Loading...
HomeMy WebLinkAbout5883-14Data D D (n N Reference Evapotranspiration (Eto) Amounts: Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2.00 1 2.70 1 3.80 1 4.60 1 5.70 1 6.90 1 7.90 1 7.40 1 5.90 1 4.20 1 2.60 2.00 Total Yearly Eto: 55.60 inches P.O.C. 'P3' WATER USE CALCULATIONS & SCHEDULING PRESSURE LOSS CALCULATIONS - CFD (BASED ON CURRENT CONDITION) VALVE # VARIES GPM 30 GPM (UP TO (2) VALVES RUN SIMUL.) WATER METER (2") 0.8 BALL VALVES (3") 1.0 BACKFLOW PREVENTER (2") 12.0 FLOW METER (3") 1.0 MASTER VALVE (2") 0.6 VALVE 0.6 MAINLINE (120' @ 3") 0.1 MAINLINE (LOOPED) (554' @ 3") 0.1 MAINLINE (225' @ 3") 0.3 LATERAL LINE (5.0 MAX.) ELEVATION CHANGE (UP GRADE 19.0') 8.2 FITTING LOSS (10%) 3.0 TOTAL PRESSURE LOSS 32.7 MINIMUM OPERATING PRESSURE 30 10% RESIDUAL PRESSURE REQUIRED 6.1 DESIGN PRESSURE REQUIRED 68.8 AVAILABLE PRESSURE (P.O.C.) 68.8 RESIDUAL PRESSURE REMAINING +0.0 IRRIGATION DESIGN CRITERIA -'P3' Name of Water Supplier: West Valley Water District 11-26-18 Pressure Given By : Daniel Guerra @ Engineering (909) 875-1322 HGL - 1884 68.8 PSI ZONE 6 HIGHEST ELEVATION ON THIS SYSTEM 1744.0 LOWEST ELEVATION ON THIS SYSTEM 1723.5 WATER METER ELEVATION 1725.0 Contractor shall verify the static water pressure with supplier prior to installation. If different from PSI noted above, Contractor to notify Owner for instructions. Failure to do so will result in contractor being responsible for changes that might occur. Gabion Ranch - PA3 PARK (CFD)- California Water Efficient Landscape Worksheet - P.O.C. TT Reference Evapotranspiration (ETo) 1 55.6 Project Type Non -Residential 0.45 Hydrozone #/ Planting Description" Plant Factor (PF) Irrigation Methodb Irrigation Efficiency (IE)` ETAF (PF/IE) Landscape Area (Sq. Ft.) JETAFx lArea Estimated Total Water Regular Landscape Areas HZ 1 - SHRUB - DRIP - L 0.2 Drip 0.81 0.25 6092 1504 51853 HZ 2 -SHRUB -DRIP - M 0.5 Drip 0.81 0.62 13,432 8291 285820 HZ 3 - SHRUB - SPRAY/ROTOR - M 0.5 Overhead 0.75 0.67 19,526 13017 448734 HZ 5 - SHRUB - SPRAY/ROTOR - L 0.2 Overhead 0.75 0.27 8968 2391 82439 HZ 6 - TREE - BUBBLER - M 0.5 Drip 0.81 0.62 125 77 2660 HZ7- VINE - EMITTER -M 0.5 Drip 0.81 0.62 1371 85 2915 NON -IRRIGATED AREA 0.75 0.00 12089 0 0 0.751 0.00 0 0 Totals 60369 25366 1 874420 Special Landscape Areas HZ4- TURF -SPRAY/ROTOR-H 1 9065 9065 312489 1 0 0 0 0 1 1 0 0 Totals 9065 9065 312489 ETWU Total 1186908 Maximum Allowed Water Allowance (MAWA)e 1248957 ETAF Calculations Regular Landscape Areas Total ETAF x Area 25366 Total Area 60,369 Average ETAF 0.42 All Landscape Areas Total ETAF x Area 34431 Total Area - See Note #1 69434 Average ETAF 0,50 Average ETAF for Regular Landscape Areas must be 0.55 or below for residential areas, and OAS or below for non-residential areas. NOTE: 1. TOTAL AREA ABOVE IS AN ADJUSTED TOTAL FOR IRRIGATION CALCULATION PURPOSES ONLY 2. ACTUAL TOTAL LANDSCAPE AREA FOR RO.C.'PT IS 69,081 SF Irrigation System Information: Station 'Plant Facto? Irr Tvve ' so It area' Opt ' Efficiencv GPM ' Hvdrozone Notes P3-1 0.5 Drip - 18" 2,760 0.43 81% 13.80 Moderate Potable P3-2 0.2 Drip-18" 3,187 0.43 81% 15.90 Low Potable P3-3 0.5 Drip - 18" 3,083 0.43 81% 15.40 Moderate Potable 1334 0.5 Drip - 18" 2,952 0.43 81% 14.80 Moderate Potable P3-5 0.5 Bubbler 37 1.00 75% 18.50 Moderate Potable P3-6 0.5 Bubbler 33 1.00 75% 16.50 Moderate Potable P3-7 0.5 Bubbler 26 1.00 75% 13.00 Moderate Potable P3-8 0.5 Spray 3,617 0.63 75% 26.90 Moderate Potable P3-9 0.5 Spray 3,321 0,63 75% 22.80 Moderate Potable P3-10 0.5 Bubbler 29 1.00 75% 14.50 Moderate Potable P3-11 0.5 Spray 1,415 0.63 75% 13.90 Moderate Potable P3-12 0.5 Spray 1,840 0.63 75% 22.10 Moderate Potable P3-13 0.5 Spray 2,353 0.63 75% 24.60 Moderate Potable P3-14 0.5 Drip - 18" 2,323 0.43 81% 11.60 Moderate Potable P3-15 0.5 Emitter 20 1.00 81% 1.30 Moderate Potable P3-16 0.8 Spray 2,829 0.63 75% 27.80 High Potable P3-17 0.5 Rotor 2,006 0.63 75% 19.20 Moderate Potable P3-18 0.5 Rotor 1,434 0.63 75% 15.10 Moderate Potable P3-19 0.5 Rotor 2,272 0.63 75% 25.40 Moderate Potable P3-20 0.5 Spray 1,268 0.63 75% 9.80 Moderate Potable P3-21 0.5 Drip - 18" 345 0.43 81% 1.70 Moderate Potable P3-22 0.2 Drip - 18" 2,905 0.43 81% 14.50 Low Potable P3-23 0.2 Spray 777 0.63 75% 5.10 Low Potable P3-24 0.2 Spray 1 754 0.63 75% 7.30 Low Potable P3-25 0.5 Emitter 117 1.00 81% 7.80 Moderate Potable P3-26 0.2 Spray 1,397 0.63 75% 10.30 Low Potable P3-27 0.2 Spray 1,044 0.63 75% 13.60 Low Potable P3-28 0.8 Spray 4,024 0.63 75% 28.90 High Potable P3-29 0.8 Spray 2,212 0.63 75% 20.70 High Potable P3-30 0.2 Spray 2,333 0.63 75% 18.80 Low Potable P3-31 0.5 Drip-18" 1,969 0.43 81% 9.80 Moderate Potable P3-32 0.2 Spray 2,663 0.63 75% 24.30 Low Potable *IRRIGATION SCHEDULE WITH POTABLE WATER Establishment Irrigation Schedule Station Run Days per week Cycles (Starttimes) Minutes per Cycle Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec P3-1 5 1 10 14 20 24 29 36 41 38 30 22 13 10 P3-2 5 1 4 6 8 10 12 14 16 15 12 9 5 4 P3-3 5 1 10 14 20 24 29 36 41 38 30 22 13 10 P3-4 5 1 10 14 20 24 29 36 41 38 30 22 13 10 P3-5 5 1 5 6 9 11 14 17 19 18 14 10 6 5 P3-6 5 1 5 6 9 11 14 17 19 18 14 10 6 5 P3-7 5 1 5 6 9 11 14 17 19 18 14 10 6 5 P3-8 3 1 1 13 17 24 29 36 44 50 47 37 27 17 1 13 P3-9 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-10 5 1 5 6 9 11 14 17 19 18 14 10 6 5 P3-11 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-12 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-13 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-14 5 1 5 6 9 11 14 17 19 18 14 10 6 5 P3-15 5 1 4 6 8 10 13 15 18 16 13 9 6 4 P3-16 3 1 20 27 39 47 58 70 80 75 60 43 26 20 P3-17 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-18 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-19 3 1 13 17 24 29 36 44 42 47 37 27 17 13 P3-20 3 1 13 17 24 29 36 44 50 47 37 27 17 13 P3-21 5 1 10 14 20 24 29 36 41 38 30 22 13 10 P3-22 5 1 4 6 8 10 12 14 16 15 12 9 5 4 P3-23 3 1 5 7 10 12 14 18 20 19 15 11 7 5 P3-24 3 1 5 7 10 12 14 18 20 19 15 11 7 5 P3-25 5 1 4 6 8 10 13 15 18 16 13 9 6 4 P3-26 3 1 5 7 10 12 14 18 20 19 15 11 7 5 P3-27 3 1 5 7 10 12 14 18 20 19 15 11 7 5 P3-28 3 1 20 27 39 47 58 70 80 75 60 43 26 20 P3-29 3 1 20 27 39 47 58 70 80 75 60 43 26 20 P3-30 3 1 5 7 10 12 14 18 1 20 1 19 15 11 7 5 P3-31 5 1 1 1 10 14 20 24 29 36 1 41 1 38 30 1 22 1 13 1 10 P3-32 3 1 1 1 5 7 10 12 14 18 1 20 1 19 1 15 1 11 1 7 1 5 NOTE: FOR THE ESTABLISHMENT PERIOD, THE CONTRACTOR IS TO SELECT THE APPROPRIATE 90 DAY PERIOD (I.E. MAY,JUNE,JULY) FROM THE ANNUAL SCHEDULE PROVIDED RUN TIMES COMPLY WITH WATERING WINDOW REQUIREMENTS Established Irrigation Schedule Station Run Days perweek Cycles (Starttimes) Minutes per Cycle Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec P3-1 5 1 9 12 16 20 25 30 34 1 32 25 18 11 9 P3-2 5 1 3 5 7 8 10 12 14 13 10 7 4 3 P3-3 5 1 9 12 16 20 25 30 34 32 25 18 11 9 P34 5 1 9 12 16 20 25 30 34 32 25 18 11 9 P3-5 5 1 4 5 8 9 11 14 16 15 12 8 5 4 P3-6 5 1 4 5 8 9 11 14 16 15 12 8 5 4 P3-7 5 1 4 5 8 9 11 14 16 15 12 8 5 4 P3-8 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-9 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-10 5 1 4 5 8 9 11 14 16 15 12 8 5 4 P3-11 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-12 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-13 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-14 5 1 4 5 8 9 11 14 16 15 12 8 5 4 P3-15 5 1 4 5 7 9 11 13 15 14 11 8 5 4 P3-16 3 1 17 23 32 39 48 58 67 63 50 36 22 17 P3-17 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-18 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-19 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-20 3 1 11 14 20 24 30 37 42 39 31 22 14 11 P3-21 5 1 9 12 16 20 25 30 34 32 25 18 11 9 P3-22 5 1 3 5 7 8 10 12 14 13 10 7 4 3 P3-23 3 1 4 6 8 10 12 15 17 16 12 9 6 4 P3-24 3 1 4 6 8 10 12 15 17 16 12 9 6 4 P3-25 5 1 4 5 7 9 11 13 15 14 11 8 5 4 P3-26 3 1 4 6 8 10 12 15 17 16 12 9 6 4 P3-27 3 1 4 6 8 10 12 15 17 16 12 9 6 4 P3-28 3 1 17 23 32 39 48 58 67 63 50 36 22 17 P3-29 3 1 17 23 32 1 39 48 58 67 63 1 50 36 1 22 1 17 P3-30 3 1 4 6 8 10 12 15 17 16 12 9 6 4 P3-31 5 1 9 12 16 20 25 30 34 32 25 1 18 1 11 1 9 23-32 3 1 4 6 8 1 10 12 15 17 16 12 1 9 1 6 1 4 *IRRIGATION SCHEDULE WHEN RECYCLED WATER IS AVAILABLE Established Irrigation Schedule Station Run Days per week Cycles (Start times) Minutes per Cycle Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec P3-1 7 1 6 8 12 14 18 21 24 23 18 13 8 6 P3-2 7 1 2 3 5 6 7 8 10 9 7 5 3 2 P3-3 7 1 6 8 12 14 18 21 24 23 18 13 8 6 P3-4 7 1 6 8 12 14 18 21 24 23 18 13 8 6 P3-5 7 1 3 4 5 7 8 10 11 11 8 6 4 3 P3-6 7 1 3 4 5 7 8 10 11 11 8 6 4 3 P3-7 7 1 3 4 5 7 8 10 11 11 8 6 4 3 P3-8 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-9 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-10 7 1 3 4 5 7 8 10 11 11 8 6 4 3 P3-11 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-12 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-13 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-14 7 1 3 4 5 7 8 10 11 11 8 6 4 3 P3-15 7 1 3 4 5 6 8 9 10 10 8 6 3 3 P3-16 7 1 7 10 14 17 21 25 29 27 21 15 9 7 P3-17 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-18 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-19 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-20 7 1 5 6 9 10 13 16 18 17 13 10 6 5 P3-21 7 1 6 8 12 14 18 21 24 23 18 13 8 6 P3-22 7 1 2 3 5 6 7 8 10 9 7 5 3 2 P3-23 7 1 2 2 3 4 5 6 7 7 5 4 2 2 P3-24 7 1 2 2 3 4 5 6 7 7 5 4 2 2 P3-25 7 1 3 4 5 6 8 9 10 10 8 6 3 3 P3-26 7 1 2 2 3 4 5 6 7 7 5 4 2 2 P3-27 7 1 2 2 3 4 5 6 7 7 5 4 2 2 P3-28 7 1 7 10 14 17 21 25 29 27 21 15 9 1 7 P3-29 7 1 7 10 14 17 21 25 29 27 21 15 9 7 P3-30 1 7 1 2 2 3 4 5 6 7 7 5 4 2 2 P3-31 1 7 1 6 8 12 14 18 21 24 23 18 13 8 6 P3-32 1 7 1 2 2 3 4 5 6 7 7 5 4 2 2 S I T E S C A P IC i Landscape Architecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamus, License CA-#2782 (949) 644-9370 (714) 210-3140 FAX w'QZU Uj 0 U O It IL ® �& V U W CA CA F- 00 M � N CS1 Cd y0-I O Ste" U O ^ Cd W O O O U �Q vANDSOgPF ��2 pQp M PO(pq '49C PC* LSPC-19000018 DATE 4/12/19 JOB # 18-025 L13 14 OF 21