HomeMy WebLinkAbout5763-160
•c
0
E
0
U
O1
N
N
0
Z3
0
0
F-
0
(L
d
POTHOLING
The District Will locate their facilities based on the information they have. It is the
responsibility of the Contractor performing work to pothole and verify the information
provided. The District is not liable for locates. The locates are provided as a service and
should be used as a reference by the contractor as to where to begin potholing for the
existing pipeline.
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement. In the event that the District facilities share a public right-of-
way or easement potholing is required for all work within 20 feet of the located District
pipeline centerline.
The District requires 48 hours notice prior to excavation of any type.
All potholing within 2 feet of the existing pipe must be done by hand.
All crossing utilities must be potholed at the point of crossing. The potholing shall
be done prior many other construction to verify the actual elevation of the District
facilities. In the event that the location of the District facilities differs from the design, the
plans shall be revised to reflect field conditions prior to construction. Review and
approval of the revised plans by the District is required.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
m+wluGE ax3 DRVE STANDARD
acovT,n �cwFGrNHAn:e PLAN NO.
POTHOLING
FAXau
:pmI3ll.Tam
SECTION XI WORK WITHIN RIGHT-OF-WAY OR EASEMENT
GENERAL
The intent of this section is to protect the existing pipeline and related structures
and preserve the current operating process without detriment to the District or its
finances. Use of the District's right-of-way or easement by others is considered in the
spirit of cooperation but without adverse impacts to the District.
Any work within, access cross, or use of in any way of the District right-of-way
or easement requires prior written approval.
The District retains all rights associated with their right-of-way or easement. Any
use granted to others shall be contingent upon maintaining the District's full and
continuous use of the right-of-way or easement. Work which restricts full and continuous
use may be granted on a temporary basis and if granted, requires a written plan for
District access and use during activities. The written plan must be reviewed and approved
by the District. The District may require modifications to the plan which increases time
and/or cost of construction for the requesting party. As an alternative to modifying the
plan as requested by the District, the requesting party may elect to construct their
facilities without impact to or use of the District right-of-way or easement.
CUTS AND FILLS
Temporary or permanent changes to the existing grade within the District right-
of-way or easement, requires prior written approval by the District.
Any approved cuts shall not compromise the pipe by reducing the structural
capacity of the pipe and soil system to less than H-20 loading. Additional cut maybe
allowed on a case by case basis. In such cases the pipe shall be reinforced, or relocated so
as to provide H-20 loading capacity.
Any approved fills shall not load the pipe in excess of the pipe design capacity
with a factor of safety of 2 plus consideration of H-20 live loading (design capacity x 2 +
H20). In addition, fill shall not be added beyond what can be excavated using an OSHA
approved trench configuration without shoring (that is open trench with laid back side
slopes). Adequate storage for spoils is also required within the right-of-way or easement.
Additional fill may be allowed on a case by case basis. In such cases the pipe may need
to be relocated.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
POTHOLING
CROSSING UTILITIES
All utilities crossing the District facilities shalt do so at right angles. The
centerline of the crossing utility shall be perpendicular to the centerline of the District
pipeline.
When the crossing utility must go UNDER the District facility, the utility must
protect the District's facilities. Such installation shall provide aman imum of 13" Of
vertical clearance between the outside of the District pipeline and the outside of the
crossing utility. Reduced separation maybe considered on a case by case basis. The
District will NOT approve a design calling for less than 4 inches of separation (outside to
outside). The District retains the right to prohibit the installation of adjacent facilities in
any and all cases regardless the information provided by the utility.
When the crossing utility crosses OVER the District facility, the utility must
maintain 12 inches of vertieal separation between the outside of the District pipeline and
the outside of the crossing utility. The construction shall be in such amanner that it does
not result in a point load on the District pipeline or a void above the pipeline.
PARAt r 13L U77EXTIB,S
No parallel utilities are permitted within Districtright•of-way or easement.
Parallel utilities where District facilities are located in public easements or rights -
of -way shall maintain 10 feet of horizontal separation. The separation is measure from
the outside of the pipeline to the outside of the other utility. This separation requirement.
is especially important at manholes.
Additional parallel separation maybe required where the adjacent utility is to be
constructed below the District's facility. The additional separation shall be such that the
proposed utility can be installed with no impact to the District facilities. Generally the
District would not allow construction that impacts the trench line of their pipeline. The
District shall determine adequate separation based on the situation proposed
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
®. c � CONSTRUCTION IN THE VICINITY TAND
TEL *MRM
° IOF DISTRICT PIPELINE
Potholing of the District's facilities is required prior to construction within the
right-of-way or easement.
LIVE LOADING
No construction equipment shall be allowed within the right-of-way or easement
unless such equipment has been demonstrated to produce toads less than H-20 loading.
In the event that heavier equipment is needed the user shall furnish adequate
protection of the pipe. Such protection shall prevent the pipe from being loaded more
than it's design capacity with a factor of safety of 2. This shall be demonstrated with
appropriate calculations.
All capacity verifications mentioned above shall be demonstrated by calculations
prepared and stamped by a qualified licensed engineer and submitted to the District for
review.
STRUCTURES
No structures shall be located within the District right-of-way or easement.
Structures outside of the District right-of-way or easements shall be constructed
without impacts within the right-of-way or easement. This includes temporary
excavation, soil stabilization, and temporary or permanent soil nails or rock bolts.
DRAINAGE
Drainage through and across the District right-of-way or easement shall not be
changed from historical patterns. The use of District right-of-way or easement for
retention or detention ponds is strictly prohibited.
LANDSCAPING
Landscaping within the District right-of-way or easement is allowed for the
benefit of the adjacent property owners. The following are requirements for landscaping
within District right-of-way or easement;
1. ALL LANDSCAPE AND HARDSCAPE ALLOWED BY THE DISTRIT
IS TO BE CONSTRUCTED AND MAINTAINED BY THE ADJACENT PROPERTY
OWNER. In the event that the District must maintain the pipeline or any related facilities,
restoration of the landscaping and or hardscape is the responsibility of the adjacent
property Owner,
2. No trees that reach a mature height of more than 15 feet will be allowed
within the right-of-way or easement.
TRENCH BACIIFIUL TO INS
FINISHED COMPACTED PER OISTRICT`
Fir
uq
WATERLINEJHIGH
,3Ars
1 FT MIN. 1 r 1 FTMIN.
Ex STING RR
BEGGING TO TRENCH SIMMLL SLURRY
BE ME= }' OONFORMINGTO
I, POREENDOOK-TAaLEMI
• li • •�-E•1:•"M v:-^. :: CROSSING
• • .0; :-t.�`N!Y� PIPE BEDDING
CROSSING 1r CLEARANCE
PIPE
CENTER FULL
LENGTH OF PIPE
_
Wilt CROSSING
NOTES..
I. PLEASE CALL THE SGVMWD (e28) 269-7911 40
TRENCH SACIffEL TO BE COMPACRED
HOURS BEFORE DOING ANY EXCAVATION IN THE
PER DISTRICT STANOARDB WITHIN IO FT
AREA OF SGVMWD FACILITIES.
EACH BIDE OF DISTRICT LINE.
2. TRENCH BACIVnL SLURRY TO CONFORM TO
CREEMBOOK TABLE 201-1.11
) 3. IN No CASE SHALL THE SEPAPA71ON
FINISHED GRADE
BETWEEN THE OU15MM OF THE PIPES BE
LESS THAN 4 INCHES.
SPRING LINE OF
4. THIS DETAIL APPLIES 70 ALL CROSSING PIPES
DISTRICT PIPELINE
IXCEPT HAWDOUS MATERIALS. ELECTRICAL
POWER.
S. TRENCH BACKFU SLURRY SHALL CONTAIN 100
DISTRICT
WATER LINE
(HW
PRESSURE)
.:
+1r CLEARANCE.
r
E00TIN0
.p
WATER INE
BEDDING
CROSSING PIPE
TRENCH SACKFILL SLURRY
cCNFDRABNG TO
-GREENSOW TABLE 201
LOS (-I SACK) OF CEMENT PER CUBIC YARD
AND SHALL HAVE 25 DAY COMPRESSIVE
STRENGTH OF IOD P5I.
e. TRENCH BACKFILL SLURRY AGGREGATE SHALL
MEET GREENB00K GPADNO E.
TABLE 201-1.3.2(A)
SAYE SIZE PERCENT PASSING
3/4' to=
3 DO-100
4 50-e0
NO. B 50-70
NO. 10 33-53
NO. 30 10-35
NO. 50 5-15
NO. IDO 2-7
NO. 200 0-4
T THE DSTMCT PIPE SHALL BE WRAPPED IN 4MIL
PLASTIC FOR THE FULL WIDTH OF PIPE IN
CONTACT TRENCH BACKI ILL SLURRY CONTAINING
MORE THAN 1 SACK OF CEMENT PER YARD OF
SLURRY.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
3i�i3bA G PIPELINES CROSSING STANDARD
LA TEND
TBL P.), -W.
FAx K1Rawnx4
UNDER DISTRICT WATERLINE SGV-39
3. 20 feet either side of the pipeline centerline shall be kept clear of
landscaping with penetrates more than 1 feet below the surface. This clear zone may not
be encroached on by the drip edge of all [nature landscaping adjacent to the 40 feet clear
area.
4. The landscaping/hardscape plan shall be submitted to the District for
approval prior to construction. The plan shall be modified to the satisfaction of the
District. The plan shalt show the mature drip edge of all vegetation with a mature height
of more than 5 feet.
NOTE:
CONTRACTOR TO PROVIDE WRITTEN INSTALLATION AND SHORING PLAN TO
ENGINEER AND SGVMWD WITH ENGINEERING CALCULATIONS STAMPED BY A
LICENSED STRUCTURAL ENGINEER DEMONSTRATING THAT ANY LOADS FROM
THE PROPOSED STORM DRAIN WILL BE STRUCTURALLY SUPPORTED SO AS
TO NOT TRANSFER LOADS ONTO THE DISTRICTS PIPELINE AND
DEMONSTRATING THAT THE DISTRICTS FACILITIES AND OPERATIONS WILL NOT
BE COMPROMISED.
a
I
rc
A V THIN,
_F HIGH PRESS I �,:q WATiE Ru -Mql
Ir:. a'MIN.
X
o'.
STORM DRAIN
1 4 0 BA11 29" QC.
3 PREFORMED EXPMSION JOINT FILLER
HIGH PRESSURE WATER MAIN-.
SECTION IIA=AD
- NOTES -
I. PLEASE CALL THE SGVMND
(626, 988-7911
48 HOURS BCPDRE DOING ANY E%CAVA-
TTON IN THE AREA OF SGVMWD FACILITIES.
2. PREFORMED EXPANSION JOINT FILLER TO
COMPLY WITH ASTM O-list.
3. PREFORNED EXPANSION JOINT FILLER TO
BE WIDTH OF TRENCH AND EXTEND 1 FOOT
BEYOND SPRING LINE. OF WATER MAIN.
i. CONCRETE SLAB TO BE 6 INCHES THICK,
AS WIDE AS THE 'r4ENCH. AND EXTEND 5
FEET BEYOND SPRING LINE (IF WATER MAIN.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
ee+vsLADE Dons wave STANDARD
" '°° STORM DRAIN PLAN NO,
GI
GLUEKC.4IFORNU l-
TEL:(SBS-%mA
rAX:OJII33IKRa
STETSON CROSSING ABOVE WATER MAIN SGv-58
ENGNEERSIN,.
MIN COVER
PER CODE
421
•�\ 3'MIN 1'L
112 X MIN
TYR MIN I
WATERLINE
BEDDING
EXISTING
WATERLINE
WATERLINE
/
TRENCH
CONDUIT PER
BACKFILL
CARRIER UTILITY
WATERLINE
BEDDING
Page 261159
CONDUIT TRENCH BACKFILL TO
BE COMPLETED AFTER
ENCASING CONCRETE HAB
CURED TO 5D0 PSI
RED CONCRETE ALL
AROUND CONDUIT 3" MIN
12- MAX FOR FULL WIDTH
OF WATERLINE ROW OR
EASEMENT
CONDUIT TRENCH BACKFILL TO BE
COMPLETED AFTER ENCASING
CONCRETE HAS CURED TO 500 PSI
FINISHED GRACE
RED CONCRETE ALL
MIN COVER AROUND CONDUIT 3"
PER CODE MIN 12- MAX FOR FULL
T
WIDTH OF WATERLINE
ROW OR EASEMENT
.. a.. •�.. .� 31MIN
t2' MAX
TYP t1.. PIPE BEDDING SHALL BE PLACED
MIN 3" MIN EXISTING
17 MAX
TYP T WATERLINE
I
ACCORDING TO SPECIFICATIONS
UP TO WITHIN 6' OF CROSSING
CONDUIT(S).
2. VOIDS AROUND CONDUIT SHALL
BE FILLED WITH RED CONCRETE
TO AT LEAST 3' ABOVE
CONDUITS) BUT NOT MORE THAN
12'.
3. BACKFILL AND COMPACTION
SHALL RESUME ABOVE CONDUIT
AND CONCRETE ACCORDING TO
SPECFICATONS.
SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT
EMU VILLAGE WKS CANE. STANDARD
SUITE IRS BURIED ELECTRICAL CONDUCTORS
COTCAr1FGRN1A91YN PLAN NO.
TEL: ICG61 S57-WO2
FAX: MIR 331-70M
STETSON CROSSING WATER LINES SGv-60
ENGINEERS INC.
Page 27/162
Prepared For: BASIS OF BEARINGS: Prepared By: CITY OF FONTANA CALIFORNIA
101
SHOULD CONSTRUCTION OF REQUIRED THE EAST LINE OF THE SE 1/4 OF SECTION 19, ALSO QROFESStO 1
D 0,
IMPROVEMENTS NOT COMMENCE WITHIN BEING THE CENTERLINE OF SIERRA AVE., PER PM NO. ALLARD ENGINEERING ��0 oNo J. q� OFFSITE STREET IMPROVEMENT PLANS
TWO YEARS OF THE DATE OF APPROVAL LENNAR 19431, PMB 242/97-98 Civl Engneering -Land Surveyng -Land Planing ti� �� Fy
z DRAWN eW SUMMIT AT ROSENA Ste' AS NOTED
AAAMAAMAVIMM✓Nr✓LAA a AAAAAAAn4An4AAAAAAAAAA SHOWN HEREON AND CARRIED FORTH N A 980 MONTECRO ERNE, SUITE 302 BEING: N00'33'32'W y tYe o /
18888 Seville Avenue
DIAL DILIGENT MANNER, THE CITY ENGINEER MAY CORONA CA 92879 BENCHMARK: Fontana, California 92335 w No. 3605:
TWO WORKING DESIGNED BY: DATE:
BEFORE DAYS BEFORE REQUIRE REVISIONS TO THE PLANS TO (951) 817-3545 (909) 358-1815 Fax (909) 385-1795 Ex . 6/30/20 SGVMWD DETAILS
CALTRANS BENCHMARK #8-17 II— 4 p DBW January, 2019
YOU DIG YOU DIG BRING THEM INTO CONFORMANCE WITH FAX (951) 817-3650 r`t"l�-C �� �P
BRASS DISK LOCATED IN S.C.E. TOWER LEG LOCATED .�%. 01/23/19 q� CIVIC- � CHECKED BY: �� D �• 1/28/2019 DRAWING NO.: 16
TOLL FREE 1-800-227-2600 CONDITIONSAND STANDARDS IN EFFECT 343' N/O 1-210, 0.2 MILES WEST OF SAN SEVAINE RD. � Allard, R.C.E. 36052 Date OF CAL" DATE:
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REy REVISION DESCRIPTION ENGR. DATE CITY DATE EL=1428.609 (expires 6/302020) RJA CITY ENGINEER R.C.E. 51152 5763 16
Filename: I:\Cal Atlantic\Summit at Rosena\Drawings\nNAL DESIGN\OFFSITE\STREETS\SUMMR AT ROSENA—SHT 16.dwg