Loading...
HomeMy WebLinkAbout3.4_To and From UtilitiesL'XIflG LETTERi1F'TRANSIVIITTAL Engineers/Planners/Surveyors 2151 Convention Center Way, Suite I OOB Ontario, California 91764-4464 (909) 937-0200 Fax (909) 937-0202 TO: WE ARE TRANSMITTING THE FOLLOWING: TTACHED 0 .SHOPDRAWINGS ❑ COPY OF LETTER ❑ PRINTS 0 PLANS 0 CHANGE ORDER Cer'ORIGINALS DATE: ATTENTION: �o r►1 JOB NO.: 0, 1 et-t-r► p-AD 'RE: J0 413. ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: 0 SAMPLES COPIES DATE NO. DESCRIPTION l 4 „THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL 0 APPROVED AS SUBMI-✓. Crii—FOR YOUR USE 0 APPROVED AS NOTED O AS REQUESTED 0 RETURNED FOR CORRECTIONS O FOR REVIEW AND COMMENT 0 0 PRINTS RETURNED AFTER LOAN TO US 0 RESUBMITCOPIES FOR APPROVAL 0 SUBMIT COPIES FOR DISTRIBUTION 0 RETURN ' CORRECTED PRINTS ❑ FOR BIDS DUE ❑ 19 Office Use Only . DCorr DTM DSv DUt DHy.'So OPC/Per DCol c DATE: FROM: INLAND EMPIRE UTILITIES AGENCY MEMORANDUM November 14, 2000 Steve Bauer City of Fontana Terry Caldwell �/ Construction Project Coordinator SUBJECT: Storm drain crossing NRW line in Jurura Avenue in the City o Fontana Project No. CW20705, Pneumatic pressure test As we discussed in the field, the pressure testing for the new section of sewer pipe recently installed by the city on Jurupa Avenue may be completed using pneumatic pressure rather than water pressure. Thank you, for your assistance during this project. Terry Caldwell Construction Project Coordinator