Loading...
HomeMy WebLinkAbout5861-1GA ION SUMMIT LANDSCAPE IMPROVEMENT PLANS STA. 126+27-29 TO 152+90N62 TR. 20153 CITY OF FONTANA, CALIFORNIA LENNAR HOMES 980 Montecito Dr. #302 Corona, California 92879 AfIr. Af.O- Afr- _TJ1 71 rjl ections: City Required Notes: Insp 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6632 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required: Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3. The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Required Statements and Certifications: 4- vAin—imum 3 inGh layor of mulch shall be applied on all oxposed soil surfaGos of plami urf mas, Greoping or - rooting graundoo;,Grs, or- pliGations where mulyh is b. "For soils less than six -percent (6%) organic matter in the top six (6) inches of soil, compost at a rate of a minimum of four (4) cubic yards per one -thousand (1,000) square feet of permeable area shall be incorporated to a depth of six (6) inches into the soil." c. "At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, and an irrigation schedule of landscape and maintenance." d. "Recirculating water systems shall be used for water features." e. "Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure of the specified irrigation devices." f. "Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur." g. "A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes." h. A Certificate of Completion shall be filled out and certified by either the designer of the landscape plans, irrigation plans, or the licensed landscape contractor for the project. i. No Certificate of Occupancy shall be issued until a City landscape inspector has verified that all irrigation, grading, and planting have been completed in accordance with the approved plans and specifications of FCC Section 28-117 at time of final inspection. j. An irrigation audit report shall be completed per FCC Section 28-106 at time of final inspection. k. With regard to landscape maintenance districts or public landscape, it shall be the responsibility of the developer to comply with FCC Section 28-118, Special Landscape District Requirements. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning Of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties On trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTE: After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior to construction. Upon completion of project, owner will provide report to city inspector for record purposes. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE Underground Service Alert QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF ,FORE Y IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS Q�� c Call: TOLL FREE ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR 1-800 PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. "1111� 422-4133 IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. TWO WORKING DAYS BEFORE YOU DIG VICINITY MP PROJECT VITE CASA SUMMIT BASELINE D O FOOTHILL BLVD Q 66 w a � � z w � � v � w SAN BERNARDINO VE 10 O N.T.S. BEET - R�- (r N.T.S. GRhN I I � I — o ��- J md— jM-5i<l..l.—_� j-1 - �I ��J }1�I.I_; �1 l H j it LU rr i[r TRt #I ��l P", 'F:11 �` �I `II ! I'II E �-21�% Jl r -1I 1, 1 ,mil li J� SUMMIT AVE. 0 N.T.S. BEET INDEX Tl COVER SHEET Ll CONSTRUCTION NOTES & LEGEND L2 CONSTRUCTION PLAN L3 CONSTRUCTION PLAN L4 CONSTRUCTION DETAILS L5 CONSTRUCTION DETAILS L6 CONSTRUCTION DETAILS L7 IRRIGATION NOTES, LEGEND & DETAILS L8 IRRIGATION DETAILS L9 IRRIGATION DETAILS, CALCS. & SCHEDULES L10 IRRIGATION MAINLINE MASTER PLAN Ll 1 IRRIGATION PLAN L12 IRRIGATION PLAN L13 PLANTING NOTES, LEGEND & DETAILS L14 PLANTING PLAN (TREES & GROUNDCOVER) L15 PLANTING PLAN (TREES & GROUNDCOVER) L16 PLANTING PLAN (SHRUBS & VINES) L17 PLANTING PLAN (SHRUBS & VINES) L18 SPECIFICATIONS Overall Quantity Breakdown Perimeter Landscape Area = 50,315 S.F. Perimeter Hardscape: Cone. Sidewalk = 19,124 S.F. Cobble (Gouted)= 1,755 S.F. Open DIG Area / Cobble= 5,600 S.F. Median Landscape Area = 13,324 S.F. Median Hardscape: Cobble (Grouted)= 10,480 S.F. Total Landscape Area = 63,639 S.F. Total Hardscape = 36,959 S.F. JOB NO. VK1hDr Z A/ 2782 A�1 3 0 2 3 9,GNATURE DATE 2/18/19 �Q % cry DATE ,q 9�FOr CAS\F��\ 2-13-1 S 1 T Landscape Architecture & Planning E S C Jk 3190 B2 Airport Loop Dr., Costa Mesa, CA. 92626 Richard Polhamus, License # 2782 P E S (949)644-9370 FAX (714) 210-3140 SUBMITTALS 1st Submittal 2/28/19 2nd Submittal 5/7/19 3rd Submittal 7/29/19 APPROVALS O ti RE V I S 1 0 0 0 0 0 0 CITY OF FONTANA LANDSCAPE PLANS D�WNDY SUMMIT AVENUE STA. 126 + 27.29 TO 152 + 90.62 TITLE SHEET $� LE. AS SHOWN DESIGNEDBY: DATE: CHECKED BY: gPPROVED DWG. No S 117 N ZW > Z> LO < w 0 CC > L N 0 04 < N it ® N + LL Z > a w o X Z g a � ❑ � N I "o o Z F- w m O �p > a O �M O 00 � i oa N d W U Q H w av w 'w 0/� M UZ LL D Q Z U U) o Q � Z 4 gN �/m Z J O U 9 a 66 X W w H C) Z � j U E zw a. o gN K UU � a Ir LSFU 19-00002U