Loading...
HomeMy WebLinkAbout5696-1+r ' A A! i ! i. .l• i i f • !` ! ! i • ! A:' ! i i !• r •, • ! ;!1'% i' ! ! !' • •!• i • i .i i !� • !• it • !• r ,:r r r: d , ! � r s . • ■ s !' ! , r so i r i • s r •A • ! r ' ! -I f... �• i •, 1, d �° •, l 1 ' f - 1 , ! , it •• i l � ,• , 1 i ' ! ! r • 1 ! !' '' i ► ! 1 i ! i s e, , r , i ■•!r ,■rr! i •- d f •, ! r, ! r • ei t 1 A WORKING, BEFORE! BEFORE i • i • y a • 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION CONFORM TO THE CITY OF FONTA NA STANDARD DETAILS. • EXPOSED CONCRETE CONFORM -.1 COLOR ! FINISH TO MATCH EXISTING CONCRETE. SEWER27. THE CONTRACTOR SHALL STAMP OF THE. CURB AT THE LOCA77ON OF • CONCRETE28. NO BE PLACED UNTIL THE FORMS i REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURALi i ARE MINIMUM t SUBJECT TO REVISION ! AND APPROVAL • r ..i OF ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32. ACTUAL THICKNESS OF A.C. PAVEMENT ANDIOR BASE COURSE MATER FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL .i. 1 SUBM17TED TO THE CITY OF FONTANA FOR, APPROVAL COMPLE77ON OF ROUGH •y1 RAISED33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE TO FINISHED GRADE PAVING CONTRACTOR .O COMPLETION OF PAVING. 34. UPON COMPLETION! i ! CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC - CONTROLDEVICES TO THE SA77SFACTION OF THE CITY TRAFFIC ENGIN 35. CONTRACTOR SHALL RELOCATE ANDIOR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFAC71ONOF THE CITY ENGINEER. THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 36. AS —BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THESE IMPROVEMENT PLANS HAVE • EEN PREPARED WITH THE INTENT THAT THE FIRM OF ALLARD ENGINEERINGt' i ! , STAKING FOR THE COMPLETEPROJECT. i ANOTHER ! NOTICESHOULD BE EMPLOYED TO USE THESE PLANS FOR THE PURPOSE OF CONSTRUC71ON ' THAT THE FIRM OF ALLARD ENGINEERING ASSUME ANY RESPONSIBILITY FOR ERRORS OR OMISSIONS, ! AVOIDED, CORRECTED OR MITIGATED IF,ALLARD ENGINEERING INC. HAD PERFORMED THE STAKING WORK. INDEX MAP SCALE: 1n=200' ENTRY IRFIE E T.I.=6.5 NTS R/W R/W 60 30' 30' 12' 18' 18' 12' 0.5' "' 1 1 5 SIDEWALK P. tJ x 5 SIDEWAI. 2,' 2 STREETLOCAL R P MIICI-fI CR COURT PENNSYLVANIA AVENUE & MUIRFIELDE T.I.=5.5 NIS 0 µ# LEGEND PROPOSED A.C. PAVEMENT e ` GRIND EXISTING ACt OVERLAY SAWCUT i REMOVE EXISTING AC PAVEMENT CENTERLINE RIGHT—OF—WAY IMPROVEMENTS EXISTING CONTOUR DIRECTION OF i> RL.U.A LIMITED USE EA L.O.C. LENGTH ON CURVE L.O.S.OF —SL— SLEEVE SHEET E; SHEET I TITLE SHEET SHEET 3 PENNSYLVANIA AVENUE SHEET 4 PITZER STREET SHEET 5 ! ■' DAME r SHEET 6 GEORGETOWN WAY ; EMORY STREET SHEET 7 TAFT COURT & BROWN COURT SHEET 8 •US AVENUE & + 77S AVENUE NORTH '� SOUTH R/W R/W e I 68' 1 34' 34' 1T 22' 22' 12' m 1 0.5' ' 5' SIDEWALK -P�r-- — = _F AVENUECURTIS NTS /W R/W 64' 32' 32' 12' 20' a 20 12' REVISION DESCRIPTION 1 ! BASIS OF BEARINGS: BASISSHOULD CONSTRUCRON OF REQUIRED Prepared For: THE CENTERLINE JMPROVFMENU ON . i M.B. 299113-15. YEARSTwo •a a • GRAND PACIFIC ■ !i SHOWN HEREON AND CARRIED BENCHMARK . FORTH MAY r r r i ENGINEER CALTrANS ■ WEST f , • e DILIGENT MANNER, THE CITY ■ 8-17 BRASS ra ■ CONCRETE IN TOWER REQUIRE REVISIONS TO ROAD,SOUTH BRING THEM INTO B. HIGHLAND # S r TOWER f ■ ■, f a • ! i i • i t! RANCHO CUCAMONGA 661�0 00 or ISUMMIT AVE $N • .,�IViffMA rATE ROUTE 210 FREEWAY J � N X v cn VICINITY P NTS 1 QUANTITY ES D I CONSTRUCTCONSTR ` PAVEMENT OVER 12" OF • COMPACTED : '`1E (SEE GENERAL NOTE 2 CONSTRUCT 6" PCC CURB & GUTTER PER CITY STD. PLAN NO. 100 8,771 LF 3 CONSTRUCT 4! PCC SIDEWALK PER CITY STD. PLAN NO. 1006, (WIDTH PER PLAN) 41,441 SF 4 CONSTRUCT PCC DRIVE APPROACH PER CITY STD. PLAN NO. 1002, 105 EA/21,362 SF • NOTED OTHERWISE 5 CONSTRUCT 8r CURB ONLY PER CITY STD. PLAN NO. 1000 175 LF i t 7 CONSTRUCT COBRA HEAD LUMINAIRE LED STREET LIGHT (90 WAT`T) 4 EA SEE PART NO. 10205811 PER r 404 ADJUST MANHOLE,,ME & COVER TO GRADE i PLAN 100 16 EA • CONSTRUCT COBRA 1 _ ! _ • FA SEE PART NO. 10205809 PER CITY STD. 404 10 CONSTRUCT 8' WIDE CROSS GUTTER, PER CITY STD. PLAN NO. 403 — 8 EA 11 ■ CONSTRUCT 1 # ii CONSTRUCT12 DEPRESSION PE` CITY STD. PLAN NO. 3003,PERPLAN) REMOVE EXISTING AC PAVEMENT 3,440 SF 15 GRIND EXIST. AC PAVEMENT (MIN. 0. 1' ) AND OVERLAY (MIN. 0. 1 590 SF 16 CONSTRUCT 8" CURB ONLY PER CITY STD. PLAN NO. 1000 —280 LF 17 CONSTRUCT14 OVER !3oO2O SF CONSTRUCT18 1- SIDEWALKDRAIN 1 r, i 3001s MODIFIED !' • _ CONSTRUCT PVC SLEEVES, SCH.40, !' RIGID • EASEE C.F.D. LANDSCAPE PLANS FOR ADDITIONAL INFORMAPON AC PAVEMENT OVERLAY i i` i' PROPOSED PAVEMENT0. GRIND EXIST.-O I Y AC PAVEMENT EXISTING SAWCUT AND REMOVE (MIN. 0.10' THICKNESS) AC PAVEMENT EXISTING AC PAVEMENT PAVEMENT , IDElAd. NTS WEST EAST R/W 1 R/W ® �/1At 1' 4' 41' 1 0.5' C t 3 6' SIDEWALK LJ LJ PRIMARY HIGHWAY • 104'RIW CITRUS AVENUE NTS R/W R/W NA! E'• nanMAIAI as LOCAL STREET - 64R/W ENTRY ROAD e a a STREET NOTREDAME s {, NTS ■ ». NIA Cff Y OF R STREET ` 1 IMPROVEMENT V "1101W. I I DRAWN BY. TRACT NO. ®, • { { ..• • r • HMG ■ 1 r ! •. • Y. 11.ME SHEET is J I t r ■ r W ♦ P a • ■ 0 � rJA , , Filename: 1:\Grand Pacific Communities 339\Trl8981 Citrus and Curtis\ DWG's\ FINAL DESIGN\ STREETS\ STREET PLAN TR 18981 SHT I.dwg ■