HomeMy WebLinkAbout5680-1CONSTRUCTION DOCUMENTS FOR: ETIWANDA RIDGE -TRACT 18987 CITY OF FONTANA, CA CFD PLANS GENERAL NOTES 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEARING OF THE PROPOSED WORK AREA, AND RELOCATION COSTS OF ALL EXISTING UTILITIES. 2. ALL WORK SHALL CONFORM TO CALIFORNIA STATE LANDSCAPE ORDINANCE EO B-29-15. 3. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF CITY OF FONTANA, IMPROVEMENT STDS. AND SPECIFICATIONS. 4. ALL UNDERGROUND FACILITIES WITH LATERALS, SHALL BE IN PLACE PRIOR TO PAVING THE STREET INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: SEWER, WATER, ELECTRIC, GAS, STORM DRAINS. 5. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/OWNER OR CONTRACTOR TO APPLY FOR AN ENCROACHMENT PERMIT FOR ALL WORK PERFORMED WITHIN PUBLIC RIGHT-OF-WAY, DEDICATED AND ACCEPTED FOR PUBLIC USE; AND TO BE RESPONSIBLE FOR SATISFACTORY COMPLIANCE FOR ALL CURRENT ENVIRONMENTAL REGULATION DURING CONSTRUCTION ACTIVITIES FOR THIS PROJECT. ADDITIONAL STUDIES AND/OR PERMITS MAY BE REQUIRED. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR DEVELOPER TO INSTALL AND MAINTAIN ALL CONSTRUCTION, REGULATORY, GUIDE AND WARNING SIGNS WITHIN THE PROJECT LIMITS AND ITS SURROUNDINGS AND TO PROVIDE SAFE PASSAGE FOR THE TRAVELING PUBLIC AND WORKERS UNTIL THE FINAL COMPLETION AND ACCEPTANCE OF THE PROJECT. 7. CONSTRUCTION PROJECTS THAT DISTURB MORE THAN ONE ACRE MUST OBTAIN A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. OWNERS/DEVELOPERS ARE REQUIRED TO FILE A NOTICE OF INTENT (NOI) WITH THE STATE WATER RESOURCES CONTROL BOARD (SWRCB) AND PREPARE A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND MONITORING PLAN FOR THE SITE. 8. ALL GRADING SHALL CONFORM TO THE CITY OF FONTANA GRADING ORDINANCE. 9. ALL PROPERTY CORNERS SHALL BE CLEARLY DELINEATED IN THE FIELD PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION/GRADING. 70. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS. 71. NO FILL SHALL BE PLACED ON EXISTING GROUND UNTIL THE GROUND HAS BEEN CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND OTHER DELETERIOUS MATERIAL. 12. FINISH GRADE SHALL BE SLOPED AWAY FROM ALL EXTERIOR WALLS AT NOT LESS THAN 2' PER FOOT FOR A MINIMUM OF 3'. 73. REFER TO CIVIL ENGINEER PRECISE GRADE PLANS FOR ALL GRADING, DRAINAGE AND RETAINING WALL SPECIFICATIONS. REFER TO STRUCTURAL ENGINEER SPECIFICATIONS AND STRUCTURAL SOIL REPORT SPECIFICATIONS FOR WALL AND STRUCTURE SPECIFICATIONS AS WELL AS SOIL COMPACTION AND DRAINAGE REQUIREMENTS. 74. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800) 422-4133 BEFORE START OF CONSTRUCTION (2 WORKING DAYS OR 48 HOURS). 75. CONTRACTOR SHALL VERIFY EXISTING LOCATION OF UTILITIES AS NECESSARY TO IDENTIFY LOCATION. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, SERVICES, STRUCTURES, AND FEATURES PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL REPAIR, AT HIS OWN EXPENSE ALL DAMAGE RESULTING FROM HIS OPERATIONS. 16. ALL 2:1 SLOPES 3 FEET IN VERTICAL HEIGHT AND ABOVE SHALL BE PLANTED AND IRRIGATED 77. CONTRACTORS ON THE JOB SHALL CARRY INSURANCE SATISFACTORY TO THE OWNER AND PROVIDE PROOF OF CERTIFICATION UPON REQUEST. THIS POLICY SHALL NOT LAPSE OR BE CANCELED AT ANYTIME DURING PROJECT CONSTRUCTION. 78. THE CONTRACTOR AGREES TO HOLD THE OWNER AND THE LANDSCAPE ARCHITECT HARMLESS FROM ANY CLAIMS ARISING OUT OF HIS OPERATIONS OR THE OPERATIONS OF ANY OF HIS SUB CONTRACTORS, MATERIALS, SUPPLIERS OR AGENTS. 79, THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONSTRUCTION PRODUCT AND DO NOT INDICATE METHODS, PROCEDURES, OR SEQUENCE OF CONSTRUCTION. 20. THESE DOCUMENTS MAY CONTAIN ERRORS, OMISSIONS, CONTRADICTIONS, ETC. THE CONTRACTOR SHALL REVIEW ALL DOCUMENTS AND SHALL NOTIFY THE LANDSCAPE ARCHITECT AND OWNER IMMEDIATELY UPON ANY SUCH DISCOVERY OR DISCREPANCY. IN THE EVENT THAT THIS NOTIFICATION IS NOT PERFORMED, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY LABOR AND MATERIALS NECESSARY TO REPAIR AND/OR RESTORE THE INSTALLATION TO INDUSTRY STANDARDS AND JURISDICTIONAL CODES. 27. THE OWNER'S SUPERINTENDENT SHALL INSPECT THE PROPOSED LANDSCAPE CONSTRUCTION WORK IN THESE PLANS PRIOR TO START OF CONSTRUCTION AND NOTIFY THE LANDSCAPE ARCHITECT OF PLAN DISCREPANCIES OR CONFLICTS WITH OTHER PROFESSIONAL DISCIPLINES PLANS SUCH AS, BUT NOT LIMITED TO CIVIL ENGINEERS, ARCHITECTS, UTILITIES, GEOTECHNICAL, ETC. 22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO COMMENCEMENT OF WORK. 23. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE DIMENSIONS FROM THESE PLANS. THE LANDSCAPE ARCHITECT AND OWNER SHALL BE NOTIFIED IMMEDIATELY OF ANY SUCH DISCREPANCY. 24. ALL LOCAL, MUNICIPAL, AND STATE LAWS AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS WORK ARE CONSIDERED TO BE INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS. RUCTION. 25. ALL UTILITIES ARE TO BE SCREENED. PLEASE GROUP UTILITIES TOGETHER IN ORDER TO REDUCE INTRUSION. SCREENING OF UTILITIES IS NOT TO LOOK LIKE AN AFTER -THOUGHT. PLAN PLANTING BEDS AND DESIGN AROUND UTILITIES. DUE TO THE RELOCATION OF UTILITIES AFTER PLAN APPROVAL, THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING LANDSCAPE WORK SO THAT THE LANDSCAPE ARCHITECT CAN REVIEW THE PROJECT UTILITY LOCATIONS AND REVISE PLANS ACCORDINGLY TO FULLY SCREEN ALL UTILITIES FROM VIEW. D (]A T ,NMNN m DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALER1 PLANS PREPARED FOR: LENNAR HOMES OF CALIFORNIA 980 MONTECITO DR. SUITE 302 CORONA, CA 92879 CITY NOTES PROJECT LOCATION SIERRA LAKES PKWY FRONTAGE ROAD 210 w; > Q a O 15 it a u, BASELINE AVE W Z w W > a a W = N U Z w rr h m U E. FOOTHILL BLVD ARROW BLVD VICINITY MAP N.T.S. /. PLANS SHALL COMPLY WITH SECTION 28-117 VERIFICATION OF LANDSCAPE INSTALLATION WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734 Il. A CERTIFICATION OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE DESIGNER OF THE LANDSCAPE PLANS, IRRIGATION PLANS OR THE LICENSED INSTALLATION CONTRACTOR FOR THE PROJECT. NO CERTIFICATE OF OCCUPANCY SHALL BE ISSUED UNTIL A CITY LANDSCAPE INSPECTOR HAS VERIFIED THAT ALL IRRIGATION, GRADING AND PLANTING HAVE BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS OF SECTION 28-117 WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734 IV. AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED PER SECTION 28-106 WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734 AT THE TIME OF FINAL INSPECTION. V. WITH REGARDS TO LANDSCAPE MAINTENANCE DISTRICTS OR PUBLIC LANDSCAPE, IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO COMPLY WITH SECTION 28-118 SPECIAL LANDSCAPE MAINTENANCE DISTRICT REQUIREMENTS WITHIN THE CITY OF FONTANA LANDSCAPE ORDINANCE #1734 Vl. AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE PROPERTY WITH A CERTIFICATE OF COMPLETION, CERTIFICATE OF INSTALLATION, IRRIGATION SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE. VIL PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES. Vlll. CHECK VALVES OR ANTI -DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR. IX. A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES. I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND HAVE SUBMITTED A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. I AGREE TO COMPLY WITH THE REQUIREMENTS OF SECTION 28-120 OF THE FONTANA MUNICIPAL CODE, ALSO KNOWN AS THE PRESCRIPTIVE COMPLIANCE OPTION OF THE STATE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE. 01-22-18 LANDSCAPE ARCHITECT DATE REVISIONS Engineer County BASIS OF BEARINGS: Approval Date: Approval Date: THE SOUTH LINE OF THE NE 4 OF SECTION 26, Tl N, R6W, S.B.M. PER RECORD OF SURVEY 88/36-42 BEING: N 89'37'36`E BENCHMARK: CALTRANS BENCHMARK #8-17 BRASS DISK LOCATED IN S.C.E. TOWER LEG LOCATED 343'N/0 1-210, 0.2 MILES WEST OF SAN SEVAINE RD., EL 1428.609 landscape architecture planning golf course architecture 41877 enterprise circle north suite 140 irl temecula, ca. 92590 David nEAULT gat 296 3430 ASSOCIATES Inc. w dnassociates.com SEAL: INDEX OF SHEETS TITLE SHEET L0.1 CONSTRUCTION PLAN L1.1 - 1.2 CONSTRUCTION DETAILS L1.3 CONSTRUCTION SPECIFICATIONS L1.4 IRRIGATION PLAN L2.1 - 2.2 IRRIGATION DETAILS L2.3-2.5 IRRIGATION SPECIFICATIONS L2.6 - 2.7 PLANTING PLAN L3.1 - 3.2 PLANTING DETAILS L3.3 PLANTING SPECIFICATIONS L3.4 PROJECT INFO LANDSCAPE AREA: 26,596 S.F. / 0.61 ACRES COBBLE AREA: 16,272 S.F. / 0.37 ACRES BASIN SLOPE AREA: 8,579 S.F. / 0.19 ACRES BASIN BOTTOM (NON IRRIGATED) :7,239 S.F. / 0.16 ACRES TOTAL MAINTENANCE AREA: 58,686 S.F. / 1.35 A - BUILDER: O w Z, a w Nw o C' � z LENNAR COMMUNITIES a a 3 o w N � 980 MONTECITO DRIVE SUITE 302 w CORONA, CA 92879 PH. (951) 817-3555 FAX (951) 817-3650 CONTACT: RYAN COMBE 1f) CIVIL ENGINEER: C5 U ALLARD ENGINEERING a rn n 16866 SEVILLE AVENUE FONTANA, CA 92335 PH. (909) 356-1815 FAX (909) 356-1795 CONTACT: DENNIS ALLARD LANDSCAPE ARCHITECT: DAVID NEAULT ASSOCIATES, INC. 41877 ENTERPRISE CIRCLE NORTH SUITE 140 TEMECULA, CALIFORNIA 92590 PH (951) 296-3430 FAX (951) 296-3431 CONTACT: BRYAN LOVE HOLD HARMLESS AND INDEMNIFICATION CLAUSE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER, THE CSA/COUNTY OF LOCAL JURISDICTION, AND THE LANDSCAPE ARCHITECT HARMLESS FROM ANY AND ALL LIABILITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, THE CSA/COUNTY OF LOCAL JURISDICTION, OR THE LANDSCAPE ARCHITECT. Pp1D S CA PF CS U Q n SIGNAiI1RE 06-30.2018 RENENAL DAiE N 0122.19 Q- 9 ogre TF OF CAV�FC� TRACT 1898 Drawn By: ESP / WL Designed By: BL / ESP Checked By TITLE SHEET 7 CITY OF FONTANA CFD NO. LSPC17-000059 CFD LANDSCAPE PLANS ✓P' ,City �.E Date L0.1 Scale: AS NOTED Date: Jan. 22, 2018 Dwg. No. at t;') LO O 0 O r IL J