Loading...
HomeMy WebLinkAbout0650-15_Fontana Auto Mall_19.1` CITE" OF' FONTANA AUTO MALL LJ PROJECT: ON -SITE SEWER IMPROVEMENTS FOR PARCEL MAP 14518 IN THE CITY OF FONTANA - RDA CONTRACT NO: SB-12-00 CONTRACTOR: K.A.S. EQUIPMENT & RENTAL, INC. CONTRACT CO NO. 1 SUPP. DATE:_ February 14, 2000 ORIGINAL CONTRACIMOUNT $43,687.00 ESTIMATE OF COST THIS CCO TOTAL TO DATE CONTRACT ITEM ($675.00) ($675.00) FORCE ACCT. AGREED PRICE ($250.00) ($250.00) ADJUSTMENT TOTAL $925.0!--b $925.00 % UNDER CONTRACT 2.12 2.12%\ CONTINGENCY BALANCE (INCL.THIS CO) $5,293.70 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specification on the contract. NOTE: This change order is not effective until approved by the City Engineer. NO. CONTRACT DESCRIPTION QTY UNIT UNIT TOTAL ITEM NO. OF WORK PRICE ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- RE: REFERENCE ORIGINAL BID ITEM NOS. BASED ON ACTUAL QUANTITIES INSTALLED, THE FOLLOWING ADJUSTMENTS HAVE BEEN MADE TO THE ORIGINAL CONTRACT. 1. 4. Const. 6" VCP Lateral (Add) 12 LF $50.00 $600.00 2. 5. Const. Sewer. Terminal Cleanout per City of Fontana STD Detail 128. Pipe stopper to allow removal. Delete frame and cover for this item.2 EA $ 125.00 ($250.00) (Delete) 3. 6. Const. 6" cleanout per City of Fontana STD Detail 125 with cleanout box per City of Fontana STD Detail 125A -(Delete) 1 EA $600.00 ($600.00) 4. 7. Pothole existing utilities (Delete) 1 EA $250.00 ($250.00) 5. 8. Sawcut existing AC remove (Delete entire item)300 SF $1.00 ($300.00) 6. 10. Const. 5 LF 8" VCP stub grade of 0.004 (Delete) 5. LF $25.00 ($125.00) 2z ��, � • Page 2 of 2 Estimated Cost Decrease$ 925.00 or Increase$ By reason of this or r t e ime of pletion will be adjusted as follows:N/A Approval Recommend Date: /27L Gl R. Sams City Construction Managaer Arrowhead Management Group Submitted by: ' Z. Date: a/"nA v ity Public Works �gspector Approved Recommended: City ]�. c Approved: City Engineer anager Date: 60'04--oo Date • L/ ��' 0 We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the word above specified, and will accept as full payment therefor the prices shown above. Accep ed, bate�% Contractor KA6 • c7otuawew J R-/VTig4/mC F4 FA WO Ai-4 Me