HomeMy WebLinkAbout7.4_To ContractorJeff Bonadiman, Vice President Bonadiman-McCain, Inc. 280 South Lena Road San Bernardino, CA 92412 RE: • City of Fontana CALIF ORNIA Slover Avenue Sewer from Hemlock Avenue to Poplar Avenue Revised Sewer Improvement Plans Dear Mr. Bonadiman: December 22, 1999 Enclosed is a revised set of sewer improvement plans for the above referenced project. The revisions to the plans are shown as Delta 1 on Sheet No. 1 and Sheet No. 5. The construction from Sta. No. 86+50.52 (Manhole No. 10) to `Sta. No. 94+90 (Manhole No. 14) shall be done as per the revisions shown on Sheet No. 5. Please contact the undersigned at (909) 350-6645, if any additional information is required. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yousuf Patanwala, P.E. Associate Civil Engineer/Special Projects cc: City Engineer Principal Civil Engineer/Special Projects Engineering Tech I/Special Projects Public Works Senior Inspector (W/Plans) Public Works Inspector (JC) Michael P. Thornton, Project Manager/L.D. King, Inc. John P. Leuer, LOR Geotechnical Group, Inc. (W/Plans) Joe Defillips, Project Superintendent/Bonadiman-McCain, Inc. (W/Plans) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper y,DEC-16-1999 13:23 BONADIMAN-MCCAIN 909 889 3706 P.01 • BONADIMAN-McCAIN, INC. P 0 BOX .6444, SAN BERNARDINO, CA 92412 ENGINEERS * CONTRACTORS PH: (909) 885 3435 FX: (909) 889-3706 SINCE 1942 LICENSE NO. 74600 A, S, C27 Fax Transmittal TO: Greg Bucknell COMPANY: City of Fontana PHONE: FAX: DATE: December 16,1999 (909) 350-6646 FROM: Penney Paulson (909) 350-6618 Number olPages Including Cover Sheet: 9 REFERENCE: SLOVER AVENUE SEWER FROM HEMLOCK TO POPLAR Greg: See attached substitution request. 0_661)'7g0 -151\ X2. z-(' LO/ s� rfl etyl C fa? ift(A-1:fi Please call (909) 885-3435 if this transmission is not received complete. Subject: December 8, 1999, . Mr. Gregory Buclawn .. City of Fontana. Mr. Michael'P. Thornton L.D. King, Inc. Ductile Iron Pipe Joint Ga.rkett /Metropolitan Water. District (MWD). Cr. Crossing- . I" reviewed: the proposed construction materials for the MWD crossing, including the ductile iron pipe with restrained joint gaskets with Charles Poling of MWD. He advised that the FIELD. LOK Qaskets arenot acceptable. Mr. Poling recommended that in lieu of restrained joints, concrete encasing of the sewer with 4,000 psi concrete (minimum 6" thick) and install reinforcing steel at each corner (No. 4 Bars) with ties.: at three -feet (3') on center. In addition, if desired, we may substitute polyvinyl chloride pipe for ductile iron pipe if the pipe is encased in concrete. Based on my discussion with Bondamin-McCain, the MWD alternative is preferred. Should you have anyquestions or need additional information,. please do not hesitate to call. • . King, inc. 2151 Convention Center Way, Suite 100B, Ontario, CA 91764-4464 (909) 937-0206. Fax: (909) 937-0202 ,DEC-16-1999 13:23 BONAD I MAN-MCCR I N 909 889 3706 P.02 LICENSE NO, 74600 A, B & C 27 INCORPORATED' 1942 TELEPHONE (909) 885.3435 TELECOPIER(909) 889-3706 IBONADI MAN McCain Inc. Engineers (0)Contractors POST OFFICE BOX 6444 SAN BERNARDINO, CALIF. 92412 December 16, 1999 Gregory J. Bucknell, P.E. City of Fontana Engineering Division 8353 Sierra Avenue Fontana, CA 92335 OFFICE 280 SOUTH LENA ROAD SAN BERNARDINO, CA 92408 YARD 835 TENNIS COURT LANE SAN BERNARDINO, CA 92408 VIA FACSIMILE: (909) 350-6618 REFERENCE: SLOVER AVENUE SEWER FROM HEMLOCK AVE. TO POPLAR-AVE. 0 44 eitg-0L-5-4w- kot We are' request'' • authorization to substitute 161 linear feet,of 8" Class` 250 Ductile Iron Pipe as, specified tem 6 on the above referenced project, with 161 linear feet of 8" SDR35 Sewer Pipe with of concrete -encasement at the,:MWD Waterline. Enclosed are the specifications for the SD 35 Sewer Pipe we are requesting to' use. There will be no additional cost to the. City of Fontana for this substitution. Dear Greg: If you have any questions, please do not hesitate to call me. Very truly yours, BONADIMAN-MCCAIN. INC. Jeff C. Bonadiman Vice President AMERICA PROGRESSES THROUGH CONSTRUCTION 4 &wows , DEC-16-1999 13:24 Amk BONADIMAN-MCCAIN Amk 909 889 3706 P.03 IIP J-M PIPE Ring-Tite® PVC Gravity Sewer Pipe and Fittings r , DEC-16-1999 13:24 • BONADIMAN—MCCAIN 909 889 3706 P.04 Ring•Tite PVC Gravity Sewer Pipe and Fittings fling-Tte joint meets restating tightness requirements, simplifies assembly h -Locked-in" robber sealing ring provides u`ght, ilexiblo • seal. Meets requirements of tAS'tM 0,32129 Joints for Drain and Serer Pipes usfng`;Flexible Elastomeric Seals." Figure 1 t7. /<$ Spigot pipe ends are pplied from factory withbevels. , ti: The. bens an integral part of the pipe section with the same strength. Meets ASTM D3034-SDR 35 4"-15"end ASTM FB791 B"-27" . Introduction The growing demand for an effective all-out attack on water pollution highlights the need for improved sanitary sewage collection systems_ A modern system needs pipe with improved design for • reserve strength and stiffness to increase load -bearing capacity — aft within the framework of maximizing sewer system Capacity at reasonable cost. Ring -Tile PVC sewer pipe is designed to meet this need. Applications J-M PVC sewer pipe is suitable for conveying domestic sanitary sewage as well as certainindustrial wastes. For further information regarding the suitability of PVC for conveying various chemicals, contact your J-M pipe representative. 1. Chemical Resistant: J-M Ring-Tite PVC sower pipe is unaffected by the fluids found in ordinary domestic sewage. It is immune to sewer gases and the suttgic acid generated by the Completion of the h,, hydrogen suede cycle. It is, immune o corrosive soils-4 both asOiine or acidic. • 2. Abrasion Resistant; %J*1 Rl ig,Tito PVC sewer.. pipe has excellent resistance to abrasion, gouging and scoring superior 10 that of most common piping materials. 3. Flow Characteristics: J•M Ring Tite PVC sewer pipe with long lengths, smooth interior, and factory -made close tolerance joints provides a Manning "n" coefficient of .009. High -carrying capacity makes possible the use of flatter grades or smarter diameter pipe. Ask your J-M sales representative for a flow nomograph and the report "Hydraulic Characteristics of PVC Sewer Pipe in Sanitary Sewers,' a joint study by Johns -Manville and Utah State University.' Locked -in Ring Through research and technology we proudly offer "busked -in" rubber ring PVC sewer pipe. This factory -made joint eliminates Me need to insert rings in the Geld. Joint design and close manufacturing tolerances allow this joint to Pass a 25 feet to head hydrostatic test in the laboratory and provides the basis for exacting infiltrationtexfifration specifications. Be secure in the future by designing with J-M Ring•Yite PVC sewer pipe with low infiltration — specify infiltration not to exceed 50 gallonsrmch dipmeter/mile/day. Call for ASTM 0-3034 SDR35 Provides Greater External Load -Carrying Capacity - This oiler's far the design and construction of PVC gravity sewer systems (4"-15") consistent with test engineering practices. A uniform minimum "pipe stiffness," (Fl pal = 46 psi) means no weak links. it also means that J-M PVC sewbr pipe in 8, 10, 12 & 15- diameters has 60 to 75 percent greater pipe stiffness than SDR 42 and SDR 41 PVC sewer pipe. This increased -pipe stiffness' provides Inc extra needed al that critical time when the pipe Is fast being installed in the trench and undergoing bedding and backfilL o. DEC-16-1999 13:25 BONADIMAN—MCCAIN. 909 889 3706 P.05 External Loads Background Loads imposed en buried. cortduks have, in past practice. been calculated by using the Marston load formula. For trench loads Marston has a formula for rigid:pipe and another formula for flexible pipe. It is important to recognize that under identical conditions of bury the soil load generated one flexible conduit is less than the Toad generated on a rigid conduit. The competitive load on a rigid conduit verses trie Toad on a flexible conduit is expressed as the ratio of trench width tp the flexible pipe OD. By definition. a flexible conduit is one which -will deflect before reaching failure. Marston's Formulas. •' For Soil Loads: Rigid ripe W = Cain Baz Flexible Pipe W = Ca w Be ea Prism Load: P, = wH (lbslft2) Where: W = Load on pipe ' (Ib/tirr, ft.) Ce= Load Coefficient w Sol unit weight (N Bo = Ditch width (IL) et s O.D. of pipe (ft) Prism Load ' Loads imposed on buried conduits have been calculated by using the Marston load formulas for rigid and flexible pipe. However. it has been determined that the Marston formula for flexible pipe may not determine the maximum long term load — the "Prism Load" formula is more accurate. The "Prism Load' is the weight of the column of soil directly above the pipe. Thus. precautions in keeping the trench narrow are unnecessary for a flexible pipe installation. The important thing' is to compact •the haunching material from ?lie pipe out to the undisturbed trench walls. ;Therefore, J.M suggests that :the maximum long term Toad `be determined by the prism load for design, • Where: P,-- Pressure at the top of the pipe due to the weight of the soil (Ib/ft2) w = Soli unit weight— . (Ib/fN) H - Depth from top of pipe to top al ground Note: To convert prism load (Ibjft,z) to lb/linear ft.. multiply by the O.D.. of the pipe in feet. or: W == wHB, Live Loads Live toads imposed on buried conduits from traffic must also be Considered in a design and become more important at shallow depths. The combination of soil load and live Toad must be H2O Highway Load 16 14 10 Figure 2 Dead road 12e Ibv J L 1 4- H2O live Ioadt + impac 500"P 10o° PYhrertiea1 5ei1 Pvessuro (Lbs/Fly) sry jwP Note: To ccrivert vertical soft pressure to load on pipe--- ' pounds permeal, foot—muk ply by O.D. of pipe in ft. tLive Toad applied on assumed area of 36-x 40"-e. Taal road rive + dead 1500 z000 added together to design for the maximum Toad as shown in curves above. The soil bad and rive Toad must be added to determine the total external Toad on a buried conduit. This combined bad should be used for design. Figure 2 illustrates the magnitude of soil and live toads seearatety and also charts the magnitude of the combined or total bads. The curves in figure 2 apply only for H2O highway loading and a soil weight of 120 Ibslcu. ft. At shallow depths o/ cover — 3 feet and less, flexible conduits can deflect and rebound under dynamic loading conditions A the trench width is not sufficiently bridged. Unless special precautions• are taken TO bridge the trench in shallow Installations, the breaking up of flexible road surfaces may result Therefore, for shallow installations under flexible road surfaces (between 1 and 3 feet), J-M recommends Class t' material be used in the pipe zone and up to the road elevation. This recommendation is not meant to conflict with the design engineer's specifications and his specifications will govern. 'see page 8 for definition of Class 1. DEC-16-1999 13:25 Pipe Deflection BONADIMAN—MCCAIN 909 889 3706 P.06 Deflection is defined as the change in vertical inside diameter of a flexible con. duit when subjected to a vertical load. The amount of deflection that will occur in any flexible conduit is a function of three factors: 1. Pipe Stiffness (F/ ay) 2. Soil Stiffness 3. load on the pipe II is important to recognize that flexible conduits per. form differently in the ground than they do under laboratory flat plate loading. The interaction Of pipe stiff- ness and soil stiffness com- bine to give flexible conduits a high effective strength when buried. Methods for Predicting Pipe Deflection The most commonly used approach in predicting deflection has been the Modified "Iowa Deflection Formula." Modified Iowa Formula: ay= DL K wrs El r -061 ' r' Where: a . 4. ay = verticaltdefleotjon (Inches) X D► a lag 1ecf r (1.5 maximum)_ K = bedding factor w - earth lead (ib.►in.) r = mean radius COD ! 1) (in.) ` 2 / E = modulus of elasticity (lb./ in?) 1 a moment of inertia 13i 12 (in.) = soil stiffness (Ib./in.Z) E' Although considered a eon- servative approach, con- siderable variation in predicted deflection will result depending upon the choice of empirical con- stants E', K and D., Empirical methods of predic- ting deflection have evolved in recent years which eliminate the guesswork inherent in the Iowa method. When design is based on actual laboratory test and previous field measurements it is unnecessary to know the actual load acting on the pipe or the soil stiffness_ Thus an instatiaiion can be designed with a known fete - tor of safety provided enough empirical data is available. To accommodate the pro- blem of having to establish data for the number of trench widths that are found in the field, the prism Toad was chosen because it represents the maximum loading condition on a flexi- ble pipe. Time Lag to account for future settlement al the backfill can be • included by choosing long- term values of deflection. J-M has detrelopedthrough Laboratory tests and actual field data, the maximum long term deflection than, Figure 3. shown on page 7. This chart eliminates the guesswork in predicting deflection and gives the design engineer a quick ready reference. This chart is for PVC SDR 35 Sewer pipe only. The values given for deflection limits are the ultimate long term deflection that will occur in a particular sOil CTaSs having a given density (compaction) in the haunching area of the pipe zone for various heights of cover (feet). DEC-16-1999 13:26 BONADIMAN—MCCAIN 909 889 3706 P.07 Use of Maximum Long Term Deflection Chart 1. Where live loads are not a factor or nor involved in the total external load on the pipe. the chart can be used directly to determine the limit of the maximum long-term deflection of the PVC pipe. Example: if an 8" PVC SDR 35 Sewer Pipe is instilled in Class IV material, having 85% compaction in the pipe zone and with 12 feet of _ cover, what will be the maximum tong term deflection Limit? Answer: Pipe will never deflect•more than 5% (color aide - dark green). 2. Where live loads must be considered, determine, first, the combined t0 a1 external load on the pipe." Next determine the equivalent prism Toad (without live Wadi - tor the:particular pipe size involved using the table of prism toads. Table 1. Read ac rosse to the left for the height of Dover (ft) tor the equivalent prism load. Using thiS height of cover with the bedding class and proctor density. enter the maximum tong term deflection chart. Figure 3, to determine the maximum long term deflection timil. Example:11 a 12- PVC SOR 35 Sewer Pipe is installed in,Class III material. having 65% compaction in the pipe zone, with 3 feet of cover and 120 IbsJtt'soil. and H-20;;(highway load) live load are imposed on the buried pipe, what will be the maximum Tong term deflection limit?. Answer: 1. The combined (dead and live) load on the pipe will be approximately 1000 Ibsfftz or 1000 x 1 ft. (pipe diameter in feet) 1000 lbs.lin ft. (per Figure 2). Enter table of prism loads (fable 1) under Column 12— Pipe Diameter (inches) — and read down until nearest figure to 1000 is reached, across from soil wt. of 120 Ibsift.'. In this case, 1000 appears opposite 120 Ibs/f1.. and 8 it. — height of cover. This represents the equivalent prism load for the combined (dead and live) 1oa0 given above. Now enter maximum long term deflection chart and read the maximum long term deflection color Code for Class III bedding classification, 65% density, and 8 ft. of cover, Dark green — maximum long term deflection will riot exceed 5%. in working with these charts, it becomes apparent that; 1. Soil density in the pipe zone plays a greater role Irian soil type in the control of deflection in buried flexible conduits. 2. The amount of deflection is independent of pipe•size, providing all pipe sizes are SOR 35. Note pipe size does not appear in the chart for maximum long term deflections. Maximum Long -Term Deflections of PVC (SDR 35) Pipe (Percent) DENSITY r .:ASTM (Proctor) Height of Cover (Peet) Bedding • • AASHD ClaSsitrcation. T99 ;Grairel Class I' Class II 90% 80%. Sand Class 111 90go•' • •85% . 75% 65% Clay Class IV 85% Peat Cass V 75% 65% 3 S 8 10 12 14 16 18 • M1 i,mun ,enq evm archon .a no4 o+eexa S'• o M tI in al 7 s eaneetn^ a vs, toot not T grol* *0 This soil lass not recommendeo 22 Figure 3 Note: Deflection values shown do not include effect of live lead or longitudinal bending. 1. No length of pipe Installed under conditions apecified will deflect mare than is Indicated; the pipe will deflect less than the amount indicated if specified density is obtained. 2. External loading based upon soil weight of 120 lbs. per cubic foot. 3, Deflections predicted are Cased upon pipe which was initially circular prior to installation. Actual deflections may differ because of meat out of roundness caused by storage and/or handling. These variations should be taken into account when measured deflections are compared with those in the table. • 4. Bedding classifications are as indicated on page 8 and Correspond to ASTM 02321. 5. Deflections listed In table are maximum long term values. The suggested maximum long term value is 7.5 percent which is approximately equal to a 5 percent initial deflection. 6. Initial deflection is deflection taken within the 1St 24 hours after trench is baciditled. 7 h DEC-16-1999 13:27 BONAD I MAN—MCCA I N 909 889 3706 P.08 Short Form Specification Scope This specification designates general requirements for unitasticized polyvinyl chloride (PVC) Plastic Gravity Sewer Pipe with integral wall bell and spigot joints far @ conveyance of dornssac sewage. Meter<iats Pipe and fittings shall meet the requirernent5 of ASTM Specification 133034 for 4"-15•" SEA 35 and F679 for 18"•27", The pipe shall be colored green for in -ground identification as sewer pipe.' __Pig Pipe Shall be suitable for use as a gravity sewer conduit. ProvisierlS;Must be .made for contraction'and expansion at each joint a rubber ring, The bell Shell consist of an integral wall section with a solid cross; section rubber ring. factory assembled. securely locked in place to prevent displacement during assembly. Saes and dimensions shall be as shown in thiS specification. Standard laying lengths shall be 20 tt. and 13 ft t1 inch. At manufacturer's option. random lengths of not more than 15% Of total footage of each size may qe shipped in lieu of standard lengths. Drop Impact Test Pipe (6- long section) shall be subjected to impact from a Inge falling We (20-lb. Tv A.) in accordance with ASTM Method of Test D2d44. No shattering or splitting (denting Is not a failure) Shall be evident when the following energy is impacted - Nominal Size Inches Ft -Lbs e t50 6 210 8. .210 '10 220 12 .. 220 15 220 18 220 21 „ 220 24 ` 220 27 220 Fittings ' All fittings and accessories .shalt be as manufactured and furnished by the pipe supplier or approved equal and have bell and/or spigot configurations compatible with that of the pipe. Temperature for Testing Pipe shall be designed to pass all tests at 73°F Pipe Stiffness Minimum "pipe Stiffness' (F/4 y) at 5% deflection Shall be 45 psi for all sizes when tested in aecordance "with ASTM Method of Test D2412, 'External Loading Properties of Plastic Pipe by Parapet -Plate Loading." • Joint Tightness Two sections of pipe shalt be assembled in accordance with the manufacturer's recommendation. Joint shall be tested ,n accordance wttn ASTM D3212, "Joints for Drain and Sewer Plastic Pipe Using Flexible EtastomerC Seals.' Flattening There shall be no evidence of splitting. cracking, or breaking when the pipe is tested ab follows' Flatten specimen of pipe, six inches bng between parallel plates in a Suitable press:: unfit the distance between the plates is forty percent of the outside diameter Of the pipe, The rate of loading shall be unifofm and;suc►+' that the compression completed within twp tR'..five • minutes. Gaskets Material used for elastomeric seal in push - on joints shall meet the requirements of ASTNI Specifieelon F 477. Installation Product should be installed in accordance with J-M Publication TR-6148, "Green -Tire' PVC Gravity Sewer Pipe Installation Guide" 10 • DEC-16-1999 13:27 BONAD I MAN-MCCA I N 909 889 3706 P.09 Sizes, Dimensions aria Weights Bell and Spigot Assembly (Inches) Pipe Pipe Details Size' Average Min. Wall Inches 0.D. Thickness "T" 4 4.215 0.120 6 6.275 0.180 8 8.400 0.240 10 10,500 , 0.300 12, 12.500 , 0.360 1 S • 16.300 A fi 0.437 18 18.701 .'' 0.536 21 22.047; " 0.632 - Pipe Size Inches 24"! 27". Min. Wall Ave. O.D. Thickness "T'' 24:803 0.711 - - - 27.953 0.801 Bell Details • APProx- Approx. weight D5 Da 119 ' N Lb8.IFt- 4.250 4.240 5:20 2.90 1.05 6.318 8.308 4, 7150 3.50 2,36 8.460 8.440,, 1010 4.10 4.24 10,570 ' 10.546'0 12;40 4.70 6.64 12.577 12.554'i 14160 5.15 9.50 15.380 • 15.362' 16.00 5.40 14.14 18.764 18,764 ' 21:98 5.90 21.43 22.110 y22.110 2563 6,40. 29.88 • Approx. Approx. Wt. 05 138 D9 N Lbs./Ft. 25.04 24.99 28.80 _'. 11.25 38.96 .T 28.72 28.17 32.50 12.75 49.47 11 TOTAL P.09 City of Fontana CALIFORNIA Jeff Bonadiman, Vice President Bonadiman - McCain, Inc. 280 South Lena Road P.O. Box 6444 San Bernardino, CA 92412 RE: Stover Avenue Sewer from Hemlock Avenue to Popular Avenue Pipe Bedding Crushed Rock and Filter Fabric Materials Dear Mr. Bonadiman: November 9, 1999 This letter is in response to your request and letter dated October 12, 1999 to Michael P. Thornton, P.E., L.D. King, Inc. on the above referenced items, the use of the graded 3/4"crushed jock for the pipe bedding per Table 200-1.2 (A), Section -1.2 Crushed Rock and Rock Dust, Part 2 Construc(; i Materials of the Standard Specifications for Public Works Construction in lieu of the specified 1/2" crushed rock and deletion of the filter fabric material above the pipe bedding zone are approved. The request for the change in the crushed rock specification for the pipe bedding is a no cost change to the construction contract per our discussions. The cost for the deletion of the filter fabric above the pipe bedding zone needs to be submitted for a contract change order deduction. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, Community Development Department En:' = iog Division J. Bucknell, P.E. Princi . Civil Engineer/Special Projects cc: City Engineer Principal Civil Engineer/CIP Associate Engineer/Special Projects Engineering Technician I/Special Projects. Public Works Inspector (JC) Michael Thornton, P.E., L.D. King, Inc. John P. Leuer, G.E., LOR Geotechnical Group, Inc. Penny Paulson, Office Manager, Bonadiman - McCain, Inc. Joe Defillips, Project Superintendent, Bonadiman - McCain, Inc. (Field Delivered) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper City of Fontana CALIFORNIA Jeff Bonadiman, Vice President Bonadiman - McCain, Inc. 280 South Lena Road P.O. Box 6444 San Bernardino, CA 92412 RE: Slover Avenue Sewer from Hemlock Avenue to Popular Avenue MWD's Additional Requirements November 9, 1999 Dear Mr. Bonadiman: Enclosed for your use and action is a copy of L.D. King, Inc.'s memorandum dated October 14,1999 on MWD's additional requirements to cross their water feeder transmission line on Slover Avenue. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, Community Development Department Eneering Division Greg& J. Bucknell, P.E. Princip Civil Engineer/Special Projects cc: City Engineer Associate Engineer/Special Projects Engineering Technician I/Special Projects Public Works Inspector (JC) Michael Thornton, P.E., L.D. King, Inc. Penny Paulson, Office Manager, Bonadiman - McCain, Inc. Joe Defillips, Project Superintendent, Bonadiman - McCain, Inc. (Field Delivered) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 * recycled paper ,Engineers/Planners- , EMORANDUr Grego Bucknell, P E PROJECT NO.: 124-10` City of Fontana ' OM Michael Thornton• DATE: October 14, 1999 L.D. King, Inc. SUBJECT: Siover Avenue Sewer (Hemlock Avenue to Poplar Avenue Conference with MWD's Charles Poling (909) 780-1511, Ext. 2826 . Poling is aware that MWD has provided permission to cross their .Feeder:- In additionto the requirements presented in their letter; he advised of the following requirements. Ductile Iron or Steel pipe must be used: Pipe must be centered over the Feeder in accordance with Health Department Standar The contractor must use mechanical or welded joints in MWD right-of-way. The contractor must -provide him`a minimum: of two (2) days" notice pnor to beginning work in MWD ,right-of-way. Hand excavation is`required within two (2) feet of feeder., advised Mr: Poling of the current schedule including potholing of the MWD Feeder Page 1 of 1 D: King;- Inc:'2151 Convention Center Way, Suite 100B,`Ontario, CA`91764-4464 (909) 937-0200 Fax..(909) 937-0202 City of Fontana CALIFORNIA Jeff Bonadiman, Vice President Bonadiman - McCain, Inc. 280 South Lena Road P.O. Box 6444 San Bernardino, CA 92412 RE: Slover Avenue Sewer from Hemlock Avenue to Popular Avenue "Notice To Proceed" November 9, 1999 Dear Mr. Bonadiman: This letter will serve as your "Notice To Proceed" on the above referenced project based on the project field meeting held on November 8,1999. The work completed to date on the project was verbally approved to commence at your company's request and risk until such time the utility companies could remove and relocate the existing power poles, electrical, telephone, and cable television lines. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, Community Development Department Engineering Division • Giego J. Bucknell, P.E. Princi Civil Engineer/Special Projects cc: City Engineer Associate Engineer/Special Projects Engineering Technician I/Special Projects Public Works Inspector (JC) Penny Paulson, Office Manager, Bonadiman - McCain, Inc. Joe Defillips, Project Superintendent, Bonadiman - McCain, Inc. (Field Delivered) www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 * recycled paper Traffic Manual " MARKINGS Delineators 6-04 6-04.1 Introduction Delineators are retroreflective devices mounted at the side of the roadway, in series, to indicate the roadway alignment. Delineators are effective aids for night driving and under other conditions of reduced visibility. They are devices to guide rather than warn. Delineators may be used on long continuous sections of highway or through short stretches where there are changes in horizontal alignment, particularly where the alignment might be confusing, or at pavement width transitions. An important advantage of delineators is that they remain visible when the roadway is wet or snow covered. Delineators are normally placed in the ground outside of the edge of pavement. Where delineation is required within a pavedarea, surface mounted channelizers may be used. See Section 6-06, CHANNELIZERS. Installations should be inspected at night to ensure that there are no confusing or misleading delineators. 6-04.2 Delineator Design Delineators shall consist of retroreflector units capable ofclearly reflecting light under normal,. atmospheric conditions from a distance of 300 m when illuminated by the upper beam of standard automobile lights. The size of retroreflector units shall be a minimum of 75 mm x 300 mm for the front, and when applicable, 75 mm x 75 mm for the back. There are two classes of delineator posts and several types of retroreflectorization as shown in Figure 6-45, TYPICAL DELINEATORS. 6(,01-&( S� Traf�� Chi 6-17 7.1996 6-04.3 Delineator Application Delineation is intended to be a clear and simple guide to the motorist regarding alignment of the highway. The color of the delineator retroreflectors shall conform to the color of edgelines except for the use of yellow on the right at narrow bridges and red at truck escape ramps. Examples of the use of delineators are shown in Figure 6-45, TYPICAL DELINEATORS. Color exceptions, are shown in Figure 6-48, NARROW BRIDGE SIGNING AND MARKINGS and Fig- ure 6-49, TYPICAL RUNAWAY TRUCK RAMP SIGNING AND MARKINGS. TYPICAL DELINEATORS AND USES: Type E - White Retroreflector (2 Sided). For use on the left or right of 2-lane 2-way streets and highways when it is desirable to have a reflector on the front, and one on the back of the delineator facing the opposite R(&.t1 direction of traffic. e,i • White Retroreflector (1 Sided). e on the right of freeways and expressways. They may also be used on 2- lane 2-way streets and highways when the Type E is not needed. • TypeG - YellowRetroreflector(1 Sided). For use on the left of divided highways and 2-lane highway intersections as shown in Figure 6-46, TYPICAL EXAMPLES OF DELINEATOR PLACEMENT WHEN USED AT INTERSECTIONS, ISLANDS, RAMPS AND CONNECTORS. 6-18 7-1996 MARKINGS Traffic Manual aemi,c ellow Retroreflector (2 Sided). at approaches to narrow bridges as shown in Figure 6-48, NARROW BRIDGE SIGNING AND MARKINGS. • Type J - Red Retroreflector (1 Sided). For placement on both sides of Truck Escape Ramps as shown in Figure 6-49, TYPICAL RUNAWAY TRUCK RAMP SIGNING AND MARKINGS. Delineators with the appropriate retroreflector color are used to indicate the narrowing of the pavement where either an outside or inside lane merges into an adjacent lane. The delineators should be used adjacent to the lane affected for the full length of the convergence and should be so placed and spaced to show the width reduction as shown in Figure 6-15, TYPICAL LANE. REDUCTION TRANSITION. 6-04.4 Delineator Placement and Spacing Delineators, when used, shall be mounted so that the top of the retroreflector is about 1.2 m above the edge of traveled way. They shall be placed 0.61 to 1.83 m outside the outer edge of the shoulder, or if appropriate, in the line with the guardrail post. Delineators should be placed at a constant distance from the edge of the roadway except that, where a guardrail or other obstruction intrudes into the space between the pavement edge and the extension of the line of delineators, the delineators should be in line with or taper to inside the innermost edge of the obstruction. See Figure 6-45, TYPICAL DELINEATORS. Unless local conditions justify otherwise, delineators shall be placed on all State highways and should be provided on all city and county roads as follows: a. On the outsides of highway curves of 914 m radius or less (including medians in divided highways), freeway exit and en- trance ramps and connectors. Exception to this; is where a median barrier is delin- eated as shown in the Median Barrier De- lineation Detail in Figure 6-50, TYPICAL MEDIAN BARRIER DELINEATION ANDCHANNELIZERS. Delineatorspac- ing on curves is shown in Figure 6-47, DELINEATOR SPACING ON CURVES. b. On the right of tangent sections of freeway entrance and exit ramps, collector roads, freeway connectors and lane reduction transition sections at 60 m spacing. c On embankments higher than 3.0 m and with side slopes steeper than 1:4. Delineator spacing is approximately 160 m. d. On approaches to narrow bridges as shown in Figure 6-48, NARROW BRIDGE SIGNING AND MARKINGS. e. On tangent sections of rural State highways where there are no reflective pavement markers, such as in snow areas. Delineator spacing is approximately 160 m. On all new guardrail or bridgerail installations, or whenmaintenance is required on existing guardrail or bridgerail, within 3.66 m of the edge of traveled way and curves of 900 m radius or less. The spacing on tangent sections is approximately 160 m. For spacing on curves, see Figure 6-47, DELINEATOR SPACING ON CURVES. 2" Maxi — RIGID BASE RFA Rail. 2 1/i'MIn Edge of Traveled Way leg Li _L BELOW SURFACE ANCHOR CHANNELIZERS • • • A minimlam post night of 26" may be used at locations where speeds are 40 MPH or less 6" to 12'1 6" to I2I Roil 6" to 12'1 1- White stripes Orange stripes • Ay Air AI Air r Air . 4 Min TYPE III BARRICADE White stripes Orange stripes Roils 6" to i2'1 6" to 12'I 45. 2' Min TYPE 11 BARRICADE BARRICADES Only face of rolls shown. 6orrleod. construction materials and Supports os specified In the specifications. I2'to6' DELINEATOR POSITIONING Whits stripes Orange stripes 6" to 12'1 RaI +5• 3"M1n 1 tr1y2'Max -1 T ii ii 1 l1 V CLASS I CLASS 2 FLEXIBLE POST METAL POST 31/=' 31/="xlz" Min 3"x12" •I Target plate reflector Oise 6"x24" when specified) 2 1/i MTn DELINEATORS to TYPE 1 BARRICADE See Note A BARRICADE TYPE 1 TYPE s TYPE 6 Width Of Roll 6"1.1in - 12"Max • 6"Min - 12''Max • 6"M6n - I2"Vox • Length of Raft 2' kiln . 2' Mtn 4' IN1 Width of Stripe. • • 6" 6" 6" N eight 3' Min 3' Min S' Min Number of Reflectorizea Raft Faces 2 tens each dlr•atlanl 4 itwe s001 dir•c+Ionl 3 If facing traffic In one direction 6 If facing troffle In two direction • For the wooden option dimensions are nomOxs Aimbsr dlmemitone. • • For rails less than 3 feet long, s Inch wide stripes shall be wed Note Ai Borricodes to have a mtnlmum of 270 swore Inches of on freeways. expressways. and other high speed highways. !active area faetng traffic when used LI oef Ca1Mlt ewiE tOYM. P50 Eet SN4 lSl&t t TYPE i REFLECTOR COLOR FRONT BACK E White White 15ee Note o F White None G Yellow None I ( Yellow Yellow (See Note 0 J 1 Red None NOTES l The re ctor ed on bock of delineator shall be one 3"square - - otNe sheeting or one standard reflex reflector. 2. The type of reflectorizotlon and the class of delineator _ to be installed VI be designated on the pions as E-I. F-2. eta 3. See Standard Plan A73B for metal post details. DELINEATOR REFLECTORIZATION STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION DELINEATORS, CHANNELIZERS AND BARRICADES NO SCALE co 1" Z V W I A73C Work Area Traffic Control Handbook • 7 25 MPH (40 Km/h) 30 MPH (45 Km/h) 35 MPH (50 Km/h) 40 MPH (60 Km/h) *50 MPH (80 Km/h) •55+MPH (85 Km/h) MINIMUM RECOMMENDED DELINEATOR AND SIGN PLACEMENT TRAFFIC SPEED TAPER LENGTH nm NE.....SPACING (Advance of Taper SIGN SPACING (Each Lane) i Between Signs) (TWO (Tanyanl) 25 Ft. (3m) 30 FL (9m) 35 FL (11m) 40 FL (12m) 45 FL (14m) 50 FL (15m) 50 FL (15m) 'Note: —See —Distancesuationa shown pia thesespeed s are approximate. 150 Fr. (50m) 200 Ft. (60m) 250 Ft. (75m) 350 Ft (110m) 550 Ft. (170m) 600 Ft (180m) 1000 R. (300m) 50 FL (15m) 60 Ft (18m) 70 FL (21m) 80 Ft (24m) 90 FL (27m) 100 Ft (30m) 100 FL (30m) 150 R. (50m) 200 FL (60m) 250 FL (75m) 350 FL (110m) 550 FL (170m) 600 FL (180m) 1000 FL (300m) 7-5. HIGH LEVEL WARNING DEVICES High level warning devices provide advance warning of a work area by being visible to a driver even when the work area is obstructed from view by vehicles or construction equipment. High level warning devices shall be at least eight feet (2.4m) high with legs, base or truck mounting designed to resist over- turning in brisk winds. Sandbags may be used to add weight to the base or legs. High level warning devices shall be equipped with a yoke at the top to accommodate at least three flags. Flags • shall be 16 inches (0.4m) square (minimum) and fabricated of high visibility orange material. Torn or dirty flags shall be immediately replaced. The high level warning device is shown on page 22 and shall be used at street approaches to locations where construction or maintenance work is.being performed within or immediately adja- cent to a traffic -lane. 7-6. WA F IFIG LIGHTS —ILLUMINATION Yellow flashing warning lights are optional and shall be used only outside the work area and to provide advance warning. Flashing warning lights shall not be used to channelize traffic; to sepa- rate opposing traffic; or to delineate the path that traffic is to follow. (It is not intended to prohibit the use of flashing warning lights which are uniformly spaced, interconnected and sequen- tially cycled). Flashing warning lights used for advance warning must be clearly distinguishable from the primary delineation and shall be positioned above the normal reflectorized barricades. Warning lights are portable, lens directed, enclosed and mounted at a minimum height of three feet (0.9m) measured from the bottom of the lens to the underlying surface. The color of the light emitted shall be yellow. They may be used in either a steady burn or flashing mode. Barricade warning lights shall be in ac- cordance with the requirements of ANSI D.10.1. • City of Fontana CALIFORNIA Jeff C. Bonadiman, Vice President Bonadiman-McCain, Inc. P.O. Box 6444 San Bernardino, CA 92412 RE: Slover Avenue Sewer. From Hemlock Avenue to Poplar Avenue Executed Contract Documents October 4,1999 Dear Mr. Bonadiman: Enclosed for your company's files is one fully executed original contract on the above referenced project. If you have any questions, please contact the undersigned at (909) 350-6646. Sincerely, Community Development Department Engineering Division re J. Bucknell, P.E. Prin pal Civil Engineer/Special Projects cc: City Engineer City Clerk's Office w/one original set of contract documents Accounting Clerk lI (LR) w/copy of City Council Action Report, proposal and contract pages www.fontana.org 8353 SIERRA AVENUE FONTANA, CALIFORNIA 92335-3528 (909) 350-7600 recycled paper LETTER OF TRANSMITTAL CITY OF FONTANA CDD/ENGINEERING DIVISION 8353 SIERRA AVENUE FONTANA, CA 92335 TO: Project: Stover Avenue Sewer from Hemlock Avenue to Poplar Avenue Date: September 20, 1999 Bonadiman-McCain, Inc. P. O. Box 6444 San Bernardino, CA 92412 ATTN: Jeff C. Bonadiman, Vice President We are sending you: (X) Attached ( ) Under seperate cover via the following item (s) : ( ) Drawing ( ) Prints (X) Plans ( ) Samples (X) Specifications ( ) Copy of Letter ( ) Change Order ( ) Check Prints ( ) Studies (X) Other: Six Sets of Plans and Specifications, and Three Orginal Contract Documents for Execution COPIES DATE NO. DESCRIPTION 3 Sets 09/20/99 6 Sets 09/20/99 N/A Orginal Contracts for Execution Dwq.No.2767 Plans and Specifications Dwq. No. 2767 Sheets 1-8 Purpose: (X) For your information/records ( ) For approval ( ) Approved as submitted (X) For your use ( ) Approved as noted (X) As requested ( ) For review and comment Please (X) Submit orginal Exec.Cont. ( ) Resubmit copies for approval (X) Submit 3 copies for distribution ( ) Return _ corrected prints (X) Other Please return all three sets of orginal contract documents for City's Execution ( ) Returned for corrections ( ) Other ( ) For bid due: ,19_ ( ) Prints returned after loaned to: Remarks: Copy to: Signed:/ Date: ‘9T^00-7y