Loading...
HomeMy WebLinkAbout5841-1CASA GRANDE AVE, STA. CITY OF 0 TO 52+00.00 FONTANA CALIFORNIA ZW QUZ 1 OIa OfU�N-ov�g a a� wO OaW aZW U Z� �Jg CS QW N3 oNoEL Z2i g.zrxI �/ m Wp O U z Z' a W. tY x a4 U C7 N Zg N .t . 1 S 1 T E S L A P E S LENNAR HOMES Landscape 3190132 Airport Loop Dr., rP P (949)644-9370 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 980 Montecito Dr. #302 & Planning Richard Polhan us, License # 2782 Corona, California 92879 406_� Afle- Afr- Aflo-e- Afr_ Aflr_ Afro a Afl� W Af.; E r Afr Afir Afr_ coi�� Afir- Afw_ Afir- Afil W Afir I. Aft Afe Ad� _T _Tj r r T­ 71 7-1 7-11 rj irl 7F 1 ir, AU21EEi: B1V11J. 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6632 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3. The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Required Statements and Certifications: a. 'A minintum 3-ine' 'ayer of mule' shall be applied on all exposed soi! sur' - igor b. "For soils less than six -percent (6%) organic matter in the top six (6) inches of soil, compost at a rate of a minimum of four (4) cubic yards per one -thousand (1,000) square feet of permeable area shall be incorporated to a depth of six (6) inches into the soil." C. "At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, and an irrigation schedule of landscape and maintenance." d. "Recirculating water systems shall be used for water features." e. "Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure of the specified irrigation devices." f. "Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur." g. "A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes." MAINTENANCE GUIDELINES Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTE: After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior to construction. Upon completion of project, owner will provide report to city inspector for record purposes. Underground Service Alert eEFORE yo Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YOU DIG SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. h' III / 1019 i,; PROJECT SITE CASA GRANDE SUMMIT n10 BASELINE AVE. HEFT IDS T1 CASA GRANDE COVER SHEET L1 CONSTRUCTION NOTES AND LEGEND L2 CONSTRUCTION PLAN L3 CONSTRUCTION PLAN L4 CONSTRUCTION DETAILS L5 CONSTRUCTION DETAILS L6 CONSTRUCTION DETAILS L7 IRRIGATION DETAILS, NOTES AND LEGEND L8 IRRIGATION DETAILS L9 IRRIGATION CALCULATIONS & SCHEDULE L10 IRRIGATION MAINLINE EXHIBIT L11 IRRIGATION PLAN L12 IRRIGATION PLAN L13 PLANTING DETAIL, NOTES, AND LEGENDS L14 PLANTING PLAN (TREES & CONCEPT LIGHTING) L15 PLANTING PLAN (TREES & CONCEPT LIGHTING) L16 PLANTING PLAN (SHRUBS & VINES) L17 PLANTING PLAN (SHRUBS & VINES) L18 SPECIFICATIONS Overall Quantity Breakdown Total Landscape Area = 159,492 S.F. Irrigated Softscape = 58,742 S.F. Hardscape: Conc. Sidewalk = 31,230 S.F. DIG Trail Compacted= 14,848 S.F. Cobble= 210 S.F. Open DG Area= 54,000 S.F. WATER DISTRICTS NOTES: 1. Please contact and notify MWD to verify specific requirement when landscape irrigation water source switches from potable to recycled / reclaimed water. 2. All tree canopies adjacent to MWD easement shall be maintained to not overhang into the easement line. 3. Please contact MWD Jesse Franco Jr. Tel: (909) 392-7184 / Cell: (818) 418-5688 at least 2 working days prior to starting any work in the vicinity of MWD facilities. �Q ti NN D S CAp7 A� �gp k pot11A 2782 QQ x —8[GNATtlRL� 12/10/18 �Q % 6� DATE �q "a[ion Da lF �F CAS SUBMITTALS 1ST. SUBMITTAL: 12/10/2018 2ND. SUBMITTAL: 01/02/2019 (MWD & SGVMWD) 3RD. SUBMITTAL: 05/07/2019 4TH. SUBMITTAL: 07/29/2019 APPROVALS Aks QED 41 toy U' 1 0 A CITY OF FONTANA LANDSCAPE PLANS DRAM BY: CASA GRANDE AVENUE SCALE: STA. 25+82.89SHE 52+00.00 AS SHOWN DESIGNED BY: TITLE SHEET DAT t\� CHECKED BY: APPROVED BY: DVJG. NO.: 1 DATE'. 19 LSPC 19-000010