HomeMy WebLinkAbout0850-72_Baseline Avenue/Almeria Avenue - Sewer Project_12.6City of Fontana
CALIFORNIA
September 30, 1993
Lester W. Davies
Albert W. Davies, Inc.
8737 Helms Avenue
Rancho Cucamonga, CA 91730
RE: Baseline/Almeria Trunk Sewer
Notice of Completion
Dear Mr. Davies:
Enclosed for your files is a copy of the recorded Notice
referenced project.
The retention money will be released 35 days after the
of Completion.
Should you have any questions, contact the undersigned at (909) 350-6645.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yo ' atanwala
Associate Engineer/Special Projects
YP:sh
Enclosure
cc:
City Engineer •
Principal Civil 'Engineer/Special Projects
Principal Civil Engineer/Capital Improvements
Redevelopment Project Coordinator (MP)
of Completion for the above
day of recordation of Notice
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7800
SISTER CITY — KAMLOOPS, B.C. CANADA
recycled paper
11
Recording requested by
City of Fontana
NO FEE
E
When recorded mail to:
City of Fontana (Engineering Division)
P. 0. Box 518
Fontana, California 92335
94-391! 36
RECORDED IN
OFFICIAL_ *- CORDS,---
93 SEP 13 PM 1: 26
SAN BERNARDINO
CO.. CALF.
NOTICE OF COMPLETION
Pursuant to the provisions of Section 3086 of the Civil Code of the State
of California and authorization of the City Council of the City of Fontana,
NOTICE IS HEREBY GIVEN that work on that certain project known as
Construction of the Baseline Avenue/Almeria Avenue Trunk Sewer System
Project No. SB-45-93 , for the City of Fontana was completed and accepted by the
City of Fontana on the 7th day of September , 1921.
The said work was performed by Albert W. Davies. Inc.
of 8737 Helms Avenue. Rancho Cucamonga. CA in accordance with the terms of
written agreement dated the 2nd day of March , 1993.
STATE OF CALIFORNIA) Dated this 8th day of September,, 1993
COUNTY OF SAN BERNARDINO)
Robert W. Weddle, P.E.
City Engineer
On September 8. 1993, before me, the undersigned, a Notary Public in and for said
State, personally appeared Robert W. Weddle. P.E., personally known to me (or
proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed
the same in his authorized uonp behalf and of that
whi chy thhis
e personsignature
acted, executed the
execut d instrument,
the
the .person, or entity p
instrument.
WITNESS my hand and icial seal.
Wilma Rinsak
OFFICIAL SEAL
WILMA PINSAK
NOTARY PUBLIC CALIFORNIA
SAN BERNARDINO COUNTY
My Comm 610303 0ic. 16, 1994
• -,7-,CJ
•
•
1-Z-S (4v
DRILL II TAR for 2
Alen toad cap *Pews
3Sld ppe cop
TIEKAD 3'. Pent
I 3 1114. Peg cop
KEY a NOTCH GATE
CONNECTION TO COLUMN
Nol to scale
314.. Cocoas
filings
01
314- • ape
0
0,
INSTALL Owls
Whale le be
3/11" 1I
WELDane lank --
CUT chain
CHAIN a LOCK CONNECTION
[.. _ cow le pee .
— C.0" for lie 4 se
NOTE Before we
prod lo 1,1 1 mos
.•_ . •• .••.
len pp* &
NM to scold
(as sitoon
801T RONK PP*
2- •
Pet
•1
2" • ow* -
_:----
4-
3- 0 PP'
• - CIa.. A concrete ovo.ceo
7
(Vt6OR)
_
I
3- • PPIt '
• l.I904
PIPE GATE
HORIZONTAL OPENING
NOLL.
AN polls welded to shop (No held welds)
AN pope and Wimps to be oulroncred
Got' sung* lo tse plaCed on channel sidle whites applicable.
Goss to open Oss•Cly from slr••1 when opplic•Bl•.
Not to scale
WELD Ye •
Sid b0. lo posl
in thwart
3 Sid gel.. pipe cop
aree•Nod with I/4 polo
round hood rived A
01
SAN BERNARDINO COUNTY
FLOOD CONTROL DISTRICT
RtviSsONS
REVISED 3-29-74
A age neve e-ii-re
416 oi• nal Les I or ?I
Dawn BY
K D G
DATE
7-6-72
CIL( NO
SP 209
e • y . • 1 - •
e 7 4
0 b V\e-t-c-tir
•
City of Fontana
CALIFORNIA
July 19, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, CA 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
July 16, 1993. You will be allowed fifteen (15) days in which to protest in writing
the correctness of the statement; otherwise the statement shall be deemed to have
been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You tlf Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. 80X 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7800
SISTER CITY- KAMLOOPS, B.C. CANADA
%p recycled paper
CITY OF FONTANA
REPORT NO. I I
WEEKLY STATEMENT OF WORKING DAYS
E50_seI tie /Aivniia _ Cter T rD�pc�
av;et?
The following statement shows the number of working days charged to your contract for the week ending]- ) b , 1993
PROJECT
TO:
Oate
Day
k.
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
. Weather
Working Oays
No Work
Done on
Controlling •
Operation
(Note 2)
7-12.
Mon.
10° - 58 °
I
7-13
Tue.
90° --se'
I
7-I4
Wed.
ri3°" .51 u
1
7 -15
Thur.
8 7° - 50°
t
7-lb
Fri.
b5 ° -55D
l
Days this week
Days previously reported
Total days to date
5
4 5
50
TIME EXTENSIONS
Days this report.
Days previously reported
Total days to date
CCO Number
Days Approved
CCO
Other
COMPUTATION OF EXTENDED DATE FOR COMPLETION
Number
of 0 s
1. Date Contract approved by City Council ~^ >`':
2. Working days specified in contract
ab rk I
3. COMPUTE DATE FOR COMPLETION (if all days specified are w o `...:..:..::.,,...
Numbered
Day (Note
Oats
54-93
'i'•,r�Y.���+.. %�i:i:%l..i:'%ir i4��?ty��:•,:�i �...: r::..:.:.:
.+: is %i: :.i:.; :<i•%::,.::::•::::......... ': � �:�::� :::.i::.
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Lin. 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date.
10. WORKING DAYS REMAINING (Line 8 minus Line 9)
Controlling Operation(s)
'+ 0
b
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct NOTE: All footnotes are on.
reverse side.
INSTRUCTIONS O RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. • Do not list days
merely as "Unworkable."
2. Enter days on which no productive work haslbeen.performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana
CALIFORNIA
July 14, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga; Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statementof working days for week ending
July 9, 1993. You will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have been
accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if .you need any additional
information.
Sincerely,
COMMUNITY. DEVELOPMENT DEPARTMENT
Engineering Division
Youf Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
recycled paper
CITY OF FONTANA I REPORT NO. I
WEEKLY STATEMENT OF WORKING DAYS
Set,Jer- Pro�rc�'
A, W� v teS
The following statement shows the number of working days charged to tour contract for the week ending7—
PROJECT
TO:
Oc ek.,he A w+eris
, 1993
Date
Day
Weather, Weather Conditions or Other Conditions
o
•
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Dons on
Controlling
Operation
(Note 2)
7-05
Mon.
I-i I;
$'
7- 06
Tue.
90.- 50° Clear-
I
_1-07
Wed.'
92°-58°; Cleo.c-
II
7-OS
Thur.
q ° -57° Gear
?-09
Fri.
9?. -59° �; Clear
O
Days this week
Days previously reported
Total da s to date
4
4 I
_ k5
_
,
TIME EXTENSIONS
CCO Number
Days Approved
CCO
Other
Days this report
Days previously reported
Total days to date
COMPUTATION OF EXTENDED GATE FOR COMPLETION
1. Date Contract Approved by City Council
2. Working days specified in contract
3. COMPUTE GATE FOR COMPLETION (if all days specified are workablet < '; .f.'- 13-93
Number Numbered
of Gays Oay (Note 5)
..sir
Date
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus. Line 6)
8. Revised working days for contract (line 2 plus Line 4)
9. Total working days to date.
10. WORKING DAYS REMAINING (Linea minus Line 9)
Controlling Operation(s)
-6-93
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
•
City of Fontana
CALIFORNIA
July 7, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
July 2, 1993. You will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have been
accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
" recycled paper
CITY OF FONTANA •
- REPORT NO. 9
WEEKLY STATEMENT OF WORKING DAYS
Sewa•- O4 p C
PROJECT 13,00eA; r //1►,i r r-; a
TO: A.W, tr1.v r ss
The following statement shows the number of working days charged to your contract for the week ending 7-Z
, 1993
Oats
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Dons on
Controlling
Operation
(Note 2)
l.,-28
Mon.
95 -64°a Clew-
I
6 -Lei
Tue.
4ij'-.4° Clew-
1
,- O
Wed.
93= 64° ClrAt-
7- I
Thur.
95°-50° Clear
7- 2-
Fri.
9Z°-58' ; 6/pair!
_
Days this week
Days previously reported
Total days to date
IO
4.1,
TIME EXTENSIONS
Days this report.
Days previously reported
Total days to date
CCO Number
c
Days Approved
CO Other
COMPUTATION OF EXTENDED' DATE FOR COMPLETION
Number Numbered
of Days Day (Note 5)
5- 6-93
•is• •U••
...y�.,F � � �G : •:: /,ti'+:•i':vii:iii
1..Date Contract approved by City Council
2. Working days specified in contract.
3. COMPUTE DATE FOR COMPLETION (if all days specified are workablea•:i<.'.. ;`,':,'-'.`<K?
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date.
10. WORKING GAYS REMAINING (Line 8 minus Line 9)
Oats
I9-13-93
aft'
..................................
9-I 3-9
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct. NOTE: All footnotes an on
reverse side.
Plilslint Engineer
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana.
CALIFORNIA
June 28, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
June 25-, 1993. You will be allowed fifteen (15) days in which to protest in writing
the correctness of the statement; otherwise the statement shall be deemed to have
been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yof Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7600
SISTEA CITY - KAMLOOPS, B.C. CANADA
I. recycled paper
CITY OF FONTANA •
• REPORT NO.
WEEKLY STATEMENT OF WORKING DAYS
PROJECT base t;he /AIric. Tr, Seer
TO: A w Dav i CS
The following statement shows the number of working days charged. to your contract for the week ending-15 , 1993
Oats
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling•
Operation
(Note 2)
6- 21
Mon.
9 3° - G 5') C.f>ee.e-
1
isZ2
_
Tue.
89°- 62.° Hdzy d- 5r.n
6-Z3
Wed.
97° -6Z° C.1tae—
I
£ -z.4
Thur.
j
IDD°- 64", C Iear 1rJ cb
I
6-2.5
Fri.
r
lbO°-- 6$ ° , C.iear+
1
/
Days this week
Days previously reported'
Total days to date
5
3 I
_ 3b
Days this report
Days previously reported
Total days to date-
MPU ATI•N • EXTEND ' DA •' •T•MP
1. Date Contract approved by City Council.
2. Working days specified in contract.
3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date.
10. WORKING GAYS REMAINING 'ne 8 minus Line
Number
of Days
90
5-6-93
9 13-
Controlling Operations)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement: otherwise the statement shall be deemed to have
been accepted by the Contractor ss correct. NOTE: AU footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana
CALIFORNIA
June 23, 1993
Mr. Lester Davies.
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
June 18, 1993. You will be allowed fifteen (15) days in which to protest in writing
the correctness of the statement; otherwise the statement shall be deemed to have
been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
YoVs j'f Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
w
ft A ror ,14,1 ranar
CITY OF FONTANA • 41, REPORT NO.
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Rc,_.5e1 �` )vnPrut—
t �uhi< Gel-Je•
TO: A , Vli,. (i F4
The following statement shows the number of working days changed to your contract for the week ending 6 40, 1993
Date
Day .
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Oays
No Work
Done on
Controlling
Operation
(Note 2)
b%14
Mon.
ell ._6q"
C(e�r-
I
b//S
Tue.
9° —65`'
.
Clear
-
to/lb
Wed.
C -(� �_°
)
Cj� r --
i,/17
Thur.
100°— 65°
C i�r ,
I
6/16
Fri.
95`'--6,$°
i
C leit—
1
,
Days this week
Days previously reported
Total days to date
2
3
TIME EXTENSIONS
Days this report.
Days previously reported
Total days to date
CCO Number
COMPUTATION OF EXTENDED GATE FOR COMPLETION
1. Date Contract approved by City Council
2. Working days specified in contract
3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED GATE FOR COMPLETION (Line 3 plus Unit 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to data
10. WORKING DAYS REMAINING 'ne 8 minus Line
Controlling Operation(s)
CCO
Number Numbered
of Days Day. (Note 5)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor es correct NOTE: All footnotes are on
reverse side.
Engineer
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana
CALIFORNIA
June 17, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: ' Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
June 11, 1993. You will be allowed fifteen (15) days in which to protest in writing
the correctness of the statement; otherwise the statement shall be deemed to have
been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineerin Division
i
You Patanwala
�d1' Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
recycled paper
CITY OF FONTANA •
• REPORT NO. 4
WEEKLY STATEMENT OF WORKING
//DAYS
PROJECT (3 cos e i ti p / H 1 wt e r. Tt`N, r, k '7 a t.J e.+r-
TO: /a . lnf 17,�,� e
The following statement shows the number of working days charad to ur contract for the week ending 6,-(► , 1993
Date
Day
Weather, Weather Conditions or Other Conditions
. Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
6-7
Mon.
90°-55° C.('en.r-
I
6--15,
Tue.
r
Apo- 50° GLew-
I
b- q
Wed.
t
cite - 54' I C1e,tvr
1
6-1O
Thur.
92°- 62° G.leas
I
to-►1
Fri.
13°- 65e tt G(ear
1
1
/
.
Days this week
Days previously reported
Total days to date
Z. T
_ 2 b
TIME EXTENSIONS
Days this report.
Days previously reported
Total days to date
CCO Number
Days Approved
CCO.
Other
COMPUTATION OF EXTENDED DATE FOR COMPLETION
1. Date Contract approved by City Council
2. Working days specified in contract.
3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)
8. Revised working days for contract -(Line 2 plus Line 4)
9. Total working days to date.
10. WORKING GAYS REMAINING 'ne 8 minus Line
Controlling Operations)
Number
of Days
Numbered
Day (Note
Date-
5--5/093
Remarks: (Note 6) (Continue on reverse).
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana
CALIFORNIA
June 8, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
June 4, 1993. You will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have been
accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEP.ARTMENT
Engineering Division
YoAuf` Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA. CALIFORNIA 92334-0518 • (7141350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
w
CITY OF FONTANA
REPORT NO. 5
PROJECT
TO:
WEEKLY STATEMENT OF WORKING DAYS
I3ASSA-I /A/ MC>LVst 5E.RROJ�GT.
Ps I7Av 1 E5
The following statement shows the number of working days charged to your contract
Date
Day
Weather, Weather Conditions or Other Conditions
.... ...-
Working
Day
.. .v O
Non -Working
Days
Caused by
Weather
- vT I JJJ
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
5-31.
Mon.
Hvl�day
es, -
I
Tue.
80 °- 52° C.l ear , Sum ny '
I
h -02
Wed.
70 _ 4E0 j Putly Joud.y 4_"""Y
I
[,-03
Thur.
1
c 53 hart- Glb�y
I
6-O4-
Fri.
f30°-5Q°i' Ptirt iI6 y
I
Days this week
Days previously reported
Total
Total days to date
4,
I '7
2. I
-
TIME EXTENSIONS
Days this report
Days previously reported
Total days to date
COMPUTATION OF EXTENDED DATE FOR COMPLETION
CCO Number
Days Approved
CCO
Other
1. Date Contract approved by City Council
2. Working days specified in contract
3. COMPUTE DATE FOR COMPLETION (if all days specked are workable
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)......................
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date •
10. WORKING.DAYS REMAINING (Line 8 minus Line 9)
Number Numbered
of Days Day (Note 5)
Date
5-QG-93
Controlling Operation(s)
ct o
ci
69
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the' statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct. 'NOTE: All footnotes are on
reverse side.
Resident Engineer
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
0
City of Fontana
CALIFORNIA
June 2, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review is the weekly statement of working days for week ending
May 28, 1993. You will be allowed fifteen (15) days in which to protest in writing
the correctness of the statement; otherwise the statement shall be deemed to have
been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You u Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY — KAMLOOPS, B.C. CANADA
w
�, recycled paper
•
CITY OF FONTANA
•
REPORT NO. 4
WEEKLY STATEMENT OF WORKING DAYS
PROJECT eAStLINi*,,,►•a 1 p SLWSIZ (�R01�CL"r
TO: AW, ►iav; e5
The following statement shows the number of working days charged to your contract for the week ending 5 -Z$ , 1993
Date
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
5_ 24
Mon.
-70° 1 kazy i Krill GIo1
I
LS
Tue.
_520
SU 40I C1•ecc.r', S�vi„�c
I
5-i,
Wed.
SU° - 50° T , Cloud.
I
�,-z�
Thur.
et)° - 2° 1pa� t 4u�N
I
5-28
Fri.
'7 °-48° 1 c«tL Llou
I
7
Days this week
Days previously reported
days to date
5 .
I Z.Total
_ _I 7V
TIME EXTENSIONS
CCO Number
Days Approved
CCO I
Other
Days this report.
Days previously reported
Total days to date -
COMPUTATION OF EXTENDED DATE FOR COMPLETION
Number
of Days
Numbered
Day (Note 5)
Date .
1. Date Contract approved by City Council •
»,;,s;>>ri;e;
—
5 - 6)-9 3
2. Working days specified in contract.
9 O
MeeigIOSOMERMN
3. COMPUTE DATE FOR COMPLETION (if all days specified ere workable:::::;
ngi
—
9- 13 -9 3
4. Total time extension days approved to date (CCO plus other)
--7*"1..w."
+��e. ; -::
5. Total non-workingdays to date (Note 4)r•>''
�x
..f.. ''`/ •
6. Sub Total (Line 4 plus Line 5)
.............................::::.:;:...::::..;.:::::.:::.:;
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)
'> i:: �•af'>:'>:;""
t
t
---
9 - 13-9 3
8. Revised working days for contract (Line 2 plus Line 4)
I tY
'''• "'"''''•
" ``" """' '
9. Total working days to date
1
'
- •t%::?:; ::<,
10. WORKING DAYS REMAINING (Line 8 minus Line 9)
173
•�>....
............
' ^ '4.»'<
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct NOTE: All footnotes are on
reverse side.
Resi ent Engineer
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
4
City of Fontana
CALIFORNIA
May 25, 1993
Mr. Lester Davies
Albert W. Davies, Inc.
8737 Helms Avenue
Rancho Cucamonga, CA 91730
Re: Temporary Traffic Control and Road Closure for the Baseline
Avenue/Almeria Avenue Sewer Improvement Project.
Dear Mr. Davies:
The subject road closures and detours of Baseline Avenue from Cherry Avenue
east to Citrus Avenue, for the dates of June 8, 1993 through August 10,
1993 has been approved by the City with the following stipulations:
1. Notification must be given to the emergency service agencies --
Police Department, County Sheriff's Department, Fire Department,
Ambulance Company, Transportation Superintendent of Fontana
Unified School District, Com Center and to the affected property
owners. A Street Closure Notification List has been enclosed.
2. There can be no other closures or detours which conflict with
this traffic control.
3. The starting date for the closures and detours cannot be sooner
than June 8, 1993. Extension of this road closure and detour may
be authorized only upon expressed approval by the City Traffic
Engineer.
4. Access for affected residents, property owners and business in
the affected area, shall be maintained at all times.
5. You must adhere to the traffic control plan which you have
provided and which has been approved by the City Traffic
Engineer.
6. You shall have approval from the Caltrans inspector for signs
placed on Foothill Boulevard (Route 66) before the City will give
final approval of the traffic control and detour.
8353 SIERRA AVENUE (P.O. 80X 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
recycled paper
Please contact the Traffic Section if you have any questions regardin
closure.
gthis
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
i
Clyde . Sweet, Jr . ,
Deputy City Engineer/City Traffic Engineer
CES:ab
Enclosure
cc: `Associa=teEnginleer;___Yp___
Engineering Technician AB
S'I'R EP CLOSURE NOTIFICATION LIST
Below is a list of agency that need to be notified when a complete or partial street
closure is necessary for construction on or near a Fontana city street.
AGENCY
CONTACT PERSON TII.F.PHONE
City of Fontana Police Department Sergeant Tim O'Connor ('714)353-71:O
17005 Upland Avenue
Fontana, California 92335
Central Valley Fire Agency John Roberts C714)823-4441
15308 San Bernardino Avenue
Fontana, California 92335
Cam -Center (714)
Fontana School District Transportation
9680 Citrus Avenue
Fontana, California 92335
City ofFontanaMaintenance Center
8353 Sierra Avenue
Fontana, California 92335
(714)3SJ-53:0
(714)39,-6 33
City of Fontana, Inspection Carlos Navarro (714)35)-610
8353 Sierra Avenue Bob Savant
Fontana, California 92335
A News Release will also be subndtted to local papers by City personnel. The local papers
are listed belowfor your information..
The Sun
399 North D Street
San Bernardino, California
Inland Valley Daily Bulletin
Ontario, California
The Fontana Herald News
16920 Spring Avenue
Fontana, California 92335
City of Fontana
C ALIFORNIA
May 24, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, Ca 91730
RE: Baseline/Almeria Sewer Project -
Weekly Statement of Working Days
Dear Mr. Davies:
Enclosed for your review are the weekly statements of working days for weeks ending
May 7, May 14 and May 21, 1993. You will be allowed fifteen (15) days in which
to protest in writing the correctness of the statements; otherwise the statement shall
be deemed to have been accepted by you as correct.
Please contact the undersigned, at (909)350-6645, if you need any additional
information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala
Associate Engineer/Special Projects
YP:jh
Enclosure
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
i recycled paper
•
CITY OF FONTANA I REPORT NO. 3
PROJECT
TO:
WEEKLY STATEMENT OF WORKING DAYS
13c-eNF_/ASew,'r Irojc�
,W, G?..v.ee,
The following statement shows the number of working days charged to your contract for the week ending 5-2 I , 1993
Date
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
-I 7
Mon.
l4:g1, SO) Lao 5Z j P�rily_00,4dly1 Sun"y
I
- /$
Tue.
84°} Low 53', �u„"i1 Llear
1
5 -19
Wed.
,rlry�
,}I .gk 09 °, Low SZ 1 5 LoaK Glcr�.r-
I
-ZO
Thur.
►+.yk eV); Loin 52°, Pay-+t),[joµdy 5uW.r
i
5-21
Fri.
N;511 133 / Low 50, l?n=Uy Gloms, I.
Days this week
Days previously reported
Total days to date
5
'7
_ l 2
1
TIME EXTENSIONS
CCO Number
Days Approved
CCO
er
Days this report
Days previously reported
Total days to date
l
,
COMPUTATION OF EXTENDED DATE FOR COMPLETION
Number
of Days
Numbered
Day (Note 5)
Date
1. Date Contract approved by City Council?'WOO
2 Working days specified in contract.
3. COMPUTE DATE FOR COMPLETION (if all days specified are workable
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to data
10. WORKING DAYS REMAINING (Line 8 minus Line 9)
5 -06- 9 3
-O
:.< r •'s?..
s > �<ry ry ~ <- ::
:>:<?' M..
--
-13 - 3
o
' `'•`'`'`•'`•S%"> ti % µj%
%<` -''<` - .
.�fv:rld+,• :..YiS$$'}S�": :SSj}j;->?
-:-:�r.•:.:?�s%:;.::•;.:::.;<`::: <H:>«<-;:
0
0
A
�'' 9-.13-9..3.
9 0
::: �~"`
jgS9r :
It,
: 4r ::fi:.:>::«.>z>.:
f 4S;;S:.„:�R:
;;w
12..
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverie)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct NOTE: All footnotes are on
reverse side.
Re.6
Eng
ineer
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA •
•
REPORT NO.
WEEKLY STATEMENT OF WORKING DAYS
PROJECT 13 aye1 Nc IA) y»e r; cc e WC r- Pf 0j\ CLt
TO: AAA),
The following statement shows the number of working days charmed to Dour contract for the week ending 5-1 + , 1993
Date
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
- 10
Mon.
�/
laipt. lO°� Low '4 j C lea.-- SU ANY
I
- I I
Tue.
){:lit bet Low 50°) PoAty Uo.4ly
I
4 - iZ
Wed.
0 411_ 7s°, Low 53J 1L,-CLeudl'
I
y-i3
Thur.
Hy, 80�t Low 53 .CLccsr 5ua
1
5-14
Fri.
N; so Lo,a SD°, GI'ear 5u.nil
I
f
Days this week
Days previously reported
Total days to date
5
2
'Jr
TIME, EXTENSIONS
CCO Number
Days Approved
CCO
Other
Days this report.
Days previously reported
Total clays to date
COMPUTATION OF EXTENDED DATE FOR COMPLETION
Number
of Days
Numbered
Day (Note 51
Date
1. Date Contract approved by City Council
2. Working days specified in contract
3. COMPUTE DATE FOR COMPLETION (if all days specified are workablee
4. Total time extension days approved to date (CCO plus other)
5. Total non -working days to date (Note 4).
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED DATE FOR COMPf_Ef1ON (Line 3 plus Line 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date
10. WORKING DAYS REMAINING (Line 8 minus Line 9)
" `"" " `
"
5- 06- 9 3
9 D
`ierra%' ,%>'< $ F mmi* -
(9-13-9 3
' fO ,:
.
o
iii9a�'`;
ppyy �'�["'"`'''
' : � <:,;<
«;'nl <> >'«1'`>
0
:: n ::!::::
—� �9 -13-9 3
9 O
,.....
;ice : `�`>
�...( <'::<:'�
F?%:>;«•:::: v::
»>"� ':> f
!,
83
.....
Controlling Operations)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA •
REPORT NO. I
TO:
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Geoel;he %A L er;a. Sewer- Froj�ci
A,VJ� 4-)avie4,
The following statement shows the number of working days charged to your contract for the week ending 5 -0'7 , 1993
Date
Day
Weather, Weather Conditions or Other Conditions
Working
Day
Non -Working
Days
Caused by
Weather
Working Days
No Work
Done on
Controlling
Operation
(Note 2)
5-03
Mon.
NI*+ '75°. LOW 53°i I�c.,�tly. CLC a1/
0
-Oq-
Tue.
_0/LH 79°, Lbw 900 ar'i4)yG 4,0,),,S,.w„),
O
4-05
Wed.
,I,ato 80° Low 50..t Il_GIn.Akt.4�NNy '
0
5-ob
Thur.
}liI,1t �E3°FLow 53 rr'.�A-IT (ln4di)../Su, tilr
I
S-07
Fn.
l
►J Kati eoci Lt 3 ° Pa,:tiv CIQKd1,,ti E.Avtiii
I
Days this week
Days previously reported
Total days to date
2.
O
_ 2.
_
TIME EXTENSIONS
CCO Number
Days Approved
CCO
Other
Days this report.
Days previously reported
Total days to date
.0
—^
-
---
,
-�-
COMPUTATION OF EXTENDED DATE FOR COMPLETION
Number
of Days
Numbered
Day (Note 5)
Date
1. Date Contract approved by City Council
2. Working days specified in contract-
3. COMPUTE DATE FOR COMPLETION (if all days specified are workable--
4. Total time extension days approved to date (CCO plus other) .,
5. Total non -working days to date (Note 4)
6. Sub Total (Line 4 plus Line 5)
7. EXTENDED GATE FOR COMPLETION (Line 3 plus Line 6)
8. Revised working days for contract (Line 2 plus Line 4)
9. Total working days to date
10. WORKING DAYS REMAINING (Line 8 minus Line 9)
—'
5 —0 ,- 93
90
IMOWINAMAINNw,
" ? %r t�
---,
q -I3 - 9 3
0gy•
�
«•,,r ;r.>::, :.,:.
''' :««....
0
r !ii
:::>< z .ss ....,,:::::::?%?>::
ONOWieffed
9-►3-i 3
9.0
::..'.:'°::",'F;:
'::`: Aii•.: '":
. �.�n/q�,.:i/
2.
••
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear -wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
•
City of Fontana
C ALIFOR NIA
May 20, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
Rancho Cucamonga, CA 91730
Subject: Baseline/Almeria Sewer Project
Caltrans Permit No. 089-93-N-TK-0533
Dear Mr. Davies:
Enclosed for your records is the copy of Caltrans Permit for placing Temporary
Construction Detour Signs on State. Route 66 (Foothill Blvd.) Please note that this
permit is valid only between June 7, 1993 and July 31, 1993. No construction
activity on Baseline Avenue will be permitted without prior written authorization from
the City.
Please call the undersigned at (909) 350-6645 if you need any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yo of Patanwala
Associate Engineer/Special Projects
YP:yv
Enclosure
cc: City Engineer
Principal Civil Engineer/Capital Improvements Projects
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY — KAMLOOPS, B.C. CANADA
Ci recycled paper
City of Fontana
CALIFORNIA
April 28, 1993
Mr. Lester Davies
Albert W. Davies
8737 Helms Avenue
P. O. Box 215
Rancho Cucamonga, CA 91730
RE: Baseline/Almeria Sewer Project
Contract Bonds
Dear Mr. Davies:
As per Section 6.4 of the agreements between the City of Fontana and the Presley
Companies (copy enclosed), the contractor is required to .name the City and the
Presley Companies jointly as Obligees on the Contract Performance Bond and Payment
Bond.
Please have your bonding company include Presley Companies as Obligee on these
bonds.
If you have any questions, please call the undersigned at 909-350-7613 or contact
Yousuf Patanwala, Associate Engineer/Special Projects at 909-350-6645.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Robert W. Weddle, P.E.
City Engineer
RWW:sh
cc: Associate Engineer/Special Projects (YP)
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
recycled paper
City of Fontana
C ALIFORNIA
April 21, 1993
Lester W. Davies
Albert W. Davies, Inc.
8737 Helms Avenue
Rancho Cucamonga, CA 91730
RE: Baseline Avenue and Almeria Avenue Trunk Sewer System
Construction project
Executed Contract Documents
Dear Mr. Davies:
Enclosed for your records is a fully executed copy of the Contract Documents for the
construction of the Baseline Avenue and Almeria Avenue Trunk Sewer System.
If you have any questions please call the undersigned at (909) 350-6645.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
YousL Patanwala.
Associate Engineer/Special Projects
Enclosure
c:\yousuf\leters93\execcont.ltr
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7800
SISTER CITY — KAMLOOPS, B.C. CANADA
CO recycled paper
LETTER OF TRANSMITTAL
CITY OF FONTANA
CDD/ENGINEERING DIVISION
8353 SIERRA AVENUE
FONTANA,CA. 92335
FILE:Baseline/Almeria Trunk Sewer
DATE: April 8, 1993
TO: Albert W. Davies
8737 Helms Avenue
P.O. Box 215
Rancho Cucamonga, CA. 91730
ATTN: Les Davies
Gentlemen:
We are sending you: (x) Attached ( ) Under seperate cover via
the following item:
( ) Drawing ( ) Print(s) ( ) Plan(s) ( ) Sample(s) ( ) Check
Print(s) ( ) Specifications ( ) Copy of Letter ( ) Change
Order(s) (x) Other: Construction Schedule
COPIES DATE NO. DESCRIPTION
PURPOSE:
( ) For your information/records
( ) For approval
( ) Approved as submitted
( ) For your use
( ) Approved as noted
( ) As requested
(. ) For review and comment
(x) Returned for corrections
( ) Other
( ) Other
( ) For Bid Due:
( ) Prints returned after loaned to:
Please
( ) Submit original
( ) Resubmit _ copie(s) for
approval
( ) Submit copie(s) for
distribution
(x) Return corrected prints
Remarks:
Copy to: Baseline/Almeria Trunk Sewer
Signed: 410(04::-•
a•'
City of Fontana
CALIFORNIA
FAX
COMMUNICATIONS
FROM FAX NUMBER (909) 350-6618
PLEASE DELIVER THE FOLLOWING PAGES TO:
Company:
•W • D v iES
Name: L. EST r Cits
Fax Number: (9040 TN-- 0154 Phone Number:
From: \Okx.rUC V N-Km frL -
Phone Number: 3S0 — 6Cc
Total Number of Pages: 1-0 Date: 3-1=C `�3 Time: \Y • I S-
444-4
(including cover sheet)
Message: j? L - E. NiAlkfi _ IF WORDS +DDEP orl
"fits p i>< '(o k-lR- PAP-oq m_ . C N .I vs .
cc:
*,**************************************************************
FAX CHARGE IS: $3.00 1ST PAGE (EXCLUDING COVER SHEET) $1.50 THEREAFTER.
PLEASE MAKE CHECK PAYABLE TO THE CITY OF FONTANA IN THE AMOUNT OF $
PLEASE MAIL TO: CITY OF FONTANA, P.O. BOX 518, FONTANA, CA 92334
FROM:
Name Company/Firm
Address Phone No.
NOTE: Please return this cover sheet with Payment
(Account No. 010-0316-2300)
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY — RAMLOOPS, B.C. CANADA
ea
i recycled paper
7-2 LABOR.
• •
7-2.2 Laws. (Add the following):
The Contractor, and all subcontractors, suppliers and vendors shall comply with
all CITY, State and Federal orders regarding affirmative action to ensure equal
employment opportunities and fair employment practices. Failure to file any
report due under said orders will result in suspension of periodic progress
payments.
The Contractor shall ensure unlimited access to the job site for all equal
employment opportunity compliance officers.
7-3 LIABILITY INSURANCE. (Replace the entire Subsection with the
following):
7-3.1 Indemnification.
The Contractor shall indemnify and save harmless the CITY OF FONTANA, the State;
the County and any incorporated cities from all claims or suits for damages
arising from his prosecution of the Contract work, as more fully described in
Subsection 7-3.2 "Contractor's Liability."
7-3.2 Insurance Requirements.
The insurance afforded by this policy shall not be canceled, suspended, or
modified or renewal of such a policy declined unless notice is mailed, by
certified mail return receipt requested to the City at least 45 days prior to the
effective date of the nonrsnswal, suspension, or modification or at least 60 days
prior to the effective date of cancellation.
The Contractor shall maintain during the life of the contract and the entire
progress of the work, and until sixty (60) days after notice of completion has
been filed a Comprehensive Automobile and General Liability policy. The policy
shall provide for not less than the following amounts:
Bodily Injury
$1,000,000
$2,000,000
$1,000,000
Property Damage $1,000,000
Worker's Compensation Statutory
e ach person
each accident
each accident for products and
completed operations
e ach accident
Automobile Liability Insurance to include all owned, non -owned or
vehicles, including loading or unloading thereof:
Automobile Bodily Injury $1,000,000 each person
$2,000,000 each accident
Automobile Property Damage $ 500,000 each occurrence
All liability insurance policies'shall.bear an endorsement or shall have attached
a rider whereby it is provided that, in the event of expiration or proposed
cancellation of such policies for any reason whatsoever, the CITY of FONTAKA
shall be notified by registered mail, return receipt requested, giving a
sufficient icable law or
statute, but in noe event less than 30 days beffore the date thereof to ore comply
towith n or clancellation is
effective.
SP-6
non -hired
City of Fontana
CALIFORNIA
March 11, 1993
Lester W. Davies
Albert W. Davies, Inc.
8737 Helms Avenue
Rancho Cucamonga, CA 91730
RE: Baseline Avenue and Almeria Avenue Trunk Sewer System
Construction Project
Pre -Construction Meeting
Dear Mr. Davies:
The City of Fontana will be conducting a Pre -Construction Meeting for the Baseline
Avenue and Almeria Avenue Trunk Sewer System construction project. We request
to have the Project Manager, Job Superintendent and subcontractor attend this
meeting. Present in written form the information regarding the Emergency Contact
Persons Names and Telephone Numbers, Name and Titles of persons authorized to
sign Change Orders and Construction Schedule.
The Pre -Construction Meeting is scheduled for 10:00 a.m., Wednesday, March 17,
1993, at the City of Fontana, in the D.A.B. Conference Room, located at 8353 Sierra
Avenue, Fontana, CA.
Please contact Don Gilbertson at (909)350-6659 or the undersigned, at
(909)350-6645, if you have any questions.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yo -atanwala
Associate Engineer/Special Projects
cc: City Engineer
Principal Civil Engineer/Special Projects
Project File
c:\yousuf\leters93\preconsm.bs1
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY - KAMLOOPS, B.C. CANADA
recycled paper
•
City of Fontana
CALIFORNIA
March 5, 1993
Albert W. Davies
Albert W. Davies, Inc.
8737 Helms Avenue
Rancho Cucamonga, CA 91730
RE: Baseline/Almeria Avenue Trunk Sewer System
Execution of Contract Documents
Dear Mr. Davies:
On March 2, 1993 City Council authorized to award the construction contract to
Albert W. Davies for the above reference project.
Enclosed herewith are five sets of contract documents, all to be executed in original.
Please only use the City's provided forms for bond and insurance purposes.
Please . return all five executed contracts by March 12, 1993, to City of Fontana
Engineering Division, 8353 Sierra Avenue Fontana, CA 92335 Attn: Yousuf
Patanwala. One fully executed set will be returned to you later for your records.
If you have any questions, please do not hesitate to call the undersigned at (909)
350-6645.
Very truly yours,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala
Associate Engineer/Special Projects
Enclosure: Five Sets of Contract Documents
cc: City Engineer
Principal Civil Engineer/Special Projects
c:\data\wp\yousuf\leters93\execofco.ltr