUIPMENT ANOfOR LABOR EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of EquIpment or Labor) ( • 1 Q V 'L. `� 1. • C.r^J.L-r — .S uP-r—i a4. LoAo e. op - (SAG(MOE K. 6� it F 1 Pt�`LAV Eft. " G • I «IQE -rMPA Et _ r-. set_ A- .6 LAR peek R. goMA 4 I LAek +2.•'t rrA1 -"r, 6... eIN, /U (.2iG... i,)Z-� 11:)-11.4, r)u C2A Tv M . * / .c -fl roc rb L S ( c41 1/.(, )m PL c s eP , • CONTRACTOR TITLE INSPECTOR s CITY OF FONTANA INSPECTOR'S DAILY REPORT Report No. Day �et=2 Date: I — 23 - I) ( M O TFSS Circle Day r,�� Shift Hours: Sta�ICI:Stop t (000 Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: n.5C(-} .ume5Il1/4i6. HOURS ITEM NO. WEATHER I b 2 r.x-►-'L-- REMARKS (Reason for Idleness or Other Remarks) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or Labor) 1 'rQ-(x_V S3 g., rr ^ A Loh . P. NAc nP r r t- _ z�u 4e) 1 le , s-, - � v _�". L..a s - Pt ()EL -At, L S( • 1 e,62-4 1.- (. ") 2.. .A 4v. - L<t-4 t 6(Z k k (-Q -, ,n4,r s� ��-- c, . i i of -'� - I W�-/a�,C��- ( (4 Qom- �.,ec-�� �5 M A -I- I c _c 4- G, - /'IA diA41 r�&- l l 6z mac-. 1 eAvreAtcf` 06c_Ai c_itt:3/0 PA, , - ,..4.p q A--e- ra . (...,c.v,Avg -sI6 P-12,014 - 20( A-c o -t-o 3'3 °i-420, .,3.5-)-8O 3 8 ts�� -tom A-l-f-5'o v 4S�-8O ; O -5-9 4- 80. S O S9- ry 461 +-/ .60 4 0U , c Q-01/)J±± E,c ts-n,- U A-c- A U e c,e 6s �Is G " -L- C,ia-t'Q-r / 4^ P.2t) * L•4- tv Lo cam, . • h n CONTRACTOR INSPECTOR CITY OF FONTANA INSPECTORS DAILY REPORT Report No. Date: 22-0\. C1 )T W T F S S Circle Day Shift Hours: StartO Stop (4,CC, Stover Ave Sewer, btwn Cherry and Hemlock. . ____ ..__ ...... CONTRACTOR: 'j (S CA -VC —IL ` LU II %� HOURS ITEMNO. WEATHER . i . REMARKS (Reason for Idleness or Other Remark*) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or labor) l T 6 Y cam—(— - ) L�- 1 1 T—(L i, u Z- ` �, IC 5_— -Q 1,P j a/1 • g _ r t S C, Lo(St-tSaiO— otOG 1 A Z_- t t 4 o-rialcif- ,q . C-Q(r-c(,-I, l K LnroG P a. ( • 1 Iry (,...rDi S PA-v vccy cam.- (:,21, Jb NO NCB =5, acaLtzvt.04.(> Mi, AC- ar3 4 S 1.(i �' n st-cv�7- An .ire- , A' -(- l!r-12-[ G - t 1 JLL t%i-S rI �1- -rik -CJ eGrw �iJ t�l c )L.F iZ F1r...lb Arl' -o-L-L61— A-L) 6.1..--s ,, -- IAA(�i/Lc e- c,ip e WiS S i vE a'F SLL, • -- Mr w/ r rneM.�--,2 Sods ( Pj G-/ki (- t't A-f ti, \=r' - 4S5 j H-G IN (,cam G-E V E -TD C-)��E,2, CONTRACTOR INSPECTOR • CITY OF FONTANA INSPECTOR'S DAILY REPORT Report No. / 0 Day Date: % r `�l - (J ` M T W T)S S Circle Day ,q.� Shift Hours: sta �l.��%6GOO top l Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: 5Ckkge L X-4& J6 HOURS REM NO. WEATHER C2--G-/1-- REMARKS (Reason for Idleness or Other Remarks) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. NO. OF MEN DESCRIPTION (OfEquipment or tabor) l l [(W cii. i / k t s-� — Sc.) !QT 1;-- E y„........._,bf - -- l't S ,1r ` P +'1(- i-f O -r2c'c It. �t (I�. r-- T l l C'. ram., 4 t P'ts cAi4 (C - • '(LEM.cJ/*/ M-e-tAtir") al 22-t- c 0 -t 244-o'3 — VAvet- > Nj&JcprN A-064- i 5 3 D c-F2 . M/rt c C/- 16 VP St#v r cam) A-c e- urn C-CSW1.Pl.G-- N6 - To 4^JIA-9-'c44- E/G eSrtn - _)) E[_ U1 c_ I -- __ i— cs t) DLIF_ 1'12) �-Ai L',v,Qc- 4. — e--o t%i r WAS t,Sr l - ' u(2- 1 l..f JL. C �'' ?- V C r G <th3 , �ri' M- _-t C� ` (2EST' � liFiF1 -r c 6 c _ Sc ifs M"'t - ,r. /4r- -- L C'_ejr€.et Et -ru 5 t CIU We; ) N �L.A-c.G ,4 ��N� �(/n H y o / c. �s l�-2�c.:.. A) _ Lc Cream r ( J( 0N(L-co W tT71 /4-l.4_ 32../7v-E-a r-� Acr43L.E Q4v i,,-)Ls • n A CONTRACTOR TITLE INSPECTOR 1; • CITY OF FONTANA INSPECTORS DAILY REPORT Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: r {,c)e1t"►6*, P`^" ' e' ru EQUIPMENT AND/OR LABOR: EQUIPMENT NO.' NO. OF MEN i DESCRIPTION (Of Equipment or Labor) 5t17-AJ Lo,ASafa - 1-122) 1)c(C_ HOURS ITEM NO. Report No. 9 Day ?- Dat.: (-- ce �O ` M T t'L'J S S Circle Day ,, .,�') ShtftHours: Staler l �lltop (( &O WEATHER REMARKS (Reason for Idleness or Other Remarks) 'pfAT6111-;-= se41" 7A-c2--bes .,N(2.AK-L - Cox -vt_ /DPP i6% 1)9 '(bM A.i ) Aix" --$�.6- 20 4- � 2 0 ,Nl�n�u'ae-rt No w W/ 3' Peivre r J� (... U1M,P T)2UGe-- t51-m1T Lv( M- LENS 0E611175 , .51 QtG-�Ir r, AK-.e5S t4S l4J(o t � t 4 Ca4 �� 2_4 G � A /440e Qc vr»CT &- Z- l 4Getg MILE- Uv- at. - L' € r mn. C C''A-14.-fN & r »-) l seiii -5 4-S Ai i . * 1.0a_ &-errrrasc4,1 /+W�e I NT KCnZ -�y •►.1 5 0e }-5 s e Tp'S �( +4? WAit -r 7W E Fz NtUU� a� i b�E k:1 A�� S 1/ uP SirJ0-5 4cSdtisS LA-7— txp cA1o)t5 p2 EA -CA ProME, N vrE ; L. 00 LA - Ai 070 L 5 L @ CsA-Y W.A$ e-c.-ers Gc> 2cM A-M. eO /d J♦ CONTRACTOR TITLE INS CTOR CITY OF FONTANA INSPECTOR'S DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: (sS Lin 471rtik EQUIPMENT AND/OR LABOR: EQUIPMENT NO. OF NO. ' MEN 1. DESCRIPTION (Of Equipment or Labor) HOURS ITEM NO. • Report No. e nay TJ.=, Oat.: r -1 '4-- d M T®T F S//rrSSj Mete Day / � Shift Hours: StaR.J(""Stop (�0 WEATHER WtNrz&I /3c7 r W 042-te I ILL ARKS (Reason for Idleness or Other Remarks) ��[7vtrt� Avert _S�� tt 2t, S r A-t_c_ it LV uo-cra 6,J mel iA." l 0-6161,41 --* t-1-rrr /.{2L W a— t m ue. 7r ttt 4-44 w I C A;rVil-r'-z'2 L_ Pt C--c_a 5 u2E /v 'LA (Z Vt t ko {� tstt AI StWe -rrzA-r,r, �, Co S Pow we r f R��,uh -� �- - / P �� - u N) C..c5,- TZ2 R it - to-tv fZ '7''� H- e9‘)‘. W- WOK /AJ. 4-06v- UP LA) t Tom itiotbeit ,) j. bqi sr- -C cril ac5Fiet e S (.J Aseuj1 ti AJ 1%c,Sak'2-> S)� I� tsyJ —AAA- M� F- C F -r-b-P tcs ©r S CA tiffs 61.- f�i Gt.cA6r ; w t-rtyk 'C ne'4v r uStxi& C �-f�2 �a'�G.i✓� --' ' el" tie MG- nn /,4u :d-rciti"r - /h Q C6 . 666E A Coy-DLos.. -S f 2 Lkrz44_- LocierLwu 5 A ?rrE knYrAW, - 'v t US c &Q►nJ --,cam coyo-rwrzyiez_ *'Pea sei CONTRACTOR TITLE INSPE • CITY OF FONTANA INSPECTORS DAILY REPORT Report No. Day ✓ Date: /!6 - o1 MJi W T F SDay vt Ctrce Daf� Shift Hours: Startttop -s(6 v Slover Ave Sewer, btwn Cherry and Hemlock. . 8iik- ... CONTRACTOR: CSC( f (.-t%Ms. HOURS REM NO. WEATHER ecovlat(j r' o�-- REMARKS - (Reason for Idleness or Other Remarks) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or Labor) 1- 1211(.1L • ¶ Kr*►rr — s a-e-r t o &2- V. ~el — &D P 1 1 gLAt)CG 1<. r€�K-2c.ts- W G,. .- t�(PG LAB( tSrL 1 1Z-1 ,. 62..(i S - t.l SAS -car tJ6- IS(SVAtG- A-C-e_W// 5 Lt)-5174'Z3fO' -ram - too, LI b crt74 N-i.rr r Faa_ sh6v-CUTT1/L/6. 6 -rriQ� A-e_-e_ 5'tipvt✓(Z S 2q,"--t'o 33-t-sfl gS-t-C 0 1-0'38-s^o it 41+ o -T--o 46 it-1 Li �j (SUP T) I J etZ PI r�2 126 QI. r L: lJ S eN G- '-" 11IG oz' PA AG G l2 i N b C 'Tv / 3b) t 1 f t.t N G / /u 5-rr54-r> n r✓ 50,) -C4IT i 2.. —� untJ'G t./P,U5 L CAA t �7t tocA�O"JS bEr&Zµi,J6 /Qo-T-r 2-e d �/� ,Nf Lvi * S 'PO V W(TM They etc) /,i Pl t €ar U p - z -r-a ctor1 wtg Leo‹ t P t tt,tz -v a.tPPtncC o5"T i'S Mr a� 6 ' 4- u a .m, CONTRACTOR !; CITY OF FONTANA INSPECTORS DAILY REPORT Report No. t!/ Day - s` ( r W T F Sqq�-sJJ//���� Mete Day Shift Hours: Star(/]�✓Stop ( 601) Stover Ave Sewer, btwn Cherry and Hemlock. • CONTRACTOR: 't5dz1'( - PL01461NIr HOURS ITEM NO. WEATHER • Mj, f C t L REMARKS (Reason for Idleness or Other Remarks) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. NO. OF MEN DESCRIPTION (Of Equipment or Labor) I ' Tr -IC' —• la. (G>!i — — 54/91--- Pe rates - e IGe+at� `fat j . a t - ►,PEA KA-_ • 1` S eu�4�Ls — 1 q a (-IzD l — �%(� 1 G'R-t' -l V"_'/t C OINJtP ra tz Mate+ .x - a:244a P Z z iti[ G. m,4irr�(/tt, ,4-S Aiec6ssitgi4 'rro 1 ie4-KS Sue6-e4ro- `.at- 5fe.- Ar1 S7inA- 21 i-60 7o 33-1-so 3sa-rd-0 rri 384-s'0 4( -1-�o i'o 4,t�. f,A� (G w4-4, scAP-ic-l60 A-i' UZ o co,vo t arc or •cam -rti-c— coM4 4-cr trr , ,u 6- tZu 12 Tta t , r�A-5 -t_- A-S / © (3Yr-re 5t Gi 4A-G-E /442Pati1-S 66 7N #'t .4- 4ts2- Nt V5arlit,e, -ram -rePrriPt c 4(2 tti t J t- Lola- WI,EaJcga�J E 7-- o C...6t-E;f2 • CONTRACTOR INSPECTOR • CITY OF FONTANA INSPECTORS DAILY REPORT Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: HOURS ITEM NO. Report No. Day Date: (-1 ?s 01:2 M T W TOS S Circle Day Shift Hours: StartU 0Stop (GtC) WEATHER EQUIPMENT ANDIOR LABOR: EQUIPMENT NO. • NO. OF MEN DESCRIPTION (Of Equipment or Labor) -r -( 4 REMARKS (Reason for Idleness or Other Remarks) ICG\J T- — a-A-7A.) N U.) 0-(2. C-t G- 04(1 I CONTRACTOR TITLE INSPE OR I; CITY OF FONTANA INSPECTOR'S DAILY REPORT Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: EQUIPMENT AND/OR LABOR: EQUIPMENT NO. • NO. OF MEN DESCRIPTION (Of Equipment or Labor) HOURS ITEM NO. • Report No. Date: 4 Day c 2— M T W®F S S Shift Hours: Start Circle Day Stop WEATHER 1 TkGU GtC 124-noci REMARKS (Reason for Idleness or Other Remarks) (<< K. r- - Stier- - fLen3SwV i)- 'IPQL -j CONTRACTOR TITLE INSPEOTOR • CITY OF FONTANA INSPECTORS DAILY REPORT Report No. 3 Day /��SI Date: io V M T®T F S 8 Circle Day Shift Hours: Start/"'Stop ( & ea Stover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: ` SG - 9LVM6n"( HOURS ITEM NO. WEATHER fit--/ Gc_.an?:c.I REMARKS • (Reason far Idleness or Other Remarks) EQUIPMENT AND/OR LABOR: EQUIPMENT NO. ' NO. OF MEN DESCRIPTION (Of Equipment or Labor) 1 ' `nZvG e_ 2.- \C6xrr- - Sire-r. L s pi M '(. M— da 1 B ve trig o 9 1 r. Z[?Q621SOr1- P I (PG LAt.(Er _ �is '. E(.4.4 — P LPG Lr 1 (+vO -(Z ci .. � ,. r)- TR "J F . C ,oznrores -- A QlarO (ns(.. <• A-01A J 612- 6-Lon) Cs.- c azmk 5: rbC• OP S e- cfc57 S 1-4- `3 S4--7-o --ro 3 8 -4-S0, /4c s o @__ 4 z -r-rs-o —I-n « -f f3) „ E .c J I si-r( Axe,_ up -n2 Lc c_cr r2cit--1 pi P2enpAieofprk.,A.) - ( 'I `oviA /►il. b ( (_ 0-6Wc rn) Ni.or.tr 4' r - CONTRACTOR TITLE • CITY OF FONTANA INSPECTOR'S DAILY REPORT Slover Ave. Sewer, btwn Cherry and Hemlock. CONTRACTOR: EQUIPMENT AND/OR LABOR: EQUIPMENT NO. NO. OF MEN DESCRIPTION (Of Equipment or Labor) HOURS ITEM NO. Report No. Day 1'J C) Date: e d t M ef)W T F SS Circle Day Shift Hours: Start(.) aStop ( G, WEATHER REMARKS (Reason for Idleness or Other Remarks) c atrm, S l G(G- ere, CONTRACTOR TITLE CRY OF FONTANA ' IaPECTOR'S DAILY REPORT S Report No. Date: 1 - ra l% T W T F S//.�S Circle Day Shift Hours: StarblStop I COG Slover Ave Sewer, btwn Cherry and Hemlock. CONTRACTOR: Ft SC&( QL UM6n,1l_ HOURS ITEM NO. WEATHER • IoN ti( REMARKS (Reason for Idleness or Other Remarks) AND/OR LABOR: 'EQUIPMENT EQUIPMENT NO. NO. OF MEN DESCRIPTION (Of Equipment Or Labor) 3 ( Ad•ln �L le -Gel" � it L i I I K.5rso 1 1 3 c.. Ea — (71 Pcc.aycerL 1 1• It-L.O -r(Lt,G4- '3 '.. c_2LViLd - LiNK62E2"c12A#J Ce, rr 4c rz,a- 6r•.) $ I -re, 'ry (3eG.1AL 4-0c7fh06.._) Se:71%k'i l vrw i-c S€1r Qe, (A-n.)/ /J C- P rdrol l4A1Z42) ,Hirr iac✓1-0 0`200 MS . • • CONTRACTOR TITLE Ii..EcToR