Loading...
HomeMy WebLinkAbout5708-61050 N LY TC 1050 CL 1050 STY TC 4 0 0 O O N o v o o+ in 0ci a C) Fo 0 �n o 0 + ,� o M o C) O c) O O 00 O p' 00 ^_ _-J O ^ o o ao o00 O^^ O °rte° N o MrM o �� `-♦ 0 o o v o N + 04 o C147EXISTING GRADE Q 0 32' N/0 CENTERLINE 0)W CD II ^ -. O N C) N o� W o oa' +� 0 o K' + , Z W 0 0 0 Cl o co + to o _ W _ O N O pj 00 CD + . No I o o r- o `� v U 0 o ov �d �`. 00 +� .0 O M + L0 O + c0 N O C4 � EX. GRADE W 0 ®CENTERLINE U L-23.19 L=23.19' U O o CURVE IOi� ol~ o rn o , CURVE H PROP. TOP OF CURB U Q o o �n o ^o + o W 3 U_ � w 0 34' S/0 CENTERLINE o o o + o� o U-) �' p j,Lr. L=78.43' m o: _ ►- o 04 c o LL CURVE G PO 0 0 0 o M +o m -Lq w o `� + aro CD 00 CD �� 0.70% �- NW W �� +� +� �i 06 �J O p NO / I'^ ~ r- NO N� O NU _ ��—/ D O) U O O U.j W V, o + cn N o 0.65% ��1 . Q ,? 1 M � o w� �_K 0.70% EXISTING GRADE Z W W Q Q a* --^ o C) N ® 34 S/0 CENTERLINE car- o r- FLOW Q Z W mcn o: ® DWY00 J ,n r- o W N O O WIC � �o _ _. Z Ui U J O J o N; M Q `n PROFILE SCALE: o 0 i HORIZ. - 1" = 40' VERT. - 1" = 4' 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 N PER DWG. NO.5652 SEE SHEET 5 MATCHLINE — STA. 36+50.00 OLEANDER AVE. PAVEMENT I ND - REMOVE EXISTING _ AC PAVEMENT - CONSTRUCT NEW ASPHALT PAVEMENT - CONSTRUCT NEW PCC SIDEWALK - GRIND AND OVERLAY - CONSTRUCT PCC IMPROVEMENTS SEE DETAIL SHEET 1 BENCH MARK: CITY OF FONTANA BENCHMARK NO. "289" FOUND RAILROAD SPIKE IN THE NORTHWEST SIDE OF POWERPOLE NUMBER 61319 AT THE NORTHEAST CORNER OF THE INTERSECTION OF SANTA ANA AVENUE AND CATAWBA AVENUE. ELEVATION = 1032.22' SANTA TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION VV VV ANA AVENUE DATE I ENGR. I CITY I DATE CURVE TABLE CURVE # DELTA RADIUS LENGTH TANGENT G 8952'26" 50.00' 78.43' 49.89' H 66'25'19" 20.00' 23.19' 13.09' 1 6625'19" 20.00' 23.19' 13.09' SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. FD ON Q to W II Wco ZW —W J� I U L r Q 1050 CL 0 20 40 80 120 SCALE:1 "=40' QROFESSlow 0 l STF * R.C.E. NO. 56155 r- Exp. 12-31-18 Q 9�F C I V 1 OQ7�- of C A\-�F r I I i 5 1046.19TC 1046.47TC / 1045 5 FL2 1045 80 I 04 5.33 TC 2 4 1045.25 TC 0" CF 32 10<.78TC o� / 104,r. 11 FL o0 CG 14\ 1045.4 TC - 1044.7E FLOEP 30 �• o �s�6�c� •0 o S 00 SANTA ANA AVE. & OLEANDER AVE. S/E CURB RETURN ACCESS RAMP PER STD. PLAN NO 1003 SCALE: 1"=20' 1048.17TC 1047-50n s em% -_- 1048.69TC 10 CITY OF FONTANA, CALIFORNIA V) lhienes Engineering, Inc. H aa� ` a STREET IMPROVEMENT PLAN C/WL ENG/NEER/NG •LAND SURKEYING a W DRAWN BY: SANTA ANA AVENUE SCALE: 14349 FIRESTONE BOULEVARD LA M/RADA, CALIFORNIA 90638 N PH.(714)521-4811 FAX(714)521-4173 G.P. FROM OLEANDER AVE TO STA. 31+00.00 U �I ~ o F- r OTNG��. o6�� �o �U000 -GONG. P Flo o• K. „� o: 047.41 TGf o0 0 M ? gREINHARD 15 AP 0�8;�24 CITY ENGINC.E. 51152 ?G •� DRIVEWAY STA. 26+52.03 DETAIL SCALE: 1"=20' C C110N NOTES 01 SAW -CUT & REMOVE EXISTING A.C. PAVEMENT. I22 PROPOSED TRAFFIC SIGNAL - SEE SIGNAL PLANS O REMOVE ALL EXISTING TREES/SHRUBS/TREES STUMPS WITHIN PUBLIC R/W. 4 REMOVE EXISTING CURB AND GUTTER 5 REMOVE EXISTING SIDEWALK 6 REMOVE EXISTING AC BERM 0 UNDERGROUND EXISTING POWER POLE BY OTHERS (FOR REFERENCE) OREMOVE & RECONSTRUCT EXISTING RESIDENTIAL DRIVEWAY PER CITY OF FONTANA STD. PLAN 1002. (WIDTH PER PLAN) 9O CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STD. PLAN 1000 10 CONSTRUCT SIDEWALK PER FONTANA STD. PLAN 1006. (WIDTH PER PLAN & DETAILS) 11 CONSTRUCT CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD. PLAN 1003. 12 CONSTRUCT 4" A.C. OVER 6" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) FOR NEW PAVING IN OLEANDER AVENUE (T.I.=6.5) 13 CONSTRUCT 5-1/2" A.C. OVER 10" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) FOR NEW PAVING IN SANTA ANA AVENUE (T.I.=9.0) 14 CONSTRUCT 5-1/2" A.C. OVER 10" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) FOR NEW PAVING IN CYPRESS AVENUE (T.I.=9.0) 15 CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF FONTANA STD. PLAN 1002 (MODIFIED AS PER DETAILS ON SHEET 2). 118 CONSTRUCT PARKWAY PLANTER BOX DETAIL PER DETAIL ON SHEET 2. PROPOSED FIRE SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY). PROPOSED FIRE D.D.C.A. TO BE INSTALLED (BY FONTANA WATER COMPANY). 19 PROPOSED FIRE HYDRANT TO BE INSTALLED (BY FONTANA WATER COMPANY) 20 PROPOSED DOMESTIC WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 21 PROPOSED IRRIGATION WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 22 PROPOSED CATCH BASIN - SEE STORM DRAIN PLANS 23 PROPOSED STREET LIGHT - SEE STREET LIGHT PLANS 24 REMOVE OR RELOCATE EXISTING STREET LIGHT - SEE STREET LIGHT PLANS 25 REMOVE OR RELOCATE EXISTING CATCH BASIN - SEE STORM DRAIN PLANS 26 REMOVE EXISTING WATER METER (BY FONTANA WATER COMPANY) 27 RELOCATE EXISTING WATER METER (BY FONTANA WATER COMPANY) 28 ADJUST EXISTING MANHOLE TO GRADE 29 REMOVE EXISTING STAND PIPE 30 REMOVE/RELOCATE EXISTING STREET SIGN PER CITY OF FONTANA STD. 4003 31 REMOVE EXISTING BLOCK WALL 32 REMOVE EXISTING FENCE 133 REMOVE EXISTING STRUCTURE 34 REMOVE EXISTING STORM DRAIN STRUCTURE - SEE STORM DRAIN PLANS 35 REMOVE EXISTING WATER FACILITIES BY OTHERS 36 REMOVE EXISTING DRIVEWAY 37 CONSTRUCT 6.5" MIN. A.C. OVER 8" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) FOR NEW PAVEMENT IN JURUPA AVENUE 38 PROTECT IN PLACE EXISTING STREET LIGHT 39 GRIND AND OVERLAY EXISTING PAVEMENT. 5WIDTH MIN. 40 RELOCATE EXISTING COMM. PULL BOX. 41 CONSTRUCT 6" CURB PER CITY OF FONTANA STD. PLAN 1000 42 ADJUST TO GRADE EXISTING WATER VALVE 43 REMOVE EXISTING TREES, LANDSCAPING AND UNDERGROUND EXISTING IRRIGATION SYSTEM TO CONTINUE BEYOND THE LIMITS OF PROPOSED MEDIAN IMPROVEMENTS. 44 PROTECT IN PLACE EXISTING MANHOLE COVER 45 REMOVE EXISTING MEDIAN CURB 46 CONTRACTOR TO CONTACT SAN GABRIEL VALLEY WATER COMPANY IN REGARD TO EXISTING CONCRETE WATER LINES AND CONFLICTS WITH ROAD IMPROVEMENTS W�/CJ# 8-360382506 Of�P 15-017 Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA V) lhienes Engineering, Inc. STREET IMPROVEMENT PLAN C/WL ENG/NEER/NG •LAND SURKEYING W DRAWN BY: SANTA ANA AVENUE SCALE: 14349 FIRESTONE BOULEVARD LA M/RADA, CALIFORNIA 90638 N PH.(714)521-4811 FAX(714)521-4173 G.P. FROM OLEANDER AVE TO STA. 31+00.00 AS sHowN c 1 SOUTH WEST FONTANA LOGISTICS CENTER win DESIGNED BY: DATE: G.P. S/W CORNER OF SANTA ANA AND CYPRESS AVE Date - li Ib cg M ? gREINHARD CHECKED BY: M.R. AP 0�8;�24 CITY ENGINC.E. 51152 ?G •� DRAWING NO.: 5708 6 7_00 STENZEL RCE NO. 56155 0