Loading...
HomeMy WebLinkAbout7.5_From ContractorDate Reference aN--mt S40r We are transmitting pages including cover sheet ATTENTION Company Address red . L&CbLQ \ 5.3 &i€rrn Ave City/State/Zip �G --cn►'cn) A 9 a 33sr Phone No. 90 q 3 s-t-(' '-1 Copies To Copies To TRANSMITTIN' Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application Fax UPS. US Mail Hand Courier Other Cargo Carrier Fax No. FROM Phone No. Fax No. OroL lr. I"; h hot --U)1(1° /c Chris Darling (909) 795-2568 (909) 795-1840 Reply Requested Enclosures Original To Follow Yes Yes ❑ Yes ❑ Transmission Verified By No❑ No El No❑ Time Approval Review & Comment Information/Files Proposal/Quote Other Urgent Message - r icts rry 4- L. CORPORATE OFFICE-12301 Central Ave. N.E., Ste 100 — Blaine, MN 55434 - Tel: (763) 755-2199 — Fax (763) 755-7801 SOUTHERN DIVISION — 2611 Westgrove Drive, Ste 107 - Carrollton, TX 75006 — Tel: (972) 9$1-9494 Fax: (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, CA 92320 — Tel: (909) 795-2568 — Fax: (909) 795-1840 United Rentals, Inc.. JAN P.O. Box 79333 City of Industry, CA 91716-9333 Tel: (949) 862-1100 Fax: (949) 862-4938 UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT, California Civil Code 3262 (d) (4) KENKO INC 12301 CENTRAL AVE NE #100 BLAINE MN 55434 The undersigned has been paid in full for all labor, services, equipment or material furnished to KENKO INC on the job of CITY OF FONTANA. Located at : ** J O B S I T E "SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO'COUNTY JOB #0012 and does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a laborand material bond on the job, except for disputed claims for extra work in the amount of $0.00 Dated 01/14/2002 UNITED RENTALS INC INISTRATOR NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc. I'ENHALL COMPANY Specialized Services for the Construction Industry UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT The undersigned has been paid in full for all labor, services, equipment or material furnished to KENKO, INC. on the job 'of located at (Your Customer) CITY OF FONTANA (Owner) ONTARIO AVE. FONTANA, CA #0012 (Job Description) and does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $ ZERO Dated: JANUARY 15, 2002 PENHALL COMPANY -DIVISION 1 ONLY By (Co (Title) e) �CREDIT ADMIN NOTICE TO PERSONS SIGNING THIS WAIVER: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN ITO EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM 91 Mailing Address: P.O. Box 4609 e Anaheim, CA 92803 91801 Penhali Way 9 (714) 778-6677 * FAX (714) 778-M7 Unconditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(2) 'Me undersigned has been paid and has received a progress payment in the sum of $ for labor, services, equipment, or material furnished to on the job of located at (Your Customer) CITY OF FONTANA (Owner) ONTARIO AVE. FONTANA, CA #0012 (Job Description) and does hereby release any mechanics' lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to _ through (Your Customer) DECEMBER 31, 2001 only and does not cover any retentions retained (Date) before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or, bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. Dated: JANUARY 15, 2002 PENHALL COMPANY -DIVISION ONE By SHERRY DONAL/hSON/CREDIT ADMIN. "NOTICE TO PERSONS SIGNING THIS. WAIVER: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID IF YOU HAVE NOT BEEN PAID 9 USE A CONDITIONAL RELEASE FORM ". NOTE: CIVIL CODE 3262 (d)(2) PROVIDES: Where the claimant is required to execute a waiver and release in exchange, for, or in order to induce payment of a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the form set forth above. Form 6-C (Rev.1194) BICA (213) 251.1100 A Construction Credit Reporting Agency: Unconditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(2) 'Me undersigned has been paid and has received a progress payment in the sum of $ for labor, services, equipment, or material furnished to KENKO, INC. CITY OF FONTANA (Owner), ONTARIO AVE. FONTANA, CA #0012 (Your Customer) (Job Description) and does hereby release any mechanics' lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. (Your Customer) NOVEMBER 30, 2001 (Date) before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. JANUARY 15, 2002 RECV JA N 16 2002 only and does not cover any retentions retained PENHALL COMPANY -DIVISION ONE By j9 jy 4 "4 (Fitly7 SHERRY DONALP SON/CREDIT ADMIN. "NOTICE TO PERSONS SIGNING THIS WAIVER: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID` IF YOU HAVE NOT BEEN PAID 9 USE A CONDITIONAL RELEASE FORM NOTE: CIVIL CODE 3262 (d)(2) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the form set forth above. Form 6-C (Rev. 1/94) BICA (213) 251-1100 A Construction Credit Reporting Agency. Unconditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(2) 'Me undersigned has been paid and has received a progress payment in the sum of $ for labor, services, equipment, or material furnished to on the job of ONTARIO AVE. FONTANA, CA #0012 KENKO, INC. CITY OF FONTANA. (Owner) (Your Customer) (Job Description) and does hereby release any mechanics' lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. OCTOBER 31, 2001 (Date) (Your Customer) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment.. Dated: JANUARY.15, 2002 PENHLL COMPANY -DIVISION ONE By SHERRY DONADSON/CREDIT ADMIN. "NOTICE TO; PERSONS SIGNING THIS WAIVER: THIS DOCUMENT, WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ,. ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID IF YOU HAVE NOT BEEN PAID 9 USE A CONDITIONAL RELEASE FORM ". NOTE: CIVIL CODE 3262 (d)(2)PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the form set forth above. Form 6-C (Rev. 1/94) BICA (213) 251-1100 A Construction Credit Reporting Agency Uaf )/ UUZ 1,111 .17: 4U PAX 'lUUti3L4 i1U Laura Lynne RELEASE FORM 4 UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT The undersigned has been paid in ' full for all labor, services, 'equipment, or material furnished to: - KENKO, INC. P.O. BOX 831 CALIMESA . CA 92320 On the job of: CITRUS AVENUE STORM DRAIN Located at: FONTANA, California and does hereby release ' any right to a mechanic's lien, stop notice or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $ -0- Dated: February 15, 2002 E. J. SALGADO, INC. By: L.Lynne, A ounting Supervisor NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, US A "CONDITIONAL RELEASE" FORM. NOTE: This form of release complies with, the requirements of Civil Code Section 3262(d)(2).: It is to be used to release claims to the extent that a progress payment has actually been received by the releasing party. PROJECT: JOB NO: FONTANA, CA 0012 03/19/2002 October November December Vender Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Robertsons Olson Precast E.J. Salgado Pacific Control Services, Inc. V-Ditch Chino Ready Mix Franklin Reinforced Steel $2,500.00 $2,100.00 $3,657.00 E.J. Salgado $74,046.00 in Full $0. 00 Western Rentals $3,000.00 Sudhakar $13,250.00 Pavement Recycling $19,210.00 Olson Precast $32,931.00 UnitedRentals # 514. $5,000.00 $0.00 Paid to Date inf II$0. -00 ' Gladding McBean $80,000.00 Holiday Rock $3,000.00 Holiday Trucking Robertson's $16,306.96 Southwest V-Ditch $13,912.33 Penhall $10,000.00 $993.00 $0.00 $0.00 Final $0.00 Nationsrent West $6,500.00 E.J. Salgada Chino Ready Mix E.J. Salgado Southwest Concrete Hub Construction None. $5,500.00 Dan Copp Crushing None $82,000.00 $0.00 Final $0.00 Clairmont Equipment None $7,500.00 Ayala & Sons Match Corporation Vulcan Matterials $2,371.00 RSC USA, Inc. None $10,000.00 Ayala & Sons PROJECT: JOB NO: FONTANA, CA 0012 July August Sept. Vender Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Robertsons Olson Precast E.J. Salgado E.J. Salgado Western Rentals Pacific Control Services, Inc. V-Ditch Chino Ready Mix Franklin Reinforced Steel $2,500.00 $2,100.00 $3,657.00 $74,046.00 $3,000.00 $0.00 Paid $11,450.07 Final Paid in Full $0.00 Final $0.00 Sudhakar $13,250.00 Pavement Recycling $19,210.00 Final Paid in Full Olson Precast $32,931.00 $0.00 $0.00 $0.00 Final $0.00 UnitedRentals # 514 $5,000.00 $0.00 Paid to Date Gladding McBean Holiday Rock Holiday Trucking Robertson's $80,000.00 $0.00 $0.00 Final $0.00 $3,000.00 $16,306.96 $1,903.92 $0.00 $1,903.92 $0.00 $0.00 $0.00 $0.00 $0.00 Final $0.00 Final $0.00 Final 0.00 Southwest V-Ditch $13,912.33 Penhall $10,000.00 $0.00 $0.00 $0.00 $0.00 Nationsrent West $6,500.00 $0.00 Paid in full $0.00 Final $0.00 E.J. Salgado Chino Ready Mix Final $0.00 E.J. Salgado Hub Construction Southwest Concrete None $5,500.00 $0.00 $0.00 $0.00 Final $0.00 $0.00 $0.00 Final $0.00 Dan Copp Crushing None $82,000.00 $594.81 $594.81 $0.00 Clairmont Equipment None $7,500.00 Ayala & Sons Vulcan Matterials Match Corporation $2,371.00 $0.00 Final $300.30 $0.00 Paid in Full $0.00 Final $0.00 RSC USA, Inc. None $10,000.00 $1,265.97 $0.00 $0.00 Ayala & Sons Final$40,787.51for Beech & Jurupa - Final $34,092.64 for Citrus & Jurupa $0.00 $0.00 PROJECT: JOB NO: FONTANA, CA 0012 April May June ' Vender Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Pacific Control Services, Inc. $2,500.00 Per Matt open invoices for April Final $0.00 Robertsons V-Ditch Olson Precast Chino Ready Mix $2,100.00 $0.00 PAID THRU 5/31 /01 $273.85 E.J. Salgado Franklin Reinforced Steel $3,657.00 Final $0.00 E.J. Salgado $74,046.00 $9,787.25 Western Rentals $3,000.00 $1,184.48 $808.23 $403.13 Sudhakar $13,250.00 $3,312.43 Pavement Recycling $19,210.00 $8,643.23 Paid in Full Paid in Full Olson Precast $32,931.00 $0.00 $1,329.30 $0.00 UnitedRentals # 514 $5,000.00 $327.25 $200.04 $744.58 $744.58 Gladding McBean Holiday Rock Holiday Trucking Robertson's $80,000.00 $3,000.00. $16,306.96 $0.00 $250.76 $802.75 $0.00 $13,412.61 $90.62 $1,676.20 $13,412.61 $90.62 $1,676.20 $0.00 $1,903.92 $0.00 $0.00 Southwest V-Ditch $13,912.33 Penhall $10,000.00 $566.50 $854.00 $0.00 $588.50 Nationsrent West $6,500.00 $4,318.13 $0.00 $0.00 $0.00 E.J. Salgado Chino Ready Mix $1,418.46 E.J. Salgado Hub Construction Southwest Concrete None $5,500.00 $0.00 $339.32 $339.32 $732.74 $732.74 $0.00 $0.00 Dan Copp Crushing None $82,000.00 March & April $55, 666.06 $52,792.76 $54,383.22 $2,185.27, Clairmont Equipment None $7,500.00 $1,800.00 $1,800.00 PAID IN FULL Ayala & Sons Vulcan Matterials Matich Corporation $2,371.00 $89,358.24 $5,136.42 PROJECT: FONTANA, CA JOB NO: 0012 January February March Vender Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Pacific Control Services, Inc. $2,500.00 Final $0.00 Robertsons V-Ditch $0.00 Final $0.00 Olson Precast Chino Ready Mix $2,100.00 $3,241.36 Paid Paid Paid thru 3 /31/01 E.J. Salgado Franklin Reinforced Steel $3,657.00 Final $3; 657.00 Final $0.00 E.J. Salgado $74,046.00 $27,806.00 $61,894.52 Western Rentals $3,000.00 $6,851.34 $1,002.53 $0.00 Sudhakar $13,250.00 $8,288.91 Pavement Recycling $19,210.00 $2,493.39 $2,493.39 • $8,214.23 Olson Precast $32,931.00 $0.00 $0.00 $0.00 UnitedRentals # 514 $5,000.00 $1,412.33 $814.44 Gladding McBean $80,000.00 $0.00 $0.00 $0.00 Holiday Rock $3,000.00 $1,420.82 $2,190.02 $0.00 Robertson's $16,306.96 $2,276.16 $537.23 $1,264.74 Southwest V-Ditch $13,912.33 Final $0.00 Penhall $10,000.00 $542.00 $566.50 $509.00 Nationsrent West $6,500.00 $4,318.13 $4,318.13 $4,318.13 E.J. Salgado Chino Ready Mix $5,186.66 $6,223.02 Paid thru 3 /30/01 E.J. Salgado Southwest Concrete $3,768.60 $0.00 $0.00 Hub Construction None $5,500.00 $2,908.37 $2,136.46 Dan Copp Crushing None $82,000.00 $4,172.54 Clairmont Equipment None $7,500.00 $0.00 $1,800.00 $1,800.00 PROJECT: JOB NO: FONTANA, CA 0012 October November December Vender Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid tJnwnd: Sudhakar Company Pacific Control Services, Inc. $2,500.00 $388.97 Robertsons V-Ditch $5,236.65 Olson Precast Chino Ready Mix $2,100.00 Date Reference CAI We are transmitting pages including cover sheet. ATTENTION Co r CCC1 Company Ctg- Address. City/State/Zip Phone No. Copies To Copies To ARE TR' SMITTIN Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application ,Message\, Fax UPS .: US Mail DII Hand • Courier ❑ Other • Cargo Carrier S A Ue. S2w•er,4 S+cv h Fax No. • v1 ICl/t'� at WA FROM .CHRIS DARLING Phone No. (909) 795-2568 Fax No. (909) 795-1840 Reply Requested Yes ❑ No Enclosures Yes ❑ No ❑ Original To Follow Yes ❑ No ❑ Transmission Verified By Time Approval Review & Comment Information/Files Proposal/Quote Other Urgent. CORPORATE OFFICE -12301 Central Ave. N.E., Ste 100 - Blaine, MN 55434-Tel: (612) 755-2199 - Fax: (612) 755-7801 SOUTHWEST DIVISION - 4901 Keller Springs Rd., Ste 112 - Dallas, TX 75248 - Tel: (972) 931-9494 - Fax: (972) 931-5474 WESTERN DIVISION - Post Office Box 831 Calimesa, CA 92320 - Tel: (909) 795-2568 - Fax: (909) 795-1840 PROJECT: FONTANA, CA JOB NO: 0012- 12/28/2001 November December Vender $ub/Supplier Prelien - Conditional _October Date Paid Uncond: Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Pacific Control SecesInc.2500.00 --- -- -,- ----"-_._ Y-,<`=:n=;=v � - <__..-- r .,.�,. " - -- - -- - - - - R bertsons -itch _- -_ = - -•-- . _ -- -_ Olson Precast ChinoReady- $2,100.00- - - - -�;�``� - _ .ls"„ ___ - _ - - _ ; `mot"� 5 : c, - E.J. I ado Franklin • Reinforced 657.00- - -y9'=4: - - � - = _ ' -_ ''''-`te � _ ' _ - - _- E.J. Salgado - $74,046.00 Western Rentals $3,000.00 _:_-. -.:.. _ -- _ Sudhakar $13,250.00 Pavement In Y 9 19 2 0.00 �•_=`-- - - _ ?fits - - -- - - - - - "�-, - - - - �y._y' i'i>;..�j;+�=.. Olson Precast 32 931.00 - -- - , .�T.. � - - _ -r ,yam _. _._- _ - - - , _ , , .. . UnitedRentals # 514 $5,000.00 $0.00 6,„1 i'� .+ G- laddln McBean- t 2.� - Tr_. - Holiday Rock ,, -_ - �����< Holiday Trucking 4, - - �=K= - Robertson's- $16,306.96 - -- - - - - - Southwest V D•Itc h - - - - - Pen• hall $10,000.00 $993.00 Nationsrent West - _..__-.:::a��,.: - E.J. SalgadoChinoReadyMc - - -- _--_- - Salgado Southwest Concrete - - - � - - - - _ _ �-�--- 1E.J. - u C Hb ons c• tru Uon n Noe 5 0 5 0.0 0 - - _ - - - - _ - - Dan CoppCr• ushing None $82,000.00 $0.00 Final $0.00 _ - - Clairmont Equipment- q P None $7,500.00- - - - - - - - Ayala & Sons -Corporation .- r= Vu anMattenals $2,371.00..:. - - - R USA, Inc. None 10000 00_, r ..__.__. _- _ u , .v�. - . ems - Ayala & Sons - - Jul August Sept. Vender Sub/Supplier Prelien Conditional Datey Paid Uncond. Conditional Date Paid Uncond. : Conditional Date Paid " Uncond. Sudhakar Company Pacific.. Controls Services, Inc. $2,500.00 Robertson V-Ditch F �y_��� Olson Precast Chino Ready Y , Mix $2,100.00 Paid Final Paid in Full E.J. Salgado Franklin Reinforced Steel _ $3,657.00 _; - �r :,� _ E.J. Salgado $74,046.00 Western Rentals $3,000.00 $0.00 $0.00 Final $0.00 Sudhakar _ - $13,250.00 ��_ ,�..0 �..e^G ?' �'� ?=,,-$-� x �, Pavement Recycling $19,210.00 - Final Paid in Full Olson Precast $32,931.00 $0.00 $0.00 $0.00 Final $0.00 UnitedRentals # 514 $5,000.00 $0.00 rwA.I 4c pc Gladding McBean $80,000.00 $0.00 $0.00 Final $0.00 Holiday Rock $3,000.00 $1,903.92 $1,903.92 $0.00 Final $0.00 Holiday Trucking $0.00 $0.00 $0.00 Final $0.00 Robertson's $16,306.96 $0.00 $0,00 Final 0.00 Southwest V-Ditch $13,91233 1-:r , A- il s ' Penhall $10,000.00 $0.00 $0.00 $0.00 $000- Nationsrent West $6,500.00 $0.00 Paid in full $0.00 Final $0.00 E.J. Salgado chino Ready Mix Final $0.00 E.J.Salgado Southwest Concrete Final $0 00 Hub Construction - None $5,500.00 $0.00 $0.00 - $0.00 $0.00 $0.00 Final $0.00 Dan Copp Crushing None $82,000.00 $594.81 $594.81 $0.00 Clairmont Equipment None $7,500 00 �� Ayala & Sons Matich corporation Final $300.30 Paid in Full Vulcan Matterials . $2,371.00 $0.00 $0.00 $0.00 _ Final $0.00 RSC USA, Inc. None : $10,000.00 $1,265.97 $0.00 $0.00 . $0.00 $0.00 - Ayala & Sons - - Final$40,787.51for Beech & Jurupa - Final $34 092.64 for Citrus & Jurupa Citrus ��� �--�� �. �� �, April May June Vender. Sub/Supplier Prelien Conditional Date Paid Uncond. Conditional Date Paid Uncond. Conditional Date Paid Uncond. Sudhakar Company Pacific Control Services, Inc. $2,500.00 Per Matte open invoices for April Final $0:00T �a2 f l: Robertsons V-Ditch Olson Precast Chino Ready Mix $2,100.00 $0.00 PAID THRU 5/31 /01 $273.85 E.J. Salgado Franklin Reinforced . Steel _ , $3,657.00 Final $0.00 E.J. Salgado $74,046.00 $9,787.25 Western Rentals $3,000.00 $1,184.48 $808.23 . $403.13 Sudhakar = $13,250.00 $3,312.43 Pavement Recycling $19,210.00 $8,643.23 Paid in Full Paid in Full Olson Precast $32,931.00 $0.00 $1,329.30 $0.00 UnitedRentals # 514 $5,000.00 $327.25 . $200.04 $744.58 $744:58f-- Giadding McBean $80,000.00 $0.00 $0.00 $0.00 HolidayRock : $3,000.00 $250.76 $13,412.61 $13,412.61 $1,903.92 Holiday Trucking $90.62 $90.62 $0.00 Robertson's $16,306.96 $802.75 $1,676.20 $1,676.20 $0.00 Southwest V-Ditch $13,912 33 '., h �.._iwo .45 _ - 3x £; - - Penhall $10,000.00 $566.50 $854.00 $0.00 $588.50 Nationsrent West $6,500.00 $4,318.13 $0.00 $0.00 $0.00 E.J. Salgado Chino Ready Mot $1,418.46 E.J. Salgado Southwest Concrete $0.00 Hub Construction None $5,500.00 $339.32 $339.32 $732.74 $732.74 $0.00 $0.00 Dan Copp Crushing None $82,000.00 March & April $55, 666.06 $52,792.76 $54,383.22 $2,185.27 Clairmont Equipment None $7,500.00 $1,800.00 $1,800.00 PAID IN FULL Ayala & Sons Matich $89,358.24 Vulcan Matterials $2,371.00 $5,136.42 RELEASE FORM 4 REC'DDEG 2 UNCONDITIONAL WAIVER AND RELEASE UPON FIl®lAL PAYMENT (Civil Code Sec. 3262) The undersigned has been paid in full for all labor, services, equipment or material furnished to KENKO, INC on the job of CITY OF FONTANA CITRUS & JURUPA JOB #0012/PO'#11241 FONTANA, CA located at And does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $ 0 — Dated: ehtoer Zo Zoo� CRG CORP NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES: THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN : PAID. IF YOU ` HAVE NOT BEEN PAID, USE CONDITIONAL RELEASE FORM. REC'DDEC 1..92001 RELEASE FORM 1 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262) Upon receipt by the undersigned of a check from KENKO, INC. In the sum of $-0- payable to DAN COPP CRUSHING CORP. And when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice or bond right the undersigned has on the job of CITY OF FONTANA CITRUS & JURUPA JOB #0012 / PO #11241 FONTANA, CA to the following extend. This release covers a progress payment for labor, services, equipment, or material furnished to KENKO, INC. through 9/30/01 TO 11/30/01 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the: release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by, the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of the document relies on it, said party should verify evidence of payment to the undersigned. REC'D DEC 192001 RELEASE FORM 2 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262) The undersigned has been paid and has received a progress payment in the sum of $594.81 for labor, services equipment or material furnished to KENKO, INC. on the job of CITY OF FONTANA located at: CITRUS & JURUPA JOB #0012 / PO #11241 FONTANA, CA and does hereby release any mechanic's lien, stop notice or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment or material furnished KEKNO, INC through 8/31/01 only and does not cover any retentions retained before or after the release date extras furnished before the release date forwhich payment has not been received, extras or items furnished after the release date. Rights based upon work, performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of contract, or the right of the undersigned to recover compensation for ` furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT .IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. United Rentals, Inc. P.O. Box 79333 City of Industry, CA 91716-9333 Tel: (949) 862-1100 Fax: (949) 862-4938 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) KENKO INC 12301 CENTRAL AVE NE #100. BLAINE MN 55434 The undersigned has been paid and has received a progress payment in the sum of for labor, services, equipment or material furnished to: KENKO INC on the job of: CITY OF FONTANA ***JOBSITE*** "SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO COUNTY JOB #0012 and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO INC through 11/30/2001 only and does not cover any retentions retained before or after the release date, extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in.this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment; or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, ormaterial was not compensated by the material covered by this release if that furnis rlebor, services, equipment,' or material was not compensated by the progress payment. �. Dated 12/11/2001 UNITED RENTALS INC Bv: NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF. YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc nyted als United Rentals, Inc. P.O. Box 79333 City of Industry, CA 91716-9333 Tel: (949) 862-1100 Fax: (949) 862-4938 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) KENKO INC. 12301 CENTRAL AVE NE #100 BLAINE MN 55434 The undersigned has been paid and has received a progress payment in the sum of for labor, services, equipment or material furnished to: KENKO INC on the job of: CITY OF FONTANA ***JOBSITE* SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO COUNTY JOB #0012 "PAID TO DATE" located at: and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to : KENKO INC through 07/31/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or, bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the material covered by, this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. ANITA SHULTZ DMINSTRATOR NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE. BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. ; IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc nited entals United Rentals, Inc. P.O. Box 79333 City of Industry, CA 91716-9333 Tel: (949) 862-1100 Fax: (949) 862-4938 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) KENKO INC 12301 CENTRAL AVE NE #100 BLAINE MN 55434 The undersigned has been paid and has received a progress payment in the sum of •for labor, services, equipment or material furnished to: KENKO INC on the job of: CITY OF FONTANA • ***JOBSITE*** "SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO COUNTY JOB #0012 $744.5.8 located at: and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to : KENKO INC through 06/30/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a • written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Dated ' 12/11/2001 By: Al (X12 V 1,441 r; ANITA SHULTZ LEfADMINSTRAT0R UNITED RENTALS INC • NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc , f1WE UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT CALIFORNIA CIVIL CODE 3262 (d)(4) The undersigned has been paid in full for all labor, services equipment or material furnished to: Kenko, Inc. on the job of: City of Fontana, Engineering Dept. located at VARIOUS STREET LOCATIONS, SEWER & STORM DRAIN, FONTANA, CA and does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $0.00. Holliday Trucking, Inc. Job #: KENKO13 Kenko, Inc. NOTICE TO PERSONS SIGNING THIS WAIVER:. THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM.. NOTE: CIVIL CODE 3262(d)(4)'PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a final payment and the claimant asserts in the waiver it has, in fact, been paid the final payment, the waiver and release shall follow substantially the form set forth above. Conditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of a check from in the sum of $ payable to 993.00 (Amount of Check) PENHALL COMPANY (Payee or Payees of Check) RECD DEC 14 201 (Maker of Check) and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice or bond right the undersigned has on the job of CITY OF FONTAANA (Owner) ONTARIO AVE. FONTAN CA #0012 (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished located at to through KENKO, INC. (Your Customer) OCTOBER 31, 2001 (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant m this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. DECEMBER 12, 2001 PENHALL COMPANY -DIVISION' ONE ONLY any Name NOTE; CIVIL CODE 3262 (d)(1) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the form set forth above. Form 6•A (Rev.1/94) BICA (213) 261•1100 A Construction Crock Reporting Agency. Unconditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(2) 'Me undersigned has been paid and has received a progress payment in the sum of $ for labor, services, equipment, or material furnished to on the job of located at CITY OF FONTANA (Owner) REC'D DEC 14 2001 KENKO, INC. (Your Customer) ONTARIO AVE. FONTANA, CA #0012 (Job Description) and does hereby release any mechanics' lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent: This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. through (Your Customer) SEPTEMBER 30, 2001 (Date) before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. Dated:. DECEMBER 12, 2001 only and does not cover any retentions retained PENH LL COMPANY -DIVISION ONE SHERRY DO "NOTICE TO PERSONS SIGNING THIS WAIVER: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID IF YOU HAVE NOT BEEN PAID 9 USE A CONDITIONAL RELEASE FORM NOTE: CIVIL CODE 3262 (d)(2) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the form set forth above. Form 6.0 (Rev. 1194) BICA (213) 251-0100 A Consh uctlon Credit Repotting Agency, 01/08/2002 08:27 FAX 7637557801 KENKO INC lJ001 No ❑ No ❑ No ❑ Time Approval Review & Comment Information/Files Proposal/Quote Other Urgent KENKO INC. FAX/TRANSMITTAL Date January 8, 2002 We are transmitting 1 ATTENTION Don Gdula Reference Citrus Ave_ Sewer and Storm Drain, N-O-C pages including cover sheet. Company City of Fontana - Engineering Div. Address City/State/Zip Phone No. Copies To Copies To WE ARE TRANSMITTING ❑oa0000 Message Please fax me a copy of the revised N-O-C. Thank You. Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application Fax UPS US Mail Hand Courier Other ❑ Cargo Carrier Fax No_ 909-350-6618 FROM Joanna Puck Phone No. 763-755-2199 Fax No. 763-755-7801 Reply Requested Enclosures Original To Follow Yes Yes Yes ❑ Transmission Verified By CORPORATE —12301 Central Ave. N.E., Ste 100 — Blaine. MN 55434 — Tel; (763) 755-2199 — Fax: (763) 755.7801 TAMPA - 801 South Falkcnburg Road, BLDG 14, STE 3, Tampa. FL 33619 - Tel (813) 653.9644 —Fax: (813) 653-1614 DALLAS— 2611 Westgrove Drive, Ste 107 — Carrollton, TX 75006 — Tel (972) 931-9494 — Fax: (972) 931.5474 PHOENIX— 3498 North San Marcos, Sulfa 2 — Chandler AZ, 65224 Tel: (480) 892-0444 - Fax (480) 892-2268 CALIMESA— Post Office Box 831— Callmesa, CA 92320 —Tel: (909) 795-2568— Fax: (909) 795-1840 KENKO INCA, "WE Dilb A ERICA" October 4, 2001 City of Fontana Engineering Division 8353 Sierra Avenue Fontana CA 92335 Attn: Felipe Molinos, PE RE: Bid No. SB-55-00 Citrus Avenue Sewer and Storm Drain from Jurupa Ave to Slover Ave Dear Mr. Molinos, We have recently received an unrecorded copy of Notice of Completion for the above referenced project. On September 27, 2001, Mr. Don Gdula stated that the document was sent to the County for recording September 26. He also indicated that a recorded copy would not be available for 4 or,5 weeks. Pursuant to the OO provisions of Section7107 c 2 of the Public Contract Code of the State of California, please authorize escrow agent to release all fundsand close account, immediately as the project was accepted by the City of Fontana on June 23, 2001 and these funds should have been released August 23, 2001. To expedite the process, please reference Escrow #105-20581, Account #9140016095 and direct your authorization, via fax, to: Maria Montoya Union Bank of California 1980 Saturn Street Monterey Park CA 91755 . (800) 699-8661 telephone (888) 847-7841 fax I appreciate your prompt cooperation in this matter. If you have any questions, I can be reached at 763-755-2199, in our corporate office. Sincerely, a . Anita Elsner CORPORATE - 12301 Central Avenue NE, Suite 100, Minneapolis Minnesota 55434 - (763) 755-2199 FAX (763) 755-7801 TAMPA - 601 South Falkenburg Road, BLDG 14, STE 3, Tampa Florida 33619 - (813) 653-9644 FAX (813) 653-1614 • ;;DALLAS - 2611 Westgrove Drive, Suite 107, Carrolton Texas 75006 - (972) 931-9494 FAX (972) 931-5474 CALIMESA - 1025 Calimesa Blvd., Calimesa California 92320 - (909) 795-2568 FAX (909) 795-1840 RUG-21-2001 12:48 mimKENKO INC. KENKO INC" 612 7557801 P.01/01 "WE'; ►IG A IIERICA" August 21, 2001 City of Fontana 8353 Sierra Avenue Fontana CA 92335 Attention: Finance Department Via Facsimile: 909-350-6618 Re Reduce and Release Retention Bid No. SB-55-00, Citrus Ave Sewer and Storm Drain from Jurupa Ave to Stover Ave To Whom it May Concern: 1 understand that you have agreed to reduce retention on the above referenced project to 5%- Please reference Escrow #105-20581, Account #9140016095 and direct your authorization to: Maria Montoya Union Bank of California 1980 Saturn Street Monterey Park CA 91755 (800) 699-8661 telephone (888) 847-7841 ` fax Thanks for your help and assistance. Should you require additional paperwork from us, please advise as soon as possible. If you have any question, please give me a call. Sincerely, 2,tL4J Anita Elsner Roger Schwarz Don Gdula CORPORATE - 12301 Central Avenue NE, Suite 100, Minneapolis Minnesota 55434 - (763) 755-2199 FAX (763) 755.7801 TAMPA - 601 South Falkenburg Road, BLDG 14, STE 3, Tampa Florida 33619 - (813) 653-9644 FAX (813) 653.1614 DALLAS - 2611 Westgrove Drive, Suite 107, Carrolton Texas 75006 - (972) 931-9494 FAX (972) 931-5474 CALIMESA • 1025 Calimesa Blvd., Calimesa California 92320 - (909) 795-2568 FAX (909) 795-1840 • • IN KCII Nt" M Prop + ►fly Owner Release ro►rrin w Whom It MNy Utmostlll KENKO ONO. ham I tt my III opt.' ly kw)viIsi l 011, KNNKO INO. rind ,,, va touo lull1 it ry lui rtii w (Al ,- 3 7 III NnII«rsnlary nott(III rIt1, rookAAJA ir%wormy) WIINr oA..) r�l IIt I4MItIN {a re • cy� I2 C tee*a.,.�. At ltnA , wrw�Iwnns-+Mwrii J Ia. µAi N- - 50 q -- 8`d-3 - I9I I pIN.)IIatI* ►iA11 Cll"Mr(]M w N000 ((tnliittlitnmk Ili, Ns NtIO w MIiUiuulirnIlu, MN M4$i 44 Tull 1I II) ?fl.tJN MAMI (ISN)1M14AO m4wMarwrvmON 144110l KuIIMr wpilnuu I(tL, will VIII 0« IiMIIMN, 'IX 101141 w I ull (NtI►111.I414., Pat (IMO 111+104 WNSINN4 DIMON N 14 Not CIrnnu Wow NA I .4. (IMIhitMMM, (Vt NYnPII ++ talt (UC1t1)1M14MIN1 w Mat(MOM)10NI1140 KENKO IN M Property Ommor RoIo&s oo Form VVhelin.It Mny ()moon); KIE' NK° INo. IVO loft my property loonier' eft ),„6„a.C,F2., rifle)/ vt� In niillur iotory condition, •urn t:a$ m rrtxnersninmrlrsetaa+ulatnicriereffetwadkrAt. huffy relenr a KIINItO IhN4;,,r lyrl r„ Ilnlallily t tit above location, tE I I" epromentetive Signature F rlitt Nemo // 5 c-(rt: u,5 AO,z. Addrtta ty Str1 talp IeOpiton (CIty or Public AUnnay or nny future. aperly Owner Signature Print Nnh11e'F nddre ete Clty/Bt tee/ 'Ip yn�..«.. .•Mrr�( wngW.kr:4�4wMwW.IhMN�<'Apr"ww,w�IF�WMwWk4':MY,w.�n"�FNfM��N?IN Telephone cf.')itportitTW k� `✓q1A »Il�grl ttprInahroolt 11r„ FHs 2,110 Mlimaapnllw, MN I1M -Talr (012) 70&0010 row (112) 700411102 • sotilliVVnarDIVISION .• 400) Kollar Ogrlrruw ritl„ tilw 1 iti •s I)wllwtr, rx 7na4i1- Twl: (072) 031�p404 0Irim (07a) 0314 474 V �4'rr l N OIVI8ION d r�oit affirm Flow 131 - clallmaaa, ()A U O'.. 1 1: (0OO) 7004000.E Fowl (000) 700.1040 KENKO INCm Property Owner Roleane .Form i WI1om It Mey Concern: K NRO INON help loft my property ionrterl nt �k9NMRYKt+'MA f)...+F wrw `!M!�/hNi� ' ... K .. .i. •MMnY•w•Y'4 Ir7 the roomy or t mlltfraotoryoondltleri, 1 hereby miens(() INO. and ... � „ . of any future' (Clty or Publlo Apenoy) . liability the ebovo location, KE�KKO opronontntive SIpnnture c/€isoAJ Print N141110 Addrerna Property +j nor * a uro Print Name :ar :�m�u4x^3f..�rram'mmu+�d���i Add roan . City tt telZIp Clly/State/ZIli ¢•A4' Mc1Y+9A%101* flt1fl100flr%* Y .l*a)s.flsfle•OErtf.'rtnRl ItY.v � 1010 S0fl%fl0kf1Mt1tW �k 1'ole°ii;no Telephone C10014O1VA'1l OIur ft7 2000 tanOrwlitonk Ilr1, TINT 0110 - MIIniMrpollk, MN I184I1 - `rwq (3I )1flfl 101- NMM! (212)12241202 BOUT iwr1 IrDIWfION..4U01 Kollar Mprhtur 11d„ I. 1'Ix-11MIII s, TX 72243 W TO (072) 031*010,1 Pfl (072) 0314474 WrISMAN DIVISION - PnMt Orfloo nom na 1 OMIlIt1MrN, CA 02120 - (000) 7004300 - I°MNI (000) 10d10410 10,94 . jko IN0t' rdlfp fie: yr1 KENKO IN . Property Owner Release Forte ,Dntopcp 00 To Whom It Mey Condom; KrNKO INO6 lino loft my proporty.Ionatod at n the county or ',► +o�Y r�mCG .� a� In w ntlt rnotory oondfUon I hereby rolonno INCII. liability + ttioabove Ioontion, nd (ENKO I" ►proaontative Signature'; c(4 Print NAM° . Addroas City/SW-to/Zip Tolephone ,.. Talophane mwlAa..rt1 �wnornw.r+mwtrx� aur4r�r rww,w (City or Public Agenay) of any future Property Ownor Signature Peg % C5 Print Name 13-9t5- Adclreat City/MtAtlI/ZIp ORPOffA1t OPl ICt SOSO 0101nplI UOk Dr" 010 220 MlnnaMholla, MN 1104 - TMII (012) itltl 111110 0. rim (012) 70041002 $01:11111 N1' DIVISION - 4001 I(aIIMr Atpino lidl„ ti1M' 112 ...1)01144, TX 711940 TO (012) 021.0404 ,.. rimr (012) 021.0414 W#. 1t)I1N DIVISION - Pawl (;)Ifina Sow 1121 . C)alUnpwa, OA 02220. Tall (000) 100.211011 Nix: (000) 700.1040 KENKO IN M Pro aorty Owner Release Form "1Whom Itl y Colic rn I t11111kO IN°. hon Ion my property Ioonted nt.J2/ 223371 In In the county or I hereby rolenne RUNK° INO. Ila�lalllty nt the above location, ntltrnotory condition,' nd �.v(Clty or Pubno Apnricay) KENt<O 'filial co ntntl voSIgnnturo4,50 I rint Nnrrtd /715 3 Ccra.4 KaaFatr CItyl' t rter' Ip Teleplicanta f r 8lunnturo Print Nnnne Addrnnn CIty/ftnt& ..ip Telephone re s. of any future eoiiPORA1fl OPTION - 0000 QhrIncibroak Dr., 010 220 - MIimoop004, MN 110423 . TMi: (012) 70041610 Pax: (012) /004002 SOUP 1l 3T DIVISION- 4001 Kollar dprlriu rlrl., Cola 112 - Willem, TX /0240 - TMI (012) 031.0404 + r. (0/2) 031.0414 WI m1Iroi hIVISIONpant tam % I1ow naI Oallntrwa, OA 02220 - Tot: (000) 100.20011- Proc; (000)100.1040 liability11 sI va I�t�Ittl tl, • KIENKO IN IN Property Owner Releelre Form 't ` o Whom It May t,lui►nallll �NAti� ANO. Imo Iatt my (1111t►aily I1ui.MIr,II al 010 sunnily or ote h.t` It y tato a* KIIIIi;NK° ANON rani) .K...._..„,.tdhk �... ,. of any tutus (lolly in Iatll,llr>7 ijwrmy) hi Mnlls?snluty r, ltclltlt111, IM�Vil1111tt� rit'I tLS )/0 }I . 414 %) -376 453A faillit Homo aM�..40E4,,L /�lll�r11NM (A C3IIy/tf 90 'Nail ate Ut 011C1N++11M OP IUM %NYNU lintlotillionit lit., Nis MMU» MIIIIINNIU111M, MN MIMS w 7011 IM1111104 310 M Misi (III)1NII.11001 MItIliWNWMsrtvvistON. MI Koller 11,1,, NI* 110 0. Itsllw.,'I X fAII44• Tils ISM 1714 414 it, Pa !M11) 011.1474 WWI ISM r3IVIIION Si 14061031m Pins Md I M tIMI1111NI1N, (IA 11MNi11.+'I.II_ (IUIj 11114111111 * PANT (Marl ?VW 140 KEE N KO lNCM Proprarity Owner Release Po tin tatty . , ,. .0 .011 , �.-W...* a 1NI1aII1 It May tlunusr11l KINK INo. ham lertt 1n Inca pally Iun,ilsrl al 04.11.1.1. 4.4.1.410011.5.010.010.101.414.04.- n the county or G. mallafaulary nonditlon, 111ereby release WINK° •No. and .�.. - ;1.1 of any future (Uliy Ag.noyi Ilabllltyy *Oho above Incallalt, ve � �gill�tuia �' 0.11 P utia► y Owner �1111t �lafllplQ em/s Aciclrnau C311� II� I'a l ltt311M 12 5 ( IIN+C"Ii+M'IM W1"t IM» NW M it uhrenk 11r„ a1N ONO MN ANON «Trli (Nil) NNOMrr Ip» MAMI` (bi1)11aiao1 a0u1Nbi+Narminx* IN 4001 Kollar apiluua U t 1 Ill. I IN «. NSW, 'IX 71111411.1111i (r11) 031.1404 w PAM! (011) 0214 414 MIS WIN DIVISION *Pool O1lua Mow XI11 . t1MlbnI M, t111 OYt1Mq *'rrlt (000) ?MINIS MMNI OOP 1001040 IINIaUIIy e I►w Iuoatlnl►, prt�ltw i iUv i iui I is 1p 9 32€V .0,53POW al • KENKO IN IN Property Owner Melees. corm 7y��ih,.e.xs pe{* o Whom It May Owolwt`ill KMINVKO MINI°. ha* Iatt fly IIIttl►atly ItHIMllall the county nr Y: v wa xasa.uiww•:v.e.:a�+eht .,nuMa.kaw.AI#$ 4.01*1 4MK$.4#t*MYSN....ie WEV)and lllrantt,ry nOnrlIticlrl, listelq It,M NKO IIMO. Isinll ,.:,._gA-C ' ' ,� _..�,, ,. (U1ly I11 1411.1llu 1iu«nuy Ow1ter grim ore v C2,44.4tez_ IJ,u i. Alclirl Ad riiy/Irwte)ih Of Arty future tqlttatrltOPIPXXi+.MINX 14,1 MIN N00 w Mh1U«MIIw1IU, MN milli Till tell) 1a11.111110.. MaoI (ail)1aa001 tit H1=1 I1r rMOON .0 4001 Kollot MIIIInU. 1441,1 NI. 'III 144 Doke, 'I X 1111141 wish (N11) Y41.041141 NMI (0111) I111.I414 N�1tIf1N1rMN OMMON» t'os(I Htn» Mmm III fl*ilh11NNN, t1A NInIt) w Tell (IOU) 1NIiIIIAN M Non (Iga)1I01040 • S KI LNKO INCH Property Owner Release Form T o Whom I► May atmantl KKNKO IN011eilly Intuits 1 wl In tltw nounly or lu NnhINraalory aolldlllan, hereby rr►Iaw*e KKNKO INO. and .�. ,t7N*< tally car tla nuern0Y) liability at the above location, Una r0I$ )519§tarii7ip e op lone roper Ng able nciclrNNN of any future Ullyll la147.10 per.. >. Y✓M.r++' , I e1�INl'a�`loil+� ODIN ONA1$ 001I000$11011II MOAN Ih,i Nip PIO PoMhn►NNpnllw, MN nh401.0 Till (Nil)1NN.NNI0 . Pisl (01I1)1014101 $0101 w arDIMIaIoNmiu1 Kollar MIIIIIIu. 1111,1 Ni* I IN r+ Dollar, 'IA r0N4N w Till (N10) Nd144N4 N Pam OM 1014414 WM1t1I NDIWSION. OtfloaIns Nil «tlsllil►Mr*, (1A 00drtl.+'loll (rap)1r1•INNNMII I `(Nt10)?WN.1IMO � DSO? gik1110 • KE NKO IN . Property Owner flelemee Form - 72),/ PIIMP...1.100,1, k.., Tu Whom It May tia11t111r111 KIKNNtCtt INC. IMAM Iatt Illy piOp!'Ilty InnsIMII MI „ „{ In the ooullty or ,I Nrr«tty toiler a MINK° INO. WWII , at the Mbpve Iaaatloll, III .„IINrMtltury t1ttiIICIIurn,, (uiiy'ur`1'ullllt, uwrttw) slit aeon ii. tact y vwiinir $(untiiur. ' 140111w rots niAnuN 4.14, c iiylt tw ip op Iona FaI.IIIg11M of turfy future C1G11fA I*A10 C1MUS 01100 MInIIUhlnnk I11ii MIM 14111 •+ MII1nispnhhw, MN 0401 "`hU (N111)1MI.0 1p» MMN1 (111j 1114101 ooli,IIW'M*rDIVISION «•410I Kellar Minims* 101,, Mla 111 Ileliar,'IX 11141 t.h OM) IA1.1Ab4-Poll Ut1) 1101.1474 Will 111104N DIVISION » Nail 0t11ne Muw Ia l . t,allmeaa, (IA 55011 M'1ali (IO/)100401 «MtrsI (I011)1I1.11A0 KENKO INOM Property Owner Ifteleasse Form . -• Datts_.„., . ---- To Whom It May cluncoml KINNKO ONO Intl Illy moonily lotimlmil ml -'11110,1001111/40010.1041 In the county )1t 16-.) .441{1.1......4.14.1.40.0.1111111.111. •••. 73)04,10 Iii sallatsclory nontlitIon, •homily �Isse RNRO UNION rind IOAiJA AbillnY) _ily or t liability the boys location, ,...411111110,111.11.-414 sprees, 0 vs Ulis the 4.01114.11040/1 tc lw &Warns 0 7L7 Iyittlia-4--/Coaro 07/ 000trent1Al OPPitil so MIMI 0tuhiuh,nnk 111,,NI. on.. Mlialeartello, MN 1104111 Tall (411) 101.01010 Prig (011) /10.10011 sot/1144par DIVISiON 04 4.01 (taller Mello( 1111,1slu 110 .111(1101, 'I X 100411 .1 Telt (0lt) 1131.0404 le Past (011) 111404 WM a 111111N MAHON Most tIttite Mom Ni 1.4 t3ollmatio, (IA (WOO -4 '1 eh (101) ?OHM al Poet (000 /11.111140 9144INIIP INakfitihilasitealeeee f IP• .44 • • • MIENKO INC. Property Owner Fiele se Forum 1'o Whom It Mow Out moo KINK° INti. limo loft my 'moonily Iw1alN(I t»1,......� /7/(--C) .�. In the county or I N1,Ww«. wwww. 1laieby !oleos, KIIiNKO INO. �riul liability i)lit«I�baxa' motion, 4/Lt,_s In NnllIfaetary nottclltian, KdAA)7.0 (Ulty or ('uhlitw ,wormy) llaprNNali t vl alunoltua Owner Signet Kitt Name Adtlinoo AJ nt Nam+, j tCt S moo ip c.liy/SlatartOp - alta� w w wet I'M(�11�►�Ila at any fulurs 001IN1."t►M1l O f tt i HOU Ntuhlnhlnuh 11r„ MIN p"111 ' Mliui.Nlmnlli, MN II114371 M Trlt (III) INCH It) w NMI (OM 100 000I 80ttWM),rDivtatON..41101 lirllrr amino 11t1,, X10 110 f" 11NIINr,'IX 1f1001. Tilt WI) 1111.04114.r.NI 0111 181.0414 IMgrr)*(4N DIVISION.. Neat faller ►luw 1131 mow, nA 11113011. Tull (OM 1N4INgl «row (N00)100 1040 • MINK° INOM Property Owner Releasee Form ' ' 111/ I e .1/ . . • • • 'lu Whom It Maw Uolloalitt MIEN KC1 I N • 110M loft • n tn• county of ly ploopoily iiimilf411 YC.-) AM a ko. Isi onlInfoolory I florally lolomoe KlitNIKO 111‘11C34 1110 lloblIlly ot Ilia Above l000lloti, A ci /// Mesa p .,114.011 Owt ire U ru of eny future t' , AZ.&•ii?"'" 0 OOMPONAIN OMMUN*11100 Ilgulnelmink lit., MIN ONO *, MN 1144111 T'.h Tocax )1) 0 p.m Rim ?mains ?*. 41014111WS0 r DIVISION .0 4001 Kallse 0.th,ua 14(1,1 NI* 111 Nollmo, 'I K /N14110 Tilt (Oil) 11141414 *nit (0/1) 00144/4 WX4110PON VIIIION NMI 001110 WIN NMI - (1411ffloom, (IA 11110 •41 all (001) /111•1111 • MINI (001)101,1140 • . t 111,1111141114140 (ND iftaiip RN • • KENKO INCN Property Owner flelease r'orrm To WIItHn It Maly t) mneillf K*NK° INCI. Ilea lett my (1tt.1(1n1Iy ,En,/U in the county or hereby tml.s*a KItNKO INCI4 r11ItI , llabIlltthe above • oallnn (ally it In NeltlNrentory nalutltIrlll, kepr smn Ml vela a ilia toe i�r wie>tr . analu ..K(5 iLeo__ ' Ar nt ante , lit we ► PI 1 i w - - . ......., .,.W AIR ..A )1("A-Aig.k - fa. 3 = ; 34., ...,e-., 9-y.z97- y elate ZIp C31 yietatelt e OOMPOPN111it optima +mid Mpthviiinnh i MI* 1011. M100sornlla, MN 11114111 M?rh (111►111 U110 0 NM (A11)1144401 aoInHI warp1Vl1 ON• 4101 Ilallar Nrilnus II(L, Nip 111 w II.,IIMN,'1 K 111141. Taff (0111)1114404 • PIM (N11)111.0174 WM1111Il,N DIVISION** Moot I3rlh10 Pm 011 «001h11ruu, pl1 MOO. Tali (000)111«0111 ilo MMMt(000j 700.1040 • KIBINKO IN ■ Property Owner Release form Whom It Mwy INit1IllMrIII KENKO INO. ItaM lett Illy IIIr»etly InnelMII nl .,,/./.� v In the molly or hereby Islamics KNRNKO INO, Mill Itela111,ant the alb ye 1or,Mtlott, MlnllwrIAnlury riollclltlr,n, (ully ter 11LI Jlta u.rtoy) �'N MM opt ion Ili1I'vM" ifulia�1ure �'ra� i Ty WI1r r ��nN use r ti Mite cod'AtiOA Cr--A•> !l1iurla *410 OF n. C?oo i I�iliit"NNie jIO2Z C rye us ntltiraaa c�iiyl�liC«�.lip or of any future 1313I 4MMIM 01'rPHt1I14.IIr11I1 MptloultIIInh IIt i NI. ON M MItiu..►InIIN, MN NMdMM w'rrh (II I) ?ALMA IN M P.M (NM 111.000I Np(iI wssrD Vi%loN« Aral kenos Nlglnui N1,1 a1M I II M IIMIIMII,'I)4 9tr141 «Tali (n1I)1314414 Past NMI I11.0414 WilalOPIN 131VIIION» wail tlU IIIr Mow RO I "" I MIIIIIMMM, t1A NIIMUl1 «'I rli (OWN 1II'11110 P151 (MMI►101.1140 t • KENACC! INC" Property Owner Release Form DI Whom It MMy (lonarrilit R*NK 1 INO. Imo lett my 11lt. oroly I1u1itlrul al 1_liatsUy reIew* liability llte In rintlrlwnlary condition, KIIINKO UNION rind /17('A-Y/A/z°(`'... al any future (oily or I'uIJII(i Auanuy) yr Iat3*(l in, lanoline Imo flint Nwlll« Addles* C311 v l�lwtM1�Cr?' 7; �� l'alanlmile If1+C'a1MII? t PN'1Cl11'+.01411 Mprinnl+inmah I1r,, MIN NMI MN 110401 w "Poll 1414)118 4410 M MOM (1101100 040 111011111%.warLSV sON«#N01 Kollar *mho (iul , 110 I IN' IINIINM,'I!l 70140 -'I I, (Oil) 431.1444 rim 1171/ 101.1474 WitalitigN DIVISION M Not Oftloo Sim NI I 0,fNII111NMN, till gpCl0U-'fell (000) 141414/ • rim 000190441140 pwll lily at the above 1ko11tIo11. tit NIN�IIII i KINN KO II NI M Property Owner Aleleace Form OL- To Whom It May taullnst KIKNKO IWO, lima Jett Illy lit (Nisi ly booth I Nl ,,.. Ire the of UI ly or _ is 10 ,,N,a � „. 111 imIletNtltory nortclltl t hereby tolemll11 11tNRhNNRCi ANON (tally or I IttlilltrAuartnyrr Pi6pnir Ow eri ?riillur - 0AL t7.!o_1 j9/r 6V a rIllltKnots- Ailt;kin a , of tatty future 70 Mp1113110 Ullyt lwl./ZIj � . /77o 013$11%10,410, OPPONt» ftufl *I Ib%ulullnk 111;, NI' M1111w Mhu1■MIInIIN, MN 101411 * Tilt (111) 7114110 M N$%l PIP 904001 - 801.11111MMarDIVISION •41g1 KullWW $IIIh111a I10,, NI• 110 r.I10II46,'1 K 1110411 * Till (i11)111•1414 r Pit (111) 0114414 NN111 NI1N DIVISION • Noel Ot010 Now Mt I *4 110IInt0ii, tiA 00100.410 (1t)1)1114441 Pim 11t111111.1140 • • KroN o I os Pwrrapes*ty Owner fl.Iema■ a rearm wlu►I►► tl Mfg)/ UuflusII%t *NKD INO+r Imo INtl illy 111ttI►Nlly I11tmsINtI Mu,.. %Ito naullly or • ' 1.1 .Ck� NIsHi+» i»,Yn•. MUy IMItsirtNM1 4*NKO INOr pool Iy.ii Ms above. Iaaollolli >cn��1, )»ww.Fwr«nr .1...»F», »II »,,.n,ll 114 • Nnliw?Nrllaty nclltrlIlldn, Fn A M � i N' 9M»uMu q� linty t11' f+►iltllti nu«Iiny) . 1 ('�III�I� NMIIIM Ailtl�antM MIAIIIItlll. 00041400,4111 t 1NgM is WO Mt II iuIunnh Itn, Mlrr 1011 w MIImNMtnNUh MN $1401 M'Tull (I I►180.4410 • roll pia) t11444 00 arOUI NWw* 1' DIV,OION. MI IOW Nlulnum I14,, NIM I I M DolloM,'IN 11141 • Tull lWWI)111.1414 PINI-101110l1604 N W'M1l I IIItN DIV$ MION w Mrrl l3l lnu MoM MN I $11lUI11/11Ni tM a1n111M l.11 IP01)11101141 • Pam Ib .,111111140 Y i • M Ka M 11111 0 M racy Owner Plieleasase Proem 'U VV1u1111 li Msy III 762 NIKO . IIM IMlli Illy 1llllls,$y 11111MIw11 NI «1,, Ir.**I ,I61`W10ahyl0+01X MM'TM.Yv11w1M.1MWI1H,aNM1+v'wMfW••40 hi MIIIIM(soItJry nut$ 1MUy 11100000 KMt A KO 'tube 11111) ....„V� "". (tlliy iy it Me rtbav (a�ItUii11� Ir 4 /IlI1MMN ;=_111,4l P0'/ll� I uiI«IIIiatiu I IitiOMNA1 W WWII. IINQ M 1111 ann* (11 , Nil ONO w MIiInHptHIN, MN WWAM *+'tell 11111 MAItt IA. PHI (I lrj 1011441111 *tilutiowoorplM It Nw 4IU) NNllo Nllilnll.I111,1 Nis III N I1.11*1 IK 1AMAA • tilt (MI1) II1.4014 Ai PHI 4Iwl1) A11+/ Aa ►MIIII111 PNVIMION * 1*rrll I tllnr Mom 1141 IIsINnM.s, ttll IYM1,1.0't et1 1001)1M1141111 so PaIt ,(AtIA,100.1� M It? • KIRINKO MN0M Property Owner Feleamwre 'worm • MIa , .,, „,:...,...-.,.,*...,.,1..,..p,b . `I'u Whom It MNy Uoilm 1111 K*N KO MO INN It Illy 11II111p1Iy Itli,MlhiI MI rfx•M, NM".�al ,.,w �� 5 c- NnIIN?Mnialy nutu111101l, Validly I0I0000 K*NKO UNION IiI I1I .....,, ,F2x) /`--k) A'` ... _,,.�.............� al /my fully Ilr I+iil111u 1�u�11uYS I 111 the nbuve loo*hull, ISMS ,� fv Iuu.liilM Of c /0 :� CU tU`1 tY'" e..fY.f, .... f •p Pit:111a r owrh- p IIII( MITI« I I to, nl N UI1NMta$M 1 k t1NN' $UN r NMNiI I1t , too 00I1 .r MIIIIIM0NNIN, MN $I40I 'I' ill IN 1I1 ?ILIA 10 w N001 Milt tU 1401 001111144'N#rOIVINIIIN• 4101 NMllor N1nU,u• I116, Nis 110 F.141Il01','IN 114411 a 10Ii I0►1) 0114414 of Poi WO 11I11144•,,; KN11 I �i1N b44$IION * NrNI t3iNnM M,IM 0111 w IIMIItnnMss, I111 Nrnrq w'I MIl IPU1) t11.01AI N MINI Rat) ?II.1141.. o-ttc • MC I MKO MIM M party Owner pI.Neas• rorim Whom Il MAy utmost Ili KIItNKIGI INOw IIAN lull Illy 1111I(INIIy IANIMM414141 /�4 y. N�, r�. w.*, a, M,N ..l. w M 11 ,.MS.40W 44.4 4WM4411 MIA county ut ».r.«1.. 1,.,,1 ..,, „ -!! .,,,.III Nn1IN?N111u1y nuutllllt,ll, IitlNlay INIMMMN 1t*NKCI INO• MI111 . ly RI Me MAWS 100111llui 1, .:. wp1NM 1 MIly IuI1N1111 M INI11^ .+i... rwwwrlw.r ^•A ' 1y- „rw tM."�i11«1. (lolly a I itll1I$H AuAjIIIYr 1 Ala 16118 11,101.111/1/4 OOPIKWA III b iui M NUNQ MI1IInuIi Unk Ills NI. moil w MlIIIrn wIIU, MN OMANI w Trl, (1111 /11.1a f i «Nail 11111110.111/1 l < Nou1N4VNA1"DIW110N. 401 II.IIMr MOON, I111,, MIN 1 IN a IIMIINu,'I K M1A1 • loll (rt1)111&1A1A 1~ Pam (1111111.1A A WIIIIIIIINDIVISIONN h+wl glnuw MOM MN 101 II IIIIINOM, aA 11n1I1.11 ali (1011 111.1141 r MANI'{IOU 11111.111,40 F • • C�CNKC) MNOIN Property Owner •MrrwlIIMs Form 010 'n Whom II MNy Uuuiistfn KKNKO INOt lime lilt flryalllrllslly hl .,...� 0 .'Mr,YYI M.FMs1.�.1+W.MMMrINv..M(u a 3 3, 7/ N/f�'1`c�lV ..Cee4tIele:5004/ III 100/0,0411I041 ncrlldlllall• 1 itstay IINl.irlullr H$NKO INO. 111111 >N . •" (L lly'I>'r fwi lilili�Jlu li�uy�"" ly at U. s t rve Iua*tIu11, {�1 N tli M Praii .NN««me eiroilre.iq ��ill'I("Nw11I1N Ai Id Mu 7 'na �'illy�W,rt«III1 1It9f1'M�f�liJl1011101011)111w 0111111$IH1flgllltlnh 111,1 NIM ONO to moilloNitnIIa1 MN NNANM w'foo 10101110,0010 NO MI1A1 fA 11, A1.11I1si a0111114i+M11 PN111111 N IA 40111 KMlhr NIIIUII 411161 014 1 I r w 114114411 N I004I1 • Mill 111111 1111.1404 01 P441 10Ilf 111004 W11 1MI1N 0IW1IUNw 00011310m Now 041 w 1I0IlI110aN, (IA mourn w'1.11 10001111.10011 w Poole 1Na0,.111.IN4p' y - - • • MEIN KO MN 0 M i'op*rty/' Owner" 11. lleame r'orni Whom It Mwy Ut1lu1Mt1►I Nita IhNO. Imo Ia11 Illy 01110411y IlmhIwtI Ml ,,, ..Q., /, „,».. ,1 . e„, i ,.. ♦M.1 I +/,0.00.0 W ..*.nn,, ..n'n$ Y,,,•NMlia .0.000...000.00 11Ft1►w nuu1►ty ot„ „., „ct ilit NfIIMrNUtialy nr,ltclllfr,ll, wUy lo1000, Nt,NINNRo INO. ty 11t Ws 111313V41(uu*llul►, ..,.,..„Y.� IA IV luiiriltus Nl11.1 ,MliM (t)liy 11r 11iI11b1 i�uwlluy� twirl y wiiwr lugs s kaitrit A-Rurall a?,FoiiklitAX& — (VOA) 1 IY ht MNINN++, 11ilwl Il ►uI IM 000000.410 111H'NUIM w M11011 Nlutngluu k MIN MIA w MIt111.NtmI$41 MN NAM •• 7411 14111 111111I/ M NMI (N 111111L111A 11pU111WMIINBIVINIAINa MINI 1441141414114011111.1 XI* 111►411NII441'I N 10041 w 7.1' 1111) I11.1A1A M Nag t11r1) 0A1.14 4 MINIM biWNItIN w Out 13l11a4 Moo NA 1 M IININn00N,11A 004011 01'I r11 1101)111.1,111 • Po m., toi.foo i, 3/ KENKO INC. Property Owner Release Form Date 6. a.a To Whott It May Concern: KENKO INO. has lett my properly boated at „di. In the county of In sntistactory condition. I hereby release KlNKO INO. and liability ,r the above location, ('N 15,\Representative Pro arty Owner Signature . ._. ra -Pafiri ►...a. PT fT Q1bc Tint Name Print Name FOA/6'L'KJA., , _ of any future (City or Public Agency) Address City/State/Ip Telephone Aidk I A-3a Ct r�d5 ?sv. Address ga33-7 - 5 � city/State/7,1p Telephone CORP©NAlS OPTICS- 0000 rgprinpbrnok Dr,, Ala 710 -. Mlnnpapolle, MN 06433 w Tel; (012) 700 0010 Priw; (a1a) 78114002 SIOUTHIMINT DIVISION — A001 Kollar O prime rid„ elm 112 — UMIIW., 'IX 187411— TN' (012) 0314404 . raw (072) 0314474 INkIAr IMN DIVISION w Pet OMNI Mx CA 02320 - Trl! (*00)100.2000 (*00) 100.1040 .!� 19'ID1tItilSQJNa, run No rre • • KIKINIKO MMNM N Property Owner fBpiNitplittra corm Deli 4 c Whom U Mow OuhoMLIII UNK° ONO. Iios 1611 Illy 11nisstly Uu1r11w1i bit ., ,� ; e- 1d1 M.wFH�r'Rls�i,rwY/M+- 1 sillIs Mntcfry notitlillnlb fMUy IMlrr►MNw KINNKO Ih11CC1. 1h1111 .4,,.k )».j _______, a ty at the above Iooa1Iui 11 1'1614'0714f 0 ais..w,wa++.w.r (ully'iir Ilidillu Au.iu,y) I' tops, ry it W I.r C3J ij/1461I07Ip" 9- '1 i11IMIiItatis attmlurM 000140$AIM f IPIOM w NNNU M1s NMI w Mhln.Mpnllai MN A$4NN w mil flip las.l111p 0 Fagg ' (Alps /14 souotwM*rpivtatoNw HUI Keller 11111htu.1111.1 NIP Hillis,/APAN *VA t010)NN1.14U • MaNI 1A11) oa1•1 IMi011MNV bIWMION w Nil nIIN1u Nog MAIM liolloiNuus t1A 0MM1111 w lib (SUM /114$01 w► MAMI711OI?00. /7J • • NK►C INI 0IN party Owner MANrriew.O M 1ritin 1i,r n •,/y WI1t1111 11 Pr11Ny Woo Hi ilk. Ilse loll my(►Ittllally Iltu►Ilwl) Nl (///—`/ ‘.?Cf"--� + li 1.1�'� this county Nii J` — 44Yrr.I s„I, w u ,. , , w,H1 *i* 14}101'MWNi WMr11/rrow....MMN+wW. 1.o... i 111441 1010000{ *NKO IKON 111I11 .,.., , ,/.r ''YIu I, t . 1.. «.++... of rally (tIlly In" I i1ilNu J' uwliuyi of the 'Above latarlllr+ll, III onIINIwitii y n t1iII IIr�11� 1 lr l0iii`i�""""'".""� *R4MI•*ITV 1Milw •IWo11. »r1N./Wh111 111 L111N1I'j MI110 10 DUI a NNMII 1101111iltnk 14.1 NIM NN1) w MIIItn.M11'll4, MN 11M4U •+'rill 11101111.14I0++ 1011)1M1/AAWA u1�11I4YM111'A1Wrw11INM I141 MNIIN1 N111N111N 111,1 NIN 111 w (1MIIMN, IIM INMAN r'1NII I0/11 /1144014.1N PNri' 10/0 001414 4VMN IMAN INVIO NUN wI ni I3$fl a Mow NA 1 M IININIINNN, IIA NMRNII M'1 NII INU11111.10410 punnet Am s • KENKO IN N Property Owner f#eIeauee 'Form UmIs To Whom It May Utmos1111 FLUNK° ItNO. Hari Irlt 111y t11ohs, ly Inl,nlrlll ►Il ,.. /. .o l 77 ,,,.; '4 ►Ii. oou, ty or IwNNN KON M° INO. the above Iao*tlnli, (L III M1IIIIralllary no ,dlllcllt� Citiumtloy Al > � 4 L Iit 411110 F ,hit MMII11N e.. �w..... re' nc cliu,u Yta 11iNrlM �i'«lilljillcallll t G#111ti11M1'M 1 P'PII 11 *, 111,, III++ 11111 «MIIUIrN,rnilN, MN RAM 04 Tilt 1411)1A11.4110» NNMI PIP 11N•NIk11 01)11111►Mi111I DIVISION it 4001 Ii.Ilsr 110100a lliI., 0114 I 10 ..10I1M4,'I K /1104N w Thlt 1010) 4414444 0 NMI WC 111.1474 140111lIIN DIVISION + KM MN. Mow MA l «n UMllm«sM, DA IWI00.1411 1414)111,1111 «NNM1` MOO 1Y1.1140 KENKO CONTRACTORS April 10, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Existing AC Berm Dear Mr. Gdula: As previously discussed we are requesting to be allowed to cap the existing asphalt berms on the above -mentioned project. The sub contractor, APCO, has been doing asphalt dike construction for the past 30 years. In short the process consists of applying a heavy tack coat to the existing clean dry berm, top and face. The 3/8 AR 8000-berm mix is then machined laid. Tile machine heats and compacts the material, which is extruded thru a slip form. The life expectancy of this installation is 20+ years. The cost of this installation is 1.81 per lineal foot. There is approximately 8,500 I.f. of existing AC berm. This will be far more cost effective than removal and replacement. Under schedule III of the pavement construction, bid item 8.0 will cover the additional .21 cents in that the quantity is anticipated to be less than depicted on the bid schedule. Your consideration of this matter is appreciated. If you have any questions or need additional information please feel free to contact me. Sincerely Roger SchvGa Superintendent cou. AtC1ZN•t IOW LtPi 01•601. c $Ire ' Asice0 4..A %A1lo 4,C ,Dtiak, et L1F► $ I a/FT $a.tiS . - mamma %%4 -me CO Cr cc: Corporate Calimesa IS)(bell; 4innir CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 - (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DMSION - 2611 Westgrove Drive, Suite 107 - Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DMSION - Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. PROPOSAL BID SHEET FOR CONSTRUCTION OF CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID NO. SB-55-00 Schedule III Pavement Construction Item No. Description Traffic Control, Signing, and Striping Earthwork Asphalt Concrete Pavement (Rover Avenue and Citrus Avenue Temporary Pavement) Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to Slaver Avenue) Asphalt Concrete Pavement (Beech Avenue) Class II Aggregate Base (Citrus Avenue Class II Aggregate Base (Beech Avenue Asphalt Concrete Dike Estimated Unit Quantity Amount ' N/A LS 10103 2,000 I q'',q 11,000 Tons II5b,4 1,600 Tons Unit Price Total Amount • ',',, a 215, 1- ,Zo(1. 11. �,1" �00) 33o,oao25_' i 6,400 CY ($ 1,000 CY 11,000 LF 9�;o� F..);IZO,) l 5-1 t ,DOUR 1.00 I rJ, (oval TOTAL AMOUNT OF BID SCHEDULE III (Sum r lUalitcl ce.a of Bid Items 1 through 8): ` f d Dollars $ P-15. (Figures) KENKO IN Date: May 3, 2001 To: Residents cc: City of Fontana From: Paul Anderson, Foreman Subject: Construction Notice "WE ®I AMERICA10 Ia Memorandu This memo is to notify you of paving from Santa Ana Ave. on Citrus to Stover on May 7th and May 8t , 2001, starting at 6:30 a.m until 5:30 p.m. Our apologies to you for this inconvenience. On Monday, May 7th and Tuesday, May 8t ., 2001 Absolutely No Parking in this area from 6:30 a.m. to 4:30 p.m. The street will be closed. Vehicles must be out of driveways before 6:30 a.m. and may return after 4 :30 p.m. Kenko, Inc. appreciates your patience and understanding during this_. time. If you have any questions, please feel free to contact Paul Anderson at (909) 376-1533. Minneapolis Minnesota- Dallas Texas — Tampa Florida — Callmesa California Western Division=1025 Calimesa Blvd. Calimesa, California 92320 — (909) 795-2568 FAX (909) 795-1840 KENKOi CONTRACTORS April 27, 2001 Mr. ;port Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Schedule III Pavement Construction Dear Mr. Gdula: Please review the attached correspondence from our paving sub -contractor. Based on my review of the Standard Specifications for Public Works Construction "Green Book" I believe his claim is not without merit. Section 3 — Changes In Work sub section 3-2.2.1 addresses this issue. Please let me know your thoughts relative to this matter. If you have any questions or need additional information please feel free to contact me. Roger Schw Superintendent cc: Corporate Calimesa CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 - (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. RECWPR 2 0 2001 GILBERT AYALA;,& SONS, INC. P. O. Box 1264 San Bernardino, Ca 92402 Phone (909) 888-7390 Fax (909) 888-0369 Contr. Lic. #605040 MBE #CT007475 Kenko Inc. P. O. Box 831 Calimesa, Ca 92320 Attn: Roger In July of last year when we bid the above referenced project we were requested by your office to provide a proposal to do the asphalt paving as described in Items #3, #4, & #5 of the bid package. Those items were described as having approximately 14,600 tons of asphalt paving in them. Now we are informed that there is only approximately 8,290 tons to be placed. This is a reduction of 6,310 tons, over 43%. The tremendous reduction in quantities has had an adverse affect on our costs for labor and materials. As a result, we feel we are entitled to adjust our pricing to reflect our increase expense. As you know, our proposal #1640 quoted 14,600 tons at $30.83 per ton. In re -calculating the project using the exact same method, but with the reduced quantities, we find that we would have quoted 32.47 per ton. The difference is'$1.64 per ton, and we feel the increase should be retroactive 10/17/00, our first day on this project. Our office will soon be forwarding a supplemental invoice to you that covers the tonnage furnished and placed on this project through.4/16/01. In addition, all subsequent billings will reflect the adjusted pricing. We thank you for your understanding and cooperation in this matter. Please feel free to call us at the above numb if you have any questions. NJ '.O3 e 600. KENKOi CONTRACTORS April 27, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Revised Slover Ave. Alignment Dear Mr. Gdula: I am in receipt of the revised plan for the sewer installation at the Slover Ave. Citrus Ave. intersection.The alignment of the 12-inch sewer heading East on Slover Ave. has changed substantially. The new alignment involves crossing under numerous utilities at awkward angles: Additional utility supports will also be required. We will be tracking our cost to construct the redesigned 12-inch VCP line and may require additional compensation for this work. If you have any questions or need additional information please feel free to contact me. CORPORATE OFFICE 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 - Carrollton, Texas 75006 - (972) 931-9494 Fax (972) 931-5474 WESTERN DIVISION- Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc: is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. KENKOi CONTRACTORS April 10, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Existing AC Berm Dear Mr. Gdula: As previously•discussed we are requesting to be allowed to cap the existing asphalt berms on the above -mentioned project. The subcontractor, APCO, has been doing asphalt dike construction for the past 30 years. In short the process consists of applying a heavy tack coat to the existing clean dry berm, top and face. The 3/8 AR 8000-berm mix is then machined laid. The machine heats and compacts the material, which is extruded thru a slip form. The life expectancy of this installation is 20+ years. The•cost of this installation is 1.81 per lineal foot. There is approximately 8,500 I.f. of existing AC berm. This will be far more cost effective than removal and replacement. Under schedule III' of the pavement construction, bid item 8.0 will cover the additional .21 cents in that the quantity is :anticipated to be less than depicted on the bid schedule. `Your consideration of this matter is appreciated. If you have any questions or need additional information please feel free to contact me. _Sincerely Roger Schv'arz Superintendent cc: Corporate Calimesa CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 - Carrollton, Texas 75006 - (972) 931-9494 Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. KENKOi CONTRACTORS April 9, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Extra Work Dear Mr. Gdula: Attached herewith are daily extra work reports, associated with various items of extra work performed between October 31, 2000 and March 22, 2001. Please consider this correspondence as our formal request for a change order related to the attached extra work. Additional workdays relative to this work are also required. If you have any questions or need additional information please give me a call. Sincerely Roger Schwarz Superintendent cc: Corporae Calimesa CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 - Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. Laura Lynne RELEASE FORM 1 • CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT undersigned of a check from: in the sum of $27,806.00 (TWENTY SEVEN THOUSAND, EIGHT HUNDRED SIX DOLLARS) Payable to: E. J. SALGADO, INC. And when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto any mechanic's lien, stop payment notice or bond right the undersigned has on the job of: CITY OF FONTANA, CALIFORNIA' R1002 located at: CITRUS AVENUE STORM DRAIN, FONTANA, CA to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished`to: KENKO, INC. Through FEBRUARY 28, 2001 only, and does not cover any retention or items furnished after said date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: MAR. 29, 2001. NOTE: This form complies with the requirements of Civil Code Section 3262(d)(1). It is to be used by a party who applies for a progress payment when the progress payment check has not yet cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. By: L.Lynn¢, Aet .Spvsr, located at to Unconditional Waiver and ReIS MAR 27 2001 Upon Final Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(4) The undersigned has been paid in full for ,all labor, services, equipment or material furnished on the job cf_ ef.c, 1 C:-.‘ tvVer r\ (Your ustomer) c ci7) IAA JO r26 11 (Job Descriptmn) and does hereby waive and release any right to a mechanics' lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $ Dated: Al7— ,,,TRAFFIC CO N1 OL SERVICE, INC. (Co7te-)p.„,k-(7) By ��i��piru�oo AUTIV413114 AGENT; NOTICE TO PERSONS SIGNING THIS WAIVER: THIS DOCUMENT WAIVES RIGHTS. UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. NOTE: CIVIL CODE 3262 (d)(4) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a final payment and the claimant asserts in the waiver it has, in fact, been paid the final payment, the waiver and release shall follow substantially the form set forth above. Form 6613 (Rev.8991) BICA (213) 251-1100 AConstruction Credit Repcdng Agency. PACIFIC tOAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-3318 (323) 568-1850 Fax (323) 563-9926 Unconditional Waiver and Release Upon Progress Payment The undersigned has been paid, and received a progress payment in the sum of $ 40,726.36 , . for labor, services, equipment or material furnished to: Kenko, Inc. on the job of : City of Fontana located at: Citrus Avenue Sewer, Jurupa & Citrus, Fontana, CA and doeshereby release any mechanic's lien, stop notice or bond right that the undersigned has on the above referenced job to the following extent: This release covers a progress payment for labor, services, equipment, or materials furnished to: Kenko, Inc. through 10-31-00 only and does not cover any retention's retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has. been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished . labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Gladding McBean (Company) Sher Vang, Credit7Manager Notice: This document waives rights unconditionally and states that you have been paid for giving up those rights. This document is enforceable against you if you sign it, even if you have been paid. If you have not been paid, use a Conditional Release form. PACIFIC building prod 4301 E. Firestone Blvd. South Gate, CA 90280-3318 (323) 568-1850 Fax (323) 563-9926 ST cts •. REC'D MAR 2 6 ZOO1 Unconditional Waiver and Release Progress Payment The undersigned has been paid, and received a progress payment in the sum of $ 11,312.95, for labor, services, equipment or material furnished to: Kenko, Inc. on the job of : City of Fontana located at: Citrus Avenue Sewer, Jurupa & Citrus, Fontana, CA and does hereby release any mechanic's lien, stop notice or bond right that the undersigned has on the above referenced job to the following extent: This release covers a progress payment for labor, services, equipment, or materials furnished to: Kenko, Inc. through 11-30-00 only and does not cover any retention's retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release, if that furnished labor, services, equipment, or material was not compensated by the progress payment. Sher Vang, Cre Notice: This document waives rights unconditionally and states that you have been paid for giving up those rights. This document is enforceable against you if you sign it, even if you have been paid. If you have not been paid, use a Conditional Release form. PACIFIC ZOAST building products 4301 E. Firestone Blvd. South Gate, CA.90280-3318 (323) 568-1850 Fax (323) 563-9926 REC'O MAR 2 Conditional Waiver and Release Progress Payment Upon receipt by the undersigned of a check from Kenko, Inc. in the sum of $ 32,783.12 , payable to: Gladding McBean, and when the check has 'been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job - of City of Fontana located at Citrus Avenue Sewer, Jurupa & Citrus, Fontana, CA to the following extent. This release covers the progressive payment for labor, services, equipment or material furnished to Kenko, Inc. through 12-31-00 only and does not cover any retention's retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or. breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Date: 03-12-01 Gladding McBean (Company) VONO PACIFIC !OAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-3318 (323) 568-1850 Fax (323) 563-9926 Conditional Waiver and Release Upon Progress Payment Upon receipt by the undersigned of a check from Kenko, Inc. in the sum of $ -0- payable to: Gladding McBean, and. when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of: City of Fontana . located at: Citrus Avenue Sewer, Jurupa & Citrus, Fontana, CA to the following extent: This release covers the progressive payment for labor, services, equipment or material furnished to: Kenko, Inc. through 02/28/01 only and does not cover any retentions retained before or after the release date; this release does not cover any previously issued yet unpaid release as indicated below, extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are. covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Date: 03/12/01 SCHEDULE OF PREVIOULSY ISSUED YET UNPAID LIEN RELEASES: 12-31-00 $32,783.12 Gladding McBean (Company) Sher Vang, C edit Manager PACIFIC !OAST building products 4301 E. Firestone Blvd. South, Gate, CA 90280-3318 (323) 568-1850 Fax (323) 563-9926 Conditional Waiver and Release Upon Progress Payment Upon receipt by the undersigned of a check from Kenko, Inc., in the sum of $ -0- payable to: Gladding McBean, and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of: City of Fontana located at: Citrus. Avenue Sewer, Juruna & Citrus, Fontana, CA to the following extent: This release covers the progressive payment for labor, services, equipment or material furnished to: Kenko, Inc. through 01/31/01 only and does not cover any retentions retained before or after the release date; this release does not cover any previously issued yet unpaid release as indicated below, extras furnished before the release date for which payment has not been received extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the . undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Date: 03/12/01 SCHEDULE OF PREVIOULSY ISSUED YET UNPAID LIEN RELEASES: 12-31-00. $32,783.12 By: Gladding McBean (Company) Sher Vang, Cre1it Manager 1. EC' Conditional Waiver and Release• • D M AR 2 6 2001 Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of a check from inthe sum of $ payable to 566.50 KENKO, INC. (Maker of Check) (Amount of Check) PENHALL COMPANY (Payee or Payees of Check) and whenthe check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice or bond right the undersigned has on the job of CITY OF FONTANA located a (Owner) ONTARIO AVE. FONTANA. CA #0012 (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished to through KENKO, INC. (Your Customer) FEBRUARY 28, 2001 (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date: Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant m this release. This release of any mechanics' lien, stop notice; or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission,abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned, Dated: MARCH 23, 2001 `,jG 1 NOTE: ABOVE AMOUNT DOES NOT INGLIng I' $542.00 FROM PREVIOUS RELEAg DATED MARCH 23, 2001. PENHALL COMPANY -DIVISION ONE ONLY NOTE:. CIVIL CODE 3262 (d)(1) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the form set forth above. Form BA (Rev. 1184) BICA (213) 251.1100 A Construction Croak Reporting Agency, REC'D MAR 2 6 200 Conditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of a check from KENKO, INC. in the sum of $ 542.00 (Amount of Check) (Maker of Check) payable to PENHALL COMPANY (Payee or Payees of Check) and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice or bond ri t the undersigned has on the job of CITY OF FONT A (Owner) located a ONTARIO AVE. FONTANA. CA #0012 (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished KENKO, INC. through (Your Customer) JANUARY 31, 2001 (Date) only, and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically. reserved by the claimant m this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: MARCH 23; 2001 v, pt. q 37 PENHALL COMPANY -DIVISION ONE ONLY mpany Name) By �� / �4. ‘2-Z -sue- - REDIT ADMIN. ("I'itte) NOTE: CIVIL CODE 3262 (d)(1) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the form set forth above. Form 6•A (Rev. 1194) BICA (213) 251.1100 A Construction Crock Reporting Agency. Conditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(I) Upon receipt by the undersigned oil cheek from in the sum of $ '' —56640 payable to KENKO, INC. (dmotutt of t.7heek) PENHALL COMPANY (Maker of Check.: (Payee or Prtvoes ofL7teek) and when the check has been properly endorsed and has bt.un paid by the hank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice or bond right the undersigned has on the job of CITY OF FONTANA ,• (Owner) located a QNTARIO AVE. FONTANAs'A w`l0012 (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment, or Material furnished KENKO, INC. ()ourC.utrom?r) through FEBRUARY 28, 2001 (Date) only and does not cover any retentions retained before or rifler the release date; extras furnished betore the release dote fur which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been filly executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant m this release, This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services,equipment, car material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: MARCH 23, 7001 PENHATT. COMPANY -DIVISION ONE ONLY / II ampmry pow) NOTE: ABOVE AMOUNT DOES NOT INCL /( $542_OO FROM PREVIOUS RELEA� - w- �traA�aC6t.r�.RELT''r1llMIN. f DATED MARCH 23, 2001. / (line) NOTfi: CIVIL CODE 3262 (d)(I) PROVIDES: Where the elaiuuun is required iv eiec'irle a waiver and release in e.xcrange• for, or in order lu induce the payment ot, a progt'aer payment and the dainrunt i$ ant, in fact, paid in exchange for the waiver nod release or a single payee check or joint payee check is given in exchange fbr den waiver am! release, the waiver and re1w. ut sha!l follow substantially the form se: fortis above. regal CA (Roy. 11.34) 9ICA (lit) 211-11ce A Cansauallan Cita Aeponfetl AAency. •a L8L9 8LL bIL . Ruedwoo.tieyuad eL0 :60 TO, E2 .aeW Conditional Waiver and Release Upon Progress Payment CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of check from KENKO, INC.,.' ('Maker of ['heck) in the sum of $ 542.00 (A never of l:hrrk) payable to PENHALL COMPANY (Payeenr Payees ofe:heck) and when the check has been properly endorsed and has been paid by the hank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice or bond right the undersigned has on the, job of • CITY OF FON'1'ANA Owner) looaled n ONTARIO AVE.FONTANA: CA #01112 (Job Description) Io der: following ezlent. This release covers a progress payment for labor, services, equipment, or material furnished CO KENKO, INC. through (Your Customer) JANUARY 31, 2001 (nate) only and does not cover any retentions iriuined before or Mier the release date; extras furnished irefore the release elate for which payment has not been received; extras or items furnished after the release date. !tights based upon work performed or items furnished under a written change order which htis been fully executed by the ponies prior to the release date are covered by this release unless specifically reserved by the claimant m this release. This release of any mechanics' lieu, stop notice, or bond right shall not otherwise affect the contract rights. including rights between parties to the contract based upon a rescission. abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, service& equipment. orniaterial was not compensated by the progress payment. Before any recipient of. this document relies on it, said party should verify evidence of payment to the undersigned. Dated: MARCH 23, 2001. PENHALL COMPANY -DIVISION ONE ONLY e•c•ta.•. )}rnpagv Nome) ..J , P 4, .CREDIT ADMIN. (role) Nt)1'131(Chat,; C;Orn 32fi2 (d)(I) PROVIDES: Where the clattnmrt Ls required to avemte a waiver and release in exelrattge, %r, or ire ere r to induce the payment of, a progress payment and true claimant it not, ht fact, paid in exchange fni• the, waiver and release ar a single payee check urjaim payee alma is given in eachanxefor the waiver and release, the waiver and release skull furrow substantially (he form serpent, above. Farm 6A (Rev.1Al)111CA 1213) 201.1100 A Coeietiouon Crock Ripening Aaone' i4adhakar Company, Inc. 50 N. Fitzgerald Ave. Rialto, CA. 92376 Phone No.(909) 879-2933 Fax No, (909) 879-2939 REC'D MAR 21 2001 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT [California Civil Code 3262 (d)(3)] The undersigned has been paid and has received a progress payment in the sum of $S,288.91 For labor, services, equipment, or material furnished to KENKO CONTRACTORS (YOUR CUSTOMER) On the job of CITY OF FONTANA ENGINEERING DEPT. Located at (OWNER) CITRUS AVE SEWER & STORM DRAIN (Job Description) And does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to KENKO CONTRACTORS (YOUR CUSTOMER) through 02/28/01 only and does not cover retention's retained before or after the release date extras (DATE) Furnished before the release date for which payment has not been received, extras or items furnished after the release date. Rights based upon work performed or items furnished under a written changer order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics lien, stop notice, or bond right shall not otherwise effect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breech of contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) OLSON PRECAST CO 2750 MARION DRIVE LAS VEGAS NV 89115 The undersigned has been paid and has received a progress payment in the sum of for labor, services, equipment or material furnished to: OLSON PRECAST CO on the job of: CITY OF FONTANA ***JOBSITE*** PO #7100/JOB #0012 SLOVER & CITRUS FONTANA CA "VARIOUS STREET IMPROVEMENTS" JS #909-795-2568 PAID THRU 01/31/2001 located at: and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to : OLSON PRECAST CO through 01/31/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights basedupon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release: This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor; services, equipment, or material was not compensated by the material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress •payment. ANNE MALEY ASSISTAN INO READY MIX REDIT MAjSdAGER NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID,: USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc EC'D MAR 21200 1 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) OLSON PRECAST CO 2750 MARION DRIVE LAS VEGAS NV 89115 The undersigned has been paid and has received a progress payment in the sum of for labor, services, equipment or material furnished to: OLSON PRECAST CO. on the job of: CITY OF FONTANA **JOBSITE*** PO #7100/JOB #0012 SLOVER &.CITRUS FONTANA CA "VARIOUS STREET IMPROVEMENTS" JS #909-795-2568 PAID THRU 02/28/2001 located at: and does hereby., release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to : OLSON PRECAST CO through 02/28/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. ANNE MALEY - ASSISTANT EDIT MA NOTICE._:.:.. THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT. BEEN PAID, USE A CONDITIONAL RELEASE FORM. Forms by Caprenos Inc RECD MAR 212001. OLSON PRECAST CO. 2750 MARION DR LAS VEGAS, NEVADA 89115 (702) 643-4371 FAX (702) 643-4510 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262 (d) (1)) Upon receipt by the undersigned of a check from KENKO, INC. in sum of $0.00 payable to OLSON PRECAST COMPANY and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto an mechanic's. lien, stop notice or bond right the undersigned has on thejob of CITY OF FONTANA located at CITRUS AVENUE SEWER AND STORM DRAIN - OLSON JOB NO. 7100 to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. from 02/01/01 through 02/28/01 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Erinn E. Sullivan, Contract Administrator OLSON PRECAST COMPANY This form complies with the requirements of Civil Code section3262 (d) (1). It is to be used by a party who applies for a progress payment when the progress payment check has not yet cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. OLSON PRECAST CO. 2750 MARION DR. LAS VEGAS, NEVADA 89115 (702) 643-4371 FAX (702) 643-4510 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262 (d) (1)) Upon receipt by the undersigned of a check from KENKO, INC. in sum of $0.00 payable to OLSON PRECAST COMPANY and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto an mechanic's lien, stop notice or bond right the undersigned hason the job of CITY OF FONTANA located at CITRUS AVENUE SEWER AND STORM DRAIN OLSON JOB NO. 7100 to the following; extent. This release covers a progress payment for labor, services, equipment, or materials' furnished to KENKO, INC. from 01/01/01 through 01/31/01 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or, items furnished after the release date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: 03/12/01 NOTE: Signed: .11 _, y _` :.pLQl1. fzu___ Erinn E. Sullivan, C'ontract'Administrator OLSON PRECAST COMPANY This form complies with the requirements of Civil Code section 3262 (d) (l). It is to be used by a party who applies for a progress payment when the progress payment check has not yet cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. OLSON PRECAST CO. 2750 MARION DR. LAS VEGAS, NEVADA 89115 (702) 643-4371 FAX (702) 643-4510 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262 (d) (1)) Upon receipt by the undersigned of a check from KENKO, INC. in sum of $17,274.60 payable to OLSON PRECAST COMPANY and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto an mechanic's lien, stop notice or bond right the undersigned has on the job of CITY OF FONTANA located at CITRUS AVENUE SEWER AND STORM DRAIN - OLSON JOB NO. 7100 to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. through 12/31/00 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Signed:_../2_liL i1 1 n Erinn E. Sullivan, C ntract Administrator OLSON PRECAST COMPANY This form complies with the requirements of Civil Code section 3262 (d) (1). It is to be used by a party who applies for a progress payment when the progress payment check has not yet cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. 2750 MARION DR. LAS VEGAS, NEVADA 89 115 (702) 643-4371 FAX (702) 643-451,0 IMAL WAIVER. AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262 (d) (1)) Upon receipt,the bypndersigned of a check from. TC1t KO, INC. in sum ofi$0 00$payable torOYESY® +" 1 RE *� Oy,_ Ny and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto an mechanic's lien, stop notice or bond right the undersigned has on the job of CITY OF F WAWA located at CITRUS AVENUE SEWER AND STORM DRAIN - OLSON JOB NO. 7100 to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to 1<ENKO, EVC. fronrO1 el40L1C�J 'off t40l/31/0'rdnly and does not cover any retention;, retained before or after, the release date; extras furnished before the release date for which payment has not been received; extras or items furni.sbed after the release date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Signed: `` f r n •1_II)1.d_fG{ lL Erinn E. Sullivan, C'ontract Administrator OLSON PRECAST COMP.ANY This form complies with the requirements of Civil Code section 3262 (d) (1). It is to be used by a party who applies for a progress payment when the progress payment check has not yet cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. OLSON PRECAST CO. 2750 MARION DR. LAS VEGAS, NEVADA 89115. ('702) 643-4371 FAX (702) 643-4510 suzrZti iTIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT (Civil Code Sec. 3262 (d) (1)) • Upon ree ip ,h, e%undersigned of a check from KENKO, INC. in sum of� SO 00Vayable to & O k .R �f AST °ClilVl PAl',and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release pro tanto at mechanic's lien, stop notice or bond right the undersigned has on the job otfery0 FON ['YAWib/.Located at CITRUS AVENUE SEWER AND STORM DRAIN - OLSON JO1F3 NO. 7100 to the following extent This release covers a progress payment for labor, services, equipment, or materials furnished to KENIKO, INC. frotrg124 >( ifin g ifilla/Of` $iiI and does not cover any retentions retained before or after the release date; extras#'urnished before the release date for which payment has not been received; extras or items furnished after the release date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: 03/12/01 Signed: "L a;k.�.0 _tt Erinn E. Sullivan, Contract Administrator OLSON PRECAST COMPANY .NOTE: This form complies with the requirements of Civil Code section 3262 (d) (1), It is to be used by a party who applies for a progress payment when the progress payment check yet not cleared the bank. This release only becomes effective when the check, properly endorsed, has cleared the bank. 'tntirNDITIQNAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) OLSON PRECAST CO 2750 MARION DRIVE LAS VEGAS NV 89115 The undersigned has been paid and has received a progress payment in the sum of 'RA for labor, services, equipment or material furnished to: gOCS0-120RECAST CO • on the job of: CITY o r 1 NA�o • ***JOBSITE PO #7100/JOBf0°d1fSLOVER & CITRUS FONTANA CA "VARIOUS STREET IMPROVEMENTS" JS #909-795-2568 r„THRU 01/31I200`.1 located at: and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced jab to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to OLSON PRECAST CO t•VTEAVYMMEgtair/20,0V4V only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice; or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the Contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, ._.or materiahcoveredLby_thimelease.if that furnished Iabor,R.services,„eguipment, or material was not compensated by_the material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. NOVICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID' FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN. IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAI©, USE A CONDITIONAL RELEASE FORM. Forma by Caprenos Inc tJNCQNDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (2) OLSON PRECAST CO 2750 MARION DRIVE LAS VEGAS NV 89115 The undersigned has been paid and has received a progress payment in the sum of for labor, services, equipment or material furnished toAtr,OLS,C1N PRE AyST, O 4 on the job of: CITY OF FON ANA �.„. ' ***JOBSITE* PO #7100/JOBrgaumeOVER & CITRUS FONTANA CA"VARIOUS STREET IMPROVEMENTS" JS #909-795-2568 liffRUl021V31200111 located at: and does hereby, release any mechanic's lien, stop 'notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to OLSON PRECAST CO tRlrp gfii,?..r":.0?J2412;Q01, only and does not cover arty retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, Including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the by that labor,services e ui pent or material was not compensated.by the progress material covered this release if furnished, q p � - payment. Dated 03/12/2001 By: NNE MALEY ASSISTANT ► ' EDIT MA R ,NOTICE:__ THISDOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE . AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF; YOU HAVE NOT EEN PAID USE A CONDITIONAL RELEASE FORM. NDITIO_ Forms by Caprenoo ins ANT RECD MAR 152001. CALIFORNIA LIEN WAIVER AND, RELEASE FORM,. "(California Civil Code Section 3262(D) et Seq.) CONDITIONAL WAIVER AND RELEASE UPON' PROGRESS PAYMENT .Upon receipt by the undersigned of a check from KENKO, INC. in the sum of $2-,614.26 payable to PAVEMENT RECYCLING SYSTEMS, INC. ,.and when the check. has been properly endorsed and has been 'paid by the: bank upon which it is 'drawn, this document shall becomeeffective to release any Mechanic':s Lien, Stop Notice or bond; right the undersigned, has on.the.job of CITY<OF.FONTANA- ENGINEERING DEPARTMENT. Said project and property 'is commonly known as the CITRUS & JURUPA project, located Fontana,' CA 92337. The specific contract information is for Our Job/Invoice #R081175.. This claim shall be released by the undersigned to the following extent: this release covers a' progress payment for labor, services, equipment or material furnished to KENKO, INC. from 02/01/2001 through 02/28/2001only. THIS SE FURNISHEDABEFORESTHETRELVER LEASEANY DATEEFORTIONS WHICHRETAINED paymentt hasOnot:beenRE. OR TER the receivedelte extrasdor; temsas gupon or items IURNISH THE Y by pparties and invoiced prior to the WRITTENEDhangeRorderRwhichEhastbeenlfull basedexecutedwothe performed'or items FURNISHED U the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any Mechanic's Lien, Stop Notice or bond right shall not otherwise affaffect'the contract rights,cluding rights between parties to the contract. based upon a g ,,. breach of the contract, or the right of the undersigned to. recover• compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment., This Release does not cover any labor, services, equipment, ,or materials that were not invoiced during this. period,, or unpaid or unauthorized change orders. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated 03/14/2001 for.Pavement Recycling' Systems, Inc., Pc0:`;Box'1266, Riverside, CA 92502 By: Robert Jensen, •.counting Clerk Telephone: (909) 682-1091 Fax: (909) 682-1094 CALIFORNIA LIEN WAIVER AND RELEASE FORM (California' Civil Code Section 3262(D) et Seq. CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT .Upon receipt by:the undersigned,' of a check from KENKO; INC. in the sum of $2,493.39`Payable 'to PAVEMENT RECYCLING SYSTEMS, INC. , and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any Mechanic's Lien, Stop Notice or.bond right the undersigned has on -the job of CITY OF FONTANA- ENGINEERING'DEPARTMENT. -Said oject9anand 7property is commonly known as the CITRUS & JURUPA project, located at adapr The specific contract information as for Our Job/Invoice #R081175. This claim shall be. released by the undersigned to the following extent: this release covers a progress payment for labor, services, equipment or material furnished to KENKO, INC. from 01/01/2001'through 01/31/2001 only.' THIS RELEASE DOES NOT COVER ANY RETENTIONS RETAINED BEFORE OR AFTER the release date; extras' FURNISHED BEFORE THE RELEASE DATE FOR WHICH payment has not been- received; extras' or.i'tems FURNISHED AFTER THE RELEASE date. Rights based upon work performed or items FURNISHED UNDER A WRITTEN:change order which has been fully executed by the parties and invoiced prior to the release date are covered:by this release unless specifically reserved by the claimant in this release.: This release;of 2ny Mechanic's Lien, Stop Notice' or bond right shall not otherwise affect the contract rights, including rights between parties to the contract• based upon`a' recession, abandonment or breach of the contract, or the right of'the undersigned to recover compensation for furnished labor,; services, equipment or material covered by this release if that furnished labor, `services, equipment or material was not compensated by the progress. payment. This Release does not cover any labor, services, equipment, or materials that were not invoiced during this period, or unpaid or unauthorized change orders. Before any recipient of this document relies on it, said party should verify evidence of payment.to-the undersigned. Dated 03/14/2001 for Pavement Recycling Systems, Inc., P.O., Box 1266, Riverside, CA 92502 counting Clerk Telephone: (909) 682-1091 CONIDITIONAL WAI•;R AND RELEASE UPON PROWESS PAYMENT A/C:003284 JOB:00012 TO:KENKCO, INC. 12301 CENTRAL AVE N.E. SUITE 100 M NNEAPOLIS, MN 55433 PROJECT:CITRUS AVE STORM DRAIN 11153 CITRUS AVE. FONTANA, CA 92334 Upon receipt by the undersigned of a check from KENKOJ INC. in the sum of $2,908.37 payable to HUB CONSTRUCTION SPECIALTIES and when the check has been properly endorsed and has been paid by the • bank upon which it drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of CITY OF FONTANA :located at.. ;. 11153 CITRUS AVE., FONTANA, CA 92334 to the following extent: This release covers a progress payment for labor, services, equipment, or materials furnished to KENKO, INC. through 2-28-01 only and does not cover retensions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon worked performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's hen, stop notice, bond right shall not , otherwise affect the contract rights between parties to the contract bases upon a rescission, abandonment, or breach of contract or the right of the undersigned to recover compensation for furnished labor, services, `equipment, or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned Note: This document has legal consequenc consultation with an attorney is encouraged h respect to its use or modification. This form is intended to meet with the requirements of California Civil Code Section 3262(d)(1) as of January 1, 1994' HUB CONSTRUCTION SPECIALTIES, INC. 379 SOUTH "I" STREET, P.O. BOX 1269 SAN BERNARDINO, CA 92402-1269 1-"Hut b1 Hub Construction Specia141" cindy 15:413-15 2001 page: 1 JOB ACCOUNT, OPEN ITEM DETAIL REPORT (CUT-OFF DATE: 2-28-01) 003284 KENKO, INC. 12301 CENTRAL AVE N.E. SUITE 100 MINNEAPOLIS. MN 55433 Job Det1:00012 [00012J CITRUS AVE STORM DRAIN 11153 CITRUS AVE. FONTANA CA 92334 INVOICE' DATE .AMOUNT DATE PAID CHECK K08001791 K09001670 KO9002798 K09005183. K09005746 K09010271 K09011680 K10005453 K10007973 K10009759 K10009763 K10012451 K11004398 K11006484. K1'1008516 K11009937 K11010090 K11010336 K11012306 K12003242 K12003323 K12004077 K12008385. 10-04-00 11-03-00 11-07-00 11-13-00 11.14-00 11-27-00, 11-28-00. 12-13-00 12-19-00 12-21-00 12-21-00 12-28-00 1-11-01'' 1-17-01 1-22-01 1-24-01 1-25-01. 1-25-01 1-29-01 2-08-01 2-08-01 2-09-01 2-21-01 462,63 43.05 320.30 68.68' 189.87 250.46 112.65 448.04 194.22 35.56. 175.58 67.53 322,50 27.61 102,92 215,00 302,09 254.38 124.36. 109.42 602.28 148.40 236.78 AMT PD .00 462.63 2-23-01 58923 43.05 .00 2-23-01 58923 320.30 .00 2-23-01 58923 68.68 .00 2-23-01 58923 189.87 .00 2-23-01 58923 250.46 .00 2-23-01 58923 112.65 .00 3-02-01 59446 448.04 .00 3-02-01 59446 194.22 .Q0 3-02-01. 59446 35.56 .00 3-02-01 59446 175.58 .00 3-02-01 59446 67.53 .00 .00 322.50 .00 27.61 .00 102.92 . 00 215.00 .00 302.09 .00 254.38 .00 124.36 .00 109.42 . 00 602.28 .00 148.40 00 236.78, REC'MAR 1'12111 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of a check from Kenko, Inc. in the sum of $1,420.82 payable to Holliday Rock Co., Inc. and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice, or bond right the undersigned has on the job of City of Fontana, Engineering Dept. located at VARIOUS STREET LOCATIONS, SEWER & STORM DRAIN, FONTANA, CA to the following extent. This release covers a progress payment for labor, services, equipment, ormaterial furnished to Kenko, Inc. through 02/28/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned: Dated: 03/12/2001 Holliday Rock Co., Inc. Asst. Cre i it Mgr. Job #:KENKO 13 Kenko, Inc. NOTE: CIVIL CODE 3262 (d)(1) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the form set forth above. CALIFORNIA LIEN WAIVER AND RELEASE D MAR 1 4° 2001 (California Civil Code Section 3262(D) et Seq.) CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the 'undersigned of'a.check from KENKO, INC. in the';sum of $4,318.13'payable.to KENKO,`INC.•• and NATIONSRENT, INC. ,: and when the check has been properly endorsed and has been .paid by the bank upon which it is drawn, this document shall become effective to'release any Mechanic's Lien, Stop`Notice or bond right the undersigned has on the job of CITY OF FONTANA - ENGINEERING DEPT. Said project and property, is JURUPA, Fontana, CA 92337' commonly known as the #0012 The specific contract information is for Our Job/Invoice #0012. This. claim"shall be released by. the undersigned to the following extent: this release covers progress payment for labor, services, equipment or material furnished to KENKO, INC. through 02/28/2001 only. a THIS RELEASE DOES NOT COVER ANY. RETENTIONS RETAINED BEFORE OR AFTER the release date;extras. FURNISHED BEFORE THE'RELEASE DATE FOR WHICH payment has not been received; -extras or'items FURNISHED' AFTER; THE RELEASE date. Rights based upon work.performed or items FURNISHED UNDER'A WRITTEN change=order which has been fully executed by the parties 'and invoiced prior to the release date -are covered by this release unless specifically reserved by the claimant in this release. This release of any Mechanic's Lien, Stop Notice or'bond'right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a recission,'abandonment or breach of the contract, or the right of the undersigned to recovery compensation for furnished labor, services,_ equipment or material covered by this release if that furnished labor, services, equipment or material was notcompensated by the progress payment.' This'Release does not cover any labor, services, equipment, or materials that were not invoiced during this period, or unpaid or unauthorized change orders. Before any recipient of this document:relies on it, said party should verify evidence ofpayment to -the undersigned, Special Instructions That Apply: to, This Release INC.,2101 E. VENTURA:BLVD.,,Oxnard, CA 93030 AUTHORIZED AGENT'Phone:(805) 485-9656 Fax CALIFORNIA LIEN WAIVER AND RELEASE FOREC,® MAP (California Civil Code Section 3262(D) et Seq.) UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT The undersigned has been paid and has received a progress payment:in the'sum of $4;318.13 for` labor, services, equipment or material furnished to KENKO, INC. on the job of CITY OF FONTANA ENGINEERING DEPT. Said project is commonly known as the- p j , t.:BEECH & JURUPA,' #0012 FONTANA CA ro ect 1'ocated a Fontana, CA 92337. The specific contract information is, for Our Job/Invoice #0012. The undersigned does hereby release any Mechanic's Lien, Stop Notice or bond right on`the above referenced job to the following extent: Thisrelease covers a progress payment for labor, services, equipment or material furnished to KENKO, INC. through 01/31/2001 only.. THIS RELEASE DOES NOT COVER ANY'RETENTIONS RETAINED BEFORE OR AFTER the release date; extras FURNISHED BEFORE THE RELEASE DATE FOR WHICH payment has not been received; extras or items FURNISHED AFTER THE RELEASE Cate.' Rights based upon work performed or items; FURNISHED UNDER A WRITTEN'change order which has been fully executed by the parties prior to the release:date are covered by this release unless specifically reserved by the Claimant in this"release. This release of any 'Mechanic's Lien, Stop Notice or bond right shall not otherwise'affect the contract rights, including rights between.. parties to the contract based: upon a recission, abandonment or breach of the contract, or the right of the undersigned to recovery compensation for furnished labor, services, equipment Cr material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress'' payment. THIS RELEASE SHALL NOT COVER UNPAID OR UNAUTHORIZED CHANGE ORDERS. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated 03/12/2001 for NATIONSRENT, INC..,2101 E. VENTURA BLVD.,Oxnard, CA'.93030 Signed by: , AUTHORIZED AGENT Phone:(805) 485-9656 Fax:( ) - NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID OR YOUR CHECK HAS BEEN RETURNED BY THE BANK.' IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM:' MAR-13-01 TUE 03:46PM 366 FAX NO, Conditional Waiver and Release Upon Progress Payment California Cavil Code Section 3262 (d)(1)` Upon receipt by the undersigned of a check from Kenko Inc. in the sum of $1002.53 payable to WESTERN RENTALS and when .the ,check has been properly ,endorsed and has been paid by the bank upon which it is drawn, this document shall become: effective to release any mechanics' lien, stop notice, or bond right the undersigned has on the job of City of Fontana located at Citrus Storm Drain between Jurupa & Siover Fontana to the following extent, This release covers a progress payment for labor, services, equipment, or material furnished to Kenko Inc. through. 2-28-01 only and does not cover any retentions retained before or after the release date; :'extras furnished before the release date for which payment has not been received; extras or items furnished. after the release date. Rights based upon wor.]c performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished, labor, services, equipment or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated; March 8, 2001 EXLUDES release dated 2-14-01 In the amount of $6851.34. Which remains unpaid. Credit Representative WESTERN RENTALS er-c,2!44 NOTE; Civil Code 3262 (d) (1) Provides: Where the Claimant is ,required to execute a waiver • and release in exchange for, or :in order to induce the,paymcnt of, a progress payment and the claimant ie not, in foot, paid in exchange for the waiver Bend ° release or a single payee check or joint payee chuck is "given in exchange for the waiver and °release, the waiver. and reieasc shall follow substantially the form set forth above. Conditional Waiver and release Upon Progress Payment California Civil Code Section 3262 (d)(1) Upon receipt by the undersigned of a check from Kenko Inc. in thesum of $6851.34 payable to WESTERN RENTALS and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice, or bond right the undersigned has on the job of City of Fontana located at Citrus Storm Drain between Jurupa & Slaver. Fontana to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished to Kenko Inc. through 1-31-01 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are costered by this release. unless specifically reserved by the claimant in this release. This release ofany mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or broach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payments Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: February 14, 2001, EXCLUDES release dated l- -In the amount of $5588'.'66 Which. remains unpaid. Credit Representative 5-01 WESTERN RENTALS NOTE: Civil code 3262 (d) (1) .Provides: Where the claimant is required Co executo a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, ,fn fact, ' paid in exchange for the waiver and release or a,'singie payee check or joint payee cheek ,is given in exchange for the waiver and release, the waiver and release :hallfollow substantially the form set forth above. REC'D MAR 1 3 2001 • United -Rentals, Inc. (initecl Rentals PO Box 51701 Los Angeles, CA 90051-6001 Tel: (949) 862-1100 Fax: (949) 862-4938 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (1) KENKO INC P 0 BOX 831 CALIMESA CA 92320 Upon receipt by the undersigned of a check from `' KENKO INC in the sum of $1,412.33 payable to UNITED RENTALS INC` and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of: CITY OF FONTANA Located at : * * *J: O B S I T E "SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO COUNTY JOB #0012 to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to,, KENKO INC through 02/28/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fullyexecuted by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract; or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment.. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated 03/12/2001 UNITED RENTALS INC ERS MCMAHAN" LIEN ADMINISTRATOR NOTE: This form ofrelease complies with the requirements of Civil Code Section 3262 (d) (1). It is not effective until the check that constitutes the progress payment has been properly endorsed, and has cleared the bank. Forms by Caprenos Inc. ROCK • SAND • BASE MATERIALS READY MIX CONCRETE CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from KENKO, INC. in the sum of $ 2,125.65 payable to ROBERTSON'S and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shallbecome effect- ive to release any Mechanic's Lien, Stop Notice or Bond right the undersigned has on the job of: CITY OF FONTANA CITRUS AVE JURUPA TO TR# FONTANA LOT# to the following extent. This release covers a progress payment for labor, services,' equipment or material furnished to not cover any retentions retained before or after the release date; extras or items furnished after the release date Rights based upon work per- formed by items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not other- wise affect the contract rights, including rights between parties to the contract based upon a recession, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipmentmaterial was not compensated ; payment. - or by theprogress BEFORE ANY RECIPIENT OF THIS DOCUMENT RELIES ON IT, SAIDPARTY SHOULD. VERIFY EVIDENCE_OF PAYMENT TO THE UNDERSIGNED. Dated: 03/12/2001 J.C.N. # 000803 ROBERTSON'S Credit Agent 6830 Van Buren Blvd. • Riverside, CA 92509 P.O. Box 33140 • Riverside, CA 92519 (909) 685-2200 • Fax (909) 685-8371 ROCK • SAND ■ BASE MATERIALS READY MIX CONCRETE CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from KENKO, in the sum of $ 2,276.16:payable to ROBERTSON'S and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effect- ive to release any Mechanic's Lien, Stop Notice or Bond right the undersigned has on the job .of CITY OF FONTANA CITRUS AVE-JURUPA TO TR# FONTANA LOT# to the following extent. This release covers a progress payment for labor, services, equipment' or material f rnished to /7 Q7 throug 01/31/2001 only and does not cover any retentionsretained before orafter the release date; extras or items furnished after the release date. Rights based upon work per- formed by items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by: the claimant in this release. This release, of any mechanic's lien, stop notice, or, bond right shall not other- wise affect the contract rights, including rights between parties to the contract based upon a recission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment BEFORE ANY RECIPIENT OF THIS DOCUMENT RELIES ON IT, SAID PARTY SHOULD. VERIFY EVIDENCE OF PAYMENT TO THE UNDERSIGNED. 6830 Van Buren Blvd. ■ Riverside, . CA 92509 PO. Box 33140 • Riverside, CA 92519 (909) 685-2200 • Fax (909) 685-8371 ROCK • SAND ■ BASE MATERIALS READY MIX CONCRETE CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from KENKO, in the sum of $ 537.23 payable to ROBERTSON'S and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effect- ive to release any Mechanic's Lien, Stop Notice or Bond right the undersigned has on the job of: CITY OF FONTANA CITRUS AVE-JURUPA TO TR# FONTANA LOT# to the following extent. This release covers a progress payment labor, services, equipment or material furnished to through'02/28/2001 not cover any retentions retained before or after the release date; extras or items furnished after the release date. Rights based upon work per- formed under a written change order which has been fully byitems furnished executed by the parties prior to the release date are covered by this release unless specificallyreserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not other- wise affect the contract rights, including rights between parties to the contract based upon a recission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment BEFORE ANY RECIPIENT OF THIS DOCUMENT RELIES ON IT, SAID PARTY SHOULD VERIFY EVIDENCE.OF PAYMENT: TO THE UNDERSIGNED. 6830 Van Buren Blvd. • Riverside, CA 92509 P.O. Box 33140 ■ Riverside, CA 92519 (909) 685-2200 ■ Fax (909);685-8371 This claim shal. be released by. the undersigned progress payment for labor, services,'equipment :02129/2001 only. Upon receipt by KENKC, INC, anc paid by the ban'' Mechanic's Lien, ENGINEERING DEP9 CALIFORNIA 'LIEN WAIVER AND RELEASE FORM (California Civil Code Section 3262(D),et Seq.) CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT the undersigned of a check from KENKO, INC. in the sum of $4,316:13 payable to NATIONSRENT, INC. , and when the check has'been properly endorsed and has been upon which, it is drawn, this document shall become effective to release any Stop Notice or bond right the undersigned has on the job of CITY OW FONTANA Said project enc. property is commonly known as the #0012 - FONTANA CA project, located at BEECH & JVRDRA, Fontana CA 92337 The speciflo co: ►tract information is for Our Job/invoice #0012. to the following extent: this release covers a or material furnished to VENKO, INC.through • THIS RELEASE DC.,S NOT COVER ANY RETENTIONS RETAINED BEFORE OR AFTER the release date; extras FURNISHED BEFOF:fi THE; RELEASE DATE -FOR WHICH payment has not been received, extras or items FURNISHED AFTE'F:THE RELEASE date. Rights based upon work performed or'items FURNISHED UNDER 'A' WRIZTEN 'changeorderwhich has been fully executed by the parties and invoiced prior to the release date a:c3 covered by this release unless specifically reserved by the claimant;in this release. This f!elease of'any Mechanic's Lien, Stop Notice'or bond right shall not otherwise affect the coril act rights, including rights between parties to the contract based upon a .recission, abatddonment or breach of the contract, or the right of the undersigned to recovery compensation fc_ furnished labor, services, equipment or material covered by this release if that furnished- labor ', services, equipment or material was not compensated by the progress payment. ThiG Release dies not cover any labor, services, equipment, or materials that were during this period, or unpaid or unauthorized change orders. Before any rec.pient of this document relies on it, said party should verify evidence of payment. to the undersigned. INV. 227697 Special Instructions That Apply to This Release Dated 02/12/2001'for NATIONSRENT, INC.,2101 E. VENTURA-BLVD.,Oxnard, CA 93030 Signed lay � i%ef , AUTHORIZED j!2ENT Phone:(802) 485-9656 Fax ) cALIFORNIA LIEN WAIVER AND RELEASE FORM (California Civil Code Section 3262(D) et Seq.) UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT The undersigned •gas been paid and has received a progress payment in the sum of $4,318.13 for labor, service8, equipment: or material` furnished to KENKO, INC. on the job of CITY OF FONTANA - ENGINEERING DEPT. Said project is ':commonly known as the #0012 - FONTANA CA project, located at BEECH & JURUPA, Fontana, CA 923 T. The a.pecific col {:Tact information is for Our Job/Invoice #0012. The undersigned does hereby release any Mechanic's Lien, Stop Notice or bond right on -the above refe::enced job `5 the following Extent: This release covers 'a progress payment for labor, serv:_ces, equipment or material furnished to KENKO, INC. through 01/31/2001 only. THIS RELEASE DOTS NOT COVER ANY RETENTIONS RETAINED BEFORE OR AFTER the release date; extract FURNISHED HEFOR: THE -RELEASE DATE FOR WHICH payment has not been received;. extras or items FURNISHED -AFTER THE RELEASE date. Rights based upon work performed OL' items FURNISHED UNDER A' WRITTEN change :rder,which has been fully executed by the parties prior to'the release 'date are covered by this, release unless specifically reserved by the claimant in this release. This release of any 4:echanic's Lien, Stop Notice or bond right shall not otherwise affect the contract righ'ts,.includi'r.g rights between parties to the contract based. upon a'recission, abandonment or breach of the contract, or the right of the undersigned rorei t:coery Comat ensathed for orofurnished shedes, labcr, :services, equipment.or material covered by equipment or material was not compensated by the progress payment. THISS RELEASE SIALL NOT COVER UNPAID OR UNAUTHORIZED CHANGE .ORDERS; . _, said party , should verifyevidence of payment Before any recipient o to i_he'undersi';zed. Dated 03/12/2)01 for NATIONSRENT, INC.,2101 N. VENTURA BLVD.,Oxnard, CA 93030 Signed by:_ , AUTHORIZED `P.:;ENT Phone:(805) 485-9656 Fax ) NOTICE: THIS ;[DOCUMENT WAIVES RIGHTS UNCONDITIONASILY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP TH0;1: RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID OR YOUR CHECK HAS BEEN RETURNED SY TgE BANK. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL R1 ;CEASE FORK. 1 AY L•1111 111 1\L'ViVL11YV - MAR-09-01 FRI 03:37 PM KENKO INC , FAX NO. 909 795 1840 Ic o o i P. 01/01 KEN!co. NC. March 9, 2001 VIA+ FACS'`,�„ ICE Pavement Recycling Systems Fax No.: (909) 682-1094 Re: Fontana, I✓A - 0012 Kenko, Inc: has received a preliminary notice on the above referenced project. We require conditional and unconditional waivers to be submitted from you and your supplier monthly until we receive finals. Month(s) January & February $ Amount Conditional Unconditional $19,210 00 Required now Required upon receipt of payment PLEASE INDICATE ON YOUR FAX COVER SHEET IF YOU HAVE NOT BEEN PAID FOR ANY OF THESE I111ONTHS. Fax'a copy to (909)195.18410 and send the original to the CaHmesa office. Sincerely, Chris Darling Western Division ,c,e.ftJ4I 7,77-3 21340.oc7 2,t `i/ 3. 37 7— 6/! ZJ iPQFMATE OFFICE•'{2901 Centre! Ave. N.E`., Suite 100-131arne, Minnesota 95434-(7$3) 755 2199 -I6X ($3) 755-7801 SOUTHERN D)VISION-2611 WestgroveDrive, Suite 107-Carrollton, Texas 75008—(972}931-9494 Fax (972)931-5474 U/ESTERNDIVE51ott-P_OOSox (331—Carimeaa,C,,tWomla92320—(9909)795-2588—rax o9)795.1940 MAR-12..01 15:14 FROM:PCBP SO GATE CREDIT 13235639926` TO:909 795 1840 PAGE:02 • PACIFIC COAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-3318 (323) 568-1850 Fax (323) 563-9926 Unconditional Waiver and Release Upon Progress Payment The undersigned has been paid, and received a progress payment in the sum of $ 40,726.36 , for labor,' services, equipment or material furnished to: Kenko, Inc. on the job of City of Fontana located at: Citrus Avenue Sewer, surupa & Citrus, Fontana, CA and does hereby release any mechanic's lien, stop notice or bond right that the undersigned has on the above referenced job to the following extent: This release covers a progress payment for labor, services, equipment, or materials furnished to: Kenko, Inc. through 10-31-00 only and does not cover any retention's retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. - This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by, this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Madding McBean (Company) By: W Sher yang, Credit Manager Notice: This document waives rights unconditionally and states that you have been paid for giving up those rights. This document is enforceable against you if you sign It, even if you have been paid. If you have not been paid, use a Conditional Release form I"IHk-1d 01 15:14 FROM:PCBP SO GATE CREDIT 13235639926 TO:909 795 1840 1 PACIFIC COAST building products 4301 E, Firestone Blvd. South Gate, CA 90280-3318 (323) 568-1850 Fax (323)563-9926, Unconditional Waiver and Release Upon Progress Payment PAGE:03 The undersigned has been paid, and received a progress payment in the sum of $ 11,312.95 , for labor, services, equipment or material furnished to: Kenko,Inc. on the job of : City. of Fontana located at: Citrus Avenue Sewer, Jurupa & Citrus, Fontana; CA and does hereby release any mechanic's lien, stop notice or bond right that the undersigned has on the above referenced job to the following extent: This release covers 'a progress payment for labor, services, equipment, or materials furnished to: Kenkol Inc. through 11-30-00 only and does not cover any retention's retained before or after the release date; extras furnished before the release date for which payment has not been 'received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this. release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, .equipment, or material covered by this release if that furnished labor, services, equipment, or, material was not compensated by the progress payment: Date: ' 03-12-01 Gladding jlcBean' &V4l (Company) By:� Sher Vang, Cre it Manager. Notice: This document waives rights unconditionally and states that you have been paid for giving up those rights. This document is enforceable against you If you sign it, even if you have been paid. If you have not been paid, use a Conditional Release form. P1HK-12 b1 15:15 FROM:PCBP SO GATE CREDIT 13235639926 TO:909 795 1840 PAGE:04 PACIFIC COAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-3318 (323) 668-1860 Fax (323) 563.9926 Conditional MI Waiver and Upon Progress Payment Upon receipt by the undersigned of a check from Kenka, Inc, In the sum of $ 32,783.12 , payable to: Gladding McKean, and when the check has .been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of City of Fontana located at Citrus Avenue Sewer. ]uruaa & Citrus, Fontana, CA to the following extent. This release covers the progressive payment for labor, services, equipment or material furnished to . Kenko, Inc, through 12-31-00 only and does not cover any, retention's retained before or, after the release date; extras furnished before the. release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon.a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. er Vang, Cr dit Manager CI P1Hd-12 01 15:15 FROM:PCBP SO GATE CREDIT 13235639926 TO:909 795 1840 PAGE:05 • PACIFIC COAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-3318. (323) 568-1850 Fax (323) 563.9926 Conditional Waiver and Release Upon Progress Payment Upon receipt .by the undersigned of a check from Kenko, Inc. in the sum of $ -0- payable to: Gladding McBean, and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice; or bond right the undersigned has on the Job of, City of Fontana located at Citrus Avenue Sewer, ]urupa & Citrus !Fontana, CA to the following extent: This release covers the progressive payment for labor, services, equipment or material furnished to: Kenko, Inc. through 02/28/01 only and does not cover any retentions retained before or after the release date; this release does not cover any previously issued yet unpaid release as indicated below, extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. SCHEDULE OF PREVIOULSY ISSUED YET UNPAID LIEN RELEASES: 12-31-00 132,783.12 By: Gladding McReaj (Company) Sher Vang, C I'IHK-l� el 15:15 hHUM:PCBP 50 GATE CREDIT 13235639926 TO:909 795 1840 PAGE:06 PAC I l" I C COAST building products 4301 E. Firestone Blvd. South Gate, CA 90280-33 1 8 (323) 568.1850 Fax (323) 563-9926 Conditional Waiver and Release Upon Progress Payment Upon receipt by the undersigned of a check from Kenko, Inc. in the sum of -0- payable to: cladding McBearl, and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has an the job of: City of Fontana located at: Citrus Avenue` Sewer,''Jurupa & Citrus; Fontana, CA to the following extent: This release covers the progressive payment for labor, services, equipment or material furnished to: Kenko, Inc. through 01131/01 only and does not cover any retentions retained before or after the release date; this release does not cover any previously issued yet unpaid release as indicated below, extras furnished before the release date for which,payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shallnot otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Date: SCHEDULE OF PREVIOULSY ISSUED YET UNPAID LIEN RELEASES: 12-31-00 $32,783.12 By: Gladdina McBean . _ (Company) Sher Vang, Cre it Manager Anited Rentals Uniteitntals, Inc. PO Box 51701 Los Angeles, CA 90051-6001 Tel: (949) 862-1100 Fax: (949) 862-4938 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT California Civil Code 3262 (d) (1) Upon receipt by the undersigned of a check from in the sum of $1,412,33 payable to UNITED RENTALS INC KENKO INC and when the check has been properly endorsed and has been paid by the bank upon which it Is drawn, this document shall become effective to release any mechanic's lien -+-- notice, or . - • right the CITY OF FONTANA Located at ***'JOBSITE*** "SEWER WORK" CITRUS & BEACH FONTANA CA PO #R-2853 SAN BERNARDINO COUNTY JOB #0012 to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to KENKO INC through 02/28/2001 only and does not cover any retentions retained before or alter the release date; extras furnished before the release date for, which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by thls release unless specifically reserved by the claimant In this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, Including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. recipient _.. . s document relies on it, said party should verify evidence of payment to the undersigned. Dated 03/12/2001 UNITED RENTALS INC SARAH I TS'ERS MCMAHAN LIEN ADMINISTRATOR NOTE: This form of release complies with the requirementsAim of Civil Code ection 3262 ) (1). It is not effective until the check that constitutes the progress payment has been properly endorsed, and has cleared the bank. Forms by Caprenos Inc. i ld�i rr:i{ CI3I 1 L/ Lnn1 n I :. of yl7� y4y-b.y15 HULLIDAY RUCK PAGE 01 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT CALIFORNIA CIVIL CODE SECTION 3262 (d)(1) Upon receipt by the undersigned of a check from Kenko, Inc. in the sum of $1,420.82 payable to Holiday Rock Co., Inc. and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics' lien, stop notice, or bond right the undersigned has on the job of City of Fontana, Engineering Dept. located at VARIOUS STREET LOCATIONS, SEWER & STORM DRAIN, FONTANA, CA to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished to Kenko, Inc. • through 02/28/2001 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or, items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by th,e parties prior to the release date are covered by this release unless specifically, reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or• the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: 03/12/2001 Holliday Rock Co., Inc. Asst. Credit Mgr. Job lhKQNKO 13 Kenko, Inc. NOTE: CIVIL CODE 3262 (d)(1) PROVIDES: Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the form set forth above. $16,306.96 i"AEZ=G�-U1 ART 0 4 ; 90 FMV VKENKO INC March 9,2d01 Robertson's Fax No,; (909) 685437/ Re: Fontana, CA -'0012 Attention: D.Roebuck, Kenko, Inc, hsts reoeived a preliminary notice on the above referenced project. We require conditional and unconditional waivers to be submitted from you and your supplier mont1ly until we receive finals. • VL1-FRX NO.J909 795 i940 tlAan (a) January February Conditional Unconditional Required now Required upon receipt of payment I-'Akst bl P, 01 01 PLEASE INDICATE ON YOUR AX COVER SHEET IF YOU HAVE NOT BEEN PAID FOR ANY OF TfESE'MONTH - Fax a copy to (909r'795•1840 and; send the original to the Calimesa offic Sincerely, Chris Darling Western Division da;44"-a--1/e4;mealL,„- OOR_P AAYS U FICE • 12301 Cootr? Ave, N.E„ Su{ielttalan t, Minnesota 5 :.- ��3) 755.2199 Yeas ia�� 7ss.7�a1 - I�1 p{Yt3 O - W 4 Igf'ow PtiNl slate 10'' - aMrakon The 75O00 - antrj1 ;K /2t 931-5474 4 WES7fi , ,�, I '=�P.O, Box 03f.Cafineriq. coomist 923IFT 795.�nu/ 1 j1840. ROCK + SAND ■ BASE MATERIALS READY MIX CONCRETE CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from KENKO, INC. in the sum of $ 2,125.65 payable to ROBERTSON'S and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effect- ive to release any Mechanic's Lien, Stop Notice or Bond right the undersigned has on the job:, of CITY OF FONTANA. located at: CITRUS AVE-XURUPA TO TR# FONTANA LOT# to the following extent. This release covers a progress labor, services, equipment or material furnished to KENKO through 12/31/20 00 only and does not cover any retentions retained before or after the release date extras or items furnished after the release date. Rights based upon work per- formed by items furnishedunder a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not other- wise.affect the contract rights, including rightsbetweenparties to the Contract based upon a recission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. BEFORE ANY RECIPIENT OF THIS DOCUMENT RELIES ON IT, SAID PARTY SHOULD VERIFY EVIDENCE 0' PAYMENT -TO THE UNDERSIGNED. 6830 Van Buren Blvd. • Riverside, CA 92509 PO. Box 33140 ■ Riverside, CA 92519 (909) 685-2200 ■ Fax (909) 685-8371 ROCK • SAND • BASE MATERIALS READY MIX CONCRETE CONDITIONAL,WAIVER AND RELEASE UPON. PROGRESS PAYMENT Upon receipt by the undersigned of a check from KENKO, INC. in the sum of $ 2,276.16 payable to ROBERTSON'S and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effect- ive to release any Mechanic's Lien, Stop Notice or Bond right the undersigned has on the job of: CITY OF FONTANA located at: CITRUS AVE-JURUPA TO TR# FONTANA LOT# to the following extent.' This release covers a progress payment for labor, services, equipment or material f /rnished to hf KEN KO INC '� thro g 01/31/2001 only and does not cover any retentions .retained before or after the release date; extras or items furnished after the release date. Rights based upon work per- formed by items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not other- wise affect the contract rights, including rights between parties to the contract based upon a recission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. BEFORE ANY RECIPIENT OF THIS DOCUMENT RELIES ON IT; SAID PARTY SHOULD VERIFY EVIDENCE OF PAYMENT TO THE UNDERSIGNED. ROBERTSON'S Credit Agent 6830 Van Buren Blvd. • Riverside, CA 92509 P.O. Box 33140 • Riverside. CA 92519 (909) 685-2200 • Fax (909) 685-8371 r'r-4kmt b4 TS ROCK • SAND ■ BASE MATERIALS READY MIX CONCRETE CONDITIONAL'. WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from']CENKO, in the sum ,of $ 53723 payable to ROBERTSON'S and,when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effect- ive to release any_, Mechanic's Lien, Stop, Notice or Bond right the undersigned has on the job of: CITY OF FONTANA • located at: CITRUS AV8-JURUPA TO TR# FONTANA LOT# to the following extent. This release covers "a progress labor, services, equipment or material feu shed to --''"--� INC rough 02/28/2001 - not cover any retentions retained before or after the release date, extras or items furnished after the release date. Rights based upon work per- formed by items furnished under a written change order which has been dully executed by the parties prior to the release date are covered bythiS ' release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not other- wise affect the contract rights, including rights between parties to the contract based upon a recission, abandonment or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment or material covered by this release if that furnished labor, services, equipment or material was not compensated by the progress payment. BEFORE ANY RECIPIENT OF THIS'DOCUMENT RELIES ON: IT VERIFY EVIDENCE OF PAYMENT TO THE UNDERSIGNED ROBERTSON'S Credit Agent 6830 Van Buren Blvd. • Riverside, CA 92509 P.O. Box 33140 • Riverside, CA 92519 (909) 685-2200 • Fax (909) 685-8371 .11 PAGE 62 ny ingiraL ito Unco The undersigned hu. to on the j 49t), located } at itional Waiver and Release Upon Final Payment C RNt,>w, CIVIL CODE SECTION 32 2 (MOO ir, hill for All labor. serriCeS, equipment or material furnished 144 and does hereby walY0 and .eleaticany right to a mechanics' liens stop notice or any right against a labor and material bond oAbe 'job. except for disp uted 4putcd claims for extra work in the amonna of $ • .4.0: FFIC CO t Of. SERVICE, 1NC NOTICE TO PEI SONS SIGNING THIS WAS THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES �lI�r �YOUGIVING UP THOSE RIGHTS, _ ,1�Eh�J, PAID lF'Q HTS, THIS DOCUMENT IS ENFORCEABLE .AGAINST YOU IF YO IF YOU�i�� ,�'�?'I'., BEEN.PAID,U SIGN IT, EVEN_ BEEN � PAID,USE A CONDITIONAL IF YOU� HAVE NOT TIQN,�,..I,, RELEASE F'QltiVi, NOTE: CIVIL CODE U62 (d)(4j 1 OVIDES: Where the daimon: it required to execute a waiver and release in cxchansefor, or in order to in f, 1 payment and the claimant asserts in the been paid the final �,yn4a�tro er f payment, the wo 'vrr and release :Audi follow s waiver It her. bullet. f •. l substantially the scrfortAr above. ►?►t' O.b6 km *pi .0,11)844 oft wtow AOPW �i%aRg AfoRtt r�p�ea! d RAL3 d, ,S s ® TQ-40-..t CONTRACTORS February 8, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave, Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Sewer Lateral Extensions Dear Mr, Gdula: Please consider this correspondence as our formal request for a change order related to the above referenced extra work. The work associated with sewer lateral extensions has been completed. The quantities and pre -negotiated cost are as follows. Additional 516 feet of 6" lateral pipe sch.1 bid item No. 8 © 55.00/lf, ` 28,380.00 Additional clean outs 39 @ 326.00 ea. Lot restorationf44"@ 800,00 ea. 12,714.00 -33;600700 Additional workdays relative to this work are also required these days are addressed under separate cover. If you have any questions or need additional information please give me a call, Roger. Schwarz �. Superintendent cc: Corporate Calimesa CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 - (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DIVISION Post Office Box 831 - Calimesa, California 92320 . (909) 795-2568 Fax (909) 795-1840 Kenko, Inc. is en Equal Opportunity Employer. Women and persons of color ere encouraged to apply, CONSTRUCT DEPARTMENT GAGE ICE MA" 4NS KENKO* CONTRACTORS) February 8, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Request for additional working days Dear Mr, Gdula: I am writing with respect to additional working days I feel are due our contract which are not yet reflected on the weekly statement of working days. These days are associated with weather and extra work These days era as follows, ✓ �.-;- 11 /07/00, ' 12/18/00, 01 /02/01, 01/03/01, 01/08/01, 01 /11/01, 01/12/01, 01/15/01, 01/17 1, 01/2 1, 01/26/ 1, 01/30/ , 01/31/01, 02/01/01, ,'. Inclement wea her. ✓ f/ ✓ ? 17 days We are requesting 22 days associated with the extension of the 6" laterals. 22 days 10 days • We are requesting 10 days associated with lot restoration. We are requesting 11 days associated with testing of the extended and re configured 6" laterals. As you are aware we experienced some problems related to the air testing of the reconfigured laterals. It is my belief that had the lateral configuration not been changed we would not have experienced the loss of time testing, which we incurred. la ss There are a few other days, which relate to daily extra work reports. The number of days will be relative to the extra work. These reports are being processed. Once they are complete we can assign an agreeable amount of time to them. If you have any questions or need additional information please give me a call._ Roger Schwarz Superintendent cc: Corporate Calimesa CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine. Minnesota 55434 (763) 755-2199 Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 - Carrollton, Texas 75006 - (972) 931-9494 = Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Cailmese, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Keniao, Inc. Is en Equal Opportunity Employer. Women end persons of color are encouraged to apply. 02/02/2001 00:11 90962333 3 Date 3h/Q, . nor c/i) KENKO PAGE 01 SPEEDIMEMO .4 - f veer v.v.. Project Name Subject ff CA+ Ave St 3 c , � .. RewAovn l 5 e>� �� ci�ttr� Hand ❑ Mail ❑ Fax Cg Overnight ❑ Reply Requested Urgent ❑ Page / of / „r, -11 II f,h I�yax1, wo . Z$3� I nrtoi 4n rrauv' W ie Ate , 1 4 do re rw vo-L cow 'Sc tted slettie- r r► S4 rYv. c' c dig Please Reply T�o (1 Location a, Sign CORPORATE OFFICE - 8990 Springbrook Dr., Ste 230 - Minneapolis, MN 55433 - Tel: 612) 786-6510 - Fax: (612) 786.6602 SOUTHWEST DIVISION-16415 Addision Rd., Ste 308 - Dallas, TX 75248 -Tel: (972) 931-9494 -- Fax: (972) 931-5474 WESTERN DIVISION- Post Office Box 831 - Calimesa, CA 92320 - Tel: (909) 795-2568 - Fax: (909) 795-1840 �-� - 431998 KENKO INC, Form No, ; 2g33 4lo KENKOi CONTRACTORS March 1, 2001 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave. Fontana, Ca. 92335 Re: Citrus Ave. Sewer and Storm Drain Subject: Traffic Control Dear Mr. Gdula: As disscussed at our meeting on Wednesday February 28th we are requesting to delete the temporary stripping shown on the traffic control plans drawing # 2833, sheet 4 of 10, stage 7, 8, and 9, The lanes will be delineated using 28" cones with reflector sleeves. Each stage is scheduled to be in effect as follows. Stage 7, anticipated to be in effect 3 days. Stage 8, 4 days. Stage 9, 3 days. Cones and signage will be monitored continuously 24hrs a, day. Your consideration and cooperation of this matter is appreciated. If you have any questions or need additional Information please give me a call. Roger Schwarz Superintendent cc: Corporate Calimesa CAM AP, CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 - (763) 755.2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc: is an Equal Opportunity Employer. Women and persons of color are encouraged to apply. O. 104 P 1 0 E Suite 100 �ve. N c Elaine, MN 55434 12301 Central DATE: PLEASE DELIVER THE FOLLOWING PAGES TO: FEB, 5; 2001 9;19Av1 KEN ON1rFt CTORS (763)755-2199 FAX (763) 755-7801 FACSIMILE COVER LETTER o NAME: Gi(:c)lti— COMPANY: a;d7 0 qo9 3s6 664 FACSIMILE NUMBER: PAGES: (INCLUDING COVER LETTER) FROM NAME: COMPANY: NOTES: 44r to/1) apid 2 ,&)- niL 169 Gt) e_A) 5SI/r) 4 11-1---11(4-11-) -JD nol PLEASE CONTACT (763) 755-2199 IF TRANSMISSION NOT. LEGIBLE City of Fontana Citrus Avenue Sewer and Storm Drab From Jurup®Avenue to Slaver Avenue cv 61d No. SB55.00, PAY ESTIMATE NO. 3 KONICO INC. dtu McOrarrrl S Assoolaob 12341 Central Ave NE, #100 Blake MN 65434 (763) 765.2199 protectW0012 FOR PERIOD ENDING DECEMBER 30, 2000 % TOTAL BID PREVIOUS TOTAL THIS MONTH AMOUNT TOTAL QUANTITY to DATE AMOUNT COMPLETE 81d Item DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT QUANTITY I f AMOUNT QUANTITY Bch du1a 1-Sewer Conatru0Uon 0,20 $8,200.00 0.60 332,600.00 80.00% 1.0 Craft and Grubb1n8 1 L8 $41.000.00 341,000.00 0.60 124,600.00 0.00 50.00 0.00 50.00 0.00% 2.0 Potholes 60 EA $150.00 $7,500.00 50.00 3181.00 $223,3'10.00 5300,00 5371,000.00 95.50% 3.0 12" Extra Strength VCP Sewer 5550 LF $70.00 5388.500.00 2109 3147,630.00 164.00 315,400.00 154.00 515,400.00 98.2516 4.0 8' Extra Strength VCP Sewer 160 LF $100.00 $16,000.00 $0.00 32205.00 , 9145% Sewer MH par City of Fontana Standard Well No.112 11 EA 52,300.00 625,800.00 5 611,385.00 5.00 511,500.00 0.95 5.0 0.0 Sewer FAH per City of Fontana Standard Detail No. 112 Sewerexceptidfemeier 7 EA $2,700.00 SI8,000.00 $0.00 6,00 $16,200,00 600 $16,200.00 8571% 7,0 Conneotianto ei.ting sewer MN per detail A, Suet No. 6, Includ'ing manhole bold and rested work 1 LS 34,000.00 34.000.00 1 64,000.00 0.00 30.00 1.00 64.000.00 100.00% 8.0 reconstruction 6" Sewer Lateral per City cif Fontana standard No.126 1602 LF 330.00 $49,030.00 30.00 1245.00 $37.350.00 1245.00 $,37,350.00 77.72% 9.0 Concrete Encasement per IA County Deptat PW Ctandaad Plan 2023-2 Case IV 144 LF 340.00 $5,760.00 50.00 144.60 $6,760.00 14400 $5,7E0.00 100.00% 10.0 Concrete Encasement per LA County Dept 0t PW Standard Plan 2023-2 Casa It 261 LP $20.00 $5,220.00 50.00 108,00 $3,720.00 186.00 63, 20.00 71.201 $321,600.00 3609,116.00 Subtotal 8chedUleI 5650,240,00 6167,016,00 Schedule 0-Storm Oraln Coratructton $0.00 0.00 50.00 0.0016 1.0 Clearing end Grubbing 1 LS $40,000.00 - $40,000.00 50.00 50.00 0.00 50.00 DAD% 2,0 Potholes 50 EA $150.00 $7,600.00 $0.00 30.00 0.00 30.00 0.00% 3.0 66"RCP (1350D) 644 IF 3150.00 398,600.00 80.00 $0.00 0.00 SO.C9 O.00% 4.0 60' RCP (1350D) 1346 LF $120.00 5131,520.00 $0.00 60.00 0.00 $0.00 0.0016 5.0 54" RCP (13500) 1341 IS' $106.00 5140,805.00 $0.00 0.00 30.00 j 0.0014 0.00% RCP 1943 LF 3100.00 5134,300.00 50.00 50.00 6.0 4€11 (13500) 773 " LF $100.00 371,300.00 50.00. 30.00 0.00 30.00 - 0.00% 7.0 42' RCP (13500) 350 LF $130.00 $49,400.00 $0.00 $0,00 0.00 $0.00 000% 0.0 30' RCP (2000D) 323 LP 5100.00 V32.300.00 SD.00 $0.00 0.00 $0.00 9.0 iio 24° RCP (2000D) Construct MH per American Palo Works Assoc. Standard Plan 320-1 18 EA 33,600.00 664,800.00 50.00 -i 0.06 0.00 $0.4o Q00% 10.0 Construct Connection to Eds5ng Storm Draln including Reinforced Concrete Box per Coltrane Standard Plan DSO and Transition Structures per American Publio WarkeAssac. Stand Pian342-1 1 L8 315,000.00 $15.000.00 30.00 $0.00 0.00 $0.00 0.00% 11.0 Construct Junction Structure per American Public Works Assoc. Standard Plan 832-1.` 4 EA $800.00 - $3,200.00 $0.00 30.00 0.00 $0.00 0.00% 12.0 Casa I Construct Concrete Collar per American Public Atlsoo. Standard Flan 360-1 2 EA 6500.00 $1,000.00 30.00 $0.00 0.00 30.00 0.00% 13.0 Works Construct Catch Basin per 56CTD Standard Plans206/203A 3 EA $5,000.00 $15.000.00 30-00 30.00 0.00 $0.00 0.0016 14.0 4 1 1 Subtotal Schedule II 3854,075.00 $0,00 30.00 40A0 Solttduie NI . Pavement Construction 60;00% • 1.0 Traffic Control, Signing and Striping 1 L8 $40,000.00 $40,000,00 0.40 $18,000,00 0.20 58,000.00 36,260.00 U6V 0.85 524,000.00 $89,420.00 65.00% •2.6 Earthwork I LS $105,200.00 5106,200.00 0,80 404.160.00 0.05 5.00% Asphalt Concrete Pavement (Storer Ave and Cihue Ave Temporary Pavement) 2000 TN $20.00 540,000.00 100 42,000.00 0.00 30.00 100.00 $2,000.00 S SO 4 6.0 Asphalt Concrete Pavement (Seeoh Ave) 1000 TN 130.00 $46,000.00 1136.00 534,080.00 0.00 $0.00 1135.00 $34,080.00 0.00% 88.70% 6.0 Crass II Aggregate Base (Citrus Ave) 6400 CY $18.00 $115,200.00 40.00 $0.00 0.00 50.00 7 8 Subtotal Schedule IN 3714,000.00 5102,246,00 413,2E0.00 31135,468.00 • 8chsduis N-Waste Disposal Reconstruction 1.0 Clearing 6 Grukting, Vcclucing removal of 10' 1 LS 52,600.00 $2,600.00 1 432,600.00 0.00 50.00 1.00 42.600.00 100.00% 30.00% 2 3 4 Relocate Erdstirg Storm Drain I LS 34,600.00 $0.00 $0.00 0.00 5.0 Subtotal Schedule IV 1a4 00 470,240.00 Schedule Change Orders of 100.00% COO No.1 1 LS 432,657.40 $32,567.40 1 132,567.40 0.00 $0.00 1.00 432,567.40 100.0014 No. 2 • 1 LS 486,952.65 565,852.55 1 465,852.55 0.00 $0,00 1.00 $65,852.55 CCO Subtotal Change Orders 4005, 418.95 . $55,410.95 $0.00 498,419.95 Contra 32,310,934,05 $514,400.85 $334,730.00, $E40,250.96 AtiJusted olTotal I o z„H,,. R.,ta.,rinn le no.n 351.449.10 Total COniraot Items Complete Total Retention 610% In Escrow Account Previous Retention (410% paid to Esorow Account AnMount Due to Escrow Account Total Amount Due to Date foss Retention Less Previous Total Paid to Date A oont Due to Contraolor 8ubxni by GorNractor, Revlewrd by City Inspector Date `5 g/ 4849,250.95 $ 34,925.10 $51,449.10 $31,470.00 $784.325.86 8493.041.05 $301,2134.01 Clay of Fontana Citrus Avenue Sewer and Storm Drain From Jumps Avenue to Stover Avenue Bid No. 8B-65-00 PAY ESTIMATE NO.4 FOR PERIOD ENDING JANUARY 31, 2001 KENKO INC. dba McGrend Associates 12301 Central Ave NE, #10O Stains MN 55434 (763)765•21H project 110012 TOTAL BID PREVIOUS TOTAL THIS MONTH TOTAL to DATE 96 COMPLETE BEd Item DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT Schedule 1 • Sewer Construction 1.0 Cfeartny and Grubbing 1 L8 $41,000.00 541,000.03 0.60 532,800.00 0.10 $4,100.00 0.80 538,903.00 90.00% 2.0 Policies 50 EA 5150.00 57,600.00 $0.00 0.00 $0.00 0.00 $0.00 0.00% 3.0 Ir Extra Strength VCP Sewer- 5550 LF $70.00 $388,500.03 5300 5371,000.00 0.00 50.00 6603.03 $371,000.00 95.50% 4.0 8` Extra Strength VC P Sower 100 LF $100.00 516,000.00 154 $15,400,00 0.00 $0.00 154.00 515,400.00 86.25% 5.0 Semi MH per CFty of Fontana Standard Detail No.112 11 EA $2,300.00 525,300.00 0.96 522,685.00 0.00 50.00 9.95 522,866.00 90A5% 6.0 BMW1.1H per City of Pontana Stamford Detail No, 112 except 5' diameter 7 EA $2,700.00 540,930,00 6 516,200.00 0.00 50.00 6.00 $16,200.00 85.71% 7.0 Co neolion to extatlng *ewer MN per detail A, Sheet No. 8, Including merhwle bass reoanetrub5onand foisted work - 1 LS $4,000.00 $4,000.00 1 54,000.00 0.00 50.00 1.00 $4,000.00 10000% 6.0 6' Sewer Lateral per City of Fontana standard No. 126 1802 LF WOO 548,060.00 1246 537,360.00 357.00 510,710.00 1602.00 $48,080.03 100.00% 9.0 Cv crste Encasement per LA County Dept of PW Standard Pion 2023-2 Case IV 144 LF $40.00 $5,760.00 144 55,760.00 0.00 50.00 144.00 $5,760.00 100.00% 10.0 Concrete Enaasernent per LA County Dept of PW Standard Plan 2023.2 Case II 281 LF $20.00 $5,220.00 166 53,720.00 76.00 $1,500.00 281.00 $5,220.00 100.00% 8uMtotal8chedugel $580,240.00 $509,115.00, 510,310.00 $528,425.00 Schedule S -Storm Deiln Construction t0 Clearing end Grubbing 1 LS S40,030.00 $40,000.00 $0.00 0.50 $20,000.00 0.50 520,000.00 50.00% 2.0 Potholes 50 EA 5150,00 $7,500.00 50.00 1.00 $150.00 1.00y $150.00 2.00% 3.0 66' RCP (1350D) 644 LF 5150.00 $98,600.00 MOO 51.e.00 $77,850.00 619.00 577,850.00 09.50% 4.0 60' RCP (13500) 1546 LF $120.00 5161,5520.00 - $0.00 50.00 0.00 50.00 0.00% 6.0 54' RCP (13500) 1341 LF $105.03 514Q 05.00 $0.00 . 50.00 0.00 50.00 0.00% 0.0 48' RCP (13500) 1343 LF $100.00 5134,300.00 50.00 50.00 0.00 50.00 0.0016 7.0 42' RCP (13500) 773 LF 5100,00 577,300.00 .50.00 $0.00 0.00 50.00 0.0055 6.0 30' RCP (20000) 350 LF 5130,00 449,400.00 $0.00 50.00 0.00 50.00 0.00% 0.0 24' RCP (20000) 323 LF 5100.00 532300.00 50.00 $0.00 0.00 50.00 0.00% 1111 10.0 CornstruetNH per American Public Wake Assoc. Standard Plan 220-1 18 EA 53,800.00 5fl4,800.00 $0.00 2.00 57,200.00 2.00 $7,200.00 11,11%: 11.0 Construct Connection to Existing Storm includirtg Reinforced Concrete Box per Cannons Standard Plan D90 arid Transition Structures perAmerkan Pub& Works Assoc. Standard Plan 342•1 1 LS 515,000.00 $15000.00 $0.00 0,68 59,900.00 0.66 $9,930.00 66.00% 12.0 Construct Junction Structure perAmencN) Public Works Assoc. Standard Plan 3321, Case I 4 EA $600,00 53,200.00 $0.00 $0.00 0.00 $0.00 0.00% 13.0 Construct Concrete Caller per American Public Works Assoc. Standard Flan380-1 2 EA $500.00 51,000.00 50.00 $0.00 0.00 $0.00 0.00% 14.0 Construct Catoh Basin per 813CT0 Standard Plana 2031208A 3 EA 35,000.00 316,000.00 $0.00 S0.00 0.00 $0.00 1109% 15.0 Canslruot Inlet per Detail 0, Sheet 0 4 EA 32,700.00 310,500,00 $0.40 30.00 0.00 40.00 0 00% 16.0 Remove Eg,sting Inlet and Lateral 1 LS 3500.00 3500.00 30.00 " 0.50 6250.00 0.50 3250.00 50.00% 17.0 Construct Storm Drain Bulkhead per Detail C, Sheet 9 9 . EA 3450.0D $4,050.00 $0.00 $0.00 0.00 $0.00 0.00% r Subtotal Schedule II $654,075,00 30,00 4115,350,00 6116,360,00 Schedule IN - Pavement Construction 1,0 Tref6o CantroT, Signing and Striping 1 LS $49,000.00 $40,000.00 0.60 424,000.00 0.00 $0.00 0.60 424,000.00 60.00% 2.0 Earthwork 1 LS 3105,200.00 4105,200,00 0.85 $89,420.00 0.00 50.00 0.65 439,420.00 85.00% 3.0 Asphalt Concrete Pavement (Stover Ave end Came Ave Temporary Pavement) 2000 TN $20.00 440,000-00 100 62,000.00 75.00 $1,500.00 175,00 $3,500.00 8.75% 4.0 Asphalt Pavemmnt (Citrus Ave from Jurupa Ave to Stover Ave) 11000 - TN $30.00 5330.000.00 30.00 40.00 0.00, 40.00 000% 5.0 Asphalt Concrete Pavement (Seech Ave) 1600 TN $30.00 $46,000,00 1138.00 $34.060.00 0.00 40.00 1136.00 334.060.00 71.00% 0.00% 8.0 Class II Aggregate Base (Citrus Ave) 6400 CY 816.00 3115,200,00 30.00 40.00 _ 0.00 30.00 7.0 'Class II Aggregate Base (Beech Ave) 1000 CY 816.00 116,000.00 867 315,966.00 0.00 _ 40.00 887.00 $16,8 6.00 68.70% 8.0 Asphalt Concrete Dike 11000 LF 31.80 417,600.00 30.00 $0.00 0.00 30.00 0,00% 111 Bubto1e1Schedule Ill $714,000,00 31E3,446,00 31,600.00 $106,006,00 • Schedule IV -Waste Dleposal Reoonsttuotlor 1.0 Clearing rin 0° Grubbing, W�uding nmoval of N� 1 LS 82,600.00 $2,600.00 1 32 600.00 0.00 $0.00 1.00 62,600.00 100.00% 2.0 Pate 10 EA $160.00 $1,500.00 3 i450.00 0.00 $0.00 3.00 3450.00 - 30.00% 3.0 12.1 090001ass 150 PVC Sewer Pipe 450 LF 8150.00 568,400.00 456 366,409.00 0.00 30.00 468.00 588,400.00 100.00% 4.0 Setter MN per Inland Empire USities Agency Standard Detail 3 EA 62,400.00 $7,200.00 2 44,800.00 0.00 $0.00 2.00 44,600.00 68.67% 6.0 Relocate Waling Storm Drain 1 LS 34,600.00 $4,500,00 $0.00 40.00 0.00 $0.130 0.00% Subtotal Schedule IV $34,200.60 676,250.00 10.00 S743,250.00 Original CorrlreotTotal $2,212,515.00 - $750,831.00 6133,130.00 33113,091.00 Schedule of Change Ordure CCO No.1 1 LS 332,567.40 332,567.40 1 532,567A0 0.00 40.00 _ 1.00 432,587.40 100.00% CCO No. 2 1 LS $65,852.55 485,852.55 1 - 565,852.55 0.00 10.00- 1.00 --- 465,662.65 160.00% CCO No. 3 -Additional Lot Restoration 1 LS 333,600.0D $83,600.00 50.00 1.00 $33,600.00 1.00 433,600.00 160.000A COO No. 4 -Additional Clean Outs _ 39 LA 432%00 612,714.00 30.00 39.00 $12,714.00 39.00 $12,714.00 100.00% COO No. 5 -Additional Lateral 516 LF $55.00 426,380.00 30.00 510.00 528,380.00 516.00 328,380.0D 100.03% Subtotal Change Orders 6173,113.06 111,410.05 474,684.00 3173,113.95 = Adjusted Contract Total 12,965A28.83 5649,2.50.95 1207,1144.00 41,067,104,95 rs Nrevrous Karen Previous Total Paid to Date Less Retention (10%) Payment Due $764,325.65 0 m 02165/01 Total Contract Rents Campkte Total Retention €110%, In Escrow Account Previous Retention 11; 1O% pall to Escrow Account Arnouitt Duo to Escrow Account Total Amount Due to Date lase Retention We Previous Total Paid to fate Amount Due to Contractor $1,067,104.95 106,710.50 $84.925.10 $20,765,40 $951.984.46 $764,325.01 $187,I BEl.6D JAN-08-2001 07:56 612 7557801 P.01/01 KENKO INC. i KENKOk CONTFt" 'TORS 12301 Central Ave. NE, Suite 100 Blaine, MN 55434 (763) 755-2199 FAX (763) 755-7801 FACSIMILE COVER LETTER DATE: / PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: COMPANY: FACSIMILE NUMBER: PAGES: 09 356 644 (INCLUDING COVER LETTER) PLEASE CONTACT (763) 755-2199 IF TRANSMISSION. NOT LEGIBLE TOTAL P. 01 DEC-12-2000 08:29 KENKO INC. 612 7557801 P 01/02 KENIZO CONTRACTQFg N 12301 Central Ave. NE, Suite 100 c Blaine, MN.55434 (763) 755-2199 FAX (763) 755-7801 FACSIMILE COVER LETTER DATE: /c 2 —1 —Dr PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: s Jb red6c4 COMPANY: FACSIMILE NUMBER: q09 3sv6 6,[s) PAGES: (INCLUDING COVER LETTER) FROM: NAME: COMPANY: NOTES: 112/'l / 4-5 n--)emo, GIs advise kAl-P PLEASE CONTACT (763) 755-2199 1F TRANSMISSION NOT LEGIBLE DEC-12-2000 08:29 KENKO INC. 612 7557801 P.02/02 • itKEN Oi12301 Central Ave. NE, Suite 100 Blaine, MN 55434 CCoNTRACTDRS (763) 755-2199 FAX (763) 755-7801 FACSIMILE COVER LETTER DATE: PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: PJ2/T( n^JOrJ- s L4s / a---/-o d COMPANY: d,� FACSIMILE NUMBER: (9460 3so- /f PAGES: T FROM: NAME: (INCLUDING COVER LETTER) COMPANY: NOTES: -bi�itf� �l-J' �it..�� p �l��rna�2� AM� S �✓C \,Gv✓�� c.2),61/, pnri e-S- //a fAi yvuf ,s_4 • Olf !ti/i% /'E�ur/-? WI4 ztLr a.GcaaSa We; Via., Sub fic&r- �'nnR.l. /.mil/�h � -7/.e r--T6 Y' ! i 1 7Li°,-e�s rZ ,t)-‘arad-uf-t) ((_ a field fib . v whti d e.d PLEASE CONTACr' 763 755-2199 IF TRANSMISSION ) NT LEGIBLE. TOTAL 'P.02 DEC-01-2000 08:52 KENKO INC. 612 7557801 P.01/04 KENIZOi 12301 Central Ave. NESuite 100 Blaine, MN 55434 ONTAA0TORS (763) 755=2199 FAX (763) 755-7801 FACSIMILE COVER. LETTER DATE: PLEASE DELIVER THE FOLLOWING PAGES TO: 4)w,bIiG VIo NAME: I rg- S �s � COMPANY:`'r� FACSIMILE NUMBER: (9060 35 7-6 PAGES: (INCLUDING COVER LETTER) FROM: NAME: COMPANY: NOTES: �rQ�-J-- 1A-4P(172-;ry�ah (,5. A/6 ,STh e-ri A -1-2) ) 1/,e4 X111 a vil r y�tc✓ i'��hl s 0471 fei-06? 6e,fre l �LvY eGc.�a�f�dS'P y� Ws W/ rya cc_ 6u I S )16 rf Pv0,1 d 1.14LF-6 wexld 1/1(1 ah� Gti� �,e'J made ✓e do -ca PLEASE CONTACc(763)57 9-2199 IF TRANSMISSION Nil LEGIBLE T LEGIBLE NOV-29-00 WED 09:48 AM KENKO INC KENK� CONTRACTORS November 28, 2000 Mr. Don Gdula Project Coordinator City Of Fontana 8353 Sierra Ave.` Fontana, Ca. 92335 Re: Citrus Ave, Sewer and Storm Drain Subject: Request for extra working days Dear Mr. Gdula: FAX NO. 909 795 1840- P.04. I am writing with reference to additional contract working days I feel are due to our contract. I have gone over these days with Steve who concurs. There are a total of 11 days due are contract related to extra work performed to date..I have attached a revised summary sheet for daily cost reports PA-Ol thru PA-20, This sheet reflects 6ofthe 11 days agreed to with Steve. The remaining 5' days relate to,the extended 12" IEUA industrial waste line. The footage of pipe was increased from 456 feet to 830 feet. If you have any questions or need additional information please give me a call Project Superintendent cc: Calimesa Corporate # 0012 CORPORATE OFFICE - .12301 Central' Avenue N.E., Suite 100 - Blaine, Minnesota 55434 - (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DMSION - 2611 Westgrove Drive, Suite 107 Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DMSION -• Post Office Box 831 Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc la an Equal, Opportunity Employer. Women and persons of color arc encouraged to apply. DEC-08-00 FRI 02:28 PM KENKO INC FAX NO. 909 .795 1840 P,01 QUc KENIKO FAX/.TRp►i11SMITTAL • Date 12/08/00 Reference Citrus Avenue Storm Drain, Fontana, CA We are transmitting pages including cover sheet. ATTENTION Company Address • City/State/Zip' • .Phone No. Copies To • • ',Copies To Mr. Donald Gdula City of Fontana Fax No. (909) 350-6618 FROM Phone No. (909) 795-2568 Fax No. (909) 795-1840 Reply Requested Enclosures Original To Follow Transmission Verified By Yes Yes LI. Yes 0 No ❑. No ❑' No El Time WE ARE TRANSMITTING VIA FOR YOUR ❑ Certified Payroll 0 " Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application ® Fax ❑ UPS ❑ US Mail O Hand • Courier • Other ID Cargo Carrier U Approval ❑ Review & Comment ❑. Information/Files ❑ Proposal/Quote• ZI Other 0 Urgent Message • Attached herewith is the invoice related to the Concrete V-Ditch installation on Beech Avenue. The total amount including Kenko, Inc.'s markup is $13,611.40. ' Please include this amount y on the November Pa Estimate..Please feel to contact me at (909)376-0298. CORPORATE OFFICE —12301 Central Ave. N.E., Ste 100 — Blaine, MN 55434 - Tel: (763) 755-2199 - Fax: (763) 755 7801 SOUTHERN DIVISION — 2611 Wcstgrove.Drive, Ste 107 — Carrollton, TX 75006 — TdI: (972) 931•.9494 •- Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 — Calimesa, CA 92320 —.Tel: (909) 795-2568'—.Fax: (909) 795-1840 m•3/00 KENKO INC. Forir No, 20' N CO '17 3 INVOICE Muni- Kefiti, ode, Ciallroymie ezool, Mein a ict Tell ( )y8i• 4 »x:(i9t )T81- °T4 Sid Ui •Tel:(760)809_ 17 -O 2 • 1 EndIiig_ Na r:3o; : r�gtreiso BE11ingc81O• Estlmat - U - -Corte! _ Ported .. Provisias Pe1Ur1 ._ - TO Dab - t Quantity Asnawit ®rr Quest Vol s .Prime ' A uii . t A zr it` - 4 � - Qxtit iarttitt- _ 01 5'.laved 'Ditch . 1400:00 . IF 8_80 $ 12,32.0.O0• .1 5.00 .6 13,836,00. 1.- - $ 1345,00,$. 1L.83b,OD KEN KO 11406 . FAX/ T 1A, IN S IVI I TTA L Date 11/03/00 We are transmitting 1 Reference CITRUS AVE. SEWER AND STORM DRAIN #0012 pages including cover sheet. Fax No. ATTENTION MR. DONALD GDULA Company CITY OF FONTANA' Address 8353 SIERRA AVE. City/State/Zip FONTANA CA. 92336 Phone No. 909-350 7632 Copies To CALIMESA JOB FILE Copies To 909-350-8818 FROM ROGER SCHWARZ Phone No. 909-376-0298 Fax No. 909 769-9796 Reply Requested Yes (8 No ❑ Enclosures Yes ❑ . No Ei Original To Follow Yes 0 - No El Transmission Verified By Time IV ARE TRANSMITTING VIA I'•OR YOUR 0 Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application 0 0 e Fax UPS US Mail Hand Courier Other Cargo Carrier ® Approval ® Review. & Comment U Information/Files DU Proposal/Quote Other ❑ Urgent Message DON I am in reciept of your October 25, 2000 statement of wonting days. I am not in agreement with the accounting shown on this report_ As of todays date we are 10 working days behind our submitted schedual. these 10 days are due to changes that the city has made to the Beech Ave, improvements as well as the addition of 374 If. of pipe to the I.E.U.A. waste line. Extra work related to the Beech Ave. improvements and IEUA is being calculated And will be submitted under separate cover. Upon your reciept and review of these documents we can have a meeting to discuss working days: Thanks Roger CORPORATE OFFICE —12301 Central Ave. N.E., Ste 100 — Blaine, MN 65434— Tel: (763) 756.2199 Fez: (763) 755-7801 SOUTHERN DIVISION — 2011 Weetgrove Drive, Ste 107 -- Carrollton, TX 75008 — Tel: (972) 931-9494 Fax: (072) 931-6474 WESTERN DIVISION — Post Office Box 831— Callmesa, CA 92320 —Tel: (909) 795-2568 - Fax: (909) 795-1840 KEN KO 1111't:. FAX/MAN SM ITTAL Date 11/03/00 Reference CITRUS AVE. SEWER AND STORM DRAIN #0012 We are transmitting 1 pages including cover sheet. ATTENTION MR. DONALD GOULA Company CITY OF FONTANA Address 8353 SIERRA AVE. City/State/Zip FONTANA CA. 92335 Phone No. 909.3504632 Copies To CALIMESA JOB FILE Copies To Fax No, FROM Phone No, Fax No. 909-350-6618 ROGER SCHWARZ 909-376.0298 909 789-9796 Reply Requested Yes No ❑ Enclosures Yes ❑ ' No Original To Follow Yes ❑ No El Transmission Verified By Time WE ARE TRANSMITTING VIA I'•OR YOUR Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application El Fax El US US Mail ❑ Hand p Courier ElOther Cargo Carrier Approval Review. & Comment Information/Files Proposal/Quote Other Urgent Message DON I am in reciept of your October 25, 2000 statement of working days. I am not in agreement with the accounting shown on this report_ As of todays date we are 10 working days behind our submitted schedual. these 10 days are due to changes that the city has made to the Beech Ave. improvements as well as the addition of 374 Lf. of pipe to the I.E.U.A. waste line. Extra work related to the Beech Ave. improvements and IEUA is being calculated And will be submitted under separate cover.' Upon Your reciept and review of these documents we can have a meeting to discuss working days. Thanks Roger CORPORATE OFFICE -12301 Central Ave. N.E., Ste 100 - Blaine, MN 55434 — Tel: (763) 756 2199 .- Fax (763) 755-7801 SOUTHERN DIVISION — 2811 Wesfgrove Drive, Ste 107 — Carrollton, TX 75006 — Tel: (972) 931-9494 — Fax: (972) 931-6474 WESTERN DIVISION - Poet Office Box 831-- Callmesa, CA 92320 —Tel: (909) 795-2588 - Fax: (909) 795-1840 KEN NCO I C. FAX/TRANSMITTAL Date 10/31/00 Reference CITRUS AVE, SEWER AND STORM DRAIN #0012 We are transmitting 2 pages including cover sheet. Fax No, 909-350-6618 ATTENTION MR. DONALD GDULA Company CITY OF FONTANA Address 8363 SIERRA AVE- City/State/Zip FONTANA CA. 92335 Phone No. 909-350-7632 Copies To CALIMESA JOB FILE Copies To FROM ROGER SCHWARZ -Phone No. 909-376-0298 Fax No, 909-769-9795 Reply Requested Yes ® No 0 Enclosures Yes ® No ❑ Original To Follow Yes 0 No El Transmission Verified By Time WE ARE TRANSMITTING VIA FC)R YOUR L 8 Certified Payroll Subcontract Purchase Order Plans/Drawings Correspondence Specifications Credit Application Fax UPS' El US Mail El Hand Courier LI Other ED Cargo Carrier Approval Review & Comment Information/Files Proposal/Quote Other Urgent Message DON ATTACHED HEREWITH IS A PLAN TAKEN FROM THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS. WE WOULD LIKE TO IMPLEMENT THIS FOR THE INSTALATION OF THE REMAINDER OF THE LE.U.A. WASTE LINE. THE IS REQUIRED DUE TO THE TIGHT WORKING CONDITIONS FROM STATION 11+50 TO 21+ 61. THE TRAFFIC CONTROL WILL ONLY BE IN EFFECT DURING DAYLIGHT WORKING HOURS. I BELIEVE IT WILL CREATE A MUCH SAFER WORK AREA AS WELL REDUCE TRAFFIC DELAYS ON WEST BOUND JURUPA AVE. PLEASE RUN THIS BY THE TRAFFIC DIVISION THANKS, ROGER CORPORATE OFFICE —12301 Central Ave. N.E., Ste 100 — Blaine, MN 55434 — Tel: (763) 755-2199 — Fax: (763) 755-7801 SOUTHERN DIVISION - 2611 Westarove Drive, Ste 107 — Carrollton, TX T3oo5 — Tel (972) 931-9494 - Fax ' (972) 931-5474 WESTERN DIVISION — Poet Office Sox 831 — Calimesa, CA 92320 — Tel: (909) 795-2568 - Fax: (909) 795-1840 C13 (Swots 7) TRAFFIC CONTROLS Figure 5-10 ;TYPICAL CLOSING OF HALF ROADWAY R'1 Kett �tk . °i`° ;, 4124 • „' • Taper L See Table l ) :moo,,,.: NOTE8t' 1;k`Ftdi•Wen dose not apply where there • an emergency condition. Under emergency conditions, equipment and personnel which we ova hide should be ublzed to Imdpleement •••:. dowry even though such clown "., kneel the etender Contained In this plan, As •.eqIp rierd or pemonrwt become available an Nrrrtedlals effort should then be made to Im. gormand Ifs standards shown on this plan, a. Where approach speeds ere low, sign may De paced at 300 Mel spacings, and Ivan Wooer In Piton areas. 3. All `advance warning signs. shall be „48` a SSP minimum on highways with ep- prom speeds of 45 mph or more. when speedsere Its than 45 mph the C23 sign , • shell be 30' x 30' minimum: other advance warning signs shell be 38' x 36' minimum. (See Note 5) 4. AB warning sighs for night closures Shell De ashen iluminated or rellectoflxed. • 5. A C23 'ROAD WORK AHEAD' ,lgnmay • be used In lieu of Ms C15. (See Note 3) 6. Determine advisory speed, at slme; • should not be posted a In soma 01 speed llndt. ; 7, AC14'END ROAD WORK' sign, aiq. proedats, may be used in lieu of the 013. This sign I optional A the end of work mire W obvious or laps within a larger Ctofsct lmlt. 8, Warning (W) mates eigne used In work zones shah be deck on orange: Existing yellow warning signs aready In piece within these Area* may remain In use. 9• Pavement markings for closures shall conform to Sedan Sae of this manual, 10, All Cones shall be Intsmslly illuminated or Aced with reflective white sleeves. (See .. Section 543,3), 11. The mwmum king between sham neiltrq devices Ins taper should be appmod- mately equal In IN to the speed trnll. (See Table 1) TRAFFIC CONTROLS Traffic Manual Figure 5-10 -tTYPICAL CLOSING OF HALF ROADWAY c S t'_� 0 0((LI) C20 (LB apes o up 14.°A- of mint f 1 it Taper L (See Table 1) L -w . .— — WA (.. note 6),' TABLE.1, Apposed, Spied (MPhil NM Low NI* Mumbwd Sassing snores ` Alen/ Tier (NA) t' 'COMM,for . Ter • 26 125 8 •: ' 25 30 • 180 7 .30.', 35 245 '' 8 .35 • ` 40 320 9.,!: 40. 46 540 13 .45 .' 50 000 13 , , 50 . 50 + 1000 21 50 (1r) eased on 12-foot wide an.. This column la also appropriate far lane i!vtdtta lase than 12 lest. C13 (See note 7) LEGEND •'Cone ► Sign 0 FlashIng Arrow Sign (Optional) 4441e, Direudan of Travel 4fi.. Fleeting ,Yellow Beacon (Optional) Taper Formula: L.SXW for speeds of 45 or mo . ,Lm� let speeds of 40 or leas. 60 Where: L.Minimum length of taper. S.Numerical value of posted speed Nm4 prior to work or . • 85 percentile speed. W•Wldth of offset, • KENKOi C CO N T R A C T CO R S September 21, 2000 City of Fontana Engineering Division 8353 Sierra Avenue Fontana CA 92335 Attention: GregoryJ Bucknell, PE Re: Bid No. SB-55-00, Citrus Ave Sewer and Storm Drain from Jurupa Ave to Stover Ave Escrow Agreements, Escrow #105-20581 Dear Mr. Bucknell, Please find four original Escrow Agreements for the above` referenced project. Please execute all of the agreements and return two of them to my attention in our corporate office. The other two are to be retained by the project owner. We are also enclosing account instructions. Please forward to the appropriate party in the Finance or Accounting Department. Thanks for your assistance. Should you have any questions please contact me. Sincerely, Anita Elsner CORPORATE OFFICE -12301 Central Ave. NE, Suite 100 - Blaine, Minnesota 55434 - (612) 755-2199 - Fax (612) 755-7801 SOUTHWESTERN DIVISION - 4901 Keller Springs Road, Suite 112 - Dallas, Texas 75248 - (972) 931-9494 Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831- Caliinesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer Women and persons of color are encouraged to apply. OCT-20-2000 15:56 KENKO INC. 612 7557801 P.01/01 • KENKOi G -r Ft O F co pt October 20, 2000 City of Fontana Engineering Division 8353 Sierra Avenue Fontana CA 92335 Attn: Don Gdula Via Facsimile - 909-350-6618 RE: Bid No. SB-55-00 Citrus Avenue Sewer and Storm Drain from Jurupa Avenue to Sloven Avenue Dear Don, We have received your faxed correspondence dated October 19, 2000, containing copies•of the latest wage determinations, SC-23-63-2-2000-2 for Operating Engineers and SC-23-102-2-2000-2 for Laborer and related classifications. We are aware that these are the latest determinations on file for these classifications. Our letter of October 9, 2000, addressed Teamsters and Laborer and related classifications, not Operating Engineers. It is Kenko's understanding that the single asterisk after the expiration date on these wage determinations, SC-23-102-2000-1 for the paying of prevailing wages to Laborers and related classifications and SC-23-26172-2000-1 for the paying of prevailing wages to Teamsters, indicate that these determinations will be used for the paying of prevailing wages for the life of our contract on this project. Please contact us within 10 days of the date of this letter if this understanding is incorrect_ Anita Elsner CORPORATE OFFICE - 12301 Central Ave. NE, Suite 100 - Blaine, Minnesota 55434 - (612) 755-2199 - Fax (612) 755-7801 SOUTHWESTERN DIVISION- 4901 Keller Springs Road, Suite 112 - Dallas, Texas 75248 - (972) 931.9494 - Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831- Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kcnko, Inc. is an Equal Opportunity Employer Women and persons of color am encouraged to apply. TOTAL P.01 • KENKOi O N T R A C T OURS October 9, 2000 City of Fontana Engineering Division 8353 Sierra Avenue Fontana CA 92335 Attn: Gregory J Bucknell, PE RE: Bid No. SB-55-00 Citrus Avenue Sewer and Storm Drain from Jurupa Avenue to Slover Avenue We have received Wage Determination #SC-23-102-2-2000-1 for the paying of prevailing wages to Laborers and Related Classifications and Wage Determination #SC-23-261-2-2000-1 for the paying of prevailing wages to Teamsters under our contract on the above referenced project. It is Kenko's understanding that the single asterisk after the expiration date on these wage determinations indicates that these wage determinations will be used for the paying of prevailing wages for Laborers and Related Classifications and Teamsters for the life of our contract on this project. Please contact us within 10 days of the date of this letter if this understanding is incorrect. Sincerely, Anita Elsner CORPORATE OFFICE -12301 Central Ave. NE, Suite 100 - Blaine, Minnesota 55434 - (612) 755-2199 - Fax (612) 755-7801 SOUTHWESTERN DIVISION 4901 Keller Springs Road, Suite 112 - Dallas, Texas 75248 - (972) 931-9494 Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831- Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc. is an Equal Opportunity Employer Women and persons of color are encouraged to apply. 612 7557801 P.03/03 • GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR' OF INDUSTRIAL: RELATIONS . ' PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1743.1 FOR COMM&RCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS • CRAFT: $#LABORER AND RELATED CLASSIFICATIONS DETERMINATION: SC-23-102-2-2000-1 • ISSUE DATE: February 22, 2000 .EXPIRATION DATE OF DETERMINATION:, June 30, 2000* Effective until superseded by a new determination issued by the Director of industrial Relations. Contact the Division of Labor Statistics and Research at (415) 703-4774 for the new rates after•10 days from 'the expiration date, if no subsequent determination is issued. LOCALITY: All localities within Imperial, Iayo, Kern, Los Angeles, Mono, Orange, Riverside, San Beinardino. San Luis Obispo, Santa Barbary, and Ventura counties. • CLASSIFICATION° • (JOURNEYPERSON) ' CLASSIFICATION GROUPS Group 1 • Group 2 Group 3 Group 4 • Group 5 ENTRY LEVEL LABORER` 5TEP1-0 '2000hrs.., STEP II - 2001- 4000 hrs Employer Pavtnents Basic, Health Pension Vacation ` Training Hourly and and Rate . Welfare • Holiday• t1.8.18 .3.50 .18.58'• 3.50 -18:78 3.50 19.83 3,50• 2Q;03. 3.50. •• 11•.90 .'•2.10• 13,88 2.45 3.3 i ' 3.31 3.31 3.31 3.31 .33 2.34b .34 2.34b .: .34 2.34b " .34 2.34b .34 2.34 .34 Straight -Time` Overtime I3otnly Rate` Hours Total Daily ' Saturday' Sunday Hourly ' and • Rate . I I/2X 1112X Holiday' 8 27.67 36.76 36,76 45 85 8 28,07 "'37.3637.36 ` 46.65 * 2827 37.60 37.66. 47 05 .` 8 29.32 39,235' 39.23$ 49.15 8 ' • 29.52 39.535 ..39.535 • .49.55 15.27 '21.22 : 21.22 27.17> ,33 1.646 .34 8 18.64 25.58 25,58 32.52 • #Indicates an apprcntieeable aiaft. Rates.for apprentices are available in the General Prevailing. Wage Apprenticeship Schedules, ' y m y 'gh j down•during work week due to inclement weather • Saturdays in the • , e work week be worked at stray t-time ifjob is shut b Includes an amount per hour worked for supplemental dues. • The ratio of En Level Laborers to Journeymen shall be one EntryLevel Laborer , for the first four Journeymen, (although the Entry Level Laborer may be the second (2"11) Laborer on the job) and one Entry Level Laborer ter. every four Journeymen thcroafter. No Entry Level Laborer•may work without a Journeyman Laborer on the job. For Classifications within each 'group, see page 14. RECOGNIZEDHOLIDAYS.: Holidays upon which the general prevailing hourly wage;rate for Holiday work •sl1ef• be paid: shall• be all holidays in the collective bargaining agreement, applicable to the particular craft. classification; or type of worker employed • • on the project, which is on file with the Director of Industrial Relations: If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rare shall he paid shall be as provided in Section.6700 of the Government Code.; You'inay''obtain the holiday provisions for the otirrent determinations on the lntcrnct•at http://urww,dir ca.aov/DLSR/PWO. • Holiday provisions for curront or superseded determinations may • be obtained by contacting the Prevailing Wt ge Unil at • (415) 703-4774. • TRAVEL AND/OR SUBSISTENCE PAYMENT: In accordance with Labor Code Sections 1773.1 and 1773.9, 'contractors ship make ienvel endler eubaisienee p,yyn ents to each 'worker to execute the work., Travel endlor suhcistenrx requirements for each craft. .`classification or type•of worker may be obtained from the Prevailing Wage Unit at (415) 703-4774. • 13 • OCT-19-2000 15:23 KENKO INC. 612 7557801 P.02/03 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL, RELATIONS PURSUANT TO CAL•XFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770,1773 AND 1773.1 FOR COMMRCIAL BUILDING, HIGHWAY; HEAVY CONSTRUCTION AND DREDGING PROTECTS. CRAFT: TEAMSTER DETERMINATION: SC-23-26I-2-2000-1 ISSUE DATE: February 4, 2000 • • :RATION DATE OE DETERMINATION: June 30, 2000* Effective until superseded by a new detcrnxination issued by the Director of Industrial Relations. Contact the Division of Labor Statistics and Research (415) 703.4774 for the Dew rates after 10 days from the expiration date, if no subsequent determination is issued. LOCALITY: All localities within Imperial, lnyo, Kern, Los Angeles, Mono, Orange, Riverside, Sim Bernardino, San Luis Obispo, Santa Barbara, and Ventura Cdumies C1aisifcatton' . (7ourneyperson)• Employer Payments • Health Pension Vacation! Training Hourly and Holiday Rate Welfare 'c Group I 20.19 .4 07 4.80 Group I1 • 2034 : 4.07 . 4.80 Group IlI 20.47 .'4.07 4.80 ,.; ,.Group ?V - 20:66 ' 4.07 = 4,80 Group V 20.60 '':;4.07 , 4.80 Group VI •20.72 ';,4.07 4:80 Group VII 20.97 4.07 4.80 ' ;Group Vrn ':. 21.22 ' , , 4.07 4.80 Group 1X 21.42. 4,07 4.80 Group X 21.72 4.07 4.80 . Group XI 22.2'2., 4.07 . , • 4,80 • Subjourneymanb 0-2000 hours 11.50 4.07 4.80 •' 2001-4000 hours, 13.50. 4,07 4.80 ,4001.6000 hours 15.50 4.07 4.80 Over 6000 hours and thereafter at j oianeyrnan rates ,Scraieht-'Time: Hours , Total Hourly ' Raze 2.60' .42 . E 2.60° .42 8 2.60' .42 8 2.60' 42 8 2.60° :.42 8 2.60° .42 8 2.60'' . :42 8 2:60' .42 8 2.60' .42 8 2.60" .42 8 2.60' _, .42 . g 1,20° 1.45° 1.70° .42 .42 .42 Overtime Hout'Iv Rates Daily Saturday Sunday ,and 1 1/2X 11/2X Holiday 32.08 42.175 42.175 , 52.27 32.23 42.40 ' . 42.40 .. ; ,, , 52.57 32.36 ; • 42.595: 42.595 52.83 3255 42,88 42.88 ,. ,: 53.21 • 32.49 42.79. 42.79 53.09 .• 32.61 ': . _42.97 42.97 53.33 32.86 43.345 43.345 53.83 33.11 43.72 • 43,72 54.33 33.31 44.02 44.02 54.73 '33.61 44.47 44.47 ' 55.33 34.11 ' 45.22 • 45.22 • 56.33 8 •2I.99 8 24.24 8 26.49 `Includes an amount for supplemental dues. Subjourneymzn may be employed at a ratio of one subjourneyman for every five jowneymen. For classi£cations within each group, see page 21A. RECOGNIZED HOLIDAYS: Holidays upon which the general preva$ing hourly wage rate for.Holiday work shall be paid, shall onbe allthholidays in the collective bargaining agreement, applicable to the partiebiar craft,classificaaion, or type of worker employed project, which•is on file with the Director of Industrial Relations- If the prevailing rate is not based on a collectively' bargain''ed rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Cove:moment Code, You may obtain the holiday provisions for the current determinations on the Internet at inn:j/www.dir.ea.govIOLSR/PWW. Holiday provisions for current or superseded determinations may be obtained by contact} the Prevailing Wage unit at (415) 703- 4774_ • 27.74 30.99 34.24 27.74 • 30.99 34.24 • '33.49 37.74 41.99 • with Labor • make travel and/or Subsistence payments to each Nworker to execute the work. Tra� and/or subsistence and mire. contractors for eacs shall TRAVEL AND/OR SUBSISTENCE • u774. nca requirements for, each crag, atussificuuvrt am- type of worker tray be obtained from the Prevailing wage Vail at (415) 703.4774. 21 KE N KO INC. FAX/TRANSMITTAL. Date roll $ /8o We are transmitting ATTENTION Company � 'FDw v Address City/State/Zip Phone No. • Reference CIttvt A. . C ex►4�!'t Soo I:>reA:v pages including cover sheet. Fax No, Copies To Copies To FROM Phone No. Fax No, El r \r- 90q" 374-oZ96 Reply Requested Enclosures Original To Follow Transmission Verified gy Time WE ARE TRANSMITTING VIA FOR YOUR Li Certified Payroll Subcontract Purchase Order, Plans/Drawings Correspondence Specifications Credit Application zf Fax. UPS, US Mail Hand Courier Other Cargo Carrier Approval Review & Comment Information/Files Proposal/Quote Other Urgent Message 4i It.,stde)s Oh se_e,i-lash COHe 90� CORPORATE OFFICE-12301 Central Ave. N.E., Ste 100 - Blaine, MN 55434 - Tel: (763) 755.2199 - Fax: (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Ste 107 - Carrollton, TX 75006 - Tel (972) 931-9494 - Fax: (972) 931-6474 WESTERN DIVISION- Post Office Box 831 - Calimeaa, CA 92320 - Tel: (909) 795-2568 - Fax: (909) 795-1840' • KENKOC. CONTRACTORS October 18, 2000 VIA HAND Residents/ Business's Re: Citrus Ave. Sewer and Storm Drain We are the contractor under contract with the City of Fontana to construct the above -mentioned project. This -project consists, in part, of installing' approximatley 5,5001ineal feet of both sewer and storm drain pipe in Citrus from Jurupa Ave.to just North of Slover Ave. This work is scheduled to begin: 10/23/00_ It will start at Jurupa and progress North. The sewer will be installed first, followed by the storm drain piping. Upon completionof piping the street will be restored with new pavement. Due to the depth, location, and configuration of -these pipelines'a=road closure is required. This closure will maintain access for emergency vehicles and local traffic. Access to individual properties may be restricted during actual pipe installation thru driveways. We will closely coordinate any access restrictions with you. Some of the private improvements (i.e. signs, mailboxes) may be temporarily re- located. All removals and replacements will be coordinated with you. Mail delivery and trash pick up will not be interrupted. Construction of this nature creates a dangerous environment for those persons not related to the construction. Please use extreme caution when traveling on Citrus Ave. during construction. If you have children, it is VITAL they be instructed not to play in or on pipes, trenches, and equipment. We place a high priority, on public safety and ask your help with these issues. If you have any questions or need additional information please give the onsite foreman Paul Anderson or myself a call at 909-795-2568 or stop the office located at 11153 Citrus Ave. I sincerely apologize for any inconvenience this project may create. CORPORATE OFFICE - 12301 Central Avenue N.E., Suite 100 - Blaine, Minnesota 55434 (763) 755-2199 - Fax (763) 755-7801 SOUTHERN DIVISION - 2611 Westgrove Drive, Suite 107 -,Carrollton, Texas 75006 - (972) 931-9494 - Fax (972) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 - (909) 795-2568 - Fax (909) 795-1840 Kenko, Inc, is en Equal Opportunity Employer Women and persona of color ere encouraged to apply. SEP-26-2000 16:40 KENKO INC. • • 612 7557801 P.0102 KENK0N 12301 Central Ave. NE, Suite 100 c Blaine, MN 55434 CONTMAGTOcts (763)755-2199 FAX (763) 755-7801 FACSIMILE COVER LETTER DATE.'G��/� PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: J Gr ^ cf/A-1 & COMPANY: U f hIx G___. FACSIMILE NUMBER: Q % J.5-- / PAGES: (INCLUDING COVER LETTER) FROM: NAME:' COMPANY: NOTES: Gl.l /A-G6-Kr PLEASE CONTACT (763) 755-2199 IF TRANSMISSION NOT LEGIBLE