POTHOLING
The District will locate their facilities based on the information they have. It is the
responsibility of the Contractor perforating work to pothole and verify the information
provided. The District is not liable for locates. The locates are provided as a service and
should be used as a reference by the contractor as to where to begin potholing for the
existing pipeline.
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement. In the event that the District facii ities share a public right-of-
way or easement potholing is required for all work within 20 feet of the located District
pipeline centerline.
The District requires 48 hours notice prior to excavation of any type.
All potholing within 2 feet of the existing pipe must be done by hand.
All crossing utilities must be potholed at the point of crossing. The potholing shall
be done prior to any other construction to verify the actual elevation of the District
facilities. In the event that the location of the District facilities differs from the design, the
glans shall be revised to reflect field conditions prior to construction. Review and
approval of the revised plans by the District is required.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
eat v,uaGE outs av's STANDARD
9UTE4W
wvu�cAUFarlxWalT:< PLAN N4.
FAXmx) eara2Q7
FAX!(629)57€-rC45 POTHOLING
StET5gN
SECTION XI WORK WITHIN RIGHT-OF-WAY OR EASEMENT
GENERA(,
The intent of this section is to protect the existing pipeline and related structures
and preserve the current operating process without detriment to the District or its
finances. Use of the District's right-of-way or easement by others is considered in the
spirit of cooperation but without adverse impacts to the District.
Any work within, access cross, or use of in any way of the District right-of-way
or easement requires prior written approval,
The District retains all rights associated with their right-of-way or easement. Any
use granted to others shall be contingent upon maintaining the District's full and
continuous use of the right-of-way or easement. Work which restricts full and continuous
use may be granted on a temporary basis and if granted, requires a written plan for
District access and use during activities. The written plan must be reviewed and approved
by the District. The District may require modifications to the plan which increases time
and/or cost of construction for the requesting party. As an alternative to modifying the
plan as requested by the District, the requesting party may elect to construct their
facilities without impact to or use of the District right-of-way or easement.
CUTS AND FILLS
Temporary or permanent changes to the existing grade within the District right-
of-way or easement, requires prior written approval by the District.
Any approved cuts shall not compromise the pipe by reducing the structural
capacity of the pipe and soil system to less than H-20 loading. Additional cut maybe
allowed on a case by case basis- In such cases the pipe shall be reinforced, or relocated so
as to provide H-20 loading capacity.
Any approved fills shall not load the pipe in excess of the pipe design capacity
with a factor of safety of 2 plus consideration of H-20 live loading (design capacity x 2 +
1120). In addition, fill shall not be added beyond what can be excavated using an OSHA
approved trench configuration without shoring (that is open trench with laid back side
slopes). Adequate storage for spoils is also required within the right-of-way or easement.
Additional fill may be allowed on a case by case basis. In such cases the pipe may need
to be relocated.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
POTHOLING
Q Q
DIAL TWO WORKING
BEFORE DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE 1-800-287-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
ENGR.
DATE
CITY
DATE
CROSSING VITLITIES
All utilities crossing the District facilities shall do so at right angles. The
centerline of the crossing utility shall be perpendicular to the centerline of the District
pipeline:
When the crossing utility must go LENDER the District facility, the utility must
protect the District's facilities. Such installation shall provide a minimum of 18" of
vertical clearance between the outside of the District pipeline and the outside of the
crossing utility. Reduced separation maybe considered on a case by case basis. The
District will NOT approve a design calling for less than 4 inches of separation (outside to
outside). The District retains the right to prohibit the installation of adjacent facilities in
any and all cases regardless the informmation provided by the utility.
When the crossing utility crosses OV33R the District facility, the, utility in=
maintain 12 inches ofvertieal separation between the outside of the District pipeline and
tiie outside of the crossing utility. The construction shall be in such a manner that it dries
not result in a point load on tho District pipeline or avoid above the pipeline.
PARALLEL
No parallel utilities ara permitted within District right-of-way or easement.
Parallel utilities where District facilities are located in public easements or rights -
of way shall maintain 10 feet of horizontal separation. The separation is measure from
the outside of the pipeline to the outside of the other utility. 'ibis separation requirement.
is especially important at manholes.
Additional parallel separation maybe required where the adjacent utility is to be
constructed below the District's facility. The additional separation shall be such that the
proposed utility can be installed vdth no impact to the District facilities. Ccnerally the
District would not allow construction, that impacts the trench line of t.heix pipeline. The
District shall determine adequate separation based on the situation proposed.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
ARD
� CCN STRUCTION IN THE VICINITY PLAN NO,
� �
aT� OF DISTRICT PIPELINE
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement.
LIVE LOADING
No construction equipment shall be allowed within the right-of-way or easement
unless such equipment has been demonstrated to produce loads less than H-20 loading.
In the event that heavier equipment is needed the user shall furnish adequate
protection of the pipe. Such protection shall prevent the pipe from being loaded more
than it's design capacity with a factor of safety of 2. This shall be demonstrated with
appropriate calculations.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
STRUCTURES
No structures shall be located within the District right-of-way or easement.
Structures outside of the District right-of-way or easements shall be constructed
without impacts within the right-of-way or easement. This includes temporary
excavation, soil stabilization, and temporary or permanent soil nails or rock bolts.
DRAINAGE
Drainage through and across the District right-of-way or easement shall not be
changed from historical patterns. The use of District right-of-way or easement for
retention or detention ponds is strictly prohibited.
LANDSCAPING
Landscaping within the District right-of-way or easement is allowed for the
benefit of the adjacent property owners. The following are requirements for landscaping
within District right-of-way or easement;
I. ALL LANDSCAPE AND HARDSCAPF ALLOWED BY THE DISTRIT
IS TO BE CONSTRUCTED AND MAINTAINED BY THE ADJACENT PROPERTY
OWNER. In the event that the District must maintain the pipeline or any related facilities,
restoration of the landscaping and or hardscape is the responsibility of the adjacent
property owner.
2. No trees that reach a mature height of more than 15 feet will be allowed
within the right-of-way or easement.
SHOULD CONSTRUCTION OF REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A
DILIGENT MANNER, THE CITY ENGINEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
Prepared F`or:
LENNAR HOMES
980 MONTECITO DRIVE, SUITE 302
CORONA, CA 92879
(951) 817-3545
FAX (951) 817-3650
BASIS OF BEARINGS:
TREKS mew" To Be
FINEKED ComPACM FEP p1,9'MCr
aTAi4ClASii39lVlTIIIN to FT
EACH 81DE OF 01ISYRiC'i' LINE
l
I
508T G of rcT 1
WATERUM M
1
t rT b..N. '-' r-
D aTING Pipe
BE}�1ING nJA
Be RE
d.
CROSSING
MPF
f F'rMIN.
TRENCH SACKRU MURRY
CONFQRMIN®TO
SABLE 201
pips 05imING
Sik SIDE TFrEX9W (PASSING
4 ...
3/4' 1t
atSCIFAR)ViGB.
3/W go-ioo
Y
NO. 4 BO—ao
A,
NO. a 50-70
''
r"strsT rue
NO. 16 33- 5W
YVAT t INE
% 30 1935
�
8g0�tFk3
NO. 30 5-15
"Wr.
100 2-7
7eR
NO; 200 6-4
THE DlsmM Ptpf SHALL BE WRAPPED IN 4UIL
PIPE
i RENCH BAWIL€. BUP"
TRENCH
PLaX FOR THE FIILi- YVlM OF PIPE IN
COWORMINGTO
Ct)tdACT TRENCH IffAC1iFILL SLURRY GONTAM1143
TABLE20i
MM THAN t SACK OF CEtAW PER YARD OF
w.
Wow.
3. 20 feet either side of the pipeline centerline shall be kept clear of
landscaping with penetrates more than 1 feet below the surface. This clear zone may not
be encroached on by the drip edge of all mature landscaping adjacent to the 40 feet clear
area.
4. The landscaping/hardscape plan shall be submitted to the District for
approval prior to construction. The plan shall be modified to the satisfaction of the
District. The plan shall show the mature drip edge of all vegetation with a mature height
of more than 5 feet.
THE BASIS OF BEARINGS FOR THIS SURVEY IS THE EAST LINE OF THE SE
1/4 OF SECTION 19, ALSO BEING THE CENTERLINE OF SIERRA AVENUE,
PER PARCEL MAP NO. 19431, P.M.B. 242/97-98.
BEING: N00'33'32"W
BENCHMARK:
CALTRANS BENCHMARK #8-17
BRASS DISK LOCATED IN S.C.E. TOWER LEG LOCATED
343' N/O 1-210, 0.2 MILES WEST OF SAN SEVAINE RD.
EL=1428.609
STORM URA1N
�3"
4 BARS 24" aC.
AREFORI.4E'O EXPANSION JOINT FILLER
HfGH-.'+RESSUR._......_vtATER-._.- MAIN_..-.
SECTION "A -A"
- NOTES -
I. NLEASC CALL THP SGWIM)
(sz�} lies-yast
AB HOURS BEFORE DQING ANY EXCrVA•-
TInN IN TIME AREA OF SGVA1IC ;�ACIL;TIEs-
2. "EFORMEP EXPANSION JOINT PILLFR TO
COMPLY 'NaTH ASTM 0--175I.
3. PnEFORHFD EXPANS'ON JOINT F1LL.F.R TO
eF W10TH Or TRCNCH AN3 EXTEND ) F0QT
a EYONO SPRING Lri.lE OF WATER €iAIN.
i . f gNCRETC SLAG TO pr & INCHES THrCK 1
A$ WIDE AS THC 'rq E.NCH. AND F.XTENO S
rEET BEYOND 51'RINC, !.)NE (IF ^LATER ?tale.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
eel VUA6EcansDRIVE. STANDARD
SUI"„° STORM DRAIN PLAN No,
COVr., CPLIfpRrylh A7�d4
I TEL: (OJE"a7-*= -
fpM:(67513aI-7oe5
STETSON CROSSING ABOVE WATER MAIN scv--sa
ENGINEERS IflC.
Page 261159
NOTE:
CONTRACTOR TO PROVIDE WRITTEN INSTALLATION AND SHORING PLAN TO
ENGINEER AND SGVMWD WITH ENGINEERING CALCULATIONS STAMPED BY A
LICENSED STRUCTURAL ENGINEER DEMONSTRATING THAT ANY LOADS FROM
THE PROPOSED STORM DRAIN WILL BE STRUCTURALLY SUPPORTED SO AS
TO NOT TRANSFER LOADS ONTO THE DISTRICT'S PIPELINE AND
DEMONSTRATING THAT THE DISTRICT'S FACILITIES AND OPERATIONS WILL NOT
CITY OF FONTANA, CALIFORNIA
LINE TZ' STORM DRAIN PLANS
CYPRESS AVENUE SCALE:
AS NOTED
DETAILS DATE:
January, 2019
(4 �q CIVIL �� CHECKED BY: APPROVED BY:---- DRAWING NO.: 7
Ha nd J. Allard, R.C.E. 36052 Date TF OF' CA1-�F� _ T DATE: 1-17-2019
(expires 6/30/2020) RJA L—II1 v : ` 5766 7
CITY ENGINEER R.C.E. 51152
Flename: l:\Cal Atlantic\Summit at Rosenc\Drawings\FINAL DESIGN\OFFSITE,STORM DRAIN10FFSITE STORM DRAIN\ CYPRESS\OFFSITE STORM DRAIN CYPRESS 07.dwg
Prepared By.
ALLARD ENGINEERING J.
�4 J. �Np q qt
Civil Engineering - Land Surveying - Land Planning �4i�
e- �� �? DRAWN BY:
16866 Seville Avenue No. 36052 HR
Fontana, California 92335 DESIGNED BY:
9 9) 358-1B15 Fax (909) 365-1795 °" Exp. 6/30/20 DBW