Loading...
HomeMy WebLinkAbout7.3_Pre-Construction MeetingCITY OF FONTANA RECORD OF'PRECONSUCTION CONFERENCE PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID NO. SB-55-00 CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING EAST ANNEX, CONFERENCE ROOM DATE: SEPTEMBER 27, 2000 NAME/COMPANY TIME:. 10:00 A.M. TELEPHONE & FAX NUMBER 1:b044 Criq OF P'cuTA414 (aff) 350-96 2 (gat) 3 31-- (dais 2: (se(f I \ S Eli la (?) 3s7-O2-LI I009) 3 7-37D 3. i--1> tL i.3(, 93 7--0( ) 4. S-m;v '3A,V 1 of Fou u(a09) 3S0 -74)SO ( ) 5. So.6 /nc do//ur•7 • 'o D"' -cia o Bcfno(709) 387-e-a 47 (9a9)3i7• 80 5�.3 9o9 79S-ZSZ 6 e�' Lrt. /r n K) (`lc1) 3?6-OZ5R- (9;0) 75' / fo It 7 i Atiden5 bid ZFA1%0 (`CO 37e, --IS 3 3 ( ) (Io9) 387:7938 ( ) t SL.g�- (, 2- 79 35 ( ) 10 _A/ 8116K/telt (94?-440464 (qb)? 3.0-46 le 11. E1j c /E-W 16 (901) 350 66?52.(909) 35a- Catt3 12 ( ) ( .) 13. ( ) ( ) 14. CY/A/ ( • • CITY OF FONTANA RECORD OF PRECONSUCTION CONFERENCE PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID NO. SB-55-00 CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING EAST ANNEX, CONFERENCE ROOM DATE: SEPTEMBER 14,`2000' TIME: 10:00 A.M. NAME/COMPANY 1. 4 ku a i/ TELEPHONE & FAX NUMBER (909) I 2-'so ( 2. VADrJia )S S tAwe)/ /or- (00a) 01817 /c (Qe i) 43sr7 Cal lS 3. icb.Y /Ze yes 6.#S co, (% ').'f °-I5'e) (9 4'3 ° — zei 4. (A) Aid l � i /5 GAS ca (409) 3 35-. ) 5. 6. Ariz_ (---• 17. (1,0 1) 3') o 2 ( ) ( f-01) 31'a Lt 7 o6' ( 7. %4,42QY 'FOLE`l CTY dF —f-C7A1 .A.1 (9°T) 366 764,/ (90) 356 / ' 8. G //^1 q‘_5c.el.f" 66 CO - (y0%► 38 7 PS ( ) 9. 4CY1 t<o 13c . cr & tw& t- (709) 79s'-aS6,8 (9Co?) 10. AL( k AAirfeet.S.c5A)(eS) SC ' ( is H 4 Jr,,q, (04504(E )(909) Jo7-oZ/3:2- 009) 3307-G/1A 12.(-2€6 Auzk gli e frY ar ,31-4.4d(9 3aO ' c '/ (9e9) 3a•d C4/S. 13. 101.1 Cd1NALA %actioF uw4a (qcA) 556 -1(031. Rut ) 3So- 4:=6 16 14. -f � gAL e /ftrzi of (90q) 3So- 3o ( 15. oA3 Lo (964) (053 ^1 &fp(?O`)j 3- I 1 q I NAME/COMPANY Page 2 of 2 TELEPHONE & FAX NUMBER 16c o / LOR G-eo440v..1 ((UM 353-)740 ( ) 17. L--(KH:c- ovi(i-Z 4-(;),K_,,,,,,,f-", ( ) ( ) 18. ) ( ) 19. ( ) ( 20. ( ) ( ) 21, ( ) ( ) 22. ( ) ( ) 23. ( ) ( ) 24. ( ) ( ) Precon sign -In atten sheet.mst Rev: 9/00 9. /t/Y) Ko'ri� CITY OF FONTANA RECORD OF PRECONSUCTION CONFERENCE PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID NO. SB-55-00 CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES LOCATION OF PRECONSTRUCTION MEETING: CITY OF FONTANA, ENGINEERING EAST ANNEX, CONFERENCE ROOM DATE: SEPTEMBER 14, 2000 NAME/COMPANY 4 ifto aid Kw.c0. TIME: 10:00 A.M. TELEPHONE & FAX NUMBER (901) 1 L1--1-AK0 1 ( ) 2. 1%AD ) a �S :5- ' _K11_ 24fl! 1 iac. (gm) 4531 /o i is (G%A) 3. 'Ace.g.y ge 'fG S ‘4¢S ee, (qangf.r.--75d 6 (Of) 33 1,S v7 4. tA., Re, GAS et (49) 33,fr- 3576 ( ) L r� �—►- (1,4) �3'► . 2� ce:07e-43;- (S i) 3d'6, Y2061 ( ) ( ) rn v 1 2,EY C Ty d'r c--e*Yrt 1- (9a f - 3 6?) ?4,44 (90) :3 . -e) L2 411? 6V ScE ' d•? 60 - (y,9, 3112-3)3 s &Lit : r t- (PO) 7'S- as-68 (?L) 4Ak'COA)(9es) 795 >'e 13' ( ) ichl 41.z-; 4' ?Fr- /8- Yb. (94,0A., 4'Er �(9o9)'07-4Z13'.Z 0,09) o7-C/yam AuzkAl £!l G m' a,-' rt(9D9) 3 5'0 4601‘. (0) 36-d 6, /S> 13. r Ot..! C,tdL P4 /ONoFF r i i (qcR) 'SS0-1(23Z: 14.g/scu t /icrz% of rmurik4 (9001) 39)- 3co ( ) 15. J F t- � O (961) (53 I 1 w re) L53 11141 17. Li Page 2 of 2 NAME/COMPANY TELEPHONE & FAX NUMBER 16. 8ri aim ril ayo,N O / L (9O4i) 3 553- i- (m o ) 18. ) ( ) 19. ( ) ( 20. ( ) ( ) 21, ( ) ( ) 22. ( ) ( ) 23. ( ) 24. 25. ( ) Precon sign -in atten sheet.mst Rev: 9/00 AGENDA FOR PRE -CONSTRUCTION MEETING PROJECT TITLE: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID NO. SB-55-00 MEETING LOCATION: CITY OF FONTANA, ENGINEERING EAST ANNEX, CONFERENCE ROOM DATE: SEPTEMBER 14, 2000 TIME: 10:00 A.M. NAME OF CONTRACTOR: KENKO INC. dba McGRAND & ASSOCIATES PHONE NO. (909) 795-2568 FAX NO. (909) 795-1840 ENGINEEROF RECORD: L.D.' KING, INC. ENGINEERS, PLANNERS & SURVEYORS DESIGN ENGINEER CONTACT PERSON::, DOUGLAS H. MAYS,P.E. SENIOR VICE PRESIDENT PHONE NO. (909) 937-0200. FAX NO. (909) 937-0202 OWNER/AGENCY City of Fontana Community Development Department Engineering Division:. City Public Works Inspector: City Public Services Manager: CONTACT Gregory J. Bucknell,P.E. (909) 350-6646 Harry Foley (909) 350-7661 Steve Bauer (909) 350-7630 Cellular (909) Don Gdula, (909) 350-7632 Cellular',(909Y 733-3139 Scott Bangle (909) 350-6766 A. GENERAL DISCUSSION OF CONTRACTUAL, LEGAL AND PERMIT ASPECTS: STATUS OF CONTRACT: Contracts should be returned by September 19, 2000. INITIATING CONSTRUCTION:(NOTICE TO PROCEED) Will be issued after contract has been fully executed by Contractor and City Officials, and after Contractor's Insurance Certificates and copies of permits and business license have been submitted to the Project Manager. EMERGENCY INFORMATION FORM: Given to Contractor with contracts, contractor to turn in before the "Notice to Proceed" (and/or City's Construction Permit and business license) will be issued. REQUIRED PERMITS: `Prior to the start of any work, the Contractor shall take out "Applicable City Permits". A City Public Works Construction permit (no -fee) is required before construction can begin. (SP-8. Sec. 7-5) COMPLETION"TIME FOR CONTRACT: The contractor has 90 working days after "Notice to Proceed" is issued, "excluding Holidays; Weather days. and maintenance days (GC-2). LIQUIDATED DAMAGES: The City and contractor agree that if the Work is not completed within the period provided in the General Conditions that the sum of $500 for each and every. Calendar Day of such delay shall be charged,(SP-6, Sec. 6-9). OTHER REQUIREMENTS OF CONTRACT DOCUMENTS:(To include City of Fontana Business License and all Appropriate State of California Required Licenses). Contractor and all Sub - Contractors shall provide a copy of their City of Fontana Business License to the Project Manager. B. CONTRACTORS SCHEDULE: MATERIALS TO BE FURNISHED BY OWNER: None. MATERIALS TO BE FURNISHED BY CONTRACTOR: (Shop Drawing Submittals) Refer to "Green Book - Subsection 4-1.6 "Trade Names or Equals". The specified contract completion time shall not be effected by any circumstances developing from provisions of this subsection. CONTRACTORS SCHEDULE: The Contractor shall submit periodic Progress Reports to the Engineer by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress Payments will be withheld pending receipt of any outstanding reports. (SP-4, Sec. 6-1) SUBCONTRACTORS: No change in Subcontractors is allowed prior to the written approval from the City. WORKING HOURS: Working hoursshall be confined to the hours between 7:00 a.m. and 4:00 p.m., Monday through Friday, excluding Holidays. (SP-5, Sec. 6-7.2) Or approved by the City Engineer's authorized representative. C. PAYMENTS: PROGRESS PAYMENTS: Progress Payments shall be submitted in the format.` required by the City (See Sample Provided). Any Progress Payment submitted differently than the format required by the City shall be returned for correction. The date of the submittal will be counted from the date the final progress payment is received in the City's Accounts Payable Department. 10% RETENTION MONIES: Pursuant to the Contract documents 10% Retention Money will be withheld from each Progress Payment.' CHANGE` ORDERS: No extra work will be performed without an approved change order from the City Engineer or directed by a authorized representative. CERTIFIED PAYROLLS:"Certified Payroll Records" shall be submitted: to the City by the tenth day of each month. "Progress Payments" will be withheld pendingreceipt of any outstanding reports (SP-12, Sec. 7-15). Contractor shall. also be responsible for the "Certified Payroll forall of their Subcontractors. D. RIGHT OF WAY AND UTILITIES: NOTIFICATION OF AGENCIES: The County of San Bernardino, Caltrans, and any other required Agencies shall be notified 48 hours in advance "Prior" to starting work within their right-of-way or as required by the specific agency. COORDINATION WITH OTHER AGENCIES: Contractor shall make arrangements for City, County, Caltrans or any other Utility Companies as required for any inspections. RIGHT-OF-WAY REQUIREMENTS: City will acquire all right-of- way, easements and rights of entry as required for this pro-iect. Contractor shall verify that the acquisition(s) are completed prior to beginning any work outside the Public Right-of-way (SP-3, Sec. 2-8). NOTIFICATION OF UTILITIES: Contractoris responsible for calling "Dig Alert" and providing the City with their "confirmation number" prior to start of work. Notify non- member utility companies separately. Caltrans is a non- member. COORDINATION WITH UTILITIES: The Contractor shall notify the utilities designated in the "General Conditions" at least 48 hours in advance of excavating around any of their structures. Contractor must coordinate with Gas, Water & Telephone companies for relocation of their respective utility lines (SP-4, Sec. 5-1). EASEMENTS REQUIREMENTS:(UTILITIES)None. UTILITY SERVICE PAYMENTS: The Contractor and the Subcontractors will be responsible for payment of all the Utility billings until the City's acceptance of pro-iect for "operationand maintenance". E. ENGINEERING/INSPECTION AND SURVEYING: STAKING: All construction survey staking shall be coordinated through the City Inspector. Construction survey staking shall be provided by the City's consulting engineer (SP-3, Sec. 2.9.2). RECORD DRAWINGS: Contractor to provide City with redlined blueprint markups ("As Builts") of all changes to plans at the end of contract work. MATERIALS AND SOILS TESTING REQUIREMENTS: Field density tests will be made by the Geo-Technical Engineer during the course of construction at the expense of the City (SP-17, Sec. 211 2.2). All calls for testing services shall be coordinated through the City Inspector. Geo-Technical Consultant shall not respond to any direct calls from the Contractor. F. CONSTRUCTION: TRAFFIC CONTROL: Special attention is called out in Section 7-10. The Contractor's operations shall cause no unnecessary inconvenience. The access rights of the public shall be considered at all times. Unless otherwise authorized, traffic shall be permitted to pass through the work area (SP- 9, Sec. 7-10.1; SP-11, Sec. 7-10.3) PROTECTION OF EXISTING FACILITIES: The .Contractor shall exercise extreme care to protect all, existing utilities in place whether shown on plans or not, and shall assume full responsibility for all damage resulting from his operations.. DUST CONTROLS: Shall be provided as required per Section 7-8.1 of the Standard Specifications for Public Works Construction. STORAGE OF MATERIAL AND EQUIPMENT: No more than 1000 linear feet of pipeline shall be stockpiled on the site, regardless of size. The Contractor shall assume full responsibility for any damage caused by stockpiling and shall repair same at his expense (SP-10, Sec. 7-10.2). JOB SAFETY:. Shall be maintained at alltimes in accordance with applicable laws. JOB SECURITY: Contractor shall be responsible at all times. OTHER MISCELLANEOUS ITEMS AND/OR COMMENTS, CONCERNS, QUESTIONS: Don Gdula will provide copies of the San Bernardino County excavation permit to the. contractor.. The right-of-way will be staked for the contractor. LOR Geotechnical will be on the project all the time.. Greg Bucknell wants photographs of all excavations. A field meeting will be scheduled for the following week to go over the traffic control plan, surveying and the construction schedule. Eric Lewis, Steve Nix, Don Gdula, Steve Bauer, and representatives from Kenko, Inc. will attend. No work will be permitted until all the required paper work has been returned to the City. FINAL INSPECTION REPORT: Project will not be accepted for operation and maintenance until all punch list items are corrected and is to the satisfaction of the City, County, and other Agency Inspectors. FINAL ACCEPTANCE BY CITY COUNCIL: The following conditions shall be fulfilled:' 1.) Project is accepted by the City Staff Maintenance. Project will then be scheduled for a City Council Meeting for Final Acceptance" and authorization to file the "Notice of Completion" with the County Recorder's Office. for Operation and• `"ADDITIONAL `NOTES OR COMMENTS" Revised 9/00 Jeff McGrand, President Kenko Inc., dba McGrand & Associates 1025 Calimesa Boulevard, Suite 4 Calimesa, CA 92320 Citrus Avenue Sewer and Storm Drain from Jurupa Avenue to Sloven Avenue Pre -Construction Meeting On September 5, 2000, the City Council authorized to award the construction contract to Kenko Inc., dba McGrand & Associates on the above referenced project. The City of Fontana has scheduled a pre -construction meeting to help facilitate the project. The schedule for pre -construction meeting is for Thursday, September' 14th, 2000 at 10:00 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA 92335. The project. manager,job superintendent, and subcontractors are required to attend this meeting. You are required to submit the following items at the meeting: 1. Construction Schedule. 2. Emergency Information Form 3. Names and Titles of persons entitled to authorize and sign change orders. City of Fontana business license for contractors & subcontractors will be required per City of Fontana Municipal Code, Section"15-36 after the official award of contract by the City Council. Permits from Caltrans. www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper A`"Notice to Proceed" will not be are provided. If `anyadditional information undersigned at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT Engineering Division Gregor Princip DEPARTMENT Bucknell,P.E. Civil Engineer/Special Projects issued until these conditions is required, please contact the cc Acting City Engineer City of Fontana CALIFORNIA Fran Stewart, Service:' Planner Southern California Edison 7951 Redwood Avenue Fontana, CA 92336 RE Citrus Avenue Sewer and Storm Drain Tram Jurupa Avenue to Stover Avenue Pre -construction Meeting Dear Mr. Stewart: The City of Fontana has scheduled a pre -construction meeting on the above referenced project. A representative is requested from your company to attend this meeting. The pre -construction meeting is schedule for Thursday, September 14t, 2000 at 10:00 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA .' 92335. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, COMMUNITY' DEVELOPMENT DEPARTMENT Eng4Leering Division CC: Bucknell,P.E. Civil Engineer/Special Projects Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper City of Fontana CALIF'ORNIA Paul Cyr, Construction Technician Comcast 1205 Dupont Avenue Ontario, CA 91761 Citrus Avenue Sewer and Storm Drain From Jurupa Avenue to Slover Avenue Pre -construction Meeting September 8, 2000 The City of Fontana has scheduled a pre -construction meeting on the above referenced project. A representative is requested from your, company to attend this meeting. The pre -construction meeting is schedule for Thursday, September 14t'`, `'2000 at 10:00 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA 92335. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Grego'y �+►Bucnl', kelP.E. Principalvil Engineer/Special Projects cc: Acting City Engineer. www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 isrecycled paper Al Krohn, Inspector Fontana Water Company P.O. Box 987 Fontana, CA 92334 RE: Citrus Avenue Sewer, and Storm Drain From Jurupa Avenue to Slover Avenue. Pre -construction Meeting Dear Mr. Krohn: The City of Fontana has scheduled a pre -construction meeting on the above referenced project. .A representative is requested -from your company.to attend this meeting. The pre -construction meeting is' schedule for Thursday, September 14th, 2000 at 10.:00 A M: in the .City of Fontana, Engineering, East Annex conference room, located at 17005 Upland Avenue, Fontana, CA 92335. If'you'have'any questions, please contact the undersigned.at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division J. Bucknell,P.E. Civil Engineer/Special Projects cc: Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper City of Fontana CALIFORNIA Rick Reyes, Construction Planner Southern California Gas Comapny P.0'. Box 3003, SC8031 Redlands, CA • 92373 RE: Citrus Avenue Sewer and Storm Drain From Jurupa Avenue to Slover Avenue .Pre -construction Meeting Dear Mr. Reyes: The City of Fontana ;has ,scheduled a pre -construction meeting on' the above referenced project. A representative is requested from your company to attend this meeting. September 8, 2000 The'- pre=construction meeting is schedule for Thursday, September 14°h, 2000 at 10:00 A.M. in the City of Fontana, ' Engineering East Annex conference room; located at 17005 Upland Avenue, Fontana, CA 92335. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engip. ering Division . Bucknell,P.E. Civil Engineer/Special Projects Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper City of Fontana CALIFORNIA M.,-Taghi Monzavi Ph.D.,P.E. Inland Empire Utilities; Agency. 9400 Cherry Avenue, Building A Fontana, CA 92335 September 8, 2000 RE: Citrus Avenue Sewer and Storm Drain. From Jurupa Avenue to Slover Avenue Pre -construction Meeting .Dear Mr. Monzavi: The City of Fontana has scheduled a pre -construction meeting on the above referenced project -A representative isrequested from your.company to attend this meeting. The`pre-construction meeting is schedule for Thursday, September 14"', 2000 at 10.: 00 A.M. in the City of Fontana, ; Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA 92335. If you have any questions, please contact the undersigned at (909) 3.50-6646'. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Gregdry Bucknell,P.E. Principa Civil Engineer/Special Projects'' www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper Steve Nix,P.E.,•Project Manager L.D. King, ' Inc. 2151 Convention Center Way, Suite 100. Ontario, CA 91764-4464 Citrus Avenue Sewer and Storm Drain:. From Jurupa Avenue to Slover Avenue Pre-construction'Meeting The City of Fontana has scheduled a pre -construction meeting on the above referenced project. A representative is requested from your company to attend this meeting. The pre -construction meeting is schedule for Thursday, September 14th, 2000 at 10:00 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA. 92335 If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division • Bucknell,P.E. ivil Engineer/Special Projects vwvw.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 IIrecycled paper City of Fontana CALIFORNIA San Bernardino County Transportation Department 'Kevin Blakeslee,P.E., Resident Engineer 825East Third Street San Bernardino,, CA 92415-0835 Citrus Avenue Sewer and Storm Drain from Jurupa.`Avenue to Slover Avunue ,Pre -construction Meeting Dear Mr. Blakeslee: September 8, 2000 The City of Fontana has scheduled a pre —construction meeting on the above referenced project. A representative is requested from your company to attend; this meeting. The pre -construction meeting is schedule for Thursday,, September 14t.'Y 2000 at '10:00 A.M: in -the City of Fontana,:., Engineering East • Annex conference room, located at 17005 Upland Avenue, Fontana, CA .92335.. If you have any questions, please 350='6646 Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division, Gregory \ Principa Bucknell,PE. Civil Engineer/Special Projects cc: Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 is recycled paper undersigned at (909) City of Fontana CALIFORNIA John P.'Leuer,G.E., President LOR Geotechnical Group, Inc. 6121 Quail Valley Court Riverside, CA 92507 Citrus Avenue' Sewer and Storm Drain From Jurupa Avenue to Slover Avenue Pre -construction. Meeting Dear Mr. Leuer: September 8, 2000 The City of Fontana has scheduled a pre -construction meeting on the above referenced project. A representative is requested from your company to attend this meeting. The pre -construction meeting is schedule for Thursday, September 14th, 2000 at 10:00 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA , 92335. If you have any questions, please contact 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Gre••r� Principa J..Bucknell,P.E. Civil Engineer/Special Projects City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 ta recycled paper the undersigned at (909) Reza Moslemi,P.E Caltrans 464 W. 4th Street, 6th Floor San Bernardino, CA 92401_, RE: Citrus Avenue Sewer and Storm Drain From Jurupa Avenue to .Slover Avenue Pre -construction Meeting Dear.Mr: Moslemi: The -City of Fontana has scheduled a pre construction meeting on the above referenced project. A representative is requested from your company to attend this meeting. The pre -construction meeting is schedule for. Thursday, September 14t'°, 2000 at 10:00 A.M. in the City of Fontana, ° Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana, CA 92335. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT En•ineering Division Greg f� Princip . Bucknell,P.E. Civil Engineer/Special Projects cc: Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper Luis Montenregro, Senior Inspector San Gabriel Valley Water 11142 Garvey Avenue El Monte, CA ' 91734 Citrus Avenue Sewer..and Storm Drain from Jurupa Avenue to Slover Avenue Pre -construction; Meeting Dear Mr. Montenregro: The City of Fontana has scheduled a pre -construction meeting on the above referenced project. A representative is requested from your company to attend this meeting. The pre construction meeting is schedule for Thursday, September 14th, 2000 at 10:00.A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005 Upland Avenue, Fontana,. CA 92335. September 8, 2000: If you have any questions, please contact 350-6646. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division GreJ. Bucknell,P.E. Princip: Civil Engineer/Special Projects Acting City', Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper the undersigned at (909 ) Steve Randall Pacific Bell 3939 E Coronado, 2nd Floor Anaheim, CA 92807 Citrus Avenue Sewer and Storm Drain From Jurupa Avenue to Slover Avenue. Pre -construction Meeting Dear Mr-. Randall: ;The City of Fontana- has scheduled a pre -construction meeting on -the above referenced project. A representative.is requested from :your company to attend this meeting: The pre -construction meeting is schedule for Thursday, September 14th, 2000 at 10:0.0 A.M. in the City of Fontana, Engineering East Annex conference room, located at 17005`Upland Avenue, Fontana, CA 92335.. If you have any questions, please contact 350-6646. Sincerely,. COMMUNITY DEVELOPMENT, DEPARTMENT Engineering Division Grey Bucknel l , P . E . Principa •Civil:Engineer/Special Projects Acting City Engineer www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper the undersigned at (909)