Loading...
HomeMy WebLinkAbout5691-20 0 Z 42A RVVIOM LODGE POLE TREE TRUNK WONDER TIE (DO NOT TWIST) MD VIRE AROUND rO STAKE NDATION OF TREE ;EPOLE PINE STAKES: DVE FINISH NITROLIZED PLANT IS ARCH DIRECTION RED :TS. E. REFER r )M GE WT. 5GAL -X= 6" 15 GAL -X=9" 24" BOX & LARGER - X = 12" MAX. SIDEWALK (WHERE SECTION PLAN VIEW 1 1/2x ROOTBALL SIZE TREE OR PALM TRUNK ROOTBALL 3" DIA. SCH. 80 PVC STAND PIPE W/ PIPE CAP LIMITS OF PLANT PIT 3" DIA. CORRUGATED A.D.S. PERFORATED DRAIN PIPE W/ DRAIN SOCK LAID BASE OF ROOTBALL TREE TRUNK ROOTBALL — PIPE CAP r— FIN. GR. DIA. SCH. 80 STAND PIPE I BACKFILL MIX DOMPACTED SOIL 3ACKFILL 3" DIA. CORRUGATED A.D.S. PERFORATED DRAIN PIPE W/ DRAIN SOCK LAID 0 BASE OF ROOTBALL NOTES: O BURY A MINIMUM OF 1/3 DEPTH OF BOULDER SIZE. O BOULDER - SEE � ON SHEET L1 FOR SPECIFICATION O3 SCARRED OR BROKEN BOULDERS SHALL NOT BE PERMITTED. ® PLACE PER PLANS AND LANDSCAPE ARCHITECT'S DIRECTION --1. ....,.,, 1-.-D SOIL APPROX. BOULDER FOOTPRINT SIZES 2 2' X 2' X 2'= 8 CU/FT fg' 3' X 3' X 3= 27 CU/FT 4' X 4' X 4' = 64 CU/FT O TREE STAKING O PIT DRAIN DETAIL O BOULDER INSTALLATION DETAIL 2 3 HOLD ROOTBALL ABOVE ULTIMATE II- FINISHED GRADE: 1 allI 1FOR 1 GAL FLUSH 2" FOR 5 & 15 GAL 5 E - II II DG LAYER PER SPECIFICATIONS -III III IIIIII Il I =1111 IILII —,_ ` o J- T III= ft�� lJ N SECTION ,..;:.,:`:,, I_I11- FERTILIZERGRO POWER TABLETS. APPLICATION RATES PER ABLE. o :.;:' 5 GRAM AGRIFORM HI � �. I I -. REFER TO SPECS. TABLETS SEE SPECS. IIII�II �'- "III=II-VIII BACKFILL MIX PER NOTES. 1" DEEP DG MULCH LAYER ..IlLlllzl II II VIII °-11 Tiff ..........................:::::::::.:.:...:::::::...::::::: . ................:::.................... 8' D / a as a.� TILLED & AMENDED PLANTING MIN. q l a BED PER SOIL TEST NATURAL SUBGRADE O1 FINISH GRADE/ADJACENT PLANTING O7 F HOLD ROOTBALL ABOVE ULTIMATE Q Q(i FINISHED GRADE: O2 PERMALOCK SPLICING STAKE/LINE STAKE, INSTALL PER GROUNDCOVER PLANTS FINISH 1" FOR 1 GAL MANUFACTURER'S SPECIFICATIONS. SEE PLANTING PLANS GRADE 2" FOR 5 & 15 GAL FOR SPACING— DG LAYER PER SPECIFICATIONS O PERMALOCK 1/8" x 4" ML. FINISH ALUMINUM EDGING. NATURAL ALUMINUM COLOR. INSTALL PER MANUFACTURER'S SPECIFICATIONS. 1" DEEP DG MULCH o J—IT�III ' • . a uI — I- A 111 IT�II�III I�I�u�I TEMPORARY 2 HIGH WATER = A BASIN. REMOVE ONCE PLANT IS O COMPACTED NATIVE SUB -GRADE LAYER. � � I- - �;•;° : '�. w o = `.®;' "' ESTABLISHED of - GRO POWER FERTILIZER TABLETS. O5 DECORATIVE ROCK MULCH PER PLAN - DEPTH VARIES O5 <,. APPLICATION RATES PER TABLE. PLAN I_,REFER TO SPECS. rl=il�=lTt=ll�-- �lTl= ISI I-- BACKFILL MIX PER NOTES. �4 GROUNDCOVER PLANTING I�5 SHRUB PLANTING lO PERMALOC ALUMINUM HEADER STORM DRAIN/ UNDERGROUND UTILITIES SEE NOTE 3 5 W SIDEWALK UTI1 100, LI z a CURB AND GUTTER METER 10' 5' TYP. TYP. L DERGROUND STRUCTURE CH BASIN NSFORMER VAULT. .—. SIDEWALK�_ L DRIVE S.L. ❑ O xi0 APPROACH _ 2 � d CURB AND GUTTER MIN MIN MIN N 5' NOTES: MIN 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY THE CITY ENGINEER AND FUEL MODIFICATION PLAN. 2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT CRITERIA AS APPROVED BY TRAFFIC ENGINEER. 3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK. 4. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE OF ALL UNDERGROUND FACILITIES. Call Underground Service Alert 5. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES STRUCTURES AND VALVE BOXES. � at least 2 days before you dig TT����``//��'((' KnoCalIbsoreyou. O TREE PLA�ElYlENT Call before you dig. a / I I I I I 4 6 i 17 \ I I I I. � �.ar '1 a •d .ai// \ ALIGN W/ ALIGN W/ DRIPLINE DRIPLINE OR OR PER MFR. OF TREE PER MFR. SPEC. SPEC. ROOT BARRIER NOTES: A. POSITION BARRIER AS CLOSE TO CURB OR SIDEWALK AS POSSIBLE. RAISED ROOT PROTECTORS SHALL BE FACING TOWARDS THE TREE. B. TOP OF BARRIER SHALL BE 1" ABOVE FINISHED GRADE. C. LENGTH OF ROOT BARRIER SHALL BE EQUAL TO THE ULTIMATE DRIPLINE OF THE PARTICULAR TREE, OR 10' MAX. LEGEND: 1Q CONCRETE CURB OR HARDSCAPE 83 FINISHED GRADE APPROVED ROOT CONTROL BARRIER ® 3/4" TO 1 1/2" GRAVEL OR CRUSHED ROCK DRIP LINE OF TREE 6 CENTER OF TREE PARKWAY WIDTH ROOT BARRIER IS TO BE 18" LINEAR BARRIER UB 18-2 WHEN ADJACENT TO WALK OR HARDSCAPE OR 24" LINEAR BARRIER UB 24-2 WHEN ADJACENT TO CURB AVAILABLE FROM: CENTURY PRODUCTS 1144 N. GROVE ST. ANAHEIM, CA 92806 (714) 632-7083 WEED CONTROL WHERE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF WORK, CLEAN AND REMOVE THESE EXISTING WEEDS BY MOWING OR GRUBBING OFF ALL PLANT MATERIAL. UPON COMPLETION OF SOIL PREPARATION AND PLANTING OF ALL SPECIMEN TREES, BEGIN WEED ABATEMENT PROGRAM BY APPLYING: 100 POUNDS OF A COMMERCIAL FERTILIZER, 46-0-0, PER ACRE AND PER MANUFACTURER'S SPECIFICATIONS. WATER ALL AREAS FOUR (4) TIMES DAILY FOR FOURTEEN (14) CONSECUTIVE DAYS UNTIL WEED SEEDS HAVE GERMINATED. CEASE WATERING FOR THREE (3) DAYS. SPRAY A NON-SELECTIVE, NON -RESIDUAL, SYSTEMIC HERBICIDE TO ERADICATE GERMINATED WEEDS. LET THE WEEDS DIE WITHOUT IRRIGATION FOR A MINIMUM DEPTH OF 1/4"INCH BELOW THE SURFACE OF THE SOIL. IF STUBBORN AND RESIDUAL WEEDS (I.E. BERMUDA) SHOULD PERSIST ERADICATION PROCEDURE SHOULD BE REPEATED. THE TYPE OF WEEDS THAT EXIST SHOULD BE IDENTIFIED AND COORDINATED WITH AN APPROVED LICENSED PEST CONTROL ADVISOR TO ENSURE COMPATIBILITY WITH CHEMICAL AND SEASON OF APPLICATION. DO NOT USE MATERIAL OR METHOD THAT WOULD ADVERSELY EFFECT NEW PLANTINGS, SLOPE STABILIZATION OR HYDROSEEDING. SOIL TEST AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE AND ROUGH GRADING COMPLETED BUT PRIOR TO SOIL PREPARATION, SEVERAL SOIL SAMPLES SHALL BE TAKEN BY THE SOILS LABORATORY OR BY THE CONTRACTOR AT THEIR INSTRUCTION AND A REPORT/RECOMENDATION PRODUCED. THE CONTRACTOR SHALL FURNISH A COPY OF TIIE SOIL TEST FOR AGRICULTURAL SUITABILITY AND FERTILITY (PREPARED BY A CALIFORNIA ASSOCIATION OF AGRICULTURAL LABORATORIES MEMBER) TO THE CONTRACTING OFFICER AND THE CITIES INSPECTOR, UPON REVIEWING THE SOILS REPORT THE ARCHITECT MAY MAKE SPECIES SUBSTITUTIONS TO THE PLANT LIST. SOIL PREPARATION MACHINE ROTOTILL THE FOLLOWING AMENDMENTS INTO THE SOIL AT RATES INDICATED PER 1000 SF: (THESE RATES ARE FOR BID PURPOSES ONLY, ACTUAL RATES TO CORRESPOND TO CONTRACTOR'S SOILS REPORT). 4 CU, YDS NITROGEN STABILIZED SAWDUST 150 LBS. GYPSUM 125 LBS STANDARD FERTILIZER DEEP ROOT BARRIERS ALL TREES WITHIN 7 FEET OF ANY PERMANENT HARDSCAPE ELEMENT SUCH AS CONCRETE WALKS, WALLS OR BUILDINGS SHALL BE PLANTED WITH AN APPROPRIATE SIZED ROOT BARRIER (UNLESS OTHERWISE NOTED ON PLANS). ROOT BARRIER TO BE LINEAR PANEL (TYP.) SEE DETAIL. TOP DRESSING (FUEL MODIFICATION AREA) ALL SHRUB AND GROUNDCOVER AREAS SHALL BE TOP DRESSED WITH A V-1/2" LAYER OF DECOMPOSED GRANITE/FRACTURED ROCK. SEE TOP DRESSING LEGEND FOR SPECIFICATIONS (SUBMIT SAMPLE TO CITY LANDSCAPE ARCHITECT FOR APPROVAL) SPECIAL NOTE CONTRACTOR SHALL SUPPLY A TOP LAYER OF 3" CLEAN "3/4" -MINUS" TOPSOIL TO ACHIEVE FINAL FINISH GRADE PRIOR TO "TOP DRESSING" D.G.. ANY ROCK OR BOULDERS OVER 6" DIA. SHALL BE BURRIED A MINIMUM OF 12" DEEP OR REMOVED FROM THE SITE. THE CLEAN TOPSOIL CAN EITHER BE GENERATED "ON-SITE" OR IMPORTED. THIS TOPSOIL SHOULD BE APPLIED AFTER IRRIGATION AND DRAINAGE WORK HAS BEEN COMPLETED. QUALITY OF TOPSOIL SHALL BE APPROVED BY THE CITY PRIOR TO INSTALLATION AND SHALL MEET ALL CITY STANDARDS. TREE & PLANTING NOTES: All trees shall be located as follows: - A loin. of 25' from beginning of curb returns at any street intersection. - 10' from light standard or utility enclosures. - 5' from fire hydrants. - A min, of Y from sidewalk edge, face of wall or back of curb. - For trees shown to be planted within parkway less than 6' wide, center tree accordingly. - No tree shall be planted in parkway less than T wide. - Provide appropriate size linear "Century" root barrier for any tee planted with in 7' of hardscape element, such as curbs, sidewalks or walls. - Hold center of all shrubs or groundcover a min. of 24" away from edge of paving (typ.) SIZING LEGEND 0 1 GALLON d X 30" BOX x 48" BOX E7 5 GALLON x\LL36" BOX x 54" BOX 15 GALLONx 42" BOX X 60" BOX ° x 24" BOX Indicates quantity Indicates species ° Indicates palm x B.T.H. as noted. x Denotes trees that are to be tagged by the Landscape Architect. Concrete sidewalk - Per C.E. Plans (L) Sight Line - Per C.E. Plans Retaining condition per C.E. wall plans �4 Perimeter wall per C.E. wall plans (5 j Install 2" layer of 3/4" "Apache Sunset" fractured rock. Rock available from Southwest Boulder & Stone (760) 342-5522. Provide Permaloe C1eanLine 1/8" x 4" aluminum header with mill finish. Set flush with top of gravel and install per manufacture's specification. See detail 6, sheet L-1 'Blasted Granite' landscape boulders from Southwest Boulder & Stone (760) 342-5522 Install per �J boulder installation detail 3, sheet L-1. Numbers indicate boulder size in total cubic feet (10 total - this plan). svn°eoL Fractured Rock Top Coat: Install a 1" - 1 1/2" layer of'Mojave Gold' 3/8" fractured rock over smooth finish grade as mulch/bark substitute after all planting. Submit sample to Landscape Architect for approval prior to installation. Available from Southwest Boulder & Stone (760) 342-5522. Street Lighting per C.E. plans aCatch basin per C.E. plans CITY OF FONTANA CFD LANDSCAPE PLANS JR: 19962 LOT B1) DRAWN BY: CYPRESS AVENUE AS SHOWN (WEST SIDE - STA. 38+35 TO 49+00) DESGNm DATE'PLAN G DERULS & NOTES CHECKED BY: APPROVED BY: .511 17 5691. 2 DATE: ENGINEER R.C.E. 51152 EXP. DATE 1® J-4 1 T e s C A P e s Landscape Architecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard Polharrus, License CA -$2782 (949) 644-9370 (714) 210-3140 FAX rLI E"I U t O ® U F M/ FLI 0 1> U ~ �� VpNDSCq F PLAN CHECK NO. DATE 01/16/17 JOB # 16-026 1 OF 10 t J i �� VpNDSCq F PLAN CHECK NO. DATE 01/16/17 JOB # 16-026 1 OF 10