Loading...
HomeMy WebLinkAbout5688-20�� M� N O to J 1 N N o N ; r a 0 D w S 3 ac 3 v 3 m i a a n a m D 0 R I v i m 1 N M r a a I a u a 0 3 0 T W R a GENERAL CONDITIONS A. CONTRACT DOCUMENTS: Shall consist of specifica#ions and its general conditions and the drawings. The intent of these documents is to include all labor, materials, and services necessary for the proper execution on the work. The documents are to be considered as ane. Whatever is called for by any parts shall be as binding as (f called for all parts, B. VERIFICATION: The Contractor shall verify measurements on the drawings before beginning work. In case of error or discrepancy in the drawings or specifications or in the work of others affecting his work, he shall notify the Owner's Representative immediately. The Contractor shall be held responsible for any damages or loss due to his failure to observe these instructions. C. MATERIALS, MACHINERY, EMPLOYEES: Except as otherwise noted, the Contractor shall provide and pay for all materials, labor, tools, and other items necessary and incidental to the completion of his work. D. SURVEYS, PERMITS, REGULATIONS: The Owner shall furnish an adequate survey of the property. The Contractor shall obtain and pay for all permits and comply with all laws and ordinances bearing on the operation or conduct of the work as drawn and specified. If the Contractor observes that ❑ variance exists therewith he shall promptly notify the Owners Representative in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. E. PROTECTION OF WORK, PROPERTY AND PERSON: The Contractor shall adequately protect the work, adjacent property, and the public, and shall be responsible for any damages or injury due to his act. F. CHANGES N THE WO K: R The Owner ma or der ch n es i a n Y 9 the work, and the contract sum being adjusted accordingly.. All such orders and adjustments plus claims by the Contractor for extras must be made in writing before executing the work Involved. G. CORRECTION OF WORK: The Contractor shall re -execute any work that falls to conform to the requirements of the contract and shall remedy defects due to faulty materials or workmanship upon written notice from the Owner's Representative for a. period of ninety (90) days from the date of completion of the contract. H. LANDSCAPE COORDINATOR STATUS: The Landscape Coordinator acts as the authorized representative of the Owner in conjunction with the project manager, and has authority to accept or reject materials or workmanship and to make minor changes in the work not involving extra cost. He will also interpret the meaning of the contract documents and may stop the work if necessary to ensure its proper execution. L CLARIFICATION OF DRAWINGS BEFORE BIDDING: After reviewing the drawings thoroughly it is the Contractor's responsibility to clarify with the Owner's Representative an uestions the Contractor m Y q aY have regarding the method of construction, quantities, or quality of materials included or cal led out, If the Contractor cannot contact the Owner's Representative, the Contractor must qualify his bid or acts pt the. interpretation of the Owner's Representative on the questionable areas as they develop during construction. J. SAMP LES: The 0 where Re resents' P Uve reserves th e ri ht to 9 take and anal ze sem lea of r. mate lois for co f Y P n ormit to Y specifications at any time. The Contractor shall furnish samples upon request by the Owner's Representative. Rejected materials shall be immediately removed from the site and replaced at the Contractor's expense, The cost of testing materials not meeting .specifications shall be paid by the Contractor. K. PRE -CONSTRUCTION CONFERENCE: Schedule a pre -construction meeting with the Owner's Representative at least seven (7) da s before be i arca work. T Y he ur ase of 9 this conference 9 P P is to revi w e an uestion s the Contractor ma have re ar i Y q do the work, administrative procedures during construction and 9, project work schedule. IRRIGATION SPECIFICATIONS I. SCOPE OF WORK: The Contractor shall provide all labor, tools, machinery, and roe es c ss necessa to in stall a tom tete ' P vri anon s stem rY P g Y as shown on the drawings and/or specified herin. When completed the irrigation system shall be a 100% coverage system in total functioning manner. II. GENERAL PRQUIREMENTS: A. VERIFICATION OF DIMENSIONS: All scaled dimensions are approximated. Before proceeding with any work, the Contractor shall careful) check and verif I ' al dimension . Y s Y Spacing of irrigation heads, locations of valves and backflow reventers a d n ro osed P.O. . P C shall be ns i ' P ndicated o P n the drawings. Any deviation from the plans must have the approval of the Owner's Representative. B. VERIFICATION OF FINISH GRADE: The Contractor shall inspect the site and check all finish grades within the work area to ensure the proper soil coverage (as specified) of the irrigation system pipes. C. WATER SUPPLY: The Contractor shall verify and be familiar with the source of water supply to the irrigation s stem as 'n i dicated on th Y e drawings. D. PERMITS AND FEES: The Contractor shall apply and pay for all necessary permits required in the pursuit of his work as required by the governing codes. E, CARE OF EXISTING BUILDINGS AND STEPS: The Contractor shall be held responsible for the care and preservation of all existing buildings and structures on the property and adjacent premises and contiguous property. Any part of these properties injured, damaged or disturbed because of his work shall be repaired, replaced or cleared by the Contractor at his expense. F. REVIEW OF DRAWINGS: It is the Contractor's responsibility to review irrigation drawings and. note any areas he believes additional heads or valves are required prior to submitting a bid. If no changes are submitted, the Contractor is responsible for full coverage of equipment as necessary at the Contractor's expense. G. GOVER IN N G REGULA iON: I T A I local mu ic' n ipal and state laws; rules and regulations governing or relating to any portion of this work and hereby incorporated into and made part of these specifications, and their provisions shall be carried out by the Irrigation Contractor. H. DIAGRAMMATIC DESIGN: The design is diagrammatic. All pipe, valves, etc., shown within paved areas are for design clarifications only and shall be installed in planted areas where possible. Never install the backflow preventers in lawn area; always in shrub areas. L INSTALLATION: All irrigation materials shall be installed in accordance with the techniques and sF�ecifications set forth by each respective manufacturer. All pertinent descriptive literature issued by these manufacturers become a part of these specifications after baving been approved by the authorized Owner's Representative. Such installation practices shall be followed only if the directions of the irrigation drawings and specifications do not thoroughly and completely order the methods or techniques to be followed. Install all equipment and materials as shown per details. J. SITE PROBLEMS: The Irrigation Contractor shall not willfully install the irrigation system as indicated on the drawings when it is obvious in the field that there are unknown obstructions, grade differences, and/or discrepancies in the area dimensions until such conditions are brought to the attention of the Owner's Representative. III. MATERIALS: Irrigation materials and equipment shall be of type, size and location as noted and Indicated on the drawings. Unless permission to change is granted from the Owners Representative; materials are to be new and in perfect condition. No deviations from the specifications shall be allowed. The decision of the Owner's Representative shall be final in determination of the quality of materials. IV. INSTALLATION: A. EXCAVATION: 1. The Contractor shall verify locations of all existing subsurface utilities. .(mechanical and electrical) prior to excavation. Any utilities, A.C. paving, concrete work, plant material, etc., destroyed or damaged by any work under this contract shall be repaired or replaced at the Contractor's expense. 'all Underground Service Aler at least 2 days before you dig Know whars below. Cell before you dig. 2. Trenches for pipe shall be cut to required grade line at a true gradient to provide uniform support for the length of the pipe. 3. Depth of trenches shall be sufficient to provide a minimum cover above the top of the pipe as noted on the drawings. B. JOINING PIPE: 1. The Contractor is responsible to be. familiar with the methods of assembling, joining, and installing the various types of pipes to be used. He will adhere in strict accordance with the manufacturer's recommended procedures. 2. PVC pipe shall not be threaded and all transition from PVC to metal piping shall be by PVC male threaded adapter fittings. C. BACKFLOW PREVENTER: The backflow prevention device specified herein shall be verified with local plumbing and health codes. In the event of any conflict on the device or the installation methods, the Owner's Representative shall be notified PRIOR TO BID OPENING. D. TESTS: 1, All main lines and lateral lines which have glued joints under paving in the system shall be. capped and pressure tested at 150 PSI. 2, Pressure shall be sustained in the lines for not less than two (2) hours. If leaks develop, the joints shall be replaced and the test repeated until the entire system is waterti ht. 9 3. Test shall be observed and approved by the Owner's Representative prior to backfill. 4. he W n the irrigation system has been completed (and before planting has begun), the Contractor, in the presence of the Owners Representative, shall test the coverage of water afforded to the lawn and planting areas as complete and adequate, The Contractor shall finish all materials and perform all work required to correct any Inadequacies of coverage. 5. The Contractor shall inform the Owner's Representative of any deviations from the plan required by wind, planting, soils, or site conditions that has a affect on present coverage. E. IRRIGATION HEAD INSTALLATION: 1. Shrub and ground cover spray heads adjacent to curbs or walks shall be installed 1 1/2" away from the curb or walk and the heads shall be pop-up models as indicated on the drawings. 2. Sh u r b s ra heads ad'acent to i ` P bu Idm fences or Y 1 9, similar structures shall be installed 1 1/2" away from the structure and the nozzle shall be 2 1/2" minimum above finish rade, No r' id r' g ( Ig leers) 3. All it do r a n heads are to have d u le 9 o b swin 'oints a 9J s def lied. a 4, Instal a I II irrigation heads per details. F. IRRIGATION HEAD ADJUSTMENTS: The Irrigation Contractor shall flush and adjust all irrigation heads for o imu pt m performance and to prevent overspray onto walks and buildings as much as possible. This shall include selectin the best de re e of arc to fit 9 existin site sit 9 uations. 9 This also in I c udes using the appropriate radius reduction equipment. G. CLOSING 0 U F NINSPECTED WO RK. The Contractor shall not allow or cause any of his work to be covered or enclosed until it has been inspected, tested and a roved b pp y the authorized Owners Representative. Should any of his work be enclosed or covered before such inspection and test, he shall uncover the work at his own ex ense a nd after it has p been inspected, tested, and approved, he shall make all repairs with like materials necessary to restore all his work and that of other Contractors to its original condition. H. BACKFILLING: 1. Backfill shall not be placed until the installed irrigation system has been inspected and approved by the Owner's Representative. 2. Tr enches shall be backfilled with a minimum ofi 4 of fine ranula r materials to r otect the i e .. 9 from the P P P clods or rocks: The remaining excavated dirt can be used as backfill. The Contractor shall not place detrimental subsoil or rocks in the top 6" of backfill. 3. If settlement occurs and adjustments in pipe, valves, irrigation heads, or any other irrigation device, necessary to bring the system to proper working order. The Contractor sh I a I, as a part of his work under this contract make all the necessary adjustments without extra cost to the Owner. 1. AUTOMATIC CONTROLLER AND VALVES: 1. A 120 volt electrical power outlet to the controller shall be provided by others. (Provided the Landscape Contractor has not included the electrical connection in his scope of work) the Irrigation Contractor shall be responsible for making the hookup from the outlet to the controller. 2. All wire from the controller to electric control valves shall be solid copper U.F. #14-600 volt direct burial. Use white for common, black for lawn and shrub systems and red for moisture sensors; common control wire. Install in common trench with main line pipe where possible. Tape control wire at 10' O.C. to main line pipe. Provide minimum 18" coverage. 3. Wire connections shall be made with "Scotch -Lok" wire connector sealing packs #3576 or Spears "Dri-splice" with sealant DS 300 or approved equal. 4, There shall be a control wire from each control valve running to the controller, and each control valve shall be connected to the common ground wire, 5. All electrical work shall comply with the applicable codes, 6. Install all valves per details, and manufactures recommendations. MOISTURE SENSOR INSTALLATION ((f applicable): 1. Installations and wiring are to be done by the Contractor in compliance with installation and operating instructions enclosed with the moisture sensor and included with these special instructions. 2. The Contractor shall furnish 2 -AWG -UF #14 (or larger) wires from the controller to the moisture sensor control stations, locations shown on drawings. Provide additional 10' expansion lead to each station for finally locating of sensors. All sensors are to be wired in parallel (see wire color nate above). 3. Ametek 6" extension boxes No. 10-170-003 covered by Ametek green cover No. IVC -10-173-004, or approved equal, shall be installed as detailed. 4. All wiring connections at valve locations shall be water- proof. 5. One service unit will be purchased to properly prepare and service the moisture sensor. The service unit along with all printed operating instructions are to furnished to the Owner by the Contractor at final inspection. 6. Moisture Sensor operating and service instruction and operations manual is to be placed in the controller, 7. Special depth and placement information to augment Moisture Sensor Installation and Operation Instruction, is to be provided by the Specified Manufacturer. 8. Installation must be inspected and accepted by the Manufacturers Respresentative. V. DRAWINGS OF RECORD (AS-BUILTS); A. GENERAL: The Contractor shall provide and keep up to date, in accordance with this section, a complete set of record ds -built" black line ozolid prints which shall be corrected daily and show every change"from the original drawings and specifications and the exact as -built" locations, sizes and kinds of equipment. Prints for this purpose may be obtained from the Owner, This set of drawings shall be kept on the site and shall be used only as a record set. These drawings shall also serve as work progress sheets and the Contractor shall make neat and legible notations thereon daily, as the work proceeds, showing the work as actually installed. These drawings shall be available at the times for inspection and shall be kept in a location designated by the Owner's Respresentative. B. REQUIRED NOTATIONS: 1. The Contractor shall dimension from two (2) permanent points of reference, building corners, sidewalks, or road. intersections, etc., the location of the following items: a. Gate valves b. The routing of the irrigation main lines c. Connection to the existing water lines d. Irrigation control valves e. Quick Coupling .valves f. Controller/Rain-check locations g. Master valve or Pump 2. The drawing shall show approved subsitutions of sizes, materials, and manufacturer's name and catalog number.. C. DELIVERY OF DRAWINGS OF RECORD: On or before the date of final inspection, the Contractor shall deliver the corrected and complete blacklines to the Owner's Representative. Delivery of blackiines will not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the prints. D, CONTROLLER CHARTS: i, As -built drawings shall be received and approved by the Owner's Representative prior to preparing controller charts. 2. Provide one controller chart for each controller supplied. 3. The chart shall be a reduced drawing of the actual as -built system, using a different color to indicate the area of coverage for each station. 4. When the chart is completed and approved by the Owner's Representative, it shall be hermetically sealed and placed in the controller box. VL CLEAN-UP: A. SCOPE AND FREQUENCY: After installation operations have been completed, remove all trash, excess soil and rubbish fro m ro ert . All s cars ruts or of P P her marks Y in the area taus ed b this work shall be e ' Y r arced and P the roan I d eft in a neat a nd order) con i ' 9 y d tion throughout the site. The Contractor shall pick up all thrash resulting from his work no less than each Friday before leaving the site, once a week and/or the last workin d o g ay f each week. All trash shalt be removed completely from the site. VII. GUARANTEE: A. SCOPE: The entire irrigation system shall be guaranteed b the Cont a r ctor os. th ma e ' t rials and w rkm n ' Y o a shi P, including settlin of backfill areas below grade for a period of one (q1) year following the date of final acts tanc e of the work. If within one P 1 ear from OY date of tom i let on se tl'n o t i ccurs a d ad' P 9 n ustments in J pipes, valves., and irrigation heads, sod, irrigation devices.., or paving is necessary to bring the system, sod or paving to the proper level of the permanent grades, the Contractor, as part of the work under this contract, shall make all adjustments without extra cost of the Owner, including the complete restoration of all damaged planting, paving or other improvements of any kind, B. RESPONSIBILITY: Should any operational difficulties in connection with the irrigation system within the specified guarantee period which is in the opinion of the Owner's Representative due to inferior material and/or workman- ship, said difficulties shall be immediately corrected by the Contractor to the satisfaction of the Owner's Representative at no additional cost to the Owner; including any and all other damage caused by such defects. C. INSTR T UC IONS: Af ter the Irrigation system has been com leted an d the connection P s made the Co ntractor shall instruct the Owner or his representative, in the o eration and m p amtenance of the system. PLANTING SPECIFICATIONS I. SCOPE OF WORK: A. Furnish all labor, materials and equipment necessary to provide and install plant materials as shown on the drawings or as s e ified c herein, P B. Work included in this section (items included but not limited to): 1. Grade, including mounding, molding and shaping surface of all planting areas as indicated including the removal of existing vegetation unless otherwise specified. 2. Prepare and till soil in planting areas including furnishing of all amendments as specified. Note that amendments indicated on the drawings (unless otherwise specified) are for bid purposes only. Actual soil amendments will be based on the soils test results. 3. Furnish and plant alt plant materials as indicated in the drawings and specifications. 4. Perform all pruning as required. 5. Stake and tie all plant materials as specified. 6, Provide for the maintenance of the planting until acceptance of the job by the Owners Representative. 7. Dispose of all debris and surplus materials. 8. Clean-up. 9. Guarantee. 10, Maintenance. II. VERIFICATION OF SITE CONDITIONS: A. EXCAVATION: The Contractor shall verify exact locations of all existing sub-suface utilities (mechanical and electrical) prior to excavation. Any utilities, A.C. paving, concrete work, etc., :destroyed or damaged by any work under this contract shall be repaired or replaced at the Contractor's expense. B. SUB -SURFACE DRAINAGE OR SOIL CONDITIONS: Should sub- surface drainage or soil conditions be encountered which would be detrimental to growth or survival of plant material, the Contractor shall notify the Owners Representative in writing, stating the conditions and submit a proposal covering cost of correction. If the Contractor fails to notify the Owners Representative of such conditions, he shall be responsible for plant material under the guarantee clause of the specifications. C. DIMENSIONS: All scaled dimensions are approximate. Before proceeding with any work, the Contractor shall carefully check and verify all dimensions and quantities, and shall immediately inform the Owner's Representative of any discrepancies between the information on the drawings and the actual conditions, refraining from doing any work in said areas until given approval to do so by the Owners Representative. III. SOIL AMENDMENTS: 1. Nitrogen stabilized redwood sawdust shall be 100% nitrogen stabilized (5% by dry weight) and free of shaving particles larger than 1/4" passing through a 100 mesh screen. 2. Soil sulfur shall be standard commercial grade. 3. Soil Conditioner - Trl-C Enterprises - 1(800) 927-3311 or (fax) (909) 590-3301. 4. Bone meal 2-22-D shall be manufactured by Kellogg Supply, Wilmington, CA. 5. Azalea organic planter mix #103 shall be manufactured by Bandini Fertilizer, 6. Ph Acidall shall be manufactured by Kellogg Supply, Wilmington, CA. 7. Par - 5 shall be manufactured by Koibab Forest Products. 8. Commercial fertilizer shall be Best Products of approved equal. 9. Mycorrhizal inoculum - Tri -C Enterprises, 1 (800) 927-3311. S. TOP SOIL: 1. Topsoil consists of a fertile, friable natural loam of uniform quality, free from subsoil, stiff clay, hard clods, hard pan, sod, partially disintegrated debris, or other undesirable materials. 2. Topsoil shall not contain obnoxious weeds, such as morning glory,: sorel, oxalis, spurge, annual poo,. nut grass or bermudo grass. C. PLANT MATERIALS: 1. Plant na mss in the Plant List conform to "Standardized Plant Names" b American Join y t Committee of Horticultural Nomenclature, except in cases not covered therein. In these instances the established custom of the nursery trade in followed. 2. Plants shall be sound, healthy, vigorous, free from disease and weeds, insect pests of their eggs and shall have healthy, normal root systems, well filling their container, but not to the point of being root bound. 3. Plants shall not be pruned prior to delivery except as authorized by the Owner's Representative. In no case shall trees be topped. 4. All plant materials shall be subject to approval of size, health, quality, character, etc., by the Owner's Representative. 5. The height and spread of all plant materials shall be measured with branches in their normal position. 6. The caliper of all trees shall be measured 4' above the surface of the ground. 7. Where tali p er or other di mensions of an P dant materials YP are om(tted from the plant list, it shall be understood that these plant materials shall be normal stock for the type listed. 8. Plant materi al shall be s mmetrical t ice f Y ea I or varlet Y and s sties a nd shall c afar o m to measuremen P is s stifled P in the Plan t List to end. / 9 9. Pa I n# material larger than those specified may be supplied if complying in all other respects and at no additional cost to the Owner, upon approval of the Owner's Representative. 10. II A tont materi I mus p a s t have been previously inspected at the nursery by the County Horticultural Department and shall be sub' ect to ecce ❑ t ace as to u I' the 0 ner' J P q a ity by w s Re resentative. P 11. Substitutions will be permitted only as indicated, or if roof is submitte dtatan lot P h n secifie is t YP P d no available a r 0 osal will e c b onsidered for the P P use of the nearest equivalent size or variety with an equitable adjustment of the contract price. 12. ti' Quan ties show n on the call outs on the Planting Plan are for the convenience of the Contractor only. Quantities drawn on the plan (whether by circles, dots or triangles) are the final authority and shall be furnished and insta Iled a s drawn. The 0 where Re resentative shal I P have the final authority as to location at all plant material. D. SEED MATERIALS: 1. Seed shall be clean, fresh, new crop seed and shall be the mixture as noted on the Planting Plan. 2. Seed shall be mixed by the dealer and furnished with the dealers guarantee statement of composition and erce tae of n uri which h I P 9 sal be fur ishe P b n d to the Owners Re res n e tat(ve. See d to s shall be deli P g vered to the Owner's Representative at the time of installation. E. STAKES: All stakes shall be per details. IV. OBSTRUCTIONS BELOW GROUND; A. CONTRACTOR'S RESPONSIBILITY: the Contractor is responsible for verifying the location of all utility lines and other under round g obstructions so that proper precaut(ons may be taken not to di sturb or damn e such im ave 9 p r meets. In the event of ❑ conflict between such lines and plant locations, the Contractor shall ram tl notlf the 0 n P p y y w er s Representative, who shall ran e a r g for the relocation of one ar the other. Failing to follow this procedure, the Contractor shall at his own expense make any and all repairs for damages resulting from his work. V. FINISH GRADING: A. TILLING: Till all planting areas as specified herein. B. UNIFORM GRADE: After tilling, all areas shall be brought to uniform grade by floating or hand raking. C. GRADE RELATIONSHIPS: Finish grade of planting areas afther application of soil amendments shall be 1" below top of concrete walks and curb grades and 6" below finish floor of building or as noted by spot elevations. D. SLOPE FROM BUILDINGS: soil areas adjacent to buildings shall slope away from the building at 29 minimum for 10 feet and shall continue to slope at a minimum of 1% until water drains to street or storm system. E. ROCKS OR CLODS: No racks or clods over 3/4" in diameter shall be on top of prepared planting beds. VI. WEED CONTROL: A, KILLING WEEDS: Contractor shall germinate and destroy existing weed seeds before preparing areas for planting. Sufficient water shall be applied to cause weed seed to sprout, Young weeds shall then be destroyed and removed before they have opportunity to set seed. B. AD I DITONAL REQUIREMENTS: For additional weed killing refer to Planting Notes on the Planting Plan. VII SOIL PREPARATION: A, SOIL REPORT: Before starting soil preparation the Contractor shall submit a soil report to the Owner and the Owner's Representative. If no soil report is submitted it will be assumed that amendments were not added and the Landscape Contractor will be requested to give a credit for soil preparation. B. COMPACTED AREAS: Soil areas that are compacted to more than 90% during site preparation shall be ripped to a minimum of 12" prior to beginning soil preparation. These areas shall be defined by the Owner's Representative and be billed as an extra if the unit price is quoted in the bid. C. METHOD OF MIXING: If the slope is under 2 to 1, the soil preparation materials should be broadcast uniformly over all landscape areas and worked to a depth of 6" by rototiller or other acceptable mechanical means to obtain a uniform blend in the soil. If the slope is greater than 2 to 1, the amendments shall be hydraulically applied for areas over 1000 square feet and raked in for small areas. For the soil amendment bid mix refer to the Planting Notes on the Planting Plan. D. EXTRANEOUS MATERIALS: In additional to the work specified above the Contractor shall remove all extraneous materials that are exposed on the surface and grade to facilitate run-off of surface water. E. DELIVERY SLIPS: Supply delivery slips from the supplier for the soil amendments to the site. Bulk loads from the G. ROLLING: Roll sod with an adequately weighted roller to Contractor's yard will not be accepted. Supply empty bags for smooth out the sod bed. fertilizer to the Superintendent of the job and the Owner's O Representative. H. PROTECTION OF EDGES: Regrode to protect the edges from �L�I drying if mowing edge is not used. Vill, SHRUB AND TREE PLANTING: r i 0 I. WATERING; After installation sod must be kept thoroughly A. CORRELATION; Trees and shrubs shall not be planted until watered to a depth of 6". No foot traffic shall be allowed for 2 to 3 weeks from the date of installation. all operations in conjunction with the installation of the W irrigation system have been completed, final grades have been Pi established, and the planting beds properly prepared by J• INSPECTION BY SUPPLIER: If there are any questions regarding cultivation and fertilization as covered in these specifications. the quality of sod installation a representative of the supplier shall be requested to. inspect the installation and the B. PLANTING TIME: No planting shall take place during extremely Contractor shall call out the supplier's representative. hot, dry, windy or freezing weather. XII. SEED LAWN PLANTING (IF APPLICABLE): C. LOCATIONS: Relative position of all plants and trees is subject to approval of the Owner's Representative and they shall, if A, REFERENCE: Refer to Para rd h V, VI, VIi, for finish g, 9 P gradin necessary, be relocated at his direction as part of this weed control, and soil preparation. contract. Trees shall normally be located a minimum of 5' from buildings, site amenities and walkways. B. PREPARATION: Cultivate to a depth of 2" below finish grade, remove stones, foreign growth of any kind and extraneous D. DISTRIBUTION: No more plants shall be distributed about the matter, and grade to remove ridges and depressions so that landscape area that can be planted and watered on the areas after settlement will conform to the finish grade. Roll same day. and rake lightly until the surface is smooth, friable and of uniform fine texture. E. CONTAINER REMOVAL• Plant containers shall be removed when planting the plants. Container may be split on both sides; C. SOWING Sow lawn seed in the area desi noted on the g however, without use of axe or spade. All containers shall be drawings at the rate as designated on the Planting Plans. removed from the site. Sow the lawn in two directions. F. PLANTING PITS: All tree and shrub pits shall have a diameter D. TOP DRESSING: Rake lightly; spread 1/4" of Por -5 top of at least twice the diameter of the root ball. Pit depths dressing with a mechanical spreader, roll with a 200 lbs. shall be a minimum 12" deeper than the rool ball for trees roller and water with a fine spray. and 8' dee r e than the root I ba I for shrubs P or as er P planting details. XIII. HYDROSEEDING SPECIFICATIONS (IF APPLICABLE): G. PLACING: Plants shall be placed and held during backfill in A. GENERAL: The hydromulch shall be applied in the form of a on upright position in the center of the pit. Plants shall slurry consisting of wood cellulose fiber, seed, chemical be held t o a r sli htl above nurse level. g Y ry The earth ball additives, commercial fertilizer and water. When hydraulically shall be kept intact. Any exposed roots shall be spread sprayed on the soil surface, the h dromulchin shall form Y g out. In ured roots shall be J pruned. a blotter Ilke ground cover impregnated uniformly with seed and fertilizer and shall allow the absorption of moisture and H. BACKFILL• Plant pit backfilling soil shall consist of 1 part rainfall to percolate to the underlying soil. nitrogen stabilized sawdust to 2 parts topsoil. Materials shall be thoroughly mixed before placement. In addition to B. EQUIPMENT: Hydraulic equipment used for the application of backfill, Tri - C CMyco Packs 7 gm.. tablets shall be added to the fertilizer, seed, and slurry of prepared wood pulp shall be plant pits at the following rates: of the "super hydro -seeder type as approved by the Owners Representative. 1 pok per 1 gallon container 2 looks per 5 gallon container 6 paks per 15 container C, APPLICATION: The operator shall spray the area with a uniform "gallon 10 paks per 24 box visible coat by using the green color of the wood pulp as a 12 oke r p pe 30" box guide. The slurry shall be applied in a sweeping motion in a 16 paks per 36" box arched stream so as to fall like rain allowing the wood fibers 18 poks per 42" box to build on each other until a good coat is achieved and the 20 paks per 48" box and those box sizes which are larger material is spread at the required rate per acre. I. WATERING: When the pit has been backfilled to three quarters D, TIME LIMIT: All slurry mixture which has not been applied within four hours after mixing will be rejected and removed of its depth water shall be poured about the roots. Air ' from the project at the Contractor's expense. ckets shat be e' I limmated and b 'I Po ackh I contiwed until the backfill is brought to grade level. E. PROTECTION: Special care should be exercised by the J. COMPACTING: Backfill shall not be compacted around the Contrac for in preventing any of the slurry being sprayed inside any reservoir basin or onto drainage ditches and channels roots or ball of the plant during or after planting, The which may impede the free flow of rain or irrigation water, b ck it a f I on which the a Int ball rests shall be li htL P corn acted. 9 Y P An slur s filled into rest i rcted ar as s Y rY P e hall be tisane u d at P the Contractor's ex ease to t he satisfaction p of the 0 ne or W f K. SETTLEMENT: Plants which settle shall be raised to the Owner's Representative. required level or replaced at the option of the Contractor. Raised plants which fail to grow shall be replaced. G. MAINTENANCE AND IRRIGATION: Once the slurry mulch has been applied and allowed to set for one day, the slope shall be L. STAKING: Stakes shall be driven to sufficient depth to hold then be irrigated. There is no set irrigation requirements in the tree rigid. Trees shall be supported by at least two ties gallons per minute, Duration of time and number of gallons (see details). to be applied will vary from day to day and system to system depending on the rate of growth and climatic conditions M. PRUNING: Limbs brant hes canes and r unners which re quire encountered. As a rule of thumb, the soil surface must be k slot moist at all times, particularly during the seeding trimmin sh all be removed to leave a cls 9 an cut flush w' ith erm(natio n eriod a ro i 9 x motel 30 da P CPP Y Ys)• the trunk rani n onl as di rected b the Ow 9 Y y ner's tv Represent e). H. RESEEDING: All bare spots shall be reseeded (sodded, if N. PLANTING BEDS: la ti P n n beds shall be ed ed a nd cultivated 9 9 h drosee ' d is turf ix m b the Contract r ' Y o within 45 da ), Y s da s Y Y ro ' ' vidm the lac p k of cover rowt 9 h or mulch is n due to 9 to the line separating areas as shown. Beds shall be brought inadequate irrigation or erosion caused by excessive watering iv to a smooth even surface conforming to established grades by the Owner. after full settlement has occurred. XIV. REPLACEMENTS: IX. GROUND COVER AREAS: A. REFERENCE: Refer to Para ra h V, VI, VII, fior finish g, 9 P gradin A. GENE RAL• The Co r nt actor shall imme ' diets) re )acs Y P any and all materials which for any reason die or are damaged while wed co e afro) and soil re ora' , tion. P P under the. Contractor's care. Replacements shall be made with plant of like kind and size in the same manner as. B. SOIL PREPARATION: Prepare the soil as per these specifications specified for the original planting (see guarantee "XVII -D" and the Planting Notes on the Planting Plan. for definition of death and replacement). C. GRADING: Areas shall be raked and floated smooth to provide XV. CLEAN-UP: a true and uniform surface. A. GENERAL: After all installation operations have been completed, 0. PLANT PITS AND FERTILIZER: Planting pts for ground cover all trash, excess soil, empty plant containers and rubbish shall be removed from the property. Al scars, ruts shall be 4 x 4" or adequate to accept plant material from flats or 4" pots without crushing or deforming the rootball. marks in the r it other caused by this work shall be repaired and Place a 1/2 tsp. Tri - C Endo 120 fertilizer tablet in each the ro t in and left in a neat and order) c 9 ondition throw Shout individual ground cover pit. the site. Contractor shall ick u all r P P t ash resulting from this work no less than each Friday before leaving the site, once a week and/or the last working day each week. All trash shall E. SP ACING: Plan t accordin t s g o pacing and in areas indicated on be re oved m completely from the site. the drawings, Soil shall be firmly tamped around each plant, and the excess soil removed from the crown. B. TOP SOIL: Excess topsoil shall be removed from the site. F, WATERING: Each section of ground cover shall be immediately watered upon completion of planting, and thereafter as C. NEATNESS: Leave the sidewalks and street in a neat an d required. clean condition et the end of each working day. G. SPACING FROM EDGE: The first row of round cover should 9 D. REMOVAL OF TAGS: Remove all tags, labels, nursery stakes and ties from II a loots u le n ss otherwise dir P ected, and only alwa s be within 6' of the ed a of lantin area and trian alar Y 9 P 9 g at the end of all installations. spaced. XVI. X. SEASONAL COLOR: PROTECTION: A, REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, A. GENERAL: At all times during construction, adequate protection shall be provided for all areas against damage of any kind, weed control, and soil preparation. until final acceptance by the Owner's Representative. B. SOIL PREPARATION: Prepare the soil as per these specifications and the Planting Notes on the Planting Plan. B. RESPONSIBILITY: the Contractor shall be held responsible for the care and preservation of all existing buildings and structures on the property and adjacent premises. Any part C. GRADING: Areas shall be raked and floated smooth to provide of them injured, damaged of disturbed because of his work a true and uniform surface. shall be repaired, replaced or cleaned by the Contractor at his expense. D. QUALITY OF PLANTS: Plants shall be healthy annual plant material In bloom in the size Indicated on the drawings. Wil, GUARANTEE: E. PLANT PITS AND FERTILIZER: Each plant pit for seasonal color A. SHRUBS: All shrubs shall be uaranteed as to growth and shall be 6 x 6", or adequate to accept material in the health for a period of ninety (q90) days after completion of the required size, with one teaspoon of bone meal mixed into the specified maintenance period and/or final acceptance by the backfill mix (shrub backfill mix should be used, not the Owner or Owner's Representative, Agriform plant tablets). B. TREE S Tress shall be guaranteed to live and grout in an F, SPACING: Plant at spacing and in areas indicated on the acceptable upright position for one (1) year after the specified drawings. Soil shall be firmly tamped around each plant, maintenance period and/or final acceptance by the Owner or and the excess soil removed from the crown. Owner's Representative. The Owner must provide adequate maintenance to ensure the extended guarantee on trees. G. WATERING: Each section of seasonal color shall be immediately watered upon completion of planting, and watered thereafter as C. DEFINITION OF DEATH: Plants which die or lose more than 30% is required, of their ori mal leaves shall be g' p laced. H. SPACING FROM EDGE: the first row of seasonal color should D. REPLACEMENT: The Contractor, within seven (7) days of be always within 6" of the edge of the planting area. written notification by the Owner or Owner's Representative, shall remove and replace all guaranteed plant materials which XI. SOD LAWN MATERIALS AND PLANTING (IF APPLICABLE): for any reason fail to meet the requirements of this guarantee. Replacement shall be made with plant material as indicated or specified from the original planting and a6 such replacement A, REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, materials shall be guaranteed as specified for the original weed control, and soil preparation. guaranteed material. B. PREPARATION: Sod area prior to planting shall be rolled XVIII. MAINTENANCE: lightly and watered to a depth of 6" the day prior to planting. If any air pockets are found, the area shall be regraded as necessary. Lightly A. SCOPE: After all work indicated on the drawings or herein water the area to be planted just prior to specified has been completed, inspected, and approved by the planting. Owner or Owners Representative, the Contractor shall maintain all planted areas by means of continuous watering (including C. QUALITY: Sod shall be #1 Grade, machine cut at uniform monitoring and adjucting irrigation schedule), weeding, rolling, thickness of 5/8 excluding top growth and thatch, weed mowing, spraying, reseeding, edging and/or any other free and shall be no less than eight months nor more than operations necessary for their care and upkeep for a period of sixteen months old, not less than ninety (90) days. At the end of the maintenance period, all plant materials shall be in a healthy, growing D. TIMING: Installation shall take place within 24 hours after condition. harvesting. B. WEED CONTROL: All planted areas shall be ke t free of debris E. INSTALLATION: Sod shall be laid in a staggered pattern, with and shall be weeded at not more that seven (7) day intervals. Areas #hat do not have a pre -emergent weed killer tight joints and in the same direction each time. On all shall also be cultivated at not more that .seven (7) day slopes sod shall be installed from the bottom up and the newly intervals. sod should be protected by walking on boards as installer moves upward. On slopes, pin the sod down with wooden peas. No metal staples will be allowed. No sod of less than 18 in C. FERTILIZING: All planted areas shall receve a fertilizer length will be allowed. application of 20 pounds oer 1,000 square feet of Gro -Power 45 days following the beginning of maintenance, Water in F. JOINTS Adjoin the sections of sad firmly together. If air thoroughly after application. spaces occur between sections of sod they must be filled with sand or the sod relaid. D. CONDITION OF SITE: Darin g the maintenance period, keep the project neat and free from debris at all times. Obtain the Owner's approval for on-site storage of equipment or maintenance materials. XIX. FINAL CONSTRUCTION AND FINAL MAINTENANCE INSPECTION: A. FINAL CONSTRUCTION INSPECTION: When all landscape improvements have been installed in accordance with the plans and specifications, the Contractor shall notify the Owners Representative and request a "Final Construction" inspection. If the Owner's Representative determines the work to be substantially complete and in conformance. with plans and specifications, the Contractor will be advised that the basic ninety (90) day maintenance period is started. 1, In order to be substantial complete, at least the following must have been finished. a. All fine grading, including elimination of low points that hold runoff, b. A complete and operable Irrigation system. c. Installation of all plant materials. d. Seeding of all seeded areas. 2. Minor pick-up items may be completed during the basic maintenance period. These items will be determined as Minor solely by the Owner's Representative. B. FINAL MAINTENANCE INSPECTION: At the end of the maintenance period and when the ground cover and turf have established and all pick-up items have been completed, the Contractor shall request a final maintenance inspection. The Contractor will be advised by the Owner's Representative at the final inspection that work is or is not satisfactory, i. If th e work is satisfac to the basic maintenance ry, period will end on the date of the final inspection as directed by the Owner's Representative. 2. If the work is unsatisfactory the basic maintenance eriod w'I it continue at n p o additional expense to the Owner until the work has been completed, inspected, and approved by the Owners Representative. C. FAILURE TO PASS INSPECTION: If the work fails to pass final inspection, any subsequent inspections must be rescheduled as per above, and will be charged to the Contractor at the prevailing hourly rate of the Owners of the Owner's Representative. CITY OF FONTANA STANDARDS LANDSCAPE MAINTENANCE SPECIFICATION FOR ALL C.F.D. AREA 3.07 THE NINETY (90) DAY MAINTENANCE PERIOD A. Preliminary Review: As soon as all plantings are completed per Contract Documents, Hold a preliminary review to determine the condition of the work b. Date of Review: Submit a written request to the Agency's Authorized Representative at lease five (5) working days prior to anticipated date of review. C. B inning of the ' Nine 90 D v Maintenanc �9 s Period: Th ty( ) edateonw' -9, hlch the Agency's Authorized Representative issues a letter of Preliminary pleted. Acceptance to the Contractor, By this date, all plant materials shall be planted all areas requiring hydroseeded lawns shall be completed. 3.08 PRE -FINAL AND FINAL ACCEPTANCE A. Conditions for Pre -Final Acceptance of Work at End of Maintenance Period: 1. Eac h )ant shall b e alive and th ' ' p rrom showin si ns of rowth 9, and no 9 9 9 si ns of str ss e disease or an 9 other. . Y 2. All plants not meeting these conditions shall be replaced and a Ninety 90 a D Maintenance Per' ( iod commence Y d for such Ian ts. P 3. Lawn areas shall not be 100% weed free unless otherwise approved by the A enc 's A g y uthorized Representative. 4. Lawn areas shall have 100% germination and establishment of turf. B. Corrective Work: 1. Work re vire q d corrective action or replacement in the judgment of the Agency's Authorized Representative shall be performed within ten (10) calendar days after the Pre -Final Review. 2. Perform corrective work and materials replacement in accordance with the Drawings and Specifications and shall be made by the Contractor at no cost to the Agency. 3. After corrective work is completed, the Contractor shall again request a Pre- in l - F' a Review for Pr e Final Ac e c tante as outlin ed above. P 4. Continue elate m Hance of Ila al ndsca ed areas until sac i htmeasall P corrective measures have been completed and accepted by the Agency s Authorized Representative. C. incl Ae P ce tante; Final approval and acceptance of the work will be given when the following conditions, as determined by the Agency's Authorized Representative have been met: 1. At completion of the ninety (90)' day maintenance period, and when one hundred (100) percent germination and plant establishment is obtained. 2. All I anon areas she II be weed fr P g ee unless otherwise approved by the Agency's Authorized Representative. 3. After final inspection and acceptance by the Agency's Authorized Representative, 4. The Agency's Authorized Representative reserves the option to extend the maintenance period beyond (90) days specified, if they determined further maintenance establishment required by the Contract Documents. 5. Approval and acceptance for operation and maintenance will be given in writing by the Agency's Authorized Representative. 3.09 WARRANITY PERIOD AND REPLACEMENTS OF PLANT MATERIALS A. Specific Requirements: Refer to the following sections: 1, Lawns and Grasses- Section 02930 2. Trees, Shrubs, and Ground Covers- Section 02950 I CITY OF FONTANA LANDSCAPE PLANS =7A STA. 113+66 TO 125+50 >U AS SHOWN 0M.1 i .:: S I T t S C A p e I Landscape Architecture and Planning 3190 82 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamue, License CA -#2782 (949) 844-9370 (714) 210-3110 FAX /,e N QW Fr�i/� V) M hal U O � O N � r--1 W W [ -1 ci � W > `c � o <C Z H C W & W M 4.t til �-- i r1--il V i� W �� �/ N Z ss�� /-1 r_O1 O Z ' I �L�I r-A--&�� r i 0 [M1 y M 4 /,e N QW Fr�i/� V) M hal U O � O N � r--1 W W [ -1 ci � W > `c � o <C Z H C W & W M 4.t til �-- i r1--il V i� W �� �/ N Z ss�� /-1 W O Z F -t 0 V r i 0 I-- l 3 U 4 W 0 Pi \kNDSC 2782 "1,r PLAN CHECK LSPC17-010 [ATE 4/10/17 JOB * 16=026 L1 - 20 OF 2Q