HomeMy WebLinkAbout7.3_Pre-Construction MeetingCITY OF FONTANA
RECORD OF'PRECONSUCTION CONFERENCE
PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA
AVENUE TO SLOVER AVENUE BID NO. SB-55-00
CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES
LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING
EAST ANNEX, CONFERENCE ROOM
DATE: SEPTEMBER 27, 2000
NAME/COMPANY
TIME:. 10:00 A.M.
TELEPHONE & FAX NUMBER
1:b044 Criq OF P'cuTA414 (aff) 350-96 2 (gat) 3 31-- (dais
2: (se(f I \ S Eli la (?) 3s7-O2-LI I009) 3 7-37D
3.
i--1> tL i.3(,
93 7--0( )
4. S-m;v '3A,V 1 of Fou u(a09) 3S0 -74)SO ( )
5. So.6 /nc do//ur•7 • 'o D"' -cia o Bcfno(709) 387-e-a 47 (9a9)3i7• 80 5�.3
9o9 79S-ZSZ
6 e�' Lrt. /r n K) (`lc1) 3?6-OZ5R- (9;0) 75' / fo
It
7 i Atiden5 bid ZFA1%0 (`CO 37e, --IS 3 3 ( )
(Io9) 387:7938
( )
t SL.g�- (, 2- 79 35 ( )
10
_A/ 8116K/telt (94?-440464 (qb)? 3.0-46 le
11. E1j c /E-W 16 (901) 350 66?52.(909) 35a- Catt3
12 ( ) ( .)
13. ( ) ( )
14.
CY/A/
(
•
• CITY OF FONTANA
RECORD OF PRECONSUCTION CONFERENCE
PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA
AVENUE TO SLOVER AVENUE BID NO. SB-55-00
CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES
LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING
EAST ANNEX, CONFERENCE ROOM
DATE: SEPTEMBER 14,`2000' TIME: 10:00 A.M.
NAME/COMPANY
1. 4 ku a i/
TELEPHONE & FAX NUMBER
(909) I 2-'so
(
2. VADrJia )S S tAwe)/ /or- (00a) 01817 /c (Qe i) 43sr7 Cal lS
3. icb.Y /Ze yes 6.#S co, (% ').'f °-I5'e) (9 4'3 ° — zei
4. (A) Aid l � i /5 GAS ca (409) 3 35-. )
5.
6. Ariz_
(---• 17. (1,0 1) 3') o 2 ( )
( f-01) 31'a Lt 7 o6' (
7. %4,42QY 'FOLE`l CTY dF —f-C7A1 .A.1 (9°T) 366 764,/ (90) 356 / '
8. G //^1 q‘_5c.el.f" 66 CO - (y0%► 38 7 PS ( )
9. 4CY1 t<o 13c . cr & tw& t- (709) 79s'-aS6,8 (9Co?)
10. AL( k AAirfeet.S.c5A)(eS) SC ' (
is H 4 Jr,,q, (04504(E )(909) Jo7-oZ/3:2- 009) 3307-G/1A
12.(-2€6 Auzk gli e frY ar ,31-4.4d(9 3aO ' c '/ (9e9) 3a•d C4/S.
13. 101.1 Cd1NALA %actioF uw4a (qcA) 556 -1(031. Rut ) 3So- 4:=6 16
14. -f � gAL e /ftrzi of (90q) 3So- 3o (
15. oA3 Lo (964) (053 ^1 &fp(?O`)j 3- I 1 q I
NAME/COMPANY
Page 2 of 2
TELEPHONE & FAX NUMBER
16c o / LOR G-eo440v..1 ((UM 353-)740 ( )
17. L--(KH:c- ovi(i-Z 4-(;),K_,,,,,,,f-", ( ) ( )
18. ) ( )
19. ( ) (
20. ( ) ( )
21, ( ) ( )
22. ( ) ( )
23. ( ) ( )
24. ( ) ( )
Precon sign -In atten sheet.mst Rev: 9/00
9. /t/Y) Ko'ri�
CITY OF FONTANA
RECORD OF PRECONSUCTION CONFERENCE
PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA
AVENUE TO SLOVER AVENUE BID NO. SB-55-00
CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES
LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING
EAST ANNEX, CONFERENCE ROOM
DATE: SEPTEMBER 14, 2000
NAME/COMPANY
4 ifto aid Kw.c0.
TIME: 10:00 A.M.
TELEPHONE & FAX NUMBER
(901) 1 L1--1-AK0 1 ( )
2. 1%AD ) a �S :5- ' _K11_ 24fl! 1 iac. (gm) 4531 /o i is (G%A)
3. 'Ace.g.y ge 'fG S ‘4¢S ee, (qangf.r.--75d 6 (Of) 33 1,S v7
4. tA., Re, GAS et (49) 33,fr- 3576 ( )
L r� �—►- (1,4) �3'► . 2�
ce:07e-43;- (S i) 3d'6, Y2061
( )
( )
rn v 1 2,EY C Ty d'r c--e*Yrt 1- (9a f - 3 6?) ?4,44 (90) :3 . -e) L2 411?
6V ScE ' d•? 60 - (y,9, 3112-3)3 s
&Lit : r t- (PO) 7'S- as-68 (?L)
4Ak'COA)(9es) 795 >'e 13' ( )
ichl 41.z-; 4'
?Fr- /8- Yb.
(94,0A., 4'Er �(9o9)'07-4Z13'.Z 0,09) o7-C/yam
AuzkAl £!l G m' a,-' rt(9D9) 3 5'0 4601‘. (0) 36-d 6, /S>
13. r Ot..! C,tdL P4 /ONoFF r i i
(qcR) 'SS0-1(23Z:
14.g/scu t /icrz% of rmurik4 (9001) 39)- 3co ( )
15. J F t- � O (961) (53 I 1 w re) L53 11141
17. Li
Page 2 of 2
NAME/COMPANY TELEPHONE & FAX NUMBER
16. 8ri aim ril ayo,N O / L (9O4i) 3 553- i- (m o
)
18. ) ( )
19. ( ) (
20. ( ) ( )
21, ( ) ( )
22. ( ) ( )
23. ( )
24.
25. ( )
Precon sign -in atten sheet.mst Rev: 9/00
AGENDA FOR
PRE -CONSTRUCTION MEETING
PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN
FROM JURUPA AVENUE TO SLOVER AVENUE
BID NO. SB-55-00
MEETING LOCATION:
CITY OF FONTANA, ENGINEERING EAST ANNEX,
CONFERENCE ROOM
DATE: SEPTEMBER 14, 2000
TIME: 10:00 A.M.
NAME OF CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES
PHONE NO. (909) 795-2568
FAX NO. (909) 795-1840
ENGINEEROF RECORD: L.D.' KING, INC.
ENGINEERS, PLANNERS & SURVEYORS
DESIGN ENGINEER
CONTACT PERSON::, DOUGLAS H. MAYS,P.E.
SENIOR VICE PRESIDENT
PHONE NO. (909) 937-0200. FAX NO. (909) 937-0202
OWNER/AGENCY
City of Fontana
Community Development Department
Engineering Division:.
City Public Works Inspector:
City Public Services Manager:
CONTACT
Gregory J. Bucknell,P.E.
(909) 350-6646
Harry Foley
(909) 350-7661
Steve Bauer
(909) 350-7630
Cellular (909)
Don Gdula,
(909) 350-7632
Cellular',(909Y 733-3139
Scott Bangle
(909) 350-6766
A. GENERAL DISCUSSION OF CONTRACTUAL, LEGAL AND PERMIT ASPECTS:
STATUS OF CONTRACT:
Contracts should be returned by September 19, 2000.
INITIATING CONSTRUCTION:(NOTICE TO PROCEED) Will be issued
after contract has been fully executed by Contractor and
City Officials, and after Contractor's Insurance Certificates
and copies of permits and business license have been
submitted to the Project Manager.
EMERGENCY INFORMATION FORM: Given to Contractor with
contracts, contractor to turn in before the "Notice to
Proceed" (and/or City's Construction Permit and business
license) will be issued.
REQUIRED PERMITS: `Prior to the start of any work, the
Contractor shall take out "Applicable City Permits". A City
Public Works Construction permit (no -fee) is required before
construction can begin. (SP-8. Sec. 7-5)
COMPLETION"TIME FOR CONTRACT: The contractor has 90 working
days after "Notice to Proceed" is issued, "excluding Holidays;
Weather days. and maintenance days (GC-2).
LIQUIDATED DAMAGES: The City and contractor agree that if the
Work is not completed within the period provided in the
General Conditions that the sum of $500 for each and every.
Calendar Day of such delay shall be charged,(SP-6, Sec. 6-9).
OTHER REQUIREMENTS OF CONTRACT DOCUMENTS:(To include City of
Fontana Business License and all Appropriate State of
California Required Licenses). Contractor and all Sub -
Contractors shall provide a copy of their City of Fontana
Business License to the Project Manager.
B. CONTRACTORS SCHEDULE:
MATERIALS TO BE
FURNISHED BY OWNER: None.
MATERIALS TO BE FURNISHED BY CONTRACTOR: (Shop Drawing
Submittals) Refer to "Green Book - Subsection 4-1.6 "Trade
Names or Equals". The specified contract completion time
shall not be effected by any circumstances developing from
provisions of this subsection.
CONTRACTORS SCHEDULE: The Contractor shall submit periodic
Progress Reports to the Engineer by the tenth day of each
month. The report shall include an updated Construction
Schedule. Any deviations from the original schedule shall be
explained. Progress Payments will be withheld pending
receipt of any outstanding reports. (SP-4, Sec. 6-1)
SUBCONTRACTORS: No change in Subcontractors is allowed prior
to the written approval from the City.
WORKING HOURS: Working hoursshall be confined to the hours
between 7:00 a.m. and 4:00 p.m., Monday through Friday,
excluding Holidays. (SP-5, Sec. 6-7.2) Or approved by the
City Engineer's authorized representative.
C. PAYMENTS:
PROGRESS PAYMENTS: Progress Payments shall be submitted in
the format.` required by the City (See Sample Provided). Any
Progress Payment submitted differently than the format
required by the City shall be returned for correction. The
date of the submittal will be counted from the date the final
progress payment is received in the City's Accounts Payable
Department.
10% RETENTION MONIES: Pursuant to the Contract documents 10%
Retention Money will be withheld from each Progress Payment.'
CHANGE` ORDERS: No extra work will be performed without an
approved change order from the City Engineer or directed by a
authorized representative.
CERTIFIED PAYROLLS:"Certified Payroll Records" shall be
submitted: to the City by the tenth day of each month.
"Progress Payments" will be withheld pendingreceipt of any
outstanding reports (SP-12, Sec. 7-15). Contractor shall.
also be responsible for the "Certified Payroll forall of
their Subcontractors.
D. RIGHT OF WAY AND UTILITIES:
NOTIFICATION OF AGENCIES: The County of San Bernardino,
Caltrans, and any other required Agencies shall be notified
48 hours in advance "Prior" to starting work within their
right-of-way or as required by the specific agency.
COORDINATION WITH OTHER AGENCIES: Contractor shall make
arrangements for City, County, Caltrans or any other Utility
Companies as required for any inspections.
RIGHT-OF-WAY REQUIREMENTS: City will acquire all right-of-
way, easements and rights of entry as required for this
pro-iect. Contractor shall verify that the acquisition(s) are
completed prior to beginning any work outside the Public
Right-of-way (SP-3, Sec. 2-8).
NOTIFICATION OF UTILITIES: Contractoris responsible for
calling "Dig Alert" and providing the City with their
"confirmation number" prior to start of work. Notify non-
member utility companies separately. Caltrans is a non-
member.
COORDINATION WITH UTILITIES: The Contractor shall notify the
utilities designated in the "General Conditions" at least 48
hours in advance of excavating around any of their
structures. Contractor must coordinate with Gas, Water &
Telephone companies for relocation of their respective
utility lines (SP-4, Sec. 5-1).
EASEMENTS REQUIREMENTS:(UTILITIES)None.
UTILITY SERVICE PAYMENTS: The Contractor and the
Subcontractors will be responsible for payment of all the
Utility billings until the City's acceptance of pro-iect for
"operationand maintenance".
E. ENGINEERING/INSPECTION AND SURVEYING:
STAKING: All construction survey staking shall be coordinated
through the City Inspector. Construction survey staking
shall be provided by the City's consulting engineer (SP-3,
Sec. 2.9.2).
RECORD DRAWINGS: Contractor to provide City with redlined
blueprint markups ("As Builts") of all changes to plans at
the end of contract work.
MATERIALS AND SOILS TESTING REQUIREMENTS: Field density tests
will be made by the Geo-Technical Engineer during the course
of construction at the expense of the City (SP-17, Sec. 211
2.2). All calls for testing services shall be coordinated
through the City Inspector. Geo-Technical Consultant shall
not respond to any direct calls from the Contractor.
F. CONSTRUCTION:
TRAFFIC CONTROL: Special attention is called out in Section
7-10. The Contractor's operations shall cause no unnecessary
inconvenience. The access rights of the public shall be
considered at all times. Unless otherwise authorized,
traffic shall be permitted to pass through the work area (SP-
9, Sec. 7-10.1; SP-11, Sec. 7-10.3)
PROTECTION OF EXISTING FACILITIES: The .Contractor shall
exercise extreme care to protect all, existing utilities in
place whether shown on plans or not, and shall assume full
responsibility for all damage resulting from his operations..
DUST CONTROLS: Shall be provided as required per Section
7-8.1 of the Standard Specifications for Public Works
Construction.
STORAGE OF MATERIAL AND EQUIPMENT: No more than 1000 linear
feet of pipeline shall be stockpiled on the site, regardless
of size. The Contractor shall assume full responsibility for
any damage caused by stockpiling and shall repair same at his
expense (SP-10, Sec. 7-10.2).
JOB SAFETY:. Shall be maintained at alltimes in accordance
with applicable laws.
JOB SECURITY: Contractor shall be responsible at all times.
OTHER MISCELLANEOUS ITEMS AND/OR COMMENTS, CONCERNS, QUESTIONS:
Don Gdula will provide copies of the San Bernardino County
excavation permit to the. contractor.. The right-of-way will be
staked for the contractor. LOR Geotechnical will be on the
project all the time.. Greg Bucknell wants photographs of all
excavations. A field meeting will be scheduled for the
following week to go over the traffic control plan, surveying
and the construction schedule. Eric Lewis, Steve Nix, Don
Gdula, Steve Bauer, and representatives from Kenko, Inc. will
attend.
No work will be permitted until all the required paper work
has been returned to the City.
FINAL INSPECTION REPORT: Project will not be accepted for
operation and maintenance until all punch list items are
corrected and is to the satisfaction of the City, County, and
other Agency Inspectors.
FINAL ACCEPTANCE BY CITY COUNCIL: The following conditions
shall be fulfilled:'
1.) Project is accepted by the City Staff
Maintenance.
Project will then be scheduled for a City Council Meeting for
Final Acceptance" and authorization to file the "Notice of
Completion" with the County Recorder's Office.
for Operation and•
`"ADDITIONAL `NOTES OR COMMENTS"
Revised 9/00
Jeff McGrand, President
Kenko Inc., dba McGrand & Associates
1025 Calimesa Boulevard, Suite 4
Calimesa, CA 92320
Citrus Avenue Sewer and Storm Drain
from Jurupa Avenue to Sloven Avenue
Pre -Construction Meeting
On September 5, 2000, the City Council authorized to award the
construction contract to Kenko Inc., dba McGrand & Associates on
the above referenced project. The City of Fontana has scheduled a
pre -construction meeting to help facilitate the project.
The schedule for pre -construction meeting is for Thursday,
September' 14th, 2000 at 10:00 A.M. in the City of Fontana,
Engineering East Annex conference room, located at 17005 Upland
Avenue, Fontana, CA 92335. The project. manager,job
superintendent, and subcontractors are required to attend this
meeting. You are required to submit the following items at the
meeting:
1. Construction Schedule.
2. Emergency Information Form
3. Names and Titles of persons entitled to authorize and sign
change orders.
City of Fontana business license for contractors &
subcontractors will be required per City of Fontana Municipal
Code, Section"15-36 after the official award of contract by
the City Council.
Permits from Caltrans.
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
A`"Notice to Proceed" will not be
are provided.
If `anyadditional information
undersigned at (909) 350-6646.
Sincerely,
COMMUNITY DEVELOPMENT
Engineering Division
Gregor
Princip
DEPARTMENT
Bucknell,P.E.
Civil Engineer/Special Projects
issued until these conditions
is required, please contact the
cc Acting City Engineer
City of Fontana
CALIFORNIA
Fran Stewart, Service:' Planner
Southern California Edison
7951 Redwood Avenue
Fontana, CA 92336
RE Citrus Avenue Sewer and Storm Drain
Tram Jurupa Avenue to Stover Avenue
Pre -construction Meeting
Dear Mr. Stewart:
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. A representative is requested from
your company to attend this meeting.
The pre -construction meeting is schedule for Thursday, September
14t, 2000 at 10:00 A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA .' 92335.
If you have any questions, please contact the undersigned at (909)
350-6646.
Sincerely,
COMMUNITY' DEVELOPMENT DEPARTMENT
Eng4Leering Division
CC:
Bucknell,P.E.
Civil Engineer/Special Projects
Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
City of Fontana
CALIF'ORNIA
Paul Cyr, Construction Technician
Comcast
1205 Dupont Avenue
Ontario, CA 91761
Citrus Avenue Sewer and Storm Drain
From Jurupa Avenue to Slover Avenue
Pre -construction Meeting
September 8, 2000
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. A representative is requested from
your, company to attend this meeting.
The pre -construction meeting is schedule for Thursday, September
14t'`, `'2000 at 10:00 A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA 92335.
If you have any questions, please contact the undersigned at (909)
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Grego'y �+►Bucnl', kelP.E.
Principalvil Engineer/Special Projects
cc: Acting City Engineer.
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
isrecycled paper
Al Krohn, Inspector
Fontana Water Company
P.O. Box 987
Fontana, CA 92334
RE: Citrus Avenue Sewer, and Storm Drain
From Jurupa Avenue to Slover Avenue.
Pre -construction Meeting
Dear Mr. Krohn:
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. .A representative is requested -from
your company.to attend this meeting.
The pre -construction meeting is' schedule for Thursday, September
14th, 2000 at 10.:00 A M: in the .City of Fontana, Engineering, East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA 92335.
If'you'have'any questions, please contact the undersigned.at (909)
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
J. Bucknell,P.E.
Civil Engineer/Special Projects
cc: Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
City of Fontana
CALIFORNIA
Rick Reyes, Construction Planner
Southern California Gas Comapny
P.0'. Box 3003, SC8031
Redlands, CA • 92373
RE:
Citrus Avenue Sewer and Storm Drain
From Jurupa Avenue to Slover Avenue
.Pre -construction Meeting
Dear Mr. Reyes:
The City of Fontana ;has ,scheduled a pre -construction meeting on'
the above referenced project. A representative is requested from
your company to attend this meeting.
September 8, 2000
The'- pre=construction meeting is schedule for Thursday, September
14°h, 2000 at 10:00 A.M. in the City of Fontana, ' Engineering East
Annex conference room; located at 17005 Upland Avenue, Fontana,
CA 92335.
If you have any questions, please contact the undersigned at (909)
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engip. ering Division
. Bucknell,P.E.
Civil Engineer/Special Projects
Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
City of Fontana
CALIFORNIA
M.,-Taghi Monzavi Ph.D.,P.E.
Inland Empire Utilities; Agency.
9400 Cherry Avenue, Building A
Fontana, CA 92335
September 8, 2000
RE: Citrus Avenue Sewer and Storm Drain.
From Jurupa Avenue to Slover Avenue
Pre -construction Meeting
.Dear Mr. Monzavi:
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project -A representative isrequested from
your.company to attend this meeting.
The`pre-construction meeting is schedule for Thursday, September
14"', 2000 at 10.: 00 A.M. in the City of Fontana, ; Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA 92335.
If you have any questions, please contact the undersigned at (909)
3.50-6646'.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Gregdry Bucknell,P.E.
Principa Civil Engineer/Special Projects''
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
Steve Nix,P.E.,•Project Manager
L.D. King, ' Inc.
2151 Convention Center Way, Suite 100.
Ontario, CA 91764-4464
Citrus Avenue Sewer and Storm Drain:.
From Jurupa Avenue to Slover Avenue
Pre-construction'Meeting
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. A representative is requested from
your company to attend this meeting.
The pre -construction meeting is schedule for Thursday, September
14th, 2000 at 10:00 A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA. 92335
If you have any questions, please contact the undersigned at (909)
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division •
Bucknell,P.E.
ivil Engineer/Special Projects
vwvw.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
IIrecycled paper
City of Fontana
CALIFORNIA
San Bernardino County
Transportation Department
'Kevin Blakeslee,P.E., Resident Engineer
825East Third Street
San Bernardino,, CA 92415-0835
Citrus Avenue Sewer and Storm Drain
from Jurupa.`Avenue to Slover Avunue
,Pre -construction Meeting
Dear Mr. Blakeslee:
September 8, 2000
The City of Fontana has scheduled a pre —construction meeting on
the above referenced project. A representative is requested from
your company to attend; this meeting.
The pre -construction meeting is schedule for Thursday,, September
14t.'Y 2000 at '10:00 A.M: in -the City of Fontana,:., Engineering East •
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA .92335..
If you have any questions, please
350='6646
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division,
Gregory \
Principa
Bucknell,PE.
Civil Engineer/Special Projects
cc: Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
is recycled paper
undersigned at (909)
City of Fontana
CALIFORNIA
John P.'Leuer,G.E., President
LOR Geotechnical Group, Inc.
6121 Quail Valley Court
Riverside, CA 92507
Citrus Avenue' Sewer and Storm Drain
From Jurupa Avenue to Slover Avenue
Pre -construction. Meeting
Dear Mr. Leuer:
September 8, 2000
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. A representative is requested from
your company to attend this meeting.
The pre -construction meeting is schedule for Thursday, September
14th, 2000 at 10:00 A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA , 92335.
If you have any questions, please contact
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Gre••r�
Principa
J..Bucknell,P.E.
Civil Engineer/Special Projects
City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
ta recycled paper
the undersigned at (909)
Reza Moslemi,P.E
Caltrans
464 W. 4th Street, 6th Floor
San Bernardino, CA 92401_,
RE: Citrus Avenue Sewer and Storm Drain
From Jurupa Avenue to .Slover Avenue
Pre -construction Meeting
Dear.Mr: Moslemi:
The -City of Fontana has scheduled a pre construction meeting on
the above referenced project. A representative is requested from
your company to attend this meeting.
The pre -construction meeting is schedule for. Thursday, September
14t'°, 2000 at 10:00 A.M. in the City of Fontana, ° Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,
CA 92335.
If you have any questions, please contact the undersigned at (909)
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
En•ineering Division
Greg f�
Princip
. Bucknell,P.E.
Civil Engineer/Special Projects
cc: Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
Luis Montenregro, Senior Inspector
San Gabriel Valley Water
11142 Garvey Avenue
El Monte, CA ' 91734
Citrus Avenue Sewer..and Storm Drain
from Jurupa Avenue to Slover Avenue
Pre -construction; Meeting
Dear Mr. Montenregro:
The City of Fontana has scheduled a pre -construction meeting on
the above referenced project. A representative is requested from
your company to attend this meeting.
The pre construction meeting is schedule for Thursday, September
14th, 2000 at 10:00.A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005 Upland Avenue, Fontana,.
CA 92335.
September 8, 2000:
If you have any questions, please contact
350-6646.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
GreJ. Bucknell,P.E.
Princip: Civil Engineer/Special Projects
Acting City', Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
the undersigned at (909 )
Steve Randall
Pacific Bell
3939 E Coronado, 2nd Floor
Anaheim, CA 92807
Citrus Avenue Sewer and Storm Drain
From Jurupa Avenue to Slover Avenue.
Pre -construction Meeting
Dear Mr-. Randall:
;The City of Fontana- has scheduled a pre -construction meeting on
-the above referenced project. A representative.is requested from
:your company to attend this meeting:
The pre -construction meeting is schedule for Thursday, September
14th, 2000 at 10:0.0 A.M. in the City of Fontana, Engineering East
Annex conference room, located at 17005`Upland Avenue, Fontana,
CA 92335..
If you have any questions, please contact
350-6646.
Sincerely,.
COMMUNITY DEVELOPMENT, DEPARTMENT
Engineering Division
Grey Bucknel l , P . E .
Principa •Civil:Engineer/Special Projects
Acting City Engineer
www.fontana.org
8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600
recycled paper
the undersigned at (909)