HomeMy WebLinkAbout5685REF-9j
at least 2 days
o before you dig
Knaw. whars below..
Call before you dig.
.r -
7
A -5
. .
A-4
A-br. _
-------------
ME&GER TF -5T
POG II&II
ELEOTfi?ICAL P.O.G. 5TA 2"T+00 A6AVE
SCE POG FOR ELEOTRIGAL SERVICE
LOCATE 50E STUB, EXTEND TO NEW METER
LOCATION. PROVIDE PULL BOX, CONDUIT #
WIRE IF NEOE55ARY
REOUIRES SCE INSPECTION
ELECTRICAL METER iADDRE55 16237 AGAVE AVE. (STA!
GONM I T $ WIRE LE&ENE7
PROVIDE BLACK WIRE FOR PHASE "All
PROVIDE RED WIRE FOR PHASE 11511
ALL CIRCUITS TO HAVE SEPARATE NEUTRALS
ALL CIRCUITS TO BE 0 UNLESS OTHERINI5E NOTED
Q 2#6 4 1 #6 E/6 - 5/4 Ila.
2#IO +s 1 010 E/6 - 112"a.
TYPICAL IN SHADE 5TRUGTUR -5
• p` PVC, OONPUIT VV AIRM A5 SHOWN TO
PANEL B CIRCUIT PIMI&NATION
1
GONDU 17 15 5HOINN D I ARAM AAI GALLY
FOR GLAIR I TY AND 15 NOT INTENDED TO
BE FREG15E IN THE FLAGEMENT. GONTRAGTOR
SHALL GOORDINATE CONDUIT INSTALLATION
WITH OTHER TRADES TO AVIOD GONFLIGT
GONDU 1 T SHALL BE A MINIMUM OF 5' FROM
GENTER LINE OF TREES
GENERAL. ONi UNION NOTES
I. PROVIDE ALL MATERIALS AND LABOR AS REGiUIRED TO ACHIEVE A COMPLETE AND
OPERA7I146 SYSTEM.
Z. COORDINATE AND OBTAIN APPROVALS FROM ALL RESPECTIVE UTILITY COMPANIES
AS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION.
O
S. INSTALL RACEWAY SYSTEMS ASF LLOWS:
a. USE P.V.C. SCH 40 CONDUIT UNDER6ROUND WITH CODE SIZED GROUND.
4. ALL NEW WIRING SHALL BE STRANDED COPPER TYPE "THHN/THWN" #10 AVi6. - U.O.N..
5. ALL METER PEDESTAL LOCATIONS SHALL BE VERIFIED WITH LAN750APE ARCHITECTIS
DRAWIN55 AS WELL AS EQUIPMENT SUPPLIER R.EQUIREMEN75 PRIOR TO ANY ROUGH -IN WORK.
b. THESE PRAININC75 ARE DIA6RAMMATIC AND REPRESENT THE INTENT OF EQUIPMENT, DEVICES, ETC..
TO BE CONNECTED AND THE CIRCUITS TO WHICH THEY ARE TO BE CONNECTED TO. CONTRACTOR
SHALL INSTALL ALL MATERIALS AS R,EOUIRED FOR A COMPLETE AND OPERATING 5Y5TEM.
?, ALL EXTERIOR EQUIPMENT SHALL BE U.L. LISTED FOR WET LOCATIONS.
5. ELECTRICAL CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL
LOCAL AND NATIONAL GOVERNING CODES.
ci. ALL EQUIPMENT SHALL BE NEW AND BEAR A "UL LABEL U.O.N..
10. ELECTRICAL CONTRACTOR SHALL SECURE AND PAY FOR ALL NECE55ARY BUILDING PERMITS.
11. COMPLETE ELECTRICAL INSTALLATION SHALL BE GUARANTEED IN WRITING FOR A PERIOD OF (1)
YEAR - U.O.N..
12. ELECTRICAL CONTRACTOR SHALL VISIT SITE PRIOR TO BID DATE, TO VERIFY ALL. EXI5TING
CONDITIONS TO BE ENCOUNTERED IN THE INSTALLATION OF ALL NEW EQUIPMENT
ETC.. EXACT INSTALLATION METHOD AND REQUIREMENTS SHALL BE VERIFIED AND DETERMINED
PRIOR TO BID DATE. CONTRACTOR SHALL IMMEDIATELY NOTIFY THI5 ENGINEER OF ANY REWIRED
MODIFICATIONS WHICH ARE NOT SHOWN ON THESE DRAWINGS. SUBMITTAL OF BID INDICATES
CONTRACTOR 15 COGNIZANT OF ALL JOB SITE OONDITION5 AND NORK TO BE PERFORMED.
15, ALL EQUIPMENT, ELECTRICAL CHARACTERISTICS, LOCATIONS, AND CONNECTION REQUIREMENT5
SHALL BE VERIFIED PRIOR TO ANY ROUPH-I`N NORK.
14. ELECTRICAL CONTRACTOR SHALL FURNISH THE FOLLOWIN6 SHOP DRAWINGS FOR PRIOR APPROVAL:
a. ALL ELECTRICAL SERVICE EQUIPMENT 4 PULL BOXES.
THESE ITEMS SHALL BE APPROVED BY THE OWNERS AUTHORIZED REPRESENTATIVE PRIOR TO ANY
COMMENCEMENT OF PLACIN6 ORDERS OR PERFORMING ANY ROUGH -IN NORK.
15. COMPLETE ELECTRICAL 5Y5TEM SHALL BE GROUNDED IN ACCORDANCE WITH THE PRESENTLY
ADOPTED EDITION OF THE N.E.C., ART. 250.
I(o. PROVIDE THE ONNER AND THI5 ENGINEER WITH ONE SET OF ELECTRICAL "A5-5UILT5" AT THE
COMPLETION OF JOB.
I7. TRENCHES SHALL BE DEEP ENOUGH TO ALLOW FOR 24" OF COMER OVER THE CONDUITS.
Ig, BACKFILL OF TRENCHES UNDER AREAS WHERE ASPHALT, CONCRETE OR VEHICULAR PAVING WILL
BE PLACED, SHALL BE COMPACTED BY THE FOLLOWING MEANS: PROPERLY M015TEN SOIL, PLACE
INTO TRENCHES 1N LIF75 OF 5 11, MAKE THREE (5) PASSES KITH A "STOMPER" TYPE COMPACTION
DEVICE, REPEAT TO TOP OF TRENCH. TRENCHES SHALL ACHIEVE c15% RELATIVE COMPACTION.
va
WEST COA5T DESIGN GROUP
ELECTRICAL d 1-161-ITING ENGINEERS
266"12 PA51E0' BRILLO, SUITE 200
5AN JUAN CAPI5TRANO, CA 1`12615
61441) 5-1000
ALL WIRING SHALL BE INSTALLED IN A METHOD THAT UPON COMPLETION THE SYSTEM
15 FREE FROM SHORT CIRCUITS AND 6ROUND5 (OTHER THAN REQUIRED 6ROUNAIN6).
THE CONTRACTOR SHALL PROVIDE A '°ME66ER" INSULATION TEST (IN THE PRESENCE OF THE
CITY REPRESENTATIVE) WHICH APPLIES A MINIMUM OF 500 VOLTS D.C. EACH CIRCUIT SHALL
MEET THE REQUIREMENT5 FOR INSULATION RESISTANCE. THE TEST SHALL BE PERFORMED
AFTER WIRING HAS BEEN INSTALLED IN THE CONDUIT, 15 SPLICED AND CONTINOU5 FROM
PANEL TO TEND OF RUN FOR EACH WIRING SYSTEM (REMOVE RUSES IN EASE OF POLE FOR
DURATION OF TEST).
LOW AND HIGH VOLTAGE CIRCUITS SHALL COMPLY WITH THE FOLLOWING MINIMUM
REQUIREMENTS FOR INSULATION RESISTANCE:
CIRCUITS OF #4 OR SMALLER Y41RE5 1,000,000 OHMS
CIRCUITS OF #2 OR LAR&ER WIRE5 - 500,000 OHMS
SCALE
1 "=10°
SHEET KEY
I
I
CHK
DATE 02/27/17
ESE
I�yyIalI ;q{ol'
,j� I I�Wti rrrry i`7riJ LIMY
°"41 fiEeee4eee_eeeeee6e ���
Ilul rrrrrrrrlrYlr�iri111r ��
E1. 1
a
OF 17
w
�
eeeeeeee
mil
EtlellelkVl���'l',s.
�Will
oe
rrarrrrrrr_r
®
U
e ,
�
o
W
d
W
�
I
H
eeeeeeeee��
S I T ESCAP IG
Landscape Architecture
and Planning
3190 e2 Airport Loop Oriv®..
Costo Mesa. CA 92025
Richard Polhomus, License CA—#27d2
(20) 644-9370 (714) 210-3140 FAX
N®. REVISION
A
E11028 a
06/30/17
DWN
CHK
DATE 02/27/17
JOB
16-033
E1. 1
a
OF 17
w
z
0
L) U
z
U
W
ry
W
d
W
H
E11028 a
06/30/17
DWN
CHK
DATE 02/27/17
JOB
16-033
E1. 1
9
OF 17