HomeMy WebLinkAbout0850-72_Highland Haven Development Sewer Project - RDA_5.5CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM NO. 3
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. On all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
• •
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM NO. 3
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. On all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
• •
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM N0. 3
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. On all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
• •
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM N0. 3
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. 0n all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
• •
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM N0. 3
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. On all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
• •
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 17, 1992
ADDENDUM NO. 1
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
A. PROPOSAL BID SHEET
Please replace Proposal Bid Sheet No. P-13 with new Bid Sheet No.
P-13.
Item 29. Raise Manholes to Grade has been added.
B. TECHNICAL PROVISION SHEET TP-7
Please change last paragraph on Sheet TP-7 to read "The concrete
for surface improvements shall be Class 520-C-2500 while that for
inlet structures and junction structures shall be Class 560-C-3250
and while that for box culverts shall be Class 650-C-4000.
C. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
Please change SP-1 to read "Except as specified below, the
Standard Specification for Public Works Construction (SSPWC) 1991
Edition as amended, commonly referred to as "The Green Book", will
apply to and control this work".
a •
Item Estimated Unit of Unit
No. Description Quantity Quantity Price Total
14. 54" DIAMETER R.C.P. (1350-D) 395 L.F. $ $
15. 48" DIAMETER R.C.P. (1350-D) 890 L.F. $ $
16. 42" DIAMETER R.C.P. (1350-D) 400 L.F. $ $
17. 36" DIAMETER R.C.P. (1350-D) 395 L.F. $ $
18. 30" DIAMETER R.C.P. (1350-D) 475 L.F. $ $
19. 24" DIAMETER R.C.P. (1350-D) 295 L.F. $ $
20. 18" DIAMETER R.C.P. (1350-D) 90 L.F. $ $
21. STORM DRAIN MANHOLE NO. 1 MOD. 1 EA $ $
22. STORM DRAIN MANHOLE NO. 4 6 EA $ $
23. STORM DRAIN JUNCTION STRUCTURE 2
NO. 2
24. STORM DRAIN JUNCTION STRUCTURE 2
NO. 4
EA $ $
EA $ $
25. STORM DRAIN TRANSITION 5 EA $ $
STRUCTURE NO. 3
26. BULKHEADS
27. BARRICADES
28. TRAFFIC CONTROLS
29. RAISE MANHOLES TO GRADE
Total Amount in Words
17
2
1
43
EA $ $
EA $ $
L.S. $ $
EA $ $
TOTAL
For Items 1 thru 29
NOTE: The estimated quantities listed in the Proposal Bid Sheet(s) are
supplied to give an indication of the general scope of work, but the
accuracy of these figures is not guaranteed and the bidder shall make
his own estimates from the drawings. In case of a variation between
the unit price and the totals shown by the bidder, the unit price will
be considered to be the bid.
BIDDER'S NAME
TELEPHONE NUMBER
FAX NUMBER
P-13
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 21, 1992
ADDENDUM NO. 2
TO: HOLDERS OF PLANS AND SPECIFICATIONS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3348 HIGHLAND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
A. NOTICE INVITING SEALED BIDS
Please change the bid opening date in the first paragraph from
29th day of April to 7th day of May, 1992.
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334.0518 .• (714) 350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA.
i
FAX
COMMUNICATIONS
FROM FAX N0. [714] 3 5 0 - 6613
PLEASE DELIVER THE FOLLOWING PAGES TO:
NAME: t\&rolA. Pr41
LOCATION: 5Lther
FAX NUMBER: VL2.. r1 4 t7
FROM: ,ZGc,(l
PHONE: S 2.9.—b Oc
% er�rl
LOCATION: ,1, l o'P Fr►,Ja+1,4L.
ACCOUNT N0. PHONE: 3 0—d 547
TOTAL NUMBER OF PAGES: 7— DATE: 5V5 TIME: 2S11-5
(including cover sheet)
MESSAGE: A++&LcL i 5 A 14e j Lon MO • 3
CITY or
CAL IFOR NIA
1
1;) r iyC�ti l-Ltveii
O
N
T
A
N
A
CC:
FAX CHARGE IS: $3.00 1ST PAVE (EXCLIJLi 1G COVER SHE() 1 5u-iHEaEA l'Ei .
PLEASE MAKE CHECK PAYABLE TO CITY OF FONTANA IN THE AMOUNT OF $
AND MAIL TO: CITY OF FONTANA, P.O.BOX 518, FONTANA, CA. 92334
FROM:
name company / firm
address phone no.
NOTE: PLEASE RETURN THIS COVER SHEET WITH PAYMENT
(ACC.N0.010-0316-2100)
JAN. 1992 SKY--
• •
City of Fontana
CALIFORNIA
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 29, 1992
ADDENDUM NO. 3
TO: HOLDERS OF PLANS AND SPECIFWAII0NS FOR THE INFRASTRUCTURE
CONSTRUCTION OF TRACT NO. 3/48 NTIOND HAVEN CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY SEWER AND STORM DRAIN IMPROVEMENTS
LOCATION: CITY OF FONTANA, COUNTY OF SAN BERNARDINO
NOTICE TO BIDDERS: It is intended that all work affected by the
following provisions shall conform to the original specifications and
be incorporated as a part of the contract documents. Bidders shall
assure themselves that all changes have been incorporated in their
proposal.
I. STORM DRAIN IMPROVEMENT PLANS - DRAWING NUMBER 2106
A. STORM DRAIN TRENCHING DETAIL - SHEET 1 of 9
Change maximum size of selected native material in bedding
zone (per referenced Detail "A") per the following (for storm
drain only):
Bedding material in bedding zone for storm drain pipe shall
contain no rocks/stones larger than 4 inches in greatest
dimension.
B. On all applicable sheets change from 30" R.C.P. (1400-D) to
30" R.C.P. (1350-D)
C. On Sheet 3 of 9 change in profile to read from 33.13 L.F. of
54" R.C.P. (1000-D) to 33.13 L.F. of 54" R.C.P. (1350-D).
II. Min. S.E. = 30 requirement for backfill material 12" above pipe is
changed to min. S.E. = 20. This applies to all sets of plans and
specifications.
8353 SIERRA AVENUE (P.O. BOX 518) • FONTANA, CALIFORNIA 92334-0518 • (714) 350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
CITY OF FONTANA
POST OFFICE BOX 518
FONTANA, CA 92334-0518
P 330 855 030
I%.! r,r p1:.,r:rf • i,— "-.�:. _�%DA
A
Ken Thomyn
2250 WLowe11 Street
Ria, CA 92377
_�,� _ ✓ �i !i S a�OSIAGE is
602194e
:11'lin-Ili 11,1 -til :„� 1,11
Is your RETURN ADDRESS
completed on the reverse side?
Thank you for using
Return Receipt Service.
•
FAX
COMMUNICATIONS
FROM FAX NO. [714] 3 5 0 - 6613
PLEASE DELIVER THE FOLLOWING PAGES TO:
NAME:
LOCATION: Kew, owe So.� I N L
FAX NUMBER: ht4)� -14-5 1, PHONE:
FROM: Z-7/1-0ezT40.1
LOCATION: (ti)[)
ACCOUNT NO.
PHONE:
CITY op
CAL IFOR NIA
1
TOTAL NUMBER OF PAGES: 2- DATE: q4/q2-. TIME: - , 2° i m
(including cover sheet)
MESSAGE: "11% 5 , 5 A cdd.e ktd t /Jo 3
0
N
T
A
N
A
FAX CHARGE IS: $3
PLEASE MAKE CHECK
AND MAIL TO:
CC:
.00 1ST PAGE (EXCLUIridG COVER SHEEI") 1 u"i IE EAF i'ER.
PAYABLE TO CITY OF FONTANA IN THE AMOUNT OF $
CITY OF FONTANA, P.O.BOX 518, FONTANA, CA. 92334
FROM:
name
company / firm
address
phone no.
NOTE: PLEASE RETURN THIS COVER SHEET WITH PAYMENT
(ACC.N0.010-0316-2100)
JAN. 1992 SKY--
CITY OF FONTANA
FONTANA REDEVELOPMENT AGENCY
NOTICE INVITING SEALED BIDS
FOR
INFRASTRUCTURE CONSTRUCTION OF
TRACT NO. 3348 - HIGHLAND HAVEN
CONSTRUCTION PHASE I
FONTANA REDEVELOPMENT AGENCY PROJECT
PUBLIC NOTICE IS HEREBY GIVEN that the Fontana Redevelopment Agency,
as AGENCY, invites sealed bids for the above stated project and will
receive such bids in the offices of the City Clerk at 8353 Sierra Avenue,
Fontana, California 92335 up to the hour of 2:00 P.M. on the 7th day of
May, 1992, at which time they will be publicly opened and read aloud.
The work of improvements shall consist of, but is not limited to,
furnishing of all materials, tools, labor, testing and incidentals as
required for the construction and installation for the above -stated project
per the plans, specifications and the contract documents. The general
items of work to be done hereunder consist of, but are not limited to: The
installation of gravity sewer mains and appurtenances including manholes,
laterals and encasement structures; installation of storm drain facilities
and appurtenances including pipes, manholes, junction structures,
transition structures and bulkheads; and pavement removal, trench repair
and pavement replacement.
Copies of Plans, Specifications, and Contract Documents are available
from the Engineering Division of the Community Development Department of
the City of Fontana, 8353 Sierra Avenue, Fontana, CA 92335 upon payment
of a Thirty-five dollars ($35.00) non-refundable fee ($40.00) if mailed.
A payment bond and a performance bond, each in an amount equal to 100%
of the total contract amount, shall be required concurrently with the
execution of the contract and shall be in the form set forth in the
contract documents..
Any contract entered into pursuant to this notice will incorporate the
provisions of the State Labor Code. Labor Code Section 1735 requires that
no discrimination be made in the employment of persons upon public works
because of the race, religious creed, color national origin, ancestry,
physical handicap, medical condition, marital status, or sex of such
person, except as provided in Government code Section 12940. Compliance
with the prevailing rates of wages and apprenticeship employment standards
established by the State Director of Industrial Relations will be required.
Affirmative action to ensure against discrimination in employment practices
on the basis of race, color, national origin, ancestry, sex, or religion
will also be required.
• •
The AGENCY hereby affirmatively ensures that minority business
enterprises will be afforded full opportunity to submit bids in response to
this notice and will not be discriminated against on the basis of race,
color, national origin, ancestry, sex, or religion in any consideration
leading to the award of contract.
The contract documents call for monthly progress payments based upon
the engineer's estimate of the percentage of work completed. The Agency
will retain 10 percent of each progress payment as security for completion
of the balance of the work. At the request and expense of the successful
bidder, the Agency will pay the amounts so retained upon compliance with
the requirements of Public Contract Code Section 22300 and the provisions
of the contract documents pertaining to Substitution of Securities.
Bids must be prepared on the approved proposal forms in conformance
with the Instructions to Bidders and submitted in a sealed envelope plainly
marked on the outside "SEALED BIDS FOR INFRASTRUCTURE CONSTRUCTION OF TRACT
NO. 3348 - HIGHLAND HAVEN, CONSTRUCTION PHASE'I, FONTANA REDEVELOPMENT
AGENCY PROJECT. DO NOT OPEN WITH REGULAR MAIL."
The AGENCY reserves the right to reject any or all bids, to waive any
irregularity, to accept any bid or portion thereof, and to take all bids
under advisement for a period of ninety-five (95) days.
At the time of contract award, the prime contractor shall possess a
Class "A" contractor's license and/or any combination of Class "C"
specialty contractors license(s) sufficient to perform the work.
BY ORDER OF the City Council of the Fontana Redevelopment Agency.
Dated this 31st day of March, 1992.
By Kathy Montoya
Agency Secretary
City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
(714) 350-7610
Note to Press: Publish twice - April 23, 1992 and April 30, 1992
Send proof of publication to: Fontana Redevelopment Agency
c/o Maggie Pacheco
8353 Sierra Avenue
Fontana, CA 92335