Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5679-11
3 >v� 4 ° - al 4 a 4:6 �� =� N \ .LU \� 7J�IIIIIIW 5 CONCRETE MOW CURB SCALE: 3" - I'-0" aportland cement cont. ® 04 rebar continuous F3 6"-12" alluvial stone ® 2" in shrub/g.c. areas 10 compacted subgrade ® cont. bad see detail •6, this sheet Note: score curb at 10'-0" linear distance, and all angle points A • D NOTE, LOCATE PLANTS SPACED EQUIDISTANT (D) FROM EACH OTHER AS SHOWN. D = AS SHOWN ON PLANTING PLAN. edge of paving, walk, lodgepole pine stake Wall, etc. ❑2 plant tablet ❑3 10"-12" thick tilled 3" deep tampered planting bed ® ground cover 10 install 3" thick mulch layer prior to planting © sidewalk/curb per others groundcover ® amended soil 3 ❑3 unamended subgrade NOTE: ALL GROUND COVER SHALL BE PLANTED 12" O.G. GROUNDCOVER PLANTING TREE STAKING - 15 1 4 2411 box ne ct plant at finish grade. F1la planting tablets (see specs) Fillall trees in turf areas shall be installed with arbor guard Ell Portland cement cont. bad ® mow -curb -see detail I, this sheet ❑� lodgepole pine stake F21Contractor shall match the ❑5 compacted subgrada ALL TREES ARE TO BE PLANTED 10' FT. FROM F21 3" deep tampered 2 ® tree trunk cobble stone accross the street. Size per note below. © sidewalk/curb per others ALL UNDERGROUND UTILITIES. around shrub, fill with 3 ❑3 tree tie, nail to stake 3 mortar between stones �3 mulch varies - see plan view ® TREE TIE MAIL ® lodgepole pine than rootball at center, but deeper around hole's edges \ stakes, 8 ft. long 2" to prevent settling. pit to 3 be 3x the width of the container. dia., 2 required N Q tablet 3X ALL cinch ties attached X X II--�� show backfill mix for desert trees and shrubs to be native With gaIVA _ Q _ E \ scarify subgrade SHRUB PLANTING TREE STAKING - 15 1 4 2411 box ne ct plant at finish grade. F1la planting tablets (see specs) Fillall trees in turf areas shall be installed with arbor guard NOTES: I. ROCK SIZES, UNLESS OTHERWISE SPECIFIED, SHALL BE COBBLESTONES. MAX 12" TO MIN. 6" WITH ONE SIDE FLAT. 2. MINIMUM OF 1/2 OF THE COBBLE THICKNESS SHALL BE EMBEDDED IN 4" PEA GRAVEL CONCRETE BED. 3. ALL SPACES BETWEEN STONES SHALL BE FILLED WITH CLASS "D" MORTAR I PART CEMENT TO 21/2 PARTS SAND, 2000 pa.l. PORTLAND CEMENT CONCRETE, NO DRY PACK IS ALLOWED. FILL TO 2/3 HEIGHT OF ROCK THE SURROUNDING CURB, SIDEWALK AND ASPHALT PAVEMENT SHALL BE PROTECTED FROM SPILLAGE. 4. A SAMPLE AREA, MIN 10 SQ. FT„ SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO PROCEEDING WITH THE REMAINING ROCK WORK 5. FINAL RESTING POSITION OF ALL ROCKS SHALL BE APPROVED BY THE CITY INSPECTOR 6. ROCKS SHALL BE SMOOTH, ROUNDED, FREE OF OBJECTIONABLE DISFIGURATIONS AND IRON CONTENT, AS APPROVED BY THE CITY INSPECTOR 1. CONCRETE SHALL BE CLASS 520-D-2600. 6. AFTER CONCRETE MORTAR HAS SET, HYDRO BLAST OR ACID ETCH, AS DIRECTED BY THE CITY INSPECTOR BRUSH ROCKS TO REMOVE CEMENT COATING. ALLUVIAL STONE GROPP I NG SCALE: I" = I'-0" SCALE: NONE ALL TREE -5 ARE TOBE PLANTED 10' FT. FROM ALL UNDERGROUND UTILITIES. 51DEWALK -v approx. ROOT BARRIER INSTALLATION P ❑D linear root barrier existing tree �3 tree planting per details ® top of rootbarrier shall be at least 1/2" above grade 3/4' to 1-1/2" gravel depth to matchbarrler © adjacent concrete ® rootbarrier model 0118-24-2. available from deep root corp. 800-458-1668 NOTE, TREES LOCATED 5' OR LE -56 FROM HARDSGAPE EDGE (CURB, WALK, ETC) SHALL RECEIVE ROOT BARRIER AND BE ENCLOSED WHERE NEGE55ARY PLANT LS ❑� set crown of rootba I I 2" above finish grade 2 F21 3" deep tampered 3 earth waterbasin around shrub, fill with mulch �3 mulch ® planting pit to be 2" shallower %i than rootball at center, but deeper around hole's edges \ / to prevent settling. pit to be 3x the width of the container. ❑� tablet 3X ALL plant show backfill mix for desert trees and shrubs to be native site soil only scarify subgrade SHRUB PLANTING NOTES: I. ROCK SIZES, UNLESS OTHERWISE SPECIFIED, SHALL BE COBBLESTONES. MAX 12" TO MIN. 6" WITH ONE SIDE FLAT. 2. MINIMUM OF 1/2 OF THE COBBLE THICKNESS SHALL BE EMBEDDED IN 4" PEA GRAVEL CONCRETE BED. 3. ALL SPACES BETWEEN STONES SHALL BE FILLED WITH CLASS "D" MORTAR I PART CEMENT TO 21/2 PARTS SAND, 2000 pa.l. PORTLAND CEMENT CONCRETE, NO DRY PACK IS ALLOWED. FILL TO 2/3 HEIGHT OF ROCK THE SURROUNDING CURB, SIDEWALK AND ASPHALT PAVEMENT SHALL BE PROTECTED FROM SPILLAGE. 4. A SAMPLE AREA, MIN 10 SQ. FT„ SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO PROCEEDING WITH THE REMAINING ROCK WORK 5. FINAL RESTING POSITION OF ALL ROCKS SHALL BE APPROVED BY THE CITY INSPECTOR 6. ROCKS SHALL BE SMOOTH, ROUNDED, FREE OF OBJECTIONABLE DISFIGURATIONS AND IRON CONTENT, AS APPROVED BY THE CITY INSPECTOR 1. CONCRETE SHALL BE CLASS 520-D-2600. 6. AFTER CONCRETE MORTAR HAS SET, HYDRO BLAST OR ACID ETCH, AS DIRECTED BY THE CITY INSPECTOR BRUSH ROCKS TO REMOVE CEMENT COATING. ALLUVIAL STONE GROPP I NG SCALE: I" = I'-0" SCALE: NONE ALL TREE -5 ARE TOBE PLANTED 10' FT. FROM ALL UNDERGROUND UTILITIES. 51DEWALK -v approx. ROOT BARRIER INSTALLATION P ❑D linear root barrier existing tree �3 tree planting per details ® top of rootbarrier shall be at least 1/2" above grade 3/4' to 1-1/2" gravel depth to matchbarrler © adjacent concrete ® rootbarrier model 0118-24-2. available from deep root corp. 800-458-1668 NOTE, TREES LOCATED 5' OR LE -56 FROM HARDSGAPE EDGE (CURB, WALK, ETC) SHALL RECEIVE ROOT BARRIER AND BE ENCLOSED WHERE NEGE55ARY PLANT LS