CITY OF FONTANA
ENGINEERING DIVISION
PROJECT:
CONTRACT NO. SB�45�93
CONTRACTOR:
CONTRACT CO NO.1 REVJSE-_�> SUPP^
ORIGINAL CONTRACT AMOUNT 00
ESTIMATE OF COST
HIS 1CO TOTAL`TO DATE
ITEM '
FORCE ACCT.
AGREED PRICE $7500.00 $7500.00.
ADJUSTMENT --------- ---------
TOTAL
% OVER CONTRACT ` 3.92%
CONTINGENCY BALANCE (INCL.THISCO)
You are hereby directed to make the herein described changes from the
and specifications or do the following described work not included in
plans and'specification on the contract.
NOTE: This change order isnbt efiective until approved by the City
Engineer.
CONTRACT
ITEM NO.
DESCRIPTION
OF WORK
plans
the
UNIT UNIT QUANTITY TOTAL
PRICE
N/A JACK HAMMER CONCRETE
MANHOLE BASE AND INSTALL
'12" STUB AND NEW 15" STUB
AND RE -CHANNEL INSIDE.
STATION 10+00, NORTH SIDE. L/S
N/A '
N/0
�
JACK HAMMER CONCRETE
MANHOLE TO LAY 21" V.C.P.
STUB. STATION 10+00,EAST
STUB.
L/S
JACK HAMMER CONCRETE
MANHCILE FOR NEW CHANNEL
FOR THE 21" V.C.P. STUB.
STATION 10+00, EAST SIDE.- L/S
N/A Cold Plan' and replace AC
Pavement 1" thick
(18' * 750') strip.
L/S
7. SAWCUT AND REMOVE AC. S.F.
PAVEMENT.
8., A.C. PAVEMENT(BASELINE)
4. 8" V.C.P. SEWER (E.S.)
11. 8" SEWER PLUS
18. 6" x 4" REDUCER
24. 'BRICK AND MOTAR PLUG
$0.10 , 4,689.32
TONS $47.00 204.15
L.F. $29.00
EA. $10.00
EA. $26.00
EA. $84.00
68.00
'
1.00
52.00
'4.00
$1,656.18
t2,191.18 '
$469'.10
$7,500.0O
$468.93
$9,595.05
($1,972..00)
$10.00)
.
($1j352.00)
(336.00)
`
or Increase
PAGE 1 OF r
�
0
By reason of this order the time of completion will be adjusted as follows:
NONE
Submitted by:
----
Field InspsgXor
Approval Recommended:
Proj��ct Manager'
Approved: City Engineer.
Date:
�� � �� /�f1L
��/(��� / �
.
`
We, the undersigned contractor, have given careful consideration � to the
,change proposed and hereby agree, if this proposal is approved, that we
id all equipment, furnish all materials except as may otherwise
will provide a e�u pmen , ,
be noted above, andperform all services necessary for the word above
spp^cified, and will accept as full payment therefor the prices shown pbove.
Accepted, Date Contractor
y
`
`
CITY OF FONTANA_ '
ENGINEERING DIVISION
PROJECT:
CONTRACT NO.
CONTRACTOR:
CONTRACT CO NO.1 SUPP.
DATE:
ORIGINAL CONTRACT'AMOUNT $
ESTIMATE OF COST
THIS CCO TOTAL TO DATE
ITEM
FORCE ACCT.,
AGREED PRICE
ADJUSTMENT
TOTAL
$7500,00
% OVER CONTRACT _ 4.00%
CONTINGENCY BALANCE (INCL.THIS CO)
'You are hereby directed to make the herein described changes from the plans
and specifications or do the following described work,not includpd in the
plans and specification on the contract. . .
NOTE: This change order is not effec�tive until approved by the City '
Engineer. '
CONTRACT
ITEM NO.
N/A
�
DESCRIPTION
OF WORK
UNIT UNIT QUANTITY
PRICE
JACK HAMMER CONCRETE
MANHOLE BASE AND INSTALL
12" STUB AND NEW 15" STUB
AND RE -CHANNEL INSIDE.
STATION 10+00, NORTH SIDE.
N/A JACKHAMMER CONCRETE
MANHOLE TO LAY 21" V.C.P.
PTUB. STATION 10+00,EAST
STUB.
N/A
N/A
8.
4.
11.
is.
L/S
L/S
� '
JACK HAMMER CONCRETE
MANHOLE FOR 'NEW CHANNEL
FOR THE 21" V.C.P. STUB.
`STATION'10+00, EAST SIDE. L/S
,Cold Plan and replace AC
Pavement 1" thick
(18' 07504 strip.
SAWCUT AND REMOVE AC.
PAVEMENT.
A.C. PAVEMENT(BASELINE)
8" V.C.P. SEWER (EA)
MOWER PLUG
6" x 4" REDUCER
Estimated Cost
Decrease$
L/S
S.F. $0.10
_
�
4,689.32
15 204.
TOTAL
$1,656.18
$2,191.18
$469.10-
$7,500.00
$468.93
TONS $47.00 20415 $9,595.05
� `
L.F. $29.00 68.00 ($1,972.00)
EA. $10.00 1.00 010.00>
EA. $26.00 52.00 ' ($1,352.00)
or Increase $1��546^44.
By reason of this order the time of completion will be adjusted as follows:
NONE '
`
Page 1 of 2
Field Inspector
Approval Recommended: �
Project Manager
Approved: City Engineer
'
Date:
�~~
° Date:
_
`
We, the- undersigned contractor, have given careful consideration to the
change proposed and hereby agree, if this proposal is approved, that we
will provide all equipm nt, furnish all materials, except as may otherwise
be noted above, and perform all services necessary for� the word above
specified, and will accept as full payment therefor the prices shown above.
Contractor,
.
Accepted,
By:
Tate-
.
/
��
�
+
^ .���^^�' ��" J�^
`
`
�
`
/
~
/
Page 2_of 2
ALBirtT W. DAVIE@, INC.
GENERAL ENGINEERING CONTRACTOR
CONTRACTOR LICENSE # SA 370846
8737 HELMS AVENUE • POST OFFICE BOX 215
RANCHO CUCAMONGA, CALIFORNIA 91730
(714) 989-3714 FAX: (714) 989-0754
T R. A N S M I T T A L
TO: Yousuf Patanwala
City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
DATE: July 15, 1993
PROJECT: Baseline/Almeria
Trunk Sewer
WE ARE SENDING YOU: / /�
Herewith Delivered by Hand Under Separate Cover via h.4.0
Fax'd To: Number of Pages
(including cover)
THE FOLLOWING:
Copy of Letter
Specification
Change Order
DESCRIPTION:
Bid Shop Drawings
Plan Contract
Samples Other
Extra work reports re -worked per our converstions 7/14/93
✓Extra work reoprt dated 6/14/93 and 7/2/93
TRANSMITTED AS INDICATED:
For You Action For Your Use For Review and Comment
For Bids Due For Approval ° For Your Information
As Requested Approved as Noted Other
REMARKS:
Signed: Lester A. Davies i4
If enclosures are not as indicated please notify us at once.
ALBERT W. DAVIES, INC.
•NCHO CUCAMONGA, CALIFORN111
DATE: July 2, 1993
EXTRA WORK REPORT
PROJECT: Baseline and Almeria Avenues
Trunk Sewer
Fontana P.O. No. 024336
OWNER:
REASON: Jack hammer concrete man hole base to remove 12'
install new 15" stub and re -channel inside.
Station 10+00, North Stub.
City of Fontana
8353 Sierra Avenue
Fontana, CA 92334
' stub and
LABOR:
TRADE
REG.
HOURS
REG. OVER -TIME
RATE HOURS RATE
EXTENTION
10 OPERATOR
6 PIPELAYER/BACK-UP
5 LABORER
3 45.51
8 36.39
8 34.25
136.53
291.12
274.00
LABOR SUB -TOTAL
701.65
EQUIPMENT: HOURS
RATE EXTENTION.
75 CAT 245 TRACK HOE
102 FORD F-350 CREW TRUCK
45 JOY COMPRESSOR 150 CFM
3
8
8
190.00
12.00
5.25
570.00
96.00
42.00
1" B II
EQUIPMENT SUB -TOTAL
708.00
MATERIALS / SUB -CONTRACTORS
QUANITY
UNIT EXTENTION
"C" MATERIAL/OTHER SUB -TOTAL
EXTRA C;
e5L
SUB -TOTAL (A+B+C)
MARK-UP ON "A"
MARK-UP ON "B + C"
20.00%
15.00%
1,409.65
140.33
106.20
TOTAL AMOUNT
1,656.18
ALBERT W. DAVIES, INC.
*NCHO CUCAMONGA, CAL IFORN
DATE: June 14, 1993
EXTRA WORK REPORT
PROJECT: Baseline and Almeria Avenues
Trunk Sewer
Fontana P.O. No. 024336
OWNER:
REASON: Jack hammer concrete man hole to lay 21"
Station 10+00,.East Stub.
V.C.P.
City of Fontana
8353 Sierra Avenue
Fontana, CA 92334
stub.
LABOR:
TRADE
REG.
HOURS
REG.
RATE
OVER -TIME
HOURS RATE EXTENTION
10 OPERATOR
6 PIPELAYER/BACK-UP
5 LABORER
14 GENERAL FOREMAN
4 45.51
8 36.39
8 34.25
4 48.81
182.04
291.12
274.00
195.24
LABOR SUB -TOTAL
942.40
EQUIPMENT:
HOURS
RATE EXTENTION
75 CAT 245 TRACK HOE
45 JOY COMPRESSOR 150 CFM
107 FORD 1/2 TON PICK-UP
92 CHEVY 1/2-TON PICK-UP
4
8
4
8
190.00
5.25
10.00
10.00
760.00
42.00
40.00
80.00
"B"
EQUIPMENT SUB -TOTAL
922.00
MATERIALS / SUB -CONTRACTORS
QUANITY
UNIT EXTENTION
""C""
MATERIAL/OTHER SUB -TOTAL
SUB -TOTAL (A+B+C)
MARK-UP ON "A"
MARK-UP ON "B + C"
20.00%
15.00%
1,864.40
188.48
138.30
EXTRA
TOTAL AMOUNT
2,191.18
ALBERT W. DAVIES, INC.
•NCHO CUCAMONGA, CALIFORN410
EXTRA WORK REPORT
DATE: June 24, 1993
PROJECT: Baseline and Almeria Avenues
Trunk Sewer
Fontana P.O. No. 024336
REASON: Jack hammer concrete man hole for new
Station 10+00, East Stub.
OWNER:
channel
City of Fontana
8353 Sierra Avenue
Fontana, CA 92334
for the 21" V.C.P. stub.
LABOR:
TRADE
REG.
HOURS
REG.
RATE
OVER -TIME
HOURS RATE EXTENTION
LABORER 8 34.25
274.00
LABOR SUB -TOTAL
274.00
EQUIPMENT:
HOURS
RATE EXTENTION
45 JOY COMPRESSOR 150 CFM
92 CHEVY 1/2-TON PICK-UP
8
8
5.25 42.00
10.00 80.00
""BIt
EQUIPMENT SUB -TOTAL
122.00
MATERIALS / SUB -CONTRACTORS
QUANITY
UNIT EXTENTION
"C" MATERIAL/OTHER SUB -TOTAL
(#PL--(112,
SUB -TOTAL (A+B+C)
MARK-UP ON "A"
MARK-UP ON "B + C"
20.00%
15.00%
396.00
54.80
18.30
TOTAL AMOUNT 469.10