HomeMy WebLinkAbout5765-103
3
5
3
J
L
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
POTHOLING
The District will locate their facilities based on the information they have. It is the
responsibility of the Contractor performing work to pothole and verify the information
provided. The District is not liable for locates. The locates are provided as a service and
should be used as a reference by the contractor as to where to begin potholing for the
existing pipeline.
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement. In the event that the District facilities share a public right-of-
way or easement potholing is required for all work within 20 feet of the located District
pipeline centerline.
The District requires 48 hours notice prior to excavation of any type
All potholing within 2 feet of the existing pipe must be done by hand
All crossing utilities must be potholed at the point of crossing. The potholing shall
be done prior to any other construction to verify the actual elevation of the District
facilities. In the event that the location of the District facilities differs from the design, the
plans shall be revised to reflect field conditions prior to construction. Review and
approval of the revised plans by the District is required.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
861 VILIAGE OAK$ CR1VE, STANDARD
6WTE 16G
C.OVINA• CALIFORNIA 01724 PLAN NO.
TEL (626) 687 71 POTHOLING
FAX (626) J3I �70666B
STETSON
OG.NEERB INC.
REV.
SECTION XI WORK WITHIN RIGHT-OF-WAY OR EASEMENT
GENERAL
The intent of this section is to protect the existing pipeline and related structures
and preserve the current operating process without detriment to the District or its
finances. Use of the District's right-of-way or easement by others is considered in the
spirit of cooperation but without adverse impacts to the District.
Any work within, access cross, or use of in any way of the District right-of-way
or easement requires prior written approval.
The District retains all rights associated with their right-of-way or easement. Any
use granted to others shall be contingent upon maintaining the District's full and
continuous use of the right-of-way or easement. Work which restricts full and continuous
use may be granted on a temporary basis and if granted, requires a written plan for
District access and use during activities. The written plan must be reviewed and approved
by the District. The District may require modifications to the plan which increases time
and/or cost of construction for the requesting party. As an alternative to modifying the
plan as requested by the District, the requesting party may elect to construct their
facilities without impact to or use of the District right-of-way or easement.
CUTS AND FILLS
Temporary or permanent changes to the existing grade within the District right-
of-way or easement, requires prior written approval by the District.
Any approved cuts shall not compromise the pipe by reducing the structural
capacity of the pipe and soil system to less than H-20 loading. Additional cut maybe
allowed on a case by case basis. In such cases the pipe shall be reinforced, or relocated so
as to provide H-20 loading capacity.
Any approved fills shall not load the pipe in excess of the pipe design capacity
with a factor of safety of 2 plus consideration of H-20 live loading (design capacity x 2 +
H20). In addition, fill shall not be added beyond what can be excavated using an OSHA
approved trench configuration without shoring (that is open trench with laid back side
slopes). Adequate storage for spoils is also required within the right-of-way or easement.
Additional fill may be allowed on a case by case basis. In such cases the pipe may need
to be relocated.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
POTHOLING
REVISION DESCRIPTION
ENGR. I DATE I CITY I DATE
CROSSING UTILITIES
All utilities crossing the District facilities shall' do so at right angles, The
centerline of the crossing utility shall be perpendicular to the centerline of the District
pipeline,
When the crossing utility must go UNDER the District facility, the utility must
protect the District's facilities. Such installation shall provide a minimum of 18" of
vertical clearance between the outside of the District pipeline and the outside of the
crossing utility. Reduced separation maybe considered on a case by case basis. The
District will NOT approve a design calling for less than 4 inches of separation (outside to
outside). The District retains the right to prohibit the installation of adjacent facilities in
any and all cases regardless the information provided by the utility.
When the crossing utility crosses OVER the District facility, the utility must
maintain 12 inches of -vertical separation between the outside of the District pipeline and
the outside of the crossing utility. The construction shall be in such amanner that it does
not result in a point load on the District pipeline of a void above the pipeline.
PARALLEL =1TJES
No parallel utilities are permitted within District right-of-way or easement.
Parallel utilities where District facilities are located in public easements or rights -
of -way shall maintain 10 feet of horizontal separation. The separation is measure from
the outside of the pipeline to the outside of the other utility. This separation requirement.
is especially important at manholes.
Additional parallel separation maybe required where the adjacent utility is to be
constructed below the District's facility. The additional separation shall be such that the
proposed utility can be installed with no impact to the District facilities. Generally the
District would not allow construction that impacts the trench line of their pipeline. The
District shall determine adequate separation based on the situation proposed
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
C" L»WA�, CONSTRUCTION IN THE VICINITY LA o
RAY:TEL 311. M
sr�zao ;OF DISTRICT PIPELINE
010110" Ind.
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement.
LIVE LOADING
No construction equipment shall be allowed within the right-of-way or easement
unless such equipment has been demonstrated to produce loads less than H-20 loading.
In the event that heavier equipment is needed the user shall furnish adequate
protection of the pipe. Such protection shall prevent the pipe from being loaded more
than it's design capacity with a factor of safety of 2. This shall be demonstrated with
appropriate calculations.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
STRUCTURES
No structures shall be located within the District right-of-way or easement.
Structures outside of the District right-of-way or easements shall be constructed
without impacts within the right-of-way or easement. This includes temporary
excavation, soil stabilization, and temporary or permanent soil nails or rock bolts.
DRAINAGE
Drainage through and across the District right-of-way or easement shall not be
changed from historical patterns. The use of District right-of-way or easement for
retention or detention ponds is strictly prohibited.
LANDSCAPING
Landscaping within the District right-of-way or easement is allowed for the
benefit of the adjacent property owners. The following are requirements for landscaping
within District right-of-way or easement;
1. ALL LANDSCAPE AND HARDSCAPE ALLOWED BY THE DISTRIT
IS TO BE CONSTRUCTED AND MAINTAINED BY THE ADJACENT PROPERTY
OWNER. In the event that the District must maintain the pipeline or any related facilities,
restoration of the landscaping and or hardscape is the responsibility of the adjacent
property owner.
2. No trees that reach a mature height of more than 15 feet will be allowed
within the right-of-way or easement.
SHOULD CONSTRUCTION OF REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A
DILIGENT MANNER, THE CITY ENGINEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
Prepared For:
LENNAR HOMES
980 MONTECITO DRIVE, SUITE 302
CORONA, CA 92879
(951) 817-3545
FAX (951) 817-3650
TRENCH BACKFILL TO BE
FINISHED
COMPACTED PER DISTRICT
GRADE
STANDARDS WTTHIN 10 FT
EACH SIDE OF DISTRICT LINE
11
EXISTING DISTRICT
I
WATERLINE (HIGH
PRESSURE)
I
1 FT MIN.
-� ��-
1 FT MIN.
EXISTING PIPE
BEDDING TO
TRENCH SACKFILL SLURRY
BE REMOVED
• )
CONFORMING TO
,�
'GREENSOOW TABLE 201
•
•
d I1. .. r , :.: /1
^ ' '.!r�- CROSSING
PIPE DDINCi
•. �. � � J _.
• . ' d :.td•.�. a e.
/
CROSSING Ir CLEARANCE J
PIPE
T�
.
■ Il--M
CENTER FULL
LENGTH OF PIPE
OVER CROSSING
TRENCH BACIG'N_L TO BE COMPACTED
PER DISTRICT STANDARDS WITHIN 10 FT
EACH SIDE OF DISTRICT LINE.
INIBHED GRADE
SPRING L1HE OF
DISTRICT PIPELINE
DISTRICT
WATER LINE
(HIGH
PRESSURE)
. ;a
• 16' CLEARANCE.
----
--ter"— ---
* EXISTING
WATERLINE
p BEDDING
CR0931N0 PIPE
i
TRENCH BACKFILL SLURRY
CONFORMING TO
'GREENSOOK• TABLE 201
NOTE&
1. PLEASE CALL THE SGVMWD (626) 969-7911 48
HOURS BEFORE DOING ANY EXCAVATION IN THE
AREA OF SGVMWD FACILITIES.
2. TRENCH WKFILL SLURRY TO CONFORM TO
GREENBOOK TABLE 201-1.1.2 (,A).
3. IN NO CASE SHALL THE VERTICAL. SEPARATION
BETWEEN THE OUTSIDES OF THE PIPES BE
LESS THAN 4 91CHES.
4. THIS DETAIL APPLIES TO ALL CROSSING PIPES
EXCEPT HAZARDOUS MATERIALS, ELECTRICAL
S. TRENCH BACKFILL SLURRY SHALL CONTAIN 100
LBS (-t SACK) OF CEMENT PER CUBIC YARD
AND SHALL HAVE 28 DAY COMPRESSIVE
STRENGTH OF 100 PSI.
S. TRENCH BACXTILL SLURRY AGGREGATE SFWl
MEET GREENBOOK GRAOMrG E.
TABLE 201-1.3.2(A)
SIEVE SIZE PERCENT PASSING
3/4' 1009
3/8- 90-100
NO. 4 W-80
No. 8 50-70
NO. i e 33-53
NO. 30 19-35
NO. 50 5-15
NO. 100 2-7
NO: 200 0-4
7. THE DISTRICT PIPE SHALL BE WRAPPED IN 4MIL
PLASTIC FOR THE FULL WIDTH OF PIPE IN
CONTACT TRENCH BACKFILL SLURRY CONTAINING
MORE THAN 1 SACK OF CEMENT PER YARD OF
SLURRY.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
Psurm 100
CAL,�„A;17W PIPELINES CROSSING STANDARD
WL:'L)Of74=
FAIL• IR91371.7�
T30 UNDER DISTRICT WATERLINE SGV 59
�IOIOO /IG
3. 20 feet either side of the pipeline centerline shall be kept clear of
landscaping with penetrates more than 1 feet below the surface. This clear zone may not
be encroached on by the drip edge of all mature landscaping adjacent to the 40 feet clear
area.
4. The landscaping/hardscape plan shall be submitted to the District for
approval prior to construction. The plan shall be modified to the satisfaction of the
District. The plan shall show the mature drip edge of all vegetation with a mature height
of more than 5 feet.
BASIS OF BEARINGS:
THE EAST LINE OF THE SE 1 /4 OF SECTION 19, ALSO
BEING THE CENTERLINE OF SIERRA AVE., PER PM NO.
19431, PMB 242/97-98
BEING: N00'33'32"W
BENCHMARK:
CALTRANS BENCHMARK #8-17
BRASS DISK LOCATED IN S.C.E. TOWER LEG LOCATED
343' N/O 1-210, 0.2 MILES WEST OF SAN SEVAINE RD.
EL=1428.609
Page 27/159
Prepared By:
ALLARD ENGINEERING
ma
Civil Engineering - Land Surveying - Land Planning
16866 Seville Avenue
Fontana, California 92335
(909) 356-1815 Fax (909) 365-1795
�%. 01 /22/19
A ymand J. Allard, A.C.E. 36052 Date
(expires 6/30/2020)
STORM DRAIN
4F 4 BARS 24" O.C.
MIN. iQi-';Yrca O, 6" come.
3" PREFORMED EXPANSION JOINT FILLER
HIGH - PRESSURE -- —WATER - •— - MAIN_-
- - - -- -- —�-::
- NOTES -
I. PLEASE CALL THE SGVMWD
(626) 969-7911
46 HOURS BEFORE DOING ANY EXCAVA-
TION IN THE AREA OF SGVMWD FACILITIES.
2. PREFORMED EXPANSION JOINT FILLER TO
COMPLY WITH ASTI4 D-1751.
3. PREFORMED EXPANSION JOINT FILLER TO
BE WIDTH OF TRENCH AND EXTEND I FOOT
3EYOND SPRING LINE OF WATER MAIN.
4, CONCRETE SLAB TO BE 6 INCHES THICK,
AS al TOE AS THE 'FRENCH, AND EXTEND 5
FEET BEYOND SPRING LINE OF WATER MAIN.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
661 V0.LAGE OAKS DRIVE, STANDARD
COMEA. CALIFORNIA 95724 STORM DRAIN PLAN NO.
OVIN
TEL: (626)967-6202
FAX:(6261335-7065
STETSON CROSSING ABOVE WATER MAIN SGV-58
ENGINEERSINC.
Page 26/159
NOTE:
CONTRACTOR TO PROVIDE WRITTEN INSTALLATION AND SHORING PLAN TO
ENGINEER AND SGVMWD WITH ENGINEERING CALCULATIONS STAMPED BY A
LICENSED STRUCTURAL ENGINEER DEMONSTRATING THAT ANY LOADS FROM
THE PROPOSED STORM DRAIN WILL BE STRUCTURALLY SUPPORTED SO AS
TO NOT TRANSFER LOADS ONTO THE DISTRICTS PIPELINE AND
DEMONSTRATING THAT THE DISTRICT'S FACILITIES AND OPERATIONS WILL NOT
BE COMPROMISED.
QRpFESSIO�
��o�o�o �• qZ 9q��ti
IT �O c=
No. 36052 m
c Exp. 6/30/20
s�gTF CIVIC '��
CA►-%F
CITY OF FONTANA, CALIFORNIA
STORM DRAIN PLANS
DRAWN BY:
HR
OFFSITE SUMMIT AVENUE & SIERRA AVENUE
DETAILS
SCALE:
AS NOTED
DESIGNED BY:
DBW
DATE:
January, 2019
CHECKED BY:
RJA
APPR_ D BY:
DATE: 1 /28/2019
DRAWING NO.:
5765
10
CITY ENGINEER R.C.E. 51152
101