HomeMy WebLinkAbout5685-18PO W o o, u a o 3 E c 3 0 0 9 a "� n a i a 0 0 v i M f.. - m v ,cmi i 2 GENERAL CONDITIONS A. CONTRACT DOCUMENTS: Shall consist of specifications and its general conditions and the drawings. The intent of these documents is to include all labor, materials, and services necessary for the proper execution an the work. The documents ❑re to be considered as one. Whatever is called for by any parts shall be as binding as if called for all parts. B. VERIFICATION: The Contractor shall verify measurements on the drawings before beginning work. In case of error or discrepancy in the drawings or specifications or in the work of others affecting his work, he shall notify the Owner's Representative immediately. The Contractor shall be held responsible. for any damages or loss due to his failure to observe these instructions. C. MATERIALS, MACHINERY, EMPLOYEES: Except as otherwise noted, the .Contractor shall provide and pay for all materials, labor, tools, and other items necessary and incidental to the completion of his work. D. SURVEYS, PERMITS, REGULATIONS: The Owner shall furnish an adequate survey of the property. The Contractor shall obtain and pay for all permits and comply with all laws and ordinances bearing on the operation or conduct of the work as drawn and specified. If the Contractor observes that a variance exists therewith he shall promptly notify the Owners Representative in writing end any necessary changes shall be adjusted as provided in the contract for changes in the work. E. PROTECTION OF WORK,. PROPERTY AND PERSON: The Contractor shall adequately protect the work, adjacent property, and the public, and shall be. responsible for any damages or injury due to his act. F. CHANGES IN THE WORK: The Owner may order changes in the work,. and the contract sum being adjusted accordingly. All such orders and adjustments plus claims by the Contractor for extras must be made in writing before executing the work involved. G, CORRECTION OF WORK: The Contractor shall re -execute any work that falls to conform to the requirements of the contract and shall remedy defects due to faulty materials or workmanship upon written notice from the Owner's Representative for a period of ninety (90) days from the date of completion of the contract. H. LANDSCAPE COORDINATOR STATUS: The Landscape Coordinator acts as the authorized representative of the Owner in conjunction with the project manager, and has authority to accept or reject materials or workmanship and to make minor changes in the work not involving extra cost. He will also interpret the meaning of the contract documents and may stop the work if necessary to ensure its proper execution. I. CLARIFICATION OF DRAWINGS BEFORE BIDDING: After reviewin the drawin s t orou 't 's e Co t acto 's g g h ghy i i th n r r responsibility to clarify with the Owners Representative n. uestio s t C a n he antractor ma have re ardin the Y9 Y 9 9 method of construction, quantities, or quality of materials included or called out. If the Contractor cannot contact the Owners Representative, the Contractor must qualify his bid or acce t the inte retation of t e 0 ners Re resent ' p rp h w p ptive on the uestion ble area as the deveo d o i a s L. unn c nstruction. 9 Y P 9 J, SAMPLES: The Owner's Representative reserves the right to take and a ze sa es na m I of materials far conformit to Y P Y specifications at any time. The Contractor shall furnish sam les u on reuest b the Owners Re resentative P P q Y i Re'ected P J materials shall bei ediatel re oved fro e ' mm m m th site and Y replaced at the Contractors expense. The .cost of testing materials not meeting specifications shall be paid by the Contractor. K. PRE -CONSTRUCTION CONFERENCE: Schedule a pre -co str c' n u tion meeting with the Owner's Re resentative at least seven 7 9 P days before beginning work. The purpose of this conference is to review a ue tions the Co tractor ma v n s I n ha e re ardin. Y q Y 9 9� the work administr tive. rocedu s urin co structio a p re d g n I. n and project work schedule. IRRIGATION SPECIFICATIONS I. SCOPE OF WORK: The Contractor shall provide all labor, tools, machinery, and processes necessary to install a complete irrigation system as shown on the drawings and/or specified herin. When completed the irrigation system shall be a 140% coverage system in total functioning manner. II. GENERAL PRQUIREMENTS: A. VERIFICATION OF DIMENSIONS: All scaled di ensio are m ns a roximated. Before roceedin with an wok the PP P 9 Y r Contractor shall careful) check and verify all di a sions. y y m n 5 acin of irri ation heads ocatio s o es d I i n f valy. and backflow P 9 9 preventers and ro osed P.O.C. shat e as indicate p p p I b don the drawings. Any deviation from the plans must have the approval of the Owners Representative. B. VERIFICATION OF FINISH GRADE: The Contractor shall inspect the site and check all finish grades within the work area to ensure the proper soil coverage (as specified) of the irrigation system pipes. C. WATER SUPPLY: T e Contrac o all vel if a h t r sh pry nd be familiar with the source of wa er su to the irri a i t I ton PPY 9 system as indicated on the drawings. D. PERMITS AND FEES: The Contractor shall apply and pay for all necessary permits required in the pursuit of his work as required by the governing codes. E. CARE OF EXISTING BUILDINGS AND STEPS: The Contractor shall be held responsible for the care and preservation of all existing buildings and structures on the property and adjacent premises and contiguous property, Any part of these properties injured, damaged or disturbed because of his work shall be repaired, replaced or cleared by the Contractor at his expense. F. REVIEW OF DRAWINGS: It is the Contractor's responsibility to review irrigation drawings and note any areas he believes additional heads or valves are required prior to submitting a bid. If no changes are submitted, the Contractor is responsible for full coverage. of equipment as necessary at the Contractor's expense. G. GOVERNING REGULATION: All local, municipal and state laws, rules and regulations governing or relating to an rtion o this wor nd hereb incor orate y po f k a y p d into and made part of these specifications, and their rovisions shall be car ied out b t p r u y he Irrigation Contractor. H. DIAGRAMMATIC DESIGN: The design is diagrammatic. All pipe, valves, etc., shown within paved areas are for design clarifications only and shall be installed in planted areas where possible, Never install the backflow preventers in lawn area; always in shrub areas. I. INSTALLATION: All irrigation materials shall be installed in accordance with the techniques and specifications set forth by each respective manufacturer. All pertinent descriptive literature issued by these manufacturers become a part of these specifications after baving been approved by the authorized Owners Representative.. Such installation practices shall be followed only if the directions of the irrigation drawings and specifications do not thoroughly and completely order the methods or techniques to be followed. Install all equipment and materials as shown per details. J. SITE PROBLEMS: The Irrigation Contractor shall not willfully install the irrigation system as indicated on the drawings when it is obvious in the field that there are unknown obstructions, grade differences, and/or discrepancies in the area dimensions until such conditions are brought to the attention of the Owners Representative. III. MATERIALS: Irrigation materials and equipment shall be of type, size and location as noted and indicated on the drawings. Unless permission to change is granted from the Owners Representative; materials are to be new and in perfect condition. No deviations from the specifications shall be allowed. The decision of the Owners Representative shall be final in determination of the quality of materials. IV. INSTALLATION: A. EXCAVATION: 1. The Contractor shall verify locations of all existin subsurface utilities mecha ical a d g ( n n electrical) prior to excavation. Any utilities, A.C. paving, concrete work, plant material, etc., destroyed or damaged by any work under this contract shall be repaired or replaced at the Contractors expense. Call Underground Service Aler at least 2 days before you dig Know what's below. Cell before you dig. 2. Trenches for pipe shall be cut to required grade line V. DRAWINGS OF RECORD (AS-BUILTS): U�} 2, Soil sulfur shall be standard commercial grade, E. DELIVERY SLIPS: Supply delivery slips from the supplier for � G. ROLLING: Roll sod with an adequately weighted roller to XIX. FINAL CONSTRUCTION AND FINAL MAINTENANCE INSPECTION: at a true gradient to provide uniform support for the V r n e -I r � the soil amendments to the site. Bulk loads from the U smooth out the sod bed. W length of the pipe. A. GENERAL: hal Z1 3. Soil Conditioner - Tri -C Enterprises - 1(800) 927-3311 � P. -I Contractors yard will not be accepted. Supply empty bags for 41 � F� I� -d • ~ Q1 `� or (fax) (909) 590-3301. fertilizer to the Superintendent of the job and the Owners 0 Z A. FINAL CONSTRUCTION INSPECTION: U r" � Representative. H. PROTECTION OF EDGES: Regrade to protect the edges from 3. Depth of trenches shall be sufficient to provide a The Contractor shall provide and keep up to date, in drying if mowing edge is not used. minimum cover above fhe top of the pipe as noted on accordance with this section, q complete set of record 4. Bone meal 2-22-D shall be manufactured by Kellogg When all landscape improvements have been installed in the drawin s. 9 as -built" black line ozolid prints which shall be corrected Supply, Wilmington, CA. VIII. SHRUD AND TREE P ANTING: I. WATERING: After installation sod must be ke t thorou hl P accordance with the plans and s ecifications, the P dail and show eve chane from the ori inal drawin s and Y rY g 9 9 5. Azalea #103 shall be 9 Y watered to a depth of 6". No foot traffic shall be allowed Contractor shall notify the Owners Representative and re nest If the Owner's q P °Final Construction" ins eto B. JOINING PIPE: s ecifications and the exact as -built" locations, sizes and P organic planter mix manufactured by Bandini Fertilizer. A. CORRELATION: Trees and shrubs shall not be planted until for 2 to 3 weeks from the date of installation. Re t b presentative determines the work to be substantially kinds of equipment. Prints for this purpose may be obtained all operations in conjunction with the installation of the complete and in conformance with plans and specifications, 1. The Contractor is responsible to be familiar with the from the Owner. This set of drawings shall be kept on the site and shall be. used only a record set. These drawings irrigation system have been completed, final grades have been the lantin J. INSPECTION BY SUPPLIER: If there are any q uestions re ardin Y q 9 9 the Contractor will be advised that the basic ninety (90) methods of assembling, joinin and installin the various 9. 9 shall also serve as work progress sheets and the Contractor gr 6. Ph Acidall shall be manufacture. b Kell Su d y egg pply, Wilmington, CA. established, and beds pro erl. pre ared b P 9 P P Y P P Y cultivation and fertilization as covered in these specifications. the quality of sod installation a representative of the supplier day maintenance period is started. types of pipes to be used. He will adhere In strict shall make neat and legible notations thereon daily, as the shall be re uested to ins ect the installation and the 9 P accordance with the. manufacturer's recommended work roceeds, showin the work as actual) installed. These p g y Contractor shall call out the suppliers representative. 1. In order to be substantial complete, at least the P procedures. drawings shall be available at the times for inspection and 7. Par - 5 shall be manufactured by Kaibab Forest Products. B. PLANTING TIME: No planting shall take place during extremely following must have been finished. shall be ke t in a location desi nated b the Owner's P 9 Y hot, dry, windy or freezing weather. XII. SEED LAWN PLANTING (IF APPLICABLE): 2. PVC pipe shall not be threaded and all transition from PVC Respresentative. 8. Commercial fertilizer shall be Best Products of approved to metal lin shall be b PVC male threaded ado ter P P 9. y P equal. C. LOCATIONS: Relative position of all plants and trees is subject A. REFERENCE: Refer to Paragraph V, VI, VII, a. All fine grading, including elimination of low Dints hold runoff. fittings. B. REQUIRED NOTATIONS: 9. Mycomhizal inoculum -Tri-C Enterprises, 1 (800) to a roval of the Owner's Re resentative and the shall, if PP P Y for finish grading,. weed control, and soil preparation. P plet b. A complete and operable irrigation system.. 927-3311 necessary, be relocated at his direction as part of this c. Installation of all plant materials. C. BACKFLOW The backflow prevention device shall dimension from two (2) permanent i. The Coof contract. Trees shall normally be located a minimum of 5' from buildings, site amenities and walkways. B. PREPARATION: Cultivate to a depth of 2" below finish grade, d. Seeding of all seeded areas. rein s all specified herein shall be verified with local plumbing and neer points of reference, buildin corners, sidewalks, or road 9 B. TOP SOIL: remove stones, foreign growth of any kind and extraneous health codes. In the event of any conflict on the device intersections, etc., the location of the following items: matter, and grade to remove ridges and depressions so that 2. Minor pick-up items may be completed during. the or the installation methods, the Owner's Representative 1. Topsoil consists of a fertile, friable natural loam of D. DISTRIBUTION: No more plants shall be distributed about the areas after settlement will conform to the finish grade. Roll basic maintenance period. These items will be shall be notified PRIOR TO BID OPENING. uniform quality, free from subsoil, stiff clay, hard clods, landscape area that can be planted and watered on the and rake. lightly until the surface is smooth, friable and of determined as Minor solely by the Owner s a. Gate valves hard pan, sod, partially disintegrated debris, or other same da , Y uniform fine texture. Representative. D. TESTS: b. The routing of the irrigation main lines undesirable materials. c. Connection to the existin water lines 9 E CONTAINER REMOVAL: Plant containers shall be removed when C. SOWING: Sow lawn seed in the area designated on the B. FINAL MAINTENANCE INSPECTION: At the end of the 1. All main fines and lateral lines which have d. Irrigation control valves 2. To soil shall not contain obnoxious weeds, such as P planting the plants. Container may be split on both sides, drawings at the rate designated on the Planting Plans. maintenance period and when fhe ground cover and turf glued }'Dints under paving the system shall be copped and e. Quick Coupling valves morning glory, sore), oxalis,. spurge, annual poo, however, without use of axe or s ade. All containers shall be P Sow the lawn in two directions. di have established and all ick -u items have been cam leted, P P P pressure tested qt 150 PSh d f_ Controller/Rain-check locations nut grass or Bermuda grass. removed from the site. the Contractor shall request a final maintenance inspection. g. Master valve or Pump D. TOP DRESSING: Rake lightly, spread 1/4" of Par -5 top The Contractor will be advised by the Owner's Representative 2. Pressure shall be sustained in the lines for less than C. PLANT MATERIALS: F. PLANTING PITS: All tree and shrub pits shall have a diameter dressing with mechanical spreader, roll with a 200 lbs. at the final inspection that work is or is not satisfactory. not two (2) hours. If leaks develop,. the joints shall be 2. The drawing shall show approved subsitutions of sizes, of at least twice the diameter of the root ball. Pit depths shall be a minimum 12" deeper than the real ball for trees a roller and water with a. fine spray. replaced and the test repeated until the entire system materials, and manufacturers name and catalog number, 1. Plant names in the Plant List conform to "Standardized and 8" deeper than the root ball for shrubs or as per 1. If the work is satisfactory, the basic maintenance is watertight. Plant Names' by American Joint Committee of planting details. XIII. HYDROSEEDING SPECIFCATIONS (IF APPLICABLE): period will end on the date of the final inspection directed C. DELIVERY OF DRAWINGS OF RECORD: Horticultural Nomenclature, except in cases not covered as by the Owners Representative. 3. Test shall observed and approved by the Owner's therein, In these instances the established custom of G. PLACING: Plants shall be placed and held during backfill in A GENERAL: The hydromulch shall be applied in the form of a iv Representative prior to backfill. On or before the date of final inspection, {he Contractor the nurse trade in followed. rY an upright position in the center of the pit. Plants shall slurry consisting of wood cellulose fiber, seed, chemical 2. If the work o unsatisfactory the basic maintenance shall deliver the corrected and complete blacklines to the be held at, or slightly above nursery level. The earth ball additives, commercial fertilizer and water. When hydraulically period will continue at no additional expense to the Owner until the work has been cam feted, ins ected, P 4. When the irrigation system has been completed. (and Owner's Re resentative. Deliver of blacklines will not relieve P Y 2. Plants shall be sound, healthy, vigorous, free from shall be ke t intact. An ex osed roots shall be s read P Y p P s ra ed on the soil surface, the h dromulchin shall form P Y Y 9 P and approved by the Owner's Representative. before planting has be un), the Contractor, in the the Contractor of the responsibility of furnishing required disease and weeds, insect pests of their eggs and shall out. Injured roots shall be pruned. a blotter like ground cover impregnated uniformly with seed presence of the owners Representative, shall test the information that ma be omitted from the rints. Y P have healthy, normal root systems, well filling their and fertilizer and sholl allow the absor tion of moisture and coverage of water afforded to the lawn end planting areas container, but not to the point of being root bound. H. BACKFILL: Plant pit backfilling soil shall consist of 1 part rainfall to percolate to the underlying soil. C. FAILURE TO PASS INSPECTION: If the work fails to pass as complete and adequate. The Contractor shall finish D: CONTROLLER CHARTS: nitrogen stabilized sawdust to 2 parts topsoil. Materials shall final inspection, any subsequent inspections must be all materials and perform all work required to correct 3. Plants shall not be pruned prior to delivery except as be thoroughly mixed before placement. In addition to B. EQUIPMENT: Hydraulic equipment used for the application of rescheduled as er above and will be char ed to the P 9 any inadequacies of coverage. authorized by the Owner's Representative. In no case backfill, Tri - C CM co Packs 7 m. tablets shall be added to y g the fertilizer, seed, and slum of y prepared wood pulp shall be Contractor the prevailing hourly rate of the Owners 1. As -built drawings shall be received and approved by shall trees be to ed. PP plant pits at the following rates: � of the 'super hydro -seeder' type as approved by the Owner s er of the Owners Representative. 5. The Contractor shall inform the Owner's Representative the Owner's Representative prior to preparing controller charts. Representative. of any deviations from the plan required by wind, planting, 4. All plant materials shall be subject to approval of size, 1 pok per 1 gallon container CITY OF FONTANA STANDARDS LANDSCAPE MAINTENANCE soils, or site conditions that has a affect on present health, quality, character, etc., by the Owner's 2 paks per 5 gallon container C, APPLICATION: The operator shall spray the area with a uniform SPECIFICATION FOR ALL C.F.D. AREA coverage. 2. Provide one controller chart far each controller supplied. Representative. 6 paks per 15 gallon container visible coat by using. the green colorof the wood pulp as ❑ 10 paks per 24" box guide. The slurry shall be applied in a sweeping motion in a E. IRRIGATION HEAD INSTALLATION: 3, The chart shall be a reduced drawing of the actual 5. The height and spread of all plant materials shall be 12 paks per 30" box arched stream so as to fall like rain allowing the wood fibers 3.07 THE NINETY (90) DAY MAINTENANCE PERIOD - as b ilt s. ste usin a di e n o u m ff re t c for to indicate the Y g measured with branches in their normal position. 16 aks er 36" box P P to build on each other until a ood coat is ac leve. a d t e 9 h d o h area of coverage for each station. 18 paks per 42" box material is spread at the required rata per acre. A. Preliminary Review: As soon as all plantings are completed per Contract 1. Shrub and ground cover spray heads adjacent to curbs 20 paks per 48" box and those box sizes which are larger Documents, Hold a preliminary review to determine the condition of the work or walks shall be installed 1 1/2" away from the curb or 6. The caliper of all trees shall be measured 4' above the walk and the heads shall be pop-up models as 4. When the chart is completed and approved by the Owners surface of the ground. D. TIME LIMIT: All slurry mixture which has not been applied indicated on the drawings. Representative, it shall be hermetically sealed and placed I. WATERING: When the pit has been backfilled to three quarters within four hours after mixing will be rejected and removed in the controller box. of its depth water shall be poured about the roots. Air from the project at the Contractors expense. b. Date of Review: Submit a written request to the Agency's Authorized 7. Wh re call er or othe dimensions of an a e r Int materials P Y P ockets s a P h II be eliminated and backfill continued until the Representative at lease five. (5) working days prior to anticipated date of 2. Shrub spray heads adjacent to building, fences., or VI. CLEAN-UP: are omitted from the plant list, it shall be understood backfill is brought to grade level. E. PROTECTION: Special care should be exercised by the review. similar structures shall be installed 1 1/2" away from the that these plant materials shall be normal stock for the structure and the nozzle shall be 2 1/2' minimum above finish type listed. Contractor in preventing any of the slurry being sprayed inside (No rigid risers) A. SCOPE J. COMPACTING: Backfill shall not be compacted around the any reservoir basin or onto drainage ditches and channels C. Beginning of the Ninety (9O) Day Maintenance Period: The date on which the grade. AN FRE UENCY: After instalation e s D Q a ration P roots or ball of t e )ant durin or after )anti The h n P 9 P 9 which ma im ede the free flow of rain or it i ati Y r on water. P 9 A enc s A thor e u ¢ d Re resentative issues a letter of Prelimina leted. 9 Y P �' P have been cam leted remove all tree excess so' P h it and 8. Plant material shall be s metria t ical Y m c i for varlet Y backf ich t e to ill on wh h nt ball rests shall be lihtl cam acted. P 9 Y P An slur s filled i Y ry P me restricted areas shall be cleaned Acceptance to the Contractor. this date, all plant materials shall be rubbish from ro ert . All scars, ruts, or other marks P P Y and species, and shall conform to measurements specified ea the Contractors expense to the satisfaction of the Owner or r r planted all areas requiring hydroseeded lawns shall be completed. se 3. All irrigation heads are to have double swing joints as in the area caused b this work shall be re air Y p ed and in the Plant List/Legend. Owners Representative. detailed. the ground left in a neat and orderly condition K: SETTLEMENT: Plants which settle shall be raised to the throughout the site. The Contractor shall pick up all re uired level or re laced at the a tion of the Cont acto . q p p t res re h h sultin from his work no less than each Frida 9 Y 9. Plant material lar er than those s ec'fied a 9 P i m be Y Raised a I nts which fail to row shall be re laced. 9 P P G. MAINTENANCE AND IRRIGATION. 0 cel t e slu r n h r mulch has been Y 3.08 PRE -FINAL AND FINAL ACCEPTANCE 4. Install all irri anon heads er details. g P be or eav' t e s" f e l in h Ite once a week ander the last 9 / su lied if cam I in in all of er es ects a d at o PP h r n n PY 9 P a lied and allowed to set for o e a he Io al P n d t s e sh I be P Y. P o w rking day of each week. All trash shall be removed additional cost to the Owner. u on ❑ roval of the � P PP L. STAKING: Stakes shall be driven to sufficient depth to hold then be irri ted. ere is o set 'r' ga Th n _ i ngation requirements in A. Conditions for Pre -Final Acce to e p nc of Work at End of Maintenance Period: F. RRIGATION HEAD ADJUSTMENTS: cam letel from the site. p y Owners Re resentative. p the tree igid. Trees shall be supported by at least two ties gallons per minute. Duration of time and number of gallons (see details). to be applied will vary from day to day and system to system 1. Each plant shall be alive and thriving, showing signs of growth and no 'u VII. GUARANTEE 1 AI la t t D I n. ma enols must have been previous) ins ected P P Y P de endin on the rate of rowth and climatic conditions P 9 9 si ns of rowth and no si ns of stress disease ora other. 9 9. 9 n Y The Irri anon Contractor s a l flush d a t h l an d s all irri ation g f 9 at the nursery by the County Horticultural Department encou tered. s a 1 n A rue of thumb, the soil surface must be 'c heads for o timum erformance a d to reve. t overs ra t P n n ono P P P Y and snail be subJect to acceptance as to. quality by M. PRUNING: Limbs ra encs c nes b n a and runners which re uire q ke t Dist t all t' es a r m a Im rti ala I durin. the seedin P � P Y 9 9 2. All plants not meeting these conditions shall be replaced and a Ninety walks and buildings as much as possible. This shall include A. SCOPE: The entire irrigation system shall be guaranteed the Owner's Re resentative. P trimming shall be removed to leave a clean cut flush with germination period (approximately 30 days). 90 Da Maintenance Period commenced for such lants. ( ) Y P selecting the best degree of arc to fit existing site situations. by the Contractor as th materials and workmanship, the trunk (pruning only as directed by the Owner's This also includes sin the a ro riat u g pp p e radius reduction including sone of backfill areas below grade fora Representative). H. RESEEDING: All bare spots shall be reseeded (sodded., if 3. Lawn areas shall not be 10D% weed free unless otherwise approved by equipment. period of one (q1) year following the date of final 11. Substitutions will be permitted only pe indicated, or if hydroseed is turf mix), by the Contractor within 45 days days the A enc 's Authorized Re resentative. 9 Y P acceptance pf the work. If, within one (1) year from proof is submitted that any plant specified is not N. PLANTING BEDS: Planting beds shall be edged and cultivated providing the lack cover growth mulch is not due to G. CLOSING OF UNI SP CTED 0 K: N E W R date of completion, settling occurs, and adjustments in valves, and irrigation heads, sod, irrigation devices, available, a proposal will be considered for the use of the nearest equivalent size or variety with an equitable to the line separating areas as shown. Beds shall be. brought n se inadequate irrigation or erosion caused by excessive watering 4. Lawn areas shall have 100% e g rmination and establishment of turf. pipes, or paving is necessary to bring the. system, sod or adjustment of the contract price. to a smooth even s rf cel co for t t u a n m ng o es abl shed grades b the Owner. y The Contractor shall not allow or cause an of his work to be y paving to the proper level of the permanent grades, the after full settlement has occurred. B. Corrective Work: covered or enclosed until 't as b en 'sec ed h e in p t ,tested and Contractor, as part of the work under this contract, shall 12. Quantities shown on the call outs on the Planting Plan XIV. REPLACEMENTS: approved by the authorized Owners Representative, Should make all adjustments without extra cost of the Owner, are for the convenience of t e Co tracts o I . h n r n Y IX. GROUND COVER AREAS: 1. Work required corrective action or replacement in the judgment of the an of his work be enclosed or covered be o e s c Y f r u h includin the cam lete restoration of all a a ed d m 9 P 9 uantities dra o the I n w circles, dots or Q can n pa (nether A. GENERAL: The Contractor shall immediately replace any and A e r nc s Autho rzed Re resentative shall be erfo m d 't in ten D g Y P p r e wi h 1 ( ) inspection and test, he. shall uncover the work at his own planting, pavin or other im rovements of an kind, 9 P Y a triangles) are the final authority and shall be furnished A. REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, all materials which for any reason die or are damaged while calendar days after the Pre -Final Review. expense and after it has been inspected, tested, and approved, he and installed as drawn. The Owners Representative shall weed control, and soil preparation. under the Contractors care. Replacements shall be made shall make all re airs with like materials necessa to P ry restore all his work and that of other Contractors to its B. RESPONSIBILITY: Should any operational difficulties in have the final authority as to location of all plant material. with plant of like kind and size in the same manner as 2. Perform corrective work and materials replacement in accordance ori inal condition. 9 connection with the irri ation s stem within the s ecified g Y P B. SOIL PREPARATION: Pre are the soil as these specifications p s ecified for the ori inal lantin see. uarantee XVII -D" P g P g( g with the Drawin s and S ecifications and shall be made b the g P Y guarantee period which is in the opinion of the Owner's D. SEED MATERIALS: per and the Planting Notes on the Planting Plan. for definition of death and replacement). Contractor at no cost to the Agency. Representative due to inferior material and/or workman- H. BACKFILLING: ship, said difficulties shall be immediately corrected by XV CLEAN -Up_ 3. After corrective work is completed, the Contractor shall again request the Contractor to the satisfaction of the Owner's 1. Seed shall be clean, fresh, new crop seed and shall de C. GRADING: Areas shall be raked and floated smooth to provide a Pre -Final Review for Pre -Final Acceptance as outlined above. 1. Backfill shall not be placed until the installed irrigation Representative at no additional cost to the Owner; the mixture as noted on the Planting Plan. a true and uniform surface. s stem has been i s ect d. an a rove y n p e d pp d by the Owners including any and all other damage caused by such A. GENERAL: After all installation operations have been completed, 4. Continue maintenance of all landsca ed areas until such time as all P Representative: defects. 2. Seed shall be mixed by the dealer and furnished with the D. PLANT PITS AND FERTILIZER: Planting pits for ground cover all trash excess soil e t mp y pant containers and rubbish shall be removed from the All scars, ruts or other corrective measures have been completed and accepted by the Agency's dealers guarantee statement of composition and shall be 4" x 4" or adequate to accept plant material from property. marks in the area caused by this work shall be repaired and Authorized Representative. 2. Trenches shall be backfilled with a minimum of 4" of C. INSTRUCTIONS: After the irrigation s stem as been 9 n y h. ercenta e of urit which s al be furnish d to p g p y n I e the lat o 4 of f s r p s without crushing or deforming the rootball. the ground left in a neat and orderly condition throughout fine, granular materials to protect the pipe from the coin leted and the connections made the Contracto r P 0 hers Re resentative. Se w ed to s shall be delivered to P 9 - Place ❑ 1 2 is .Tri C E do 20 ertil'ze tab et i e / P n 1 f i r I n ach the site. Contractor shall pick up all trash resulting from this C. Final Acce t. ace: p a Final approval and acceptance of the work will be given clods nor rocks. The remaining excavated dirt can be shall instruct the Owner or his representative, in the the Owner's Representative at the time of installation. individual ground cover pit. work no less than each Friday before leaving the site, once a when the following conditions, as determined by the Agency's Authorized used as backfill. The Contractor shall not place operation and maintenance of the system. week and/or the last working day each week. All trash shall Representative have been met: detrimental subsoil or rocks in the to 6° of b c fill. p a k E. STAKES: All stakes shall be per details. E. SPACING: Plant according to spacing and in areas indicated on be removed coin letel from the site. P Y the drawin s. Soils all be f' e g h vmly tamp d around each plant,. 1. At coin letion of the nin 90 da. p ety ( ) y maintenance period, and when one 3. If settlement occurs and adjustments in pipe, valves, /� PLANTING SPECIFICATIONS IV. OBSTRUCTIONS BELOW GROUND: and the excess soil removed from the crown. B. TOP SOIL: Excess topsail shall be removed from the site. hundred (100) percent germination and plant establishment is obtained. irrigation heads, or any other irrigation device, necessary to bring the system to proper working order. The. A: CONTRACTOR'S the Co N arrector is responsible SIBof F, WATERING: Each section of ground cover shall be immediately C. NEATNESS: Leave the sidewalks and street in a neat and 2. All lantin areas. shall be eed reel unle o P 9 w f ss therwise approved by the Contractor shall, as a art of his work under #his P I. SCOPE OF WORK: a: loco for verifying the location of all utility lines and other watered a on cam letion of lantin and thereafter as P P p 9. clean condition at the end of each working day. Agency s Authorized Representative. contract make all the ecessar ad' st e t n y Ju in n s without extra underground obstructions so that proper precautions may be required. cost tc the Owner. A. Furnish all labor, materials and equipment necessary to taken not to disturb or damage such improvements. In the D. REMOVAL OF TAGS: Remove all tags, labels, nursery stakes 3. After final inspection and acceptance by the Agency's Authorized provide and install plant materials as shown on the drawings event of a conflict between such es a lin nd )ant locations P � G. SPACING FROM EDGE: The first row of ground cover should and ties from all plants unless otherwise directed, and only Re resentative. P I. AUTOMATIC CONTROLLER AND VALVES: or as specified herein. the Contractor shall promptly notify the Owner's Representative, always be within 6" of the edge of planting area and triangular at the end of all installations. who shall arran e for the relocation of g one or the other. spaced. 4. The Agency's Authorized Representative reserves the option to extend 1. A 120 volt electrical power outlet to the controller B, Work included in this section items included but not limited ( Failing to follow this procedure, the Contractor shall at his own ex ense make an and all re airs for damn es resultin XVI. PROTECTION: the maintenance eriod be and 90 da s s ecified, if the determined P Y O Y P y shall be provided by others. (Provided the Landscape to): i y P 9 9 from his work. X. SEASONAL COLOR: further maintenance establishment required by the Contract Contractor has not included the electrical connection Documents. in his scope of work) the Irrigation Contractor shall be A. GENERAL: At all times during construction, adequate protection responsible for making the hookup from the outlet to 1. Grade, including mounding, molding and shaping surface V. FINISH GRADING: A. REFERENCE: Refer to Paragraph V, VI;. VII, for finish grading, shall be provided for all areas against damage of any kind, 5. Approval and acceptance for operation and maintenance will be given in the controller. of all .planting areas as indicated including the removal weed control, and soil preparation. until final acceptance by the Owner's Representative. writing by the Agency s Authorized Representative. of existing vegetation unless otherwise specified. A. TILLING: Till all planting areas as specified herein. 2. All wire from the controller to electric control valves B. SAIL PREPARATION: Prepare the soil qs per these specifications B. RESPONSIBILITY: the Contractor shall be held responsible for shall be solid co er U.F. 14-fi00 volt direct burial PP 2. Pre are and till soil in lantin areas includin furnishin P P 9 9 g and the Planting Notes on the Planting Plan. the care and preservation of all existing buildings and 3"09 WARRAN Y PERIOD AND REPLACEMENTS OF PLANT MATERIALS Use white for common, black for lawn and of all amendments as specified. Note that amendments B. UNIFORM GRADE: After tilling, all areas shall be brought to uniform grade by floating or hand raking. structures on the ro ert a J p y part p p y nd ad'acent remises. An shrub systems and red for moisture sensors; common indicated on the drawings (unless otherwise specified) C. GRADING: Areas shall be raked and floated smooth to provide of them injured, damaged of disturbed .because of his work A. Specific Requirements: Refer to the following sections: control wire. Install in common trench with main line are for bid purposes only. Actual soil amendments will a true and uniform. surface. shall be repaired,. replaced or cleaned by the Contractor at pipe where possible. Tape control wire at 10' O,C. to be based on the soils test results. C. GRADE RELATIONSHIPS: Finish grade of planting areas afther his expense. 1. Lawns and Grasses- Section 02930 main line pipe. Provide minimum 18" coverage. - application of soil amendments shall be 1" below top of concrete walks and curb grades and 6" below finish floor D. QUALITY OF PLANTS: Plants shall be health annual last Y P XVII. GUARANTEE: 2. Trees, Shrubs, and Ground Covers- Section 02950 "Scotch 3, Furnish and plant all plant materials as indicated in the of building or as noted by spot elevations. material in bloom in the size indicated on the drawings. 3. Wire connections shall be made with -Lok" wire drawings and specifications. connector sealing packs #3576 or Spears "Dri-splice" with sealant DS 300 or approved equal. D. SLOPE FROM BUILDINGS: soil areas adjacent to buildings shall E. PLANT PITS AND FERTILIZER: Each lant it for seasonal color P P A. SHRUBS: All shrubs shall be uaranteed as to growth and health for (90) days the 4. Perform all pruning as required. slo e awe from the buildin at 2% minimum for 10 feet and P Y 9 shall be 6" x 6", or adequate to accept material In the a period of ninety after completion of specified maintenance period andfor final acceptance by the shall continue to slo e at a minimum of 1% until water drains P required size, with one teaspoon of bone meal mixed into the Owner or Owner's Representative. 4. There shall be a control wire from each control valve 5. Stake and tie all plant materials as specified. to street or storm system. backfill mix (shrub backfill mix should be used, not the runnin to the controller and each control valve shah g I rform t. ab Ag i pan to lets). be connected to the common ground wire. B. TREES: Trees shall be guaranteed to live and grow in an 6. Provide for the maintenance of the Planting until E. ROCKS OR CLODS: No rocks or clods over 3/4' in diameter F. SPACING: Plant at in areas indicated the acceptable upright position for one (1) year after the specified 5. All electrical work shall comply with the applicable codes. acceptance of the job by the Owners Representative. shall be or top of prepared planting beds. spacin and on g drawings. Soil shall be firmly tamped around each plant, maintenance period and/or final acceptance by the Owner or and the excess soil removed from the crown. Owner's Representative. The Owner must provide adequate 7. Dispose of all debris and surplus materials. VI. WEED CONTROL maintenance to ensure the extended guarantee on trees. 6, Install all valvas per details, and manufactures eco me n datio s. r m n n G. WATER NG: Eac sectio n 0 0 immediately h n f seasonal c for shall 8. Clean-up. A. KILLING WEEDS: Contractor shall erminate and destro 9 Y watered upon completion of planting, and watered thereafter as t C. DEFINITION OF DEATH: Plants which die or lose more than 30% existing weed seeds before preparing areas for planting. required. of their ori inal leaves shall be re laced. 9 P MOISTURE SENSOR INSTALLATION a icab : (if ppl be) 9. Guarantee. Suf icie t w e s f n at r hall be applied to cause weed seed to sprout. Young weeds shall then be destroyed and removed before they D. REPLACEMENT: The Contractor, within seven (7) days of n rj rt f� ��'�pq U U �„,, 9p 1. Installations and wiring are to be done by the Contractor have o ortunit to set seed. PP Y H. SPACING FROM EDGE: the first row of seasonal color should be. always within 6" the the written notification by the Owner or Owner's Representative, ',, _LF 9g EL%1 4� in compliance with installation and operating instructions 10. Maintenance. of edge of planting area. shall remove and replace all guaranteed plant materials which enclosed with the moisture sensor and included with B. ADDITIONAL REQUIREMENTS: For additional weed killing refer for any reason fail to meet the requirements of this guarantee. a 1 {1� these special instructions. II. VERIFICATION OF SITE CONDITIONS: to Planting Notes on the Planting Plan. XI. SOD AWN MATERIALS AND PLANTING (IF APPLICABLE): Replacement shall be made with plant material as indicated or �y1 `1 specified from the original planting and all such replacement "° 2. The Contractor shall furnish 2 -AWG -UF 14 or lar er # ( g ) A. EXCAVATION: The Contractor shall verif exact locations of Y VII. SOIL PREPARATION: A. REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, materials shall 6e guaranfeed as specified for the original guaranteed material. wires from the controller to the moisture sensor control .all existing sub-suface utilities (mechanical and electrical) weed control, and soil preparation. stations, locations shown on drawings, Provide additional prior to excavation. Any utilities, A.C. paving, concrete work, A. SOIL REPORT: Before sta Ing soil preparation the Contractor XVIII. MAINTENANCE: expansion lead to each station for finally of etc., destroyed or damaged by any work under this contract shall submit a soil report to the Owner and the Owners 8. PREPARATION: Sad area prior to planting shall to rolled e sensors. All sensors are to be wired in parallel (see wire el (s e shall be repaired or replaced at the Contractors expense. Representative. If no soil report is submitted it will be lightly and watered to a depth of 6 the day prior to color note above). assumed that amendments were not added and the Landscape planting. If any air pockets are found, the area shall be A. SCOPE: After all work indicated on the drawings or herein B. SUB -SURFACE DRAINAGE OR SOIL CONDITIONS: Should sub- Contractor will be requested to give a credit for soil regraded as necessary. Lightly water the area to be specified has been completed, inspected, and approved by the 3. Ametek 6" extension boxes No. 10-170-003 covered by surface drainage or soil conditions be encountered which preparation. planted just prior to planting. Owner or Owners Representative, the Contractor shall maintain Ametek green cover No. IVC -10-173-004, or approved would be detrimental to growth or survival of plant material, all planted areas by means of continuous watering (including equal, shall be installed as detailed. the Contractor shall notify the Owners Representative in B. COMPACTED AREAS: Soil areas that are compacted to more C. QUALITY: Sod shall be #1 Grade, machine cut at uniform monitoring and adjucting irrigation schedule), weeding, rolling, writing, stating the conditions and submit a .proposal covering than 907 during site preparation shall be ripped toe minimum thickness of 5f8" excluding top growth and thatch, weed mowing, spraying, reseeding, edging and/or any other 4. All wirin connections at v Ive loco 'ons - 9 a ti shall be water cost of correction, If the Contractor fails to notify the of 12" nor to be ronin soil re oration. These areas shall P 9 P P free and shall be no less than eight months nor more than operations necessary for their care and upkeep for a period of less than 90 da At th the ( ) Owner's Re resentative of such conditions he s all be P h defined by the Owners Representative and. be billed as an s' t e ix e n months old. not ninet s. end of mai c Y Y e ntenan e proof. responsible for plant material under the guarantee douse of ex is extra if the unit in the bid. eriod, all la y, growing p p nt materials shall be in a health the specifications. price quoted condition. 5. One service unit will be purchased to properly prepare and D. TIMING: Installation shall take place within 24 hours after service the moisture sensor. The service unit along with all C. DIMENSIONS: All scaled dimensions are approximate. Before C. M D O ETHO F MIXING: If the slope is under 2 to 1, the soil harvestin g• B. WEED CONTROL• All planted areas shall be kept free of debris printed operating instructions are to furnished to the proceeding with any work,. the Contractor shall carefully check preparation materials should be broadcast uniformly over all and be weeded at not more that seven day Owner by the Contractor at final inspection. and verify all dimensions and quantities, and shall immediately Iandscq a areas and worked to a de th of 6" b rototlller or P. p y E. INSTALLATION: Sod shall be laid in a staggered pattern, with vale. intervals. Areas that do not have apre-emergent weed killer gel inform the Owners Representative of any discrepancies between other acceptable mechanical means to obtain a uniform blend tight joints and in the same direction each time. On all shall also be cultivated at not more that seven {7) day 6. Moisture Sensor operating and service instruction and the information on the drawings and the actual conditions, in the soil. If the slope is greater than 2 to 1, the slopes sod shall be installed from the bottom up and the newly intervals. operations manual is to be placed in the. controller. refraining from doing any work in said areas until given amendments shall be hydraulically applied for areas over 1000 sod should be protected by walking on boards as installer moves approval to do so by the Owner's Representative. square feet and raked in for small areas. For the soil upward. On slopes, pin the sod down with wooden pe s. No .9, C. FERTILIZING: All planted areas shall receive a fertilizer 7: Special depth and placement information to augment amendment bid mix refer to the Plantin Notes on the 9 Plantin Plan. metal staples will be allowed. No sod of less than 18 in application of 20 pounds Der 1,000 square feat of Gro -Power Moisture Sensor Installation and 0 eration Instruction, P ILL SOIL AMENDMENTS: 9 ength will be allowed. 45 da s followin the be innin of maintenance. Water in X 9 9 9 is to be provided by the Specified Manufacturer. thoroughly after application. D. EXTRANEOUS MATERIALS: In additional to the work specified F. JOINTS: Adjoin the sections of sod firmly together. If air 1. Nitrogen stabilized redwood sawdust shall be 100% above the Contractor shall remove all extraneous materials that spaces occur between sections of sod they must be filled 8. Installation must be inspected and accepted by the nitrogen stabilized (5% by dry weight) and free of are exposed on the surface and grade to facilitate run-off of with sand or the sod relaid. D. CONDITION OF SITE: During the maintenance period, keep the Manufacturers Respresentative. shaving particles larger than 1/4 passing through a surface water. project neat and free from debris at all times. Obtain the 100 mesh screen. Owner's approval for on-site storage of equipment or maintenance materials. CITY OF FONTANA LANDSCAPE PLANS ° �'° �. VALLEY OAK PARK a5 sxournr m f SPECW,ICATTONS clr�m 9w APWwra:.�., -- owe "5 18 aye I� - '� 5685 n S I T E S 6 A P E Landscape Architecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamus, License CA -#2782 (049) 844-9370 (714) 210-.3140 FAX REVISION ��VNNDSC4 f ��@ pRD A. Pp�N4 S U d /Q 2%�2 1V z PC # LSPC 17-0015 DATE 02/27/17 JOB # 16-033 17 18 OF 18 U�} 0) H � 1� 00 V r n e -I r � § U < W � 1 hal Z1 � ^1 � P. -I ® � of 41 � F� I� -d • ~ Q1 `� 0 Z U r" � ��VNNDSC4 f ��@ pRD A. Pp�N4 S U d /Q 2%�2 1V z PC # LSPC 17-0015 DATE 02/27/17 JOB # 16-033 17 18 OF 18 Z I- O V r 0 Z �i H § U < W 0 ��VNNDSC4 f ��@ pRD A. Pp�N4 S U d /Q 2%�2 1V z PC # LSPC 17-0015 DATE 02/27/17 JOB # 16-033 17 18 OF 18