Loading...
HomeMy WebLinkAbout5883REF-63 7 1 6d — I—A - 4. A. e '�. 1/2" R. (TYP.) c , e AW 2 2 i DECORATIVE SAWCUT SAWCUT CONTROL EXPANSION JOINT JOINT JOINT AT VERTICAL SURFACE 2 1 50'° MIN. ®SIDEWALK „ �4 7\ F G 1 /2"R F(TYP.) 4 dco d 1, c VARIES-SEE PLAN 1/2 R. (TYP.) 1 6 d. \ 2 a 1777 6" c c 1 Q II 5 II e ._ na e \ d x c0 14 .. I %171Q. 99 ItC7,}32 5 5 Q a 2 ENLARGEMENT O DECOMPOSED GRANITE O SAWCUT EXPANSION JOINT N.T.S. / O CONCRETE GRADE BEAM O 12" 3 O FINISH GRADE OCONCRETE SCORE JOINTS "DECORATIVE BANDS SEE PLAN FOR WIDTH & O CONCRETE PAVING FOR COLOR AND �— O (2) #3 REBAR — CONTINUOUS ® TOP & BOTTOM O FINISH GRADE O SUBBASE PER SOILS REPORT LOCATION FINISH, SEE FINISH SCHEDULE ON SHEET L-1 O s�o " DIA. X 24LONG SMOOTH STEEL 4O BASE COMPACT PER SOILS REPORT O3 BASE MATERIAL & DEPTH @CONCRETE PAVING TEXTURE TO OY4" DOWEL ® 18 O.C. FOR PEDESTRIAN. USE "SPEED AZTEC CONCRETE 2O CONCRETE GRADE BEAM O PER SOILS REPORT BE MEDIUM BROOM FINISH UNLESS EXPANSION MATERIAL DOWEL" BY 3O (2) #3 REBAR —CONTINUOUS INDICATED ON PLAN STEEL REINFORCING PER SOILS O Ysrd DEPTH OF THE PAVING THICKNESS ACCESSORIES ® TOP & BOTTOM 'OTHERWISE (2)DEEPENED FOOTING, AS REQUIRED FOR REPORT. IF NONE IS INDICATED `CHANGE O REINFORCING PER STRUCTURAL ENG. ® BASE COMPACT PER IN GRADE THEN INSTALL #3 REBAR 0 18" O.C. (BOTHWAYS) O BACKER ROD AND 'TRAFFIC CAULKrr O Ya" SOILS REPORT JOINT SEALANT TO MATCH CONCRETE TOOLED RADIUS (OMIT IN AREAS UNDER 5' WIDE) COLOR. APPLY SAND FINISH TO CAULK SURFACE AFTER APPLICATION Og VERTICAL SURFACE 1 0 CONCRETE PAVING 2 0 CONCRETE JOINTS 3 0 CONCRETE BAND/D.G. PAVING 4O CONCRETE STEP EXTENSION / GRADE BEAM 6' 1 O CUSTOM 3"X3" #5Ga. RAW STEEL OPRECISION WALL CAP 17 3' 3' GABION BASKET. 24"x24 x72 PER BASIC MODULE @FOOTING &REBAR PER STR. ENG. O 4" DIA. LODGEPOLE FENCE POST AS END ® GALVANIZED TURNBUCKLE 5 O ASSEMBLE ON SITE USING RAW STEEL (i)8" WIDE SPLIT FACE BLOCK 17 ANCHORS W/ 1/2 CHAMFER AT TOP. C—HOG RINGS AT ALL CORNERS AND CONSTRUCTION SET INTO NATIVE AS REQUIRED O FOR CABLE DRILL HOLE THRU POST SIDES TO BE 8" O.C. O APPROVED PLANTER WATERPROOFING MEMBRANE. l�THICK STAINLESS STEEL CABLE O " WITH ALUMINUM FERREL CLAMPS 6 2 Y4" DIA. PRESSURED TREATED iv 30INSTALL (X4) STIFFENERS PER iv @EXPANSION JOINT AT TOP, MIDDLE, AND BOTTOM LODGEPOLE STAKE, DRIVE INTO 2 EXPOSED FACE, AND (X2) PER BACK FACE. O CONCRETE PAVING O" EYEBOLT W/ FLAT WASHER INTO NATIVE SOIL AS REQUIRED AND LOCKING NUT O PLASTIC NURSERY TIE O4 RAW STEEL DIAPHRAGM IN THE O APPROVED PLANTER BACKFILL MIX. 4„ FG CENTER OF MODULE ® VINEYARD IRRIGATION SYSTEM SQ. J 1 4 BASIC MODULE PLAN VIEW O COMPACTED SUB —BASE SEE DETAIL 4, SHEET L-12 ELEVATION —LOW WALL CONDITION O5 STONE TO EAGLE ROCK 1 2' RUBBLE 6" TO 10"; x 8" 8' O.C. —TYPICAL 3 AVAILABLE FROM SEPULVEDA to BUILDING MATERIAL. ON EXPOSED FACES OF GABIONS, PLACE 5 , 7 2 4 STONES BY HAND WITH FLATTEST F G N \ 5 SURFACE BEARING AGAINST FACE _ _ _. 4 MESH TO PRODUCE SATISFACTORY -' a ALIGNMENT AND APPEARANCE. II N � 2 II t0 3 -I W h 3 io N M \ e / GRAVITY STACK AND SECURED 7F7 4 _ - - - � 5 iv ° BY C—RINGER '��� 6 iffil/ y I � _' � F.S. .. N Rim 8 • e •... e Z Uj e. 8 a• FG 7_Li to VINEYARD TRELLIS ENLARGEMENT / ARTIA AS REQUIRE PER PER STR. ENG. BASIC MODULE ISOMETRIC SITE GRADING ELEVATION —HIGH WALL CONDITION CONDITION �5 VINEYARD TRELLIS O6 GABION WALL O7 CMU RETAINING WALL Mal. ju BRENUE 1 CITY OF FONTANA PA-3 PARK SITE LANDSCAPE PLANS (CFD) Call Underground Service Alert DRAVK BY, scab GABION RANCH at least 2 days AS SHOWN DESIGNED DT before you dig CONSTRUCTION DETAILS 1 A CHECKED BY, APPRtIVED BY, Dwtc No' 6 Know whats below. Call before you dig. DATE po 21 sITescAPIE% Landscape Arctrifecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard PO ohms, License CA— 2782 (949) 644-9370 (714) 210-3140 FAX REVISION U z WMOD a H 0 U IL 0 U 00 N d1 O ,w � U 50 F� O 00 U CO) O ZLU o U � v 3 a � Z � o O to �ANDS(;gPf PC * LSPC-19000018 DATE 4/12/19 JOB # 18-025 L 5 6 OF 21 !rPf P•\1 R\1 R-n9c; RPr ArPac-Parkc\I nnricranP\PA \Xrafe\X1 R-fl7r, PAR-TR riXAm