Loading...
HomeMy WebLinkAbout0650-15_Fontana Auto Mall_5.4W-9 CITY OF FONTANA BID TALLY SHEET BID OPENING DATE: 10-21-99 TIME: 2:00 D.M. LOCATION: City Hall, Council Chambers, 8353 Sierra Avenue, FofMa, SUBJECT: Fontana Auto Mall on Site Sewer COMPANY NAME ADDRESS BOND. INS AM I. J and C Underpround 1813 I'L Rose St. Burbank, CA 91505 Y 3gga- 2. B & D Construction 145 N . loth Ave. Upland, CA 91786 ✓ 179797 0 3. Sean I1alek Engineering 3772 Brennan Ave. Perris, 92571 ao 184085 4. K.A.S. Equi pment Rental PO Box 9570 Ontario, CA 91762-957 ✓ 42,48 7 / 5•Flemina Environmental 6130 Valley View Buena Park, CA 90620 V V vo 0 1 6.Trautwein Construction 14046 Santa Ana Ave. Fontana, CA 92337 5 4 84 7 J •International Flow Technologies 30230 Los Alamos Murrieta, CA 92563 ✓ ✓ ti &g 12. 8. 9. 10. 11. 12. 13. 14. s Arrowhead FONTANA AUTO MALL Management ON -SITE, SEWER PLANS FOR PARCEL MAP 14518 Group IN THE CITY OF FONTANA RDAj BID NO. SB -12 - 00 Prepared By: Arrowhead Management Group BID DATE: Summary of Bidder's Tabulations Thursday, October 21, 1999 @ 2:00 p.m. K.A.S. Equip. & Rental, Inc. J&C Underground, Gen 818-526-0006 TTrautwein Const. 909-829-8258 IMATESj909-623-5481 Schedule of Work Pay Items: Unit Quan Price Amount Price Amount Price Amount Price Amount 1. Clearing and Grubbing LS 1 0.00 0 5,000.00 5,000 500.00 500 2,000.00 2,000 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 22.00 25,762 36.58 42,835 32.00 37,47 3. Const. 48" Dia. Precast Cone. Manhole EA 5 2,750.00 13,750 1,40..0.00 7,000 1,081.00 5,405 1,400.00 7,000 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 50.00 800 36.58 585 100.00 1,600 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 750.00 1,500 500.00 1,000 500.00 1,000 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with , Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 600.00 1,200 500.00 1,000 500.00 1,000 7. Pothole Existing Utilities EA 2 165.00 330 250.00 500 250.00 500 200.00 400 8. Sawcut Existing AC and Remove SF 300 3.00 900 1.00 300 - 0.83 249 5.00 1,500 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and Join with 7' +/- of New 8" Sewer LF 1 550.00 550 1,000.00 1,000 1,000.00 1,000 2,000.00 2,00 10. Construct 5 LF 8" VCP Stub at Grade of 0.004 LF 25 17.00 425 25.00 625 36.58 915 35.00 875 TOTAL BID 43,687 53,989 54,847 Note: Totals Rounded To Nearest Dollar 0 Aonn 1 Arrowhead Management Group Prepared By: Arrowliead Management Group ` FONTANA AUTO MALL ON -SITE SEWER PLANS FOR PARCEL MAP 14518 1N THE CITY OF FONTANA - RDA BID NO. SB -12 - 00 BID DATE: Summary of Bidder's Tabulations Thursday, October 21, 1999 @ 2:00 p.m. International Flow'rech., Inc 909-926-4849 Fleming Environ. Inc. 714-228-0935 ►1&D Construction 909-949-0360 . ; .. Schedule of Work Pay Items: Unit Quai I Price Amount Price Amount Price Amount Price Amount 1. Clearing and Grubbing LS 1 0.00 0 5,717.00 5,717 11,149.00 11,149 9,000.00 9,000 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 32.00 37,472 32.00 37,472 37.00 43,327 3. Const. 48" Dia. Precast Conc. Manhole EA 5 2,750.00 13,750 1,614.00 8,070 1,650.00 8,250 2,800.00 14,000 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 69.25 1,108 100.00 1,600 70.00 1,120 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 572.00 1,144 800.00 1,600 800.00 1,600 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 589.00 1,178 840.00 1,680 800.00 1,600 7. Pothole Existing Utilities EA 2 165.00 330 300.00 600 350.00 700 200.00 400 8. Sawcut Existing AC and Remove SF 300 3.00 900 1.20 360 5.00 1,500 19.00 5,700 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and .loin with 7' +/- of New 8" Sewer LF 1 550.00 550 273.00 273 350.00 350 300.00 - 300 10. Construct 5 LF 8" VCP Stub at Coracle of 0.004 LF 25 17.00 425 42.00 1,0.50 100.00 2,500 70.00 1,750 TOTAL BID 56,972 66,801 78,797 Note: Totals Rounded To Nearest Dollar Paae 2 Arrowhead Management Group Prepared By: Arrowhead Management Group FONTANA AUTO MALL ON -SITE SEWER PLANS FOR PARCEL MAP 14518 1N THE CITY OF FONTANA - RDA BID NO. SB -12 - 00 zv BID DATE: Summary of Bidder's Tabulations Thursday, October 21, 1999 @ 2:00 p.m. Sean Malek Eng. & Const. In JENGINEER'SIESTIMATEN909-943-2548 Schedule of Work Pay Items: I Unit I Quan Price I -Amount I Price Amount Price Amount Price Amount 1. Clearing and Grubbing LS 1 0.00 0 10,000.00 10,000 0 0 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 35.00 40,985 0 0 3. Const. 48" Dia. Precast Conc. Manhole EA 5 2,750.00 13,750 3,750.00 18,750 0 0 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 200.00 3,200 0 0 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 1,600.00 3,200 0 0 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 1,500.00 3,000 0 0 7. Pothole Existing Utilities EA 2 165.00 330 600.00 1,200 0 0 8. Sawcut Existing AC and Remove SF 300 3.00 900 5.00 1,500 0 0 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and Join with 7' +/- of New 8" Sewer' LF 1 550.00 550 1,000.00 1,000 0 0 10. Construct 5 LF 8" VCP Stub at Grade of 0.004 LF 25 17.00 425 50.00 1,250 0 0 TOTAL BID 84,085 Note: Totals Rounded To Nearest Dollar Panes Arrowhead Management Group DOCUMENT TRANSMITTAL Method of Transmittal: ✓ Hand Delivered O U.S. Mail O Federal Express O Golden State Overnight Date: October 22, 1999 To: Greg Bucknell Company: City of Fontana 'From: Glen R. Sams Arrowhead Management Group Job Reference: City of Fontana Auto Mall Item(s) Transmitted: Summary of Bidder's Tabulations for On -Site Sanitary Sewer for Parcel Map 14518 in the City of Fontana - RDA. Comments: ARROWHEAD MANAGEMENT GROUP • 190 North Arrowhead Avenue • Suite E • Rialto, California 92376 • Phone: (909) 873-9660 • Fax: (909) 873-9661 Arrowhead FONTANA AUTO MALL Management ON -SITE SEWER PLANS FOR PARCEL MAP 14518 Group IN THE CITY OF FONTANA - RDA - BIDNO.SB-12-00 Prepared By: BID DATE: Thursday, October 21, 1999 @ 2:00 p.m. Arrowhead Management Group Project Manager Summary of Bidder's Tabulations A.S. Equip. & Rental, Inc. 909-623-5481 J&C Underground, Gen. 818-526-0006 Trautwein Const: 909-829-8258 Schedule of Work Pay Items: Unit Quan Price Amount Price Amount Price Amount Price Amount 1. Clearing and Grubbing LS 1 0.00 0 5,000.00 5,000 500.00 500 2,000.00 2,000 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 22.00 25,762 36.58 42,835 32.00 37,472 3. Const. 48" Dia. Precast Conc. Manhole EA 5 2,750.00 13,750 1,400.00 7,000 1,081.00 5,405 1,400.00 7,0 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 50.00 800 36.58 585 100.00 1,600 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 750.00 1,500 500.00 1,000 500.00 1,000 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 600.00 1,200 500.00 1,000 500.00 1,000 7. Pothole Existing Utilities EA 2 165.00 330 250.00 500 250.00 500 200.00 400 8. Sawcut Existing AC and Remove SF 300 3.00 900 1.00 300 0.83 249 5.00 1,500 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and Join with 7' +/- of New 8" Sewer LF 1 550.00 550 1,000.00 1,000 1,000.00 1,000 2,000.00 2,000 10. Construct 5 LF 8" VCP Stub at Grade of 0.004 LF 25 17.00 425 25.00 625 36.58 915 35.00 87 TOTAL BID 43,687 53,989 54,847 Note: Totals Rounded To Nearest Dollar Page 1 Arrowhead FONTANA AUTO MALL Management ON -SITE SEWER PLANS FOR PARCEL MAP 14518 Group IN THE CITY OF FONTANA - RDA BID NO. SB - 12 - 00 Prepared By: BID DATE: Thursday, October 21, 1999 @ 2:00 p.m. Arrowhead Management Group Project Manager Summary of Bidder's Tabulations International Flow Tech., Inc 909-926-4849 Fleming Environ. Inc. 714-228-0935 B&D Construction 909-949-0360 Schedule of Work Pay Items: Unit Quan Price Amount Price T Amount Price Amount Price F Amount 1. Clearing and Grubbing LS 1 0.00 0 5,717.00 5,717 11,149.00 11,149 9,000.00 9,000 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 32.00 37,472 32.00 37,472 37.00 43,327 3. Const. 48" Dia. Precast Cone. Manhole EA 5 2,750.00 13,750 1,614.00 8,070 1,650.00 8,250 2,800.00 14,0 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 69.25 1,108 100.00 1,600 70.00 1,120 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 572.00 1,144 800.00 1,600 800.00 1,600 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 589.00 1,178 840.00 1,680 800.00 1,600 7. Pothole Existing Utilities EA 2 165.00 330 300.00 600 350.00 700 200.00 400 8. Sawcut Existing AC and Remove SF 300 3.00 900 1.20 360 5.00 1,500 19.00 5,700 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and Join with 7' +/- of New 8" Sewer LF 1 550.00 550 273.00 273 350.00 350 300.00 300 10. Construct 5 LF 8" VCP Stub at Grade of 0.004 LF 25 17.00 425 42.00 1,050 100.00 2,500 70.00 1,75 TOTAL BID 56,972 66,801 78,797 Note: Totals Rounded To Nearest Dollar Page 2 Arrowhead FONTANA AUTO MALL Management ON -SITE SEWER PLANS FOR PARCEL MAP 14518 Group IN THE CITY OF FONTANA - RDA BID NO. SB-12-00 Prepared By: BID DATE: Thursday, October 21, 1999 @ 2:00 p.m. Arrowhead Management Group Project Manager Summary of Bidder's Tabulations Sean Malek Eng. & Const. In 909-943-2548 Schedule of Work Pay Items: I Unit I QuagnIF Price I Amount Price 177Xmount Price Amount Price Amount 1. Clearing and Grubbing LS 1 0.00 0 10,000.00 10,000 0 0 2. Const. 8" Extra Strength V.C.P. LF 1,171 24.00 28,104 35.00 40,985 0 0 3. Const. 48" Dia. Precast Cone. Manhole EA 5 2,750.00 13,750 3,750.00 18,750 0 4. Const. 6" V.C.P. Lateral LF 16 18.00 288 200.00 3,200 0 0 5. Const. Sewer Terminal Cleanout Per City of Fontana STD Detail 128 Modified Vitrified Clay Pipe Stopper to Allow Remval EA 2 550.00 1,100 1,600.00 3,200 0 0 6. Const. 6" Cleanout Per City of Fontana STD Detail 125 with Cleanout Box Per City of Fontana STD Detail 125A EA 2 550.00 1,500.00 3,000 0 0 7. Pothole Existing Utilities EA 2 165.00 330 600.00 1,200 0 0 8. Sawcut Existing AC and Remove SF 300 3.00 900 5.00 1,500 0 0 9. Contractor to Verify Vertical and Horizontal Location of Existing 8 Sewer and Join with 7' +/- of New 8" Sewer LF 1 550.00 550 1,000.00 1,000 0 0 10. Construct 5 LF 8" VCP Stub at Grade of 0.004 LF 25 17.00 425 50.00 1,250 0 TOTAL BID 84,085 Note: Totals Rounded To Nearest Dollar Page 3