Loading...
HomeMy WebLinkAbout5860-5" / 0 z 0 zz as O 46" SQ. CUSTOM PRECAST CONCRETE W/ O PEAK CAP. 02 OFFSET FACE OF CMU BLOCK IS REQUIRED TO CREATE 2" DEEP REVEAL BOX O STONE VENEER, INSTALL PER MFG. SPEC. O O PRECISION CMU CONSTRUCTION W/ REBAR AND FOOTING PER SIR. ENG. GROUT FILL CENTER SOLID. PROVIDE MASONRY TIES ® 24" O.C. (6 CMU FOR THE 24" SQ. COMMUNITY MARKER) M SINGAGE NOTES: CONTRACTOR TO SUBMIT SIGNAGE SHOP DRAWING FOR APPROVAL O Y4" x 4" DEEP STEEL FRAME ANCHORED INTO ,2 CMU WALL CORE AS REQUIRE. O6 PROJECT LOGO BY OTHERS. TYP. O7 MOSAIC TILE THINSET OVER CMU. O 08 BACKLIT LED FIXTURE. CONTRACTOR = TO PROVIDE POWER TO LOCATION. 00 a I 09 ELECTRICAL CONDUIT AS REQUIRE C', 10 CONCRETE FOOTING PER STR. ENG. 182x2 L—BRACKET WELDED W/ STEEL FRAME. to I i� CONSTRUCT 36" SQ. CMU COLUMN 42" SQ. SECTION -A I ) NEIGHBORHOOD ENTRY "COLUMN" R� (IF APPLICABLE) 1 1/2" R. (TYP.) W Wo 00 z _J tL (nMDO � J W U Q LL� Z -1 6- -1 1_1 0 FINISH GRADE 0 CONCRETE MOW STRIP TO BE NATURAL CONCRETE W/ MEDIUM BROOM FINISH (3250 PSI) O BASE MATERIAL & DEPTH 1/2" HT.-(1) #3 REBAR - CONTINUOUS 1/2" HT.-(2) #3 REBAR - CONTINUOUS ® TOP & BOTTOM NOTES: O BURY A MINIMUM OF 1/3 DEPTH OF BOULDER SIZE. Q BOULDER SHALL BE ROUNDED RIVER BOULDER JB-GRADE PER SOIL REPORT O O SCARRED OR BROKEN BOULDER SHALL NOT BE PERMITTED. 04 PLACE PER PLANS AND LANDSCAPE ARCHITECT'S DIRECTION Call Underground Service Alert at least 2 days Q before you dig Know. wnars below. 3 Call before you dig. BOULDER DETAIL R 4" 1" GROUT BETWEEN ROCK AND BACK OF CURB ROCK HEIGHT F 1/2 INCH ABOVE TC 24" PEA GRAVEL CONC.4"MIN. THICK BED CURB EDGE SECTION %90X MIN. BASE MATERIAL COMPACTED PER PLARNASDE AND SPECS. NOTE: TC TC WHERE CURB SEE PLANS FOR MEDIAN WIDTH ELEVATIONS VARY INSTALL TO DRAIN TO LOW CURB. SEE DETAIL A — az wBw zs wn 1" CONCRETE GAP BETWEEN SET ROCK TO FULL DEPTH IN CONCRETE ROCK AND BACK OF CURB BED WITH REQUIRED 1/2" EXPOSURE ABOVE TC. WIRE BRUSH FINISH JOINTS BETWEEN ROCKS ROCK HEIGHT — r 6" MIN. PEA GRAVEL - 1/2 INCH ABOVE TC 1 CONCRETE BED DETAIL A tr NOT TO SCALE FOR ILLUTIVE PURPOSES ONLY 90% MIN. COMPACTED SUBGRADE OR BASE MATERIAL PER PLANS AND SPECS. FULL WIDTH SECTION COBBLESTONE NOTES: 1. ROCK SIZES UNLESS OTHERWISE SPECIFIED SHALL BE: COBBLESTONES: MAX. 12" TO MIN. 6" WITH ONE SIDE FLAT. 2. 'Y2 INCH MIN. EXPOSURE OF ROCK ABOVE TOP OF CURB. 3. A SAMPLE AREA, MIN. 10 SQ. FT. SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO PROCEEDING WITH THE REMAINING ROCK WORK. 4. FINAL RESTING POSITION OF ALL ROCKS SHALL BE APPROVED BY THE CITY INSPECTOR 5. ROCKS SHALL BE SMOOTH, ROUNDED, FREE OF OBJECTIONABLE DISFIGURATIONS AND IRON CONTENT AS APPROVED BY THE CITY INSPECTOR 6. CONCRETE SHALL BE CLASS 520-D-2500 4 INCH SLUMP CONCRETE. 7. WIRE BRUSH ALL JOINTS AFTER THE INSTALLATION OF THE ROCKS 8. AFTER CONCRETE MORTAR HAS SET, HYDRO BLAST AS DIRECTED BY THE CITY INSPECTOR. BRUSH ROCKS TO REMOVE CEMENT COATING. 9. WHERE ROCK BORDERS TURF AREA, PLACE 1" CONCRETE EDGE BETWEEN BACK OF ROCK AND TURF. 10. HAND PLACE IN CONC. SETTING BED WITH FLATTER SIDES UP TO FORM A UNIFORM SURFACE WITHIN THE DRAINAGE COURSE. 11. PROVIDE LESS UNIFORMITY AS STONE GRADUATES IN SIZE AND PLACEMENT AWAY FROM DRAINAGE COURSE. 12. DEPTH OF STONE EMBEDMENT TO BE NO LESS REFERENCE _1 THAN TWO-THIRDS THE DIAMETER OF THE STONE FOR SIZES 4"-12", NO GREATER THE ONE -THIRDS THE DIAMETER FOR SIZES LAGER THAN 1211 DIAMETER. 13. COMPACT SUBGRADE TO A HARD, FIRM, UNYIELDING SURFACE, SMOOTH AND TRUE TO LINE AND GRADE: TEST FOR REQUIRED COMPACTION PRIOR CITY OF F O N T A N A TO PLACING ROCKWORK. 14. ADJUST PLANTER AREA GRADES TO FLOW @ 2% MINIMUM INTO LANDSCAPE PLANS DRAINAGE COURSE, (TYPICAL) MWN SIERRA AVENUE AS SIERR STA.73TO STA.99+91.12 SHOWN RESUR40 en DA CONSTRUCTION DETAILS 1 9 4 DECORATIVE COBBLE STONE PAVING awam Dn Wpfam UAW, D�NO,xv � 517 S 1 T E S C A P E S Landscape Architecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamus, License CA—#2782 (949) 6"-9370 (714) 210-3140 FAX REVISION N ,-1 r-i 01 W U LU 0 �-+ �Oo G. O W ZOC) Vl � N a1 1or�i Q 'C3 cd � O U Cd W CD0 00 N F- z,...., W ® I--1 0 E4 �� �ANDSCgPF ��@ pp0 a PO(yq q9C � H PC * LSPC 19-000009 DATE 12/18/18 JOB* 18-023 L4 5 OF 17