HomeMy WebLinkAbout0850-72_Baseline Avenue/Almeria Avenue - Sewer Project_12.6City of Fontana CALIFORNIA September 30, 1993 Lester W. Davies Albert W. Davies, Inc. 8737 Helms Avenue Rancho Cucamonga, CA 91730 RE: Baseline/Almeria Trunk Sewer Notice of Completion Dear Mr. Davies: Enclosed for your files is a copy of the recorded Notice referenced project. The retention money will be released 35 days after the of Completion. Should you have any questions, contact the undersigned at (909) 350-6645. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yo ' atanwala Associate Engineer/Special Projects YP:sh Enclosure cc: City Engineer • Principal Civil 'Engineer/Special Projects Principal Civil Engineer/Capital Improvements Redevelopment Project Coordinator (MP) of Completion for the above day of recordation of Notice 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7800 SISTER CITY — KAMLOOPS, B.C. CANADA recycled paper 11 Recording requested by City of Fontana NO FEE E When recorded mail to: City of Fontana (Engineering Division) P. 0. Box 518 Fontana, California 92335 94-391! 36 RECORDED IN OFFICIAL_ *- CORDS,--- 93 SEP 13 PM 1: 26 SAN BERNARDINO CO.. CALF. NOTICE OF COMPLETION Pursuant to the provisions of Section 3086 of the Civil Code of the State of California and authorization of the City Council of the City of Fontana, NOTICE IS HEREBY GIVEN that work on that certain project known as Construction of the Baseline Avenue/Almeria Avenue Trunk Sewer System Project No. SB-45-93 , for the City of Fontana was completed and accepted by the City of Fontana on the 7th day of September , 1921. The said work was performed by Albert W. Davies. Inc. of 8737 Helms Avenue. Rancho Cucamonga. CA in accordance with the terms of written agreement dated the 2nd day of March , 1993. STATE OF CALIFORNIA) Dated this 8th day of September,, 1993 COUNTY OF SAN BERNARDINO) Robert W. Weddle, P.E. City Engineer On September 8. 1993, before me, the undersigned, a Notary Public in and for said State, personally appeared Robert W. Weddle. P.E., personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized uonp behalf and of that whi chy thhis e personsignature acted, executed the execut d instrument, the the .person, or entity p instrument. WITNESS my hand and icial seal. Wilma Rinsak OFFICIAL SEAL WILMA PINSAK NOTARY PUBLIC CALIFORNIA SAN BERNARDINO COUNTY My Comm 610303 0ic. 16, 1994 • -,7-,CJ • • 1-Z-S (4v DRILL II TAR for 2 Alen toad cap *Pews 3Sld ppe cop TIEKAD 3'. Pent I 3 1114. Peg cop KEY a NOTCH GATE CONNECTION TO COLUMN Nol to scale 314.. Cocoas filings 01 314- • ape 0 0, INSTALL Owls Whale le be 3/11" 1I WELDane lank -- CUT chain CHAIN a LOCK CONNECTION [.. _ cow le pee . — C.0" for lie 4 se NOTE Before we prod lo 1,1 1 mos .•_ . •• .••. len pp* & NM to scold (as sitoon 801T RONK PP* 2- • Pet •1 2" • ow* - _:---- 4- 3- 0 PP' • - CIa.. A concrete ovo.ceo 7 (Vt6OR) _ I 3- • PPIt ' • l.I904 PIPE GATE HORIZONTAL OPENING NOLL. AN polls welded to shop (No held welds) AN pope and Wimps to be oulroncred Got' sung* lo tse plaCed on channel sidle whites applicable. Goss to open Oss•Cly from slr••1 when opplic•Bl•. Not to scale WELD Ye • Sid b0. lo posl in thwart 3 Sid gel.. pipe cop aree•Nod with I/4 polo round hood rived A 01 SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT RtviSsONS REVISED 3-29-74 A age neve e-ii-re 416 oi• nal Les I or ?I Dawn BY K D G DATE 7-6-72 CIL( NO SP 209 e • y . • 1 - • e 7 4 0 b V\e-t-c-tir • City of Fontana CALIFORNIA July 19, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, CA 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending July 16, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division You tlf Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. 80X 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7800 SISTER CITY- KAMLOOPS, B.C. CANADA %p recycled paper CITY OF FONTANA REPORT NO. I I WEEKLY STATEMENT OF WORKING DAYS E50_seI tie /Aivniia _ Cter T rD�pc� av;et? The following statement shows the number of working days charged to your contract for the week ending]- ) b , 1993 PROJECT TO: Oate Day k. Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by . Weather Working Oays No Work Done on Controlling • Operation (Note 2) 7-12. Mon. 10° - 58 ° I 7-13 Tue. 90° --se' I 7-I4 Wed. ri3°" .51 u 1 7 -15 Thur. 8 7° - 50° t 7-lb Fri. b5 ° -55D l Days this week Days previously reported Total days to date 5 4 5 50 TIME EXTENSIONS Days this report. Days previously reported Total days to date CCO Number Days Approved CCO Other COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of 0 s 1. Date Contract approved by City Council ~^ >`': 2. Working days specified in contract ab rk I 3. COMPUTE DATE FOR COMPLETION (if all days specified are w o `...:..:..::.,,... Numbered Day (Note Oats 54-93 'i'•,r�Y.���+.. %�i:i:%l..i:'%ir i4��?ty��:•,:�i �...: r::..:.:.: .+: is %i: :.i:.; :<i•%::,.::::•::::......... ': � �:�::� :::.i::. 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Lin. 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date. 10. WORKING DAYS REMAINING (Line 8 minus Line 9) Controlling Operation(s) '+ 0 b Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct NOTE: All footnotes are on. reverse side. INSTRUCTIONS O RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. • Do not list days merely as "Unworkable." 2. Enter days on which no productive work haslbeen.performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana CALIFORNIA July 14, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga; Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statementof working days for week ending July 9, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if .you need any additional information. Sincerely, COMMUNITY. DEVELOPMENT DEPARTMENT Engineering Division Youf Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper CITY OF FONTANA I REPORT NO. I WEEKLY STATEMENT OF WORKING DAYS Set,Jer- Pro�rc�' A, W� v teS The following statement shows the number of working days charged to tour contract for the week ending7— PROJECT TO: Oc ek.,he A w+eris , 1993 Date Day Weather, Weather Conditions or Other Conditions o • Working Day Non -Working Days Caused by Weather Working Days No Work Dons on Controlling Operation (Note 2) 7-05 Mon. I-i I; $' 7- 06 Tue. 90.- 50° Clear- I _1-07 Wed.' 92°-58°; Cleo.c- II 7-OS Thur. q ° -57° Gear ?-09 Fri. 9?. -59° �; Clear O Days this week Days previously reported Total da s to date 4 4 I _ k5 _ , TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report Days previously reported Total days to date COMPUTATION OF EXTENDED GATE FOR COMPLETION 1. Date Contract Approved by City Council 2. Working days specified in contract 3. COMPUTE GATE FOR COMPLETION (if all days specified are workablet < '; .f.'- 13-93 Number Numbered of Gays Oay (Note 5) ..sir Date 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus. Line 6) 8. Revised working days for contract (line 2 plus Line 4) 9. Total working days to date. 10. WORKING DAYS REMAINING (Linea minus Line 9) Controlling Operation(s) -6-93 Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: • City of Fontana CALIFORNIA July 7, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending July 2, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division You Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA " recycled paper CITY OF FONTANA • - REPORT NO. 9 WEEKLY STATEMENT OF WORKING DAYS Sewa•- O4 p C PROJECT 13,00eA; r //1►,i r r-; a TO: A.W, tr1.v r ss The following statement shows the number of working days charged to your contract for the week ending 7-Z , 1993 Oats Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Dons on Controlling Operation (Note 2) l.,-28 Mon. 95 -64°a Clew- I 6 -Lei Tue. 4ij'-.4° Clew- 1 ,- O Wed. 93= 64° ClrAt- 7- I Thur. 95°-50° Clear 7- 2- Fri. 9Z°-58' ; 6/pair! _ Days this week Days previously reported Total days to date IO 4.1, TIME EXTENSIONS Days this report. Days previously reported Total days to date CCO Number c Days Approved CO Other COMPUTATION OF EXTENDED' DATE FOR COMPLETION Number Numbered of Days Day (Note 5) 5- 6-93 •is• •U•• ...y�.,F � � �G : •:: /,ti'+:•i':vii:iii 1..Date Contract approved by City Council 2. Working days specified in contract. 3. COMPUTE DATE FOR COMPLETION (if all days specified are workablea•:i<.'.. ;`,':,'-'.`<K? 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date. 10. WORKING GAYS REMAINING (Line 8 minus Line 9) Oats I9-13-93 aft' .................................. 9-I 3-9 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes an on reverse side. Plilslint Engineer INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana. CALIFORNIA June 28, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending June 25-, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yof Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7600 SISTEA CITY - KAMLOOPS, B.C. CANADA I. recycled paper CITY OF FONTANA • • REPORT NO. WEEKLY STATEMENT OF WORKING DAYS PROJECT base t;he /AIric. Tr, Seer TO: A w Dav i CS The following statement shows the number of working days charged. to your contract for the week ending-15 , 1993 Oats Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling• Operation (Note 2) 6- 21 Mon. 9 3° - G 5') C.f>ee.e- 1 isZ2 _ Tue. 89°- 62.° Hdzy d- 5r.n 6-Z3 Wed. 97° -6Z° C.1tae— I £ -z.4 Thur. j IDD°- 64", C Iear 1rJ cb I 6-2.5 Fri. r lbO°-- 6$ ° , C.iear+ 1 / Days this week Days previously reported' Total days to date 5 3 I _ 3b Days this report Days previously reported Total days to date- MPU ATI•N • EXTEND ' DA •' •T•MP 1. Date Contract approved by City Council. 2. Working days specified in contract. 3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date. 10. WORKING GAYS REMAINING 'ne 8 minus Line Number of Days 90 5-6-93 9 13- Controlling Operations) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement: otherwise the statement shall be deemed to have been accepted by the Contractor ss correct. NOTE: AU footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana CALIFORNIA June 23, 1993 Mr. Lester Davies. Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending June 18, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division YoVs j'f Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA w ft A ror ,14,1 ranar CITY OF FONTANA • 41, REPORT NO. WEEKLY STATEMENT OF WORKING DAYS PROJECT Rc,_.5e1 �` )vnPrut— t �uhi< Gel-Je• TO: A , Vli,. (i F4 The following statement shows the number of working days changed to your contract for the week ending 6 40, 1993 Date Day . Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Oays No Work Done on Controlling Operation (Note 2) b%14 Mon. ell ._6q" C(e�r- I b//S Tue. 9° —65`' . Clear - to/lb Wed. C -(� �_° ) Cj� r -- i,/17 Thur. 100°— 65° C i�r , I 6/16 Fri. 95`'--6,$° i C leit— 1 , Days this week Days previously reported Total days to date 2 3 TIME EXTENSIONS Days this report. Days previously reported Total days to date CCO Number COMPUTATION OF EXTENDED GATE FOR COMPLETION 1. Date Contract approved by City Council 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED GATE FOR COMPLETION (Line 3 plus Unit 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to data 10. WORKING DAYS REMAINING 'ne 8 minus Line Controlling Operation(s) CCO Number Numbered of Days Day. (Note 5) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor es correct NOTE: All footnotes are on reverse side. Engineer INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana CALIFORNIA June 17, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: ' Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending June 11, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineerin Division i You Patanwala �d1' Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper CITY OF FONTANA • • REPORT NO. 4 WEEKLY STATEMENT OF WORKING //DAYS PROJECT (3 cos e i ti p / H 1 wt e r. Tt`N, r, k '7 a t.J e.+r- TO: /a . lnf 17,�,� e The following statement shows the number of working days charad to ur contract for the week ending 6,-(► , 1993 Date Day Weather, Weather Conditions or Other Conditions . Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 6-7 Mon. 90°-55° C.('en.r- I 6--15, Tue. r Apo- 50° GLew- I b- q Wed. t cite - 54' I C1e,tvr 1 6-1O Thur. 92°- 62° G.leas I to-►1 Fri. 13°- 65e tt G(ear 1 1 / . Days this week Days previously reported Total days to date Z. T _ 2 b TIME EXTENSIONS Days this report. Days previously reported Total days to date CCO Number Days Approved CCO. Other COMPUTATION OF EXTENDED DATE FOR COMPLETION 1. Date Contract approved by City Council 2. Working days specified in contract. 3. COMPUTE DATE FOR COMPLETION (if all days specified are workabl 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract -(Line 2 plus Line 4) 9. Total working days to date. 10. WORKING GAYS REMAINING 'ne 8 minus Line Controlling Operations) Number of Days Numbered Day (Note Date- 5--5/093 Remarks: (Note 6) (Continue on reverse). The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana CALIFORNIA June 8, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending June 4, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEP.ARTMENT Engineering Division YoAuf` Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA. CALIFORNIA 92334-0518 • (7141350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA w CITY OF FONTANA REPORT NO. 5 PROJECT TO: WEEKLY STATEMENT OF WORKING DAYS I3ASSA-I /A/ MC>LVst 5E.RROJ�GT. Ps I7Av 1 E5 The following statement shows the number of working days charged to your contract Date Day Weather, Weather Conditions or Other Conditions .... ...- Working Day .. .v O Non -Working Days Caused by Weather - vT I JJJ Working Days No Work Done on Controlling Operation (Note 2) 5-31. Mon. Hvl�day es, - I Tue. 80 °- 52° C.l ear , Sum ny ' I h -02 Wed. 70 _ 4E0 j Putly Joud.y 4_"""Y I [,-03 Thur. 1 c 53 hart- Glb�y I 6-O4- Fri. f30°-5Q°i' Ptirt iI6 y I Days this week Days previously reported Total Total days to date 4, I '7 2. I - TIME EXTENSIONS Days this report Days previously reported Total days to date COMPUTATION OF EXTENDED DATE FOR COMPLETION CCO Number Days Approved CCO Other 1. Date Contract approved by City Council 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION (if all days specked are workable 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6)...................... 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date • 10. WORKING.DAYS REMAINING (Line 8 minus Line 9) Number Numbered of Days Day (Note 5) Date 5-QG-93 Controlling Operation(s) ct o ci 69 Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the' statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. 'NOTE: All footnotes are on reverse side. Resident Engineer INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: 0 City of Fontana CALIFORNIA June 2, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review is the weekly statement of working days for week ending May 28, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division You u Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA w �, recycled paper • CITY OF FONTANA • REPORT NO. 4 WEEKLY STATEMENT OF WORKING DAYS PROJECT eAStLINi*,,,►•a 1 p SLWSIZ (�R01�CL"r TO: AW, ►iav; e5 The following statement shows the number of working days charged to your contract for the week ending 5 -Z$ , 1993 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5_ 24 Mon. -70° 1 kazy i Krill GIo1 I LS Tue. _520 SU 40I C1•ecc.r', S�vi„�c I 5-i, Wed. SU° - 50° T , Cloud. I �,-z� Thur. et)° - 2° 1pa� t 4u�N I 5-28 Fri. '7 °-48° 1 c«tL Llou I 7 Days this week Days previously reported days to date 5 . I Z.Total _ _I 7V TIME EXTENSIONS CCO Number Days Approved CCO I Other Days this report. Days previously reported Total days to date - COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 5) Date . 1. Date Contract approved by City Council • »,;,s;>>ri;e; — 5 - 6)-9 3 2. Working days specified in contract. 9 O MeeigIOSOMERMN 3. COMPUTE DATE FOR COMPLETION (if all days specified ere workable:::::; ngi — 9- 13 -9 3 4. Total time extension days approved to date (CCO plus other) --7*"1..w." +��e. ; -:: 5. Total non-workingdays to date (Note 4)r•>'' �x ..f.. ''`/ • 6. Sub Total (Line 4 plus Line 5) .............................::::.:;:...::::..;.:::::.:::.:; 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) '> i:: �•af'>:'>:;"" t t --- 9 - 13-9 3 8. Revised working days for contract (Line 2 plus Line 4) I tY '''• "'"''''• " ``" """' ' 9. Total working days to date 1 ' - •t%::?:; ::<, 10. WORKING DAYS REMAINING (Line 8 minus Line 9) 173 •�>.... ............ ' ^ '4.»'< Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct NOTE: All footnotes are on reverse side. Resi ent Engineer INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: 4 City of Fontana CALIFORNIA May 25, 1993 Mr. Lester Davies Albert W. Davies, Inc. 8737 Helms Avenue Rancho Cucamonga, CA 91730 Re: Temporary Traffic Control and Road Closure for the Baseline Avenue/Almeria Avenue Sewer Improvement Project. Dear Mr. Davies: The subject road closures and detours of Baseline Avenue from Cherry Avenue east to Citrus Avenue, for the dates of June 8, 1993 through August 10, 1993 has been approved by the City with the following stipulations: 1. Notification must be given to the emergency service agencies -- Police Department, County Sheriff's Department, Fire Department, Ambulance Company, Transportation Superintendent of Fontana Unified School District, Com Center and to the affected property owners. A Street Closure Notification List has been enclosed. 2. There can be no other closures or detours which conflict with this traffic control. 3. The starting date for the closures and detours cannot be sooner than June 8, 1993. Extension of this road closure and detour may be authorized only upon expressed approval by the City Traffic Engineer. 4. Access for affected residents, property owners and business in the affected area, shall be maintained at all times. 5. You must adhere to the traffic control plan which you have provided and which has been approved by the City Traffic Engineer. 6. You shall have approval from the Caltrans inspector for signs placed on Foothill Boulevard (Route 66) before the City will give final approval of the traffic control and detour. 8353 SIERRA AVENUE (P.O. 80X 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA recycled paper Please contact the Traffic Section if you have any questions regardin closure. gthis Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division i Clyde . Sweet, Jr . , Deputy City Engineer/City Traffic Engineer CES:ab Enclosure cc: `Associa=teEnginleer;___Yp___ Engineering Technician AB S'I'R EP CLOSURE NOTIFICATION LIST Below is a list of agency that need to be notified when a complete or partial street closure is necessary for construction on or near a Fontana city street. AGENCY CONTACT PERSON TII.F.PHONE City of Fontana Police Department Sergeant Tim O'Connor ('714)353-71:O 17005 Upland Avenue Fontana, California 92335 Central Valley Fire Agency John Roberts C714)823-4441 15308 San Bernardino Avenue Fontana, California 92335 Cam -Center (714) Fontana School District Transportation 9680 Citrus Avenue Fontana, California 92335 City ofFontanaMaintenance Center 8353 Sierra Avenue Fontana, California 92335 (714)3SJ-53:0 (714)39,-6 33 City of Fontana, Inspection Carlos Navarro (714)35)-610 8353 Sierra Avenue Bob Savant Fontana, California 92335 A News Release will also be subndtted to local papers by City personnel. The local papers are listed belowfor your information.. The Sun 399 North D Street San Bernardino, California Inland Valley Daily Bulletin Ontario, California The Fontana Herald News 16920 Spring Avenue Fontana, California 92335 City of Fontana C ALIFORNIA May 24, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, Ca 91730 RE: Baseline/Almeria Sewer Project - Weekly Statement of Working Days Dear Mr. Davies: Enclosed for your review are the weekly statements of working days for weeks ending May 7, May 14 and May 21, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned, at (909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yousuf Patanwala Associate Engineer/Special Projects YP:jh Enclosure cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA i recycled paper • CITY OF FONTANA I REPORT NO. 3 PROJECT TO: WEEKLY STATEMENT OF WORKING DAYS 13c-eNF_/ASew,'r Irojc� ,W, G?..v.ee, The following statement shows the number of working days charged to your contract for the week ending 5-2 I , 1993 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) -I 7 Mon. l4:g1, SO) Lao 5Z j P�rily_00,4dly1 Sun"y I - /$ Tue. 84°} Low 53', �u„"i1 Llear 1 5 -19 Wed. ,rlry� ,}I .gk 09 °, Low SZ 1 5 LoaK Glcr�.r- I -ZO Thur. ►+.yk eV); Loin 52°, Pay-+t),[joµdy 5uW.r i 5-21 Fri. N;511 133 / Low 50, l?n=Uy Gloms, I. Days this week Days previously reported Total days to date 5 '7 _ l 2 1 TIME EXTENSIONS CCO Number Days Approved CCO er Days this report Days previously reported Total days to date l , COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 5) Date 1. Date Contract approved by City Council?'WOO 2 Working days specified in contract. 3. COMPUTE DATE FOR COMPLETION (if all days specified are workable 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to data 10. WORKING DAYS REMAINING (Line 8 minus Line 9) 5 -06- 9 3 -O :.< r •'s?.. s > �<ry ry ~ <- :: :>:<?' M.. -- -13 - 3 o ' `'•`'`'`•'`•S%"> ti % µj% %<` -''<` - . .�fv:rld+,• :..YiS$$'}S�": :SSj}j;->? -:-:�r.•:.:?�s%:;.::•;.:::.;<`::: <H:>«<-;: 0 0 A �'' 9-.13-9..3. 9 0 ::: �~"` jgS9r : It, : 4r ::fi:.:>::«.>z>.: f 4S;;S:.„:�R: ;;w 12.. Controlling Operation(s) Remarks: (Note 6) (Continue on reverie) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct NOTE: All footnotes are on reverse side. Re.6 Eng ineer INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA • • REPORT NO. WEEKLY STATEMENT OF WORKING DAYS PROJECT 13 aye1 Nc IA) y»e r; cc e WC r- Pf 0j\ CLt TO: AAA), The following statement shows the number of working days charmed to Dour contract for the week ending 5-1 + , 1993 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) - 10 Mon. �/ laipt. lO°� Low '4 j C lea.-- SU ANY I - I I Tue. ){:lit bet Low 50°) PoAty Uo.4ly I 4 - iZ Wed. 0 411_ 7s°, Low 53J 1L,-CLeudl' I y-i3 Thur. Hy, 80�t Low 53 .CLccsr 5ua 1 5-14 Fri. N; so Lo,a SD°, GI'ear 5u.nil I f Days this week Days previously reported Total days to date 5 2 'Jr TIME, EXTENSIONS CCO Number Days Approved CCO Other Days this report. Days previously reported Total clays to date COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 51 Date 1. Date Contract approved by City Council 2. Working days specified in contract 3. COMPUTE DATE FOR COMPLETION (if all days specified are workablee 4. Total time extension days approved to date (CCO plus other) 5. Total non -working days to date (Note 4). 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED DATE FOR COMPf_Ef1ON (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) " `"" " ` " 5- 06- 9 3 9 D `ierra%' ,%>'< $ F mmi* - (9-13-9 3 ' fO ,: . o iii9a�'`; ppyy �'�["'"`''' ' : � <:,;< «;'nl <> >'«1'`> 0 :: n ::!:::: —� �9 -13-9 3 9 O ,..... ;ice : `�`> �...( <'::<:'� F?%:>;«•:::: v:: »>"� ':> f !, 83 ..... Controlling Operations) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA • REPORT NO. I TO: WEEKLY STATEMENT OF WORKING DAYS PROJECT Geoel;he %A L er;a. Sewer- Froj�ci A,VJ� 4-)avie4, The following statement shows the number of working days charged to your contract for the week ending 5 -0'7 , 1993 Date Day Weather, Weather Conditions or Other Conditions Working Day Non -Working Days Caused by Weather Working Days No Work Done on Controlling Operation (Note 2) 5-03 Mon. NI*+ '75°. LOW 53°i I�c.,�tly. CLC a1/ 0 -Oq- Tue. _0/LH 79°, Lbw 900 ar'i4)yG 4,0,),,S,.w„), O 4-05 Wed. ,I,ato 80° Low 50..t Il_GIn.Akt.4�NNy ' 0 5-ob Thur. }liI,1t �E3°FLow 53 rr'.�A-IT (ln4di)../Su, tilr I S-07 Fn. l ►J Kati eoci Lt 3 ° Pa,:tiv CIQKd1,,ti E.Avtiii I Days this week Days previously reported Total days to date 2. O _ 2. _ TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report. Days previously reported Total days to date .0 —^ - --- , -�- COMPUTATION OF EXTENDED DATE FOR COMPLETION Number of Days Numbered Day (Note 5) Date 1. Date Contract approved by City Council 2. Working days specified in contract- 3. COMPUTE DATE FOR COMPLETION (if all days specified are workable-- 4. Total time extension days approved to date (CCO plus other) ., 5. Total non -working days to date (Note 4) 6. Sub Total (Line 4 plus Line 5) 7. EXTENDED GATE FOR COMPLETION (Line 3 plus Line 6) 8. Revised working days for contract (Line 2 plus Line 4) 9. Total working days to date 10. WORKING DAYS REMAINING (Line 8 minus Line 9) —' 5 —0 ,- 93 90 IMOWINAMAINNw, " ? %r t� ---, q -I3 - 9 3 0gy• � «•,,r ;r.>::, :.,:. ''' :««.... 0 r !ii :::>< z .ss ....,,:::::::?%?>:: ONOWieffed 9-►3-i 3 9.0 ::..'.:'°::",'F;: '::`: Aii•.: '": . �.�n/q�,.:i/ 2. •• Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear -wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: • City of Fontana C ALIFOR NIA May 20, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue Rancho Cucamonga, CA 91730 Subject: Baseline/Almeria Sewer Project Caltrans Permit No. 089-93-N-TK-0533 Dear Mr. Davies: Enclosed for your records is the copy of Caltrans Permit for placing Temporary Construction Detour Signs on State. Route 66 (Foothill Blvd.) Please note that this permit is valid only between June 7, 1993 and July 31, 1993. No construction activity on Baseline Avenue will be permitted without prior written authorization from the City. Please call the undersigned at (909) 350-6645 if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yo of Patanwala Associate Engineer/Special Projects YP:yv Enclosure cc: City Engineer Principal Civil Engineer/Capital Improvements Projects 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA Ci recycled paper City of Fontana CALIFORNIA April 28, 1993 Mr. Lester Davies Albert W. Davies 8737 Helms Avenue P. O. Box 215 Rancho Cucamonga, CA 91730 RE: Baseline/Almeria Sewer Project Contract Bonds Dear Mr. Davies: As per Section 6.4 of the agreements between the City of Fontana and the Presley Companies (copy enclosed), the contractor is required to .name the City and the Presley Companies jointly as Obligees on the Contract Performance Bond and Payment Bond. Please have your bonding company include Presley Companies as Obligee on these bonds. If you have any questions, please call the undersigned at 909-350-7613 or contact Yousuf Patanwala, Associate Engineer/Special Projects at 909-350-6645. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Robert W. Weddle, P.E. City Engineer RWW:sh cc: Associate Engineer/Special Projects (YP) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper City of Fontana C ALIFORNIA April 21, 1993 Lester W. Davies Albert W. Davies, Inc. 8737 Helms Avenue Rancho Cucamonga, CA 91730 RE: Baseline Avenue and Almeria Avenue Trunk Sewer System Construction project Executed Contract Documents Dear Mr. Davies: Enclosed for your records is a fully executed copy of the Contract Documents for the construction of the Baseline Avenue and Almeria Avenue Trunk Sewer System. If you have any questions please call the undersigned at (909) 350-6645. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division YousL Patanwala. Associate Engineer/Special Projects Enclosure c:\yousuf\leters93\execcont.ltr 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7800 SISTER CITY — KAMLOOPS, B.C. CANADA CO recycled paper LETTER OF TRANSMITTAL CITY OF FONTANA CDD/ENGINEERING DIVISION 8353 SIERRA AVENUE FONTANA,CA. 92335 FILE:Baseline/Almeria Trunk Sewer DATE: April 8, 1993 TO: Albert W. Davies 8737 Helms Avenue P.O. Box 215 Rancho Cucamonga, CA. 91730 ATTN: Les Davies Gentlemen: We are sending you: (x) Attached ( ) Under seperate cover via the following item: ( ) Drawing ( ) Print(s) ( ) Plan(s) ( ) Sample(s) ( ) Check Print(s) ( ) Specifications ( ) Copy of Letter ( ) Change Order(s) (x) Other: Construction Schedule COPIES DATE NO. DESCRIPTION PURPOSE: ( ) For your information/records ( ) For approval ( ) Approved as submitted ( ) For your use ( ) Approved as noted ( ) As requested (. ) For review and comment (x) Returned for corrections ( ) Other ( ) Other ( ) For Bid Due: ( ) Prints returned after loaned to: Please ( ) Submit original ( ) Resubmit _ copie(s) for approval ( ) Submit copie(s) for distribution (x) Return corrected prints Remarks: Copy to: Baseline/Almeria Trunk Sewer Signed: 410(04::-• a•' City of Fontana CALIFORNIA FAX COMMUNICATIONS FROM FAX NUMBER (909) 350-6618 PLEASE DELIVER THE FOLLOWING PAGES TO: Company: •W • D v iES Name: L. EST r Cits Fax Number: (9040 TN-- 0154 Phone Number: From: \Okx.rUC V N-Km frL - Phone Number: 3S0 — 6Cc Total Number of Pages: 1-0 Date: 3-1=C `�3 Time: \Y • I S- 444-4 (including cover sheet) Message: j? L - E. NiAlkfi _ IF WORDS +DDEP orl "fits p i>< '(o k-lR- PAP-oq m_ . C N .I vs . cc: *,************************************************************** FAX CHARGE IS: $3.00 1ST PAGE (EXCLUDING COVER SHEET) $1.50 THEREAFTER. PLEASE MAKE CHECK PAYABLE TO THE CITY OF FONTANA IN THE AMOUNT OF $ PLEASE MAIL TO: CITY OF FONTANA, P.O. BOX 518, FONTANA, CA 92334 FROM: Name Company/Firm Address Phone No. NOTE: Please return this cover sheet with Payment (Account No. 010-0316-2300) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — RAMLOOPS, B.C. CANADA ea i recycled paper 7-2 LABOR. • • 7-2.2 Laws. (Add the following): The Contractor, and all subcontractors, suppliers and vendors shall comply with all CITY, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. 7-3 LIABILITY INSURANCE. (Replace the entire Subsection with the following): 7-3.1 Indemnification. The Contractor shall indemnify and save harmless the CITY OF FONTANA, the State; the County and any incorporated cities from all claims or suits for damages arising from his prosecution of the Contract work, as more fully described in Subsection 7-3.2 "Contractor's Liability." 7-3.2 Insurance Requirements. The insurance afforded by this policy shall not be canceled, suspended, or modified or renewal of such a policy declined unless notice is mailed, by certified mail return receipt requested to the City at least 45 days prior to the effective date of the nonrsnswal, suspension, or modification or at least 60 days prior to the effective date of cancellation. The Contractor shall maintain during the life of the contract and the entire progress of the work, and until sixty (60) days after notice of completion has been filed a Comprehensive Automobile and General Liability policy. The policy shall provide for not less than the following amounts: Bodily Injury $1,000,000 $2,000,000 $1,000,000 Property Damage $1,000,000 Worker's Compensation Statutory e ach person each accident each accident for products and completed operations e ach accident Automobile Liability Insurance to include all owned, non -owned or vehicles, including loading or unloading thereof: Automobile Bodily Injury $1,000,000 each person $2,000,000 each accident Automobile Property Damage $ 500,000 each occurrence All liability insurance policies'shall.bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the CITY of FONTAKA shall be notified by registered mail, return receipt requested, giving a sufficient icable law or statute, but in noe event less than 30 days beffore the date thereof to ore comply towith n or clancellation is effective. SP-6 non -hired City of Fontana CALIFORNIA March 11, 1993 Lester W. Davies Albert W. Davies, Inc. 8737 Helms Avenue Rancho Cucamonga, CA 91730 RE: Baseline Avenue and Almeria Avenue Trunk Sewer System Construction Project Pre -Construction Meeting Dear Mr. Davies: The City of Fontana will be conducting a Pre -Construction Meeting for the Baseline Avenue and Almeria Avenue Trunk Sewer System construction project. We request to have the Project Manager, Job Superintendent and subcontractor attend this meeting. Present in written form the information regarding the Emergency Contact Persons Names and Telephone Numbers, Name and Titles of persons authorized to sign Change Orders and Construction Schedule. The Pre -Construction Meeting is scheduled for 10:00 a.m., Wednesday, March 17, 1993, at the City of Fontana, in the D.A.B. Conference Room, located at 8353 Sierra Avenue, Fontana, CA. Please contact Don Gilbertson at (909)350-6659 or the undersigned, at (909)350-6645, if you have any questions. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yo -atanwala Associate Engineer/Special Projects cc: City Engineer Principal Civil Engineer/Special Projects Project File c:\yousuf\leters93\preconsm.bs1 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper • City of Fontana CALIFORNIA March 5, 1993 Albert W. Davies Albert W. Davies, Inc. 8737 Helms Avenue Rancho Cucamonga, CA 91730 RE: Baseline/Almeria Avenue Trunk Sewer System Execution of Contract Documents Dear Mr. Davies: On March 2, 1993 City Council authorized to award the construction contract to Albert W. Davies for the above reference project. Enclosed herewith are five sets of contract documents, all to be executed in original. Please only use the City's provided forms for bond and insurance purposes. Please . return all five executed contracts by March 12, 1993, to City of Fontana Engineering Division, 8353 Sierra Avenue Fontana, CA 92335 Attn: Yousuf Patanwala. One fully executed set will be returned to you later for your records. If you have any questions, please do not hesitate to call the undersigned at (909) 350-6645. Very truly yours, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yousuf Patanwala Associate Engineer/Special Projects Enclosure: Five Sets of Contract Documents cc: City Engineer Principal Civil Engineer/Special Projects c:\data\wp\yousuf\leters93\execofco.ltr 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper