HomeMy WebLinkAbout5861-1GA ION
SUMMIT
LANDSCAPE IMPROVEMENT PLANS
STA. 126+27-29 TO
152+90N62
TR. 20153
CITY OF FONTANA, CALIFORNIA
LENNAR HOMES
980 Montecito Dr. #302
Corona, California 92879
AfIr. Af.O- Afr-
_TJ1 71 rjl
ections:
City Required Notes:
Insp
1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior
to desired inspection of an item at (909) 350-6632
2. Prior to the release of utilities or maintenance period commencement, the
following inspections are required:
Pre -construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting.
Planting, including street trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
Compliance with approved plans.
Final Inspection.
3. The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana
"Standard Landscape Specification Manual for Streetscapes" shall become a part of this document.
Required Statements and Certifications:
4- vAin—imum 3 inGh layor of mulch shall be applied on all oxposed soil surfaGos of plami urf mas, Greoping or -
rooting graundoo;,Grs, or- pliGations where mulyh is
b. "For soils less than six -percent (6%) organic matter in the top six (6) inches of soil, compost at a rate of a minimum of four (4)
cubic yards per one -thousand (1,000) square feet of permeable area shall be incorporated to a depth of six (6) inches into the
soil."
c. "At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion,
certificate of installation, and an irrigation schedule of landscape and maintenance."
d. "Recirculating water systems shall be used for water features."
e. "Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure of the specified
irrigation devices."
f. "Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur."
g. "A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management
purposes."
h. A Certificate of Completion shall be filled out and certified by either the designer of the landscape plans, irrigation plans, or the
licensed landscape contractor for the project.
i. No Certificate of Occupancy shall be issued until a City landscape inspector has verified that all irrigation, grading, and
planting have been completed in accordance with the approved plans and specifications of FCC Section 28-117 at time of final
inspection.
j. An irrigation audit report shall be completed per FCC Section 28-106 at time of final inspection.
k. With regard to landscape maintenance districts or public landscape, it shall be the responsibility of the developer to comply with
FCC Section 28-118, Special Landscape District Requirements.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning Of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition.
8. Stakes, guys, and ties On trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering Division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
SOILS REPORT NOTE:
After grading of site is complete, soils report will be prepared and provided by owner to
contractor for his information prior to construction. Upon completion of project, owner will
provide report to city inspector for record purposes.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
Underground Service Alert QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
,FORE Y IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
Q�� c Call: TOLL FREE ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
1-800 PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
"1111� 422-4133 IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
TWO WORKING DAYS BEFORE YOU DIG
VICINITY MP
PROJECT VITE
CASA
SUMMIT
BASELINE D
O
FOOTHILL BLVD Q
66
w
a � �
z w �
� v �
w SAN BERNARDINO VE
10
O
N.T.S.
BEET
-
R�- (r
N.T.S.
GRhN
I I � I
— o
��-
J md—
jM-5i<l..l.—_�
j-1 - �I
��J }1�I.I_; �1 l H j it
LU rr i[r
TRt #I ��l P", 'F:11 �` �I `II ! I'II
E �-21�% Jl
r
-1I 1, 1 ,mil li J�
SUMMIT AVE. 0
N.T.S.
BEET INDEX
Tl
COVER SHEET
Ll
CONSTRUCTION NOTES & LEGEND
L2
CONSTRUCTION PLAN
L3
CONSTRUCTION PLAN
L4
CONSTRUCTION DETAILS
L5
CONSTRUCTION DETAILS
L6
CONSTRUCTION DETAILS
L7
IRRIGATION NOTES, LEGEND & DETAILS
L8
IRRIGATION DETAILS
L9
IRRIGATION DETAILS, CALCS. & SCHEDULES
L10
IRRIGATION MAINLINE MASTER PLAN
Ll 1
IRRIGATION PLAN
L12
IRRIGATION PLAN
L13
PLANTING NOTES, LEGEND & DETAILS
L14
PLANTING PLAN (TREES & GROUNDCOVER)
L15
PLANTING PLAN (TREES & GROUNDCOVER)
L16
PLANTING PLAN (SHRUBS & VINES)
L17
PLANTING PLAN (SHRUBS & VINES)
L18
SPECIFICATIONS
Overall Quantity Breakdown
Perimeter Landscape Area =
50,315 S.F.
Perimeter Hardscape:
Cone. Sidewalk =
19,124 S.F.
Cobble (Gouted)=
1,755 S.F.
Open DIG Area / Cobble=
5,600 S.F.
Median Landscape Area =
13,324 S.F.
Median Hardscape:
Cobble (Grouted)=
10,480 S.F.
Total Landscape Area = 63,639 S.F.
Total Hardscape = 36,959 S.F.
JOB NO.
VK1hDr Z
A/
2782 A�1 3 0 2 3
9,GNATURE DATE
2/18/19 �Q
% cry DATE ,q
9�FOr CAS\F��\ 2-13-1
S 1 T
Landscape
Architecture
& Planning
E S C Jk
3190 B2 Airport Loop Dr.,
Costa Mesa, CA. 92626
Richard Polhamus, License # 2782
P E S
(949)644-9370
FAX (714) 210-3140
SUBMITTALS
1st Submittal 2/28/19
2nd Submittal 5/7/19
3rd Submittal 7/29/19
APPROVALS
O ti
RE V I S 1
0
0
0
0
0
0
CITY
OF FONTANA
LANDSCAPE PLANS
D�WNDY
SUMMIT AVENUE
STA. 126 + 27.29 TO 152 + 90.62
TITLE SHEET
$� LE.
AS SHOWN
DESIGNEDBY:
DATE:
CHECKED BY:
gPPROVED
DWG. No
S
117
N
ZW
> Z> LO <
w 0
CC >
L
N
0 04 <
N it
® N
+
LL
Z >
a w
o X
Z
g a �
❑ � N I
"o o
Z
F-
w m O
�p > a O
�M O
00 � i
oa N d
W U Q H w
av w 'w 0/�
M UZ LL
D Q Z U U)
o Q � Z
4 gN �/m Z J
O U 9
a 66 X W
w
H C) Z � j U
E zw
a. o gN K UU
� a Ir
LSFU 19-00002U