Loading...
HomeMy WebLinkAbout5747-3im u'""ENERAL SIGNING CONSTRUCTION NOTES 1. ALL THE MATERIAL AND WORK SHALL CONFORM TO THE LATES EDITION OF COUNTY OF RIVERSIDE STANDARD PLANS, CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND CALIFORNIA MANUAL ON UNIFORM TRAFFIC - CONTROL DEVICES. r—l] REMOVE EXISTING STRIPE. 2. ALL TRAFFIC STRIPES, PACEMENT MARKINGS, AND SIGNS SHALL BE REFLECTIONIZED AND IN STANDARD SIZE. ALL STRIPING AND MARKINGS DETAILS SHALL MATCH CALTRANS STANDARD PLANS DETAILS. STENCILS FOR PAVEMENT PAINT 12" WHITE LINE (LIMIT LINE) PER 2010 CALTRANS MARKING SHALL MATCH CALTRANS STANDARD PLANS. STD. PLAN A24E. 3. THE CONTRACTOR SHALL REMOVE ALL CONFLICTING STRIPES, PAVEMENT MARKINGS, AND RAISED PAVEMENT MARKERS IN ACCORDANCE WITH THE PLANS AND AS DIRECTED BY THE ENGINEER. WORD OR SYMBOL PAVEMENT MARKINGS ® RELOCATE EXISTING SIGN AS SHOWN ON PLAN. SHALL BE REMOVED BY SANDBLASTING OR GRINDING A RECTANGULAR AREA COVERING THE WHOLE MARKING. 4. ALL CROSSWALKS SHALL HAVE 10 FEET IN BETWEEN THE 12—INCH WHITE OR YELLOW STRIPES. 5. ALL DOUBLE YELLOW STRIPES SHALL HAVE 3—INCH PAINTED BLACK LINE SEPARATING THE YELLOW STRIPES. 6. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL TRAFFIC STRIPES, RAISED PAVEMENT MARKERS (RPMs). PAVEMENT MARKINGS, AND SIGNS IN ACCORDANCE WITH THE PLANS AND AS DIRECTED BY THE ENGINEER. 7. ALL PAVEMENT MARKINGS INCLUDING CROSSWALKS, LIMIT LINES, AND STOP BARS SHALL BE APPLIED WITH THERMOPLASTIC MATERIAL. ALL OTHER TRAFFIC STRIPES SHALL BE PAINED IN TWO COATS. 8. ALL RPMs SHALL BE INSTALLED WITHIN SEVEN WORKING DAYS OF ROADWAY STRIPING. ALL EXISTING RPMs WITHIN THE PROJECT AREA SHALL BE REPLACED IN KING OR REMOVED IN ACCORDANCE WITH THE PLANS, OR AS DIRECTED BY THE ENGINEER. 9. THE CONTRACTOR SHALL INSTALL STANDARD SIZE SIGN PANEL ON 2" SQUARE PERFORATED STEEL TUBE POST WITH TWO PIECE ANCHOR AND SLEEVE, FASTENED WITH 3/ 8" RIVETS , WITH STAINLESS STEEL WASHERS, UNLESS OTHERWISE NOTED. THE EXACT LOCATION OF ALL SIGNS SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER. 10. THE CONTRACTOR SHALL REMOVE SIGNS IN ACCORDANCE WITH THE PLANS AND AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL DELIVER REMOVED SIGNS TO THE CITY OF JURUPA VALLEY YARD OR AS DIRECTED BY THE ENGINEER. 11. THE CONTRACTOR SHALL SUBMIT A TRAFFIC SIGNAL TIMING SHEET TO THE CITY OF JURUPA VALLEY FOR REVIEW AND APPROVAL PRIOR TO THE BEGINNING OF CONSTRUCTION OF ANY NEW OR MODIFIED TRAFFIC SIGNAL. THE TIMING SHEET WILL MEET ALL REQUIREMENTS PER THE LATEST CALIFORNIA MUTCD, PART 4 "HIGHWAY TRAFFIC SIGNALS". Cor ner storlc 2® ,o 0 2® $o Land ur veying Inc. A.L.T.A. Topot� hic ` ary Construction Envir toI SCALE IN FEET 20 73 KNOB PLACE 1 inch = 20 ft.