5.4_Bid Summary Report
CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SBS5-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 1- SEWER CONSTRUCTION ENGINEER'S - ESTIMATE KENKO INC. dba McGRAND 1025 CALIMESA BLVD. CALIMESA, CA 92320 KIP INCORPORATED 25740 WASHINGTON AVE. - MURRIETA, CA 92562 MAJICH BROS., INC. P.O. BOX 337 ALTADENA, CA 91003-0337 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL - AMOUNT UNIT - PRICE TOTAL AMOUNT UNIT PRICE TOTAL - AMOUNT , UNIT PRICE _ TOTAL AMOUNT 1 Clearing and Grubbing 1 - LS $20,000.00 $20,000.00 $41,000.00 $41,000.00 $25,000.00 $25,000.00 $15,000.00 $15,000.00 2 Potholes 50 EA $400.00 $20,000.00 $150.00 $7,500.00 _ $150.00 $7,500.00 $50.00 $2,500.00 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 LF $75.00 $416,250.00 $70.00 $388,500.00 $35.00 $194,250.00 $76.00 $421,800.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 LF $65.00 $10,400.00 $100.00 $16,000.00 $50.00 $8,000.00 $50.00 $8,000.90 5 Sewer Manhole per City of Fontana - Standard Detail No. 112 11 EA $3,000.00 $33,000.00 $2,300.00 $25,300.00 $2,000.00 $22,000.00 $2,000.00 ; $22,000.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 EA $4,000.00 $28,000.00 $2,700.00 $18,900.00 $2,400.00 $16,800.00 $2,500.00 $17,500.00 7 Connection to existing Sewer Manhole , per Detail' A', Sheet No. 8, including manhole base reconstruction and• related work. 1 LS $5,000.00 $5,000.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00 $4,000.00 $4,000.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $30.00 $48,060.00 $50.00 $80,100.00 $20.00 $32,040.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $40.00 $5,760.00 $32.00 $4,608.00 $25.00 $3,600.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $20.00 $5,220.00 $18.00 $4,698.00 $30.00 $7,830.00 SUBTOTAL SCHEDULE 1 $638,310.00 $560,240.00 $364,456.00 $534,270.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 t 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE KENKO INC. dba McGRAND 1025 CALIMESA BLVD. CALIMESA, CA 92320 KIP INCORPORATED 25740 WASHINGTON AVE. MURRIETA, CA 92562 MAJICH•BROS., INC. P.O. BOX 337 ALTADENA, CA 91003-0337 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL _ AMOUNT UNIT PRICE TOTAL AMOUNT, 1 Clearing and Grubbing 1 LS . $20,000.00 $20,000.00 $40,000.00 . $40,000.00 $25,000.00 $25,000.00 $20,000.00 $20,000.00 2 Potholes 50 EA - $400.00 $20,000.00 $150.00 $7,500.00 $150.00 $7,500.00 $50.00 $2,500.00 3 66" Reinforced Concrete Pipe (1350D) 644 LF $180.00 . $115,920.00 $150.00 $96,600.00 . $165.00 $106,260.00 $200.00 $128,800.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF $150.00 . $201,900.00 $120.00 $161,520.00 $148.00 $199,208.00 $160.00 $215,360.00 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $105.00 $140,805.00 $135.00 $181,035.00 $140.00 $187,740.00 6 48" Reinforced Concrete Pipe (1350D) 1343 LF - $115.00 $154,445.00 $100.00 $134,300.00 $110.00 $147,730.00 $100.00 . $134,300.00 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $100.00 $77,300.00 $95.00 $73,435.00 $90.00 $69,570.00 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $130.00 $49,400.00 $80.00 $30,400.00 $80.00 $30,400.00 9 24" Reinforced Concrete Pipe (1350D) 323 LF . $70.00 $22,610.00 $100.00 $32,300.00 $65.00 $20,995.00 $70.00 $22,610.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1 18 EA - $4,500.00 $81,000.00 $3,600.00 $64,800.00 $3,200.00 $57,600.00 $3,500.00 $63,000.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS - $20,000.00 $20,000.00 $15,000.00 $15,000.00 $13,500.00 $13,500.00 $20,000.00 $20,000.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $800.00 $3,200.00 $1,500.00 $6,000.00 $750.00 $3,000.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $500.00 $1,000.00 $300.00 $600.00 $800.00 $1,600.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 EA $3,500.00 $10,500.00 $5,000.00 $15,000.00 $4,200.00 $12,600.00 $4,500.00 $13,500.00 15 Construct Inlet per Detail 'B', Sheet 8 4 EA $2,500.00 $10,000.00 $2,700.00 $10,800.00 $2,600.00 $10,400.00 $1,000.00 - $4,000.00 16 Remove Existing Inlet and Lateral 1 LS , $2,000.00 $2,000.00 $500.00 $500.00 $1,250.00 $1,250.00 $2,000.00 $2,000.00 17 Construct Storm Drain Bulkhead per Detail 'C', Sheet 9 9 EA $1,000.00 $9,000.00 $450.00 $4,050.00 $275.00 $2,475.00 - $500.00 $4,500.00 SUBTOTAL SCHEDULE II $961,405.00 $854,075.00 $895,988.00 $922,880.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE III - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE KENKO INC. dba McGRAND 1025 CALIMESA BLVD. CALIMESA, CA 92320 KIP INCORPORATED 25740 WASHINGTON AVE. - MURRIETA, CA 92562 MAJICH BROS., INC. P.O. BOX 337 ALTADENA, CA 91003-0337 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT : _ PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $40,000.00 $40,000.00 $56,500.00 $56,500.00 $30,000.00 $30,000.00 2 . Earthwork 1 LS $10,000.00 $10,000.00 $105,200.00 $105,200.00 $140,000.00 $140,000.00 , $100,000.00 $100,000.00 3 r Asphalt Concrete Pavement (Saver Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $20.00 $40,000.00 $50.00 $100,000.00 $38.00 $76,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to SioverAvenue) , 11000 TONS $40.00 _ $440,000.00 $30.00 $330,000.00 $36.00 $396,000.00 $36.00 $396,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 , TONS $40.00 $64,000.00 $30.00 $48,000.00 $36.00 $57,600.00 $38.00 $60,800.00 6 Class II Aggregate Base (Citrus Avenue) 6400 CY $30.00 $192,000.00 $18.00 $115,200.00 $21.00 $134,400.00 $20.00 $128,000.00 7 Class II Aggregate Base (Beech Avenue) _ 1000 CY $30.00 $30,000.00 $18.00 $18,000.00 $21.00 $21,000.00 $22.00 $22,000.00 8 Asphalt Concrete Dike 11000 LF $2.00 $22,000.00 $1.60 $17,600.00 $3.00 $33,000.00 $6.10 $67,100.00 ' SUBTOTAL SCHEDULE III $888,000.00 $714,000.00 $938,500.00 $879,900.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE KENKO INC. dba McGRAND 1025 CALIMESA BLVD. CALIMESA, CA 92320 KIP INCORPORATED 25740 WASHINGTON AVE. MURRIETA, CA 92562 MAJICH BROS., INC. P.O. BOX 337 - ALTADENA, CA 91003-0337 ITEM NO DESCRIPTION EST. QTY. UNIT, UNIT : PRICE - TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT r UNIT PRICE _ TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 $2,600.00 : $2,600.00 $4,000.00 $4,000.00 $5,000.00 $5,000.00 2 Potholes 10 EA $400.00 $4,000.00 $150.00 $1,500.00 $250.00 $2,500.00 $50.00 $500.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 " . LF $70.00. $31,920.00 $150.00 . $68,400.00 $65.00 $29,640.00 $75.00 $34,200.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $2,400.00 $7,200.00 $1,700.00 $5,100.00 $3,500.00 $10,500.00 5 Relocate Existing Storm Drain 1 LS $10,000.00 $10,000.00 $4,500.00 $4,500.00 $5,000.00 $5,000.00 $5,000.00 - $5,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $84,200.00 $46,240.00 $55,200.00 GRAND TOTAL $2,550,635.00 $2,212,515.00 $2,245,184.00 . $2,392,250.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 1 - SEWER CONSTRUCTION ENGINEER'S ESTIMATE CP CONSTRUCTION P.O. BOX 1026 ONTARIO, CA 91762 UTAH PACIFIC 4040 ELEANORA WAY MURRIETA, CA 92562 SIMICH CONSTRUCTION ,CO 324 CARBONIA AVENUE WALNUT, CA 91789 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $15,000.00 $15,000.00 $58,169.00 $58,169.00 $35,000.00 $35,000.00 2 Potholes 50 EA $400.00 $20,000.00 $100.00 $5,000.00 $158.00 $7,900.00 $100.00 $5,000.00 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 LF $75.00 $416,250.00 $65.00 $360,750.00 - $45.00 $249,750.00 $76.00 $421,800.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 LF $65.00 $10,400.00 $75.00 $12,000.00 $121.00 $19,360.00 $72.00 $11,520.00 5 Sewer Manhole per City of Fontana Standard Detail No. 112 11 EA $3,000.00 $33,000.00 $2,650.00 $29,150.00 $2,287.00 $25,157.00 $2,200.00 $24,200.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 EA $4,000.00 $28,000.00 $4,650.00 $32,550.00 $2,956.00 $20,692.00 $2,500.00 $17,500.00 7 Connection to existing Sewer Manhole per Detail'A', Sheet No. 8, including manhole base reconstruction and related work. 1 LS _ $5,000.00 $5,000.00 -_ $1,885.00 $1,885.00 , $4,726.00 $4,726.00 $4,000.00 $4,000.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $50.00 $80,100.00 $30.00 $48,060.00 $65.00 $104,130.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $25.00 $3,600.00 $40.00 $5,760.00 $30.00 $4,320.00. 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $18.00 $4,698.00 $38.00 $9,918.00 $60.00 $15,660.00 SUBTOTAL SCHEDULE I $638,310.00 $544,733.00 $449,492.00 $643,130.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: -JULY 20, 2000 t 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE CP CONSTRUCTION P.O. BOX 1026. ONTARIO, CA 91762 UTAH PACIFIC 4040 ELEANORA WAY MURRIETA, CA 92562- SIMICH CONSTRUCTION ,CO 324 CARBONIA AVENUE I" WALNUT, CA 91789 ITEM NO DESCRIPTION EST. QTY. - UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 ' Clearing and Grubbing 1 LS $20,000.00 $20,000.00 -. $20,000.00 $20,000.00 $58,169.00 $58,169.00 $0.00 $0.00 2 Potholes 50 EA $400.00 $20,000.00 $150.00 $7,500.00 $158.00 $7,900.00 $100.00 $5,000.00 3 66" Reinforced Concrete Pipe (1350D) 644 LF $180.00 $115,920.00 $130.00 $83,720.00 $158.00 $101,752.00 $148.00 $95,312.00 4 60" Reinforced Concrete Pipe (1350D) 1346 - LF $150.00 $201,900.00 $122.00 $164,212.00 $162.00 $218,052.00 $130.00 $174,980.00_ 5. 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $110.00 $147,510.00 $141.00 $189,081.00 $118.00 $158,238.00 6 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 $154,445.00 $99.00 $132,957.00 $98.00 $131,614.00 $110.00 $147,730.00 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $105.00 $81,165.00 $88.00 $68,024.00 $95.00 $73,435.00 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $85.00 $32,300.00 $87.00 $33,060.00 $84.00 $31,920.00 9 24" Reinforced Concrete Pipe (1350D) 323 LF $70.00 $22,610.00 $75.00 $24,225.00 $86.00 $27,778.00 -_ $80.00 $25,840.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1 18 EA $4,500.00 $81,000.00 $3,000.00 $54,000.00 $4,855.00 $87,390.00 $3,300.00 $59,400.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 $16,000.00 $16,000.00 $27,712.00 $27,712.00 $15,500.00 $15,500.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $850.00 $3,400.00 $3,148.00 $12,592.00 $600.00 $2,400.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $1,085.00 $2,170.00. $4,846.00 $9,692.00 $900.00 $1,800.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 EA $3,500.00 $10,500.00 $5,000.00 $15,000.00 $5,680.00 $17,040.00 $4,400.00 $13,200.00 15 Construct Inlet per Detail'B', Sheet 8 4 EA $2,500.00 $10,000.00 $2,850.00 $11,400.00 $1,382.00 $5,528.00 $3,000.00 $12,000.00 16 Remove Existing Inlet and Lateral 1 .LS $2,000.00 $2,000.00 $4,500.00 $4,500.00 $6,434.00 $6,434.00 $2,000.00 $2,000.00 . 97 Construct Storm Drain Bulkhead per Detail 'C'. Sheet 9 - 9 , EA $1,000.00 $9,000.00 $650.00 $5,850.00 $1,027.00 $9,243.00 $400.00 $3,600.00 SUBTOTAL SCHEDULE II $961,405.00 $805,909.00 $1,011,061.00 _ $822,355.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB.55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 111- PAVEMENT CONSTRUCTION ENGINEER'S CP CONSTRUCTION UTAH PACIFIC ESTIMATE P.O. BOX 1026 4040 ELEANORA WAY ONTARIO, CA 91762 MURRIETA, CA 92562 SIMICH CONSTRUCTION ,CO 324 CARBONIA AVENUE WALNUT, CA 91789 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $35,000.00 $35,000.00 $48,211.00 $48,211.00 $65,000.00_ $128,000.00 $65,000.00 $128,000.00 2 Earthwork 1 LS $10,000.00 $10,000.00 $315,000.00 $315,000.00 $138;966.00 $138,966.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $26.00 $52,000.00 $37.00 $74,000.00 $35.00 $70,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to Stover Avenue) 11000 TONS $40.00 $440,000.00 $31.00 $341,000.00 $37.00 $407,000.00 $35.00 $385,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS $40.00 $64,000.00 $30.50 $48,800.00 $37.00 $59,200.00 $35.00 $56,000.00 6 Class II Aggregate Base (Citrus Avenue) 6400 _ CY $30.00 : $192,000.00 $24.00 $153,600.00 $19.00 $121,600.00 $18.00 $115,200.00 7 Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 $24.00 $24,000.00 $19.00 $19,000.00 - - $18.00 $18,000.00 8 Asphalt Concrete Dike 11000 LF $2.00. $22,000.00 $2.40 $26,400.00 $2.00 $22,000.00 $4.00 $44,000.00 SUBTOTAL SCHEDULE III : $888,000.00 $995,800.00 $889,977.00 $881,200.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 t 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE CP CONSTRUCTION P.O. BOX 1026 ONTARIO, CA 91762 UTAH PACIFIC 4040 ELEANORA WAY MURRIETA, CA 92562 SIMICH CONSTRUCTION ,CO 324 CARBONIA AVENUE WALNUT, CA 91789 ITEM NO DESCRIPTION EST. - QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT : PRICE TOTAL AMOUNT UNIT PRICE .TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 $10,000.00 $10,000.00 $25,874.00 $25,874.00 $4,000.00 $4,000.00 2 Potholes 10 EA $400.00 $4,000.00 $150.00 $1,500.00 $403.00 $4,030.00 $200.00 $2,000.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 LF $70.00 $31,920.00 $98.00 $44,688.00 $61.00 $27,816.00 $75.00 - $34,200.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $3,000.00 $9,000.00 - $3,262.00 $9,786.00 $2,000.00 $6,000.00 5 Relocate Existing Storm Drain 1 - LS $10,000.00 $10,000.00 $6,500.00 $6,500.00 $9,034.00 $9,034.00 $8,000.00 $8,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $71,688.00 $76,540.00 $54,200.00 GRAND TOTAL $2,550,635.00 :. $2,418,130.00 $2,427,070.00 $2,400,885.00 *$2,435,885.00 BID TOTAL AND SPREAD SHEET DIFFERENT CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 1 - SEWER CONSTRUCTION ENGINEER'S ESTIMATE STEVE CASADA 1426 SO. ALLEC ST. _ ANAHEIM, CA 92805 S.J. BURKHARDT, INC 6901 CENTERAL AVENUE RIVERSIDE, CA 92504 RADICH 4680 LOS ANGELES, STE. 0 SIMI VALLEY, CA 93063 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL - AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing. 1 LS $20,000.00 $20,000.00 $10,000.00 $10,000.00 $39,000.00 $39,000.00 $125,000.00 $125,000.00 2 Potholes 50 EA $400.00 $20,000.00 $200.00 $10,000.00 $375.00 $18,750.00 $250.00 $12,500.00 ' 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 LF $75.00 $416,250.00 $55.00 $305,250.00 $51.00 $283,050.00 $62.00 $344,100.00 4 8" Extra Strength Vitrified Clay Pipe S , Sewer 160 LF , $65.00 $10,400.00 $50.00 $8,000.00 $47.00 $7,520.00 $84.00 $13,440.00 5 Sewer Manhole per City of Fontana Standard Detail No.112 11 EA $3,000.00 - $33,000.00 $3,000.00 $33,000.00 $2,475.00 $27,225.00 $2,200.00 $24,200.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 EA $4,000.00 $28,000.00 $4,000.00 $28,000.00 $2,950.00 $20,650.00 $2,550.00 $17,850.00 7 . Connection to existing Sewer Manhole , per Detail 'A', Sheet No. 8, including manhole base reconstruction and related work. 1 LS . $5,000.00 $5,000.00 $6,000.00 $6,000.00 $3,000.00 '-$3,000.00 $2,000.00 $2,000.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $50.00 $80,100.00 $41.00 $65,682.00 $47.00 $75,294.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $100.00 $14,400.00 $53.00 $7,632.00 $30.00 $4,320.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $50.00 $13,050.00 $27.00 $7,047.00 $25.00 $6,525.00 SUBTOTAL SCHEDULE I $638,310.00 $507,800.00 $479,556.00 $625,229.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM•JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 c 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE STEVE CASADA 1426 SO. ALLEC ST. ANAHEIM, CA 92805 S.J. BURKHARDT, INC 6901 CENTERAL AVENUE RIVERSIDE, CA 92504 RADICH 4680 LOS ANGELES, STE. 0 SIMI VALLEY, CA 93063 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL . AMOUNT - UNIT PRICE TOTAL AMOUNT UNIT - PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $10,000.00 , $10,000.00 $32,500.00 $32,500.00 $40,000.00 $40,000.00 • 2 Potholes - 50 : EA $400.00 $20,000.00 $200.00 $10,000.00 $300.00 $15,000.00 $250.00 $12,500.00 3 66" Reinforced Concrete Pipe (1350D) - 644 LF $180.00 $115,920.00 $155.00 $99,820.00 $148.00 $95,312.00 $202.00 $130,088.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF $150.00 $201,900.00 _ $145.00 $195,170.00 $135.00 $181,710.00 $150.00 $201,900.00 • 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $133.00 $178,353.00 $130.00 $174,330.00 $136.00 $182,376.00 ' 6 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 $154,445.00 $132.00 $177,276.00 $120.00 $161,160.00 $114.00 $153,102.00 • 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $60.00 $46,380.00 $97.00 $74,981.00 $90.00 $69,570.00 8 , 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $55.00 $20,900.00 $146.00 $55,480.00 $78.00 $29,640.00 • 9 24" Reinforced Concrete Pipe (1350D) - 323 _ LF $70.00 _ $22,610.00 $50.00 $16,150.00 $141.00 $45,543.00 $69.00 $22,287.00 10 Construct Manhole perAmerican Public Works Association Standard Plan 320-1 18 EA $4,500.00 $81,000.00 $3,400.00 $61,200.00 $4,125.00 $74,250.00 $3,000.00 $54,000.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 $16,000.00 $16,000.00- $11,400.00 $11,400.00 $10,000.00 $10,000.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $500.00 $2,000.00 $1,200.00 $4,800.00 $800.00 $3,200.00 - 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $500.00 $1,000.00 $950.00 $1,900.00 $800.00 $1,600.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A. 3 EA $3,500.00 $10,500.00 $4,000.00 $12,000.00 $4,900.00 $14,700.00. $3,800.00 $11,400.00 15 Construct Inlet per Detail 'B', Sheet 8 4 EA $2,500.00 $10,000.00 $2,500.00 $10,000.00 $2,650.00 $10,600.00 $3,200.00 $12,800.00 16 Remove Existing Inlet and Lateral 1 - LS $2,000.00 $2,000.00 $5,000.00 $5,000.00; $1,900.00 $1,900.00 $1,500.00 " $1,500.00 17 Construct Storm Drain Bulkhead per Detail 'C', Sheet 9 9 EA $1,000.00 $9,000.00 $200.00 $1,800.00 $700.00 $6,300.00 $250.00 $2,250.00 • SUBTOTAL SCHEDULE 11 $961,405.00 $863,049.00 $961,866.00 $938,213.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 t 10:00 AM SCHEDULE III - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE STEVE CASADA 1426 SO. ALLEC ST. ANAHEIM, CA 92805 S.J. BURKHARDT, INC - 6901 CENTERAL AVENUE RIVERSIDE, CA 92504 > RADICH 4680 LOS ANGELES, STE. 0 SIMI VALLEY, CA 93063 ITEM NO - DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $38,000.00 . $38,000.00 $90,000.00 $90,000.00 $55,000.00 $55,000.00 2 Earthwork 1 LS $10,000.00 $10,000.00 $275,000.00 $275,000.00 $195,300.00 $195,300.00 . $148,000.00 $148,000.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $43.00 $86,000.00 $32.00 $64,000.00 $33.92 $67,840.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to Stover Avenue) 11000 TONS $40.00 - $440,000.00 $40.00 . $440,000.00 $33.50 $368,500.00 $33.92 $373,120.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS $40.00 $64,000.00 $43.00 $68,800.00 $36.00 $57,600.00 $33.92 $54,272.00 6 Class II Aggregate Base (Citrus Avenue) 6400 CY $30.00 $192,000.00 $12.00 $76,800.00 $23.00 $147,200.00 $17.25 $110,400.00 7 Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 $12.00 $12,000.00 $24.00 $24,000.00 $17.25 $17,250.00 8 Asphalt Concrete Dike 11000 LF $2.00 $22,000.00 $7.00 $77,000.00 $2.50 $27,500.00 $2.09 $22,990.00 SUBTOTAL SCHEDULE III $888,000.00 $1,073,600.00 $974,100.00 $848,872.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE STEVE CASADA ° 1426 SO. ALLEC ST. ANAHEIM, CA 92805 - S.J. BURKHARDT, INC 6901 CENTERAL AVENUE RIVERSIDE, CA 92504 RADICH 4680 LOS ANGELES, STE. 0 SIMI VALLEY, CA 93063 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 $5,000.00 $5,000.00 , $3,500.00 $3,500.00 $35,000.00 $35,000.00 2 Potholes 10 EA $400.00. $4,000.00 $200.00 $2,000.00 $375.00 $3,750.00 $250.00 $2,500.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 LF $70.00 $31,920.00 $62.00 $28,272.00 $132.00 $60,192.00 $140.00 $63,840.00 ' 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $2,500.00 ,.. $7,500.00 $4,400.00 $13,200.00 $2,000.00 $6,000.00 5 Relocate Existing Storm Drain 1 . LS $10,000.00 $10,000.00 $5,000.00 -- $5,000.00 $3,700.00 $3,700.00 $4,500.00 $4,500.00 SUBTOTAL SCHEDULE IV - $62,920.00 $47,772.00 $84,342.00 $111,840.00 $2,524,154.00 GRAND TOTAL $2,550,635.00 $2,492,221.00 $2,499,864.00 *$2,491,421.00 ' BID TOTAL AND SPREAD SHEET DIFFERENCE CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 10:00 AM SCHEDULE 1-SEWER CONSTRUCTION ENGINEER'S ESTIMATE VASIL J. CONSTRUCTION 1416AVENIDA ENTRADA SAN DIMAS, CA 91773 COLICH AND SONS 547 W. 140TH GARDENA, CA 90248 SO CAL UNDERGROUND P.O. BOX 1747 BREA, CA 92822 ITEM NO °- DESCRIPTION EST. QTY. UNIT UNIT PRICE. TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT- PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $7,500.00 $7,500.00 $133,730.00 $133,730.00 $5,000.00 $5,000.00 2 Potholes 50 EA $400.00 $20,000.00 $50.00 ; $2,500.00 $311.00 $15,550.00 $75.00 $3,750.00 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 LF $75.00 $416,250.00 $85.00 $471,750.00 $50.00 $277,500.00 $80.00 $444,000.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 LF $65.00 $10,400.00 $80.00 - $12,800.00 $173.00 $27,680.00 $75.00 $12,000.00 5 - Sewer Manhole per City of Fontana Standard Detail No. 112 11 EA $3,000.00 $33,000.00 $3,500.00 $38,500.00 - $2,914.00 $32,054.00 $3,000.00 $33,000.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 EA $4,000.00 $28,000.00 $3,700.00 $25,900.00 - $3,318.00 $23,226.00 $4,000.00 $28,000.00 7 Connection to existing Sewer Manhole per Detail 'A', Sheet No. 8, including manhole base reconstruction and related work. 1 LS $5,000.00 $5,000.00 $1,500.00 $1,500.00 $2,812.00 $2,812.00 $10,000.00 $10,000.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $70.00 $112,140.00 $48.00 $76,896.00 $45.00 $72,090.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $70.00 $10,080.00 $48.00 $6,912.00 $40.00 $5,760.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $50.00 $13,050.00 $53.00 $13,833.00 $25.00 $6,525.00 SUBTOTAL SCHEDULE I - $638,310.00 $695,720.00 $610,193.00 $620,125.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 i 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE VASIL J. CONSTRUCTION 1416 AVENIDA ENTRADA SAN DIMAS, CA 91773 COLICH AND SONS 547 W. 140TH GARDENA, CA 90248 SO CAL UNDERGROUND P.O. BOX 1747 BREA, CA 92822 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL - AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $7,500.00 $7,500.00 $133,972.00 $133,972.00 $30,000.00 $30,000.00 2 Potholes 50 EA $400.00 $20,000.00 $50.00 $2,500.00 $307.00 $15,350.00 $75.00 $3,750.00 3 66" Reinforced Concrete Pipe (1350D) 644 LF $180.00 $115,920.00 $150.00 $96,600.00 $168.00 $108,192.00 : $130.00 $83,720.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF $150.00 $201,900.00 $140.00 $188,440.00 $150.00 $201,900.00 $125.00 $168,250.00 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $120.00 $160,920.00 $136.00 $182,376.00 $120.00 $160,920.00 6 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 $154,445.00 $95.00 $127,585.00 $123.00 $165,189.00 $115.00 $154,445.00 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 - , $77,300.00 $80.00 $61,840.00 $126.00 $97,398.00 $110.00 $85,030.00 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $70.00 $26,600.00 $89.00 $33,820.00 $100.00 $38,000.00 9 24" Reinforced Concrete Pipe (1350D) 323 LF $70.00 $22,610.00 $70.00 $22,610.00 $79.00 $25,517.00 . $90.00 $29,070.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1 18 EA $4,500.00 - $81,000.00 $4,200.00 $75,600.00 $3,620.00 $65,160.00 $4,000.00 $72,000.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 $16,000.00 $16,000.00 $14,056.00 $14,056.00 $100,000.00 $100,000.00 12 • Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $1,200.00 $4,800.00 $1,720.00 $6,880.00 $500.00 $2,000.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $950.00 $1,900.00 $1,279.00 $2,558.00 $300.00 $600.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 EA $3,500.00 $10,500.00 $4,300.00 $12,900.00 $5,230.00 $15,690.00 $5,000.00 $15,000.00 ' 15 Construct Inlet per Detail 'B', Sheet 8 4 EA $2,500.00 $10,000.00 $1,500.00 $6,000.00 $3,984.00 $15,936.00 $2,000.00 $8,000.00 16 Remove Existing Inlet and Lateral 1 . LS $2,000.00 $2,000.00 $1,000.00 $1,000.00 $3,636.00 $3,636.00 $2,000.00 ' $2,000.00 17 Construct Storm Drain Bulkhead per Detail 'C', Sheet 9 9 EA $1,000.00 $9,000.00 $300.00 $2,700.00 $838.00 $7,542.00 $200.00 $1,800.00 SUBTOTAL SCHEDULE II $961,405.00 $815,495.00 $1,095,172.00. $954,585.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 11I - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE VASIL J. CONSTRUCTION 1416 AVENIDA ENTRADA SAN DIMAS, CA 91773 COUCH AND SONS 547 W. 140TH GARDENA, CA 90248 SO CAL UNDERGROUND P.O. BOX 1747 BREA, CA 92822 ITEM NO DESCRIPTION EST. - QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1" Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $70,000.00 $70,000.00 $52,890.00 $52,890.00 $50,000.00 $50,000.00 2 Earthwork 1 LS - $10,000.00 $10,000.00 $140,000.00 $140,000.00 $99,940.00 $99,940.00 $150,000.00 $150,000.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $30.00 $60,000.00 $36.00 $72,000.00 $52.00 . $104,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to Stover Avenue) 11000 TONS $40.00 $440,000.00 $35.00 $385,000.00 $36.00 $396,000.00 $40.00 $440,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS - $40.00 $64,000.00 $37.00 $59,200.00 $36.00 $57,600.00 $42.00 $67,200.00 6 Class II Aggregate Base (Citrus Avenue)- 6400 CY $30.00 $192,000.00 $28.00 $179,200.00 $18.00 $115,200.00 $22.00 $140,800.00 7 . Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 - $28.00 $28,000.00 . - $18.00 $18,000.00 $22.00 $22,000.00 8 Asphalt Concrete Dike - 11000 , LF $2.00 $22,000.00 $3.00 $33,000.00 - $2.00 $22,000.00 $7.00 $77,000.00 $1,051,000.00 SUBTOTAL SCHEDULE III $888,000.00 $954,400.00 $833,630.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE VASIL J. CONSTRUCTION 1416 AVENIDA ENTRADA SAN DIMAS, CA 91773 - COLICH AND SONS 547 W. 140TH GARDENA, CA 90248 SO CAL UNDERGROUND -' P.O. BOX 1747-- BREA, CA 92822 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE - TOTAL AMOUNT UNIT - PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 $2,500.00 $2,500.00 $11,287.00 $11,287.00 $7,000.00 $7,000.00 2 Potholes 10 EA $400.00 $4,000.00 $50.00 $500.00 $280.00 -, $2,800.00 $50.00 $500.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 LF $70.00 $31,920.00 $125.00 $57,000.00 $63.00 $28,728.00 $85.00 , $38,760.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $3,500.00 $10,500.00 $2,349.00 $7,047.00 _. $3,500.00 $10,500.00 5 Relocate Existing Storm Drain 1 LS $10,000.00 $10,000.00 $1,000.00 $1,000.00 $1,716.00 $1,716.00 $3,000.00 $3,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $71,500.00 $51,578.00 $59,760.00 GRAND TOTAL $2,550,635.00 - $2,537,115.00 $2,590,573.00 $2,685,470.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM ._ SCHEDULE 1 - SEWER CONSTRUCTION . ENGINEER'S ESTIMATE VADNAIS 9164 REHCO ROAD SAN DIEGO, CA 92121 BYRON CRUME 1826 POMONA ROAD CORONA, CA 91720 MIRAMONTES P.O. BOX 90095 CITY OF INDUSTRY, CA ITEM NO - DESCRIPTION EST. QTY. UNIT UNIT " PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 . $50,000.00 $50,000.00 $102,000.00 $102,000.00 $15,000.00 $15,000.00 2 Potholes 50 EA $400.00 $20,000.00 $250.00 $12,500.00 $400.00 $20,000.00 $220.00 $11,000.00 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 LF $75.00 $416,250.00 $89.00 $493,950.00 $71.00 $394,050.00 $97.00 $538,350.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 LF $65.00 $10,400.00 $100.00 $16,000.00 $70.00 $11,200.00 $65.00 $10,400.00 5 Sewer Manhole per City of Fontana Standard Detail No. 112 - 11 EA $3,000.00 $33,000.00 $2,500.00 $27,500.00 . $2,700.00 $29,700.00 $3,000.00 $33,000.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 EA $4,000.00 $28,000.00 $3,000.00 $21,000.00 $3,000.00 $21,000.00 $3,500.00 $24,500.00 7 " Connection to existing Sewer Manhole per Detail 'A', Sheet No. 8, including manhole base reconstruction and related work. 1 LS $5,000.00 $5,000.00 $3,000.00 $3,000.00 - $850.00 $850.00 $3,500.00 $3,500.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $97.00 $155,394.00 $19.00 $30,438.00 $60.00 $96,120.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $12.00 $1,728.00 $51.00 $7,344.00 -- $25.00 $3,600.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $8.00 $2,088.00 $17.00 $4,437.00 $25.00 $6,525.00 SUBTOTAL SCHEDULE I $638,310.00 $783,160.00 $621,019.00 $741,995.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE:. JULY 20, 2000 @ 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE VADNAIS 9164 REHCO ROAD " " SAN DIEGO, CA 92121 BYRON CRUME 1826 POMONA ROAD CORONA, CA 91720 MIRAMONTES P.O. BOX 90095 CITY OF INDUSTRY, CA ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 - $20,000.00 $10,000.00 $10,000.00 $96,000.00 $96,000.00 $15,000.00 $15,000.00 2 Potholes 50 - EA - $400.00 $20,000.00 $248.00 $12,400.00 $400.00 $20,000.00 $220.00 $11,000.00 3 66" Reinforced Concrete Pipe (1350D) 644 LF - $180.00 $115,920.00 $160.00 $103,040.00 $150.00 $96,600.00 $155.00 $99,820.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF - $150.00 $201,900.00 $150.00 $201,900.00 $144.00 $193,824.00 $150.00 $201,900.00 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $145.00 $194,445.00 $139.00 $186,399.00 $140.00 $187,740.00 6 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 $154,445.00 $125.00 $167,875.00 $107.00 $143,701.00 $120.00 $161,160.00 ' 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $122.00 $94,306.00 $95.00 $73,435.00 $114.00 $88,122.00 . 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 - $30,400.00 $130.00 $49,400.00 $175.00 $66,500.00 $100.00 $38,000.00 9- 24" Reinforced Concrete Pipe (1350D) 323 LF $70.00 $22,610.00 $120.00 $38,760.00 $156.00 $50,388.00 $90.00 $29,070.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1. < 18 _ EA $4,500.00 $81,000.00 $4,200.00 $75,600.00 $3,500.00 $63,000.00 $4,300.00 $77,400.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 ,$18,000.00 $18,000.00 $7,250.00 $7,250.00 • $18,000.00 $18,000.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $500.00 $2,000.00 $200.00 $800.00 $1,300.00 $5,200.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $500.00 $1,000.00 $500.00 $1,000.00 $900.00 $1,800.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 x EA $3,500.00 $10,500.00 $5,500.00 . $16,500.00 $3,500.00 $10,500.00 $4,500.00 $13,500.00 15 Construct Inlet per Detail 'B', Sheet 8 4 EA $2,500.00 $10,000.00 $3,000.00 $12,000.00 $3,600.00 $14,400.00 $3,000.00 $12,000.00 16 Remove Existing Inlet and Lateral 1 LS _, $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,700.00 $1,700.00 $2,500.00 $2,500.00 17 Construct Storm Drain Bulkhead per . Detail 'C', Sheet 9 9 EA $1,000.00 $9,000.00 $500.00 $4,500.00 $440.00 $3,960.00 - $500.00 , $4,500.00 SUBTOTAL SCHEDULE II $961,405.00 $1,002,726.00 $1,029,457.00 $966,712.00 CITY OF FONTANA DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 © 10:00 AM SCHEDULE III - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE VADNAIS 9164 REHCO ROAD . SAN DIEGO, CA 92121 BYRON CRUME 1826 POMONA ROAD CORONA, CA 91720 . MIRAMONTES P.O. BOX 90095 CITY OF INDUSTRY, CA ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $75,000.00 $75,000.00 $104,000.00 $104,000.00 $55,000.00 $55,000.00 2 Earthwork 1 LS $10,000.00 $10,000.00 $143,000.00 $143,000.00 : $9,300.00 $9,300.00 $135,000.00 $135,000.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $32.50 $65,000.00 $44.00 $88,000.00 $38.00 $76,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to Slaver Avenue) 11000 TONS $40.00 $440,000.00 $32.50 $357,500.00 $43.00 $473,000.00 $38.00 $418,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS $40.00 $64,000.00 $32.50 $52,000.00 $44.00 $70,400.00 $38.00 $60,800.00 6 Class II Aggregate Base (Citrus Avenue) 6400 CY $30.00 $192,000.00 $17.00 $108,800.00 $18.00 $115,200.00 $20.00 $128,000.00 7 Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 $17.00 $17,000.00 $18.00 $18,000.00 $20.00 $20,000.00 8 Asphalt Concrete Dike 11000 LF $2.00 $22,000.00 $1.75 $19,250.00 $6.00 $66,000.00 $3.00 $33,000.00 SUBTOTAL SCHEDULE III $888,000.00 $837,550.00 . - $943,900.00 $925,800.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) - BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE VADNAIS 9164 REHCO ROAD SAN DIEGO, CA 92121 BYRON CRUME _ 1826 POMONA ROAD CORONA, CA 91720 MIRAMONTES P.O. BOX 90095 — CITY OF INDUSTRY, CA ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL - AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE , TOTAL AMOUNT UNIT PRICE ' TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 $10,000.00 $10,000.00 $1,700.00 $1,700.00 $10,000.00 $10,000.00 2 Potholes 10 EA $400.00 ; $4,000.00 $250.00 $2,500.00 $400.00 $4,000.00 $220.00 $2,200.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 - LF $70.00 $31,920.00 $95.00 , $43,320.00 $175.00 $79,800.00 $80.00 $36,480.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $2,500.00 $7,500.00 $2,600.00 $7,800.00 $2,500.00 $7,500.00 5 Relocate Existing Storm Drain 1 LS $10,000.00 $10,000.00 $1,500.00 $1,500.00 $5,700.00 - $5,700.00 $10,000.00 _ $10,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $64,820.00 $99,000.00 $66,180.00 GRAND TOTAL $2,550,635.00 $2,688,256.00 $2,693,376.00 $2,700,687.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00). BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE 1 - SEWER CONSTRUCTION ENGINEER'S - ESTIMATE ALBERT W. DAVIES 8737 HELMS RANCHO CUCAMONGA, CA KEN THOMPSON . 8851 WATSON STREET CYPRESS, CA 90630 T.A. RIVARD 8884 JURUPA ROAD RIVERSIDE, CA 92509 ITEM NO DESCRIPTION EST. QTY. ` UNIT . UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 " $20,000.00 $13,400.00 $13,400.00 $48,000.00 $48,000.00 $43,000.00 $43,000.00 2 Potholes 50 EA $400.00 $20,000.00 $218.00 $10,900.00 $134.00 $6,700.00 $150.00 _ $7,500.00 3 12" Extra Strength Vitrified Clay Pipe Sewer 5550 - LF $75.00 $416,250.00 $88.00 $488,400.00 $70.00 $388,500.00 $81.00 $449,550.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 LF $65.00 $10,400.00 $130.00 $20,800.00 $153.00 $24,480.00 $40.00 $6,400.00 5 Sewer Manhole per City of Fontana Standard Detail No. 112 11 EA - $3,000.00 $33,000.00 $3,300.00 $36,300.00 $1,955.00 $21,505.00 $2,800.00 $30,800.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5' diameter manhole 7 . EA $4,000.00 $28,000.00 $3,700.00 $25,900.00 $2,440.00 $17,080.00 . $3,500.00 $24,500.00 7 Connection to existing Sewer Manhole per Detail 'A', Sheet No. 8, including manhole base reconstruction and related work. 1 . LS $5,000.00 $5,000.00 > $3,400.00 $3,400.00 $4,275.00 $4,275.00 $3,000.00 $3,000.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 - $28.00 $44,856.00 $60.00 $96,120.00 $40.00 $64,080.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $100.00 $14,400.00 $18.00 $2,592.00 $100.00 $14,400.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 $62.00 $16,182.00 $18.00 $4,698.00 $40.00 $10,440.00 SUBTOTAL SCHEDULE I $638,310.00 $674,538.00 $613,950.00 $653,670.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES 8737 HELMS RANCHO CUCAMONGA, CA KEN THOMPSON 8851 WATSON STREET CYPRESS, CA 90630 TA. RIVARD 8884 JURUPA ROAD RIVERSIDE, CA 92509 ITEM NO - DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS - $20,000.00 $20,000.00 $20,000.00 $20,000.00 $47,590.00 $47,590.00 $70,000.00 $70,000.00 2 Potholes - 50 EA $400.00 $20,000.00 $217.00 $10,850.00. $134.00 $6,700.00 $150.00 $7,500.00 3 66" Reinforced Concrete Pipe (1350D) 644 - LF $180.00 $115,920.00 $152.00 $97,888.00 $198.00 $127,512.00 $228.00 $146,832.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF $150.00 $201,900.00 $140.00 $188,440.00 $175.00 $235,550.00 $153.00 . $205,938.00 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $130.00 $174,330.00 $162.00 $217,242.00 $137.00 $183,717.00 6 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 _ $154,445.00 $122.00 $163,846.00 $150.00 $201,450.00 $125.00 $167,875.00 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $115.00 $88,895.00 $137.00 $105,901.00 $125.00 $96,625.00 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $70.00 $26,600.00 $100.00 , $38,000.00 $100.00 $38,000.00 9 24" Reinforced Concrete Pipe (1350D) 323 LF - $70.00 $22,610.00 $90.00 $29,070.00 $99.00 $31,977.00 $72.00 $23,256.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1 18 EA $4,500.00 $81,000.00 $5,300.00 $95,400.00 $3,275.00 $58,950.00 $5,000.00 $90,000.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 $18,500.00 $18,500.00 $14,655.00 $14,655.00 $25,000.00 $25,000.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $1,180.00 $4,720.00 $365.00 $1,460.00 $400.00 $1,600.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $1,175.00 $2,350.00 $425.00 $850.00 $500.00 $1,000.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 EA $3,500.00 $10,500.00 $4,350.00 $13,050.00 $4,890.00 $14,670.00 $5,100.00 $15,300.00 15 Construct Inlet per Detail 'B', Sheet 8 4 EA $2,500.00 $10,000.00 $1,620.00 $6,480.00 $3,055.00 $12,220.00 $5,000.00 $20,000.00 16 Remove Existing Inlet and Lateral 1 LS $2,000.00 $2,000.00 $2,155.00 $2,155.00 $2,445.00 $2,445.00 $3,000.00 $3,000.00 17 Construct Storm Drain Bulkhead per Detail 'C', Sheet 9 9 EA - $1,000.00 $9,000.00 $360.00 $3,240.00 $610.00 $5,490.00 $600.00 , $5,400.00 SUBTOTAL SCHEDULE II $961,405.00 $945,814.00 $1,122,662.00 $1,101,043.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE III - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES 8737 HELMS - RANCHO CUCAMONGA, CA KEN THOMPSON 8851 WATSON STREET CYPRESS, CA 90630 T.A. RIVARD 8884 JURUPA ROAD RIVERSIDE, CA 92509 ITEM NO DESCRIPTION EST. QTY. UNIT.; UNIT - PRICE TOTAL AMOUNT UNIT PRICE - TOTAL AMOUNT UNIT '- PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS $50,000.00 $50,000.00 $15,500.00 $15,500.00 $93,580.00 $93,580.00 $105,000.00 $105,000.00 2 Earthwork 1 LS $10,000.00 $10,000.00 $300,000.00 $300,000.00 $106,000.00 $106,000.00 $146,000.00 $146,000.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS $40.00 $80,000.00 $46.00 $92,000.00 $42.50 $85,000.00 $40.00 $80,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jurupa Avenue to SloverAvenue) 11000 TONS $40.00 $440,000.00 $33.00 $363,000.00 $36.60 $402,600.00 $39.00 _ $429,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS $40.00 $64,000.00 $30.00 $48,000.00 $42.70 $68,320.00 $41.00 $65,600.00 6 Class II Aggregate Base (Citrus Avenue) 6400 CY $30.00 $192,000.00 $23.00 $147,200.00 $19.00 $121,600.00 - $20.00 $128,000.00 7 Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 $23.00 $23,000.00 $19.00 $19,000.00 $22.00 $22,000.00 8- Asphalt Concrete Dike 11000 LF $2.00 $22,000.00 $3.50 $38,500.00 $2.40 $26,400.00 - $3.00 $33,000.00 $1,008,600.00 SUBTOTAL SCHEDULE III $888,000.00 $1,027,200.00 _ $922,500.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM BID DATE: JULY 20, 2000 10:00 AM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES 8737 HELMS RANCHO CUCAMONGA, CA KEN THOMPSON : 8851 WATSON STREET CYPRESS, CA 90630 T.A. RIVARD 8884 JURUPA ROAD RIVERSIDE, CA 92509 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE - TOTAL AMOUNT UNIT PRICE TOTAL - AMOUNT UNIT - PRICE TOTAL AMOUNT UNIT - PRICE TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline - 1 LS $5,000.00 $5,000.00 $4,600.00 $4,600.00 $14,789.00 $14,789.00 $15,000.00 $15,000.00 2 Potholes 10 EA $400.00 $4,000.00 $240.00 $2,400.00 $134.00 $1,340.00 $150.00 $1,500.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 LF $70.00 $31,920.00 ' $96.00 $43,776.00 $79.00 $36,024.00 : $70.00 $31,920.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $2,725.00 $8,175.00 $1,945.00 - $5,835.00 $3,000.00 $9,000.00 5 Relocate Existing Storm Drain 1 LS $10,000.00 $10,000.00 $2,600.00 $2,600.00 $4,890.00 $4,890.00- $10,000.00 $10,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $61,551.00 $62,878.00 $67,420.00 GRAND TOTAL $2,550,635.00 $2,709,103.00 $2,721,990.00 $2,830,733.00 12,722,000.00 * BID TOTAL AND SPREAD SHEET DIFFERENCE CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 t 10:00 AM - SCHEDULE 1 - SEWER CONSTRUCTION ENGINEER'S ESTIMATE STEVE BABALO P.O. BOX 1048 MONROVIA, CA. 91017 WA. RASIC 11126 WRIGHT ROAD LYNWOOD, CA 90262 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00 2 Potholes 50 EA $400.00 $20,000.00 $100.00 $5,000.00 $300.00 $15,000.00 3 12" Extra Strength Vitrified Clay Pipe _ Sewer 5550 LF $75.00 $416,250.00 $100.00 $555,000.00 $100.00 $555,000.00 4 8" Extra Strength Vitrified Clay Pipe S Sewer 160 . LF $65.00 $10,400.00 $70.00 $11,200.00 $80.00 $12,800.00 5 Sewer Manhole per City of Fontana Standard Detail No. 112 11 EA $3,000.00 $33,000.00 $2,800.00 $30,800.00 $2,000.00 $22,000.00 6 Sewer Manhole per City of Fontana Standard Detail No. 112 except 5', diameter manhole 7 - EA $4,000.00 $28,000.00 $3,300.00 $23,100.00 $2,500.00 $17,500.00 7 Connection to existing Sewer Manhole per Detail 'A', Sheet No. 8, including manhole base reconstruction and related work. 1 LS $5,000.00 $5,000.00 $1,000.00 $1,000.00- $1,500.00 $1,500.00 8 6" Sewer Lateral per City of Fontana Standard Nos. 125. 1602 LF $60.00 $96,120.00 $70.00 $112,140.00 $70.00 $112,140.00 9 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class IV 144 LF $30.00 $4,320.00 $60.00 $8,640.00 $100.00 $14,400.00 10 Concrete Encasement per Los Angeles County Department of Public Works Standard Plan 2023-2. Class II 261 LF $20.00 $5,220.00 _ $60.00 $15,660.00 $100.00 $26,100.00 SUBTOTAL SCHEDULE I $638,310.00 $772,540.00 $801,440.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT:, CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 t 10:00 AM SCHEDULE II - STORM DRAIN CONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES 8737 HELMS . RANCHO CUCAMONGA, CA WA. RASIC 11126 WRIGHT ROAD LYNWOOD, CA 90262. ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 . $7,000.00 $7,000.00 $35,000.00 $35,000.00 2 Potholes 50 EA $400.00 $20,000.00 $100.00 $5,000.00 $300.00 $15,000.00 3 66" Reinforced Concrete Pipe (1350D) 644 LF $180.00 $115,920.00 $256.00 $164,864.00 . $185.00 $119,140.00 4 60" Reinforced Concrete Pipe (1350D) 1346 LF $150.00 $201,900.00 $239.00 $321,694.00 $185.00 $249,010.00 5 54" Reinforced Concrete Pipe (1350D) 1341 LF $130.00 $174,330.00 $228.00 $305,748.00 $180.00 $241,380.00 6 . 48" Reinforced Concrete Pipe (1350D) 1343 LF $115.00 $154,445.00 $217.00 $291,431.00 $150.00 $201,450.00 7 42" Reinforced Concrete Pipe (1350D) 773 LF $100.00 $77,300.00 $206.00 $159,238.00 $150.00 $115,950.00 8 30" Reinforced Concrete Pipe (1350D) 380 LF $80.00 $30,400.00 $160.00 $60,800.00 $108.00 $41,040.00 9 24" Reinforced Concrete Pipe (1350D) _ 323 , LF $70.00 $22,610.00 $150.00 $48,450.00 $85.00 $27,455.00 10 Construct Manhole per American Public Works Association Standard Plan 320-1 18 EA $4,500.00 $81,000.00 $3,000.00 $54,000.00 $4,000.00 $72,000.00 11 Construct Connection to Existing Storm Drain including Reinforced Concrete Box per Caltrans Standard Plan D80 and Transition Structures per American Public Works Association Standard Plan 342-1 1 LS $20,000.00 $20,000.00 $20,000.00 $20,000.00 $12,000.00 $12,000.00 12 Construct Junction Structure per American Public Works Association Standard Plan 332-1, Case 4 EA $2,500.00 $10,000.00 $1,000.00 $4,000.00 $1,200.00 $4,800.00 13 Construct Concrete Collar per American Public Works Association Standard Plan 380-1 2 EA $1,000.00 $2,000.00 $2,000.00 $4,000.00 $850.00 $1,700.00 14 Construct Catch Basin per SBCTD Standard Plan 206 and 206A 3 EA $3,500.00 $10,500.00 $4,000.00 $12,000.00 $4,200.00 $12,600.00 15 Construct Inlet per Detail'B', Sheet 8 - 4 EA $2,500.00 $10,000.00 $2,000.00 $8,000.00 $1,000.00 $4,000.00 16 Remove Existing Inlet and Lateral 1 LS $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 17 Construct Storm Drain Bulkhead per Detail 'C', Sheet 9 9 EA $1,000.00 $9,000.00 $500.00 $4,500.00 $1,000.00 $9,000.00 SUBTOTAL SCHEDULE 11 $961,405.00 $1,471,725.00 $1,163,025.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB-55-00) BID DATE: JULY 20, 2000 @ 10:00 AM _ SCHEDULE III - PAVEMENT CONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES - 8737 HELMS RANCHO CUCAMONGA, CA- WA. RASIC 11126 WRIGHT ROAD LYNWOOD, CA 90262 ITEM NO DESCRIPTION ` EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Traffic Control, Signing,. And Striping 1 LS _ $50,000.00 $50,000.00 $18,000.00 $18,000.00 $50,000.00 $50,000.00 2 Earthwork 1 LS $10,000.00 $10,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 3 Asphalt Concrete Pavement (Sover Avenue and Citrus Avenue Temporary Pavement) 2000 TONS -- $40.00 $80,000.00 $20.00 $40,000.00 $38.00 $76,000.00 4 Asphalt Concrete Pavement (Citrus Avenue from Jumpa Avenue to SloverAvenue) 11000 TONS $40.00 $440,000.00 $25.00 $275,000.00 $38.00 $418,000.00 5 Asphalt Concrete Pavement (Beech Avenue) 1600 TONS $40.00 $64,000.00 $25.00 $40,000.00 $38.00 $60,800.00 6 Class II Aggregate Base (Citrus Avenue) 6400 CY - $30.00 $192,000.00 $12.00 $76,800.00 $26.00 $166,400.00 7 Class II Aggregate Base (Beech Avenue) 1000 CY $30.00 $30,000.00 $12.00 $12,000.00 $26.00 $26,000.00 8 Asphalt Concrete Dike 11000 - LF $2.00 $22,000.00 $4.00 $44,000.00 $6.00 $66,000.00 SUBTOTAL SCHEDULE III $888,000.00 $555,800.00 $913,200.00 CITY OF FONTANA - DETAIL BID SUMMARY PROJECT: CITRUS AVENUE SEWER AND STORM DRAIN FROM JURUPA AVENUE TO SLOVER AVENUE (SB55-00) BID DATE: JULY 20, 2000 @ 10:00 AM SCHEDULE IV - WASTE DISPOSAL RECONSTRUCTION ENGINEER'S ESTIMATE ALBERT W. DAVIES 8737 HELMS RANCHO CUCAMONGA, CA W.A. RASIC 11126 WRIGHT ROAD LYNWOOD, CA 90262 ITEM NO DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 Clearing and Grubbing, including removal of existing 10" Pipeline 1 LS $5,000.00 $5,000.00 , $6,000.00 $6,000.00 $10,000.00 $10,000.00 2 Potholes 10 EA $400.00 $4,000.00 $100.00 $1,000.00 $300.00 $3,000.00 3 12" C-900 Class 200 PVC Pipe Sewer 456 LF $70.00 $31,920.00 $150.00 $68,400.00 $100.00 $45,600.00 4 Sewer Manhole per Inland Empire Utilities Agency Standard Detail 3 EA $4,000.00 $12,000.00 $6,000.00 $18,000.00 . $1,500.00 $4,500.00 5 . Relocate Existing Storm Drain 1, , LS $10,000.00 $10,000.00 $3,000.00 - $3,000.00 $5,000.00 _ $5,000.00 SUBTOTAL SCHEDULE IV $62,920.00 $96,400.00 $68,100.00 GRAND TOTAL $2,550,635.00 $2,896,465.00 $2,945,765.00 *$2,878,465.00 12,948,765.00 * BID TOTAL AND SPREAD SHEET DIFFERENCE MEMORANDUM CITY. OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION/SPECIAL: PROJECTS TO: SIDD LAMBERT, PURCHASING SPECIALIST FROM: SUBJECT:' .YOUSUF PATANWALA, P.E., SENIOR CIVIL ENGINEER/SPECIAL PROJECTS'` CITRUS AVENUE SEWER AND STORM DRAIN - 'FROM JURUPA AVENUE TO.SLOVER AVENUE BID NO. SB-55=00 BID BOND VERIFICATION' DATE: JULY 20, 2000 ***************************************************************** **************************************************************** Enclosed are the bid bonds for the three lowest bidders for the above referenced- project. Please verify and .respond in writing if the bonds submitted are' from acceptable:Surety Companies. ;g1920 r CITY OF FONTANA BID TALLY SHEET• BID OPENING DATE: July 20, 2000 TIME: 10:00 am LOCATION: City Hall, Council Chambers, 8353 Sierra Avenue, Fon SUBJECT: Citrus Ave. Sewer and Storm'Drain from Jurupa to Slo gdsVEi to ` t i. COMPANY NAME ADDRESS BOND INS AMOUNT 1.Byyron Crume 1826 Pomona Road r^rona 2•Steve Casada •T.A. Rivard 1826 Pomona Road Corona, CA 91720 1426`So. Allec St. Anaheim, CA 92805 8884 Jurupa Road Riverside, Ca 9250 ;03,37b 2,4611,4zr ZI 3 oi'j 33 4Majich Bros.,'- Inc P.O.. Box 337 Altadena, CA 91003 31 z,2.So 5.Ken Thompson, Inc. 8851 Watson St. Cypress, CA 90630 'Z, 7 Z 2, art, 6.KIP Incorp. '].Vasil J. $•Albert W. Davies Inc. dba Mcgrand lOJtah Pacific 11W.A. 12Vadnais 25740 WashingtonAve. Murrieta, CA 92562 1416 Avenida Entrada San Dimas, CA 91773' 8737 Helms Rancho Cucamonga, 1025 Calimesa Blvd., Suite 4 Calimesa, Ca 92320 ✓ 4040 Eleanora Way Murrieta, CA 92562 11126 Wright Rd. Lynwood, CA 90262 9164 Rehco Rd. San Diego, CA 92121 2,2LIS;18 2i C3-7 )) Z11 01 I o3 2,ZII( SIS itolo 2(19g(v7 2,c88,ZS6 13;Iiramontes 14Simich' 1SRadich P.O. Box 90095 City of Industry, 324 Carbonia Ave. Walnut, Ca 91789 4680 'Los Angeles, Ste ( Simi Valley, CA 93063 211 o 0 6g7 2,52.j rIS/1. P.O. Box 1747 Brea, CA'92822 BID TALLY SHEET Page2` 16. Steve Babalo 17. Colich & Sons 18. CP Construction P.O. Box 1048 Monrovia, CA 91017 547 W. 140th Gardena, CA 90248 P.O., Box 1026 Ontario, CA 6901 Central Ave Riverside, CA 92504 z glg yi be 21130 2 q 1,%%it 20. So Cal. Underground. 21. FOR ILL L'.ESULTS CONTACT Z168S 147o