HomeMy WebLinkAbout3.3_To and From Property Owner(s)Date/Time.
Local' ID
Local -Name
Company Logo
This document was confirmed.
(reduced sample and details below
Document Size Letter-S
Total Pages Scanned
Ioa3 Slone Ammo
Fartene. CA 92335
Fhq,9' B09-$00-7632
Fax 609350RO1e
City of Fontana
Engineering Division
Special Projects
Fax
Communications
To: Henry M. 5hl9ekunl
Faac 9-1310.316.7918
Phase: 9-1.310-940.9266
From: Don Gdula
Date: November 8, 2000
Page: 2
Re: Temporary RI¢Il of Eniry Form CC:
0 Urgent 0 For Review 0 Please Comment . 0 Please Reply 0 Please Reeyeb
•Cummenrs: This Is page 3 of the first fax.. 1 warted to show you the future right of way.
Total Pages Confirmed -
11- 8-00; 3:16PM
1234567
No.
Doc
Remote Station
Start Time,
Duration
Pages
Mode
Comments
Results
1
536
913103167918
11- 8-00; 3:15PM
60"
2/ "2
EC
CP 9600.
Notes **
EC: Error Correct
BC: Broadcast Send
CP: Completed
LS: Local Scan
RE: Resend,
MP: Multi -Poll
RM: Receive to Memory
LP: Local Print
PD: Polled by'Remote - MB •Receive to:Mellbox:
PG: Polling a Remote PI Power .In�terr.uptIon'
DR: Document., Removed TM:,'Terminated by user
FO: Forced Output WT: Walting;'Transfer
PROP
R/W.
EX.
R/W
46'
3
1
N 89'44'33"W
L=50 L.F.
S=0.0040
44'
0.5'
CENTER WAY
4
1 /
E226
5' 5'
30'
PROP. STORM DRAIN
08„
46'
a4„ G
PROPOSED
-SEWER
TYPICAL CROSS SECTION AT STA 33+00
SCALE: 1 " = ' 10'
PLAN / PROFILE FOR
SEWER IMPROVEMENTS
CITRUS AVENUE
FROM JURUPA AVE. TO SLOVER AVE.
0.5'
SHOULD CONSTRUCTION OF TI
REQUIRED IMPROVEMENTS NC
COMMENCE WITHIN TWO YEARS 0
DATE OF APPROVAL SHOWN HEf
AND CARRIED FORTH IN A DILIC
MANNER, THE CITY ENGINEER I
REQUIRE REVISIONS TO THE PLAP
BRING THEM INTO CONFORMANCE
CONDITIONS AND STANDARDS IN E
smiss.ion Report
Date/Time
Local ID
Local Name.
Company Logo
This document was confirmed.
(reduced sample and detail
Document Size Letter-S
Total
23S3SIara Avonuo
Fontana, CA 92335
Phone 309350-7632
Fart B09350E010
City of Fontana
Engineering Division
Special Projects
Communications
Tel Henry M. Shigekuni From Don Gdula
Face 9.1310-318-7918 •
phone: 9.1.310.540.9266
Datr November8.2000
Pagesr 3
as: Temporary Fight of Entry - ' CC:
❑ Urgent ❑ Per Review ❑ Please Comment C Please Reply O Pleaee Recycle
•Commenter This temporary right of entry wit allow the City of Fontana's Conhactor Kenko, 1PC. 10
extend the sewer lateral an additional 16 feet to the 46 foot fume street right of way from the street
centerline. Seethe attached sheet cross section. Please call if you have any questions.
Total Pages Con -Firmed : 2'
8-00;10:46AM
�1234567
No-
Doc
Remote Station
Start Time
Duration
Pages
Mode
Comments
Results
1
441
913103167918
11-`8-00;)0c'44AM
• 58"
2/ 2
EC
CP 9600
** Notes **
EC: Error Correct
BC: Broadcast Send
CP: Completed
LS: Local Scan
RE: Resend
MP: Multi -Poll:
RM:`Recel.ve to Memory
LP: Local Print
PD: Polled by'Remote MB: Receive to Mellbox
PG: Polling a Remote PI': Power interruption...
DR: Document Removed TM: Terminated by user
FO: Forced Output WT:'Walting Transfer
Assessor's Parcel No: 255-071-01
Property Address: S/E Corner of Santa Ana Avenue 'and Citrus Avenue, Fontana, CA
Temporary Right of Entry For Access to Private Property
I/We, the undersigned owner(s) of the real property which is the subject of this Right of Entry for
Access to Private Property, understand(s) that the City. of Fontana ("City") for the sewer
improvement project which will provide for the construction of sewer lateral improvements on
Citrus Avenue. The proposed sewer lateral improvements will require an encroachment within
the subject property.
I/We understand that the work shall be done in accordance to the Citrus Avenue Sewer
Project, Drawing No. 2831, sheets 1 thru 8 and that the cost of the proposed construction will be
borne by the City. The property owner will not be liable for any work done by the City's
contractor.
I/We understand that the City will repair any existing improvements that may be damaged during
construction and the City will have the construction area restored to an equal or better condition
than prior to the start of construction.
I/We hereby grant permission to the City, its employees, •agents, contractors and sub-
contractors, to enter upon my/our real property as necessary for survey staking and the
construction of the proposed sewer improvements and related onsite improvements. The
permission shall be effective as of the date indicated below and will expire upon final acceptance
of the project by the City.
Date:
(Signature) - Property Owner
(Print Name) - Property Owner
Date:
(Signature) - Property Owner
(Print Name) - Property Owner