Loading...
HomeMy WebLinkAbout5688-1,&VENUE (NORTH SIDE STA. 113+66 TO 125+50) TRme 19962, 19962ml CITY OF FONTANA, CALIFORNIA_ NORTH FONTANA INVESTMENT COMPANY, LLC 1156 N. Mountain GENERAL(909) 985=0971 1 S ' P E Landscape 3190 B2 Airport Loop Dr., (949) 644-9370 ATc111tectwe Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planning Richard Polhamus, License # 2782 NOTES: City Required Inspection Notes Inspections: 1.It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6632 2.Prior to the release of utilities or maintenance period commencement, the following inspections are required Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3.The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTE: After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior to construction. Upon completion of project, owner will provide report to city inspector for record purposes. CITY REQ. NOTES & STATEMENTS: 1. appheat sone i dieated. Note: Per Fuel Modification Plan, crushed rock provided in lieu of bark mulch 2. For soils less than 6% organic matter in the top 6 inches of soil, compost at a rate of a minimum of four cubic yards per 1,000 square feet of permeable area shall be incorporated to a depth of six inches into the soil. 3. Recirculating water systems shall be used for water features. 4. Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure of the specified irrigation devices. 5. Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur. 6. A diagram of the irrigation plan showing hydro -zones shall be kept with the irrigation controller for subsequent management purposes. 7. A Certificate of Completion shall be filled out and certified by either the designer of the landscape plans, irrigation plans, or the licensed landscape contractor for the project. 8. Comply with Section 28-117 Verification of Landscape Installation within the City of Fontana Landscape Ordinance #1734. 9. No certificate of occupancy shall be issued until a city landscape inspector has verified that all irrigation, grading and planting have been completed in accordance with the approved plans and specifications of Section 28-117 within the City of Fontana Landscape Ordinance #1734. 10. An irrigation audit report shall be completed per Section 28-106 within the City of Fontana Landscape Ordinance #1734 at the time of final inspection. 11. With regards to landscape maintenance districts or public landscape, it shall be the responsibility of the developer to comply with Section 28-118 Special Landscape Maintenance District Requirements within the City of Fontana Landscape Ordinance #1734. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. HAWKER- CRAWFORD CHANNEL 1% VVV VIIVVLJ LJ, Y1✓, L16 & L18 See Sheets L2, 1,12, See Sheets L4 & L5 L15 & L17 N.T.S. N.T.S. T- 1 TITLE SHEET L-1 CONSTRUCTION NOTES & LEGEND L-2 CONSTRUCTION PLAN (20 SCALE) L- 3 CONSTRUCTION PLAN (20 SCALE) L- 4 CORNER ENLARGEMENT - CONSTRUCTION (10 SCALE) L- 5 CORNER ENLARGEMENT - GRADING (10 SCALE) L- 6 CONSTRUCTION DETAILS L- 7 CONSTRUCTION DETAILS L- 8 IRRIGATION DETAILS, NOTES & LEGEND L- 9 IRRIGATION DETAILS L-10 IRRIGATION CALCULATIONS & SCHEDULE L- 11 IRRIGATION MAINLINE MASTER PLAN (100 SCALE) L-12 IRRIGATION PLAN (20 SCALE) L- 13 IRRIGATION PLAN (20 SCALE) L- 14 PLANTING DETAILS, NOTES & LEGEND L- 15 PLANTING PLAN - TREES (20 SCALE) L- 16 PLANTING PLAN - TREES (20 SCALE) L- 17 PLANTING PLAN - SHRUBS (20 SCALE) L- 18 PLANTING PLAN - SHRUBS (20 SCALE) L- 19 SPECIFICATIONS LANDSCAPE AREA U!U IMi lelRI'i HARDSCAPE AREA: 1,118 SQ.FT. SHRUB/GROUNDCOVER AREA: 28,772 AREA Q TOTAL COMPLIANCE STATEMENT I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE AND GRADING DESIGN PLAN. AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE PROPERTY WITH A CERTIFICATED OF COMPLETION, CERTIFICATE OF INSTALLATION, AND AN IRRIGATION SCHEDULE OF LANDSCAPE AND MAINTENANCE. IL, 4/13/17 RICK POLHAMUS LA#2782 EXP. 90/97 DATE CAP 1, 2782 * ���— "MAIm 4/13/17 �Q �l li F DATT a F Y% R'�rron Date l0.9��10�` OCAS\� SUBMITTALS 1ST SUBMITTAL: 2/10/17 2ND SUBMITTAL: 4/14/17 APPROVALS annumn REVISIONS 0 0 0 0 D 0 A O CITY OF FONTANA CFD LANDSCAPE PLANS (TR: 19962,19962-1) DRAWN BY: CASA GRANDE AVENUE (NORTH SIDE - STA. 113+66 TO 125+50) SCALE: AS SHOWN DESIGNED BY: DATE: y TITIIE SHEET CHECKED W. APPROVED BY: 'T" e --y DATE: OWG. 5688 1 20 .� CIN ENGINEER R.C.E. 51152 UP. DATE Z o U U ILL0 > z z� o a jow z > 0 4 W w N0 O O 4 Z C] 4 U W K W4 U OO W H z U ¢ wU �0 2 ❑ N Q m N U W O q z ; CD U S ~ .. Z 0 W Z O 0 0 C3 `¢ H 0 z d D m 0U 00 U y W N .. W O 00 a H in U U = E z 0, s0 00 13 RECEIVED APR 1 9 1011 PLAN CHECK NO.: LSPAC 17-010