HomeMy WebLinkAbout3.4_To and From UtilitiesL'XIflG
LETTERi1F'TRANSIVIITTAL
Engineers/Planners/Surveyors
2151 Convention Center Way, Suite I OOB
Ontario, California 91764-4464
(909) 937-0200 Fax (909) 937-0202
TO:
WE ARE TRANSMITTING THE FOLLOWING:
TTACHED
0 .SHOPDRAWINGS
❑ COPY OF LETTER
❑ PRINTS 0 PLANS
0 CHANGE ORDER Cer'ORIGINALS
DATE:
ATTENTION: �o r►1
JOB NO.: 0, 1
et-t-r► p-AD
'RE: J0
413.
❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS:
0 SAMPLES
COPIES
DATE
NO.
DESCRIPTION
l
4
„THESE ARE TRANSMITTED AS CHECKED BELOW:
❑ FOR APPROVAL 0 APPROVED AS SUBMI-✓.
Crii—FOR YOUR USE 0 APPROVED AS NOTED
O AS REQUESTED 0 RETURNED FOR CORRECTIONS
O FOR REVIEW AND COMMENT 0
0 PRINTS RETURNED AFTER LOAN TO US
0 RESUBMITCOPIES FOR APPROVAL
0 SUBMIT COPIES FOR DISTRIBUTION
0 RETURN ' CORRECTED PRINTS
❑ FOR BIDS DUE ❑ 19
Office Use Only . DCorr DTM DSv
DUt DHy.'So OPC/Per DCol c
DATE:
FROM:
INLAND EMPIRE UTILITIES AGENCY
MEMORANDUM
November 14, 2000
Steve Bauer
City of Fontana
Terry Caldwell �/
Construction Project Coordinator
SUBJECT: Storm drain crossing NRW line in Jurura Avenue in the City o
Fontana
Project No. CW20705, Pneumatic pressure test
As we discussed in the field, the pressure testing for the new section of
sewer pipe recently installed by the city on Jurupa Avenue may be
completed using pneumatic pressure rather than water pressure.
Thank you, for your assistance during this project.
Terry Caldwell