Loading...
HomeMy WebLinkAboutDiamond Hills Golf Course- Hydrology and Drainage Study (Volume 1)Preliminary Engineering Investigation DIAMOND HILL GOLF COURSE HYDROLOGY AND DRAINAGE STUDY March 24, 2000 Prepared For: Dennis Lee Desert Dunes Golf Course 19-300 Palm Dr. Desert Hot Springs, CA 92240 Prepared By: (W B �obert "BeiQ,ffYi E= `Ro- st 6&c'9lssociates Professional Engineers, Planners & Surveyors ~ P.O. Box 57057, 14725 Alton Parkway, Irvine, CA 92619 (949)472-3505 Fax: (949) 472-8122 Contact Persons: Jun Wang Andy Gong RBF JN 10-033209 ol Index I. Objective II. Methodology III. Proposed Development Condition IV. Pre -development Condition V. Hydraulics Appendix A: Hydrology Maps Appendix B: Watershed Isohyetal Maps Appendix C: Watershed Point Rainfall Data Appendix D: Multi -Storm Rainfall Appendix E: Watershed Loss Factor Appendix F: Detention Basin Outflow Curves Appendix G: Detention Basin Storage Curves Appendix H: AES Rational Method Computer Output • 100 -Year Pre -developed Conditions • 100 -Year Developed Conditions • 25 -Year Developed Conditions • 10 -Year Developed Conditions • 5 -Year Developed Conditions • 2 -Year Developed Conditions Appendix I: AES Multi -Storm Analysis • 100 -Year, 24-hour rainfall, Developed Conditions • 100 -Year, 48-hour rainfall, Developed Conditions • 100 -Year, 24-hour rainfall, Developed Conditions • 25 -Year Developed Conditions • 10 -Year Developed Conditions • 5 -Year Developed Conditions • 2 -Year Developed Conditions Appendix J: STORM Analysis DIAMOND HILL GOLF COURSE HYDROLOGY STUDY I. Objective The proposed Diamond Hill Golf Course development which involves construction of an 18 -hole golf course, a practice range, a club house, parking, and maintenance facilities is located in the City of Fontana, west of Locust Avenue and north of Armstrong Road (Figure 1). The development will encompass approximately 197 acres of currently undeveloped land bordered by the San Bernardino/Riverside County line on the south and the Southern California Edison easement on the north. The objective of this hydrology study is to provide the City of Fontana with sufficient data and analysis to support the project proponents proposal to develop the site in the absence of existing downstream drainage facilities. The applicant understands that issuance of construction permits will be subject to review and approval of detailed construction drawings and hydraulic calculations for the proposed drainage facilities. II. Methodology San Bernardino County's Rational and Unit Hydrograph hydrologic procedures were followed to determine runoff volumes and peak rates from 100 -year, 25 -year, 10 -year, 5 -year, and 2 -year storm events. The precipitation and rainfall intensity information were determined based upon the isohyetal map and intensity -duration curves in the County's Hydrology Manual. Computer programs developed by Advanced Engineering Software (AES) for the rational method and unit hydrograph computations were utilized in the hydrology analysis. The results of the hydrology calculations are provided in Technical Appendices. III. Proposed Development Condition A watershed drainage map representing the proposed Diamond Hill Golf Course project is provided in Appendix A. In order to reduce the runoff being released form the watershed west of Locust Avenue the proposed lake areas would be utilized as detention basins linked with storm drain pipes from upstream to downstream. Locations as well as notations of the on-site detention basins (or Iakes) are shown on the proposed condition drainage map. The reduced runoff would eventually be discharged to 11" Street at Locust Avenue and then carried further by an earthen channel. The peak discharge at the outlet is expected to be reduced below the anticipated street conveyance capacity. A flow chart showing the drainage characteristics is also presented in Appendix A. With the proposed drainage configuration, the peak runoff and hydrographs of inflows to the detention basins under each of the n -year storms were computed using the San Bernardino County's rational and unit hydrograph methods. Th -c land use type of public park (90% pervious) was -1- assumed for drainage basins within the project area. Lakes on the golf course are modeled as commercial area with a 100% imperviousness. The detention basin outflows were determined through a hydrologic routing procedure based upon the stage -outflow and basins stage -storage characteristics as plotted in Appendix F and G, respectively. Based upon the San Bernardino County Flood Control District's Detention Basin Policy and Design Criteria, the proposed golf course detention basins (or lakes) were designed to accommodate the runoff resulting from the 100 -year rainfall. A multi -day analysis was performed using 24-hour, 48- hour, and 72 -hour rainfall durations to ensure that the proposed detention basins have adequate storage capacities. Rainfall patterns and magnitudes of the multi -day storms were created following the criteria introduced in the San Bernardino County Hydrology Manual. The results are provided in Table 1. As indicated in the table, the maximum outflow generated from the project site was estimated to be 15.7 cfs, which is discharged to 11 `h Street and conveyed by an earthen channel. Hydrology analyses considering the 25-, 10-, 5-, and 2 -year rainfalls were also performed for the proposed project. The results are provided in Appendix I. IV. Pre -development Condition The proposed project is expected to substantially reduce the runoff to the streets east of the watershed area. For the purpose of comparison, a pre -development condition analysis was conducted to determine the 100 -year flood peak runoff rates based upon the 25 -year rainfall. A drainage map delineated for the pre -development condition watershed is provided in Appendix A. The drainage sub -basins were identified based upon the USGS topographic map. The soil type was identified according to the soil maps provided in San Bernardino County's Hydrology Manual. For drainage basins located within the mountainous areas, "natural and barren" were assumed for the land use characteristics. Based upon the flow pattern shown in the drainage map, runoffs reaching Locust Avenue are expected to exit near 7`h Street, 91h Street, and 11`h Street. The computed 100 -year peak flow rates are listed in the table below. The detailed computation is provided in Appendix H. Table 2 Pre -development Condition Analysis Results Locust Avenue Location 100 -year Peak Flow (cfs) 7`' Street 204.19 9t' Street 127.39 11 `h Street 91.06 The proposed detention basins would provide a substantial reduction of the runoff from the -2- watershed to the existing local streets. The runoff carrying capacity for 1111 street, 60' right of way and 24' of pavement with a gradient of 0.5%, is approximately 28.2 cfs, which is greater than the peak outflow of the detention basin. With the storage capacity of the detention basins combined with the metered outflow, the 100 -year flood event peak runoff is reduced to 16.5% of estimated peak runoff from existing land uses tributary to I lt' Street. V. Hydraulics The Storm Drain Analysis Program PC/RD4412 created by the Los Angeles County Department of Public Works, Roads Department was used to perform a hydraulic analysis of the proposed storm drain system. The program calculates the hydraulic grade line elevation of a proposed or existing storm drain system given the physical characteristics and the discharge rate. It can calculate both pressure and open channel flow in a conduit with either a circular or rectangular conveyance cross section. The program starts the computation for the hydraulic grade line by evaluating the friction losses and minor losses throughout the system. The junction losses are evaluated by equating pressure plus momentum for the incoming and outgoing flows through the junction. This is accomplished by applying the formula developed by the City of Los Angeles, which establishes that the summation of pressures, ignoring friction, is equal to the average cross section flow area, multiplied by the change in the hydraulic gradient through the junction. The basic flow elevations used for the main lines at either end of the junction that apply to the pressure plus momentum equation depends on the type of flow at each end of the junction. These elevations are determined by computing the drawdown curves for each line. The control elevation for the lateral or lateral system is taken as the average of the hydraulic grade line elevations at both ends of the junction. If the water elevation in the lateral is above this control, the momentum contributed by the lateral in the analysis of the junction is decreased in proportion to the ratio of the area in the lateral below the control to the total area of flow. When flow changes from partial to full or from full to partial, the program determines and prints the location where this change occurs. If the flow reaches normal depth within a channel, the program determines and prints the location. When flow changes from supercritical to subcritical because of downstream conditions, it happens via a hydraulic jump; the program determines the precise location of the jump by equating the pressure plus momentum for the two kinds of flow. It prints the jump location, pressure plus momentum at the jump and the depth of water before and after the jump. The storm drain analysis file is provided inAppendix J. (G:\GRP8TDATAl33209\ WPW MWPDOCS\Iiydrpt.wpd) -3- Figure 1 Vicinity Map of the Proposed Rancho La Tierra Golf Course ONTARIO FRS Y I-15 � U) z Z D MULBERRY AVE. Cm • a z 0 Z � 0 O T� 'q0 LOCUST AVE. LINDEN AVE. -TI CEDAR AVE. O Figure 1 Vicinity Map of the Proposed Rancho La Tierra Golf Course Table 1 Routing Analysis for Multi -day Storms 100 -Year 24 -Hour Storm Event Basin Inflow (cfs) Max. Storage Volume (Ac -ft) Outflow (cfs) 1UU1.bO 48.46 1.43 7.90 1003.20 44.86 0.06 43.10 1003.30 43.12 0.21 35.40 1003.40 35.42 0.21 31.70 1003.50 31.70 0.17 29.40 1009.2* 151.11 --- 136.15 1013 78.58 7.20 9.30 931 75.98 2.25 8.20 911 138.77 9.99 10.50 915 337.66 73.16 15.40 " Basin 1009.2 channel routing, no storage 100 -Year 48 -Hour Storm Event Basin Inflow (cfs) Max. Storage Volume (Ac -ft) Outflow (cfs) 1UU1.bU 48.92 1.44 7.90 1003.20 44.80 0.06 43.10 1003.30 43.10 0.21 35.40 1003.40 35.40 0.21 31.70 1003.50 31.70 0.17 29.40 1009.2* 151.90 --- 136.90 1013 79.20 7.36 9.40 931 76.70 2.27 8.30 911 139.60 10.02 10.50 915 339.40 80.11 1 15.70 Basin 1009.2 channel routing, no storage 100 -Year 72 -Hour Storm Event Basin Inflow (cfs) Max. Storage Volume (Ac -ft) Outflow (cfs) IUU1.bU 48.YU 1.44 7.90 1003.20 45.30 0.06 43.50 1003.30 43.50 0.22 35.60 1003.40 35.60 0.21 31.90 1003.50 31.90 0.17 29.60 1009.2* 151.90 --- 136.90 1013 79.20 7.36 9.40 931 76.70 2.27 8.30 911 139.60 10.02 10.50 915 339.50 80.29 1 15.70 Basin 1009.2 channel routing, no storage DIAMOND HILLS GOLF COURSE ---a lel �--� �f � `J `..-• -- 1000' 500' 01 1000' 1 11 V/WHN SCALE 1 s I VW 1005. @1OA1 11A�it }i! - �IJ I � •--. 1 12A i I QO / .. . TA ,V EXISTING /` ` �. ' 13A 49A ` 1015 DEBRIS BASIN J1 � u l ♦ y �a �:17A 1020 c ' ` :d 100 4A �18A �. �. 1016 a f� 1 ��g 101 6A, . _ :- . 1.022 _ALDER AVE • EXISTING ' – - % 100 V \ _/,-1-01 1011--�/ ,� DEBRIS BASIN #2 q'Q� 1, @2A 15A 19A '�o ,•.°tip ' ! ,�� '� ! ,�, SEE ONSITE HYDROLOGY MAP is Y934 LOCUST AVE i 14 f LEGEND SUBAREA INDICATOR , . •JJ^. i , = — — SUBAREA ��++ L . 1 { SUBAREA NODE f:� 7 Watershed Map of Diamond Hills Golf Course under Project Conditions 41 L ;-Zj 1 5 1000, 500' 01 1000, OMPHIC SC4LF- I'F—IOW .� 1 rAN ALDER AVE VN_ LI WOUST AVE A Work Mop of Diamond Hills Golf Course for the Multi—Storm Event 7 7 DRAINAGE AREA gil DETENTION a4SIN Work Mop of Diamond Hills Golf Course for the Multi—Storm Event Fn � o m z Q -, _ O � N LX Q Q Q � � cC7 U z_ r'7 r� r7 J O -- Q a - J cl� J Q Q Q Q m C) D O r� r� LL- m z w J Q D Z rj O Q I U J LL- Q J _U O C� O O J 00 rn O Q ,— O N N r� i z � 0 Z U O Q r F— Q L{ W Q N I W _ Q Q Q U 00 N N N N a � f rn O ul rV * Zes r i Y %� Q O (� F � r . »;: x' v> Q Q Q Q Q Q C, S a G �t r` cof W� rn r y x 0 O Vol Iwo, Sw d • { " , .-�..� :,,'�� � food GR4P )C SOUZ t--1000' - - L1A _ 3A _-O ® 0 ` 3 110 SAO 9 1 1004 ' 0 �. /- 2 uo2 � 6A 1005 - i-- ti oma. U2+ .� 1 1112 10127A ` ■ 1013 O f \ "/ 1151 _\ - ,� � 1 2 115 , 3000. 2000 L•OOUST AVE SA ' I a a — SL ARFA FLOWINE y ti n a Watershed Map of Diamond Hills Golf Course under Existing Conditions DIAMOND HILLS GOLF COURSE ours U IrviLwnn �' U. , o— I—VU , �I•OGAM , WILLUAW J, U.-* 12345574 1 ENGINEERS & PJ ANNERS FACSIMILE TRANSMISSION COVER SMETC DATE: o'� TIME: TO: FIRM W NUMBER: 0 5 U 6& / FROM: Todd Miller FAX NUMBER:_(909) 888.5107 MAIN PH®NE: OFFICE; San Bernardino 2 MAIN PHONE:_ (909)386.0200 This FAX consists of ) pages (including cover sheet if problems with this transmissions lease contact ) —there are any StN I UY -IWILLUAN 5.b. ; 3— 7-00 ; 9, 53AM ; WILLDAN S, B. -4 7T WILLDAN Serving Public Agencles Memorandum T0: Felipe Molinos, City of Fontana FROM: Todd Miller SUBJECT: Diamond Hill Golf Course Hydrology and Drainage Study Informal First Review DATE: March 7, 2000 1234567;9 2 We have completed our informal first review of the Hydrology and Drainage Report for the subject project. The following is a list of general comments for the overall informal first plan check. Rational Method Hydrology Analysis Need to provide Drainage System Map that shows the following; Watercourse, Watershed boundary, Subarea boundary, Node numbers, node elevations, area in acres, north arrow, scale, etc, See example sheet D-20 of the San Bernardino County Hydrology Manual, Unit Hydrograph Analysis 24, 48, and 72 hr Continue 001 1, Provide the following information, a, Watershed Map including Boundary and Geometric Information b. Land Use Map showing existing and ultimate development (with study area outlined). c. Soil Group Map (with study area outlined). d. Watershed Information Form (Figure E-7) e. 1 -Hour, 6 -Hour, 24 -Hour Rainfall Isohyetals f. Area -Averaged Rainfall Determination g. 3 -Hour Area -Averaged Rainfall Estimation (Figure E-8) SLNI by;W1LLUAN 5. B. ; 3— 7-00 ; 9:53AM ; WILLDAN 5. B. -+ 1234567;# 3 h. 5 -Minute and 30 -Minute Area -Averaged Rainfall Estimations. (Figure D-3) i, Adjusted and Unadjusted Mass Rainfall Plots; Depth -Area Effects. (E-4, E-8) j. Watershed -Loss Information Map k. Area -Averaged Maximum Loss Rate (Fm) Determination, (Show cals or use AES Software) Area -Averaged Low Loss Fraction ( ) Determination. (Show cats. Or use AES software) Flow -Through Detention Basin Calculations 24, 48, and 72 hr 2, Provide the following information; a, Hydraulic calculations for the outflow structures that were used to determine Basin outflow verses depth. b. Detention basin outflow (c.f.s.) as a function of depth (feet), c. Detention basin storage (acre — feet) as a function of depth (feet), d. Detention basin information form (Figure F-8), e, Detention Basin inflow I outflow hydrographs, f, Detention basin routing calculations. The multiday storm runs appear to conform to the required form. Verify that the low -loss fraction for node 1003.2 to 1003.2 code 1, is correct. It appears that the storm runoff yleld (Y) was used and not the low loss fraction ( ). If you have anv question please call me at 949.470-8848 Page 1 of 1 file://A:\MVC-206X.JPG 3/8/00 A ^Yi jR. a 4 t