HomeMy WebLinkAbout15.1_Weekly Statement of Working DaysFischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 • City of Fontana CALIFORNIA' August 7, 2001 RE: Slover Avenue Sewer • from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report Nos. 20 Through 29 Dear Mr. Fischer: Enclosed for the review are the weekly statementsof working days for week ending July.27, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division. Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper �1 CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 29 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending:17/27/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 7/23/01 Mon. Hot and Clear 1 0 0 7/24/01 Tue. Hot and Clear 1 0 0 7/25/01 Wed. Hot and Clear 1 0 0 7/26/01 Thur. Hot and Clear 1 0 0 7/27/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date • 5 0 0 112 18 9 117 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report Days previously reported. Total days to date 0 0 25 0 25 25 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total•non-working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Dap MMWMMEM 60 25 27 52 Numbered Day (Note 4) Day No. 744 Date 1/8/01 MMUMMMMWMOMM Day No. 804 4/4/01 112 117 0 Day No. 856 ( 6/18/01 Remarks: (Note 5) (Continue on reverse) WORKING AND NONWORKING days are shown for record only sine the contract time has elapesed. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 8/7/01 Donald Gdula/Pro'ect Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". • 2. Enter days on which no productive work has been* performed . on the controlling operation(s) for reasons other than weather: 3. List numbers of contract change orders providing for time extensions. 4 Do not include nonworking days, which occur after expiration of the ExtendedDATE.OF;COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been . reached, continue recording working and nonworking. days but do not add into the totals. Make ' statement under REMARKS, the WORKING and NONWORKING days are shown forrecord' only since the contract time has elapsed. 5. ' Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)' Cause of delay andspecification reference/under which approval was granted. 0 • (b) Statement as to what controlling operation or operations are being' delayed and to'what extent. . (c) Dates for which the extension' was granted. (d) Reference to supporting data. 0 ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 28 TO: FISCHER PLUMBXNG The following statement shows the number of working days charged to your contract for the week ending: 7/20/01 Date Day • Weather, Weather. Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 7/16/01 Mon. Hot and Clear 1 0 0 7/17/01 Tue. Hot and Clear 1 0 0 7/18/01 Wed. Hot and Clear 1 0 0 7/19/01 Thur. Hot and Clear 1 0 0 7/20/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 107 18 9 112 . 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 25 0 25 25 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days ....... .......... 60 mummwmais 25 27 52 MMOMMM 112 112 0 Numbered Day (Note 4) Day No. 744 Date 1/8/0l MiiiMiiMMWMMUMEM Day No. 804 4/4/01 Day No. 856 I 6/18/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 r • INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed . on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended, DATE OF COMPLETION. On contracts that are .overtime, the total under WORKING DAYS shall not`. be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of workingdays has been reached, continue recording working and nonworking. days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay .and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE 27 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 7/13/01 I Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather I Working Days No Work Done on Controlling Operation (Note 2) 7/9/01 Mon. Hot and Clear 1 0 0 7/10/01 Tue. Hot and Clear 1 0 0 7/11/01 Wed. Hot and Clear 1 0 0 7/12/01 Thur. Hot and Clear 1 0 0 7/13/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 102 18 9 107 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report - Days previously reported. Total days to date 5 & 6 25 0 0 0 25 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus.Line.6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days MMWMWMg 60 MUMOWNO 25 27 52 aMMOMMMW 112 107 5 Numbered • Day (Note 4) Day No. 744 Date 1/8/01 ONOWNMWWWWWWWM Day No. 804 4/4/01 Day No. 856 6/18/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does' not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed • on the controlling operation(s) for reasons other than weather. 3 • List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended `DATE . OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not. be greater than. the .total of •REVISED WORKING. DAYS, (line 8). After approved total of working days has ;'been . reached, continue recording working and nonworking. days but do. not add into the totals. Make • statement under REMARKS. the WORKING and NONWORKING days are shown for. record. only since the contract time has elapsed. • 5. Time extensions other, are to be explained under REMARKS and the .following. information is to be included:. (a)* Cause of delay . and specification• reference/under which approval was granted. . • (b) Statement as to what controlling operation or operations are being delayed and tovwhat extent. . (c) 'Dates for which the extension' was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 26 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 7/6/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done. on Controlling Operation (Note 2) 7/2/01 Mon. Hot and Clear 1 0 0 7/3/01 Tue. Hot and Clear 1 0 0 7/4/01 Wed. Holiday 0 0 0 7/5/01 Thur. Hot and Clear 1 0 0 7/6/01 Fri. Hot and Clear 1 0 0 Days this week Days previously -reported Total days to date 4 0 0 98 18 9 102 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other). 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE, FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) • Controlling Operation(s) Number of Days MWEEMME Numbered Day (Note 4) Day No. 744 Date 1/8/01 60 0 27 27 MMWMNMM 87 87 0 Day No. 804 4/4/01 Day No. 830 5/10/01 Remarks: (Note 5) (Continue on reverse) 1 WORKING and NONWORKING days are shown for record only since the contract time has elapsed. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why. the day was unworkable when the weather description itselfdoes not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". • 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3 List numbers of contract change orders providing for time extensions-. 4. Do not include nonworking days, which occur after expiration of the Extended DATE -OF .COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not `. be greater ` than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been. reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for. record. only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)' Cause of delay and specification reference/under which approval was granted. . . (b) • Statement as to what controlling operation or operations are being delayed and to'what extent. (c) Dates for which the extension' was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 25 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 6/29/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 6/25/01 Mon. Hot and Clear 1 0 0 6/26/01 Tue. Hot and Clear 1 0 0 , 6/27/01 Wed. Hot and Clear 1 0 0 6/28/01 Thur. Hot and Clear i 0 0 6/29/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 93 18 9 98 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operations) Number • of Days AMMEMME 60 0 27 27 87 87 0 Numbered Day (Note 4) Day No. 744 Date 1/8/01 MMONMWMONOMMUR Day No. 804 4/4/01 Day No. 830 1 5/10/01 Remarks: (Note 5) (Continue on reverse) WORKING and NONWORKING days are shown for record only since the contract time has elapsed. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to . work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE. OF:COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be • greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record. only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay .and specification reference/under which approval was granted. 0 • (b) . Statement as to what controlling operation .or operations are being delayed and to•what extent. . (c) Dates for which the extension' was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 24 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 6/22/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done'on Controlling Operation (Note 2) 6/18/01 Mon. Hot and Clear 1 0 0 6/19/01 Tue. Hot and Clear 1 0 0 6/20/01 Wed. Hot and Clear 1 0 0 6/21/01 Thur. Hot and Clear 1 0 0 6/22/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 88 18 9 93 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days aMMUMMM Numbered Day .(Note.4) Day No. 744 Date 1/8/01 60 UMMMaMNNMMWMMMM SMOAWOOM 0 27 27 ONVAMMON 87 87 0 Day No. 804 4/4/01 Day No. 830 I 5/10/01 Remarks: (Note 5) (Continue on reverse) WORKING and NONWORKING days are shownfor record only since the contract time has elapsed. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 8/7/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was' unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has beenperformed • on the controlling operation(s) for reasons other than weather. 3. • List numbers of contract change orders providing for time extensions. 4. ' Do not include nonworking days, which occur after expiration of the Extended DATE. OF :COMPLETION. On contracts that are overtime, the total under WORKING DAYS , shall not't be greater than. the. .total of 'REVISED WORKING. DAYS, (line 8). After approved total of working .days has .been.reached, continue recording working and nonworking- days but do not add into the totals. Make • statement under REMARKS. the WORKING and NONWORKING days are shown for .record. only since the contract time has elapsed. 5 Time extensions other, are to be explained under REMARKS and the .following. information is to be included:. (a)' Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to'what extent. (c) Dates for which the extension'was granted. (d) Reference to supporting data. ' ADDITIONAL REMARKS: CITY OF FONTANA, WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 23 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 6/15/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 6/11/01 Mon. Hot and Clear 1 0 0 6/12/01 Tue. Hot and Clear 1 0 0 6/13/01 Wed. Hot and Clear 1 0 0 6/14/01 Thur. Hot and Clear 1 0 0 6/15/01 Fri. Hot and Clear 1 0 0 Days this week Days previously -reported Total days to date 5 0 0 83 18 9 . 88 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report .Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days ammmgma 60 Numbered Day (Note 4) Day No. 744 Date 1/8/01 0 27 27 87 87 0 Day No. 804 4/4/01 Day No. 830 I 5/10/01 Remarks: (Note 5) (Continue on reverse) WORKING and NONWORKING days are shown for record only since the contract time has elapsed. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. v_CacaQ_Q2__ 8/7/01 Donald Gdula/Project Coordinator r INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to. describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not* be greater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included:. (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to•what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 22 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 6/08/01 Date Day 4 Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 6/4/01 Mon. Hot and Clear 1 ,0 0 6/5/01 Tue. Hot and Clear 1 0 0 6/6/01 Wed. Hot and Clear 1 0 0 6/7/01 Thur. Hot and Clear 1 0 0 6/8/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 78 18 9 83 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR'COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days MWMOiMg 60 0 27 27 87 83 4 Numbered. Day (Note 4) Day No. 744 Date 1/8/0l MgaMMWMMOMMOM Day No. 804 4/4/01 Day No. 830 l 5/10/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall, be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 J INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkablewhen the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS. shall not begreater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included:. (a)* Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to' what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE TO: FISCHER PLUMBING REPORT NO. 21 The following statement shows the number of working days charged to your contract for the week ending: 6/01/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5/28/01 Mon. Holiday 0 10 0 5/29/01 Tue. Hot and Clear 1 0 0 5/30/01 Wed. Hot and Clear 1 0 0 5/31/01 Thur. Hot and Clear 1 0 0 6/1/01 Fri. Hot and. Clear 0 0 1 Days this week Days previously reported Total days to date 3 0 1 75 18 8 78 18 9 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO .Days Days Total this report previously reported. days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days OMMEMEM Numbered Day (Note 4) Day No. 744 Date 1/8/01 60 MMaWaiMUM 0 27 27 87 78 9 Day No. 830 f 5/10/01 Controlling Operation(s) Foreman Randy Kent was off for personal reasons and the crew did not work on Friday, June 1, 2001. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 8/7/01 INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the • Extended DATE OF COMPLETION. On contracts that are overtime, the total, under WORKING DAYS shall not be' greater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has 'been :reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and :to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 20 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 5/25/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5/21/01 Mon. Hot and Clear 1 0 0 5/22/01 Tue. Hot and Clear 1 0 0 5/23/01 Wed. Hot and Clear 1 0 0 5/24/01 Thur. Hot and Clear 1 0 0 5/25/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 70 18 8 75 18 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days MEMEMOM 60 Numbered Day (Note 4) Day No. 744 Date 1/8/01 EEMMWM 0 26 26 Day No. 804 4/4/01 nWOMMW Day No. 830 5/10/01 86 75 11 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 8/7/01 Donald Gdula/Project Coordinator • • INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3.. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended ' DATE OF -COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not begreater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days. has 'been reached, continue recording working and nonworkingdays but do not add into the, totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included:. (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIF ORNIA May 31, 2001" RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue. Weekly Statement of Working Days Report Nos. 1'8 and 19 Dear Mr. Fischer: Enclosed for the review are the weekly statements of working days for week ending May 18, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. • If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely,, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper, CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 18 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 5/11/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5/7/01 Mon. Hot and Clear 1 0 0 5/8/01 Tue. Hot and Clear 1 0 0 5/9/01 Wed. Hot and Clear 1 0 0 5/10/01 Thur. Hot and Clear 1 0 0 5/11/01 Fri. Hot and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 • 60 18 8 65 18 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 10 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day. designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5, Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days 60 Numbered Day (Note 4) Date 1/8/01 Day No. 744 Day No. 804 1 4/4/01 0 26 26 MigWOMMM 86 65 21 Day No. 830 5/10/01 Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 5/31/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed • on the . controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4 Do not include nonworking days, which occur after expiration of the Extended' DATE. OF -COMPLETION. ..On contracts that are overtime, the total under WORKING DAYS shall not': be' greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the totals. Make ' statement under REMARKS. the WORKING and NONWORKING days are shown for record.only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)Cause of delay . and specification reference/under which approval was granted. • (b) Statement as to what controlling operation or operations are being delayed and to'what extent. (c) Dates for which the extension' was granted: (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. • 19 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the.week ending: 5/18/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5/14/01 Mon. Hot and Clear 1 0 0 5/15/01 Tue. Hot and Clear 1 0 0 5/16/01 Wed. Hot and Clear 1 0 0 5/17/01 - Thur. Hot and Clear 1 10 0 5/18/01 Fri. Hot and Clear • 1 10 0 Days this week Days previously reported Total days to date 5 0 0 65 18 8 70 18 8 TIME EXTENSIONS . CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 • 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total'non-working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number .of Days MUMMUMM 60 Numbered Day (Note 4) Date 1/8/01 Day No. 744 0 26 26 86 70 16 Day No. 804 I 4/4/01 Da No. 830 r 5/10/01 Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 5/31/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; .state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE. OF COMPLETlON. On contracts that are overtime, the total under WORKING DAYS. shall not': be. greater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the totals. Make ' statement under REMARKS. the WORKING and NONWORKING days, are shown for record.only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be. included:. (a) Cause of delay . and specification reference/under which approval was granted. • (b) Statement as to what controlling operation or operations are being delayed and to' what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing. Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA' May 15, 2001 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report Nos. 16 and 17 Dear Mr. Fischer: Enclosed for the review is the weekly statement of working days for week ending May. 4, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 * recycled paper J CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 17 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 5/4/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 4/30/01 Mon. Warm and Clear 1 0 0 5/1/01 Tue. Warm and Clear 1 0 0 5/2/01 Wed. Warm and Clear 1 0 0 5/3/01 Thur. High Wind 0 1 0 5/4/01 Fri. Warm and Clear 1 • 0 0 Days this week Days previously reported Total days to date 4 1 0 56 17 8 60 18 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. . Total days to date 0 0 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 4) Date 1. First working day designated daysspecified Working in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3'plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Managne 60 1/8/01 Day No. 744 WisMONWN 0 26 26 86 60 26 Day No. 804 4/4/01 Day No. 830 5/10/01 Controlling Operation(s) Thursday, May 3, 2001 was a non -working day due to high winds. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 5/15/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions: 4 Do not include nonworking days, which occur after expiration of the Extended DATE. OF: COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not: be' greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been 'reached, continue recording working and nonworking. days, but do not add into the totals. Make ' statement under . REMARKS. the WORKING' and NONWORKING days are shown for record. only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)' Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL, REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF. WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE TO: FISCHER PLUMBING' REPORT1NO. 16 The following statement shows the number of working days charged to your contract for the week ending: 4/27/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 4/23/01 Mon. Warm and Clear 1 0 0 4/24/01 Tue. Warm and Clear 1 0 0 4/25/01 Wed. Warm and Clear 1 0 0 4/26/01 Thur. Warm and Clear ' 1 0 0 4/27/01 Fri. Warm and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 . 51 17 8 56 17 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date • 0 0 0 0 0 0 • 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS'REMAINING (Line 8 minus Line 9) Controlling Operation(s) of Days 60 Numbered Day (Note 4) Date 1/0/01 Day No. 744 0 25 25 85 56 . 29 Day No. 804 J 4/4/01 Day No. 829 5/9/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of thestatement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 5/15/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable 2 Enter days on which no productive work has been performed • on the controlling operation(s) for reasons other than weather. 3. • List numbers of contract change orders providing for time extensions'. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. On contracts that are .overtime, the total under WORKING DAYS shall not'. be. greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of workingdays has been reached, continue recording working and nonworking_ days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record. only since •the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)* Cause of delay and specification reference/under which approval was granted. • (b) Statement as to what controlling operation or operations are being delayed and to•what extent. (c) Dates for which the extension was granted. (d) • Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA April 26, 2001 RE: Slover Avenue Sewer . from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report Nos. 13, 14 and 15' Dear Mr. Fischer: Enclosed for the, review is the weekly statementof working days for week ending April 20, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 11) recycled paper CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 13 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 4/6/01 Date Day Weather, Weather Conditions or Other Conditions ' Working Day Non -Working Days Caused by Weather , Working Days No Work Done on Controlling Operation (Note 2) 4/2/01 Mon. Cool and Clear 1 0 0 4/3/01 Tue. Cool and Clear 1 0 0 4/4/01 Wed. Cloudy and Cold 1 0 0 4/5/01 Thur. Cloudy and Cool 1 0 0 4/6/01 Fri. Cloudy and Cool 1 0 0 Days this week Days previously reported Total days to date 5 0 0 37 16 8 42 16 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report Days previously reported. Total days to date 0 0 '0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 4) Date 1. First working day designated dayssp ecified Working s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified.are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date. 10. WORKING DAYS REMAINING (Line 8 minus Line 9) VgiMMOMOM 60 1/8/01 Day No. 744 Day No. 804 0 24 24 4/4/01 MgMMWMO 84 42 42 Day No. 828 I 5/8/01 Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 4/26/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2 Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the. totals. Make statement under REMARKS, the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5 Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delayand specification reference/under which approval was granted. (b) Statement as to what controlling operation .or operations are being delayed and to'what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA • WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 14 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 4/13/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 4/9/01 Mon. Rain 0 1 0 4/10/01 Tue. Cloudy 1 0 0 4/11/01 Wed. Cloudy 1 0 0 4/12/01 Thur. Cool and Clear 1 0 0 4/13/01 Fri. Cool and Clear 1 0 0 Days this week Days previously -reported Total days to date . 4 1 0 42 16 8 46 17 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) .6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number• of Days 60 Numbered Day (Note 4) Date 1/8/01 Day No. 744 0 25 25 MWMiiiMgMi 85 46 39 Day No. 804 4/4/01 Day No. 829 5/9/01 Controlling Operationa) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 4/26/01 Donald Gdula/Pro'ect Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to . describe conditions when the weather is clear, but the grade is too wet to work. Do not -list days merely as "Unworkable". 2. Enter days. on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not; be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking_ days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record* only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)Cause of delay . and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: • CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 15 TO: FISCHER PLUMING The following statement shows the number of working days charged, to your contract for the week ending: 4/20/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 4/16/01' Mon. Very Warm and Clear 1 0 0 4/17/01 Tue. Very Warm and Clear 1 0 0 4/18/01 Wed. Very Warm and Clear i 0 0 4/19/01 Thur. Warm and Clear 1 0 0 4/20/01 Fri. Warm and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 46 17 8 51 17 8 TIME EXTENSIONS • CCO Numbers • (Note.3.). Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0. 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingspecified da s y in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days WMMONWO 60 Numbered Day (Note 4) Date 1/8/01 Day No. 744 0 25 25 85 51 34 Day No. 804 4/4/01 Day No. 829 J • 5/9/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 4/26/01 Gdula/Project Coordinator • INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why. the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2 Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not': be greater than the .total' of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record' only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay . and specification reference/under which approval was granted. (b) Statement as to what controlling operation .or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ' ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA April 4, 2001 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statements of Working Days Report Nos. 10, 11 and 12 Dear Mr. Fischer: Enclosed for the review are the weekly statements of working days for week ending March 30, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering. Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 10 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending:, 3/16/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 3/12/01 Mon. Clear 1 0 0 3/13/01 Tue. Clear 1 0 0 3/14/01 Wed. Clear 1 0 0 '3/15/01 Thur. Clear 1 0 0 3/16/01 Fri. Clear 1 0 0 Adjustment for Holiday on 2/19/01 1 Days thls week Days previously reported Total days to date 5 0 1 22 16 7 27 16 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 °0 0 0 0 7 ' 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days :........................... 60 Numbered Day (Note 4) Date 1/8/01 Day No. 744 Day No. 804 4/4/01 0 24 24 MMWMMIEM 84 27 57 Day No. 828 1 5/8/01 Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) Adjustment'of working days add one (1) Working day to contract completion date for the Holiday on Monday February 19, 2001. The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 4/3/01 • INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". • Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. • 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF :COMPLETION. On contracts that are overtime, the total under WORKING DAYS , shall not : be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has 'been reached, continue recording working and nonworkingdays but do not add into . the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown forrecord' only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the '.following. information is to be included:. (a)Cause of delay . and specification reference/under which approval was granted. (b) • Statement as to what controlling operation or operations are being delayed and to' what extent. . (c) Dates for which the extension' was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 11 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 3/23/01 Date Day Weather, Weather Conditions or Other Conditions Working Day . Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation' (Note 2) 3/19/01 Mon. Clear 1 0 0 3/20/01 Tue. Clear 1 0 0 3/21/01 Wed. Clear 1 0 0 3/22/01 Thur. Clear 1 0 0 3/23/01 Fri. Partly Cloudy 1 0 0 Days this week Days previously reported Total days to date 5 0 0 27 16 8 32 16 8 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) Number of Days 60 Numbered Day'(Note 4) Date 1/8/o1 Day No. 744 Day No. 804 1 4/4/01 0 24 24 84 32 52 Day No. 828 5/8/oi Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 4/3/01 INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2 Enter days • on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3 List numbers of contract change orders providing for time. extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE.. OF :COMPLETION. On contracts that are .overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the -following-information is to be included: (a)Cause of delay and specification reference/under which approval was granted. • (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 12 TO: FISCHER PLUMBXNG The following statement shows the number of working days charged to your contract for the week ending: 3/30/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 3/26/01 Mon. Warm and Clear 1 0 0 3/27/01 Tue. Warm and Clear 1 0 0 3/28/01 Wed. Warm and Clear 1 0 0 3/29/01 Thur. Warm and Clear 1 0 0 3/30/01 Fri. Warm and Clear 1 0 0 Days this week Days previously reported Total days to date 5 0 0 32 16 8 37 16 8 TIME EXTENSIONS CCO Numbers (Note 3) 'Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 •0; 0 COMPUTATION OF EXTENDED DATE FOR.COMPLETION Number of Days Numbered Day (Note 4) Date 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) 60 EMMOW 0 24 24 84 37 47 1/8/01 Day No. 744 DarNo. 804 f 4/4/01 Day No. 828 I 5/8/01 Controlling Operation(a) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 4/3/01 • • INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. . List numbers of contract change orders providing for time extensions'. 4 Do not include nonworking days, which occur after expiration of the Extended DATE. OF: COMPLETION. On contracts that are .overtime, the total under WORKING DAYS shall not be greater than. the total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking. days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5 Time .extensions other, are to be explained under REMARKS and the following: information is to be included:. (a)* Cause of delay and specification reference/under which approval was granted. • (b) • Statement as to what controlling operation or operations are being decayed and to' what extent. (c) Dates for which the extension was granted. (d) Reference to 'supporting data. . ADDITIONAL REMARKS: :1 VTh R,VI'YlV. , , , • • City of Fontana CALIFORNIA Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report No. 9 Dear Mr. Fischer: March 1 , 2001 Enclosed for the review is the weekly statement of working days for week ending March 9, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, Community Development Department Engineering Division Donald Gdula Consultant Project Coordinator Special Projects Enclosures: Weekly Statement of Working Days cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper '�ex;v e.^erw :atn ae;,n: 4,414444 CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 9 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 3/9/01 Date Day Weather, Weather Conditions or Other Conditions • Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 3/5/01 Mon. Clear 1 0 0 3/6/01 Tue. Rain 0 11 0 3/7/01 Wed. Rain 0 1 0 3/8/01 Thur. Clear 1 0 0 3/9/01 Fri. Clear 1 0 0 Days this week Days previously reported Total days to date 3 2 0 19 14 7 22 16 7 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other 'Days this report Days previously reported. Total days to date 0 0 0 0.. 0 7 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Day (Note 4) Date of Days 1. First working day designated .................................. ••�•��������v•�•••�•��•��••�•���� .••60•J. Day No. 744 01 Vein 2. Working days specified in contract ............................... ........ :.:.:.WM• 3. COMPUTE DATE FOR COMPLETION(ifall days specified are workable) �. %'•%%;:."?�:<�'%`:' DayNo. 804 4/4/01 4. Total time extension days approved to date, (CCO plus other) M1•�0 `•�:::::::>•::::::»<•>#........,.;;•.�:.;;:.,.:,.:.;:..;:.:;..;,;.;;..::.�, 5. Total non -working days to date (Note 4) 23 ».:».:»'::` •:: >: :? r »4,> >:'! 6 7 . 8. Sub Total (Line 4 plus Line 5)23 DATEON(Line 3plus Line EXTENDED FOR.COMPLETION 6) Revised workingdays for contract(Line 2plus Line Y 6) .::a827•::5/701 Day No ..:: 8•:::::::..:::::::.::. :;:>: �::: �. m:.:::::_ :...............................: 83 ::... • 9. Total working days to date 22 )yss`': s`:;::^`::;:<v:<::':>>?;3.%,'• 10. WORKING DAYS REMAINING (Line 8 minus Line 9) 61 .;:.<:;.:.;::,::::;;;;�.:.:.:.......:..........;:..;....... Controlling Operation(s) Add two (2) working days to contract completion date due to rain on Tuesday 3/6/01 and Wednesday 3/7/01. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 3/16/01 Donald Gdula/Project Coordinator City of Fontana CALIFORNIA' Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street .San Bernardino, CA 92405 RE: Stover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report No. 8 Dear Mr. Fischer: March 6, 2001 ,Enclosed for the review is the weekly statement of working days for week ending March 2, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, Community Development Department Engineering Division Donald Gdula Consultant Project Coordinator Special Projects Enclosures: Weekly Statement of Working Days cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) w/enclosures www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 8 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week,ending:13/2/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 2/26/01 Mon. Rain 0 1 0 2/27/01 Tue. Rain 0 • .1 0 2/28/01 Wed. Cloudy and Cool 1 0 0 3/1/01 Thur. Clear 1 0 0 3/2/01 Fri. Clear 1 0 0 Days this week Days previously reported Total days to date 3 2 0 16 12 7 19 •14 7 TIME EXTENSIONS . CCO Numbers (Note 3) Days Ap roved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 .0• 7 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Day (Note 4) Date of Days 1. First working day designated ...:....<::....::.:.::..:.......... E<:: :> >•:r: :::: Rey No. 744 1/8/01 2. Working days specified in contract 60 MUMOMftig0WWWia 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) ":,. , """"`'""``""`"' Day No. 804 4/4/01 4 Total time extension days approvedto dateplus other)0J y pp (CCO :'•::»'•»'•s::>::s::>:>f:#::?>::>>?:::?? 5. 6. Total non -working g days to date (Note 4) . Sub Total (Line 4 plus Line 5)2 21 =£':h�•,'"�•,•��:a:;?'�>;:��:••<.:::'s., :•.r>.>.:::>:•>;:;:s;:•>; .:..:::.:..::.:•,:x.. ..: ::.a: i>�� �: �>%:: >::>F�•z:• 7. EXTENDED DATE FOR COMPLETION(Line 3 plusLine 6) >»:<%;<.i:.#i::#>::»a """"' .......... Day No. 825 5/3/01 Revised working days for contract (Line 2 plus Line 6 81 :•'. >':«"• «2 `•>:•.< ::z'. :#> .. 9. Total working days to date 19 �• • � �•••:::::;::;s::>:�::;:; 10. WORKING DAYS REMAINING (Line 8 minus Line 9) 62 ,....,.,, ..:;-;:;: Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 3/6/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to, describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. • List numbers of contract change orders providing for time extensions. • 4. Do not include nonworking days, which occur after expiration of the Extended. DATE. OF:COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not: be• greater .than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been . reached, continue recording working and nonworking. days: but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for. record. only since the contract time has elapsed. Time extensions other, are to be explained under REMARKS and the following, information is to be included:. (a) Cause of delay . and specification reference/under which approval was granted. . (b) Statement as to what controlling operation or operations are being' delayed and to what extent. . (c) Dates for which the extension was granted. (d) . Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA March 1, 2001 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statements of Working Days Report Nos..6 and 7 Dear Mr. Fischer: Enclosed for the review are the weekly statements of working days for week ending February 23, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 CITY OF FONTANA WEEKLY STATEMENT OF. WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 6 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 02/16/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 2/12/01 Mon. Rain 0 1 0 2/13/01 Tue. Rain 0 1 0 2/14/01 Wed. Clear and cool 0 1 0 .2/15/01 Thur. Clear and Warm 1 0 0 2/16/01 Fri. Clear and Warm 1 0 0 Days thls week Days previously reported Total days to date 2 3 0 10 8 7 12 11 7 TIME EXTENSIONS CCO Numbers (Note 3) Days Ap roved CCO Other " Days Days Total this report previously reported. days to date 0 0 0 0 0 7 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8.. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days MMMENaMi 60 0• 18 18 IMOMMWM 78 12 66 Numbered Day (Note 4) Day No. 744 Date 1/8/01 MOMOMMiNgffigNiMM Day No. 804 ( 4/4/01 Day No. 822 4/30/01 Controlling Operation(s) February 14, 2001 was non -working day. The roadway was too wet to stripe for traffic control per the approved plans. Stripping has to be in place before the digging operation could start. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 3/1/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER, When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to .work. Do not list days merely as "Unworkable". • Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions'. 4. * Do not include nonworking days, which occur after expiration of the Extended DATE. OF COMPLETION. On contracts that are .overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working .and nonworking. days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for .record' only since the contract time has elapsed. 5. • Time extensions other, are to be explained under REMARKS and the following. information is to be included:. (a)* Cause of delay .and specification reference/under which approval was granted. • (b) Statement as to what controlling operation or operations are being delayed and to'what extent.. (c) Dates for which the extensionwas granted. (d) Reference to supporting data. ADDITIONAL. REMARKS: CITY OF FONTANA WEEKLY'STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE TO: FISCHER PLUMBING REPORT NO. 7 The following statement shows the number of working days charged to your contract for the week ending: 02/23/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 2/19/01 Mon. Cloudy 1 0 0 2/20/01 Tue. Clear and cool 1 0 0 2/21/01 Wed. Clear and cool 1 0 0 2/22/01 Thur. Clear and Warm 1 0 0 2/23/01 Fri. Rain 0 1 0 Days this week Days previously reported Total days to date 4 1 0 12 11 7 16 12 7 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days, this report Days previously reported, Total days to date 0 0 0 0 .0 7 . 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number 1. First working day designated 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) of Days OMMWM 60 WWWWWW 0 19 19 79 16 63 Numbered Day (Note 4) Date Day No. 744 1/8/01 MMOMOMMUMMMeg Day No. 804 4/4/01 Day No. 823 5/1/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator 3/1/01 INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example; "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE. OF COMPLETION. On contracts that.are overtime, the total under WORKING DAYS shall not ". be • greater than the' .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been .reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for.record'only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay .and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and ta'what extent. (c) . Dates for which the extension'was granted. • (d) Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA February 20, 2001 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report No. 5 Dear Mr. Fischer: Enclosed for the review is the weekly statement of working days for week ending February 9, 2001. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 * recycled paper CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE TO: FISCHER PLUMBING REPORT NO. 5 The following statement shows the number of working days charged to your contract for the week ending: 02/09/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 2/5/01 Mon. Clear and Warm 0 '0 1 2/6/01 Tue. Clear and Warm 0 0 1 2/7/01 Wed. Clear and Warm 0 0 1 2/8/01 Thur. Clear and Warm 0 0 1 2/9/01 Fri. Clear and Warm 0 0 1 Days this week Days • previously reported Total days to date 0 0 5 10 8 0 10 .. 8 5 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved CCO Other Days this report Days previously reported. Total days to date 0 0 5 0 0 2 0 0 7 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days MUMMEN Numbered Day (Note 4) Day No. 744 Date 1/8/01 60 7 8 15 Dar No.804.•.•. ....•.;.4/4/01 ><:..... 75 10 65 Day No. 819 J 4/25/01 Controlling Operation(s) February 5 thru 9, 2001 were non -working days. Traffic control plans were being revised because the encroachment at the Union Pacific Railraod has not been approved. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15).days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 2/19/01 Donald Gdula/Project Coordinator • INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed . on the controlling operation(s) for reasons other than weather. 3. ' List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF:COMPLETION. On contracts that are overtime, the total under WORKING DAYS . shall not be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has 'been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record' only since the contract time has elapsed. 5. ' Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay . and specification reference/under. which approval was granted. (b) . Statement as to what controlling operation or operations are being • delayed and to' what extent. . (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: Fischer Plumbing Mike Fischer, Owner 1372 W. 26th Street San Bernardino, CA 92405 City of Fontana CALIFORNIA' February 20, 2001 RE: Slover Avenue Sewer from Cherry Avenue to Hemlock Avenue Weekly Statement of Working Days Report Nos 1,2,3,and 4 Dear Mr. Fischer: Enclosed for the review is the weekly statement of working days reports 1,2,3, and .4 which I found to have incorrect revised working days and working days remaining. You will be allowed '(15). days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. If you need additional information, please contact the undersigned at (909) 350-7632. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Donald Gdula Consultant Project Coordinator Special Projects cc: Principal Civil Engineer/Special Projects Consultant Public Works Inspector (SB) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 40 recycled paper CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the. week ending:101/12/01 1 Date Day . Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 1/8/01 Mon. Rainy and Cold 0 1 0 1/9/01 Tue. Clear and Cool 1 0 0 1/10/01 Wed. Clear and Cool 1 0 0 1/11/01 Thur. Rainy and Cold 0 1 0 1/12/01 Fri. Rainy and Cold 0 1 0 Days this week Days previously reported Total days to date 2 3 0 0 0 0 2 3 0 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved CCO Other Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working•days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) . Controlling Operation(s) Number of Days OMMEMNR 60 MMOMMW 0 3 3 Numbered Day (Note 4) Day No. 744 Date 1/8/01 MOMMEWWWWONN Day No. 804 4/4/01 omwmgmm 63 2 61 Day No. 807 i 4/9/01 Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 2/19/01 Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,* "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF :COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the .followinginformation is to be included:. (a) Cause of delay .and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. -(d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 2 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending:101/19/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 1/15/01 Mon. Light Rain. and Cold 1 0 0 1/16/01 Tue. Cloudy and Cool 1 0 0 1/17/01 Wed. Very Windy 0 1 0 1/18/01 Thur. Clear and Cool 1 0 0 1/19/01 Fri. Clear and Cool 1 0 0 Days this week Days previously reported Total days to date 4 1 0 2 3 0 6 4 0 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved CCO Other Days this report", Days previously reported. Total days to date 0 0 0 0 0 0 0 0 0 COMPUTTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days OMMWMME Numbered Day (Note 4) Day No. 744 Date 1/8/01 60 ., Da....•••No.•.. •..8•04... ... ..'4�• 4 ..'; 01:>:`•..... 0 4 4 WWWMME 64 6 58 Day No. 808 l 4/10/01 Controlling Operation(s) Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 2/19/01 Donald Gdula/Project Coordinator • '• INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work, has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF -COMPLETION. , On contracts that are overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING DAYS, (line 8). 'After approved total of working days has been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included:. (a)Cause of delay and specification reference/under which approval was granted. • (b) • Statement as to what controlling operation or operations are being delayed and to'what extent. (c) Dates for which the extension'was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. 3 TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 01/26/01 Date Day Weather, Weather Conditions or Other Conditions • Working • Day Non -Working Days Caused by Weather I Working Days No Work Done on Controlling Operation (Note 2) 1/22/01 Mon. Clear 1 0 0 1/23/01 Tue. Clear 1 0 0 1/24/01 Wed. Rain 0 1 0 1/25/01 Thur. Clear 1 0 0. 1/26/01 Fri. Rain 0 1 0 Days this week Days previously reported Total days to date 3 2 0 6 4 0 9 6 0 TIME EXTENSIONS CCO Numbers • (Note 3) Days Approved Other CCO Days this report Days previously reported. Total days to date 0 0 0 0 0 0 0 0 0 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified s ecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) • 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION'(Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) • Number of Days .................................... Numbered • Day (Note 4) Day No. 744 Date 1/8/01 60 0 6 6 MOMMOMMMENN Day No. 804 4/4/01 UMMOM 66 9 57 Day No. 810 1 4/12/01 Remarks:' (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. 2/19/01 Donald Gdula/Project Coordinator • s INSTRUCTION TO RESIDENT ENGINEER When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,. "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days 'on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF :COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not : be greater than the .total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworkingdays but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record.only since the • contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA WEEKLY STATEMENT OF WORKING DAYS PROJECT: SLOVER AVENUE SEWER FROM CHERRY AVENUE TO HEMLOCK AVENUE REPORT NO. TO: FISCHER PLUMBING The following statement shows the number of working days charged to your contract for the week ending: 02/02/01 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 1/29/01 Mon. Clear and Cool 1 0 0 1/30/01 Tue. Very Windy 0 1 0 1/31/01 Wed. Very Windy • 0 1 0 2/1/01 Thur. Very Windy 0 0 1 2/2/01 Fri. Clear and Warm .0 0 1 Days this week Days previously reported Total days to date 1 2 2 9 6 0 10 8 2 TIME EXTENSIONS CCO Numbers (Note 3) Days Approved Other CCO Days this report' Days previously reported. Total days to date 0 0 2 0 0 0 0 0 2 COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. First working day designated 2. Workingdaysspecified in contract 3. COMPUTE DATE FOR COMPLETION(if all days specified are workable) 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 6) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Number of Days 60 2 8 10 Numbered Day (Note 4) Day No. 744 Date 1/8/01 i•":'Da`•:'•#r:No: 804'# ...rt`4/4 01#'.... Y 7�`� / 70 10 60 Day No. 814 l 4/18/01 Controlling Operation(s) February 1 and 2, 2001 were non -working days. Traffic control plans were being revised because the encroachment at the Union Pacific Railraod has not been approved. Remarks: (Note 5) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on the reverse side. Donald Gdula/Project Coordinator INSTRUCTION TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example,' "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed • on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days, which occur after expiration of the Extended DATE OF :COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the .total of REVISED WORKING. DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking; days but do not add into the totals. Make statement under REMARKS. the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the followinginformation is to be included:. (a)Cause of delay and specification reference/under which approval was granted. • • (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension -was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: