Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5690-2
gg TREE OR PALM TRUNK L➢ PLANTING NOTES oz ro SIDEWALK (WHERE OCCURS) ROOTBALL LODGE POLE ®� O7 U00 a PIPE CAP WEED CONTROL FIN. GR. WHERE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF WORK, CLEAN AND REMOVE F 0 U THESE EXISTING WEEDS BY MOWING OR GRUBBING OFF ALL PLANT MATERIAL. UPON TREE TRUNK j'{ COMPLETTON OF SOIL PREPARATION AND PLANTING OF ALL SPECIMEN TREES, BEGIN WEED WONDER TIE 3" DIA. SCH. 80 D ABATEMENT PROGRAM BY APPLYING: 100 POUNDS OF A COMMERCIAL FERTILIZER, 46-0-0, PER �. 0 0 7 0�,) j �J 7 O 0 (DO NOT TWIST) a F PVC STAND PIPE ACRE AND PER NLSNUFACTURER'S SPECIFICATIONS. WATER ALL AREAS FOUR (4) TIMES DAILY FOR FOURTEEN CONSECUTIVE DAYS UNTII. WEED SEEDS HAVE GERMINATED. CEASE PREVAILING WIND LANTER BACKFILL MIX (14) DIRECTION WATERING FOR THREE (3) DAYS. SPRAY A NON-SELECTIVE, NON -RESIDUAL, SYSTEMIC — HERBICIDE TO ERADICATE GERMINATED WEEDS. LET THE WEEDS DIE WITHOUT IRRIGATION \ COMPACTED SOIL FOR A MINITvIUM DEPTH OF 1/4"INCH BELOW THE SURFACE OF THE SOIL. IF STUBBORN AND "B000000 BACKFILL RESIDUAL WEEDS (LE. BERMUDA) SHOULD PERSIST ERADICATION PROCEDURE SHOULD BE 000000e"oe000""aoovooaooaoo 000e" REPEATED. THE TYPE OF WEEDS THAT EXIST SHOULD BE IDENTIFIED AND COORDINATED WITH "WONDER TREE -TIE" - WRAP WIRE AROUND 3" DIA. CORRUGATED R A.D.S. PERFORATED AN APPROVED LICENSED PEST CONTROL ADVISOR TO ENSURE COMPATIBILITY WITH CHEMICAL OUTSIDE OF STAKE. SECURE RECOMMENDATION STAKE o, PER IDE OFACTAKE. SURETOSTAK RAIN PIPE DRAIN ------- — -- AND SEASON OF APPLICATION. DO NOT USE MATERIAL OR METHOD THAT WOULD ADVERSELY AND BELOW BRANCHING YOKE OF TREE 1 1/2x ROOTBALL SIZE SOCK LAID 0 BASE EFFECT NEW PLANTINGS, SLOPE STABILIZATION OR HYDROSEEDING. OF ROOTBALL (2) 3" DIA x 10' LONG LODGEPOLE PINE STAKES: SOIL TEST LOCATE OUTSIDE OF ROOTBALL AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE AND ROUGH GRADING COMPLETED BUT ARBOR GUARD IN TURF AREAS SECTION PRIOR TO SOIL PREPARATION, SEVERAL SOIL SAMPLES SHALL BE TAKEN BY THE SOILS LABORATORY z sEr TOP OF ROOTBALL 6" ABOVE FINISH OR BY THE CONTRACTOR AT THEIR INSTRUCTION AND A REPORT/RECOMENDATION •o GRADE. INSTALL a LAYER OF NTIROLIZED 90% COMPACTED SOIL PRODUCED. THE CON'T'RACTOR SHALL FURNISH A COPY OF THE SOIL TEST FOR I WOOD CHIP MULCH. AGRICULTURAL SUITABILITY AND FERTILITY (PREPARED BY A CALIFORNIA ASSOCIATION OF — — — TREE OR PALM TRUNK AGRICULTURAL LABORATORIES MEMBER) TO THE CONTRACTING OFFICER AND THE CITIES INSPECTOR, DEEP ROOT BARRIER IF WITHIN 5' OF ANY _ _ — r UPON REVIEWING THE SOILS REPORT THE ARCHITECT MAY MAKE SPECIES FG HARDSCAPE (SEE DETAIL) ROOTBALL SUBSTITUTIONS TO THE PLANT LIST. WATER BASIN/ REMOVE ONCE PLANT IS I I SOIL PREPARATION v ESTABLISHED BER LANDSCAPE ARCH DIRECTION I I 3" DIA SCH, BO PVC STAND PIPE W/ NOTES: APPROX. BOULDER FOOTPRINT SIZES MACHINE ROTOTH.L THE FOLLOWING AMENDMENTS INTO THE SOIL AT RATES INDICATED PER PLANT PR DRAIN WHEN REQUIRED tI (PER SEPARATE DETAIL) I" PIPE CAP I O1 BURY A MINIMUM OF 1/3 DEPTH 2' X 2' X 2'= 8 CU/FT 1000 SF: (THESE RATES ARE FOR BID PURPOSES ONLY, ACTUAL RATES TO CORRESPOND TO CONTRACTOR'S SOILS REPORT). �1I l t I LIMITS OF PLANT PIT OF BOULDER SIZE. 4 CU. YDS NITROGEN STABILIZED SAWDUST r GRO POWER FERTILIZER TABLETS. — — — J 3" DIA CORRUGATED A.D.S. PERFORATED O BOULDER - SEE 5 ON SHEET 3' X 3' X 3= 27 CU/FT 150 LBS. GYPSUM 1 APPLICATION RATES PER TABLE REFER iK TO PLANTING NOTES. �— — — — RAIN PIPE W/ DRAIN SOCK WD ® Ll FOR SPECIFICA 125 LBS STANDARD FERTILIZER BASE OF ROOTBALL ® SCARRED OR BROKEN BOULDERS - 4' 4' X 4' X 4' = 64 CU/FT BACKFILL MIX PER SPECS. ^ �A� PLAN VIEW SHALL NOT BE PERMITTED. DEEP ROOT BARRIERS a NATIVE SOIL SUBGRADE EXCAVATE TO CORRECT HEIGHT �4 PLACE PER PLANS AND ALL TREES WITHIN 7 FEET OF ANY PERMANENT HARDSCAPE ELEMENT SUCH AS CONCRETE FOR PLANTING. SCARIFY BOTTOM TO ENSURE ADEQUATE DRAINAGE LANDSCAPE ARCHITECTS DIRECTION WALKS, WALLS OR BUILDINGS SHALL BE PLANTED WITH AN APPROPRIATE SIZED ROOT BARRIER (UNLESS OTHERWISE NOTED ON PLANS). ROOT BARRIER TO BE LINEAR PANEL (TYP.) FOR HEALTHY GROWTH OF PLANT. SEE DETAIL. 21X ROOTBALL SCHEDULE OF PR EXCAVATION TOP DRESSING (FUEL MODIFICATION AREA) 5 GAL - x - 6" 15 GAL - X - 9" ALL SHRUB AND GROUNDCOVER AREAS SHALL BE TOP DRESSED WITH A V-1/2" LAYER OF DECOMPOSED 24" BOX & LARGER - X - 12" MAX. GRANITE/FRACTURED ROCK. SEE TOP DRESSING LEGEND FOR SPECIFICATIONS (SUBMIT SAMPLE TO CITY LANDSCAPE ARCHITECT FOR APPROVAL) O O PIT DRAIN DETAIL O BOULDER INSTALLATION DETAIL TREE STAKING SPECIAL NOTE CONTRACTOR SHALL SUPPLY A TOP LAYER OF 3" CLEAN "3/4".MINUS" TOPSOIL TO ACHIEVE FINAL FINISH GRADE PRIOR TO "TOP DRESSING" D.G.. ANY ROCK OR BOULDERS OVER 6" DLA. SHALL BE BURRIED A MINIMUM OF 12" DEEP OR REMOVED FROM THE SITE. THE CLEAN TOPSOIL CAN EITHER BE GENERATED "ON-SITE" OR IMPORTED. THIS TOPSOIL SHOULD BE APPLIED AFTER IRRIGATION AND DRAINAGE WORK HAS BEEN COMPLETED. QUALITY OF TOPSOIL SHALL BE APPROVED BY THE CITY PRIOR TO INSTALLATION AND SHALL MEET ALL CITY STANDARDS. TREE & PLANTING NOTES: HOLD ROOTBALL ABOVE ULTIMATE FU41SHED GRADE: 2 L,, All trees shall be located as follows: 1FOR 1 GAL_R. 2" FOR 5 & 15 GAL 1/2' (NP.)0 - 00 - A min. of 25' from beginning of curb returns at any street intersection. DG LAYER PER SPECIFICATIONS 1 4 a LL u II li II IV from light standard or utility enclosures. :,. c, .:sF:<;s:::::; 5' fro:N:s:,•.:::.;;<:;:xs:;. m fire hydrants. SECTION o e:' a ;' GRO POWER FERTILIZER TABLETS. :.. ~a A min of 3' from sidewalk edge, face of wall or back of curb. 5 GRAM AGRf FORM ° "'•> APPLICATION RATES PER TABLE. REFER TOMSX . TABLETS SEE SPECS. - _ - PER NOTES. -For trees shown to be planted within azkwa P parkway 1 " DEEP DG MULCH LAYER _ - less than 6' wide, center tree accordingly. o °q oo ° TILLED &AMENDED PLANTING MIN. 3 No tree shall be planted in parkway less than T wide. �a / BED PER SOIL TEST 6" Provide appropriate size linear "Century" root barrier 1111111111111111111111111=1111 -NATURAL SUBGRADE Ofor 1 FINISH GRADE any tree planted with in T of hardscape element, such as curbs, sidewalks or walls. Hold center of all shrubs or groundcover a min. of 24" Fp HOLD ROOTBALL ABOVE ULTIMATE O CONCRETE CURB - NATURAL COLOR away from edge of paving (typ.) F (� FINISHED GRADE: CONCRETE WITH MEDIUM BROOM FINISH GROUNDCOVER PLANTS pJ 9 SEE PLANTING PLANS FINISH t FOR 1 GAL GRADE 2" FOR 5 & 15 GAL O (1) #3 REBAR - CONTINUOUS �� FOR SPACING— / DG LAYER PER SPECIFICATIONS 4O D.G. TOP COAT© 1" DEEP DG MULCH LAYER. 0 a l ". TEMPORARY 2" HIGH WATER = (b BASIN. REMOVE ONCE PLANT IS �7� SIZING LEGEND j ESTABLISHED :. GRO POWER FERTILIZER TABLETS. APPLICATION RATES PER TABLE, z 1 GALLON x 30" BOX 48" BOX PLAN ;. ;;;:: REFER TO SPECS. x BACKFILL MIX PER NOTES. !8' x 5 GALLON z36" BOX 9C\L2LY54" BOX x 15 GALLON X 42" BOX X 60" BOX MLN. �- 24" BOXIndicates quantity �o i1 Indicates palm X x Indicatesspecies B.T.H. as noted. # Denotes trees that are to be tagged by the Landscape Architect. O4 GROUNDCOVER PLANTING O SHRUB PLANTING O CONCRETE HEADER CONSTRUCTION SCHEDULE STORM DRAIN/ UNDERGROUND UTILITIES R - - 1 Concrete sidewalk -Per C.E. Plans NOTES: / �\ SEE NOTE 3 1 MIN. MIN. j Accessible curb depression - Per C.E. Plans A. POSITION BARRIER AS -/ \CLOSE 5'SIDEWALK TO CURB OR AS POSSIBLE. Concrete Header - See detail 6, sheet L-1, RAISED ROOT PROTECTORS RJ SHALL BE FACNG . TOWARDS THE (TREE 2 3 Install 2" layer of 3/4" "Apache Sunsef' fractured rock. Rock available from Southwest Boulder &Stone (760) 342-5522. Provide Permalac C1eanLine 1/8" x 4�� aluminum header with mill z SIDEWALK UTILITY' a B. TOP OF BARRIER SHALL finish. Set flush with top of gravel and install per manufacture's specification. v 3 io 3 BE 1" ABOVE FINISHED - w 4 _ GRADE. t FLUSH 5 See detail 9, sheet L-1 � E CURB AND GUTTER ML-I'ER 1IH 0' 5\ \ \ 4 C. LENGTH OF ROOT BARRIER SHALL BE EQUAL TO THE ULTIMATE DRIPLINE OF _t iv ( 5) 'Blasted Granite' landscape boulders from Southwest Boulder &Stone (760) 342-5522 Install per �—/ boulder installation detail 3, sheet L-1. Numbers indicate boulder size in total cubic feet (S total - this plan). TYP TYP \ THE PARTICULAR TREE, OR __ I I UNDERGROUND STRUCTURE 10' MAX. 3 / 1 III] III I swt;soL 6 Decomposed Granite Top Coat: Install a 1 1 1/2 layer of'Mojave GOId 3/8"fractured LOCk CATCH BASIN / LEGEND: over smooth finish grade as mulch/bazk substitute after all planting. Submit sample to Landscape [TRANSFORMERVAULT. : 1 r t0 installatioII Available from Southwest Boulder & St0 Architect for royal ri e 760 prior n ( ) 1Q CONCRETE CURB OR 342-5522.PP SIDEWALK w ®'^' i. HARDSCAPE / Lu_.�_•_. •`__ _"' �, •°. '.,_,a_,:1 FINISHED GRADE I - -- ---- I 8 APPROVED ROOT CONTROL I I BARRIER ®3/4" TO 1 1/2" GRAVEL I I , OR CRUSHED ROCK 4 7 Sight Line - Per C.E. Plans ( 8) Maintenance access driveway per C.E. plans �J IDRIVE S.L. a \10' APPROACH z 2 CURB AND GUTTER CJIT MIN MIN MIN MIN I I DRIP LINE OF I RYOF TR EEE CENTER Perimeter walls & pilasters per C.E. wall plans 5' I 4 6 I PARKWA17 I I ` 1 I TO BE 18" O FINISH GRADE/ADJACENT PLANTING © 10 Street Lighting per C.E. plans MIN NOTES: ROOT BARRIER IS j/ LINEAR BARRIER UB 18-2 WHEN ADJACENT TO WALK PERMALOCK SPLICING STAKE/LINE STAKE, INSTALL PER O MANUFACTURER'S SPECIFICATIONS. I1 Hydrant location per C.E. plans 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY I I 1 OR HARDSCAPE OR 24"3 PERMALOCK 1/8" x 4" ML. FINISH ALUMINUM EDGING. NATURAL THE CITY ENGINEER AND FUEL MODIFICATION PLAN. �' 4-. • LINEAR BARRIER e . ,A . I • ALUMINUM COLOR. INSTALL PER MANUFACTURER'S SPECIFICATIONS. 12 Catch Basin per C.E. plans 2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT °• ` ' UB 24-2 WHEN ADJACENT TO CURB 4 � COMPACTED NATIVE SUB -GRADE CRITERIA AS APPROVED BY TRAFFIC ENGINEER. / 13 Decomposed Granite Trail: Install a 2" layer of compacted stabilized'Califomia Gold' 3/8" minus 3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO AVAILABLE FROM: O5 DECORATIVE ROCK MULCH PER PLAN -DEPTH VARIES ® with 11% fines decomposed granite over smooth native with natural edge. Submit sample to PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK. i CENTURY PRODUCTS — — ` 1 1144 N. GROVE ST. Landscape Architect for approval prior to installation. Available from Southwest Boulder & 4, MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE ANAHEIM, CA 92806 ALIGN W/ ALIGN W/ (714) 632-7083 Stone (760) 342-5522. CITY OF FONTANA OF ALL UNDERGROUND FACILITIES. DRIPLINE DRIPLINE 14 Existing Gas Line 5. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES OR OR LANDSCAPE PLANS Call Underground Service Alert PER MFR. OF TREE PER MFR. STRUCTURES AND VALVE BOXES. at least 2 days SPEC. SPEC. owe SwF CITRUS AVENUE (EAST SIDE) FROM AS SHOWN STA. 115+00 TO 125+60 I3*_ ®OTT' B A D D -1E (\ A 171"1n R iia\ O9 PERMALOC ALUMINUM HEADER � before you dig O TREE PLACEMENT IXRowwlaeebelow. �pp ® w. CANTING DETAILS NOTES &LEGEND f 2 Cellbelareyouai®. V}( J) ` 5690 10 rm rua,¢s gas snsx om. rvafr, 16 T E 1 0 A P E S Landscape Architecture and Planning 3190 82 Airport Loop Drive Costa Mesa, CA 92626 RlchaM Palhamus, License CA—/2782 (949) 644-9370 (714) 210-3140 FAX `p9D 2782 P pe LSPC 17-007 DATE 2/3/17 JOB # 16-026 L 1 OF 9 U H ®� O7 U00 H N Z W cT ' O \p D 0 U Z `p9D 2782 P pe LSPC 17-007 DATE 2/3/17 JOB # 16-026 L 1 OF 9 H O7 H N Z W pay 0 F" 1 Z D F-1 `p9D 2782 P pe LSPC 17-007 DATE 2/3/17 JOB # 16-026 L 1 OF 9