Loading...
HomeMy WebLinkAbout0850-72_Baseline Avenue/Almeria Avenue - Sewer Project_29.1• 4•J• INCORPORATED P.O. Box 231 • 1355 East Cooley Drive, Colton, CA 92324 • Phone (909) 824-7210 11910 Hesperia Road, Suite 2 • Hesperia, CA 92345 • (619) 949-0006 August 11, 1993 City of Fontana P. O. Box 518 Fontana, California 92335 Attention: Mr. Yusuf Patanwala Dear Mr. Patanwala: Job No. 93301-1 This letter transmits four copies of our Compaction Report, Street Finish Grade_Tests, Baseline Avenue, West of Almeria Avenue, Fontana, California. We appreciate this opportunity to provide geotechnical services for this project. If you have questions or comments concerning this report, please contact us at your convenience. f GJM/JED:tlh Respectfully submitted, C.H.J., INCORPORATED e, John E. Dalgity, Operations Manager RECEIVED AUG • 3 `si S OFFICE SOILS ENGINEERS • MATERIALS TESTING AND EVALUATION • CONSTRUCTION INSPECTION C • H • cJ • INCORPORATED P.O. Box 231 • 1355 East Cooley Drive, Colton, CA 92324 • Phone (909) 824-7210 11910 Hesperia Road, Suite 2 • Hesperia, CA 92345 • (619) 949-0006 August 11, 1993 City of Fontana P. O. Box 518 Fontana, California 92335 Attention: Mr. Yusuf Patanwala Dear Mr. Patanwala: Job No. 93301-1 This letter transmits four copies of our Compaction Report, Sewer Trench Backfill Tests, Baseline Avenue and Almeria Avenue, Trunk Sewer System, Fontana, California. We appreciate this opportunity to provide geotechnical services for this project. If you have questions or comments concerning this report, please contact us at your convenience. Respectfully submitted, C.H.J., INCORPORATED John E. Dalgity, Operations Manager GJM/JED:tlh SOILS ENGINEERS • MATERIALS TESTING AND EVALUATION • CONSTRUCTION INSPECTION • (IMI• 1-V-11 • � • INCORPORATED P.O. Box 231 • 1355 East Cooley Drive, Colton, CA 92324 • Phone (909) 824-7210 11910 Hesperia Road, Suite 2 • Hesperia, CA 92345 • (619) 949-0006 August 11, 1993 City of Fontana P. O. Box 518 Fontana, California 92335 Attention: Mr. Yusuf Patanwala Subject: Compaction Report Street Finish Grade Baseline Avenue, West of Almeria Avenue Fontana, California Dear Mr. Patanwala: Job No. 93301-1 This report covers the results of in —place density tests taken to date on the street finish grade at the above referenced location. All tests were taken in "coordination with and as requested by the client's representative. FIELD PROCEDURE: A total of 19 in —place density tests were taken by the sand volume method between July 8 and July 12, 1993. A representative sample of the soil encountered was returned to the laboratory for determination of the Optimum Moisture Content — Maximum Dry Density curve. SOILS ENGINEERS • MATERIALS TESTING AND EVALUATION • CONSTRUCTION INSPECTION •. •Cv�J• Page No. 2 Job No. 93301-1 The locations of the in —place density tests are indicated on the attached Field Compaction Test Summary Sheet and Plat. OPTIMUM MOISTURE — MAXIMUM DENSITY RELATION: ASTM D 1557-78 Soil Optimum Moisture Maximum Dry Density Type Classification (Percent) (PCF) 1 Sandy Gravel, fine .to medium, 8.5 132.5 with coarse; gravel to 3", brown (GP) RESULTS: The results of the in —place density tests taken to date, and the relative compaction in each case, are shown on the attached Field Compaction Test Summary Sheet. The test results presented herein represent an independent sample of the compaction achieved by the contractor who performed the actual compaction operation. Certain information concerning the location of the street finish grade tested was furnished by persons representing themselves as knowledgeable of those conditions. In many cases, independent verification of that information furnished to us, or the knowledge of that information by any person representing themselves as knowledgeable, is not possible. That information is relied upon during the performance of these tests. Page No. 3 Job No. 93301-1 Compaction testing by our firm in no way relieves the contractor from his obligation to properly perform his work, and this report does not serve as a warranty of the contractor's work or of the information supplied to us by the contractor. Qt�orf ss• oy\ d\ soya et No. 443 a EXPIRATION DATE * 3-31.97 qlf OF CAt.1iCr GJM/GK/RJJ:tlh Respectfully submitted, C.H.J., INCORPORATED tanjali Kanchi, Staff Engineer Robert J. Johnson, G.E. 443 Senior Vice President Enclosures: Field Compaction Test Summary Sheet Plat Distribution: City of Fontana (4) FIELD COMPACTION TEST SUMMARY SHEET PROJECT: CITY OF FONTANA - STREET FINISH GRADE, BASELINE AVENUE, WEST OF ALMERIA AVENUE, FONTANA, CALIFORNIA Job No Sh 93301-1 1 of 1 Date Test No. Location Of Test Depth Cut Of Fill Depth Of Test DENSITIES MC% Soil Type Remarks or Retest Of Dry Max. Rel. (Ibs/cubic foot) 7-08-93 FG-1 Baseline Avenue, Station 10+25, Main 0.0-0.5 132.2 138.0 96 6.1 1 20% RX FG-2 Baseline Avenue, Station 12+75, Main 0.0-0.5 141.2 142.0 99 7.0 1 35% RX FG-3 Baseline Avenue, Station 15+25, Main 0.0-0.5 130.6 135.0 97 6.3 1 10% RX FG-4 Baseline Avenue, Station 17+75, Main 0.0-0.5 134.3 139.5 96 5.9 1 25% RX FG-5 Baseline Avenue, Station 20+25, Main 0.0-0.5 134.7 137.0 98 6.6 1 15% RX FG-6 Baseline Avenue, Station 22+75, Main 0.0-0.5 132.1 139.5 95 6.0 1 25% RX FG-7 Baseline Avenue, Station 25+25, Main 0.0-0.5 131.1 137.0 96 5.8 1 15% RX FG-8 Baseline Avenue, Station 27+75, Main 0.0-0.5 134.0 141.0 95 6.0 1 30% RX FG-9 Baseline Avenue, Station 30+25, Main 0.0-0.5 140.0 139.5 100+ 8.0 1 25% RX FG-10 Baseline Avenue, Station 32+75, Main ° 0.0-0.5 141.6 142.0 99 8.6 1 35% RX FG-11 Baseline Avenue, Station 35+25, Main 0.0-0.5 133.0 138.0 96 6.7 1 20% RX FG-12 Baseline Avenue, Station 37+75, Main 0.0-0.5 134.3 137.0 98 7.2 1 15% RX FG-13 Baseline Avenue, Station 40+25, Main 0.0-0.5 131.8 138.0 96 6.3 1 20% RX • 7-09-93 FG-14 Baseline Avenue, Station 42+25, Main 0.0-0.5 145.4 142.0 100+ 8.6 1 35% RX 7-12-93 FG-15 Baseline Avenue, Station 10+00, Lateral 0.0-0.5 138.7 139.5 99 6.5 1 25% RX FG-16 Baseline Avenue, Station 16+35, Lateral 0.0-0.5 137.4 139.5 98 8.0 1 25% RX FG-17 Baseline Avenue, Station 29+01, Lateral 0.0-0.5 140.0 144.5 97 7.5 1 40% RX FG-18 Baseline Avenue, Station 36+51, Lateral 0.0-0.5 132.8 137.0 96 6.0 1 20% RX FG-19 Baseline Avenue, Station 42+70, Lateral 0.0-0.5 134.8 139.5 97 6.5 1 25% RX LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP) Tests on Fill in Progress (FG) Tests on Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure •. ei • • -N- Scale:l'=150' O + w CV < W W ZZ UN' Qm 28100 29t00 I 8+00- 7+00- 6+00 2 U 1A O— — CC 5+00 W U 4+00- 2}00' WALNUT ST. ALMERIA 9iq��X 30t00 31100 32100 •) 33 I 26+00- 25+00- 24+00- IZ 0 Q 23+00- > 41115t4u, � -VF.x00 / 22+00- 21+00-CC / U MATCHLINE 20+00 19+00- 18+00- 17+00- SEWERLINE (Typ.) 16+00 - 15+00 - 14+00- 13+00- 12+00- 34t00 35t00 36t00 37+00 38t00 39t00 401-00 41t00 42+00 MATCHLINE 20+00 R/ W (TyP•)\ LIME AVE. 10 j00 11 +00 SEWERLINE (Typ. BASELINE AVE. /19 r R/W (Typ.) MONTECA DR. ALMERIA 12 100 13 +,00 14+00 15+00 16 +00 17 +00 18 i00 19 100 20-100 21t00 22100 23t00 24400 251i- 00 26t00 BEECH AVE. BASELINE II SULTANA AVE. AVE. 0 O + N < 'LULLS ZZ ' ~am w cc 0 -J 0 Z w , JOB NUMBER 0 O1 w w 0 ' J Z La U w W N •Q Z Y Z F- 0 0 w UJ Cd w N CO ro b L w •0 0 DATE: August 1993 FINISH GRADE TESTS 4•iJ• INCORPORATED P.O. Box 231 • 1355 East Cooley Drive, Colton, CA 92324 • Phone (909) 824-7210 11910 Hesperia Road, Suite 2 • Hesperia, CA 92345 • (619) 949-0006 August 11, 1993 City of Fontana P. O. Box 518 Fontana, California 92335 Attention: Mr. Yusuf Patanwala Subject: Compaction Report Sewer Trench Backfill Baseline Avenue and Almeria Avenue Trunk Sewer System Fontana, California Dear Mr. Patanwala: Job No. 93301-1 This report covers the results of in —place density tests taken to date on the sewer trench backfill at the above referenced location. All tests were taken in coordination with and as requested by the client's representative. FIELD PROCEDURE: A total of 19 in —place density tests were taken by the sand volume method between May 11 and July 1, 1993. A representative sample of the soil encountered was returned to the laboratory for determination of the Optimum Moisture Content — Maximum Dry Density curve. SOILS ENGINEERS • MATERIALS TESTING AND EVALUATION • CONSTRUCTION INSPECTION C•H•�• Page No. 2 Job No. 93301-1 The locations of the in —place density tests are indicated on the attached Field Compaction Test Summary Sheet and Plat. OPTIMUM MOISTURE — MAXIMUM DENSITY RELATION: ASTM D 1557-78 Soil Optimum Moisture Maximum Dry Density Type Classification (Percent) (PCF) 1 Sandy Gravel, fine to medium, 8.5 132.5 with coarse; gravel to 3", brown (GP) RESULTS: The results of the in —place density tests taken to date, and the relative compaction in each case, are shown on the attached Field Compaction Test Summary Shcet. The test results presented herein represent an independent sample of the compaction achieved by the contractor who performed the actual compaction operation. Certain information concerning the depth and location of the sewer trench backfill tested was furnished by persons representing themselves as knowledgeable of those conditions. In many cases, independent verification of that information furnished to us, or the knowledge of that information by any person representing themselves as knowledgeable, is not possible. That information is relied upon during the performance of these tests. (C • N•c1• Page No. 3 Job No. 93301-1 Compaction testing by our firm in no way relieves the contractor from his obligation to properly perform his work, and this report does not serve as a warranty of the contractor's work or of the information supplied to us by the contractor. - ,J. `15.o. 443 s = `mil EXPIRATION DATE I:ESSIoy c 3.31.97 P� sT °TEetitk\ a�Q foff)>k GJM/GK/RJJ:tlh Respectfully submitted, C.H.J., INCORPORATED 7 G/tanjali Kanchi, Staff Engineer Ro . e J. Johnso r , .E. 443 Sen or Vice Presi• nt Enclosures: Field Compaction Test Summary Sheet Plat Distribution: City of Fontana (4) FIELD COMPACTION TEST SUMMARY SHEET PROJECT: CITY OF FONTANA - SEWER TRENCH BACKFILL, BASELINE AVENUE AND ALMERIA AVENUE, TRUNK SEWER SYSTEM, FONTANA, CALIFORNIA Job No Sh 93301-1 1 of 1 Date Test No. Location Of Test Depth p Cut Of Fill Depth Of Test DENSITIES MC% Soil Type Remarks or Retest Of Dry Max. Rel. (Ibs/cubic foot) 5-11-93 BF-1 Almeria Avenue, Station 14+25 17.0 8.0 3.0-3.5 115.4 138.0 84 7.0 1 25% RX " • 5-12-93 BF-2 Almeria Avenue, Station 16+75 16.0 8.0 2.5-3.0 124.9 144.0 87 9.0 1 42% RX ** 5-13-93 BF-3 Almeria Avenue, Station 19+50 18.0 10.0 3.0-3.5 151.1 138.5 100+ 9.9 1 25% RX 5-14-93 BF-4 Almeria Avenue, Station 22+25 18.0 6.0 3.0-3.5 118.0 142.5 83 10.0 1 35% RX " 5-18-93 BF-5 Almeria Avenue, Station 24+75 16.0 13.0 3.0-3.5 135.6 141.0 96 9.1 1 35% RX I3F-6 Almeria Avenue, Station 26+35 16.0 13.0 3.5-4.0 137.3 145.0 95 9.5 1 43% RX 5-19-93 I3F-7 Almeria Avenue, Station 1+30 14.0 14.0 3.5-4.0 142.2 144.0 99 10.3 1 40% RX 5-24-93 13F-8 Almeria Avenue, Station 7+00 16.0 16.0 3.5-4.0 137.5 141.0 98 8.6 1 30% RX 13F-9 Almeria Avenue, Station 11+00 15.0 15.0 4.0-4.5 136.0 138.0 98 4.5 1 20% RX 6-17-93 I3F-10 I3aseline Avenue, Station 15+25 17.0 7.0 1.0-1.5 132.9 143.0 93 9.0 1 34% RX BF-11 Baseline Avenue, Station 12+00 17.0 17.0 3.0-3.5 129.8 135.0 96 9.2 1 10% RX 6-18-93 BF-12 Baseline Avenue, Station 17+75 17.0 8.0 1.0-1.5, 129.0 144.0 90 7.9 1 40% RX 6-22-93 BF-13 Baseline Avenue, Station 25+00 17.0 10.0 2.0-2.5 135.5 141.0 96 9.0 1 30% RX • BF-14 Baseline Avenue, Station 20+80 17.0 17.0 1.0-1.5 126.2 135.0 94 7.0 1 10% RX 6-23-93 BF-15 Baseline Avenue, Station 27+75 17.0 10.0 1.0-1.5 128.9 141.0 91 7.4 1 30% RX 6-25-93 BF-16 Baseline Avenue, Station 34+00 17.0 11.0 1.0-1.5 130.3 141.0 • 92 9.6 1 30% RX BF-17 Baseline Avenue, Station 30+50 17.0 17.0 3.0-3.5 140.3 148.0 95 8.7 1 55% RX 6-29-93 BF-18 Baseline Avenue, Station 38+00 17.0 14.0 2.0-2.5 132.0 139.5 95 8.6 1 25% RX 7-01-93 BF-19 Baseline Avenue, Station 40+50 17.0 17.0 3.0-3.5 129.0 139.5 93 8.0 1 25% RX LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP), Tests on Fill in Progress (FG) Tests on Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure (**) Denotes Failure, No Retest Requested . • -N- Scale: r-150' 8+00- 7+00- 6+00 cc U <n O— — 2 5+00-CC W U 4+00- 28t00 29t00. I I� LIME AVE. 10100 11100 R/W(Typ.)\ WALNUT ST. Fti41 2, qI,x 30t00 31100 32+00 26+00- 25+00- 24+00- 23+00- 22+00— 21+00— CC 34+00 35i00 36t00 37+00 38+00 39+00 40t00 19+00- 18+00- 17+00— SEWERLWE (Typ.) 16+00- 41t00 15+00 — 14+00— 13+00— 12+00— 42+00 MATCHLINE 20+00 16 12100 BASELINE 13100 14t00 SEWERLINE (Typ. AVE. ✓ R/W(Typ•) MONTECA DR. MARIPOSA DR. cd C / 2 ALMERIA —11+00 15+00 16100 17100 18100. 19100 20100 _ .. 21t00 22100 23t00 24t00 25t00 26t00 ZZ 1 I I IO I9 13 '=LL1 UN I'- BEECH AVE. BASELINE SULTANA AVE. AVE. 1— J d ENCLOSURE ALMERIA AVENUE TRUNK SEWER SYSTEM FONTANA, CALIFORNIA City:of-Fontana M 01 0i +..A V) CA a 0 O BACKFILL TESTS '■i■r►