HomeMy WebLinkAbout5834-2so AC PAVEMENT REMOVALUl
zo AC OVERLAY
• NOTE:
0 to M 6D tea HORIZONTAL AND VERTICAL LOCAPONS TO
BE VERIDED IN THE FEW AND ENGINEER
NOMED OF ANY DISCREPANCIES PRIOR TO
CONSTRUCTION.
SCALE i' = 40'
BENCH MARK: NO. REVISION DESCRIPTION DATE ENGR. CITY DATE i i ^\ i /� (� CITY OF FONTANA, CALIFORNIA
CITY OF FLEVATI BENCHMARK N0. 529 P O SHOULD CONSTRUCTION OF THE RpOFESSIgyq L--I�J� �I 1 H \ 0 0
NCV029, ELEVAPON=1123.13 I 'I�� I111 �� REQUIRED IMPROVEMENTS NOT O y Y 1 1 1 I I/ u �,) 34G93CC4 OG�PGROOMCG�'n1CGvJ4 PLAN
CHIZ "SQUARE° ON SW CORNER OF CATCH BASIN AT III// l'I�1111IIV1,\ COMMENCE WITHIN TWO YEARS 4Q4' �.V yq� Fy
NORTHEAST CORNER OF SAN BERNARDINO AND OF THE DATE OF APPROVAL $ %' Huitt-Zollars, Inc. Ontario DRAWN BY: SCALE:
SHOWN HEREON AND CARRIED PARCEL MAP NO. 79984
POPLAR ¢ N0. 67512 A 3990 CONCOURS. SUITE 330 " ONTARIO. CALIFORNIA 91764 • (909) 941-7799 HZ STAFF AS SHOWN
FORTH IN A DILIGENT MANNER, ENliatian
DIAL TWO WORKING WASNINaTON DRIVE
BASIS OF BEARING: BEFORE DAYS BEFORE THE CITY ENGINEER MAY REQUIRE * 6-3D-Z q DESIGNED BY: DATE:
YOU DIG REVISIONS TO THE PLANS TO PREPMM UNDER TIE aIIPkAM=k aF JOHNNY MURAD
BEARINGS SHOWN HEREON ARE BASED ON THE YOU DIG 4 CIVII .H3 DLW FROM STA + O.t + 6/2019
Tou FltEE 1-800-22J-2600 BRING THEM INTO CONFORMANCE
CENTERLINE OF VALLEY BOULEVARD —IMPROVEMENT WITH STANDARDS IN EFFECT. OF CNEVE� CHECKED BY: APPRO BY: DWG. NO.:
BEING NORTH 8946'24° EAST ON RECORD OF A PUBLIC SERVICE BY UNIIERGROUNB SERVICE ALERT 67512 6-30-21 8-t5H9 J.M. ' 95' 5834 2
SURVEY 04-329, R.S.B. 123/81, R.cE E>mFs wre Cltt ENGINEER R.C.E. 51152 ATE:
CURVE DATA
�
R
L
T
A
40'32'09"
50.00'
35.37
18.46�