HomeMy WebLinkAbout5685-1Ave. Upland, CA 91786
1156 N. Mountain
(909)
985 0971
GENERAL NOTES:
City Required Inspection Notes Maintenance Guidelines
Inspections: Landscape shall be maintained in a neat, clean, weed free and healthy
1.It is the Landscape Contractor's responsibility to contact the condition. This shall include but not be limited to:
Engineering Division's Landscape Inspector 48 hours prior to 1. Cultivation of planted beds at intervals not to exceed ten (10) days.
desired inspection of an item at (909) 350-6632 2. Regular mowing to maintain lawn height not to exceed two (2) inches
2.Prior to the release of utilities or maintenance period commencement, (will vary with species).
the following inspections are required : 3. Regular pruning of plants as necessary to control and direct growth
Pre -construction meeting. 4. Scheduled maintenance of irrigation controller to assure proper
Inspection of irrigation system in open trench condition (prior to application rate of water necessary for proper plant growth. Drip
backfill). irrigation may require specialized landscape maintenance care.
Mainline pressure test @ 150 p.s.i. for a three (3) hour period. 5. Immediate replacement of irrigation materials as needed to maintain
Irrigation coverage tests including initial and final tests. good working condition.
6. Fertilization on a regular schedule as recommended by the
Finish grade prior to planting.
Plant materials prior to planting. manufacturer to provide proper plant growth.
7. Immediate repair or replacement of irrigation materials as needed to
Planting, including street trees.
Contact the Parks Planning and Landscape maintain good working condition.
Development section Engineering Division, for species and final 8. Stakes, guys, and ties on trees shall be checked regularly for correct
locations. function. Ties are to be adjusted to avoid abrasions or girdling of trunk
Compliance with approved plans. or branches.
Final Inspection. 9. Upon completion of a minimum of three (3) month (90 day) contract
3.The Owner's representative and Landscape Contractor shall be maintenance period, an inspection shall be made by the Community
present at each inspection. The City of Fontana "Standard Landscape Development Department Engineering Division Landscape Inspection
Specification Manual for Streetscapes" shall become a part of this Staff. The landscape shall be maintained in accordance with these
document. landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule
the maintenance inspection.
SOILS REPORT NOTE:
After grading of site is complete, soils report will be prepared and provided by owner to
contractor for his information prior to construction. Upon completion of project, owner will
provide report to city inspector for record purposes.
CITY REQ. NOTES & STATEMENTS:
1. A minimum 3 -inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except
turf areas, creeping or rooting groundcovers, or direct seeding applications where mulch is
contraindicated.
2. For soils less than 6% organic matter in the top 6 inches of soil, compost at a rate of a minimum of four
cubic yards per 1,000 square feet of permeable area shall be incorporated to a depth of six inches into the
soil.
3. Recirculating water systems shall be used for water features.
4. Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure
of the specified irrigation devices.
5. Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur.
6. A diagram of the irrigation plan showing hydro -zones shall be kept with the irrigation controller for
subsequent management purposes.
7. A Certificate of Completion shall be filled. out and certified by either the designer of the landscape plans,
irrigation plans, or the licensed landscape contractor for the project.
8. Comply with Section 28-1.17 Verification of Landscape Installation within the City of Fontana Landscape
Ordinance #1734.
9. No certificate of occupancy shall be issued until a city landscape inspector has verified that all irrigation,
grading and planting have been completed in accordance with the approved plans and specifications of
Section 28-117 within the City of Fontana Landscape Ordinance #1734.
10. An irrigation audit report shall be completed per Section 28-106 within the City of Fontana Landscape
Ordinance #1734 at the time of final inspection.
11. With regards to landscape maintenance districts or public landscape, it shall be the responsibility of the
developer to comply with Section 28-118 Special Landscape Maintenance District Requirements within
the City of Fontana Landscape Ordinance #1734.
,,I lk ORA N
ACRES:
0.773
AC
HARDSCAPE AREA:
65240
SQ. FT.
RUBBERIZED PLAY SURFACE:
1,656
SQ. FT.
TURF AREA:
10,899
SQ. FT.
SHRUB/GROUNDCOVER AREA:
13,799
SQ. FT.
NEW SEAT WALL - FREESTANDING (2 TOTAL)
Ill
LN. FT.
14' SQ. SHADE STRUCTURE AREA (2 TOTAL)
196
SQ. FT. (EACH)
19' SQ. SHADE STRUCTURE AREA (1 TOTAL)
361
SQ. FT.
20'x24' OVERHEAD AREA (1 TOTAL)
480
SQ. FT.
4'x6' DECORATIVE PANEL SCREEN (1 TOTAL)
18
LN. FT.
5'x6' DECORATIVE PANEL SCREEN (2 TOTAL)
12
LN. FT. (EACH)
VALUATION OF 14' SQ. SHADE STRUCTURE:
$10,200.00 EA.
VALUATION OF 19' SQ. SHADE STRUCTURE:
$17,600.00 EA.
HAWKER-
CRAWFORD
CHANNEL
SHEET KEY
�II
PARK SITE
See Sheets L2, L12,
L14, L15 & L16
NSI
�L
N.T.S.
HEET
11L E
SEQUENCE
SHEET
SHEET
NO.
NO.
DESCRIPTION
1
T-1
TITLE SHEET
2
L- 1
CONSTRUCTION NOTES & LEGEND
3
L- 2
CONSTRUCTION PLAN (10 SCALE)
4
L- 3
CONSTRUCTION DETAILS
5
L- 4
CONSTRUCTION DETAILS
6
L- 5
CONSTRUCTION DETAILS
7
L- 6
CONSTRUCTION DETAILS
8
L- 7
CONSTRUCTION DETAILS
9
L- 8
IRRIGATION DETAILS, NOTES & LEGEND
10
L- 9
IRRIGATION DETAILS
11
L- 10
IRRIGATION DETAIL, CALCULATIONS & SCHEDULE
12
L- 11
IRRIGATION MAINLINE MASTER PLAN (100 SCALE)
13
L- 12
IRRIGATION PLAN (10 SCALE)
14
L- 13
PLANTING DETAILS, NOTES & LEGEND
15
L- 14
PLANTING PLAN - TREES & GROUNDCOVER(10 SCALE)
16
L- 15
PLANTING PLAN - SHRUBS (10 SCALE)
17
L- 16
SITE FURNISHING PLAN (10 SCALE)
18
L- 17
SPECIFICATIONS
ELECTRICAULIGHTING - FOR REFERENCE ONLY
LU
=a¢
SE1.01
SITE ELECTRICAL PLANS
U ._(n
z o
SEL02
SITE PHOTOMETRY
to af H
SEL03
SITE ELECTRICAL DETAILS
SE1.44
SITE ELECTRICAL DETAILS
SE 1.05
TITLE 24 CALCULATIONS
SE 1.06
TITLE 24 CALCULATIONS
Pocket Park planter area = 169769 S.F.
Pocket Park turf area = 105899 S.F.
Total square footage of landscape area ^ 275668 S.F.
COMPLIANCE STATEMENT
I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER
EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE
LANDSCAPE DOCUMENTATION PACKAGE.
A 5124/17
RICK POLHAMUS LA#2782 EXP. 10117 DATE
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR. MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
LN�DSCAA_
4
27$2 �L fI1P����
SIGNATUR
5/24/17
DANE
e
[A
OF CALF
ul
2/27/17
.001
5; 1
Landscape
Architecture
& Planning
3190 B2 Airport Loop Dr.,
Costa Mesa, CA. 92626
Richard Polhamus, License # 2782
Ida
I
h�
W
0
UJ
0
0
�
of
Z
W
0
(1Y
�
U
p
Q Z
w
H
E
z
Y
O
CD
f-
a Q
z
LU
W
UJ
0
0
�
of
Z
W
a0
¢
U
Y Ir
❑ p
Q Z
w
O O
U
z
Y
O
U
f-
a Q
z
7 z
Ir
z
LU
CJ LL
Cn
U �
0
(n ❑ �
_J
..
❑ z w
Z0
F
¢ w
�Of
m
W
P:
20
Eau
M
Cl
Om
U0<
p -d
a
U W
U r
LLO 7
��W
4 >
Wd
❑
LU
=a¢
v�
U ._(n
z o
O
� ❑
to af H
M W
(949) 644-9370
FAX (714) 210-3140
PLAN CHECK NO.
LSPC 17-0016