Loading...
HomeMy WebLinkAbout5682-11v j 2E �T I TREE TRUNK PLANTING NOTES o 000 SIDEWALK (WHERE OCCURS) NOTES: ROOTBALL MIN. MIN. ° 9 LODGE POLE 1 gARRIER AS � PIPE CAP A. POSITION CLOSE TOBCURB OR g a F "' FIN. GR. ` SIDEWALK AS POSSIBLE. WEED CONTROL WHERE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF WORK, CLEAN AND REMOVE g TREE TRUNK % •` 5"•' ''• '% SHAL RAISED BE®®AC NG PROTECTORS THESE EXISTING WEEDS BY MOWING OR GRUBBING OFF ALL PLANT MATERIAL. UPON 3 ���j�, p WONDER TIE TOWARDS THE TREE. COMPLETION OF SOIL PREPARATION AND PLANTING OF ALL SPECIMEN TREES, BEGIN WEED O" `� ` a (DO NOT TWIST) PVC STANDD. HPIPE® ®' :. ABATEMENT PROGRAM BY APPLYING: 100 POUNDS OF A COMMERCIAL FERTILIZER, 46-0-0, PER PREVAILING WIND 3 ae = N B. TOP OF BARRIER SHALL ACRE AND PER MANUFACTURER'S SPECIFICATIONS. WATER ALL AREAS FOUR (4) TIMES DAILY m O' DIRECTION CANTER BACKFILL MIX 4 to 3 BE 1 ABOVE FINISHED FOR FOURTEEN (14) CONSECUTIVE DAYS UNTIL WEED SEEDS HAVE GERMINATED. CEASE i O GRADE. WATERING FOR THREE (3) DAYS. SPRAY A NON-SELECTIVE, NON -RESIDUAL, SYSTEMIC 6 O — 4 HERBICIDE TO ERADICATE GERMINATED WEEDS. LET THE WEEDS DIE WITHOUT IRRIGATION COMPACTED SOIL C. LENGTH OF ROOT BARRIER FOR A MINIMUM DEPTH OF 1/4"INCH BELOW THE SURFACE OF THE SOIL. IF STUBBORN AND a ° BACKFILL SHALL BE EQUAL TO RESIDUAL WEEDS (I.E. BERMUDA) SHOULD PERSIST ERADICATION PROCEDURE SHOULD BE 3" DIA. CORRUGATED THE ULTIMATE DRIPLINE OF REPEATED. THE TYPE OF WEEDS THAT EXIST SHOULD BE IDENTIFIED AND COORDINATED WITH n 2 SETS OF "WONDER TREE -TIE" - WRAP WIRE AROUND A.D.S. PERFORATED m w OUTSIDE OF STAKE. SECURE TO STAKE W/ 1" WOOD SCREWS THE PARTICULAR TREE, OR AN APPROVED LICENSED PEST CONTROL ADVISOR TO ENSURE COMPATIBILITY WITH CHEMICAL PLACE BELOW BRANCHING YOKE OF TREE so RAIN PIPE W/ DRAIN rA SOCK LAID O BASE 3 10' MAX. AND SEASON OF APPLICATION. DO NOT USE MATERIAL OR METHOD THAT WOULD ADVERSELY 2 1 1/2x ROOTBALL SIZE 5 1 m OF ROOTBALL EFFECT NEW PLANTINGS SLOPE STABILIZATION OR HYDROSEEDING. � (2) 3" DA 90° LONG LODGEPOLE PINE STAKES: ' LOCATE OUTSIDE OF ROOTBALL \ LEGEND: SOIL TEST c ARBOR GUARD IN TURF AREAS SECTION m i e 1Q CONCRETE CURB OR AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE AND ROUGH GRADING COMPLETED BUT n SET TOP OF ROOTBALL 6" ABOVE FINISH"<• , d,• . •I HARDSCAPE PRIOR TO SOIL PREPARATION, SEVERAL SOIL SAMPLES SHALL BE TAKEN BY THE SOILS LABORATORY m p GRADE. INSTALL 4" LAYER OF NITROLIZED L�-•�-__.' --- _!__,!_-_-, A•.J FINISHED GRADE OR BY THE CONTRACTOR AT THEIR INSTRUCTION AND A REPORT/RECOMENDATION " I WOOD CHIP MULCH. / I �• I \ 8 APPROVED ROOT CONTROL PRODUCED. THE CONTRACTOR SHALL FURNISH A COPY OF THE SOIL TEST FOR m � TREE TRUNK / I I BARRIER AGRICULTURAL SUITABILITY AND FERTILITY(PREPARED BY A CALIFORNIA ASSOCIATION OF DEEP ROOT BARRIER r;1._,._PVC ®3/4" TO 1 1/2" GRAVEL AGRICULTURAL LABORATORIES MEMBER) TO THE CONTRACTING OFFICER AND THE CITIES INSPECTOR, ° IF WITHIN 5' OF ANY $ FG HARDSCAPE (SEE DETAIL) ROOTBALL I ! I 1 OR CRUSHED ROCK UPON REVIEWING THE SOILS REPORT THE ARCHITECT MAY MAKE SPECIES DRIP LINE OF TREE SUBSTITUTIONS TO THE PLANT LIST. a WATER BASIN / REMOVE ONCE PLANT IS 6 6 CENTER OF TREE r e :p'?• ESTABLISHED PER LANDSCAPE ARCH DIRECTION 3" DIA. SCH. BO 4 7 PARKWAY WIDTH SOIL, PREPARATION v, a�` I 1 a PLANT PR DRAIN WHEN REQUIRED STAND PIPE W/ I I PIPE CAP 1 I I ROOT BARRIER IS TO BE 18 Cr " MACHINE ROTOTILL THE FOLLOWING AMENDMENTS INTO THE SOIL AT RATES INDICATED PER c j I (PER SEPARATE DETAIL)/ 1000 SF: (THESE RATES ARE FOR BID PURPOSES ONLY, ACTUAL RATES TO CORRESPOND TO I I I I LINEAR BARRIER UB 18-2 CONTRACTORS SOILS REPORT). 3 1 OMITS OF PLANT PIT ®I I — I I / WHEN ADJACENT TO WALK T) g ORO POWER FERTILIZER TABLETS. — — \ I 4 CU. YDS NITROGEN STABILIZED SAWDUST (j APPLICATION RATES PER TABLE. REFER DIA CORRUGATED A.D.S. PERFORATED---•- �- ;---ar,-- OR HARDSCAPE OR 24 " , 150 LBS. GYPSUM a •y BASE OFROOTBALLa<e :'.. • ' ' LINEARBARRIER ADJACENT �a RAIN SOCK LAID O . ; e' •. ' I / WHEN 125 LBS STANDARD FERTILIZER TO PLANTING NOTES. UB 24 2 BACKFILL MIX PER SPECS. TO CURB N NATIVE SOIL SUBGRADE PLAN VIEW / DEEP ROOT BARRIERS EXCAVATE TO CORRECT HEIGHT \ AVAILABLE FROM: FOR PLANTING. SCARIFY BOTTOM \ ALL TREES WITHIN 7 FEET OF ANY PERMANENT HARDSCAPE ELEMENT SUCH AS CONCRETE 70 ENSURE ADEQUATE DRAINAGE_ _ 1 CENTURY PRODUCTS WALKS, WALLS OR BUILDINGS SHALL BE PLANTED WITH AN APPROPRIATE SIZED ROOT FOR HEALTHY GROWTH OF PLANT. 1144 N. GROVE ST. BARRIER (UNLESS OTHERWISE NOTED ON PLANS). ROOT BARRIER TO BE LINEAR PANEL (TYP.) ALIGN W/ ALIGN W/ ANAHEIM, - 92806 SEE DETAIL. SCHEDULE OF PIT EXCAVATION (714) 632-7083 ROOTBALL *PIT DRAIN DETAIL FOR ALL TREES 60" BOX OR LARGER DRIPLINE DRIPLINE 5 GAL - x ®6" OR OR TOP DRESSING (FUEL MODIFICATION AREA) 15 GAL - X - 9" 24" BOX OR LARGER -X 92° MAX. PER MFR. OF TREE PER MFR. ALL SHRUB AND GROUNDCOVER AREAS SHALL BE TOP DRESSED WITH A 1"-1/2" LAYER OF DECOMPOSED - SPEC. SPEC. GRANITE/FRACTURED ROCK. SEE CONSTRUCTION LEGEND 0FOR SPECIFICATIONS O TREE STA GPIT DRAIN DETAIL ROOT BARRIER o 2 (SUBMIT SAMPLE TO CITY LANDSCAPE ARCHITECT FOR APPROVAL) 3 0 SPECIAL NOTE CONTRACTOR SHALL SUPPLY A TOP LAYER OF 3" CLEAN "3/4" -MINUS" TOPSOIL TO ACHIEVE FINAL FINISH GRADE PRIOR TO "TOP DRESSING" D.G.. ANY ROCK OR BOULDERS OVER 6" DIA. SHALL BE BURRIED A MINIMUM OF 12" DEEP OR REMOVED FROM THE SITE. STORM DRAIN/ THE CLEAN TOPSOIL CAN EITHER BE GENERATED "ON-SITE" OR IMPORTED. THIS TOPSOIL SHOULD BE APPLIED UNDERGROUND UTILITIES -R _ AFTER IRRIGATION AND DRAINAGE WORK HAS BEEN COMPLETED. QUALITY OF TOPSOIL SHALL BE APPROVED BY THE CITY PRIOR TO INSTALLATION AND SHALL MEET ALL CITY STANDARDS. 5' I I TREE & PLANTING NOTES: HOLD ROOTBALL ABOVE ULTIMATE I All trees shall be located as follows: FINISHED GRADE: R — . — . — .. — . — . — .. —I.. — L 1" FOR 1 GAL w z SIDEWALK unu 2°'FOR 5&15 GAL - A min. of 25 from beginning of curb returns at any street intersection. _ITIII II IIITII1I — FRACTURED ROCK LAYER 11 - 10' from light standard or utility enclosures. LI=I PER SPECIFICATIONS oI�1�1 g CURB ANUTTER (J` _ I - 5' from fire hydrants. lll�ll rl• .:1 D GMETER I_'I SECTION W ��-I ,' ®•.. _- - GRO POWER FERTILIZER TABLETS. 10 5 \ -Amin of 3' from sidewalk edge, face of wall or back of curb. TY - APPLICATION RATES PER TABLE. ,..•.. _ II= .:: \ 5 GRAM AGRIFORM _ - ^' •_ REFER TO SPECS. TABLETS SEE SPECS. _ _ - - _ - - t. - SEE PLANSTYP. _4"' SEE PLP.ANS \ -For trees shown o be planted within parkway _� - - -1" 1- -11 BACKFILL MIX PER less than 6' wide, tree accordingly. 1 1/2 DEEP DG MULCH LAYER 11 . 11..11: II-III 11 11 NOTES. UNDERGROUND STRUCTURE :....... ° °�0 8 . ° CATCH BASIN N ° � TILLED &AMENDED PLANTING MIN, TRANSFORMER VAULT - 0 tree Shall be planted lri parkway less than 4' Wlde R ��_% ° /u BED PER SOIL TEST SIDEWALK- Provide appropriate size linear "Century" root barrier NATURAL SUBGRADE DRIVE z Ior an tree ]anted with in ofhardsca a element APPROACH S.L... ❑ '0 \10, = such as T p curbs, sidewalks or walls. CURB AND GUTTER i - Hold center of all shrubs or groundcover a min. of 24" HOLD ROOTBALL ABOVE ULTIMATE 5' S' 10' away from edge of paving (typ.) F FINISHED GRADE: "'III GROUNDCOVER PLANTS JP �'q 1" FOR 1 GAL MIN MIN MIN M°' SEE PLANTING PLANS �GRADE 2" FOR 5 & 15 GAL w FOR SPACING _ FRACTURED ROCK LAYER PER 11L 5' SIZING LEGEND \ SPECIFICATIONS MIN 1 1/2" DEEP DG MULCHO>n .• ,° Tn=_ TEMPORARY 2" HIGH WATER NOTES: X I GALLON X 30" BOX X 48" BOX LAYER. \ �: \�.: ,. BASIN. REMOVE ONCE PLANT IS 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY u I;•.®' it- ESTABLISHED THE CITY ENGINEER AND FUEL MODIFICATION PLAN. 5GALLON 36"BOX ° " ex 54 BOX ea r III ...r.,. , ,, ,.I GRO POWER FERTILIZER TABLETS. 2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT PLAN I.:�^•;;•_•:.•.., ;•",,• I, APPLICATION RATES PER TABLE. CRITERIA AS APPROVED BY TRAFFIC ENGINEER. 15 GALLON 42"BOX " u -T =..... :. • .,.•: - e � 60 BOX - _ - - - -J1REFER TO SPECS. L=III=1� III HT1 -i -I BACKFILL MIX PER NOTES. 3. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE --Tii=lllTll�lll- II III�Ti III ° 24" BOX medicates quantity o Indicates palm 8" OF ALL UNDERGROUND FACILITIES. Indicates species B.T.H. asnoted. MIN4. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES * Denotes trees that are to be tagged by the Landscape Architect. STRUCTURES AND VALVE BOXES. O GROUNDCOVER. PLANTING 5 SHRUB o PLANTING 6 TREE LOCATION 0 PLANT EACH POT W/ (1) 15 GALLON MORAEA O EPDXY SEAL AROUND SLEEVE TO IRIDIOIDES (FORTNIGHT LIILY) AND (8) 4" POT SECURE POT AND SEAL HOLE. SENECIO MANDRALISCAE (BLUE CHALK STICKS) O FINISH GRADE O DECORATIVE POT 14 01/2" SCH 40 PVC IRRIGATION 6 LINE -EXTEND THROUGH 2" DRAIN 8 LINE/SLEEVE AND PROVIDE FLEXIBLE ADAPTER FOR 1/2" DRIP 5�,.� EMITTER TUBE AT END (�) 1/4" RAINBIRD LDQ-08-12 DRIP 3 SUPPLY TUBING W/ BARBED "T" 4 $ t AT ENDS. INSTALL PER MFG. ------- - -- - SPECS. I 9 q. Q 1/2" LANDSCAPE DRIPLINE (SEE I 6 LEGEND). INSTALL AROUND 1 t g �! PERIMETER OF POT OR PER DRIPLINE INSTALLATION DETAIL. E ATTACH TO BARBED 'T" AT END a 2 3 90% COMPACTED SOIL OF SUPPLY TUBING. BURY 1" BELOW SURFACE OF POT. 7 5 OAREA DRAIN CONNECTED TO STORM DRAIN SYSTEM 0 TOP OF SOIL O NOTES: APPROX. BOULDER FOOTPRINT SIZES 3" LAYER OF PEA GRAVEL OVER OBURY A MINIMUM OF 1/3 DEPTH 2° X 2° X 2'= 8 CU/FT FILTER FABRIC. RUN FABRIC OVER OF BOULDER SIZE. TOP OF DRAIN LINE/SLEEVE OPENING.® BOULDER - SEE 12 ON SHEET 3 ' 3' X 3' X 3= 27 CU/FT L1 FOR SPECIFICATION WATERPROOF INSIDE OF POT AS NOTE: O SCARRED OR BROKEN BOULDERS 4' X 4' X 4' = 64 CU/FT REQUIRED SHALL NOT BE PERMITTED. ® PLACE PER PLANS AND LANDSCAPE ARCHITECT'S DIRECTION p� Call Underground Service Alert CITY OF FONTANA1 at least 2 days CFD LANDSCAPE PLANS ARBORETUM AVENUE 91415. before you dig STA. 6+90 TO 19+50 AS SHOWN KnowCall before you d19. �7 + whays bow.7 1 DETAILPLANTING DETAILS NOTES &LEGENDDIM �8 BOULDER DETAIL aRa>p�o ®rt APPRaYfD ea �,� 1� II, Orn. wo.: 11 ns2 EV. WE 5682 16 S I T E 1 C A P IE S Landscape Architecture and Planning 3190 B2 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamus, License CA—#2782 (049) 614-1370 (714) 210-3140 FAX REVISION !■+meq o'� U rn C) 0o IL v)��C� Z��P�®® a® Cn '-e [-1 ��4I,ADSC4 F S~� �G PLAN CHK.* LSPC17-000027 ®ATE 3/31/17 JOB* 16-026 L10 11 OF 16 U N � F -eq Z W .- > -! � • o ON C7 ®� Z 03 U 00 „ pN • IZ r- ��4I,ADSC4 F S~� �G PLAN CHK.* LSPC17-000027 ®ATE 3/31/17 JOB* 16-026 L10 11 OF 16 • • • r ��4I,ADSC4 F S~� �G PLAN CHK.* LSPC17-000027 ®ATE 3/31/17 JOB* 16-026 L10 11 OF 16