HomeMy WebLinkAbout5715-11. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL
IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK, INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION
UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR
OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES
5 FEET OF GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE
GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE
REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN
FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER,
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION
AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE
THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO
WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC
WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES
SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT
APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER
COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
15. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
16. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
18. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
19. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT
PRIOR WRITTEN APPROVAL.
20. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
22. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
23. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
24. IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL
CLEANOUT AT THE PHASE BOUNDARY, NOT MORE THAN 150 FEET FROM THE DOWNSTREAM MANHOLE, SEE
CITY OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT.
25. SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED
CLAY PIPE (V.G.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE ASTM
DESIGNATION C700 FOR V.C.P.
26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY
ENGINEER.
27. SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW
FOR MINOR DEFLECTIONS IN ALIGNMENT.
28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION
AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
29. ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED
BY THE CITY ENGINEER.
30. TERMINATE ALL 4" HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12" BELOW THE
GROUND SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE
LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT.
31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE
SEWER LATERAL.
32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
INSPECTED AND APPROVED.
34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF
STREETS.
35. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
36. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE
BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO
SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
39. CONSTRUCTION SHALL NOT BEGIN ON IEUA FACILITIES UNTIL AN IEUA PERMIT HAS BEEN ISSUED AND
AFTER A RECONSTRUCTION MEETING IS HELD AT LEAST 1 WEEK PRIOR TO THE WORK
D1GdLt1111ejRT
'V
DIAL TWO WORKING
BEFORE !jDF:DAY!S BEFORE
YOU DIG YOU DIG
TOLL FREE: 811 WWW.DIGALERT.ORG
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
BASIS OF BEARINGS:
THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, ZONE 5,
NAD 83 (EPOCH 2011.00) AS DETERMINED LOCALLY BY A LINE BETWEEN CONTINUOUS GLOBAL
POSITIONING STATIONS (CGPS) AND/OR CONTINUOUS OPERATING REFERENCE STATIONS (CORS)
EWPP AND RTHS BEING S 84. 19'29.60" E AS DERIVED FROM GEODETIC VALUES PUBLISHED BY
THE CALIFORNIA SPATIAL REFERENCE CENTER (CSRC) AND/OR NATIONAL GEODETIC SURVEY (NGS),
RESPECTIVELY. ALL DISTANCES ARE U.S. FEET (GRID). GROUND DISTANCES CAN BE OBTAINED
BY MULTIPLYING A COMBINATION FACTOR OF 0.99995585.
NOTE:
I 'L'ESVO
SEWER CONSTRUCTION NOTES
THE QUANTITIES SHOWN HEREON ARE ESTIMATES ONLY. THE CONTRACTORS SHALL PREPARE
THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
A. CONTRACTOR TO ADJUST ALL VALVE COVERS AND MANHOLE RIMS TO GRADE
AFTER FINAL PAVING HAS BEEN INSTALLED.
QUANTITIES
s3
INSTALL 8"
(EXTRA STRENGTH) VCP SEWER LINE (TRENCHING PER CITY OF FONTANA STD. 1008) ............. I ........
791
LF
s14
INSTALL SEWER CLEANOUT AND PLASTIC BOX PER CITY OF FONTANA
STD. 2005 & 2007 ................................
1
EA
s15
CONSTRUCT
4' SEWER MANHOLE PER CITY OF FONTANA STD. 2001............................................................
R/W ..........
4
EA
s5sINSTALL
8"
VCP PLUG.....................................................................................................................
SD .......
1
EA
s77
CORE DRILL
THROUGH EXISTING MANHOLE BASE, CREATE A SMOOTH
CHANNEL TO DIRECT FLOW, & FILL OPENING
SEWER
TYP...........
TYPICAL
AROUND NEW PIPE WITH NON -SHRINK GROUT TO THE SATISFACTION
OF IEUA INSPECTOR ...............................
1
EA
s85
ADJUST RIM
TO GRADE AFTER FINAL PAVING IS INSTALLED PER CITY
OF FONTANA STD. 2000 .........................
4
EA
ss8
INSTALL 6"
VCP SEWER LATERAL PER CITY OF FONTANA STD. 2005...........................................................
UTILITY
27
LF
0
CONSTRUCT
TRENCH REPAIR PER CITY OF FONTANA STD. 1008..................................................................
PROPOSED STORM DRAIN
1406
LF
LEGEND
- 0
EXISTING R/W
- -
PROPOSED R/W
2
LOT LINE
-
CENTER LINE
Ak
FIRE HYDRANT
R .........
PROPERTY LINE
R/W ..........
RIGHT OF WAY
C .........
CENTERLINE
BOT. .......
BOTTOM
SD .......
STORM DRAIN
SMH .........
SEWER MANHOLE
STD .........
STANDARD
SEW .........
SEWER
TYP...........
TYPICAL
IMP. ..........
IMPROVEMENT
P.I.P..........
PROTECT IN PLACE
DWG .........
DRAWING
EXIST..........
EXISTING
RW ..........
RECYCLED WATER
INV .........
INVERT OF PIPE
UT .........
UTILITY
SPPWC.........
STANDARD PLANS FOR
SOUTHERN CALIFORNIA GAS CO.
PUBLIC WORKS CONSTRUCTION
to
0
PROPOSED STORM DRAIN
-
- -
EXISTING SEWER
--- - -
EXISTING WATER
(800) 427-2200
EXISTING RECYCLED WATER
L
EXISTING STORM DRAIN
EXISTING GAS
REVIEWED BY: Date: (4v -25 - t
EXISTING TELEPHONE
EXISTING ELECTRICAL
d
EASEMENT
�.
TRENCH REPAIR
BENCHMARK:
THE BENCHMARK FOR THIS
PROJECT IS BASED ON THE
NATIONAL GEODETIC SURVEY (NGS)
VERTICAL CONTROL NETWORK.
BENCHMARK NUMBER PID EV9267
DESIGNATION OF -628, ELEVATION
1006.35' (NAVD88).
M
REVISION DESCRIPTION
SHEETINDEX MAP
SCALE: 1"=100'
SHEET INDEX
SHT N0.
DESCRIPTION
1
TITLE SHEET
2
LIVE OAK AVE. SEWER IMPROVEMENT STA. 10+00.00 TO 18+15.40
UTILITY CONTACTS
OWNER/DEVELOPER
ELECTRICITY
TELEPHONE
IDI GAZELEY C/O IDIG LIVE OAK, LLC
0
w
SOUTHERN CALIFORNIA EDISON
AT&T
8 CORPORATE PARK, SUITE 300-34
7951 REDWOOD AVENUE
3939 E CORONADO STREET
IRVINE, CA 92606
FONTANA, CA 92336
ANAHEIM, CA 92807
PH: (949) 351-7243
(909) 357-6203
(714) 237-6155
CONTACT: STEVE HOLLIS
WATER
SEWER
CIVIL ENGINEER
FONTANA WATER CO.
CITY OF FONTANA
HUITT-ZOLLARS, INC
15966 ARROW ROUTE
8353 SIERRA AVENUE
3990 CONCOURS, #330
FONTANA, CALIFORNIA 92335
FONTANA, CA 92335
LO
(909) 822-2201
(909) 350-6632
ONTARIO, CA. 91761
PHONE (909) 941-7799
(909) 941-7789
GASFAX
CABLE
CONTACT: MANUEL (MANNY) GONZALES, PE
SOUTHERN CALIFORNIA GAS CO.
SPECTRUM
to
0
1981 W. LUGONIA AVENUE
1500 AUTO CENTER DRIVE
e_
REDLANDS, CA 92374
ONTARIO, CA 91761
(800) 427-2200
(800) 892-2253
L
DATE I ENGR. I CITY I DATE
SHOULD CONSTRUCTION OF THE
REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS
OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE
WITH STANDARDS IN EFFECT.
o QRpFESSlON9l
NO. 67512 m
0-1 EXPIRATION
6-30-2019
CIVIC
OF Cp�\F
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON
THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR
KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE
UTILITIESSHOWN AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS.
ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE
PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE
PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS
SHALL COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S.
DEPARTMENT OF LABOR, AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL
RELATIONS' "CONSTRUCTION SAFETY ORDERS".
THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS' AND
SUBCONTRACTORS' COMPLIANCE WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF
THE U.S. DEPARTMENT OF LABOR OR WITH THE STATE OF CALIFORNIA DEPARTMENT OF
INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS
CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING
SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND,
INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY,
REAL ORp ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT,
EXCEPTING FOR ANY LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER.
UNAUTHORIZED CHANGES AND USES NOTESm
CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS.
CITY ACCEPTANCE OF PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE
CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. UPON REQUEST OF
THE CITY INSPECTOR, THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY
ENGINEER FOR REVIEW.
d
01)
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND
COMPLETE RESPONSIBILITY FOR JOB SITE , CONDITIONS DURING THE COURSE OF CONSTRUCTION OF Co
THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT N
SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND
CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN >1
PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH
THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE
0
NEGLIGENCE OF DESIGN PROFESSIONAL.
0
d
I
ELCP17-00045 TPM#17-001 / DRP#17-004
d
CITY OFFONTANA, CALIFORNIA y
D
J
- 1nc. kiniarlo DRAWN BY: SCALE:
TITLE SHEET
3990 CONCOURS, #330 * ONTARIO, CALIFORNIA 91761 * (909) 941-7799 H --Z STAFF AS SHOWN
PREPA D UNDER THE SUPERVISION OF: JOHNNY M U RAD
67512
DESIGNED BY: LIVE OAK AVENUE DATE:
M. G. 06/2018 CD,
CHECKEDBY: APPA 3 DWG. NO.: o
6-30-19 (P -Zs-/8 J.M. < . 5715
EXPIRES DATE CITY ENGINEER R.C.E. 51152 DATE. 2
m
3
0
w
J
e
INLAND-
EMPIRE UTILITIES AGENCY'S
3
*A Municipal Water District
LOCATION MAILING ADDRESS
3
6075 Kimball Avenue Post Office Box 9020
A
Chino, California 91708 Chino Hills, California 91709
LO
Telephone (909) 993-1600
0
e
m
PROJECT
NAME: Gtorl tot= FQtdTANA• IZC-G. 00t4r,4- F-27
to
0
e_
PROJECT
NO.: ® S
L
kn
REVIEWED BY: Date: (4v -25 - t
Liza Mu z, IEUA Senior Engineer
d
a
DRAWING
NO.: 4-7 2--
d
CITY OFFONTANA, CALIFORNIA y
D
J
- 1nc. kiniarlo DRAWN BY: SCALE:
TITLE SHEET
3990 CONCOURS, #330 * ONTARIO, CALIFORNIA 91761 * (909) 941-7799 H --Z STAFF AS SHOWN
PREPA D UNDER THE SUPERVISION OF: JOHNNY M U RAD
67512
DESIGNED BY: LIVE OAK AVENUE DATE:
M. G. 06/2018 CD,
CHECKEDBY: APPA 3 DWG. NO.: o
6-30-19 (P -Zs-/8 J.M. < . 5715
EXPIRES DATE CITY ENGINEER R.C.E. 51152 DATE. 2