HomeMy WebLinkAbout3.4_To and From UtilitiesLETTER OF TRANSMITTAL
CITY OF FONTANA
CDD/ENGINEERING DIVISION
8353 SIERRA AVENUE
FONTANA, CA 92335
TO:
Project: Slover Avenue Sewer
from Hemlock Avenue
to Poplar Avenue
Date: December 28, 1999
Metropolitian Water District
Mills Filtration Plant
550 E. Alessandro
Riverside, CA 92508
ATTN: Charles Poling, Engineering Technician III
We are sending you: (X) Attached ( ) Under seperate cover via
the following items): ( ) Drawing ( ) Prints (X) Plans
( ) Samples ( ) Specifications ( ) Copy of Letter ( ) Change
Order ( ) Check Prints ( ) Studies (X) Other: Enclosed is a
revised set of Sewer Improvement Plans for theabove referenced
project.. The revisions to the plans are shown as, Delta 1 on Sheet
No. 1 and Sheet No. 5. The construction from Sta. No.'86+50.52
(Manhole No. 10) to Sta. No. 94+90 (Manhole No. 14) shall be done
per the revisions on Sheet No. 5.
COPIES
DATE NO.
1 Set 12/28/99 Dwg No. 2767
Purpose:
(X) For your information/records
(X) For approval
( ) Approved as submitted
(X) For your use
( ) Approved as noted
( ) As requested
prints
(X) For review and comment
( ) Returned for corrections
( ) Other
( ) For bid due: ,19_
( ) Prints returned after loaned
DESCRIPTION.
Sheets 1 thru 8
Please
( ) Submit orginal
( ) Resubmit copies for
approval
( ) Submit copies for
distribution
( ) Return
corrected
( ) Other
to:
Remarks: Hand delivered 1 Set of Revised Plans to MWD's Patroller
Inspector, Conrad Martinez at the job site by Bob Savant/SR.
Public Works Inspector for the City.
Copy to:
4