HomeMy WebLinkAbout5715-11. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK, INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OF GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED. 14. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 15. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 16. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 17. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 18. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 19. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 20. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 22. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 23. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 24. IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT AT THE PHASE BOUNDARY, NOT MORE THAN 150 FEET FROM THE DOWNSTREAM MANHOLE, SEE CITY OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT. 25. SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED CLAY PIPE (V.G.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE ASTM DESIGNATION C700 FOR V.C.P. 26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 27. SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR MINOR DEFLECTIONS IN ALIGNMENT. 28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 29. ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 30. TERMINATE ALL 4" HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12" BELOW THE GROUND SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT. 31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 35. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 36. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 37. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 39. CONSTRUCTION SHALL NOT BEGIN ON IEUA FACILITIES UNTIL AN IEUA PERMIT HAS BEEN ISSUED AND AFTER A RECONSTRUCTION MEETING IS HELD AT LEAST 1 WEEK PRIOR TO THE WORK D1GdLt1111ejRT 'V DIAL TWO WORKING BEFORE !jDF:DAY!S BEFORE YOU DIG YOU DIG TOLL FREE: 811 WWW.DIGALERT.ORG A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, ZONE 5, NAD 83 (EPOCH 2011.00) AS DETERMINED LOCALLY BY A LINE BETWEEN CONTINUOUS GLOBAL POSITIONING STATIONS (CGPS) AND/OR CONTINUOUS OPERATING REFERENCE STATIONS (CORS) EWPP AND RTHS BEING S 84. 19'29.60" E AS DERIVED FROM GEODETIC VALUES PUBLISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER (CSRC) AND/OR NATIONAL GEODETIC SURVEY (NGS), RESPECTIVELY. ALL DISTANCES ARE U.S. FEET (GRID). GROUND DISTANCES CAN BE OBTAINED BY MULTIPLYING A COMBINATION FACTOR OF 0.99995585. NOTE: I 'L'ESVO SEWER CONSTRUCTION NOTES THE QUANTITIES SHOWN HEREON ARE ESTIMATES ONLY. THE CONTRACTORS SHALL PREPARE THEIR OWN QUANTITIES AND BID A COMPLETE JOB. A. CONTRACTOR TO ADJUST ALL VALVE COVERS AND MANHOLE RIMS TO GRADE AFTER FINAL PAVING HAS BEEN INSTALLED. QUANTITIES s3 INSTALL 8" (EXTRA STRENGTH) VCP SEWER LINE (TRENCHING PER CITY OF FONTANA STD. 1008) ............. I ........ 791 LF s14 INSTALL SEWER CLEANOUT AND PLASTIC BOX PER CITY OF FONTANA STD. 2005 & 2007 ................................ 1 EA s15 CONSTRUCT 4' SEWER MANHOLE PER CITY OF FONTANA STD. 2001............................................................ R/W .......... 4 EA s5sINSTALL 8" VCP PLUG..................................................................................................................... SD ....... 1 EA s77 CORE DRILL THROUGH EXISTING MANHOLE BASE, CREATE A SMOOTH CHANNEL TO DIRECT FLOW, & FILL OPENING SEWER TYP........... TYPICAL AROUND NEW PIPE WITH NON -SHRINK GROUT TO THE SATISFACTION OF IEUA INSPECTOR ............................... 1 EA s85 ADJUST RIM TO GRADE AFTER FINAL PAVING IS INSTALLED PER CITY OF FONTANA STD. 2000 ......................... 4 EA ss8 INSTALL 6" VCP SEWER LATERAL PER CITY OF FONTANA STD. 2005........................................................... UTILITY 27 LF 0 CONSTRUCT TRENCH REPAIR PER CITY OF FONTANA STD. 1008.................................................................. PROPOSED STORM DRAIN 1406 LF LEGEND - 0 EXISTING R/W - - PROPOSED R/W 2 LOT LINE - CENTER LINE Ak FIRE HYDRANT R ......... PROPERTY LINE R/W .......... RIGHT OF WAY C ......... CENTERLINE BOT. ....... BOTTOM SD ....... STORM DRAIN SMH ......... SEWER MANHOLE STD ......... STANDARD SEW ......... SEWER TYP........... TYPICAL IMP. .......... IMPROVEMENT P.I.P.......... PROTECT IN PLACE DWG ......... DRAWING EXIST.......... EXISTING RW .......... RECYCLED WATER INV ......... INVERT OF PIPE UT ......... UTILITY SPPWC......... STANDARD PLANS FOR SOUTHERN CALIFORNIA GAS CO. PUBLIC WORKS CONSTRUCTION to 0 PROPOSED STORM DRAIN - - - EXISTING SEWER --- - - EXISTING WATER (800) 427-2200 EXISTING RECYCLED WATER L EXISTING STORM DRAIN EXISTING GAS REVIEWED BY: Date: (4v -25 - t EXISTING TELEPHONE EXISTING ELECTRICAL d EASEMENT �. TRENCH REPAIR BENCHMARK: THE BENCHMARK FOR THIS PROJECT IS BASED ON THE NATIONAL GEODETIC SURVEY (NGS) VERTICAL CONTROL NETWORK. BENCHMARK NUMBER PID EV9267 DESIGNATION OF -628, ELEVATION 1006.35' (NAVD88). M REVISION DESCRIPTION SHEETINDEX MAP SCALE: 1"=100' SHEET INDEX SHT N0. DESCRIPTION 1 TITLE SHEET 2 LIVE OAK AVE. SEWER IMPROVEMENT STA. 10+00.00 TO 18+15.40 UTILITY CONTACTS OWNER/DEVELOPER ELECTRICITY TELEPHONE IDI GAZELEY C/O IDIG LIVE OAK, LLC 0 w SOUTHERN CALIFORNIA EDISON AT&T 8 CORPORATE PARK, SUITE 300-34 7951 REDWOOD AVENUE 3939 E CORONADO STREET IRVINE, CA 92606 FONTANA, CA 92336 ANAHEIM, CA 92807 PH: (949) 351-7243 (909) 357-6203 (714) 237-6155 CONTACT: STEVE HOLLIS WATER SEWER CIVIL ENGINEER FONTANA WATER CO. CITY OF FONTANA HUITT-ZOLLARS, INC 15966 ARROW ROUTE 8353 SIERRA AVENUE 3990 CONCOURS, #330 FONTANA, CALIFORNIA 92335 FONTANA, CA 92335 LO (909) 822-2201 (909) 350-6632 ONTARIO, CA. 91761 PHONE (909) 941-7799 (909) 941-7789 GASFAX CABLE CONTACT: MANUEL (MANNY) GONZALES, PE SOUTHERN CALIFORNIA GAS CO. SPECTRUM to 0 1981 W. LUGONIA AVENUE 1500 AUTO CENTER DRIVE e_ REDLANDS, CA 92374 ONTARIO, CA 91761 (800) 427-2200 (800) 892-2253 L DATE I ENGR. I CITY I DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. o QRpFESSlON9l NO. 67512 m 0-1 EXPIRATION 6-30-2019 CIVIC OF Cp�\F PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIESSHOWN AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S. DEPARTMENT OF LABOR, AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS". THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS' AND SUBCONTRACTORS' COMPLIANCE WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S. DEPARTMENT OF LABOR OR WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL ORp ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR ANY LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER. UNAUTHORIZED CHANGES AND USES NOTESm CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. CITY ACCEPTANCE OF PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. UPON REQUEST OF THE CITY INSPECTOR, THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR REVIEW. d 01) CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE , CONDITIONS DURING THE COURSE OF CONSTRUCTION OF Co THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT N SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN >1 PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE 0 NEGLIGENCE OF DESIGN PROFESSIONAL. 0 d I ELCP17-00045 TPM#17-001 / DRP#17-004 d CITY OFFONTANA, CALIFORNIA y D J - 1nc. kiniarlo DRAWN BY: SCALE: TITLE SHEET 3990 CONCOURS, #330 * ONTARIO, CALIFORNIA 91761 * (909) 941-7799 H --Z STAFF AS SHOWN PREPA D UNDER THE SUPERVISION OF: JOHNNY M U RAD 67512 DESIGNED BY: LIVE OAK AVENUE DATE: M. G. 06/2018 CD, CHECKEDBY: APPA 3 DWG. NO.: o 6-30-19 (P -Zs-/8 J.M. < . 5715 EXPIRES DATE CITY ENGINEER R.C.E. 51152 DATE. 2 m 3 0 w J e INLAND- EMPIRE UTILITIES AGENCY'S 3 *A Municipal Water District LOCATION MAILING ADDRESS 3 6075 Kimball Avenue Post Office Box 9020 A Chino, California 91708 Chino Hills, California 91709 LO Telephone (909) 993-1600 0 e m PROJECT NAME: Gtorl tot= FQtdTANA• IZC-G. 00t4r,4- F-27 to 0 e_ PROJECT NO.: ® S L kn REVIEWED BY: Date: (4v -25 - t Liza Mu z, IEUA Senior Engineer d a DRAWING NO.: 4-7 2-- d CITY OFFONTANA, CALIFORNIA y D J - 1nc. kiniarlo DRAWN BY: SCALE: TITLE SHEET 3990 CONCOURS, #330 * ONTARIO, CALIFORNIA 91761 * (909) 941-7799 H --Z STAFF AS SHOWN PREPA D UNDER THE SUPERVISION OF: JOHNNY M U RAD 67512 DESIGNED BY: LIVE OAK AVENUE DATE: M. G. 06/2018 CD, CHECKEDBY: APPA 3 DWG. NO.: o 6-30-19 (P -Zs-/8 J.M. < . 5715 EXPIRES DATE CITY ENGINEER R.C.E. 51152 DATE. 2