Loading...
HomeMy WebLinkAbout0850-72_Highland Haven Development Sewer Project - RDA_1.1FIRM: \.• APR 28 '92 15:24 JF DAVIDSON ASSOC MeMEW iikomitema. Mir astar Now am. WNW. Immo Emig"' moor Mom, - blow MOW NNW Mimr ' gime Emir OM. Moir Mgr Mir =Mr _mar dims•r Maws" moor ...wiffor WORK ORDER #: DATE: 4/112. ? FROM: 2IVSE-15 AL vu•IMM,,• =NW PLEASE DELIVER THE FOLLOWING PAGES TO: NAMELA44/ , Fat: itto A:aos t J.F. Davidson Associates, Inc. ENGINEERING OIVISION JFDA Fax No. (714) 686-5807 CITY AND STATE: IC"' 'tztry24.141z04.4.-- C-04 TELEFAX TELEPHONE: lielt_3ssa OFFICE TELEPHONE if 471 3si:La 174 / TOTAL NUMBER OF PAGES (Including cover letter): Itv12... If you do not receive all of the pages, please phone (714) 683-02090 as soon as possible and astior telefax operator ,./0 ADDITIONAL COMME TS: JLA. heda;42-12--t- I 345 cl$0,44-„-, 7, 2 CP / 3 ‘0 5e) 4€5C /3.5-0 3:126 "191)th Street • P.O. Eio'4 493 * Riversid6. CA 92502 • /14r 68:,:;-.::;209 FAX 714.68i.-3-Ef PIPE ,SIZE i 1.25 1.5 t2 15 2500 2000 2000 18 . --- 11 2250 27 ./30 33 '��• wd �+ Ia00 3 D 1'!00 1500 1400 ' 42 1600 1400' 1300 s 4 sou [001200 51 1400 r200•'1100 5 4 1300 11 C3a • --- F•-S -1200 [ o°ar 60 • : tunny �: 1100 950 900 63 66 69 72 1050 1000 900* B50 • REQUIRED D--LOADING FOR _iiJ FORCED CONCRETE PIPE CASE I BEDDING PER' STANDARD PLAN ' 76-0I DEPTH OF C0V1J Fa. FEET 2000 l000 10Ap unrestricted Trench Width 2000 Calculated for projection Condition 7000 1400- 1 10 11 2000 20 [500 1500 1500 1400 1400 1300 .1300 1250 1250 1200 1200 DEPTH OF COVER 1N FEET 16 17 113 19 20 2000 2000.2000 2000' 2000 2000 2000 1750 f 1750 -1740 1750-1750 15000 1400 - [400 1350 1350 1650 I700 2 2250 23 2250 Trench. Width = 0.D. + 20; W=!0"(Sea hole 4) Colcotaled for Trench Condition 34 50 PIPE SIZE 12 27.• 30 33 1800 54 1850 j NOTE:: 1. D•Loods shown on this plate ore to be used in design and shown on project plans, 2. D-Loads shown ore based on overoge soil condifiohs and should be -increased where soil analysis truncates grealer eorlh toads. Where soils hove low cohesive veins and cover is greeter !kin 10:-use O-Loads catcutaled For projection condition (Plate 2.6-0697). . 3. Dalai Sofety Factor = 1.25; Load Foaclor = LB for Case i; Live Load = 14120-S16 Truck; Eorlh Land = 110 P.C.F(Marslons Formula). l j11 / .: 4. Where cover is grealer lien 10', D-Lords shown may ,be used with Case 11 Bedding for values of "Y/"not exceeding the following W"= 15 for pipe 48 or Less in diameter. „W"=22" for pipe 72" or less in diameter. "W "=28" for pipe 96" or less in diameter. Where "W"exceeds the above voles, D-toads,shown en.Piole 2.6-0697,'Option No. must be used with Case?L Bedding. D--LOAD FOR CASE I BEDDING 57 60 63 66 Name of C.P.'s project manager: Mr. Matthew K. Pfister. Name'of C.P.'s project superintendent: Mr. Henry Ramirez. 2. Emergency contact telephone numbers: • a. During normal daytime hours, 6:30 A.M. 'til 5:30 P.M., call C.P.'s office at main telephone number (714) 981-1091 - this number has a three -line rotary switch, and rings through onto 981-1092 and 981-1093. C.P. also has 'phone number (714) 981-1084 as a fourth line into the office, if the other three are all busy. b. After normal hours, call Matt Pfister's home, at (714) 985-7424, Michael Pfister's home at (714) 985-8689, or Mark Pfister's home at (714) 931-7212. Additional after-hours numbers will be pro- vided upon request, if you so desire. c. Please feel free to call C.P.'s mobile telephone numbers too, if necessary - (714) 321-7532 for Matt Pfister, (714) 321-3477 for Mike Pfister, and (714) 321-6790 for Mark Pfister. 3. Persons authorized to sign change orders are: Mr. Charles Pfister, Jr.; Mr. Michael Pfister; Mr. Matthew K. Pfister; Mr. Mark E. Pfister; • Mr. John Blough, and Mr. Robert Davis. MIGIIIANO-HAVEN SEWER/STORM DRAIN . 1. SPECIFICATIONS 1.1 Contract Specifications 1.2 Engineers Cost Estimate 2. PRE BID DOdRIE1RATI0N 2.1 Agreements 2.2 Right of Nay Certification 2.3 Council Actions 3. PRE BID ACTIVITIES 3.1 Advertisement for Bids 3.2 Bidders List (Documents) 3.3 Bid Opening Reports 3.4 Summary h Evaluation 4. SERVICE COIffRyT i AGREEMENTS 4.1 Contractor Agreement Calif.4.2 So. Co. 4.3 Work Order Request 5. CORRESPONDENCE 5.1 To Contractor 5.2 From Contractor 5.3 General 5.4 Utility Company 5.5 Pre Bid Addendums 6. COISTmr10 TN PHASE 6.1•Pre Construction Meeting 6.2 Notice to Proceed 9. CONSTRIrT 9.1 Photographic Reports 9.2 . Engineers Daily Reports 9.3 Weekly Report of Working Days 9.4 Construction Inspection Report 9.5 MonthlReporty(Contractors Project kStatus and Subcontractors) 10. CONTRACT CHANGE ORDERS 10.1 Change Orders 10.2 Extra Work Reports NFO PROVIDED AT PROJECT START 11.1 Forms 11.2 Project Requirements 11.3 Control lon Uniform Traffic 11.4 Labor in Formation 12. ANC 1LABOR C_ Employee nterviews 12.2 Equal Employment 12.3 Contractor Payrolls 12.4, Subcontract Request Form 13. ACCOUNTING 13.1 Progress Payments 13.2 Final Project Accounting UTILITY WORK PERFORMED 14.1 Utilityss 11. 7. 8. 8.1�AcceptanceIAL GA Test 8.2 Certicates of Compliance 8.3 Reports of Inspection 8.4 Independent Assurance Test 8.5 Final Tests 14. ION PHASE EXTRAS 15. PUBLIC15.1ComplaIONS 15.2 Claims 15.3 Prelim. Reports from Contr. 16. 17. 18. CONPLETIONIOFFePROJECT