HomeMy WebLinkAbout0850-72_Tamarind Avenue Sewer Lift Station_12.5, RECORD OF TELEPHONE CONVERSATION �I CITY OF FOITANA Date Individual 7/L 5, I 15 / Organization Job No. By 7121- /�-/ Project Phone No. 7( 3 — 3� ( Items Discussed Comments or Action Required 8S I-?106 , 9r) RECORD OF TELEPHONE CONVERSATION CITY OF FOhl+i'ANA Job N2 By Project ,_ i144.4 Date _ (�Pr'_je"'�� Individual s/C Organization 71,—.1/2 1r lf't"`-'' • Phone No. Sti t""/L� `,570 I terns Discussed iJ ee'''t W/O .-I/M-4 cce AA/. Ss( ..at c a�v�-02-e e-de 7211.P.Aic � ,� « . Comments or Action Required BSI-Pn06 „qr • City of Fontana CALIFORNIA September 8, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Contract Change Order No.4 Dear Mr. Ramirez: Enclosed are 2 copies of Contract Change Order No.4. Sign both copies and return to the City for final approval by the City Engineer. You will then receive an executed original from the City. Also enclosed is your copy of Contract Change Order No.2. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John ley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA CO recycled paper City of Fontana C ALIFORNIA April 20, 1993 Mr. Albert Ramirez Multi -Construction Company, Inc. 2440 N. Glassell Avenue Orange, CA 92665 RE: Tamarind Avenue Force Main and Sewer Lift Station No. 8 Contract Document and Notice to Proceed Dear Mr. Ramirez: Enclosed is one copy of the original contract on the above referenced project. The City of Fontana has fully executed said contract, effective date March 16, 1993, per City Council approval of the award. This letter will also serve as the office Notice to Proceed for the above referenced project. In addition, this letter will also serve as official notification that the City of Fontana has reviewed and approved the pump equipment shop drawings (page 1) and the electrical shop drawings (page 2) for the control panel, MCC and enclosure, etc. Pursuant to the executed contract document, the manufacturers must supply you with their certifications as required. Also brought to your attention is the 8-10 week delivery date as specified by the manufacturer, Essca (Engineers Sales -Service Company, Inc.) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA w recycled paper Mr. Albert Ramirez April 20, 1993 Page Two If you have any further questions, please contact the undersigned at 909-350-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:sh Enclosure cc: City Engineer Deputy City Engineer/City Traffic Engineer Principal Civil Engineer/Special Projects Principal Civil Engineer/Capital Improvements City of Fontana CALIFORNIA August 17, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. GlasseII Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending August 13, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. PLEASE BE ADVISED, AS INDICATED ON REPORT #15 THERE ARE NO WORKING DAYS LEFT ON THIS CONTRACT. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA fe5 recycled paper • City of Fontana CALIFORNIA April 14, 1993 Mr. Albert Rameriz Multi -Construction 2440 No. Glasse11 Orange, CA 92665 RE: Tamarind Avenue Sewer Force Main and Lift Station No. 8 Dear Mr. Rameriz: This letter is to document that on April 13, 1993, the contract documents were returned to Multi -Construction to correct the insurance certificates as required by the City of Fontana's Risk Manager. Your immediate response to correct this matter is greatly appreciated. Also, please find enclosed a copy of the traffic control requirements for this project. Along with the memorandum dated April 12, 1993, from the City Traffic Engineer, I have enclosed the cover sheet and price sheet for the Manual of Traffic Controls for Construction and Maintenance of Work Zones dated 1990. It is suggested that a copy of this manual be on hand at the job site while construction is underway. If you have any further questions, please contact the undersigned at 909-350-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Associate Engineer/Special Projects JR: sh Enclosures cc: City Engineer City Traffic Engineer Principal Civil Engineer/Special Projects Principal Civil Engineer/Capital Improvements Public Works Inspector (WB) Engineering Tech II/Traffic (AB) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER -CITY - KAMLOOPS, B.C. CANADA t, recycled paper ar CITY OF FONTANA CALIFORNIA MEMORANDUM TO: JOHN RILEY ASSOCIATE ENGINEER FROM: CLYDE E. SWEET, JR., P.E.—i &/ DEPUTY CITY ENGINEER/CITY TRAF IC ENGINEER SUBJECT: TAMARIND AVENUE SEWER FORCE MAIN, TRAFFIC CONTROL DATE: APRIL 12, 1993 The. Traffic Control, signs and traffic control devices for the above mentioned project shall conform to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones, latest edition. A full Traffic Control Plan for this project is not required at this time. The following is a list of Traffic Control requirements for this project: 1. Tamarind Avenue and the intersection of Santa Ana and Tamarind Avenues shall remain open to normal flow of traffic with one 12' travel lane for each direction of traffic during non working hours. 2. A qualified flagman shall be in place at all times during any lane closures. 3. Notification shall be given to the emergency, service agencies -- Police Department, Fire Department, Ambulance Company, Com Center, Colton School District and the affected property owners. 4. There can be no other construction or traffic control which conflict with this traffic control. 5. The contractor shall adhere to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones, latest edition. 6. A minimum 12' lane shall be maintained at all times during construction. 7. If there should be any change in the construction that might affect the flow of traffic the ,contractor shall notify the City Engineering Inspector immediately. cc: City Engineer Principal Engineer, F.M. Engineering Tech II, A.B. State Of California Business, Transportation And Housing Agency Department Of Transportation MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES 1990 GEORGE DEUKMEJIAN Governor ROBERT K. BEST C. D. BARTELL Director Chief Department of Transportation Division of Traffic Operations J. F. MALONEY FRED JAGER Chief Deputy Director Editor Highway Maintenance and Office of Signs & Delineation Traffic Operations MANUAL OF TRAFFIC CONTROLS For Construction And Maintenance — Work Zones State of California Business, Transportation And Housing Agency Department of Transportation — 1990 — Republished, with Permission, by BNI Books, Division of Building News, Inc., 3055 Overland Avenue, Los Angeles, California 90034 — (213) 202-7775 For Sale At Building News, Inc., Bookstore At Above Location; Or Send Prepaid Mail Orders To Building News, Inc., P.O. Box 3031, Terminal Annex, Los Angeles, California 90051. COSTS 1 to 9 copies, each $5.75 10 to 49 copies, each 5.25 50 to 99 copies, each 4.75 100 to 199 copies, each 4.25 200 or more copies, each 4.00 Large Quantity Prices On Application For Mail Orders: Add 6'h% sales tax to California destinations - 63/4 to L.A. County desti- nations, plus shipping charges of 75c for the first booklet and 15c for every booklet over one. NOTES: CITY OF FONTANA CALIFORNIA MEMORANDUM: TO: ALBERT RAMERIZ MULTI -CONSTRUCTION FROM: JOHN RILE1e2+ ASSOCIATE ENGINEER/SPECIAL PROJECTS DATE: AUGUST 11, 1993 SUBJECT: TAMARIND AVENUE FORCE MAIN AND SEWER LIFT STATION NO. 8 NOTICE OF RECEIPT OF STOP WORK NOTICES RECEIVED ****************************************************************** Please be advised that the City of Fontana has as of this date received two "STOP WORK NOTICES" and are listed as follows: 1. Crane Rental Services: for $3017.50 received by the City of Fontana on July 28, 1993. 2. R.J. Lalonde, Inc.: for $13,954.50 received by the City of Fontana on August 10, 1993. Multi -Construction must clear all outstanding billings not paid to date with all sub -contractors and rental companies before this contract can be finalized through the City Council for acceptance and completion and the "Notice of Completion" can be recorded with the County Recorders Office. If you have any further questions regarding this matter, please contact my office at (909) 350 - 6644. cc City Engineer Principal Civil Engineer/Special Projects Principal Civil Engineer/Capital Improvements Engineering Tech I (HF) • City of Fontana CALIFORNIA August 11, 1993 Mr. Merle R. Johnson Multi -Construction Company, Inc. 2440 N. Glasse11 Orange, CA 92665 RE: Sewer Force Main for Tamarind Avenue and Sewer Lift Station No. 8 SB-48-93 Progress Payment No. 3 Dear Sir: The City of Fontana is in receipt of your Progress Payment No. 3 for the above referenced project. In review of your request for payment it was noticed that you have not included the required ten (104%) percent retention as required, therefore this progress payment is being returned to revise this discrepancy. At the bottom of the last sheet your billing MUST reflect the following verbiage: Total Contract $287,155.86 Completed to Date 210,308.87 10% Less Retention 21,030.89 Amount Previously Paid Invoice Amount Due Balance Once the above changes have been made to your billing statement and resubmitted, the City will process this billing as previously stated (usually 30 day turn around). If you have any further questions please contact the undersigned at (909) 350-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division- John R. Riley Associate Engineer/Special Projects attachments cc: City Engineer Principal Civil Engineer/Special Projects Principal Civil Engineer/Capital Improvements Engineer Tech I (H.F.) c: \ data \wp\riley\leters93\bingdisc.tam 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA `i recycled paper VENDOR # _ P.O.f0.R.# AMT. S ALIT. # APPROVAL: 33� PAYMENT REQUEST. BREAKDOWN FOR PART AYMElf REQUESTS MCASET 4280/7 (Rev 9-74) . StF'1T DRAFT TO CONTRACT INSPECTOR THEN 2 TYPED ,ar OR PRINTED COPIES WITH INVOICE 1 PAYMENT ESTIMATE NO. 03 40- CONTRACT NO. SB=48=93 CONTRACTOR FIRM NAME MULTI CONST. & RAMIREZ FOR WORK COMPLETE AS OF 7-24-93 (Date) This breakdown is to be used as a back-up sheet for payment requests. The Contractor's field superintendent is to check a rough breakdown wita the Navy Inspector prior to submitting a payment request. With the typed payment request, two typed.or printed copies of this break- down -are required. XNPORTANT NOTE: Insert ONLY EXECUTED (SIGNED) Change Orders. For "CON (Military Construction Program) Contracts, the line item of the change must be shown. COPY Columns 1 through 3 from your approved Schedule of'Prices. Copy all items EACH TIME. 1) 2) 3) 4) • 5) ITEM NO OR COST CAT. DESCRIPTION TOTAL COST in Dollars Matl + Labor IN P1. ' $$$ X Work IN PLACE (Col S 4- 3) 6) Total Value Material Delivered NOT IN PLACE 7) 807 Value Matl Deliv NOT IN PLACE 1 CLEARING & GRUBBING LS 2,000 17800 100 0 0 2 CONC.SEWER LIFT STA. 6,800 6,800 100 0 0 EXCAVATION 13,643. 13,643 100 0 0 BACKFILL & COMPACTION 19,357 17,227.73 89 0 0 ELECTRICAL 11,000 2,200 20 0 0 PUMPS 67,092 67,092 100 0 0 BLOCK BLDG. 2,000 1,600 80 . 0 0 SITE CONC. 4,500 4,500 100 0 0 TOTAL [24,392 50" j METER MANHOLE LS 4,500 • 1,350 30 0 0 • te POTHOLE UTILITIES 4 EA. 680 680 100 0 0. 12" DIP 6-7 FORCE MAIN LF 55,150 54,595.14 99 0 0 8) 9) Z Earned To Total $$$ Date.Includ. Earned Undistributed (col 4 + 7) Matl (Col 84-3 2,000 2,000 6,800 6,800 13,643 13,643 17,227.73 17,227.73 2,200 2,200 67,092 1,600 4,500 67,092 1,600 4,500 1,35Q 1,350 680 680 54,595.14 54,595.14 PAYMENT REQUEST BREAKDOWN FOR PARTIAL PAYMENT REOUESTS (continued) ' MCASET 4280/7 (9-74) Pape 2 of 2 1) ITEM NO OR'�A' COST CAT. 2) DESCRIPTION '3) TOTAL 006T Dollars 4) nail + Iabor PLA(:E:.$:$ 5) X Work I PLACE (Col 4. 3) 6) Total Valne:ltaterial DeYiviet'ed ` NOT IN PLACE 7) 80i Va1ae NOT PLACE 8 otal SSS (Col Earned A) 9) - 2 Earned to Date'Includ. Undiittributed Marl '(Col 8=3) 6 18" VCP SEWER LF 6,270 6,270 100 0 0 6,270. 6,270 7 12" dip 45°2EA. 860 860 100 0 0 860 860 8 12" DIP LATERAL 5EA. 6,610 6,610 100 0 - 0 6,610 6,610 9 60" DROP MANHOLE 1 EA. 3,500 1,050 . 30 0 0 1,050 1,050 10 4x5 PRECAST UTILITY HT. 11,200 11,200 100 0 0 11,200 11,200 11 REMOVE A.C. S.F. 8,384 8,384 100 0 - 0 8,384 8,384 12 PCC SLURRY BACKFILL LF 4,247 4,247 100 0 0 4,247 4,247 13 6" AGO BASE TONS 3,045 ' 0 . 0 0 0 0 0 • . • 4a'4 ASPHALT REPAIR TONS - _ 22,269,66 .0 . k. 0 ttl 1 •q NERATOR TRAILER LS 29,670 0 0 0 0 0 0 16 EQUIP. MAINT. VEHICLE 4,320 0 0 0 0 0 0 • • TOTAL 210,308.87' PAID DUE 40,180.00 170,126.87 • .. t - a ' aF. � •..• '1 .t �' L C i t 3.•1F -! <i' /•3 t Y'. .i1G :N 'Yit'9t Y Yl $ ` ft.. .p: !! ';4# t1., • '.it . 3-_ 4 i i _ .7 ; yt, . 1.. ,.; CONSTRUCTION PftOGREVICHART I !NO NESTINV MO/TO IREV.1-601 Li P b AT Et . /715- 93 • '5 I uoutT•TO Tuft Ar•AOTAL TO COPITIT•C•00 11 0 I- T I Lc,tistQ.00florI PRINCIPAL CONTRACT FEATURE • I EMS - 2., Lj LOCATICAT ,TfIrMA4NA AvE, Foivr AN A L.- LINE ITEM DURATION ESTIMATED COST COATAACT twAi.•TION, OATT 0. vi .1. P AND 2g,) o 9 7' LIFT T7A 4-30 100 • Pig AY •PAAOTTO AT X - ICAMO. ACTUAL TE MS - 3, q TENS - 5, 7) • T EMS- 6 TEM- ro 'TEM- II ACKTO. ACTUAL Scheduled propels to date of rtport • Actual proven Scheduled Myna Prostne ISFENMAINIITYKAMOStill, o SCAT.0. ARLIAL •CLetO. ACTUAL SCAM. ACTUAL I t TEM- I2. AC.. O. ACTUAL I TEMS- 13, TEO- IS II SCO.O. ACTUAL ACTAtO ACTUAL 11153Bill *Cut ACTUAL I Ie 30 yr, 10 •. City of Fontana CALIFORNIA. August 10, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending August 6, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. PLEASE BE ADVISED, AS INDICATED ON REPORT #14 THERE ARE NO WORKING DAYS LEFT ON THIS CONTRACT. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350-7800 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper City of Fontana CALIFORNIA August 4, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending July 30, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. PLEASE BE ADVISED, AS INDICATED ON REPORT #13 YOU ARE 3 DAYS PAST THE CONSTRUCTION DATE OF COMPLETION WHICH WAS JULY 27, 1993. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division ' Le/C e e John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350-7800 SISTER CITY - KAMLOOPS, B.C. CANADA recycled paper City of Fontana CALIF ORNIA July 26, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending July 26, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. PLEASE BE ADVISED, AS INDICATED ON REPORT #12 THERE ARE ONLY 2 WORKING DAYS LEFT ON THIS CONTRACT. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350.7600 SISTEA CITY - KAMLOOPS, B.C. CANADA 1 i recycled paper • City of Fontana CALIFORNIA July 22, 1993 Mr. Merle R. Johnson Multi -Construction Company, Inc. 2440 N. Glassell Orange, CA. 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 SB-48-93 Request for Changes in Work Dear Sir: The City of Fontana acknowledges receipt of the five (5) memorandums, dated July 20, 1993 (copies attached) as they relate to the above referenced project. The following list of items must be formally submitted to the City of Fontana for this agency to process any requests for changes in work and/or requests for payments for extra work pursuant to Section 3 "Changes In Work" of the Standard Specifications for Public Works. 1. Labor 2. Materials 3. Tool and Equipment Rental 4. Other Items Once the City of Fontana has received all the above requested information, your requests will be acted upon as requested. If you have any further questions regarding this matter, please contact the undersigned at (909) 350 - 6644. Sincerely John R. Riley Associate Engineer/Special Projects attachments cc City Engineer Principal Civil Engineer/Special Projects Principal Civil Engineer/Capital Improvements Engineer Tech I (HF) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7800 SISTER CITY - KAMLOOPS, B.C. CANADA CA recycled paper City of Fontana CALIFORNIA July 19, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending July 16, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. PLEASE BE ADVISED, AS INDICATED ON REPORT #11 THERE ARE ONLY 7 WORKING DAYS LEFT ON THIS CONTRACT. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA I" 0 recycled paper City of Fontana CALIFORNIA July 12, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending July 9, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Gory J. Bucknell, P.E. Principal Civil Engineer/Special Projects GB:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA 4.0 recycled paper • City of Fontana LIFC AF ORNIA June 28, 1993 Mr. Albert Ramirez Multi -Construction Company, Inc. 2440 N. Glassell Orange, CA 92665 RE: Sewer Force. Main For Tamarind Avenue and Sewer Lift Station No. 8 SB 48-93 Compaction Failures Dear Sir: Please be advised that the City of Fontana is concerned with the amount of compaction failures that have occurred onthis project. Enclosed is written documentation from G.P.I., geotechnfcal engineer on the project, who have addressed the density failures to be approximately 40 percent of the tests taken on the backfill for the sewer lift station wet well. Also, the City is in receipt of the daily reports from G.P.I. dated June 17, 21, and 22 which indicate that the trench backfill for the sewer force main has also failed and will have to be retested. Please refer to contract documents Section 211, page SP-12 (specifically, Section 211- 2.2 "Field Density", pages SP-12 and SP-13, more specifically, the last sentence which states "Retest of areas which have failed compaction will be performed by the Engineer at the Contractor's expense". Your immediate attention is requested to correct any unacceptable field construction methods which cause these failures to occur. 8353 SIERRA AVENUE (P.O.' BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA 0 recycled paper Mr. Albert Rameriz June 28, 1993 Page Two If you have any further questions regarding these matters previously stated, please contact the undersigned at 909-250-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley .Associate Engineer/Special Projects JR: sh Enclosure cc: City Engineer Principal Engineer/Special Projects Principal Engineer/Capital Improvements Associate Engineer/Inspection Public Works Inspector (WB) 172. June 7, 1993 111 GEOTECHNICAL NI PROFESSIONALS INC. City of Fontana 8353 Sierra Avenue Fontana, California 92335 Attention: Mr. John Riley Subject: Fees for Geotechnical Services Tamarind Avenue Lift Station Empire Center Fontana, California GPI Project No. 1023.63C Dear Mr. Riley: I 0 1993 In accordance with your request, we have evaluated the time and fees expended to date, related to our services on the subject project. We concur with the concerns that progress of the backfill recently completed resulted in a higher level of effort than is typically required for this type of project. The backfill required two full weeks to complete, including some ten hour days. Since the excavations was small in plan dimension, full time presence was required (to test each lift). Based on estimated dimensions, the excavation backfill consisted of approximately 2500 yards of soil; therefore, backfill was placed at approximately 250 yards per day: Typical deep (25 feet) trench backfill is typically placed at rates well in excess of 1000 cubic yards per day. We expended approximately 110 hours observing and testing the backfill. A copy of the invoice for this project is attached. During the backfill, field density testing indicated inadequate compaction, resulting in reworking of the soil and retesting. A total.of 33 tests were taken in the backfill. Fourteen of these tests indicated inadequate density. This is a failure rate of approximately 40 percent. Typically rates of failing tests are less than 10 percent. Based on our experience, it is our opinion that backfill of this type of excavation should take one week or less. Manhole excavations, having similar depths, usually take one to two days to backfill. We believe this provides the information requested. If you have any questions, please call. Very iruiy yours, Geotechnical Professionals Inc. James E. Harris, G.E. Principal Attachment: Excerpt from GPI Invoice 33198 1023-63C.02L(6/93) 5736 Corporate Avenue • Cypress, CA 90630 • (714) 220-221 1 , FAX (714) 220-2122 Alexander Haagen Company c/o Arrowhead Development .GPI Invoice 33198 - Fontana Off -Sites June 4, 1993 GPI Prj 1023 1023.63 TAMARIND LIFT STATION SUMMARY OF SERVICES DURING THIS BILLING PERIOD: Services included observation and testing during subgrade preparation and excavation backfill. The project manager attended the pre -construction meeting. ITEMIZED CHARGES: Principal Engineer 9.5 hrs @ $113/hr $ 1,073.50 Senior Technician 102.0 hrs @ $62/hr 6,324.00 Technician 19.0 hrs @ $50/hr 950.00. Clerical 1.5 hrs @' $41/hr 61.50 Expenses: Field Vehicle Mileage 121.0 hrs @ $7/hr 112 miles .@ $.35/mi .847.00 39.20. TASK .63 TOTAL $ 9,295.20 INVOICE TOTAL $13,577.20 SUBMITTED BY: James E. Harris, G. Principal Page 3 of 3 Pages • City of Fontana CALIFORNIA June 25, 1993 Mr. Albert Ramirez Multi -Construction Company, Inc. 2440 N. Glassell Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 SB 48-93 Progress Payment No. 2 Dear Sir: Please be advised that -Progress Payment No. 2 cannot be processed for payment for the following listed reasons: 1. Item No.'s listed on progress payment do not agree with the bid line items. Progress payments must reflect only those line items by number that correspond to the contract document. 2. The "Backfill and Compaction" line item is being billed at 95% complete. This does not agree with field investigation and inspector's review as only being 75% complete. 3. The line item "12" DIP FORCE MAIN L.F." is being billed at 75% complete as of June 23, 1993. Per inspection reports and field investigation "by stationing" only 50% of this line item has been installed. Also, in reviewing the compaction, reports for trench backfill, all test indicated that the 95% compaction is not being met. 4 A Revised Construction Schedule was not submitted with your Progress Payment No. 2. Please furnish said revised schedule with each request for payment so as to not hold up the processing procedures through the City system. 5. The labor classification must be noted on all certified payroll documents as previously requested with Progress Payment No. 1. 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA 1,1�0 recycled paper V' Mr. Albert Ramirez June .25, 1993 Page Two 6. Line item "PCC Slurry Backfill" is being billed at $4270.00 as 100% complete. Contract Document line item No. 12 reflects 280 L.F. at $15.17/LF for total amount of $4247.00. No contract change order has been approved for this increase in costs. Please revise billing amount to reflect bid amount. 7. Line item "Construct Sewer Lift Station No. 8, Complete" is a lump sum billing and must be reflected in your progress payment as such. You may list sub -items (not numbered) under main line item, but they must equal total lump sum amount. Please change your Progress Payment No. 2 to reflect this discrepancy. Your immediate response to the above mentioned concerns will be appreciated and enable the City to process .your requests more efficiently. If you have any further questions regarding the above listed concerns, please contact the. undersigned at 909-250-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Join ley Associate Engineer/Special Projects JR:sh Enclosure cc: City Engineer Principal Engineer/Special Projects Principal Engineer/Capital Improvements ✓ Account Technician/Engineering MPLETE ?AYMENT REQUEST BREAKDOWN FOR PARTIAL PAYMENT REQUESTS MCASET 4280/7 (Rev 9-74) ' MULTI CONST. CO. P.O. BOX 2665 ORANGE,CALIF. 92669 SCPMIT DRAFT TO CONTRACT` INSPECTOR THEN 2 TYPED OR PRINTED COPIES WITH INVOICE PAYMENT ESTIMATE NO. 02 CONTRACT NO. cg_ijt_g3 CONTRACTOR FIRM NAME MULTI' CONST. CO. & RAMIREZ FOR WORK COMPLETE AS OF 6-23-93 (Date) • This breakdown is to be used as a back-up sheet for payment requests. The Contractor's field superintendent is to check a rough breakdown wit;, the Navy Inspector prior to submitting.a payment request. With the typed payment request, two typed or printed copies of this break - town are required. IMPORTANT NOTE: Insert ONLY EXECUTED (SIGNED) Change Orders. For MCON (Military Construction Program) Contracts, the line item of the change must be shown. COPY Columns 1 through 3 from your approved Schedule of Prices. Copy all items EACH TIME. 1) ITEM NO OR COST CAT. 2) DESCRIPTION 3) TOTAL COST in Dollars. 4) Natl. + Labok IN PLACE. $$$ 5) 2 Work IN PLACE (Col 4 4- 3) 6) Total Value Material Delivered NOT IN PLACE 7) 807 Value Matl Deliv NOT IN PLACE 8) Total $$$ Earned (Col 4 + 7) 9) I Earned To Date.Includ. Undistributed Matl (Col 8--3) 1 CLEARING & GRUBBING LS 2,000 2,000 100 0 0 2,000 2,000 2 CONC. SEWER LIFT STA. 6,800 • 6,800 100 0 0 6,800 6,800 3 EXCAVATION 13,643 13,643 •100 0 0 13,643 13,643 4 BACKFILL & COMPACTION 19,357 18,389.15 ,W /7_ 0 0 18,389.15 18,389.15 5 ELECTRICAL • 11,000 2,200 20 0 0 2,200 2,200. 6 PUMPS 67,092 0 0 0 0 0 0 7 BLOCK BLDG. 2,000 0 0 0 0 0 0 8 SITE CONC. 4,500 0 0 0 0 0 0 9 60" METER MANHOLE LS 4,500 I/ 0 0 0 0 0 0 10 POTHOLE UTILITIES 4 EA. 680 V 680 100 0 0 680 680 11 12" DIP FORCE MAIN LF 55,150 V 41,362.50 75 i/) 0 0 41,362.50 41,362.50 12 18" VCP SEWER LF 6,27Q ✓ 0 0 0 0 0 0 VENDOR # P.O. / O.R. # PARTIAL AMT. $ ACCT. # • APPRO IE copy INVOIC PAYMENT REQUEST BREAKDOWN FOR PARTIAL PAYMENT REOIIESTS (continued) MCASET 4280/7 (9-74) Page 2 of 2 1) ITEM NOValue OR COST CAT. 2)• DESCRIPTION 3) TOTAL COST in Dollars 4) Matl + Labor IN PLACE $$$ 5) 7 WorkDate IN PLACE (Col 4 = 3) 6) Total Material Delivered NOT IN PLACE 7) 807 Value Matl Deliv NOT IN PLACE 8) Total$S$ Earned (Col 4 4. 6) 9) % Earned to Includ. Undistributed Matl (Col 8::'-3) 13 12" DIP 45° 2EA. 860 17 860 100 0 0 860 860 14 12" DIP LATERAL 5 EA. 6,610 N/ 6,610 100 0 0 6,610 6,610 15 60" DROP MANHOLE 1 EA. 3.500 '/ 0 0 0 0 0 0 16 5 EA. 4X5 PRECAST. UTILITY VAULT 11,200 ✓ 11,200 100 0 0 11,200 11;200 17 REMOVE A.C. S.F. 8,384 ✓ 8,384 100 0 0 8,384 8,384 18 PCC SLURRY BACKFILL LF y24/7 -4- 70 , 4,270 100 0 0 4,270 4,270 19 . 6" AGG. BASE TONS 3,045 L- 0 0 0 0 0 .0 20 4".ASPHALT REPAIR TONS 22,269.66v' 0 0 0 0 0 0 21 GENERATOR TRAILER LS 29,670• ✓ 0 0 0 0 0 0 22 EQUIP. MAINT. VEHICLE LE 4,320 V/ 0 0 0 0 0 0 TOTAL 116,398.65 PAID DUE 40,180.00 76,218 65 • City of Fontana CALIFORNIA June 21, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending June 18, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Jo'v'iley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. 80X 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350.7600 SISTER CITY- KAMLOOPS, B.C. CANADA CO recycled paper • City of Fontana CALIF ORNIA June 14, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind'Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending June 11, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Jo ' iley1 Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA , CALIFORNIA 92334.0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA i, recycled paper City of Fontana CALIFORNIA June 7, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending June 4, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA t., recycled paper City of Fontana CALIFORNIA June 1, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending May 28, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA it recycled paper City of Fontana CALIFORNIA May 26, 1993 Albert Ramirez Multi -Construction 2440 N. Glassell Avenue Orange, CA 92665 RE: Tamarind Avenue Force Main and Sewer Lift Station No. 8 SB 48-93 Shop Drawing Acceptance Dear Mr. Ramirez: Attached for your records are copies of the shop drawings submitted to the City of Fontana for review and acceptance. The following submittals have been reviewed by the undersigned: 1. 80 KW trailer mounted diesel generator set 2. Pipe and fittings 3. A. Flat top base for wet well B. Additional manhole sheets 4. Beard electric submittal #1, May 24, 1993, BE-2646 If you have any questions regarding this subject, please contact the undersigned at 909-350-6641. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Felipe Molinos, P.E. Principal Engineer/Capital Improvements FM: sh cc: Associate Engineer/Special Projects (JR) Public Works Inspector (WB) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER'CITY — KAMLOOPS, B.C. CANADA to recycled paper City of Fontana CALIF ORNIA May 24, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending May 21, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division 1,-)^"/\ John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518). • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY — KAMLOOPS, B.C. CANADA CoCrecycled paper City of Fontana CALIF ORNIA May 17, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending May 14, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by ' you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John ley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA. CALIFORNIA 92334-0518 s (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA 0 recycled paper CITY OF FONTANA CALIFORNIA MEMORANDUM: TO: ALBERT RAMIREZ MULTI -CONSTRUCTION FROM: JOHN RILEYc4 ASSOCIATE ENGINEER/SPECIAL PROJECTS DATE: MAY 14, 1993 SUBJECT: TAMARIND AVENUE FORCE MAIN AND SEWER LIFT STATION NO. 8 SHOP DRAWING ACCEPTANCE ****************************************************************** Attached for your records are copies of the shop drawings submitted to the City of Fontana for review and acceptance. The following has. been reviewed by the City Principal. Engineer/Capital Improvements and are listed as follows: 1. Submittal of 4' X 5' Vault 2. Submittal of 4' X 6'-6" Vault 3. Pipe and Fittings If you have any further questions regarding this subject please contact me at (909) 350-6646. CO Principal Engineer/Capital Improvements Public Works Inspector (WB) City of Fontana CALIFORNIA May 10, 1993 Mr. Albert Ramirez Multi Construction Company 2440 N. Glassell Avenue Orange, CA 92665 RE: Sewer Force Main For Tamarind Avenue and Sewer Lift Station No. 8 Weekly Statement of Working Days Dear Mr. Ramirez: Enclosed for your review is the weekly statement of working days for week ending May 7, 1993. You will be allowed fifteen (15) days in which to protest in writing the correctness of the statements; otherwise the statements shall be deemed to have been accepted by you as correct. Please contact John Tesley at (909) 350-6642 or the undersigned, at (909) 350- 6644, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Riley Associate Engineer/Special Projects JR:JT:jt 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 • (714) 350.7600 SISTER CITY - KAMLOOPS, B.C. CANADA R. i recycled paper • City of Fontana CALIFORNIA FAX COMMUNICATIONS FROM FAX NUMBER (909) 350-6618 PLEASE DELIVER THE FOLLOWING PAGES TO: Company: Name: Fax Number: From: Phone Number:(' 0 ) S®- 6Pg Total Number of Pages: Z Date: 5103 Time: (including cover sheet)?, X J p — f 6- Message: fL;135r /7- %; -r /e 7/1 ZS) 3 - 3 6 Phone Number:04) ,3 - FeU PE P- f P,, ZL EZn o, S' fritit4 G 47� Re-co/WV " 1722Ats . cc: **********•*••*• •*••••••••••*•••••••••••••••*••••••••••*••••••• FAX CHARGE IS: $3.00 1 ` PAGE (EXCLUDING COVER SHEET) $1.50 THEREAFTER. PLEASE MAKE CHECK PAYABL 0 THE CITY OF FONTANA IN THE AMOUNT OF $ PLEASE MAIL TO: CITY OF FONTANA, -.O. BOX 518, FONTANA, CA 92334 FROM: Name any/Firm Address -hone No. NOTE: Please return this cover sheet with Payment ccount No. 010-0316-2300) 8353 SIERRA AVENUE (P.O.' BOX 518) • FONTANA. CALIFORNIA 92334-051 = (714) 350.7600 SISTER CITY - KAMLOOPS, B.C. CANADA R-rrvclee paper From : ALCASA CONSTRUCTION PHONE No. : 818 9126221 • May.05 1993 6:06PM P01 ALCASA CONS UCTION COMPANY 2322 unnosa Drive • ttowlhnd Height, CA. 91748 818 912-6221 Fax: 818 D12-6221 Pagers 818 2/Z /6?? I�AX mmoRANDUM Date: c '- c `� /` _. To: •r ' ._ AttentiOri: Fax NO.: Re: From: Comments: • Number of pages sent with this transmission a • tinc1udet cover ' sheet) If this transmission is incomplete, please call. From : ALCASA CONSTRUCTION PHONE No. : '919 9126221 May.05 1993 6:07PM P02 oft.4" CORE \-\101-fS w ElbeCEk. E '/ 4 L C S A N h t Ji f S "r E E 1_ TaG1. ei Tc . bf*/tw c)`l sJ6-/g3 • RECORD OF TELEPHONoCONVERSAiIOH CITY OF FONTANA Job No. By 1Z Project ��i t...a[%P 2 93 -C c� c244- y �� G y • Individual //�n/�/z— Organization / 1 a/ — 4,44d—isr-) Phone No. Date Items Discussed _ /f c74�liw ,( G/1/ G� -- C61,_ Age,,e7 )4,p /6 Comments or Action Required DSI-Pfl06 2 !gel • RECORD OF TELEPHONWOHVERSATIQ`N CITY OF FONTANA Date Individual Organization 4-I 1/ie� r/7�G! 4a/7` 1- C_ p� Lf 5'7 b/G 7`f d-�t Job No. By „/ Z-/ety- PrdIect /���jy!/jQ�/'/4/ ` 1 e_ �", No . v' Phone No. 7/4 —J t3 Items Discussed -14 '14 �� `�G(' �i Z -1 /CGS 4.. f Gam/ J oe///e�/pG, • /teferzec %� !mac `�2 �f !� f "(� tv.5? 77f J1 y� cs5-,0v6,(fr Comments or Action Required BSI-Pfl06 „S CITY OF FONTNV/k COMMUNITY DEYECOPMENT DEPARTMENT 8353 Sierra Avenue Fontana, CA 92335 TO: Mdi,fi- biblalID I W 41PETTER OF TRANSMITTAL File: c//a/ Pi %bgAk fOIfr 1AI1A4INO AI}E• Date: •t Or RE: EMENE�cr3 lattlATlotA IPX\ 4) 11: 6ft. , 004.0,)(A qi/fd,o4 ATTN:Q•oetiozi M• disio*I Gentlemen: We are sending you: (Attached I_I Under separate cover via the following item: I_I Drawings I_I Prints I_I Plans I_I Samples I_I Specifications I_I Copy of Letter I I Change Order I_I Check Print(s) ISStudies Other: iI"l(G 0,d(rj 1042Mkllo� 61 COPIES I DATE I NO. I DESCRIPTION I I 1 ur e: For your information/records I For approval I I Approved as submitted 4-4or your use I 1 Approved as noted ( As requested I I Returned for corrections I For review & comment I I Other I For bid due: , 19 I Prints returned after loaned to: , Re�.markIDs• f.J(4QED IS' dr-DAV gHWl il� ''ATIOJ 6 co y0i) .- LD1i Please: 1 I Submit original I I Resubmit copies for approval. 1 I Submit copies for distribution 1 I Return corrected prints I I Other Copy to: (1(,C Signed: Title: ("9 • City of Fontana CALIFORNIA April 14, 1993 Mr. Albert Rameriz Multi -Construction 2440 No. Glasse11 Orange, CA . 92665 RE: Tamarind Avenue Sewer Force Main and Lift Station No. 8 Dear Mr. Rameriz: This letter is to document that on April 13, 1993, the contract documents were returned to Multi -Construction to correct the insurance certificates as required by the City of Fontana's Risk Manager. Your immediate response to correct this matter is greatly appreciated. Also, please find enclosed a copy of the traffic control requirements for this project. Along with the memorandum dated April 12, 1993, from the City Traffic Engineer, I have enclosed the cover sheet and price sheet for the Manual of Traffic Controls for Construction and Maintenance of Work Zones dated 1990. It is suggested that a copy of this manual be on hand at the job site while construction is underway. If you have any further questions, please contact the undersigned at 909-350-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division John Associate Engineer/Special Projects JR: sh Enclosures cc: City Engineer City Traffic Engineer Principal Civil Engineer/Special Projects / Principal Civil Engineer/Capital Improvements ✓ Public Works Inspector (WB) Engineering Tech II/Traffic (AB) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA CO recycled paper CITY OF FONTANA CALIFORNIA MEMORANDUM TO: JOHN RILEY ASSOCIATE ENGINEER FROM: CLYDE E. SWEET, JR., P.E.5ef —d DEPUTY CITY ENGINEER/CITY TRAF IC ENGINEER SUBJECT: TAMARIND AVENUE SEWER FORCE MAIN, TRAFFIC CONTROL DATE: APRIL 12, 1993 The Traffic Control, signs and traffic control devices for the above mentioned project shall conform to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones, latest edition. A full Traffic Control Plan for this project is not required at this time. The following is a list of Traffic Control requirements forthis project: 1. Tamarind Avenue and the intersection of Santa Ana and Tamarind Avenues shall remain open to normal flow of traffic with one 12' travel lane for each direction of traffic during non working hours. 2. A qualified flagman shall be in place at all times during any lane closures. Notification shall be given to the emergency service agencies -- Police Department, Fire Department, Ambulance Company, Com Center, Colton School District and the affected property owners. 4. There can be no other construction or traffic control which conflict with this traffic control. 5. The contractor shall adhere to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones, latest edition. 6. A minimum 12' lane shall be maintained at all times during construction. 7. If there should be any change in the construction that might affect the flow of traffic the contractor shall notify the City Engineering Inspector immediately. cc: City Engineer Principal Engineer, F.M. Engineering Tech II, A.B. State Of California Business, Transportation'And Housing Agency Department Of Transportation MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES 1990 GEORGE DEUKMEJIAN Governor ROBERT K. BEST Director Department of Transportation J. F. MALONEY Chief Deputy Director Highway Maintenance and Traffic Operations C. D. BARTELL Chief Division of Traffic Operations FRED JAGER Editor Office of Signs & Delineation MANUAL OF TRAFFIC CONTROLS For Construction And Maintenance — Work Zones State of California Business, Transportation And Housing Agency Department of Transportation — 1990 — Republished, with Permission, by BNI Books, Division of Building News, Inc., 3055 Overland Avenue, Los Angeles, California 90034 — (213) 202-7775 For Sale At Building News, Inc., Bookstore At Above Location; Or Send Prepaid Mail Orders To Building News, Inc., P.O. Box 3031, Terminal Annex, Los Angeles, California 90051. COSTS 1 to 9 copies, each $5.75 10 to 49 copies, each 5.25 50 to 99 copies, each 4.75 100 to 199 copies, each 4.25 200 or more copies, each 4.00 Large Quantity Prices On Application For Mail Orders: Add 61/2% sales tax to California destinations - 63/4 to L.A. County desti- nations, plus shipping charges of 75¢ for the first booklet and 154 for every booklet over one. NOTES: CITY OF FONT COMMUNITY DEYEL. ENT DEPARTMENT 8353 Sierra Avenue Fontana, CA 92335 To: Md141 C01•ITMVOl Gentlemen: We are sending your the following item: _ETTER OF TRANSMITTAL File: M Aa i t D 1 O P.E. 1v i t,1 l-I 57A,Tl 01- Date: A-11, - RE: f�bPi ���1"`��(c, lb 4 OF �IaC.TO � fbcJ 6111 .(161-\o5cJ Attached I_1 Under separate cover via 1_1 Drawings 1Prints 1_1 Plans I_I Samples 1_1 Copy of Letter 1_1 Change Order 1_1 Check Print(s) I_I'Studies I_1 Other: ( I_I Specifications • CO4IES DATE I NO. I 1221b I I DESCRIPTION hA(Kt Ro- Alaeiµo MsaC vJE(z L-.'PT $1 i I c44 M0 • S 1 1 Purpose: I I For your information/records I I For approval 1 1 Approved as submitted 1v(For your use 1 1 Approved as noted I 1 As requested 1 1 Returned for corrections I I For review & comment 1 I Other I 1 For bid due: , 19 I Prints returned after loaned to: Remarks: lL IU I4 % Chi `I UN _10 (lo ID 1 Aart Please: 1 1 Submit original I I Resubmit copies for approval. I I Submit copies for distribution 1 1 Return corrected prints 1 1 Other £P' ITS ULU1-U/ 'E-MtT L�0 TO 0 Copy to: elu Signed: Title: • City of Fontana CALIFORNIA FAX COMMUNICATIONS FROM FAX NUMBER (909) 350-6618 PLEASE DELIVER THE FOLLOWING PAGES TO: Company: rn z 779 G,om s i ucp'c % A-L 3&72i RA-N /2E - t9/2 / S 2LE vI/Nsa,V / , m •ti(,4-�37- s87/ n4 Fax Number Z c§' 3_ 3 8 6 Phone Number('4) 2 3 7,4 ig /2; t) t s 412.;;E " 7, _27 a Fe LipLa'• 04-/,fro . From: Phone Number(00 3 50--6641 Total Number of Pages: O/V Date: ¢I13/73T e: /3/, (including cover sheet) Message: G A-L.L. U/L!v 1l7 L it - Yoe,.) fl6 r /4r T//E .T"�l s /7 ''/ ` 4i&ems" P/I-r 7:00 /)./1 J9A( SOL Ls IL"', , 20,0i %u M /v 4E/2r cr 72 GE2?7 Z A "s / Se'/ c d& r2¢ " r, c r.s' chi T 7/67-7 *************************************************************** FAX CHARGE IS: $ '0 1ST PAGE (EXCLUDING COVER SHEET) $1.50 THEREAFTER. S-Arl______" PLEASE MAKE CHECK PA :LE TO THE CITY OF FONTANA IN THE AMOUNT OF $ gr'lei' 14 Ai 1111o7C PLEASE MAIL TO: CITY OF FONTA FROM: 4 Name , P.O. BOX 518, FONTANA, CA 92334 Co • any/Firm Address NOTE: Please return this cover sheet with Payment one No. (Ac . nt No. 010-0316-2300) 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA CALIFORNIA 92334.0518 SISTER CITY — KAMLOOPS, B.C. CANADA `, recycled paper • (714) 350-7600 CITY OF FONT COMMAIITY DEVE ENT DEPARTMENT 8353 Sierra Avenue Fontana, CA 92335 TO: MJ 1,11 (O05Tf Chi tRi O Lid , cA -)2320 ATTN: Av 01 Oa/fuLe dtAJS04 Gentlemen: We are sending you: Ittached 1_1 Under separate cover via the following item: *ETTER OF TRANSMITTAL Fi 1 e: fOU AIL Ply, Tr1Qe414 Date: 41.V5 RE: 1_1 Drawings 1Prints 1_I Plans 1_1 Samples 1_1 Specifications 1_1 Copy of Letter 1_1 Change Order 1_1 Check Print(s) I_I'Studies I_I Other: COIEL I DATE NO. I DESCRIPTION /1/LI 1� 1rOR.CE Nll����A�I�'�AMA��1� s�1�r.1 1 Purpose: I I For your information/records 1 I For approval 1 I Approved as submitted k,eFor your use 1 I Approved as noted I I As requested 1 I Returned for corrections 1 1 For review & comment 1 1 Other I I For bid due: , 19_ I I Prints returned after loaned to: Please: I I Submit original I 1 Resubmit copies for approval. 1 1 Submit copies for distribution I 1 Return corrected prints Other R marks: ILLO%0 4 5e POC qi ADl&Ut -15 Copy to: 'Fill Signed: Title: (90J 39) -�64Z City of Fontana CALIFORNIA March 17, 1993 Multi Construction, Inc. 2440 N. Glassell Avenue Orange, CA 92665 RE: Tamarind Avenue Lift Station No. 8 and Force Main (Contract Documents) Gentlemen: On March 16, 1993, the City Council of the City of Fontana approved the contract award to Multi Construction, Inc. for the above referenced project. Enclosed you will find three (3) original contract documents that must be executed and returned to the City of Fontana prior to issuing the notice to proceed. As you are aware, this contract is on a very tight construction time frame. Your expedient response to return all required documents is requested. A pre -construction meeting will be scheduled soon to go over the project in detail. You will be notified as to the date, time and location of this upcoming meeting. As you are aware, the City of Fontana is in the process of obtaining a temporary construction easement for this project from the property owner adjacent to the lift station site. This easement will be executed prior to the notice to proceed; however, as part of this easement negotiation the property owner Terminal Freight Handling Company, a Delaware Corporation, Sears Logistics Services (SLS) 225 Windsor Drive, Itasca, Illinois 60143-1223, is requiring that they be added as additional insured to all insurance policies as they pertain to this contract. Therefore, please have your insurance provider include the above referenced parties as additional insured pursuant to Section 7-3.1 and 7-3.2 of the contact documents. 8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600 SISTER CITY - KAMLOOPS, B.C. CANADA CO recycled paper Multi Construction March 17, 1993 Page Two If you have any questions regarding this matter or the contact in general, please call the undersigned at 909-350-6644. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division T - �! John Ri e Associate Engineer/Special Projects Ends. cc: City Engineer Principal Engineer/Capital Improvements