Loading...
HomeMy WebLinkAbout5742-13Z*zz PLAN NOTES: Oi 3/4"C. 2 #10 & 1 #10 E/G. 2O 1•C. 2 #8 & 1 #10 E/G. O1"C.O. ® 1 1/4"C. 4 #8 & 1 #10 E/G. 5O CONTRACTOR SHALL OBTAIN SEPARATE PERMIT FOR STREET CROSSING AND INCLUDE TRAFFIC CONTROL IN BID. J > © 4"C.O. INSTALLED PER CITY OF S.C.E. REQUIREMENTS TO PICK—UP POINT. VERIFY PRIOR TO ROUGH —IN. ® i CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING W — W ITEMS AND SHALL INCLUDE ALL COST IN BID: —IDENTIFYINm PLANNER GOFOCAL UTILITY COMPANY —SUBMITTAL PLANS TO UTILITY COMPANY —INCORPORATION OF UTILITY COMPANY RED LINES ONTO PLANS ® N —APPROVAL OF PLANS WITH UTILITY COMPANY —ALL COORDINATION WITH UTILITY COMPANY ® ¢ —COMPLETE INSTALLATION OF ALL REQUIRED CONDUIT AND J PULLBOXES W VERIFY RISER QUADRANT PRIOR TO ROUGH -IN. SPLICEPROVIDE DOWNSIZE SITE AND RTOTCIR ® LLJW oO ® O — — — CONDUCTORS RIOR TOSCONNEC11ONCIRCUIT BREAKERS Q OVERIFY EXACT LOCATION W/ UTILITY COMPANY PRIOR TO W ROUGH -IN zZ 10 1 1/2"C. 4 #6 (1,3), 4 #8 & 1 #10 E/G. 38+00 39+00 4 = ,,/2•C.4#6&,#t0E/G. = 6+00 37+00 U 12 (1) 1 1/2"C. 4 #6 (1,3), 4 #8 & 1 #10 E/G. U MOUNT IN CONTROL ENCLOSURE COMPARTMENT OF NEW METER . � PEDESTAL "MPM" EC PANEL MPM @ LOCATION: NORTH OF STATION 40 BUS RATING 100 AMP 120/240V 10 3W MAIN. 3OA/2P MOUNTING: PEDESTAL LOCATION VOOLT CIR BKR A B BKR CIR LTM'B LOCATION oB ,A WEST FLOOD LIGHTING 408 1 20 20 2 272 FLOOD LIGHTING WEST SPOT LIGHTING 426 3 20 20 4 204 EAST SPOT LIGHTING • — 5 20 6 300 TIME SWITCH • — 7 — 20 8 300 IRRIGATION CONTROL • — 9 — 10 — • — 11 — — 12 — 408 426 SUB TOTAL 572 504 TOTAL CONNECTED VA = 1960 VA LCL• 1960 VA O 25% = 490 VA TOTAL PANEL LOAD = 2450 VA FEEDER AMPS — 10.2 AMPS A PROVIDE 7—DAY 24—HOUR 2—CHANNEL PHOTOCELL ON T.S.—OFF ELECTRONIC TIME SWITCH 120V. B PROVIDE 250V-2P-20A CONTRACTOR 12OV. COIL AND CONNECT TO CHANNEL 1 OF TIME SWITCH C PROVIDE 250V-2P-2OA CONTRACTOR/ 12OV. COIL AND CONNECT TO CHANNEL 2 OF TIME SWITCH D PROVIDE PHOTOCELL ON INTERIOR OF GEAR AT FAMORY PROVIDED PHOTOCELL WINDOW D A A ENLARGED ELECTRICAL SITE PLAN SCALE ib E1•—O" W I w Iff OF E i-4'i9_b 9130118 No�th Engineering Inc. Electrical Engineering &Consulting ;_ N U 8048 Palm Ave ^ m Highland. Ca. E ^� 92346 6 909 864-0223 Fax 909 864-0280 o a james.corns@jcaen9.com ENLARGED ELECTRICAL SITE PLAN SALE (2] Underground Service Alert SECTION 4216 4217 OF THE GOVERNMENT �gFEssip," 230 ENGINEERING, INC. 1 1A R 'r( 2305 CHICAGO AVENUE CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A PERMIT TO 4� RIVERSIDE, CA 92507 EXCAVATE WILL BE VALID ' ~ No.69984 aIKE (951) 680-0440 FOR YOUR DIG ALERT I.D. NUMBER CALL Exp,9_30-18 ERING FAX (951) 680-0490 UNDERGROUND SERVICE ALERT �s C1VO- TOLL FREE 1-800-227-2600 °F CA`' TERRY M. RENNER R.C.E. No. 69984 TWO WORKING DAYS BEFORE YOU DIG REV. REVISION DESCRIPTION DATE I ENGR. CITY DATE LANDSCAPE IMPROVEMENTS FOOTHILL BOULEVARD OLEANDER AVENUE TO 600' EAST OF CYPRESS AVENUE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. CITY OF FONTANA, CALIFORNIA ELECTRICAL IMPROVEMENT PLANS E-1.2 DRAWN BY: FOOTHILL BOULEVARD MEDIAN IMPROVEMENTS SCALE: P.M.M. AS SHOWN DESIGNED BY: ELECTRICAL PLANS DATE: J.J.C. ENLARGED ELEC IC REET PLANS SEPT. 2018 CHECKED BY: APPROVED BY: DATE: � DRAWING NO.: 13 J.J.R. __. _.._.. e_ - - - .. _I -__ 5742