Loading...
HomeMy WebLinkAbout5708-1STREET IMPROVEMENT GENERAL NOTES ' 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. -BEGINNING OF CURVE 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. DETAIL SHEET- TYPICAL SECTIONS & DETAILS 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. -BACK OF WALK 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. -CONCRETE 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. STA. 277+50.00 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. END OF CURVE 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 24.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25.THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 26.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 28.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29.ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31.PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32.ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33.ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35.CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. OWNER: GNA 18201 VON KARMAN AVENUE, SUITE 1170 IRVINE, CA 92612 PHONE: (949) 407-0100 FAX: (949) 502-5505 SEE DETAIL SHEET 1 SOILS ENGINEER: SOUTHERN CALIFORNIA GEOTECHNICAL SOILS & GEOTECHNICAL CONSULTANTS 22885 SAVI RANCH PARKWAY SUITE E YORBA LINDA, CA 92887 PHONE:(714)685-1115 FAX:(714)685-1118 BENCH MARK: CITY OF FONTANA BENCHMARK NO. "289" FOUND RAILROAD SPIKE IN THE NORTHWEST SIDE OF POWERPOLE NUMBER 61319 AT THE NORTHEAST CORNER OF THE INTERSECTION OF SANTA ANA AVENUE AND CATAWBA AVENUE. ELEVATION = 1032.22' STREET IMPROVEMENT PLAN SOUTH WEST FONTANA LOGISTICS CENTER �a A.B. A.C. B.C.R. BLDG B.O.W. B.W. C. L. F. CONC. C. F. C. B. E.C.R. EXIST. E. P. F. G. F. F. F. L. F. S. F. H. G. B. H. C. H. P. I NV. M. H. N. G. I�_ PB P. P. R/W R. D. TRANS PAD T. B. S= S. D. S. L. ST. LT. T.G. T. C. TOP TOE WM WV S/W CORNER OF SANTA ANA AVE &CYPRESS AVE21 -AGGREGATE BASE ' I -ASPHALT CONCRETE 127,463 I -BEGINNING OF CURVE �) -BUILDING STA. 27+00.00 TO STA. 18+00.00 -BOTTOM OF WALL DETAIL SHEET- TYPICAL SECTIONS & DETAILS Lr r -BACK OF WALK STA. 18+00.00 TO W -CHAIN LINK FENCE OLEANDER AVE FROM 10+86.62ECR AVE TO STA. 20+00.00 W -CONCRETE STA. 277+50.00 TO T -CURB FACE OLEANDER AVE FROM STA. 20+00.00 TO STA. 28+00.00 covJ CATC H BAS I N STA. 270+00.00 TO STA. 277+50.00 CENTERLINE OLEANDER AVE FROM STA. 28+00.00 TO STA. 36+50.00 13 END OF CURVE OLEANDER AVE STA. 11+00.00 TO STA. 25+50.00 -EXISTING SANTA ANA AVE FROM OLEANDER TO STA. 31+00.00 14 -EDGE OF PAVEMENT OLEANDER AVE STA. 26+00.00 TO STA. 36+50.00 FINISH GRADE SANTA ANA AVE FROM STA. 31+00.00 TO CYPRESS AVENUE 15 -FINISH FLOOR LAJ 8 -FLOW LINE 16 CROSS SECTIONS - -FINISH SURFACE Z SIS OF BEARINGS' -FIRE HYDRANT CROSS SECTIONS - t. -GRADE BREAK , r HANDICAP Q -HIGH POINT 14 W INVERT SF MANHOLE -NATURAL GRADE CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF FONTANA STD. PLAN 1002 CO PROPERTY LINE Q (MODIFIED AS PER DETAILS ON SHEET 2). -PULL BOX 16 POWER POLE 54 I -RIGHT OF WAY PROPOSED FIRE SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY). 2 -ROOF DRAIN 18 PROPOSED FIRE D.D.C.A. TO BE INSTALLED (BY FONTANA WATER COMPANY). TRANSFORMER PAD EA 19 TOP OF BERM 2 EA -SLOPE PROPOSED DOMESTIC WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 2 -STORM DRAIN 21 PROPOSED IRRIGATION WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 2 -SIGHT LINE 22 PROPOSED CATCH BASIN - SEE STORM DRAIN PLANS -STREET LIGHT EA 23 -TOP OF GRATE N/A 24 -TOP OF CURB N/A 25 -TOP OF SLOPE I EA -TOE OF SLOPE REMOVE EXISTING WATER METER (BY FONTANA WATER COMPANY) 11 WATER METER RELOCATE EXISTING WATER METER (BY FONTANA WATER COMPANY) WATER VALVE EA 28 SAN BERNARDINO COUNTY FLOOD CONTROL 825 E. THIRD STREET, ROOM 140 SAN BERNARDINO, CA 92415-0835 PHONE: (909) 387-8256 ATTN: TOM WILLIAMS FONTANA WATER COMPANY 15966 ARROW ROUTE FONTANA, CA 92355 PHONE: (909) 822-2201 ATTN: BRENDA FOWLER SOUTHERN CALIFORNIA GAS COMPANY BA TENTATIVE PARCEL MAP NO. 19711 FONTANA, CALIFORNIA Ver.. L.VV . 7V.VV Z IUALL: I = LOU 41 W Q W 1� SHEET INDEX ' 1 REDLANDS, CA 127,463 I TITLE SHEET - GENERAL NOTES, CONSTRUCTION NOTES, AND LEGEND 9 CYPRESS AVE FROM STA. 27+00.00 TO STA. 18+00.00 2 DETAIL SHEET- TYPICAL SECTIONS & DETAILS 10 CYPRESS AVE FROM STA. 18+00.00 TO JURUPA AVE 3 OLEANDER AVE FROM 10+86.62ECR AVE TO STA. 20+00.00 II JURUPA AVE FROM STA. 277+50.00 TO STA. 288+00.00 4 OLEANDER AVE FROM STA. 20+00.00 TO STA. 28+00.00 12 JURUPA AVE FROM STA. 270+00.00 TO STA. 277+50.00 5 OLEANDER AVE FROM STA. 28+00.00 TO STA. 36+50.00 13 CROSS SECTIONS - OLEANDER AVE STA. 11+00.00 TO STA. 25+50.00 6 SANTA ANA AVE FROM OLEANDER TO STA. 31+00.00 14 CROSS SECTIONS - OLEANDER AVE STA. 26+00.00 TO STA. 36+50.00 7 SANTA ANA AVE FROM STA. 31+00.00 TO CYPRESS AVENUE 15 CROSS SECTIONS - SANTA ANA AVE STA. 23+50.00 TO STA. 36+00.00 8 CYPRESS AVE FROM SANTA ANA AVE TO STA. 27+00.00 16 CROSS SECTIONS - CYPRESS AVE STA. 10+50.00 TO STA. 25+00.00 SIS OF BEARINGS' 17 CROSS SECTIONS - CYPRESS AVE STA. 25+50.00 TO STA. 36+50.00 1981 W. LUGONIA AVE. ' 1 REDLANDS, CA 127,463 PAVEAAENT LEGEND 2 THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA STATE PLANE N/A PHONE: (909) 335-7965 COORDINATE SYSTEM (CCS83), ZONE 5, NORTH AMERICAN DATUM 1983 (NAD83) - REMOVE EXISTING ATTN: ED SANTILLAN BASED LOCALLY ON CONTINUOUSLY OPERATING REFERENCE STATIONS (CORS) AC PAVEMENT AT&T "EWPP" AND "LORS" AS SHOWN HEREON (BASIS OF BEARINGS. N 81'2926" W). - CONSTRUCT NEW 1265 VAN BUREN ST. #180 ALL BEARINGS SHOWN HEREON ARE GRID BEARINGS. ASPHALT PAVEMENT ANAHEIM, CA 92807 COORDINATES SHOWN ARE BASED ON NAD83, CCS83, ZONE 5, 2010.0 EPOCH, -CONSTRUCT NEW PHONE: (714) 666-5614 AS FURNISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER (CSRC) AND PCC SIDEWALK ATTN: LEE QUEST PUBLISHED WITH THE NATIONAL GEODETIC SURVEY (NGS). ALL DISTANCES SHOWN - GRIND AND OVERLAY 389 ARE GROUND DISTANCES, UNLESS OTHERWISE NOTED. TO OBTAIN GRID DISTANCES, SOUTHERN CALIFORNIA EDISON MULTIPLY GROUND DISTANCES BY A COMBINATION FACTOR OF 0.9999530827 DERIVED - CONSTRUCT PCC 7951 REDWOOD AVENUE LOCALLY AT THE FOUND 1" IRON PIPE (OPEN) ACCEPTED AS THE INTERSECTION OF IMPROVEMENTS FONTANA, CA 92336 JURUPA AVE. AND OLEANDER AVE., 34'02'53.7361 1 " NORTH, 1 17'2655.26062" WEST 'EWPP" PHONE: (909) 549-5345 SF CSRC CORS STATION ATTN: JEFF HUDSON THE MAPPING ANGLE AT 1 " IRON PIPE IS 0'1851.32506" NORTH LATITUDE = 34'06'15.10 WEST LONGITUDE = 11731 '32.0585585 7" 12 CONSTRUCT 4" A.C. OVER 6" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) 72,623 CALIFORNIA STATE PLANE COORDINATE SYSTEM (SPCS), TIME WARNER - ZONE 5 NORTH AMER/CAN DATUM 1983 120100 EPOCH) 17777 CENTER COURT DR. 8TH FLOOR _/V 82926 W / NORTHING = 1,860,639.606 U.S. SURVEY FEET CERRITOS, CA 90703 (BSS/S EAST/NG = 6 705, 286.971 U.S. SURVEY FEET � � � -' - � _ � of PHONE: (562) 677-0263 `� -' - 6EA/�GS) 6986 ELEVATION = 1192.248 U.S SURVEY FEET ATTN: JOHN CHRISTIANSEN `� \ 585 (6gg63S7 COMBINED FACTOR = 0.9999336429 GA'0) CONVERGENCE ANGLE = 00'16'14" FONTANA UNITED SCHOOL DISTRICT --- 9680 CITRUS AVENUE \ A FONTANA, CA 92335 PHONE: (909) 357-5000 X 29455 CSRC CORS STATION "CORS" ATTN: SHERRI WHITTEN NORTH LATITUDE = 34'0759.96493' A/ WEST LONGITUDE = 11745'14.60442" INLAND EMPIRE UTILITY AGENCY CALIFORNIA STATE PLANE COORDINATE SYSTEM SPCS, S Ile 2`s8" FOR SEWER) IZONE 5, NORTH AMERICAN DATUM 1983, (2010.0 EPOCH) (_9 6075 KIMBALL AVENUE NORTH/NG = 1,870,992.226 U.S. SURVEY FEET CHINO, C A 917 08 EAST/NG = 6, 636, 093.592 U.S. SURVEY FEET J \ \ ELEVATION = 1581.278 U.S SURVEY FEET ` \ PHONE: (909) 993-1696 COMBINED FACTOR = 0.9999095355 \ ATTN: LIZA MUNOZ CONVERGENCE ANGLE = 00'08'25" GPS TIES �c BASIS Ur BEARINGS N. TS. TOLL FREE -q"mmw'- 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH REV. I REVISION DESCRIPTION DATE ENGR. CITY DATE STANDARDS IN EFFECT. �i� N 0°22'16" W 2734.82' QROFESS/pNq Qj * R.C.E. NO. 56155 r �Exp. 12-31-18 � �Q 9 F SIV 0F C A \-�F SAN BERNARDINO FRWY w = w a > a Q Q AVE. i of w � Z N wa N d cl, ck� J w U O d O N T U JURUPA AVENUE CITY 0r F O INTA 1\l VICINITY MAP N.T.S. CONSTRUCTION NOTES= QUANTITY 1 SAW -CUT & REMOVE EXISTING A.C. PAVEMENT. 127,463 SF 2 PROPOSED TRAFFIC SIGNAL - SEE SIGNAL PLANS N/A 3O REMOVE ALL EXISTING TREES/SHRUBS/TREES STUMPS WITHIN PUBLIC R/W. N/A 4 REMOVE EXISTING CURB AND GUTTER 113 LF 5 REMOVE EXISTING SIDEWALK 2,070 SF 6 REMOVE EXISTING AC BERM 682 LF 7O UNDERGROUND EXISTING POWER POLE BY OTHERS (FOR REFERENCE) 15 EA OREMOVE & RECONSTRUCT EXISTING RESIDENTIAL DRIVEWAY PER 389 SF CITY OF FONTANA STD. PLAN 1002. (WIDTH PER PLAN) 9O CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STD. PLAN 1000 5,129 LF 10 CONSTRUCT SIDEWALK PER FONTANA STD. PLAN 1006. (WIDTH PER PLAN & DETAILS) 33,670 SF 11 CONSTRUCT CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD. PLAN 1003. 3 EA 12 CONSTRUCT 4" A.C. OVER 6" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) 72,623 SF FOR NEW PAVING IN OLEANDER AVENUE (T.I.=6.5) 13 CONSTRUCT 5-1/2" A.C. OVER 10" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) 64,336 SF FOR NEW PAVING IN SANTA ANA AVENUE (T.I.=9.0) 14 CONSTRUCT 5-1/2" A.C. OVER 10" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) 82,711 SF FOR NEW PAVING IN CYPRESS AVENUE (T.I.=9.0) 15 CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF FONTANA STD. PLAN 1002 8,684 SF (MODIFIED AS PER DETAILS ON SHEET 2). 16 CONSTRUCT PARKWAY PLANTER BOX DETAIL PER DETAIL ON SHEET 2. 54 EA 17 PROPOSED FIRE SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY). 2 EA 18 PROPOSED FIRE D.D.C.A. TO BE INSTALLED (BY FONTANA WATER COMPANY). 2 EA 19 PROPOSED FIRE HYDRANT TO BE INSTALLED (BY FONTANA WATER COMPANY) 2 EA 20 PROPOSED DOMESTIC WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 2 EA 21 PROPOSED IRRIGATION WATER SERVICE TO BE INSTALLED (BY FONTANA WATER COMPANY) 2 EA 22 PROPOSED CATCH BASIN - SEE STORM DRAIN PLANS 4 EA 23 PROPOSED STREET LIGHT - SEE STREET LIGHT PLANS N/A 24 REMOVE OR RELOCATE EXISTING STREET LIGHT - SEE STREET LIGHT PLANS N/A 25 REMOVE OR RELOCATE EXISTING CATCH BASIN - SEE STORM DRAIN PLANS I EA 26 REMOVE EXISTING WATER METER (BY FONTANA WATER COMPANY) 11 EA RELOCATE EXISTING WATER METER (BY FONTANA WATER COMPANY) 1 EA 28 ADJUST EXISTING MANHOLE TO GRADE 10 EA 127 29 REMOVE EXISTING STAND PIPE 2 EA 30 REMOVE/RELOCATE EXISTING STREET SIGN PER CITY OF FONTANA STD. 4003 1 EA 31 REMOVE EXISTING BLOCK WALL 450 LF 32 REMOVE EXISTING FENCE 5,390 LF 33 REMOVE EXISTING STRUCTURE 2 EA 34 REMOVE EXISTING STORM DRAIN STRUCTURE - SEE STORM DRAIN PLANS I EA 35 REMOVE EXISTING WATER FACILITIES BY OTHERS I EA 36 REMOVE EXISTING DRIVEWAY I EA 37 CONSTRUCT 6.5" MIN. A.C. OVER 8" A.B. OVER 12" OF NATIVE (COMPACTED TO 95%) 6,873 SF FOR NEW PAVEMENT IN JURUPA AVENUE 38 PROTECT IN PLACE EXISTING STREET LIGHT I EA 39 GRIND AND OVERLAY EXISTING PAVEMENT. 5' WIDTH MIN. 57,423 SF 40 RELOCATE EXISTING COMM. PULL BOX. 1 EA 41 CONSTRUCT 6" CURB PER CITY OF FONTANA STD. PLAN 1000 400 LF 42 ADJUST TO GRADE EXISTING WATER VALVE 4 EA 43 REMOVE EXISTING TREES, LANDSCAPING AND UNDERGROUND EXISTING IRRIGATION SYSTEM TO CONTINUE BEYOND THE LIMITS OF PROPOSED MEDIAN IMPROVEMENTS. 44 PROTECT IN PLACE EXISTING MANHOLE COVER 2 Ea 45 REMOVE EXISTING MEDIAN CURB 473 LF 46 CONTRACTOR TO CONTACT SAN GABRIEL VALLEY WATER COMPANY IN REGARD TO EXISTING CONCRETE WATER LINES AND CONFLICTS WITH ROAD IMPROVEMENTS PRIVATE ENGINEER'S NOTE TO CONTRACTOR THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE COUNTY OF SAN BERNARDINO, THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. Prepared Under The Supervision Of Thienes Engineering, Inc. CIVIL ENGINEERING • LAND SURVEYING 14349 FIRESTONE BOULEVARD DRAWN BY: LA MIRADA, CALIFORNM 90638 PH.(714)521-4811 FAX(714)521-417J G.P. G.P. Date : `f'II(QI j CHECKED BY: NHARD STENZEL RCE NO. 56155 M.R. WD/D# 8-36C382506 DRP 15-017 ! CITY OF FONTANA, CALIFORNIAIs STREET IMPROVEMENT PLAN TITLE SHEET SCALE: sHOWN GENERAL NOTES, CONSTRUCTION NOTES & LEGEND SOUTH WEST FONTANA LOGISTICS CENTER DATE: i S W CORNER OF SANTA ANA AND CYPRESS AVE N 1 oM APP OVED DRAWING NO.:1 $o y 2G • = g CITY ENGINEER R.C.E. 51D152 5708 %_3 0